RESUMEN REDISEÑO DE MATERIAL POR M3 DE CONCRETO 175 f'c (kg/cm2)

(CONSISTENCIA PLÁSTICA ASENTAMIENTO DE 3" a 4")

M3 CEMENTO (Kg) BOLSAS AG. FINO (kg) AG. GRUESO (kg) AGUA(lt) TOTAL (kg/m3)

0.10 33.59 0.79 90.3 90.0 20.4 234.2


0.13 42.50 1.00 114.2 113.8 25.8 296.3
0.20 67.18 1.58 180.5 179.9 40.8 468.4
0.30 100.77 2.37 270.8 269.9 61.2 702.6
0.40 134.36 3.16 361.0 359.8 81.6 936.8
0.50 167.95 3.95 451.3 449.8 102.0 1,171.0
0.60 201.54 4.74 541.5 539.8 122.4 1,405.2
0.70 235.13 5.53 631.8 629.7 142.8 1,639.4
0.80 268.72 6.32 722.0 719.7 163.2 1,873.6
0.90 302.31 7.11 812.3 809.6 183.6 2,107.8
1.00 335.90 7.90 902.5 899.6 204.0 2,342.0
1.10 369.49 8.69 992.8 989.6 224.4 2,576.2
1.20 403.08 9.48 1,083.0 1,079.5 244.8 2,810.4
1.30 436.67 10.27 1,173.3 1,169.5 265.2 3,044.6
1.40 470.26 11.06 1,263.5 1,259.4 285.6 3,278.8
1.50 503.85 11.86 1,353.8 1,349.4 306.0 3,513.0
1.60 537.44 12.65 1,444.0 1,439.4 326.4 3,747.2
1.70 571.03 13.44 1,534.3 1,529.3 346.8 3,981.4
1.80 604.62 14.23 1,624.5 1,619.3 367.2 4,215.6
1.90 638.21 15.02 1,714.8 1,709.2 387.6 4,449.8
2.00 671.80 15.81 1,805.0 1,799.2 408.0 4,684.0
2.10 705.39 16.60 1,895.3 1,889.2 428.4 4,918.2
2.20 738.98 17.39 1,985.5 1,979.1 448.8 5,152.4
2.30 772.57 18.18 2,075.8 2,069.1 469.2 5,386.6
2.40 806.16 18.97 2,166.0 2,159.0 489.6 5,620.8
2.50 839.75 19.76 2,256.3 2,249.0 510.0 5,855.0
2.60 873.34 20.55 2,346.5 2,339.0 530.4 6,089.2
2.70 906.93 21.34 2,436.8 2,428.9 550.8 6,323.4
2.80 940.52 22.13 2,527.0 2,518.9 571.2 6,557.6
2.90 974.11 22.92 2,617.3 2,608.8 591.6 6,791.8
3.00 1,007.70 23.71 2,707.5 2,698.8 612.0 7,026.0
3.04 1,020.00 24.00 2,740.5 2,731.7 619.5 7,111.8
3.50 1,175.65 27.66 3,158.8 3,148.6 714.0 8,197.0
4.00 1,343.60 31.61 3,610.0 3,598.4 816.0 9,368.0
4.50 1,511.55 35.57 4,061.3 4,048.2 918.0 10,539.0
5.00 1,679.50 39.52 4,512.5 4,498.0 1,020.0 11,710.0
5.50 1,847.45 43.47 4,963.8 4,947.8 1,122.0 12,881.0