01-Mar-23 471 4.334,52 9,20 401 3.705,20 9,24 872 8.039,72 9,22 53 1.604,85 30,28 153 4.463,40 29,17 206 6.068,25 29,46 - - - 77 1.372,14 17,82 77 1.372,14 17,82
02-Mar-23 460 4.771,63 10,37 534 4.870,08 9,12 994 9.641,71 9,70 105 3.008,15 28,65 254 6.860,10 27,01 359 9.868,25 27,49 108 1.710,72 15,84 159 2.833,38 17,82 267 4.544,10 17,02
03-Mar-23 498 5.123,30 10,29 474 4.488,56 9,47 972 9.611,86 9,89 90 2.760,40 30,67 224 6.092,95 27,20 314 8.853,35 28,20 93 1.473,12 15,84 283 5.043,06 17,82 376 6.516,18 17,33
04-Mar-23 514 4.976,88 9,68 402 4.216,88 10,49 916 9.193,76 10,04 186 5.535,45 29,76 177 4.241,10 23,96 363 9.776,55 26,93 133 2.106,72 15,84 267 4.757,94 17,82 400 6.864,66 17,16
05-Mar-23 546 5.766,45 10,56 546 5.268,32 9,65 1092 11.034,77 10,11 220 6.477,25 29,44 113 3.048,95 26,98 333 9.526,20 28,61 104 1.647,36 15,84 185 3.296,70 17,82 289 4.944,06 17,11
06-Mar-23 516 5.111,45 9,91 447 4.505,28 10,08 963 9.616,73 9,99 164 4.652,85 28,37 173 4.886,65 28,25 337 9.539,50 28,31 109 1.726,56 15,84 262 3.563,20 13,60 371 5.289,76 14,26
07-Mar-23 549 5.896,46 10,74 423 4.272,64 10,10 972 10.169,10 10,46 205 6.012,90 29,33 108 2.950,15 27,32 313 8.963,05 28,64 68 1.077,12 15,84 218 2.964,80 13,60 286 4.041,92 14,13
08-Mar-23 485 5.257,42 10,84 366 3.792,40 10,36 851 9.049,82 10,63 218 6.318,55 28,98 133 3.511,60 26,40 351 9.830,15 28,01 96 1.520,64 15,84 250 4.455,00 17,82 346 5.975,64 17,27
10-Mar-23 354 3.772,48 10,66 230 2.404,56 10,45 584 6.177,04 10,58 139 4.256,10 30,62 - - - 139 4.256,10 30,62 66 1.045,44 15,84 169 2.298,40 13,60 235 3.343,84 14,23
11-Mar-23 232 2.480,64 10,69 328 3.413,12 10,41 560 5.893,76 10,52 203 5.838,95 28,76 - - - 203 5.838,95 28,76 - - - 191 3.403,62 17,82 191 3.403,62 17,82
12-Mar-23 192 1.820,96 9,48 321 3.548,88 11,06 513 5.369,84 10,47 5 273,00 54,60 172 4.828,80 28,07 177 5.101,80 28,82 40 633,60 15,84 221 3.005,60 13,60 261 3.639,20 13,94
13-Mar-23 144 1.332,48 9,25 314 3.442,08 10,96 458 4.774,56 10,42 7 345,35 49,34 191 5.452,00 28,54 198 5.797,35 29,28 42 665,28 15,84 122 1.659,20 13,60 164 2.324,48 14,17
14-Mar-23 325 3.193,69 9,83 410 4.055,36 9,89 735 7.249,05 9,86 16 711,85 44,49 227 6.598,65 29,07 243 7.310,50 30,08 130 2.059,20 15,84 133 1.808,80 13,60 263 3.868,00 14,71
15-Mar-23 68 753,90 11,09 502 5.214,64 10,39 570 5.968,54 10,47 15 752,50 50,17 235 6.588,45 28,04 250 7.340,95 29,36 163 2.581,92 15,84 - - - 163 2.581,92 15,84
16-Mar-23 - - - 357 3.255,84 9,12 357 3.255,84 9,12 69 1.874,40 27,17 - - - 69 1.874,40 27,17 70 1.108,80 15,84 - - - 70 1.108,80 15,84
17-Mar-23 - - - 357 3.255,84 9,12 357 3.255,84 9,12 207 5.838,95 28,21 - - - 207 5.838,95 28,21 109 1.726,56 15,84 184 3.278,88 17,82 293 5.005,44 17,08
18-Mar-23 - - - 255 2.325,60 9,12 255 2.325,60 9,12 116 3.119,95 26,90 - - - 116 3.119,95 26,90 136 2.154,24 15,84 - - - 136 2.154,24 15,84
19-Mar-23 240 2.260,04 9,42 377 3.438,24 9,12 617 5.698,28 9,24 6 361,25 60,21 355 9.944,35 28,01 361 10.305,60 28,55 184 2.914,56 15,84 225 4.009,50 17,82 409 6.924,06 16,93
20-Mar-23 322 3.365,76 10,45 64 583,68 9,12 386 3.949,44 10,23 - - - 23 629,30 27,36 23 629,30 27,36 384 6.082,56 15,84 117 2.084,94 17,82 501 8.167,50 16,30
21-Mar-23 250 2.707,93 10,83 474 4.677,04 9,87 724 7.384,97 10,20 130 3.854,05 29,65 311 7.897,20 25,39 441 11.751,25 27 334 5.290,56 15,84 201 3.581,82 17,82 535 8.872,38 16,58
22-Mar-23 133 1.527,37 11,48 206 2.003,36 9,73 339 3.530,73 10,42 65 2.178,65 33,52 171 4.202,25 24,57 236 6.380,90 27,04 165 2.613,60 15,84 165 2.940,30 17,82 330 5.553,90 16,83
23-Mar-23 - - - 202 1.971,44 9,76 202 1.971,44 9,76 - - - - - - - - - 179 2.835,36 15,84 146 2.601,72 17,82 325 5.437,08 16,73
24-Mar-23 150 1.452,88 9,69 187 1.904,56 10,18 337 3.357,44 9,96 78 2.504,65 32,11 90 2.508,40 27,87 168 5.013,05 29,84 223 3.532,32 15,84 300 5.346,00 17,82 523 8.878,32 16,98
25-Mar-23 318 3.037,88 9,55 244 2.225,28 9,12 562 5.263,16 9,37 97 2.978,25 30,70 105 2.866,50 27,30 202 5.844,75 28,93 207 3.278,88 15,84 316 5.631,12 17,82 523 8.910,00 17,04
26-Mar-23 437 4.093,24 9,37 366 3.421,52 9,35 803 7.514,76 9,36 68 2.110,05 31,03 106 2.907,80 27,43 174 5.017,85 28,84 223 3.532,32 15,84 247 4.401,54 17,82 470 7.933,86 16,88
27-Mar-23 224 2.211,60 9,87 231 2.184,24 9,46 455 4.395,84 9,66 67 2.234,65 33,35 92 2.377,35 25,84 159 4.612,00 29,01 103 1.631,52 15,84 167 2.975,94 17,82 270 4.607,46 17,06
28-Mar-23 138 1.468,32 10,64 199 1.814,88 9,12 337 3.283,20 9,74 142 4.245,30 29,90 134 3.706,25 27,66 276 7.951,55 28,81 378 5987,52 15,84 154 2258,98 14,67 532 8.246,50 15,50
29-Mar-23 255 2.325,60 9,12 334 3.213,28 9,62 589 5.538,88 9,40 119 3.803,55 31,96 199 5.377,60 27,02 318 9.181,15 28,87 344 5.448,96 15,84 129 2298,78 17,82 473 7.747,74 16,38
30-Mar-23 259 2.674,87 10,33 175 1.919,12 10,97 434 4.593,99 10,59 90 2.788,90 30,99 183 5.116,65 27,96 273 7.905,55 28,96 274 4.340,16 15,84 197 3.510,54 17,82 471 7.850,70 16,67
TOTAL 8.080 81.717,77 10,11 9.726 95.391,92 9,81 17.806 177.109,69 9,95 2.901 87.007,55 29,99 3.929 107.056,45 27,25 6.830 194.064,00 28,41 4.465 70.725,60 15,84 5.085 85.381,90 16,79 9.550 156.107,50 16,35
BPP 3-4 130.000,00 95.391,92 73,4% 34.608,08 130.000,00 107.056,45 82,4% 22.943,55 75.000,00 -3.082,86 85.381,90 82.299,04 109,7% -
TOTAL 260.000,00 177.109,69 68,1% 82.890,31 260.000,00 194.064,00 74,6% 65.936,00 150.000,00 -5.411,34 156.107,50 150.696,16 100,5% -
NOTE : SELISIH SISA STOCK WASH UPDATE CF 50% DENGAN STOCK FISIK ACTUAL LAPANGAN DIPENGARUHI BEBERAPA FAKTOR DIANTARANYA :
- Tonase Wash Perhitungan Mining Masih Assumption CF 50% Belum Assumption CF LAB
- Konsistensi Muatan Bucket Alat Loading Mining (Intern)
- Akurasi Timbangan CMI (Ekstern)
- Persentase : Bentuk Material Yang Halus , Material yang Sudah Lapuk , Material Menjadi Lantai Stock Wash (intern)
MONITORING STOCK WASH WP 1,2,3,4
PERIODE MARET 2023
TOTAL 81.717,77 95.391,92 177.109,69 87.007,55 107.056,45 194.064,00 -5.002,41 -3.316,11 -8.318,52
EFEKTIFITAS
251.612,90 177.109,69 -74.503,22 251.612,90 194.064,00 -57.548,90 145.161,29 150.696,16 5.534,87
KERJA
SISA HARI 1
UPDATE MONITORING MUATAN RATA-RATA/RIT PRODUKSI MINING WP 1-2-3-4
PERIODE MARET 2023
WP 1 WP 2 WP 3 WP 4
TANGGAL
BLOK 6 BLOK 24 BLOK 63 BOLDER INT-WP BLOK 24 BLOK 63 BLOK 69 BOLDER INT-WP BLOK 6 BLOK 70 BOLDER INT-WP BLOK 20 BLOK 69 BLOK 70 BOLDER INT-WP
6 24 63 BOLDER IW 24 63 69 BOLDER IW 6 70 BOLDER IW 20 69 70 BOLDER IW
01-Mar-23 9,12 - 9,12 - 10,64 # - 9,19 - - - # - 9,12 - - # 9,17 - - - 12,00
02-Mar-23 9,12 - - - 12,00 # - 11,48 - - - # - 9,12 - - # 9,12 - - - -
03-Mar-23 9,12 - - - - # - 11,48 - - - # - 9,12 - - # 9,79 - - - -
04-Mar-23 9,12 - - - - # - 11,27 10,27 - 9,20 # - 9,97 - - # 9,12 9,91 - - 13,33
05-Mar-23 9,90 - - - - # - 11,18 - - - # - 9,95 - - # 9,12 9,65 9,12 - -
06-Mar-23 9,58 - - - - # - 10,23 - - - # - 9,48 - - # 10,64 - 10,64 - -
07-Mar-23 9,88 - - - - # - 11,48 - - - # - 10,01 - 12,00 # 9,12 - 10,64 - -
08-Mar-23 10,32 - - - - # - 11,35 - - - # - 10,64 - - # 10,25 - 9,12 - -
09-Mar-23 - - - - - # - - - - - # - - - - # - - - - -
10-Mar-23 10,64 - - - - # 9,12 - - - 12,00 # - 10,64 - - # - - 9,82 - 12,00
11-Mar-23 9,85 - - - 9,12 # - - - - 12,00 # - 9,80 - - # 9,57 - - - 12,00
12-Mar-23 9,77 - - - 9,12 # - - - - 9,12 # - 10,64 - - # - - 10,44 - 12,00
13-Mar-23 9,12 - - - 9,37 # - - - - - # - 9,12 - - # - - 9,12 - 12,63
14-Mar-23 9,12 - - - - # - 10,46 - - - # - 9,51 - - # - - 10,20 - -
15-Mar-23 10,64 - - - - # - 11,48 - - - # - 10,16 - - # - - 10,64 - 9,60
16-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - 9,12
17-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - 9,12
18-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - -
19-Mar-23 9,12 - - - - # - 10,15 - - 9,12 # - 9,12 - - # - - 9,12 - -
20-Mar-23 - - - - - # - - - - 10,45 # - - - - # - - 9,12 - -
21-Mar-23 - - 11,48 - - # - 10,64 - - - # 9,44 9,69 - - # - - 10,16 - -
22-Mar-23 - - 11,48 - - # - - - - - # 9,12 - - - # - - 10,64 - -
23-Mar-23 - - - - - # - - - - - # - - - 10,64 # - - 9,12 - -
24-Mar-23 - 9,12 - - - # - 10,14 - - 9,60 # - 10,00 - - # - - 9,87 - 10,64
25-Mar-23 9,12 - - - 10,03 # - 9,68 - - - # - 9,12 - - # - - 9,12 - -
26-Mar-23 9,12 9,12 - - - # - 9,59 - - - # 9,12 - - - # - - 9,46 - -
27-Mar-23 - 9,12 - - - # - 10,64 - - - # 9,12 - - - # - - 9,79 - -
28-Mar-23 - - - - - # - 10,64 - - - # - 9,12 - - # - - 9,12 - -
29-Mar-23 - 9,12 - - - # - - - - - # - 9,12 - - # - - 9,88 - -
30-Mar-23 - 9,12 - - - # - - - - 11,75 # - - - - # - - 10,64 - 11,41
L
AVG 9,57 9,12 10,23 - 9,80 # 9,12 10,67 10,27 - 10,69 # 9,19 9,60 - 11,13 # 9,51 9,71 9,78 - 11,40
CATATAN
WASH CF ASSUMPTION 50 %
RATA-RATA MUATAN SESUAI LAPORAN CHECKER WP YANG SUDAH DI PERIKSA FOREMAN DAN SPV DI POST MASING-MASING
MUATAN DI BAWAH 10,00 TON/RIT
WASH MATERIAL BOLDER = 30% DARI PERHITUNGAN UNWASH
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION MINING WP 1-2
PERIODE MARET 2023
24 63 6 69 INTERMEDIET/BOLDER - WP KETERANGAN
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM
WP1 07:00-07:42 PERSIAPAN A2B LOADING & 08:44-10:08 WAITING WP1 19:00-19:18 WAITING UNIT, 23:13-23:57, 13:17-14:55
INFO & PREPARE LOADING BLOK 6, 10:15 HUJAN PRODUKSI SLOWLY KURANG DT, WP2 19:00-19:21 MENUNGGU OPERATOR,
01/03/2023 236 2.184,06 - - 235 2.150,46 - - 471 4.334,52 9,20 - - - - - - 0:27 7 14 0:13 2 1 - - - 0:09 2 5 DIALIHKAN BLOK 63, 15:00-16:00, 16:02-16:55 SLOWLY KURANG DT, 19:51-19:57, 21:02-21:09, 21:14-21:21 BOLDER, 23:18-00:00
WP2 07:00-08:49 SLIPPERY & REPAIR MINEROAD, 13:00-13:17 MATERIAL BETROCK DT DUMPING INTERMEDIET, 01:00-01:43,
BOLDER, 14:28-14:54, 15:35-16:14 SLOWLY KURANG DT 03:04-04:51 SLOWLY KURANG DT
WP1 07:00-08:10 SAFETY GENERAL ALERT, 08:30-08:37 PERBAIKAN
WP1 20:47-20:58, 22:49-23:01 SLOWLY LOW WATER SPRAY, 01:22-
GORONG-GORONG KEGIATAN SEMENTARA LOADING DARI STOCK
01:41 PENGONDISIAN DT AMBLAS, 02:21-02:29, 02:45-03:17
INTERMEDIET, 09:34-09:47 PINDAH POST BLOK LOADING, 10:00-
BOLDE, 03:30-04:55 SLOWLY KURANG DT, WP2 20:10-20:20
02/03/2023 235 2.483,23 - - 225 2.288,40 - - 460 4.771,63 10,37 - - - - - - 0:28 7 15 0:16 5 24 - - - 0:10 2 7 11:16, 13:00-14:07 SLOWLY KURANG DT, 14:46-14:57 KAYU DI
BOLDER, 20:46-23:08 LOW WATER SPRAY DT DUMPING
HOPPER, 16:11-16:27 BOLDER, WP2 07:00-07:55 GENERAL SAFETY
INTERMEDIET, 03:03-03:23 PART BPP PROBLEM, 04:15-04:53
ALERT, 13:06-13:18 BOLDER, 13:19-13:44, 16:33-16:54 SLOWLY
SLOWLY KURANG DT
KURANG DT
WP1 07:00-07:10 WAITING UNIT, 07:55-08:26 SLOWLY KURANG DT,
WP1 22:30-23:58 SLOWLY KURANG DT, 01;26-01:38 BOLDER, 02:27-
11:00-12:00 IBADAH JUM'AT, 13:00-13:13 WAITING UNIT, 15:09-
02:40 BOLDER, WP2 19:00-19:27 TRAVEL A2B LOADING, 20:23-
16:45 SLOWLY KURANG DT, WP2 07:00-07:40 PART BPP PROBLEM,
03/03/2023 239 2.442,08 - - 259 2.681,22 - - 498 5.123,30 10,29 - - - - - - 0:26 7 12 0:12 7 19 - - - - - - 20:35, 21:38-21;48, 22:31-22:42, 23:07-23:2, 01:04-01:19 BOLDER,
08:16-09:31 SLOWLY KURANG DT, 09:58-10:11 BOLDER, 11:00-12:00
02:49-03:16 ANGKAT JARING LOUNDER, 03:20-04:00 SLOWLY
IBADAH JUM'AT, 15:19-15:25 PERAPIAN MATERIAL DEPAN HOPPER,
KURANG DT
15:32-15:40, 15:54-16:05, 16:08-16:14 BOLDER
WP1 07:00-07:20 WAITING UNIT, 09:47-11:00, 15:54-16:45 SLOWLY WP1 19:00-19:10 WAITING UNIT, 21:11-21:21, 2123-21:33, 21:57-
KURANG DT, WP2 07:00-07:24 WAITING UNIT, 08:12-08:21 BOLDER, 22:06 BOLDER, 23:30-00:00, 01:00-02:15, 04:17-04:55 SLOWLY
08/03/2023 256 2.717,05 - - 229 2.540,37 - - 485 5.257,42 10,84 - - - - - - 0:25 7 16 0:14 5 24 - - - - - - 13:32-14:11 EVAKASI DT TUMBANG, 16:20-16:55 SLOWLY KURANG KURANG DT, WP2 19:00-19:33 WAITING OPERATOR, 02:53-04:00
DT SLOWLY KURANG DT
WP1 07:00-08:05 REPAIR MINEROAD WP AREA, 08:07-08:20 BOLDER, WP1 19:00-05:00 OFF, WP2 19:00-20:04 SLIPPERY, 22:10-22:24
11/03/2023 137 1.340,64 - - 95 1.140,00 - - 232 2.480,64 10,69 - - - - - - - - - 0:09 3 42 - - - 0:09 2 27 08:46-08:50 PINDAH POST LOADING, 11:43-11:54 BOLDER, WP2 07:00- CHUTE PENUH WL TROUBLE, 23:25-00:00 SLOWLY KURANG DT,
17:00 OFF 03:10-04:50 SLOWLY KURANG DT
WP1 07:00-12:00 OFF, 13:45-13:56, 14:05-14:14 BOLDER, 16:26-16:55 WP1 02:28-04:30 SLWOY KURANG DT, 04:30-05:00 OFF KURANG
14/03/2023 83 759,11 - - 242 2.434,58 - - 325 3.193,69 9,83 - - - - - - 0:27 7 9 0:14 5 15 - - - - - - SLOWLY KURANG DT, WP2 07:00-09:53 PENGALIHAN BLOK, 13:00- DT, WP2 19:00-19:22 REPAIR MINEROAD, 01:37-04:00 SLWOLY
17:00 OFF DUMPING INTERMEDIET KURANG DT
16/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL
17/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL
SHIFT 1 SHIFT 2 TOTAL BLOK - WP
24 63 6 69 INTERMEDIET/BOLDER - WP KETERANGAN
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM
18/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL
WP1 07:00-17:00 OFF PROBLEM TANGGUL TAILING, WP2 07:00-07:18 WP1 19:00-05:00 OFF PART BPP PROBLEM, WP2 19:00-20:00, 01:00-
20/03/2023 149 1.788,00 - - 173 1.577,76 - - 322 3.365,76 10,45 - - - - - - - - - - - - - - - 0:07 2 81
WAITING UNIT, 13:00-13:26 PART BPP PROBLEM 02:00 SLOWLY JALAN LICIN WP AREA
23/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN) WP1-2 19:00-05:00 OFF TANGGUL TAILING & BLOK BELUM READY
WP1 07:00-07:15 P2H A2B LOADING, 11:45-12:00 OFF AWAL KURANG WP1 19:00-05:00 OFF HUJAN & BROKEN MINEROAD, WP2 19:00-
DT, 15:25-17:00 OFF HUJAN & SLPPERY, WP2 07:00-12:00 OFF DT 19:25 WAITING A2B LOADING, 22:40-05:00 OFF STOCK
30/03/2023 198 1.942,87 - - 61 732,00 - - 259 2.674,87 10,33 - - - 0:18 6 23 - - - - - - - - - 0:06 2 30
SUPPORT HAULING, 16:10-16:25 SLOWLY KURANG DT, 16:30-17:00 INTERMEDIET HABIS & FRONT LOADING BROKEN MINEROAD
OFF AWAL PUASA RAMADHAN ACCESS
TOTAL 4518 44.950,57 - - 3562 36.767,19 - - 8.080 81.717,77 10,11 - - - 0:19 7 16 0:26 7 13 0:13 4 23 0:19 5 25 0:08 2 27
CATATAN
PW ANGKUTAN DARI BLOK KE WP
PH ANGKUTAN DARI BLOK KE SAMPING WP
PI ANGKUTAN DARI BLOK KE INTERMEDIET (SW)
IW ANGKUTAN DARI STOCK INTERMEDIET KE WP
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION MINING WP 3-4
PERIODE MARET 2023
6 20 69 70 INTERMEDIET/BOLDER - WP
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM
WP3 07:00-07:25 SAFETY GENERAL ALERT. 08;57-09:48, 11:13-11:55, 15;20- WP3 19:00-19:20 WAITING OPERATOR, 22:52-00:00, 02:53-04:55 SLOWLY
02/03/2023 271 2.471,52 - - 263 2.398,56 - - 534 4.870,08 9,12 - - - - - - 0:23 7 17 - - - 0:26 8 17 - - - 16:50 SLOWLY KURANG DT, WP4 07:00-07:35 SAFETY GENERAL ALERT, 09:20- KURANG DT, WP4 19:00-19:16 WAITING OPERATOR, 20:00-21:00, 22:52-
09:32 PART BPP PROBLEM, 13:56-14:47, 16:17-16:50 SLOWLY KURANG DT 23:00, 02:55-04:55 SLOWLY KURANG DT
WP3 07:00-09:30 SLIPPERY MINEROAD, 15:21-15:38 PINDAH SHAFT, 16:00- WP3 19:00-19:28 P2H & TRAVEL A2B LOADING, 19:29-20:00, 21:37-22:00,
16:55 SLOWLY KURANG DT, WP4 07:00-08:06 SLIPPERY & REPAIR 23:26-00:00, 01:00-02:00, 02:20-04:50 SLOWLY KURANG DT, WP4 19:00-
14/03/2023 201 1.972,96 - - 209 2.082,40 - - 410 4.055,36 9,89 - - - - - - - - - - - - 0:27 8 13 - - -
MINEROAD, 10:47-11:06 BOLDER, 13:57-14:16 PART BPP PROBLEM, 16:40- 19:19 P2H & TRAVEL A2B LOADING, 02:07-04:00, 04:10-04:50 SLOWLY
17:00 OFF KURANG DT KURANG DT
WP3 07:00-07:22 PREPARE A2B LOADING, 09:07-10:00 SLOWLY KURANG DT, WP3 19:57-21:00, 22:00-23:00 SLOWLY KURANG DT, 03:18-05:00 OFF HUJAN
15/03/2023 243 2.585,52 - - 259 2.629,12 - - 502 5.214,64 10,39 - - - - - - - - - - - - 0:26 8 12 0:09 2 9 WP4 07:00-07:22 PREPARE A2B LOADING, 11:13-11:55, 13:00-14:00, 16:12- & SLIPPERY, WP4 19:00-19:15 WAITING UNIT, 23:05-23:42 SLOWLY KURANG
16:50 SLOWLY KURANG DT DT, 03:27-03:41 OFF HUJAN PREPARE LOADING INTERMEDIET
WP3 07:00-07:20 P2H & WAITING UNIT, 13:00-13:10 PART BPP PROBLEM,
WP3 22:08-23:20 SLOWLY KURANG DT, 23:30-00:00 OFF HUJAN & SLIPPERY
WP4 07:00-07:30 P2H & WAITING UNIT, 0820-08:31 PART BPP PROBLEM,
19/03/2023 254 2.316,48 - - 123 1.121,76 - - 377 3.438,24 9,12 - - - - - - - - - - - - 0:26 8 11 - - - 10:12-11:58 SLOWLY KURANG DT, 13:00-13:10 PART BPP PROBLEM, 15:22-
23:00-23:40 SLOWLY HUJAN, 01:00-01:19 WAITING UNIT, 01:38-02:00
SLOWLY KURANG DT
16:50 SLOWLY KURANG DT
SHIFT 1 SHIFT 2 TOTAL BLOK - WP
6 20 69 70 INTERMEDIET/BOLDER - WP
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM
WP3 07:00-07:33 SLIPPERY & REPAIR MINEROAD, 14:22-15:00, 16:25-16:50 WP3 20:18-20:29, 22:24-22:45 BOLDER, 03:00-04:50 SLOWLY KURANG DT,
21/03/2023 246 2.380,32 - - 228 2.296,72 - - 474 4.677,04 9,87 - - - 0:26 5 18 - - - - - - 0:27 8 14 - - - SLOWLY KURANG DT, WP4 07:00-07:30 SLIPPERY & REPAIR MINEROAD, WP4 20:09-22:02 SLOWLY KURANG DT, 02:33-02:40 BOLDER, 03:00-04:00
11:02-11:05 GANTI A2B LOADING, 14:17-15:00 SLOLWY KURANG DT SLOWLY KURANG DT
WP3 07:00-07:21 TRAVEL A2B LOADING & DT, 10:00-11:00 SLOWLY KURANG
DT, 16:35-17:00 OFF LEBIH AWAL, WP4 07:00-07:19 WAITING UNIT, 09:00-
22/03/2023 206 2.003,36 - - - - 206 2.003,36 9,73 - - - 0:20 5 18 - - - - - - 0:27 8 7 - - - LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN)
10:00, 11:18-11:50 SLOWLY KURANG DT, 14:06-14:24, 14:34-17:00 PART BPP
PROBLEM DT DUMPING STOCK INTERMEDIET
WP3 07:00-17:00 OFF DT SUPPORT HAULING, WP4 07:00-07:20 TRAVEL TIME WP3 19:00-05:00 OFF HUJAN & BROKEN MINEROAD,WP4 19:00-19:22
30/03/2023 101 1.074,64 - - 74 844,48 - - 175 1.919,12 10,97 - - - - - - - - - - - - 0:26 8 10 0:08 2 37 DT, 07:23-07:42 PART BPP PROBLEM, 09:33-11:00, 13:00-14:00 SLOWLY PREPARE ROAD WP AREA, 22:04-00:00 OFF PROBLEM A2B HANDEL CHUTE
KURANG DT, 15:50-17:00 OFF HUJAN & BROKEN MINEROAD TROUBLE, 02:37-03:40 OFF SAHUR, 03:45-05:00 REWASHED
TOTAL 5127 50.138,08 - - 4599 45.253,84 - - 9.726 95.391,92 9,81 - - - 0:24 5 18 0:23 7 14 0:21 5 19 0:26 8 12 0:09 2 29
CATATAN
PW ANGKUTAN DARI BLOK KE WP
PH ANGKUTAN DARI BLOK KE SAMPING WP
PI ANGKUTAN DARI BLOK KE INTERMEDIET (SW)
IW ANGKUTAN DARI STOCK INTERMEDIET KE WP
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION TAILING - DISPOSAL WP 1-2 DAN WP 3-4
PERIODE MARET 2023
WP 1-2 WP 3-4
KETERANGAN
DATE SHIFT 1 SHIFT 2 TOTAL UNIT STATISTIK/RIT/SHIFT SHIFT 1 SHIFT 2 TOTAL UNIT STATISTIK/RIT/SHIFT
RIT 3 RIT 3 RIT 3 3 OPERASI MAX MIN AVERAGE CIRCLE RIT 3 RIT 3 RIT 3 3 OPERASI MAX MIN AVERAGE CIRCLE SHIFT 1 SHIFT 2
M M M M /RIT M M M M /RIT
01/03/2023 - - - - - - - - - - - - - - 77 1.372,14 77 1.372,14 17,82 3 28 21 26 0:09 KEGIATAN OFF WP1-2 OFF, WP3-4 RUNNING (20:00-23:55)
02/03/2023 73 1.156,32 35 554,40 108 1.710,72 15,84 4 28 5 14 0:17 159 2.833,38 - - 159 2.833,38 17,82 3 53 53 53 0:08 WP1-2 RUNNING (08:04-16:38), WP3-4 RUNNING (07:00-16:50) WP1-2 RUNNING (19:05-21:11), WP3-4 OFF
03/03/2023 50 792,00 43 681,12 93 1.473,12 15,84 4 16 6 13 0:13 198 3.528,36 85 1.514,70 283 5.043,06 17,82 4 51 21 35 0:08 WP1-2 RUNNING (13:34-16:50), WP3-4 RUNNING (07:50-16:54) WP1-2 RUNNING (19:04-21:49), WP3-4 RUNNING (19:05-21:56)
04/03/2023 105 1.663,20 28 443,52 133 2.106,72 15,84 5 29 4 14 0:16 201 3.581,82 66 1.176,12 267 4.757,94 17,82 4 62 22 36 0:08 WP1-2 RUNNING (07:11-16:33), WP3-4 RUNNING (07:07-16:56) WP1-2 RUNNING (19:20-21:20), WP3-4 RUNNING (19:00-21:55)
05/03/2023 64 1.013,76 40 633,60 104 1.647,36 15,84 4 22 3 13 0:17 99 1.764,18 86 1.532,52 185 3.296,70 17,82 4 29 13 23 0:08 WP1-2 RUNNING (9:34-16:43), WP3-4 RUNNING (13:05-16:52) WP1-2 RUNNING (19:12-21:52), WP3-4 RUNNING (19:05-21:59)
06/03/2023 73 1.156,32 36 570,24 109 1.726,56 15,84 4 24 5 14 0:17 179 2.434,40 83 1.128,80 262 3.563,20 13,60 4 61 19 40 0:08 WP1-2 RUNNING (07:31-16:04), WP3-4 RUNNING (07:02-16:55) WP1-2 RUNNING (19:27-21:51), WP3-4 RUNNING (19:00-21:58)
07/03/2023 68 1.077,12 - - 68 1.077,12 15,84 4 23 12 17 0:14 153 2.080,80 65 884,00 218 2.964,80 13,60 4 60 14 30 0:09 WP1-2 RUNNING (07:38-14:03), WP3-4 RUNNING (07:15-16:53) WP1-2 OFF, WP3-4 RUNNING (19:10-21:59)
08/03/2023 64 1.013,76 32 506,88 96 1.520,64 15,84 3 25 10 16 0:18 183 3.261,06 67 1.193,94 250 4.455,00 17,82 3 63 21 42 0:08 WP1-2 RUNNING (07:40-16:26), WP3-4 RUNNING (07:09-16:52) WP1-2 RUNNING (19:16-21:46), WP3-4 RUNNING (19:00-21:56)
10/03/2023 66 1.045,44 - - 66 1.045,44 15,84 3 30 13 22 0:14 169 2.298,40 - - 169 2.298,40 13,60 3 57 56 56 0:08 WP1-2 RUNNING (07:45-16:20), WP3-4 RUNNING (07:17-16:50) KEGIATAN OFF HUJAN & SLIPPERY
11/03/2023 - - - - - - - - - - - - 191 3.403,62 - - 191 3.403,62 17,82 4 49 45 48 0:08 WP1-2 OFF, WP3-4 RUNNING (07:00-17:00) KEGIATAN OFF HUJAN & SLIPPERY
12/03/2023 40 633,60 - - 40 633,60 15,84 4 15 2 10 0:18 221 3.005,60 - - 221 3.005,60 13,60 4 56 55 55 0:08 WP1-2 RUNNING (08:42-14:25), WP3-4 RUNNING (07:00-16:45) KEGIATAN OFF HUJAN & SLIPPERY
13/03/2023 42 665,28 - - 42 665,28 15,84 4 13 7 11 0:13 122 1.659,20 - - 122 1.659,20 13,60 6 32 2 20 0:08 WP1-2 RUNNING (10:15-14:58), WP3-4 RUNNING (07:00-14:30) KEGIATAN OFF HUJAN & SLIPPERY
14/03/2023 94 1.488,96 36 570,24 130 2.059,20 15,84 4 26 10 18 0:13 133 1.808,80 - - 133 1.808,80 13,60 4 55 26 33 0:08 WP1-2 RUNNING (09:47-16:35), WP3-4 RUNNING (07:00-16:45) WP1-2 RUNNING (19:09-21:45), WP3-4 OFF
15/03/2023 113 1.789,92 50 792,00 163 2.581,92 15,84 4 29 9 20 0:15 - - - - - - - - - - - - WP1-2 RUNNING (07:45-16:37), WP3-4 OFF WP1-2 RUNNING (19:10-20:00), WP3-4 OFF
16/03/2023 32 506,88 38 601,92 70 1.108,80 15,84 4 11 7 9 0:14 - - - - - - - - - - - - WP1-2 RUNNING (14:36-16:45), WP3-4 OFF WP1-2 RUNNING (19:02-20:46), WP3-4 OFF
17/03/2023 109 1.726,56 - - 109 1.726,56 15,84 4 30 26 27 0:13 184 3.278,88 - - 184 3.278,88 17,82 4 49 44 46 0:09 WP1-2 RUNNING (08:00-16:53), WP3-4 RUNNING (07:00-16:45) KEGIATAN OFF HUJAN & SLIPPERY
18/03/2023 - - 136 2.154,24 136 2.154,24 15,84 7 35 1 24 0:13 - - - - - - - - - - - - KEGIATAN OFF HUJAN & SLIPPERY WP1-2 RUNNING (19:08-04:03), WP3-4 OFF
19/03/2023 137 2.170,08 47 744,48 184 2.914,56 15,84 4 42 13 25 0:13 164 2.922,48 61 1.087,02 225 4.009,50 17,82 4 55 2 35 0:08 WP1-2 RUNNING (07:34-16:40), WP3-4 RUNNING (08:09-16:57) WP1-2 RUNNING (19:13-23:37), WP3-4 RUNNING (19:00-21:58)
20/03/2023 173 2.740,32 211 3.342,24 384 6.082,56 15,84 5 48 26 38 0:10 117 2.084,94 - - 117 2.084,94 17,82 6 27 12 20 0:10 WP1-2 RUNNING (09:18-16:45), WP3-4 RUNNING (08:15-15:37) WP1-2 RUNNING (18:50-04:50), WP3-4 OFF
21/03/2023 149 2.360,16 185 2.930,40 334 5.290,56 15,84 5 52 1 37 0:10 201 3.581,82 - - 201 3.581,82 17,82 4 56 42 50 0:08 WP1-2 RUNNING (08:20-16:44), WP3-4 RUNNING (07:50-16:55) WP1-2 RUNNING (19:00-04:55), WP3-4 OFF
22/03/2023 165 2.613,60 - - 165 2.613,60 15,84 5 55 6 33 0:08 165 2.940,30 - - 165 2.940,30 17,82 3 57 54 55 0:08 WP1-2 RUNNING (07:23-16:30), WP3-4 RUNNING (08:04-16:30) LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN)
23/03/2023 - - 179 2.835,36 179 2.835,36 15,84 6 45 1 18 0:11 - - 146 2.601,72 146 2.601,72 17,82 3 51 11 34 0:10 LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN) WP1-2 RUNNING (19:21-04:50), WP3-4 RUNNING (19:00-04:50)
24/03/2023 106 1.679,04 117 1.853,28 223 3.532,32 15,84 3 42 23 33 0:11 138 2.459,16 162 2.886,84 300 5.346,00 17,82 3 54 36 50 0:09 WP1-2 RUNNING (07:52-16:36), WP3-4 RUNNING (07:30-16:10) WP1-2 RUNNING (19:47-04:40), WP3-4 RUNNING (19:17-04:57)
25/03/2023 105 1.663,20 102 1.615,68 207 3.278,88 15,84 5 29 9 23 0:13 150 2.673,00 166 2.958,12 316 5.631,12 17,82 4 55 26 40 0:09 WP1-2 RUNNING (08:03-16:36), WP3-4 RUNNING (07:00-16:31) WP1-2 RUNNING (19:10-23:45), WP3-4 RUNNING (19:05-04:55)
26/03/2023 126 1.995,84 97 1.536,48 223 3.532,32 15,84 5 30 9 23 0:13 170 3.029,40 77 1.372,14 247 4.401,54 17,82 5 46 12 27 0:09 WP1-2 RUNNING (08:07-16:23), WP3-4 RUNNING (07:55-16:33) WP1-2 RUNNING (19:13-23:54), WP3-4 RUNNING (19:03-21:55)
27/03/2023 103 1.631,52 - - 103 1.631,52 15,84 5 30 11 21 0:13 167 2.975,94 - - 167 2.975,94 17,82 3 57 54 56 0:08 WP1-2 RUNNING (08:07-16:23), WP3-4 RUNNING (07:55-16:33) KEGIATAN OFF HUJAN & SLIPPERY
28/03/2023 127 2.011,68 251 3.975,84 378 5.987,52 15,84 7 56 6 29 0:12 154 2.258,98 - - 154 2.258,98 14,67 4 51 15 39 0:08 WP1-2 RUNNING (09:00-16:28), WP3-4 RUNNING (08:40-16:37) WP1-2 RUNNING (19:18-05:00), WP3-4 OFF
29/03/2023 140 2.217,60 204 3.231,36 344 5.448,96 15,84 6 45 7 32 0:13 129 2.298,78 - - 129 2.298,78 17,82 3 44 41 43 0:08 WP1-2 RUNNING (07:07-16:21), WP3-4 RUNNING (07:00-16:40) WP1-2 RUNNING (19:13-05:00), WP3-4 OFF
30/03/2023 165 2.613,60 109 1.726,56 274 4.340,16 15,84 5 40 21 28 0:10 197 3.510,54 - - 197 3.510,54 17,82 4 54 42 49 0:09 WP1-2 RUNNING (08:39-16:26), WP3-4 RUNNING (07:00-16:36) WP1-2 RUNNING (19:03-22:00), WP3-4 OFF
TOTAL 2489 39.425,76 1976 31.299,84 4465 70.725,60 15,84 4 32 9 21 0:14 3944 65.673,84 1141 19.708,06 5085 85.381,90 16,79 4 50 29 40 0:08
PT.JAGA USAHA SANDAI 1 CV.FRAND USAHA KITA PT.SARANA KARYA DUA SATU PT.SARWA INSPIRASI KONTRUKSI PT.BULAWAN GATRA WANI PT.CITA MINERAL INVESTINDO TOTAL
TANGGAL
RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT
01 Maret 2023 96 2.834,05 35 2,7 13 328,15 3 4,3 24 834,00 6 4,0 43 1.210,45 21 2,0 8 223,35 6 1,3 22 638,25 10 2,2 206 6.068,25 81
02 Maret 2023 145 4.156,10 42 3,5 13 317,55 3 4,3 30 924,15 6 5,0 71 1.833,10 22 3,2 4 114,20 2 2,0 96 2.523,15 21 4,6 359 9.868,25 96
03 Maret 2023 104 3.056,30 32 3,3 8 200,00 3 2,7 33 1.093,25 7 4,7 76 2.012,35 21 3,6 8 252,45 5 1,6 85 2.239,00 18 4,7 314 8.853,35 86
04 Maret 2023 141 4.235,45 42 3,4 14 321,95 4 3,5 28 913,70 7 4,0 86 2.012,60 21 4,1 8 225,40 6 1,3 86 2.067,45 20 4,3 363 9.776,55 100
05 Maret 2023 133 4.036,20 38 3,5 16 400,25 3 5,3 29 963,85 7 4,1 67 1.781,60 21 3,2 6 188,00 4 1,5 82 2.156,30 21 3,9 333 9.526,20 94
06 Maret 2023 135 3.901,25 39 3,5 10 271,15 3 3,3 26 827,25 7 3,7 66 1.768,30 19 3,5 6 192,45 4 1,5 94 2.579,10 19 4,9 337 9.539,50 91
07 Maret 2023 138 4.122,70 46 3,0 14 364,55 4 3,5 15 498,60 6 2,5 51 1.396,05 18 2,8 23 647,90 10 2,3 72 1.933,25 19 3,8 313 8.963,05 103
08 Maret 2023 120 3.449,95 30 4,0 14 343,10 4 3,5 36 1.171,20 6 6,0 80 2.120,15 18 4,4 7 218,85 4 1,8 94 2.526,90 20 4,7 351 9.830,15 82
09 Maret 2023 - - - - 1 22,45 1 1,0 3 86,80 3 1,0 11 295,25 11 1,0 - - - - 6 162,30 6 1,0 21 566,80 21
10 Maret 2023 61 1.974,50 20 3,1 7 180,70 3 2,3 15 508,55 5 3,0 51 1.423,10 20 2,6 5 169,25 3 1,7 - - - - 139 4.256,10 51
11 Maret 2023 101 2.987,25 36 2,8 10 261,40 4 2,5 13 418,50 4 3,3 59 1.624,50 21 2,8 20 547,30 10 2,0 - - - - 203 5.838,95 75
12 Maret 2023 86 2.573,20 36 2,4 10 255,50 4 2,5 20 634,30 6 3,3 40 1.053,00 18 2,2 21 585,80 9 2,3 - - - - 177 5.101,80 73
13 Maret 2023 118 3.529,00 44 2,7 9 231,85 4 2,3 13 433,40 5 2,6 54 1.489,65 20 2,7 4 113,45 4 1,0 - - - - 198 5.797,35 77
14 Maret 2023 137 4.186,15 39 3,5 10 267,65 4 2,5 25 806,75 6 4,2 50 1.423,90 19 2,6 9 285,45 6 1,5 12 340,60 11 1,1 243 7.310,50 85
15 Maret 2023 151 4.530,35 47 3,2 13 335,90 4 3,3 26 810,95 6 4,3 47 1.279,45 18 2,6 12 355,80 5 2,4 1 28,50 1 1,0 250 7.340,95 81
16 Maret 2023 43 1.182,80 21 2,0 8 197,05 4 2,0 9 255,55 4 2,3 9 239,00 6 1,5 - - - - - - - - 69 1.874,40 35
17 Maret 2023 111 3.252,50 43 2,6 13 318,20 4 3,3 15 447,60 7 2,1 48 1.252,80 20 2,4 18 512,70 11 1,6 2 55,15 2 1,0 207 5.838,95 87
18 Maret 2023 72 1.950,00 33 2,2 11 272,80 5 2,2 - - - - 29 780,20 19 1,5 4 116,95 4 1,0 - - - - 116 3.119,95 61
19 Maret 2023 126 3.961,85 38 3,3 20 523,25 5 4,0 13 379,35 4 3,3 59 1.631,60 22 2,7 15 464,80 9 1,7 128 3.344,75 36 3,6 361 10.305,60 114
21 Maret 2023 119 3.560,15 39 3,1 19 457,35 4 4,8 21 609,50 6 3,5 81 2.159,10 22 3,7 33 900,50 10 3,3 168 4.064,65 36 4,7 441 11.751,25 117
22 Maret 2023 56 1.890,80 24 2,3 11 261,65 4 2,8 13 393,90 6 2,2 50 1.271,70 20 2,5 9 287,85 6 1,5 97 2.275,00 34 2,9 236 6.380,90 94
23 Maret 2023 - - - - - - - - - - - - - - - - - - - - - - - - - - -
24 Maret 2023 72 2.309,10 29 2,5 14 368,00 5 2,8 21 659,90 6 3,5 55 1.480,50 21 2,6 6 195,55 3 2,0 - - - - 168 5.013,05 64
25 Maret 2023 105 3.185,90 43 2,4 20 515,55 5 4,0 23 668,50 5 4,6 50 1.366,65 21 2,4 4 108,15 4 1,0 - - - - 202 5.844,75 78
26 Maret 2023 67 2.038,85 36 1,9 17 438,25 5 3,4 24 720,05 6 4,0 50 1.357,85 21 2,4 16 462,85 8 2,0 - - - - 174 5.017,85 76
27 Maret 2023 60 2.020,30 24 2,5 11 258,90 5 2,2 13 388,20 6 2,2 68 1.730,25 22 3,1 7 214,35 6 1,2 - - - - 159 4.612,00 63
28 Maret 2023 152 4.529,95 53 2,9 12 304,90 4 3,0 18 527,90 5 3,6 58 1.569,40 21 2,8 6 168,85 4 1,5 30 850,55 13 2,3 276 7.951,55 100
29 Maret 2023 167 5.126,35 49 3,4 19 479,00 4 4,8 19 546,55 5 3,8 68 1.810,40 21 3,2 25 679,45 10 2,5 20 539,40 8 2,5 318 9.181,15 97
30 Maret 2023 145 4.333,35 46 3,2 12 314,50 4 3,0 16 484,40 5 3,2 72 1.946,05 21 3,4 8 259,65 4 2,0 20 567,60 17 1,2 273 7.905,55 97
TOTAL 2.961 88.914,35 37 2,9 350 8.837,60 4 3,2 541 17.006,65 6 3,6 1.549 41.318,95 19 2,8 292 8.491,30 6 1,9 1.137 29.495,15 18 3,4 6.830 194.064,00 90
27 29 27 28 26 CMI 19 29
BPP 1-2 BPP 3-4 TOTAL TABULASI HAULING ALL KONTRAKTOR WP 1,2,3,4
PERUSAHAAN UNIT/HR AVERAGE AVERAGE AVERAGE
RIT/HR TON/HR RIT/UNIT/HR
rit ton ton/rit % rit ton ton/rit % rit ton ton/rit %
88.914,35
PT.Jaga Usaha Sandai 1 37 2.040 62.569,90 30,7 71,91% 921 26.344,45 28,60 24,61% 2.961 88.914,35 30 45,82% 110 3.293,12 2,9
PT.Sarwa Inspirasi Kontruksi 19 262 7.029,60 26,83 8,08% 1.287 34.289,35 26,64 32,03% 1.549 41.318,95 27 21,29% 55 1.475,68 2,8 41.318,95
29.495,15
17.006,65 8.837,60 8.491,30
PT.Cita Mineral Investindo 18 163 4.275,90 26,23 4,91% 974 25.219,25 25,89 23,56% 1.137 29.495,15 26 15,20% 60 1.552,38 3,4
PT.Sarana Karya Dua Satu 6 212 6.852,85 32,32 7,88% 329 10.153,80 30,86 9,48% 541 17.006,65 31 8,76% 20 629,88 3,6
CV.Frand Usaha Kita 4 69 1.704,00 24,70 1,96% 281 7.133,60 25,39 6,66% 350 8.837,60 25 4,55% 12 304,74 3,2
PT.Bulawan Gatra Wani 6 155 4.575,30 29,52 5,26% 137 3.916,00 28,58 3,66% 292 8.491,30 29 4,38% 11 326,59 1,9
TOTAL 90 2901 87.007,55 29,99 100% 3929 107.056,45 27,25 100% 6.830 194.064,00 28 100% 268 7.582,39 3,0
UPDATE MONITORING MUATAN RATA-RATA DT HAULING WP 1,2,3,4