Vous êtes sur la page 1sur 9

luas (m2) Average Jarak/ Volume (m3)

No PIT Penampang Seam panjang BJ


Batubara OB Batubara OB Batubara OB
(m)
1 78.86 682.16
1 B 49.27 433.93 450 22,171.50 195,268.50 1.3
2 19.68 185.7
1
2 2 B1 8.31 75.67 8.31 75.67 170 1,412.70 12,863.90 1.3

3 55.22 475.15
3 B 45.845 389.945 272.5 12,492.76 106,260.01 1.3
5 36.47 304.74
5 36.47 304.74
4 B 28.515 257.75 168 4,790.52 43,302.00 1.3
6 20.56 210.76
6 20.56 210.76
5 B 36.79 327.145 124 4,561.96 40,565.98 1.3
7 53.02 443.53
7 53.02 443.53
6 2 B 70.555 653.255 183 12,911.57 119,545.67 1.3
8 88.09 862.98
8 88.09 862.98
7 B 82.245 710.165 228 18,751.86 161,917.62 1.3
9 76.4 557.35
9 76.4 557.35
8 B 101.21 907.58 145 14,675.45 131,599.10 1.3
10 126.02 1257.81

9 10 BA 39.15 362.69 39.15 362.69 130 5,089.50 47,149.70 1.3

22 13.8 141.77
10 B 30.475 267.175 260 7,923.50 69,465.50 1.3
23 47.15 392.58
23 47.15 392.58
11 3 B 96.275 852.215 280 26,957.00 238,620.20 1.3
24 145.4 1311.85
24 145.4 1311.85
12 B 87.715 776.135 350 30,700.25 271,647.25 1.3
25 30.03 240.42

13 4 12 B1 23.84 205.88 23.84 205.88 240 5,721.60 49,411.20 1.3

14 13 B2 10.96 104.7 10.96 104.7 150 1,644.00 15,705.00 1.3

14 50.3 438.64
15 B1 27.26 234.51 220 5,997.20 51,592.20 1.3
15 4.22 30.38
15 4.22 30.38
16 5 B1 12.735 118.51 130 1,655.55 15,406.30 1.3
16 21.25 206.64
16 21.25 206.64
17 B1 15.13 142.035 100 1,513.00 14,203.50 1.3
17 9.01 77.43
17 9.01 77.43
18 B1 12.585 107.67 180 2,265.30 19,380.60 1.3
18 16.16 137.91

19 6 18 BA 4.04 36.81 4.04 36.81 250 1,010.00 9,202.50 1.3

19 122.45 1063.39
20 B1 97.275 827.84 350 34,046.25 289,744.00 1.3
20 72.1 592.29
7
20 72.1 592.29
21 B1 49.37 463.68 200 9,874.00 92,736.00 1.3
14 26.64 335.07
Wlayah Selatan

luas (m2) Average Jarak/ Volume (m3)


No PIT Penampang panjang BJ
Batubara OB Batubara OB Batubara OB
(m)
34 4.36 35.1
22 8 A 8.12 74.095 470 3,816.40 34,824.65 1.3
35 11.88 113.09
30 26.38 217.13
23 9 BB,BA 46.5 436.325 350 16,275.00 152,713.75 1.3
31 66.62 655.52
11BGP 163.63 1144.67
24 B 124.565 1056.61 250 31,141.25 264,152.50 1.3

10
24 B 124.565 1056.61 250 31,141.25 264,152.50 1.3
30 85.5 968.55
30 85.5 968.55
25 10 BA 191.675 1800.83 250 47,918.75 450,207.50 1.3
31 297.85 2633.11
31 297.85 2633.11
26 BB 354.04 3117.54 350 123,914.00 1,091,139.00 1.3
32 410.23 3601.97
12BGP 15.84 166.03
27 C 12.32 114.555 220 2,710.40 25,202.10 1.3
27 8.8 63.08
27 8.8 63.08
28 11 C 26.395 230.04 250 6,598.75 57,510.00 1.3
28 43.99 397
28 43.99 397
29 C 52.945 474.26 350 18,530.75 165,991.00 1.3
29 61.9 551.52
28 15.68 145.15
30 12 C1 46.93 412.185 470 22,057.10 193,726.95 1.3
29 78.18 679.22
39 17.53 169.68
31 13 A 50.985 484.905 500 25,492.50 242,452.50 1.3
40 84.44 800.13
71BGP 115.61 687.7
32 E 114.695 1097.325 250 28,673.75 274,331.25 1.3
41 113.78 1506.95
14
41 113.78 1506.95
33 E 268.725 2451.56 350 94,053.75 858,046.00 1.3
42 423.67 3396.17
72BGP 73.41 702.31
34 15 F 55.32 510.425 350 19,362.00 178,648.75 1.3
43 37.23 318.54
Wlayah Utara

luas (m2) Average Jarak/ Volume (m3)


No PIT Penampang Seam panjang BJ
Batubara OB Batubara OB Batubara OB
(m)
1 54.78 384.83
1 B 34.525 238.975 450 15,536.25 107,538.75 1.3
2 14.27 93.12
1
2 2 B1 5.85 35.07 5.85 35.07 170 994.50 5,961.90 1.3

3 41.51 268.46
3 B 33.455 222.99 272.5 9,116.49 60,764.78 1.3
5 25.4 177.52
5 25.4 177.52
4 B 20.215 143.96 168 3,396.12 24,185.28 1.3
6 15.03 110.4
6 15.03 110.4
5 B 27.525 189.755 124 3,413.10 23,529.62 1.3
7 40.02 269.11
7 40.02 269.11
6 2 B 53.19 343.95 183 9,733.77 62,942.85 1.3
8 66.36 418.79
8 66.36 418.79
7 B 66.26 402.685 228 15,107.28 91,812.18 1.3
9 66.16 386.58
9 66.16 386.58
8 B 59.49 378.22 145 8,626.05 54,841.90 1.3
10 52.82 369.86

9 10 BA 27.32 175.26 27.32 175.26 130 3,551.60 22,783.80 1.3

23 34.56 231.84
10 B 86.18 592.33 280 24,130.40 165,852.40 1.3
24 137.8 952.82
3
24 137.8 952.82
11 B 80.525 557.775 350 28,183.75 195,221.25 1.3
25 23.25 162.73

12 4 12 B1 19.59 137.39 19.59 137.39 240 4,701.60 32,973.60 1.3

13 13 B2 8.13 54.76 8.13 54.76 150 1,219.50 8,214.00 1.3

5
14 36.96 220.27
14 B1 20.105 118.955 220 4,423.10 26,170.10 1.3
15 3.25 17.64
15 3.25 17.64
15 5 B1 9.89 70.575 130 1,285.70 9,174.75 1.3
16 16.53 123.51
16 16.53 123.51
16 B1 11.265 78.49 100 1,126.50 7,849.00 1.3
17 6 33.47
17 6 33.47
17 B1 9.185 56.305 180 1,653.30 10,134.90 1.3
18 12.37 79.14

18 6 18 BA 2.74 16.53 2.74 16.53 250 685.00 4,132.50 1.3

19 95.7 600.66
19 B1 79.14 469.67 350 27,699.00 164,384.50 1.3
20 62.58 338.68
7
20 62.58 338.68
20 B1 41.595 271.475 200 8,319.00 54,295.00 1.3
14 20.61 204.27
Wlayah Selatan

luas (m2) Average Jarak/ Volume (m3)


No PIT Penampang Seam panjang BJ
Batubara OB Batubara OB Batubara OB
(m)
34 3.34 20.08
21 8 A 5.895 38.095 470 2,770.65 17,904.65 1.3
35 8.45 56.11
30 18.18 117.22
22 9 BB,BA 33.24 231.46 350 11,634.00 81,011.00 1.3
31 48.3 345.7
11BGP 132.99 788.21
23 B 99.23 668.695 250 24,807.50 167,173.75 1.3
30 65.47 549.18
30 65.47 549.18
24 10 BA 127.845 837.455 250 31,961.25 209,363.75 1.3
31 190.22 1125.73
31 190.22 1125.73
25 BB 238.77 1600.89 350 83,569.50 560,311.50 1.3
32 287.32 2076.05
12BGP 10.23 66.85
26 C 8.505 51.755 220 1,871.10 11,386.10 1.3
27 6.78 36.66
27 6.78 36.66
27 11 C 21.855 149.865 250 5,463.75 37,466.25 1.3
28 36.93 263.07
28 36.93 263.07
28 C 43.27 304.695 350 15,144.50 106,643.25 1.3
29 49.61 346.32
28 10.93 70.15
29 12 C1 39.97 256.52 470 18,785.90 120,564.40 1.3
29 69.01 442.89
39 12.58 87.93
30 13 A 37.495 245.035 500 18,747.50 122,517.50 1.3
40 62.41 402.14
71BGP 115.61 687.7
31 E 85.365 573.47 250 21,341.25 143,367.50 1.3
41 55.12 459.24
14
41 55.12 459.24
32 E 171.85 1030.695 350 60,147.50 360,743.25 1.3
42 288.58 1602.15
72BGP 51.17 326.07
33 15 F 39.815 245.41 350 13,935.25 85,893.50 1.3
43 28.46 164.75
Wlayah Utara
Tonase Kedalaman Total Total TM IM A VM FC S
SR
Batubara galian OB(m3) Batubara (ton) (ar) (adb) (adb) (adb) (adb) (adb)
(ton) (1:…) (m) per PIT per PIT % % % % % %
15
28,822.95 7
14
208,132.40 30,659.46 22.39 12.75 7.71 38.37 41.18 3.63
1,836.51 7 8

12
16,240.59 7
12
12
6,227.68 7
11
11
5,930.55 7
10
10
16,785.03 7 650,340.08 95,255.70 25.185 11.42 3.16 39.255 246.17 1.77
15
15
24,377.42 7
13
13
19,078.09 7
12

6,616.35 7 16

7
10,300.55 7
13
13
35,044.10 7 579,732.95 85,254.98 21.76 12.41 2.05 39.51 46.04 1.73
23
23
39,910.33 7
10

7,438.08 7 9 49,411.20 7,438.08

2,137.20 7 8

14
7,796.36 7
6
6
2,152.22 7 116,287.60 24,435.65 23.68 12.67 5.49 38.26 43.59 2.53
14
14
1,966.90 7
9
9
2,944.89 7
11

1,313.00 7 6 9,202.50 1,313.00 24.19 11.97 10.6 35.74 41.69 3.25

22
44,260.13 7
17
382,480.00 57,096.33 25.58 11.98 3.71 39.93 44.38 2.55
17
12,836.20 7
12
Jumlah 1,995,586.73 301,453.19

Tonase Kedalaman Total Total TM IM A VM FC S


SR
Batubara galian OB(m3) Batubara (ton) (ar) (adb) (adb) (adb) (adb) (adb)
(ton) (1:…) (m) per PIT per PIT % % % % % %
5
4,961.32 7 34,824.65 4,961.32
7
16
21,157.50 7 152,713.75 21,157.50 29.8 17.53 10.24 37.35 34.88 1.31
17
30
40,483.63 7

1,805,499.00 263,866.20 31.78 14.01 11.64 39.18 35.17 1.26


40,483.63 7
32
32
62,294.38 7 1,805,499.00 263,866.20 31.78 14.01 11.64 39.18 35.17 1.26
35
35
161,088.20 7
30
9
3,523.52 7
7
7
8,578.38 7 248,703.10 36,191.87 32.5 13.29 10.92 42.19 33.6 3.32
14
14
24,089.98 7
15
7
28,674.23 7 193,726.95 28,674.23
14
11
33,140.25 7 242,452.50 33,140.25 28.59 12.75 13.31 39.76 34.19 2.90
24
25
37,275.88 7
25
1,132,377.25 159,545.75 34.15 13.26 14.36 38.91 33.47 1.31
11
122,269.88 7
47
16
25,170.60 7 178,648.75 25,170.60 37.03 12.32 11.2 40.3 36.18 2.73
14
Jumlah 3,988,945.95 572,707.72

5,984,532.68 874,160.91

Tonase Kedalaman Total Total TM IM A VM FC S


SR
Batubara galian OB(m3) Batubara (ton) (ar) (adb) (adb) (adb) (adb) (adb)
(ton) (1:…) (m) per PIT per PIT % % % % % %
13
20,197.13 5
10
113,500.65 21,489.98 22.39 12.75 7.71 38.37 41.18 3.63
1,292.85 5 6

8
11,851.43 5
11
11
4,414.96 5
8
8
4,437.03 5
9
9
12,653.90 5 340,860.41 68,827.73 25.185 11.42 3.16 39.255 46.17 1.77
10
10
19,639.46 5
11
11
11,213.87 5
10

4,617.08 5 12

10
31,369.52 5
19
361,073.65 68,008.40 21.76 12.41 2.05 39.51 46.04 1.73
19
36,638.88 5
8

6,112.08 5 7 32,973.60 6,112.08

1,585.35 5 6

61,542.75 12,620.53 23.68 12.67 5.49 38.26 43.59 2.53


10
5,750.03 5
5
5
1,671.41 5 61,542.75 12,620.53 23.68 12.67 5.49 38.26 43.59 2.53
11
11
1,464.45 5
6
6
2,149.29 5
9

890.50 5 4 4,132.50 890.50 24.19 11.97 10.6 35.74 41.69 3.25

18
36,008.70 5
11
218,679.50 46,823.40 25.58 11.98 3.71 39.93 44.38 2.55
11
10,814.70 5
10
Jumlah 1,132,763.06 224,772.61

Tonase Kedalaman Total Total TM IM A VM FC S


SR
Batubara galian OB(m3) Batubara (ton) (ar) (adb) (adb) (adb) (adb) (adb)
(ton) (1:…) (m) per PIT per PIT % % % % % %
4
3,601.85 5 17,904.65 3,601.85
5
12
15,124.20 5 81,011.00 15,124.20 29.8 17.53 10.24 37.35 34.88 1.31
11
22
32,249.75 5
25
25
41,549.63 5 936,849.00 182,439.73 31.78 14.01 11.64 39.18 35.17 1.26
24
24
108,640.35 5
25
6
2,432.43 5
5
5
7,102.88 5 155,495.60 29,223.16 32.5 13.29 10.92 42.19 33.6 3.32
12
12
19,687.85 5
12
5
24,421.67 5 120,564.40 24,421.67
11
7
24,371.75 5 122,517.50 24,371.75 28.59 12.75 13.31 39.76 34.19 2.90
17
12
27,743.63 5
11
504,110.75 105,935.38 34.15 13.26 14.36 38.91 33.47 1.31
11
78,191.75 5
33
11
18,115.83 5 85,893.50 18,115.83 37.03 12.32 11.2 40.3 36.18 2.73
10
Jumlah 2,024,346.40 403,233.55

3,157,109.46 628,006.15
GCV CV CV
(adb) (daf) (ar)
cal/g cal/g cal/g

5795 7285 5155

6297 7371 5314

6333 7403 5657

6011 7344 5252

5676 7330 4888

6129 7269 5182

GCV CV CV
(adb) (daf) (ar)
cal/g cal/g cal/g

5112 7077 4351

5289 7114 4196


5289 7114 4196

5419 7149 4221

5289 7149 4331

5013 6925 3803

5131 5709 3685

GCV CV CV
(adb) (daf) (ar)
cal/g cal/g cal/g

5795 7286 5155

6297 7371 5314

6333 7403 5657

6011 7344 5252


6011 7344 5252

5676 7330 4888

6129 7269 5182

GCV CV CV
(adb) (daf) (ar)
cal/g cal/g cal/g

5112 7077 4351

5289 7114 4196

5419 7149 4221

5289 7149 4331

5013 6925 3803

5131 5709 3685