PT.

JAGA USAHA SANDAI


MONITORING PRODUCTION SITE SANDAI
PERIODE MARET 2023

MINING CF 50% HAULING TAILING


DATE
BPP 1-2 BPP 3-4 TOTAL BPP 1-2 BPP 3-4 TOTAL BPP 1-2 BPP 3-4 TOTAL
RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG RIT TON AVG

01-Mar-23 471 4.334,52 9,20 401 3.705,20 9,24 872 8.039,72 9,22 53 1.604,85 30,28 153 4.463,40 29,17 206 6.068,25 29,46 - - - 77 1.372,14 17,82 77 1.372,14 17,82

02-Mar-23 460 4.771,63 10,37 534 4.870,08 9,12 994 9.641,71 9,70 105 3.008,15 28,65 254 6.860,10 27,01 359 9.868,25 27,49 108 1.710,72 15,84 159 2.833,38 17,82 267 4.544,10 17,02
03-Mar-23 498 5.123,30 10,29 474 4.488,56 9,47 972 9.611,86 9,89 90 2.760,40 30,67 224 6.092,95 27,20 314 8.853,35 28,20 93 1.473,12 15,84 283 5.043,06 17,82 376 6.516,18 17,33

04-Mar-23 514 4.976,88 9,68 402 4.216,88 10,49 916 9.193,76 10,04 186 5.535,45 29,76 177 4.241,10 23,96 363 9.776,55 26,93 133 2.106,72 15,84 267 4.757,94 17,82 400 6.864,66 17,16

05-Mar-23 546 5.766,45 10,56 546 5.268,32 9,65 1092 11.034,77 10,11 220 6.477,25 29,44 113 3.048,95 26,98 333 9.526,20 28,61 104 1.647,36 15,84 185 3.296,70 17,82 289 4.944,06 17,11

06-Mar-23 516 5.111,45 9,91 447 4.505,28 10,08 963 9.616,73 9,99 164 4.652,85 28,37 173 4.886,65 28,25 337 9.539,50 28,31 109 1.726,56 15,84 262 3.563,20 13,60 371 5.289,76 14,26

07-Mar-23 549 5.896,46 10,74 423 4.272,64 10,10 972 10.169,10 10,46 205 6.012,90 29,33 108 2.950,15 27,32 313 8.963,05 28,64 68 1.077,12 15,84 218 2.964,80 13,60 286 4.041,92 14,13
08-Mar-23 485 5.257,42 10,84 366 3.792,40 10,36 851 9.049,82 10,63 218 6.318,55 28,98 133 3.511,60 26,40 351 9.830,15 28,01 96 1.520,64 15,84 250 4.455,00 17,82 346 5.975,64 17,27

09-Mar-23 - - - - - - - - 21 566,80 26,99 - - - 21 566,80 26,99 - - - - - - - - -

10-Mar-23 354 3.772,48 10,66 230 2.404,56 10,45 584 6.177,04 10,58 139 4.256,10 30,62 - - - 139 4.256,10 30,62 66 1.045,44 15,84 169 2.298,40 13,60 235 3.343,84 14,23

11-Mar-23 232 2.480,64 10,69 328 3.413,12 10,41 560 5.893,76 10,52 203 5.838,95 28,76 - - - 203 5.838,95 28,76 - - - 191 3.403,62 17,82 191 3.403,62 17,82

12-Mar-23 192 1.820,96 9,48 321 3.548,88 11,06 513 5.369,84 10,47 5 273,00 54,60 172 4.828,80 28,07 177 5.101,80 28,82 40 633,60 15,84 221 3.005,60 13,60 261 3.639,20 13,94
13-Mar-23 144 1.332,48 9,25 314 3.442,08 10,96 458 4.774,56 10,42 7 345,35 49,34 191 5.452,00 28,54 198 5.797,35 29,28 42 665,28 15,84 122 1.659,20 13,60 164 2.324,48 14,17

14-Mar-23 325 3.193,69 9,83 410 4.055,36 9,89 735 7.249,05 9,86 16 711,85 44,49 227 6.598,65 29,07 243 7.310,50 30,08 130 2.059,20 15,84 133 1.808,80 13,60 263 3.868,00 14,71

15-Mar-23 68 753,90 11,09 502 5.214,64 10,39 570 5.968,54 10,47 15 752,50 50,17 235 6.588,45 28,04 250 7.340,95 29,36 163 2.581,92 15,84 - - - 163 2.581,92 15,84

16-Mar-23 - - - 357 3.255,84 9,12 357 3.255,84 9,12 69 1.874,40 27,17 - - - 69 1.874,40 27,17 70 1.108,80 15,84 - - - 70 1.108,80 15,84

17-Mar-23 - - - 357 3.255,84 9,12 357 3.255,84 9,12 207 5.838,95 28,21 - - - 207 5.838,95 28,21 109 1.726,56 15,84 184 3.278,88 17,82 293 5.005,44 17,08
18-Mar-23 - - - 255 2.325,60 9,12 255 2.325,60 9,12 116 3.119,95 26,90 - - - 116 3.119,95 26,90 136 2.154,24 15,84 - - - 136 2.154,24 15,84

19-Mar-23 240 2.260,04 9,42 377 3.438,24 9,12 617 5.698,28 9,24 6 361,25 60,21 355 9.944,35 28,01 361 10.305,60 28,55 184 2.914,56 15,84 225 4.009,50 17,82 409 6.924,06 16,93

20-Mar-23 322 3.365,76 10,45 64 583,68 9,12 386 3.949,44 10,23 - - - 23 629,30 27,36 23 629,30 27,36 384 6.082,56 15,84 117 2.084,94 17,82 501 8.167,50 16,30

21-Mar-23 250 2.707,93 10,83 474 4.677,04 9,87 724 7.384,97 10,20 130 3.854,05 29,65 311 7.897,20 25,39 441 11.751,25 27 334 5.290,56 15,84 201 3.581,82 17,82 535 8.872,38 16,58

22-Mar-23 133 1.527,37 11,48 206 2.003,36 9,73 339 3.530,73 10,42 65 2.178,65 33,52 171 4.202,25 24,57 236 6.380,90 27,04 165 2.613,60 15,84 165 2.940,30 17,82 330 5.553,90 16,83
23-Mar-23 - - - 202 1.971,44 9,76 202 1.971,44 9,76 - - - - - - - - - 179 2.835,36 15,84 146 2.601,72 17,82 325 5.437,08 16,73

24-Mar-23 150 1.452,88 9,69 187 1.904,56 10,18 337 3.357,44 9,96 78 2.504,65 32,11 90 2.508,40 27,87 168 5.013,05 29,84 223 3.532,32 15,84 300 5.346,00 17,82 523 8.878,32 16,98

25-Mar-23 318 3.037,88 9,55 244 2.225,28 9,12 562 5.263,16 9,37 97 2.978,25 30,70 105 2.866,50 27,30 202 5.844,75 28,93 207 3.278,88 15,84 316 5.631,12 17,82 523 8.910,00 17,04

26-Mar-23 437 4.093,24 9,37 366 3.421,52 9,35 803 7.514,76 9,36 68 2.110,05 31,03 106 2.907,80 27,43 174 5.017,85 28,84 223 3.532,32 15,84 247 4.401,54 17,82 470 7.933,86 16,88
27-Mar-23 224 2.211,60 9,87 231 2.184,24 9,46 455 4.395,84 9,66 67 2.234,65 33,35 92 2.377,35 25,84 159 4.612,00 29,01 103 1.631,52 15,84 167 2.975,94 17,82 270 4.607,46 17,06

28-Mar-23 138 1.468,32 10,64 199 1.814,88 9,12 337 3.283,20 9,74 142 4.245,30 29,90 134 3.706,25 27,66 276 7.951,55 28,81 378 5987,52 15,84 154 2258,98 14,67 532 8.246,50 15,50

29-Mar-23 255 2.325,60 9,12 334 3.213,28 9,62 589 5.538,88 9,40 119 3.803,55 31,96 199 5.377,60 27,02 318 9.181,15 28,87 344 5.448,96 15,84 129 2298,78 17,82 473 7.747,74 16,38
30-Mar-23 259 2.674,87 10,33 175 1.919,12 10,97 434 4.593,99 10,59 90 2.788,90 30,99 183 5.116,65 27,96 273 7.905,55 28,96 274 4.340,16 15,84 197 3.510,54 17,82 471 7.850,70 16,67

TOTAL 8.080 81.717,77 10,11 9.726 95.391,92 9,81 17.806 177.109,69 9,95 2.901 87.007,55 29,99 3.929 107.056,45 27,25 6.830 194.064,00 28,41 4.465 70.725,60 15,84 5.085 85.381,90 16,79 9.550 156.107,50 16,35

MINING CF 50 % HAULING TAILING

PRODUCTION ANGKUTAN MARET


TARGET/HARI TARGET/HARI YANG TARGET/HARI
TARGET ALL PROGRESS TARGET ALL PROGRESS TARGET ANGKUTAN MARET ALL PROGRESS
BERJALAN BERJALAN DIPINDAHKAN KE BERJALAN
FEBRUARI
BPP 1-2 130.000,00 81.717,77 62,9% 48.282,23 130.000,00 87.007,55 66,9% 42.992,45 75.000,00 -2.328,48 70.725,60 68.397,12 91,2% 6.602,88

BPP 3-4 130.000,00 95.391,92 73,4% 34.608,08 130.000,00 107.056,45 82,4% 22.943,55 75.000,00 -3.082,86 85.381,90 82.299,04 109,7% -

TOTAL 260.000,00 177.109,69 68,1% 82.890,31 260.000,00 194.064,00 74,6% 65.936,00 150.000,00 -5.411,34 156.107,50 150.696,16 100,5% -

SISA HARI KERJA 1 HARI

NOTE : SELISIH SISA STOCK WASH UPDATE CF 50% DENGAN STOCK FISIK ACTUAL LAPANGAN DIPENGARUHI BEBERAPA FAKTOR DIANTARANYA :
- Tonase Wash Perhitungan Mining Masih Assumption CF 50% Belum Assumption CF LAB
- Konsistensi Muatan Bucket Alat Loading Mining (Intern)
- Akurasi Timbangan CMI (Ekstern)
- Persentase : Bentuk Material Yang Halus , Material yang Sudah Lapuk , Material Menjadi Lantai Stock Wash (intern)
MONITORING STOCK WASH WP 1,2,3,4
PERIODE MARET 2023

MINING DRAFT STOCK BUKU


DATE HAULING NOTE
CF 50 CF 50
WP1-2 WP3-4 TOTAL WP 1-2 WP 3-4 TOTAL WP1-2 WP3-4 TOTAL
SISA STOCK FEBRUARI 2023 287,37 8.348,42 8.635,79
01-Mar 4.334,52 3.705,20 8.039,72 1.604,85 4.463,40 6.068,25 3.017,04 7.590,22 10.607,26
02-Mar 4.771,63 4.870,08 9.641,71 3.008,15 6.860,10 9.868,25 4.780,52 5.600,20 10.380,72
03-Mar 5.123,30 4.488,56 9.611,86 2.760,40 6.092,95 8.853,35 7.143,42 3.995,81 11.139,23
04-Mar 4.976,88 4.216,88 9.193,76 5.535,45 4.241,10 9.776,55 6.584,85 3.971,59 10.556,44
05-Mar 5.766,45 5.268,32 11.034,77 6.477,25 3.048,95 9.526,20 5.874,05 6.190,96 12.065,01
06-Mar 5.111,45 4.505,28 9.616,73 4.652,85 4.886,65 9.539,50 6.332,65 5.809,59 12.142,24
07-Mar 5.896,46 4.272,64 10.169,10 6.012,90 2.950,15 8.963,05 6.216,21 7.132,08 13.348,29
08-Mar 5.257,42 3.792,40 9.049,82 6.318,55 3.511,60 9.830,15 5.155,08 7.412,88 12.567,96
09-Mar - 0,00 566,80 - 566,80 4.588,28 7.412,88 12.001,16
10-Mar 3.772,48 2.404,56 6.177,04 4.256,10 - 4.256,10 4.104,66 9.817,44 13.922,10
11-Mar 2.480,64 3.413,12 5.893,76 5.838,95 - 5.838,95 746,35 13.230,56 13.976,91
12-Mar 1.820,96 3.548,88 5.369,84 273,00 4.828,80 5.101,80 2.294,31 11.950,64 14.244,95
13-Mar 1.332,48 3.442,08 4.774,56 345,35 5.452,00 5.797,35 3.281,44 9.940,72 13.222,16
14-Mar 3.193,69 4.055,36 7.249,05 711,85 6.598,65 7.310,50 5.763,28 7.397,43 13.160,71
15-Mar 753,90 5.214,64 5.968,54 752,50 6.588,45 7.340,95 5.764,68 6.023,62 11.788,30
16-Mar - 3.255,84 3.255,84 1.874,40 - 1.874,40 3.890,28 9.279,46 13.169,74
17-Mar - 3.255,84 3.255,84 5.838,95 - 5.838,95 -1.948,67 12.535,30 10.586,63
18-Mar - 2.325,60 2.325,60 3.119,95 - 3.119,95 -5.068,62 14.860,90 9.792,28
19-Mar 2.260,04 3.438,24 5.698,28 361,25 9.944,35 10.305,60 -3.169,82 8.354,79 5.184,97
20-Mar 3.365,76 583,68 3.949,44 - 629,30 629,30 195,94 8.309,17 8.505,11
21-Mar 2.707,93 4.677,04 7.384,97 3.854,05 7.897,20 11.751,25 -950,19 5.089,01 4.138,82
22-Mar 1.527,37 2.003,36 3.530,73 2.178,65 4.202,25 6.380,90 -1.601,47 2.890,12 1.288,65
23-Mar - 1.971,44 1.971,44 - - 0,00 -1.601,47 4.861,56 3.260,09
24-Mar 1.452,88 1.904,56 3.357,44 2.504,65 2.508,40 5.013,05 -2.653,23 4.257,72 1.604,49
25-Mar 3.037,88 2.225,28 5.263,16 2.978,25 2.866,50 5.844,75 -2.593,60 3.616,50 1.022,90
26-Mar 4.093,24 3.421,52 7.514,76 2.110,05 2.907,80 5.017,85 -610,41 4.130,22 3.519,81
27-Mar 2.211,60 2.184,24 4.395,84 2.234,65 2.377,35 4.612,00 -633,46 3.937,11 3.303,65
28-Mar 1.468,32 1.814,88 3.283,20 4.245,30 3.706,25 7.951,55 -3.410,44 2.045,74 -1.364,70
29-Mar 2.325,60 3.213,28 5.538,88 3.803,55 5.377,60 9.181,15 -4.888,39 -118,58 -5.006,97
30-Mar 2.674,87 1.919,12 4.593,99 2.788,90 5.116,65 7.905,55 -5.002,41 -3.316,11 -8.318,52

TOTAL 81.717,77 95.391,92 177.109,69 87.007,55 107.056,45 194.064,00 -5.002,41 -3.316,11 -8.318,52

DATA BELUM MASUK (CF LAB & WASH ADJUSTMENT) BY SURVEYOR


SISA STOCK WASH HASIL TOPO MPE
PT.JAGA USAHA SANDAI
MONITORING PENCAPAIAN PRODUKSI BPP 1234
PERIODE MARET 2023

MINING CF 50% HAULING TAILING


DATE
TARGET ACTUAL SELISIH TARGET ACTUAL SELISIH TARGET ACTUAL SELISIH
ANGKUTAN TAILING MARET YANG DIPINDAHKAN KE FEBRUARI -5.411,34
01-Mar 8.387,10 8.039,72 -347,38 8.387,10 6.068,25 -2.318,85 4.838,71 1.372,14 -3.466,57
02-Mar 8.398,68 9.641,71 1.243,04 8.464,39 9.868,25 1.403,86 5.134,64 4.544,10 -590,54
03-Mar 8.355,81 9.611,86 1.256,05 8.415,98 8.853,35 437,37 5.155,00 6.516,18 1.361,18
04-Mar 8.310,95 9.193,76 882,80 8.400,36 9.776,55 1.376,19 5.106,39 6.864,66 1.758,27
05-Mar 8.278,26 11.034,77 2.756,52 8.349,39 9.526,20 1.176,81 5.041,27 4.944,06 -97,21
06-Mar 8.172,24 9.616,73 1.444,50 8.304,13 9.539,50 1.235,37 5.045,01 5.289,76 244,75
07-Mar 8.114,46 10.169,10 2.054,64 8.254,72 8.963,05 708,33 5.035,22 4.041,92 -993,30
08-Mar 8.028,85 9.049,82 1.020,97 8.225,20 9.830,15 1.604,95 5.076,61 5.975,64 899,04
09-Mar 7.984,46 0,00 -7.984,46 8.155,42 566,80 -7.588,62 5.037,52 0,00 -5.037,52
10-Mar 8.347,39 6.177,04 -2.170,35 8.500,36 4.256,10 -4.244,26 5.266,49 3.343,84 -1.922,65
11-Mar 8.450,74 5.893,76 -2.556,98 8.702,47 5.838,95 -2.863,52 5.358,05 3.403,62 -1.954,43
12-Mar 8.578,59 5.369,84 -3.208,75 8.845,64 5.101,80 -3.743,84 5.455,77 3.639,20 -1.816,57
13-Mar 8.747,47 4.774,56 -3.972,91 9.042,69 5.797,35 -3.245,34 5.551,38 2.324,48 -3.226,90
14-Mar 8.968,18 7.249,05 -1.719,14 9.222,98 7.310,50 -1.912,48 5.730,65 3.868,00 -1.862,65
15-Mar 9.069,31 5.968,54 -3.100,77 9.335,48 7.340,95 -1.994,53 5.840,22 2.581,92 -3.258,30
16-Mar 9.263,11 3.255,84 -6.007,27 9.460,14 1.874,40 -7.585,74 6.043,86 1.108,80 -4.935,06
17-Mar 9.663,59 3.255,84 -6.407,75 9.965,86 5.838,95 -4.126,91 6.372,87 5.005,44 -1.367,43
18-Mar 10.121,29 2.325,60 -7.795,69 10.260,64 3.119,95 -7.140,69 6.470,54 2.154,24 -4.316,30
19-Mar 10.720,96 5.698,28 -5.022,67 10.809,92 10.305,60 -504,32 6.802,56 6.924,06 121,50
20-Mar 11.139,51 3.949,44 -7.190,07 10.851,95 629,30 -10.222,65 6.792,44 8.167,50 1.375,06
21-Mar 11.793,16 7.384,97 -4.408,19 11.781,28 11.751,25 -30,03 6.667,43 8.872,38 2.204,95
22-Mar 12.233,98 3.530,73 -8.703,24 11.784,28 6.380,90 -5.403,38 6.446,94 5.553,90 -893,04
23-Mar 13.201,00 1.971,44 -11.229,56 12.384,66 0,00 -12.384,66 6.546,17 5.437,08 -1.109,09
24-Mar 14.604,70 3.357,44 -11.247,26 13.932,74 5.013,05 -8.919,69 6.684,80 8.878,32 2.193,52
25-Mar 16.211,45 5.263,16 -10.948,29 15.206,98 5.844,75 -9.362,23 6.371,44 8.910,00 2.538,56
26-Mar 18.036,17 7.514,76 -10.521,40 16.767,35 5.017,85 -11.749,50 5.948,35 7.933,86 1.985,51
27-Mar 20.140,45 4.395,84 -15.744,61 19.117,25 4.612,00 -14.505,25 5.551,25 4.607,46 -943,79
28-Mar 24.076,60 3.283,20 -20.793,40 22.743,56 7.951,55 -14.792,01 5.787,19 8.246,50 2.459,31
29-Mar 31.007,73 5.538,88 -25.468,85 27.674,23 9.181,15 -18.493,08 4.967,43 7.747,74 2.780,31
30-Mar 43.742,15 4.593,99 -39.148,16 36.920,78 7.905,55 -29.015,23 3.577,27 7.850,70 4.273,43
31-Mar 82.890,31 0,00 0,00 65.936,00 0,00 0,00 - 0,00 0,00

EFEKTIFITAS
251.612,90 177.109,69 -74.503,22 251.612,90 194.064,00 -57.548,90 145.161,29 150.696,16 5.534,87
KERJA

KEKURANGAN TON TARGET


PRODUCTION TARGET/BLN PENCAPAIAN TARGET 31/03/2023
HARI BERJALAN
MINING 260.000,00 177.109,69 82.890,31 -74.503,22
HAULING 260.000,00 194.064,00 65.936,00 -57.548,90
TAILING 150.000,00 150.696,16 - 5.534,87

SISA HARI 1
UPDATE MONITORING MUATAN RATA-RATA/RIT PRODUKSI MINING WP 1-2-3-4
PERIODE MARET 2023

WP 1 WP 2 WP 3 WP 4
TANGGAL
BLOK 6 BLOK 24 BLOK 63 BOLDER INT-WP BLOK 24 BLOK 63 BLOK 69 BOLDER INT-WP BLOK 6 BLOK 70 BOLDER INT-WP BLOK 20 BLOK 69 BLOK 70 BOLDER INT-WP
6 24 63 BOLDER IW 24 63 69 BOLDER IW 6 70 BOLDER IW 20 69 70 BOLDER IW
01-Mar-23 9,12 - 9,12 - 10,64 # - 9,19 - - - # - 9,12 - - # 9,17 - - - 12,00
02-Mar-23 9,12 - - - 12,00 # - 11,48 - - - # - 9,12 - - # 9,12 - - - -
03-Mar-23 9,12 - - - - # - 11,48 - - - # - 9,12 - - # 9,79 - - - -
04-Mar-23 9,12 - - - - # - 11,27 10,27 - 9,20 # - 9,97 - - # 9,12 9,91 - - 13,33
05-Mar-23 9,90 - - - - # - 11,18 - - - # - 9,95 - - # 9,12 9,65 9,12 - -
06-Mar-23 9,58 - - - - # - 10,23 - - - # - 9,48 - - # 10,64 - 10,64 - -
07-Mar-23 9,88 - - - - # - 11,48 - - - # - 10,01 - 12,00 # 9,12 - 10,64 - -
08-Mar-23 10,32 - - - - # - 11,35 - - - # - 10,64 - - # 10,25 - 9,12 - -
09-Mar-23 - - - - - # - - - - - # - - - - # - - - - -
10-Mar-23 10,64 - - - - # 9,12 - - - 12,00 # - 10,64 - - # - - 9,82 - 12,00
11-Mar-23 9,85 - - - 9,12 # - - - - 12,00 # - 9,80 - - # 9,57 - - - 12,00
12-Mar-23 9,77 - - - 9,12 # - - - - 9,12 # - 10,64 - - # - - 10,44 - 12,00
13-Mar-23 9,12 - - - 9,37 # - - - - - # - 9,12 - - # - - 9,12 - 12,63
14-Mar-23 9,12 - - - - # - 10,46 - - - # - 9,51 - - # - - 10,20 - -
15-Mar-23 10,64 - - - - # - 11,48 - - - # - 10,16 - - # - - 10,64 - 9,60
16-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - 9,12
17-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - 9,12
18-Mar-23 - - - - - # - - - - - # - 9,12 - - # - - 9,12 - -
19-Mar-23 9,12 - - - - # - 10,15 - - 9,12 # - 9,12 - - # - - 9,12 - -
20-Mar-23 - - - - - # - - - - 10,45 # - - - - # - - 9,12 - -
21-Mar-23 - - 11,48 - - # - 10,64 - - - # 9,44 9,69 - - # - - 10,16 - -
22-Mar-23 - - 11,48 - - # - - - - - # 9,12 - - - # - - 10,64 - -
23-Mar-23 - - - - - # - - - - - # - - - 10,64 # - - 9,12 - -
24-Mar-23 - 9,12 - - - # - 10,14 - - 9,60 # - 10,00 - - # - - 9,87 - 10,64
25-Mar-23 9,12 - - - 10,03 # - 9,68 - - - # - 9,12 - - # - - 9,12 - -
26-Mar-23 9,12 9,12 - - - # - 9,59 - - - # 9,12 - - - # - - 9,46 - -
27-Mar-23 - 9,12 - - - # - 10,64 - - - # 9,12 - - - # - - 9,79 - -
28-Mar-23 - - - - - # - 10,64 - - - # - 9,12 - - # - - 9,12 - -
29-Mar-23 - 9,12 - - - # - - - - - # - 9,12 - - # - - 9,88 - -
30-Mar-23 - 9,12 - - - # - - - - 11,75 # - - - - # - - 10,64 - 11,41
L
AVG 9,57 9,12 10,23 - 9,80 # 9,12 10,67 10,27 - 10,69 # 9,19 9,60 - 11,13 # 9,51 9,71 9,78 - 11,40

CATATAN
WASH CF ASSUMPTION 50 %
RATA-RATA MUATAN SESUAI LAPORAN CHECKER WP YANG SUDAH DI PERIKSA FOREMAN DAN SPV DI POST MASING-MASING
MUATAN DI BAWAH 10,00 TON/RIT
WASH MATERIAL BOLDER = 30% DARI PERHITUNGAN UNWASH
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION MINING WP 1-2
PERIODE MARET 2023

SHIFT 1 SHIFT 2 TOTAL BLOK - WP

24 63 6 69 INTERMEDIET/BOLDER - WP KETERANGAN
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM

AVG AVG AVG AVG AVG


AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG
RIT TON BUCKET TON RIT TON BUCKET TON RIT TON TON/RIT BUCKET TON TON/RIT CIRCLE CIRCLE CIRCLE CIRCLE CIRCLE SHIFT 1 SHIFT 2
OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT
TIME TIME TIME TIME TIME

WP1 07:00-07:42 PERSIAPAN A2B LOADING & 08:44-10:08 WAITING WP1 19:00-19:18 WAITING UNIT, 23:13-23:57, 13:17-14:55
INFO & PREPARE LOADING BLOK 6, 10:15 HUJAN PRODUKSI SLOWLY KURANG DT, WP2 19:00-19:21 MENUNGGU OPERATOR,
01/03/2023 236 2.184,06 - - 235 2.150,46 - - 471 4.334,52 9,20 - - - - - - 0:27 7 14 0:13 2 1 - - - 0:09 2 5 DIALIHKAN BLOK 63, 15:00-16:00, 16:02-16:55 SLOWLY KURANG DT, 19:51-19:57, 21:02-21:09, 21:14-21:21 BOLDER, 23:18-00:00
WP2 07:00-08:49 SLIPPERY & REPAIR MINEROAD, 13:00-13:17 MATERIAL BETROCK DT DUMPING INTERMEDIET, 01:00-01:43,
BOLDER, 14:28-14:54, 15:35-16:14 SLOWLY KURANG DT 03:04-04:51 SLOWLY KURANG DT
WP1 07:00-08:10 SAFETY GENERAL ALERT, 08:30-08:37 PERBAIKAN
WP1 20:47-20:58, 22:49-23:01 SLOWLY LOW WATER SPRAY, 01:22-
GORONG-GORONG KEGIATAN SEMENTARA LOADING DARI STOCK
01:41 PENGONDISIAN DT AMBLAS, 02:21-02:29, 02:45-03:17
INTERMEDIET, 09:34-09:47 PINDAH POST BLOK LOADING, 10:00-
BOLDE, 03:30-04:55 SLOWLY KURANG DT, WP2 20:10-20:20
02/03/2023 235 2.483,23 - - 225 2.288,40 - - 460 4.771,63 10,37 - - - - - - 0:28 7 15 0:16 5 24 - - - 0:10 2 7 11:16, 13:00-14:07 SLOWLY KURANG DT, 14:46-14:57 KAYU DI
BOLDER, 20:46-23:08 LOW WATER SPRAY DT DUMPING
HOPPER, 16:11-16:27 BOLDER, WP2 07:00-07:55 GENERAL SAFETY
INTERMEDIET, 03:03-03:23 PART BPP PROBLEM, 04:15-04:53
ALERT, 13:06-13:18 BOLDER, 13:19-13:44, 16:33-16:54 SLOWLY
SLOWLY KURANG DT
KURANG DT
WP1 07:00-07:10 WAITING UNIT, 07:55-08:26 SLOWLY KURANG DT,
WP1 22:30-23:58 SLOWLY KURANG DT, 01;26-01:38 BOLDER, 02:27-
11:00-12:00 IBADAH JUM'AT, 13:00-13:13 WAITING UNIT, 15:09-
02:40 BOLDER, WP2 19:00-19:27 TRAVEL A2B LOADING, 20:23-
16:45 SLOWLY KURANG DT, WP2 07:00-07:40 PART BPP PROBLEM,
03/03/2023 239 2.442,08 - - 259 2.681,22 - - 498 5.123,30 10,29 - - - - - - 0:26 7 12 0:12 7 19 - - - - - - 20:35, 21:38-21;48, 22:31-22:42, 23:07-23:2, 01:04-01:19 BOLDER,
08:16-09:31 SLOWLY KURANG DT, 09:58-10:11 BOLDER, 11:00-12:00
02:49-03:16 ANGKAT JARING LOUNDER, 03:20-04:00 SLOWLY
IBADAH JUM'AT, 15:19-15:25 PERAPIAN MATERIAL DEPAN HOPPER,
KURANG DT
15:32-15:40, 15:54-16:05, 16:08-16:14 BOLDER

WP1 22:56-00:00 OFF HUJAN, SLIPPERY & REPAIR MINEROAD,


WP1 07:00-07:12 WAITING UNIT MINESUPPORT, 14:18-16:15
01:00-02:00 SLOWLY BROKEN MINEROAD, 0431-04:44 SLOWLY
SLOWLY KURANG DT, WP2 07:00-07:17 TRAVEL A2B LOADING, 08:41-
04/03/2023 263 2.544,48 - - 251 2.432,40 - - 514 4.976,88 9,68 - - - - - - 0:25 7 8 0:13 6 24 0:19 5 25 0:07 2 38 KURANG DT & BROKEN MINEROAD, WP2 19:00-19:15 WAITING
09:21 SLOWLY KURANG DT, 14:07-14:18, 14:27-14:37, 14:40-14:53,
OPERATOR, 22:39-22:52 OFF HUJAN KEGIATAN DI ALIHKAN
15:00-16:06-15:13-15:20 BOLDER
LOADING STOC INTERMEDIET, 04:03-04:18 BOLDER

WP1 07:00-07:13 WAITING UNIT DARI MINESUPPORT, 07:13-08:21


SLOWLY KEKURANGAN UNIT, 10:00-12:00 SLOWLY KEKURANGAN
WP1 19:16-19:19 PERUBAHAN BUCKET, 20:00-22:00 KEKURANGAN
UNIT, 13:00-14:00 KEKURANGAN UNIT, 15:23-17:00 SLOWLY
UNIT, 22:57-24:00 KEKURANGAN UNIT, 02:20-05:00 SLOWLY
05/03/2023 266 2.679,06 - - 280 3.087,40 - - 546 5.766,45 10,56 - - - - - - 0:24 7 17 0:12 4 33 - - - - - - KEKURANGAN UNIT, WP2 07:00-07:28 WAITING UNIT & PREPARE
KEKURANGAN UNIT, WP2 19:00-19:08 WAITING OPERATOR DARI
EXCA LOADINGAN, 09:00-09:53 KEKURANGAN UNIT, 09:53-10:03
MINESUPPORT, 03:00-05:00 SLOWLY KEKURANGAN UNIT
PERPINDAHAN SHAFT, 10:46-10:54 BOLDER, 13:49-13:58 BOLDER,
14:06-14:10 BOLDER

WP1 07:00-07:15 WAITING UNIT DARI MINESUPPORT, 11:00-12:00


SLOWLY KEKURANGAN UNIT, 13:00-13:08 WAITING UNIT DARI BLOK, WP1 19:00-21:00 SLOWLY KEKURANGAN UNIT, 22:32-22:38
13:08-14:00 SLOWLY KEKURANGAN UNIT, 14:30-14:36 OVER CHUTE, PERAPIAN DEPAN HOPPER, 23:12-23:37 PENGANGKATAN JARING
14:42-14:51 OVER CHUTE, 15:23-15:34 PERAPIAN DEPA HOPPER, LOUNDER, 02:00-05:00 SLOWLY KEKURANGAN UNIT, 02:27-02:29
06/03/2023 252 2.417,63 - - 264 2.693,83 - - 516 5.111,45 9,91 - - - - - - 0:24 7 15 0:14 4 32 - - - - - - 16:00-17:00 SLOWLY KEKURANGAN UNIT, WP2 07:00-07:12 WAITING PERPINDAHAN SHAFT, WP2 19:00-19:07 WAITING OPERATOR EXCA
UNIT DARI BLOK, 07:12-08:00 SLOWLY KEKURANGAN UNIT, 09:30- LOADINGAN, 21:00-24:00 KEKURANGAN UNIT, 22:05-22:12
09:32 PENGURANGAN JUMLAH BUCKET, 13:06-13:13 OVER CHUTE, PENAMBAHAN BUCKET, 23:16-23:40 PENGANGKATAN JARING
13:39-13:46 PERPINDAHAN SHAFT, 15:17-15:56 PARRT BPP PROBLEM, LOUNDER, 01:00-05:00 SLOWLY KEKURANGAN UNIT
16:00-17:00 SLOWLY KEKURANGAN UNIT

WP1 07:00-07:14 WAITING UNIT DARI MINESUPPORT, 07:14-08:00


WP1 19:35-20:19 BOLDER, 20:10-24:00 KEKURANGAN UNIT, 01:00-
SLOWLY KEKURANGAN UNIT, 08:45-08:54 BOLDER, 09:00-12:00
01:11 PART BPP PROBLEM, 01:11-05:00 SLOWLY KEKURANGAN
SLOWLY KEKURANGAN UNIT, 13:00-13:05 WAITING UNIT DARI BLOK,
07/03/2023 282 2.938,26 - - 267 2.958,20 - - 549 5.896,46 10,74 - - - - - - 0:24 7 20 0:13 5 27 - - - - - - 13:05-14:00 KEKURANGAN UNIT, 14:00-17:00 SLOWLY, WP2 07:00-
UNIT, WP2 19:00-19:27 TRAVEL EXCA LOADINGAN, 23:00-24:00
SLOWLY KEKURANGAN UNIT, 01:00-02:00 SLOWLY JALAN
07:29 WAITING UNIT DARI MINESUPPORT, 07:29-09:00
BERKABUT TEBAL, 02:00-05:00 SLOWLY KEKURANGAN UNIT
KEKURANGAN UNIT, 16:00-17:00 SLOWLY KEKURANGAN UNIT

WP1 07:00-07:20 WAITING UNIT, 09:47-11:00, 15:54-16:45 SLOWLY WP1 19:00-19:10 WAITING UNIT, 21:11-21:21, 2123-21:33, 21:57-
KURANG DT, WP2 07:00-07:24 WAITING UNIT, 08:12-08:21 BOLDER, 22:06 BOLDER, 23:30-00:00, 01:00-02:15, 04:17-04:55 SLOWLY
08/03/2023 256 2.717,05 - - 229 2.540,37 - - 485 5.257,42 10,84 - - - - - - 0:25 7 16 0:14 5 24 - - - - - - 13:32-14:11 EVAKASI DT TUMBANG, 16:20-16:55 SLOWLY KURANG KURANG DT, WP2 19:00-19:33 WAITING OPERATOR, 02:53-04:00
DT SLOWLY KURANG DT

09/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - KEGIATAN OFF KEGIATAN OFF

WP1 07:00-07:39 WAITING UNIT DARI MINESUPPORT, 09:04-09:17


HOPPER KOSONG, DT 158 AMBLAS, 10:00-11:00 KEKURANGAN UNIT,
11:00-13:00 IBADAH JUM'AT & OVER SHIFT, 13:00-14:00
KEKURANGAN UNIT, 15:15-16:20 SLOWLY KEKURANGAN UNIT, 16:20- WP1 19:00-05:00 OFF BROKEN MINEROAD, HUJAN & SLIPPERY,
17:00 MINING OFF HUJAN & SLIPPERY, WP2 07:00-07:31 WAITING WP2 19:00-19:06 PERSIAPAN KEGIATAN IW, 19:06-24:00 SLOWLY
10/03/2023 227 2.248,48 - - 127 1.524,00 - - 354 3.772,48 10,66 - - - 0:19 7 17 - - - 0:14 5 21 - - - 0:08 2 34
UNIT DARI MINESUPPORT, 07:31-08:00 SLOWLY KEKURANGAN UNIT, SLIPPERY, 01:00-02:00 SLOWLY SLIPPERY, 02:23-02:41 OVER
09:04-09:09 PERPUNDAHAN SHAFT, 10:-11:00 SLOWLY KEKURANGAN CHUTE, 02:41-05:00 SLOWLY SLIPPERY
UNIT, 11:00-13:00 IBDAHA JUM'AT & OVER SHIFT, 13:00-13:13
WAITING UNIT DARI BLOK, 16:17-16:22 MINING OFF HUJAN &
SLIPPERY DILANJUTKAN IW 16:22-17:00

WP1 07:00-08:05 REPAIR MINEROAD WP AREA, 08:07-08:20 BOLDER, WP1 19:00-05:00 OFF, WP2 19:00-20:04 SLIPPERY, 22:10-22:24
11/03/2023 137 1.340,64 - - 95 1.140,00 - - 232 2.480,64 10,69 - - - - - - - - - 0:09 3 42 - - - 0:09 2 27 08:46-08:50 PINDAH POST LOADING, 11:43-11:54 BOLDER, WP2 07:00- CHUTE PENUH WL TROUBLE, 23:25-00:00 SLOWLY KURANG DT,
17:00 OFF 03:10-04:50 SLOWLY KURANG DT

WP1 07:00-07:23 P2H A2B LOADING, 08:31-08:35 PINDAH POST


WP1 19:00-05:00 OFF, WP2 19:00-19:39 PREPARE LOADING
LOADING, 09:21-09:33 CHUTE PENUH, 09:45-09:50, 10:52-11:21,
12/03/2023 126 1.219,04 - - 66 601,92 - - 192 1.820,96 9,48 - - - - - - - - - 0:12 3 36 - - - 0:09 2 21 14:04-14:14 BOLDER, 14:35-14:44 CHUTE PENUH, 15:58-16:50
INTERMEDIET & HUJAN, 01:00-05:00 OFF EXCA LOADING HABIS
BBM
SLOWLY KURANG DT, WP2 07:00-17:00 OFF

WP1 07:00-07:18 REPAIR MINEROAD, 08:17-08:26 PINDAH POST


BLOK LOADING, 13:01-13:17 BOLDER, 13:30-13:40 HUJAN, 13:42-
WP1 21:00-05:00 OFF STOCK INTERMEDIET HABIS, WP2 19:00-
13/03/2023 119 1.104,48 - - 25 228,00 - - 144 1.332,48 9,25 - - - - - - - - - 0:11 4 17 - - - 0:09 2 15 13:58 BOLDER, 15:10-15:17 A2B HANDEL CHUTE SUPPORT LOADING
05:00 OFF
HAULING, 16:00-16:50 SLOWLY MATERIAL LENGKET, WP2 07:00-
17:00 OFF

WP1 07:00-12:00 OFF, 13:45-13:56, 14:05-14:14 BOLDER, 16:26-16:55 WP1 02:28-04:30 SLWOY KURANG DT, 04:30-05:00 OFF KURANG
14/03/2023 83 759,11 - - 242 2.434,58 - - 325 3.193,69 9,83 - - - - - - 0:27 7 9 0:14 5 15 - - - - - - SLOWLY KURANG DT, WP2 07:00-09:53 PENGALIHAN BLOK, 13:00- DT, WP2 19:00-19:22 REPAIR MINEROAD, 01:37-04:00 SLWOLY
17:00 OFF DUMPING INTERMEDIET KURANG DT

WP1 07:00-07:19 P2H & TRAVEL A2B LOADING, 09:40-17:00 OFF


15/03/2023 68 753,90 - - - - 68 753,90 11,09 - - - - - - 0:26 7 5 0:13 3 11 - - - - - - TANGGUL TAILING JEBOL, WP2 07:00-07:26 WAITING OPERATOR, WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL
09:36-17:00 OFF TANGGUL TAILING JEBOL

16/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL

17/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL
SHIFT 1 SHIFT 2 TOTAL BLOK - WP

24 63 6 69 INTERMEDIET/BOLDER - WP KETERANGAN
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM

AVG AVG AVG AVG AVG


AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG
RIT TON BUCKET TON RIT TON BUCKET TON RIT TON TON/RIT BUCKET TON TON/RIT CIRCLE CIRCLE CIRCLE CIRCLE CIRCLE SHIFT 1 SHIFT 2
OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT
TIME TIME TIME TIME TIME

18/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - WP1-2 07:00-17:00 OFF TANGGUL TAILING JEBOL WP1-2 19:00-05:00 OFF TANGGUL TAILING JEBOL

WP1 07:00-07:33 REPAIR MINEROAD, 07:39-07:51, 08:20-08:32 PART


BPP PROBLEM, 08:46-08:57 PENGONDISIAN UNIT AMBLAS, 09:00- WP1 19:00-05:00 OFF PROBLEM TANGGUL TAILING, WP2 19:00-
09:39 REPAIR MINEORAD, 10:48-12:00 PERBAIKAN TANGGUL, 13:49- 19:22 WAITING OPERATOR, 21:05-21:14 HUJAN PRODUKSI
19/03/2023 99 902,88 - - 141 1.357,16 - - 240 2.260,04 9,42 - - - - - - 0:26 7 10 0:17 4 25 - - - 0:06 2 36 13:58 BOLDER, 15:04-15:28 REFUELING A2B LOADING, 16:35-16:56 SLOWLY, 23:23-00:00 OFF HUJAN BROKEN MINEROAD, 01:00-01:14
SLOWLY KURANG DT, WP2 07:00-17:00 OFF PROBLEM TANGGUL PART BPP PROBLEM
TAILING

WP1 07:00-17:00 OFF PROBLEM TANGGUL TAILING, WP2 07:00-07:18 WP1 19:00-05:00 OFF PART BPP PROBLEM, WP2 19:00-20:00, 01:00-
20/03/2023 149 1.788,00 - - 173 1.577,76 - - 322 3.365,76 10,45 - - - - - - - - - - - - - - - 0:07 2 81
WAITING UNIT, 13:00-13:26 PART BPP PROBLEM 02:00 SLOWLY JALAN LICIN WP AREA

WP1 07:00-12:00 OFF PROBLEM TANGGUL TAILING, 14:50-15:03


SLWOLY A2B HANDEL CHUTE TROUBLE, 15:52-16:50 SLOWLY WP1 19:00-05:00 OFF PROBLEM TANGGUL TAILING, WP2 19:00-
21/03/2023 132 1.352,82 - - 118 1.355,11 - - 250 2.707,93 10,83 - - - - - - 0:27 7 16 - - - - - - - - - KURANG DT, WP2 07:00-07:22 P2H A2B LOADING, 11:20-11:58 19:14 WAITING UNIT, 11:50-03:03, 03:15-04:34 SLOWLY KURANG
SLOWLY KURANG DT, 13:13-17:00 OFF PART BPP PROBLEM PRODUKSI DT
DI ALIHKAN KE WP1

WP1 07:00-07:28 WAITING UNIT, 08:06-08:33, 10:00-11:00 SLOWLY


22/03/2023 133 1.527,37 - - - - 133 1.527,37 11,48 - - - - - - 0:25 7 19 - - - - - - - - - KURANG DT, 16:40-17:00 OFF AWAL, WP2 07:00-17:00 OFF PROBLEM LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN)
TANGGUL TAILING

23/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - - LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN) WP1-2 19:00-05:00 OFF TANGGUL TAILING & BLOK BELUM READY

WP1 07:00-08:51 PREPARE FRONT LOADING, 10:00-11:00 SLWOLY


KURANG DT, 11:00-12:00 IBADAH JUM'AT, 13:00-13:10 WAITING
UNIT, 15:28-17:00 OFF HUJAN, WP2 07:00-07:55 PREPARE FRONT
24/03/2023 150 1.452,88 - - - - 150 1.452,88 9,69 - - - 0:19 8 7 0:29 7 8 - - - - - - 0:06 2 9 LOADING, 09:00-11:00 SLWOLY KLURANG DT, 11:00-12:00 OFF WP1-2 19:00-05:00 OFF HUJAN & SLIPPERY
IBADAH JUM'AT, 13:00-13:30 REFUELING A2B LOADING, 14:35-15:21
SLOWLY KURANG DT, 15:37-15:42 HUJAN & PREPARE LOADING
STOCK INTERMEDIET
WP1 07:00-07:41 REPAIR MINEROAD, 08:29-08:40 PENIMBUNAN
JALAN PRODUKSI DARI STOCK INTERMEDIET, 11:40-12:00 OFF STOCK
WP1 19:00-19:09 WAITING UNIT, 21:39-05:00 OFF HUJAN &
INTERMEDIET HABIS, 16:30-17:00 OFF AWAL (PUASA RAMADHAN),
25/03/2023 235 2.202,24 - - 83 835,64 - - 318 3.037,88 9,55 - - - - - - 0:27 7 9 0:12 3 18 - - - 0:07 2 29 WP2 07:00-08:40 SLIPPERY & REPAIR MINEROAD, 10:44-11:22, 13:00-
SLIPPERY, WP2 19:00-19:13 WAITING UNIT, 21:49-21:59 BOLDER,
23:03-00:00, 01:00-05:00 OFF HUJAN & SLIPPERY
14:00 SLOWLY KURANG DT, 16:40-17:00 OFF AWAL (PUASA
RAMADHAN)
WP1 19:00-20:00 SLOWLY KEKURANGAN UNIT, 21:03-21:18
HOPPER KOSONG, PERGANTIAN BOLA LAMPU EXCA LOADINGAN,
22:30-24:00 MINING OFF MATERIAL SHAFT HABIS, 01:00-01:27
WP1 07:00-07:45 REPAIR MINEROAD, 13:06-13:13 PERPINDAHAN
REPAIR MINEROAD PASCA HUJAN, 02:57-03:41 SAHUR, 03:41-04:50
SHAFT, 14:29-14:52 REPAIR JALAN AREA FRONT, 15:00-16:15 SLOWLY
SLOWLY KEKURANGAN UNIT. 04:50-05:00 MINING OFF, WP2 19:00-
KEKURANGAN UNIT, 16:15-16:30 MINING OFF KEKURANGAN UNIT,
26/03/2023 253 2.315,69 - - 184 1.777,55 - - 437 4.093,24 9,37 - - - 0:19 8 16 0:27 7 13 0:13 5 16 - - - - - - 19:08 WAITING UNIT DARI BLOK, 19:39-19:50 PERGANTIAN EXCA
WP2 07:00-08:00 REPAUR MUNEROAD & WAITING UNIT DARI
LOADINGAN, 20:34-21:00 KEKURANGAN UNIT, 22:10-23:30
MINESUPPORT, 09:26-09:37 BOLDER, 13:00-14:22 SLOWLY
KEKURANGAN UNIT, 23:30-24:00 MINING OFF HUJAN & SLIPPERY,
KEKURANGAN UNIT, 15:55-16:32 KEKURANGAN UNIT
01:00-01:25 REPAIR MINEROAD PASCA HUJAN, 01:34-02:55
KEKURANGAN UNIT, 02:55-03:30 SAHUR, 03:30-04:52 SLOWLY
KEKURANGAN UNIT, 04:52-05:00 MINING OFF

WP1 07:00-07:27 WAITING UNIT, 11:00-12:00 SLOWLY KURANG DT,


16:30-17:00 OFF AWAL PUASA RAMADHAN, WP2 07:00-07:29
27/03/2023 224 2.211,60 - - - - 224 2.211,60 9,87 - - - 0:20 8 14 0:27 7 12 - - - - - - - - - WAITING UNIT, 09:07-09:28 BOLDER, 13:00-13:39, 15:31-16:29
WP1-2 19:00-05:00 OFF HUJAN & SLIPPERY
SLOWLY KURANG DT, 16:30-17:00 AWAL PUASA RAMADHAN

WP1 TARGET COMPLATE, WP2 19:00-19:11 WAITING UNIT, 23:24-


28/03/2023 - - 138 1.468,32 - - 138 1.468,32 10,64 - - - - - - 0:25 7 15 - - - - - - - - - WP1-2 07:00-17:00 OFF TARGET COMPLATE 23:56 SLWOLY KURANG DT, 01:00-02:04 SLOWLY KURANG DT,
02:36-03:36 OFF ISTIRAHAT SAHUR

WP1 19:00-19:20 PART BPP PROBLEM, 22:50-22:56 PINDAH SHAFT


WP1 07:10-07:43, 10:11-11:00, 15:05-15:52 SLOWLY KURANG DT, LOADING, 23:12-23:52 SLOWLY KURANG DT, 02:33-05:00 OFF
29/03/2023 156 1.422,72 - - 99 902,88 - - 255 2.325,60 9,12 - - - 0:20 7 19 - - - - - - - - - - - - 16:35-17:00 OFF AWAL PUASA RAMADHAN, WP2 07:00-17:00 OFF HUJAN & SLIPPERY (DRIVER NEGATIF UNTUK PRODUKSI STOCK
TARGET COMPLATE INTERMEDIET), WP2 19:00-05:00 PART BPP SLURRY PUMP
PROBLEM

WP1 07:00-07:15 P2H A2B LOADING, 11:45-12:00 OFF AWAL KURANG WP1 19:00-05:00 OFF HUJAN & BROKEN MINEROAD, WP2 19:00-
DT, 15:25-17:00 OFF HUJAN & SLPPERY, WP2 07:00-12:00 OFF DT 19:25 WAITING A2B LOADING, 22:40-05:00 OFF STOCK
30/03/2023 198 1.942,87 - - 61 732,00 - - 259 2.674,87 10,33 - - - 0:18 6 23 - - - - - - - - - 0:06 2 30
SUPPORT HAULING, 16:10-16:25 SLOWLY KURANG DT, 16:30-17:00 INTERMEDIET HABIS & FRONT LOADING BROKEN MINEROAD
OFF AWAL PUASA RAMADHAN ACCESS

TOTAL 4518 44.950,57 - - 3562 36.767,19 - - 8.080 81.717,77 10,11 - - - 0:19 7 16 0:26 7 13 0:13 4 23 0:19 5 25 0:08 2 27

CATATAN
PW ANGKUTAN DARI BLOK KE WP
PH ANGKUTAN DARI BLOK KE SAMPING WP
PI ANGKUTAN DARI BLOK KE INTERMEDIET (SW)
IW ANGKUTAN DARI STOCK INTERMEDIET KE WP
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION MINING WP 3-4
PERIODE MARET 2023

SHIFT 1 SHIFT 2 TOTAL BLOK - WP

6 20 69 70 INTERMEDIET/BOLDER - WP
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM

AVG AVG AVG AVG AVG


AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG
RIT TON BUCKET TON RIT TON BUCKET TON RIT TON TON/RIT BUCKET TON TON/RIT CIRCLE CIRCLE CIRCLE CIRCLE CIRCLE SHIFT 1 SHIFT 2
OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT
TIME TIME TIME TIME TIME

WP3 07:00-12:00 OFF SLIPPERY BROKEN MINEROAD, 13:00-13:15 WAITING


WP3 19:00-19:30 WAITING OPERATOR & TRAVEL A2B LOADING, 22:07-23:00
UNIT, 13:16-12:00, 16:08-16:55 SLOWLY KURANG DT, WP4 07:00-08:17
SLOWLY KURANG DT, 23:01-23:55 SLOWLY BROKEN MINEROAD ACCESS,
01/03/2023 141 1.323,36 - - 260 2.381,84 - - 401 3.705,20 9,24 - - - - - - 0:25 7 16 - - - 0:26 7 11 0:08 2 4 SLIPPERY & REPAIR MINEROAD, 09:15-09:22 PREPARE PERPINDAHAN POST
01:35-03:00 SLOWLY KURANG DT, WP4 01:00-02:00, 03:00-04:00 SLOWLY
LOADING, 13:00-14:00 SLOWLY KURANG DT, 15:21-15:35, 16:10-17:00 PART
KURANG DT
BPP PROBLEM

WP3 07:00-07:25 SAFETY GENERAL ALERT. 08;57-09:48, 11:13-11:55, 15;20- WP3 19:00-19:20 WAITING OPERATOR, 22:52-00:00, 02:53-04:55 SLOWLY
02/03/2023 271 2.471,52 - - 263 2.398,56 - - 534 4.870,08 9,12 - - - - - - 0:23 7 17 - - - 0:26 8 17 - - - 16:50 SLOWLY KURANG DT, WP4 07:00-07:35 SAFETY GENERAL ALERT, 09:20- KURANG DT, WP4 19:00-19:16 WAITING OPERATOR, 20:00-21:00, 22:52-
09:32 PART BPP PROBLEM, 13:56-14:47, 16:17-16:50 SLOWLY KURANG DT 23:00, 02:55-04:55 SLOWLY KURANG DT

WP3 07:00-07:20 WAITING UNIT, 09:25-10:16 EVAKUASI DT TUMBANG,


10:19-11:00 SLOWLY KURANG DT, 11:00-12:00 IBADAH JUM'AT, 14:00-15:00, WP3 19:00-19:17 WAITING UNIT, 23:35-23:55 SLOWLY KURANG DT, 01:00-
15:19-16:00 SLOWLY KURANG DT, 16:27-17:00 OFF AWAL PUTARAN DT 01:17 WAITING UNIT, 03:00-04:00 SLOWLY KURANG DT, WP4 19:17-20:00,
03/03/2023 201 1.934,96 - - 273 2.553,60 - - 474 4.488,56 9,47 - - - - - - 0:23 7 13 - - - 0:26 8 13 - - - TIDAK MAKSIMAL, WP4 07:00-07:22 PART BPP PROBLEM, 09:00-10:58 22:00-23:00 SLOWLY KURANG DT, 01:00-01:15 WAITING UNIT, 02:16-04:58
SLOWLY KURANG DT, 11:00-12:00 IBADAH JUM'AT, 13:00-13:14, 16:20-16:58 SLOWLY KURANG DT
WAITING UNIT
WP3 07:00-07:34 MENUNNGU OPERATOR, 09:39-09:45 PERPINDAHAN
WP3 19:00-19:13, 19:21-19:37 BOLDER, 23:43-05:00 OFF HUJAN BROKEN
SHAFT LOADING, 14:33-14:50 BOLDER, 15:02-16:00 SLOWLY KURANG DT,
MINEROAD, WP4 20:33-20:58 EVAKUASI DT AMBLAS DI FRONT, 22:41-22:56
04/03/2023 256 2.558,16 - - 146 1.658,72 - - 402 4.216,88 10,49 - - - - - - 0:22 7 11 0:24 5 9 0:27 8 9 0:11 2 21 16:27-17:00 BOLDER, WP4 07:00-07:16 WAITING OPERATOR, 11:00-11:58
HUJAN DAN PERALIHAN PRODUKSI LOADING STOCK INTERMEDIET, 04:25-
SLOWLY KURANG DT, 13:08 PRODUKSI RUNNING INTERMEDIET, 14:56-
05:00 OFF AWAL
15:31, 16:29-17:00 A2B LOADING PROBLEM
WP3 07:00-07:45 REPAIR MINEROAD, 07:45-09:48 SLOWLY KEKURANGAN
UNIT, 09:48-09:58 PERAPIAN DEPAN HOPPER, 10:00-12:00 SLOWLY WP3 19:00-19:08 BOLDER, 19:08-22:00 SLOWLY KEKURANGAN UNIT &
KEKURANGAN UNIT, 13:00-13:20 BOLDER, 13:20-14:58 SLOWLY MATERIAL JALAN FRONT BONYOK, 02:51-02:53 PERPINDAHAN SHAFT, 03:41-03:50
05/03/2023 254 2.482,16 - - 292 2.786,16 - - 546 5.268,32 9,65 - - - - - - 0:20 7 12 0:19 5 30 0:26 8 14 - - - LENGKET, 14:58-15:05 PERAPIAN DEPAN HOPPER, 15:31-17:00 SLOWLY BOLDER, 03:50-05:00 SLOWLY KEKURANGAN UNIT, WP4 19:00-20:00
MATERIAL HALUS & KEKURANGAN UNIT, WP4 07:00-08:00 PERGANTIAN KEKURANGAN UNIT, 21:21-21:36 PART BPP PROBLEM, 22:33-22:37
PLAN LOADINGAN DARI BLOK 70 KE BLOK 20, 13:04-13:34 PENGONDISIAN PERUBAHAN BUCKET, 23:00-24:00 SLOWLY JALAN FRONT BONYOK
JARING TROMOL PRIMERY, 15:00-17:00 SLOWLY HOPPER SERING PENUH
WP3 07:00-07:25 P2H & TRAVEL EXCA LOADINGAN, 07:25-09:00 SLOWLY WP3 19:00-22:00 SLOWLY KEKURANGAN UNIT & JALAN FRONT BONYOK,
KEKURANGAN UNIT, 09:00-12:00 SLOWLY MATERIAL BERLUMPUR, 13:00- 22:00-23:00 SLOWLY JALAN FRONT BONYOK, 23:00-24:00 SLOWLY
15:21 SLOWLY MATERIAL BERLUMPUR, 15:21-17:00 MINING OFF, PART BPP KEKURANGAN UNIT, 01:00-05:00 SLOWLY KEKURANGAN UNIT, WP4 19:00-
06/03/2023 203 2.009,44 - - 244 2.495,84 - - 447 4.505,28 10,08 - - - - - - 0:26 7 18 - - - 0:26 8 12 - - - PROBLEM, WP4 07:00-07:30 P2H & TRAVEL EXCA LOADINGAN, 08:51-09:02 19:15 PENGONDISIAN MESIN POMPA RESERVOIR, 19:23-19:43 BOLDER,
BOLDER, 09:09-09:18 PENGONDISIAN JARING LOUNDER, 09:18-12:00 20:01-20:10 BOLDER23:00-24:00 SLOWLY KEKURANGAN UNIT, 01:00-02:00
SLOWLY HOPPER SERING PENUH, 13:00-13:10 WAITING UNIT DARI BLOK, SLOWLY KEKURANGAN UNIT, 02:00-03:00 SLOWLY MATERIAL HALUS, 03:00-
14:32-14:44 BOLDER, 15:19-17:00 MINING OFF PART BPP PROBLEM 05:00 SLOWLY KEKURANGAN UNIT
WP3 07:00-07:23 P2H & TRAVEL EXCA LOADINGAN, 07:23-07:54
KEKURANGAN UNIT, 07:54-08:15 HOPPER KOSONG, PENYEKRAPAN JALAN DI
AREA FRONT, 08:15-10:00 SLOWLY JALAN FRONT BONYOK, 10:00-12:00
WP3 19:00-19:25 PREPARE EXCA LOADINGAN, 20:05-20:24 BOLDER, 21:00-
SLOWLY JALAN FRONT BONYOK & KEKURANGAN UNIT, 13:00-13:18 REPAIR
24:00 SLOWLY JALAN FRONT BONYOK & KEKURANGAN UNIT, 01:00-05:00
AREA FRONT PASCA HUJAN, 13:59-14:13 MINING OFF DILANJUTKAN IW,
07/03/2023 198 2.058,00 - - 225 2.214,64 - - 423 4.272,64 10,10 - - - - - - 0:24 7 12 - - - 0:26 8 11 0:07 2 24 SLOWLY KEKURANGAN UNIT, WP4 19:00-19:18 WAITING UNIT DARI BLOK,
14:13-17:00 SLOWLY SLIPPERY, WP4 07:00-07:16 P2H & TRAVEL EXCA
19:18-23:00 SLOWLY KEKURANGAN UNIT, 01:00-02:00 SLOWLY
LOADINGAN, 07:16-08:00 KEKURANGAN UNIT, 09:15-09:33 PENGELASAN
KEKURANGAN UNIT, 03:00-05:00 SLOWLY KEKURANGAN UNIT
PLAT PRIMERY, 09:48-10:18 BOLDER, 10:27-10:47 BOLDER, 11:00-12:00
SLOWLY KEKURANGAN UNIT, 13:00-13:58 SLOWLY KEKURANGAN UNIT,
13:58-17:00 MINING OFF HUJAN & SLIPPERY
WP3 19:00-20:04 PART BPP PROBLEM, 20;19-20:29, 20:35-20:45 BOLDER,
WP3 07:00-07:22 P2H A2B LOADING, 08:47-09:02, 10:04-10:25, 13:37-13:46,
03:00-04:55 SLOWLY KURANG DT, WP4 19:00-19:20 WAITING UNIT, 21:02-
08/03/2023 161 1.649,20 - - 205 2.143,20 - - 366 3.792,40 10,36 - - - - - - 0:25 7 14 - - - 0:24 8 11 - - - 14:53-15:24, 15:24-15:43, 15:53-16:09 BOLDER, WP4 07:00-07:45 P2H A2B &
23:27 SLOWLY KURANG DT, 01:00-01:20 WAITING UNIT, 02:00-04:40 SOWLY
TRAVEL A2B LOADING, 10:13-12:00, 13:00-17:00 OFF PART BPP PROBLEM
KURANG DT, 04:40-05:00 OFF AWAL DT KURANG

09/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - KEGIATAN OFF KEGIATAN OFF

WP3 07:00-07:34 P2H & TRAVEL EXCA LOADINGAN, 09:00-10:00 SLOWLY


LOW WATER SPRAY, 10:00-11:00 SLOWLY KEKURANGAN UNIT, 11:00-13:00
IBADAH JUM'AT & OVER SHIFT, 13:06-13:21 PART BPP PROBLEM, 13:21-14:00
KEKURANGAN UNIT, 14:00-16:20 SLOWLY KEKURANGAN UNIT & BROKEN WP3 19:00-05:00 OFF BROKEN MINEROAD, HUJAN & SLIPPERY, WP4 19:00-
10/03/2023 201 2.056,56 - - 29 348,00 - - 230 2.404,56 10,45 - - - - - - - - - - - - 0:26 8 10 0:13 2 15 MINEROAD, 16:20-17:00 MINING OFF HUJAN, WP4 07:00-07:45 P2H & 19:26 PERSIAPAN LOADINGAN IW, 19:49-20:41 PART BPP PROBLEM, 20:41-
TRAVEL EXCA LOADINGAN, 10:00-11:00 PUTARAN DT KURANG MAKSIMAL, 22:20 SLOWLY HUJAN & SLIPPERY, 22:20-05:00 IW OFF HUJAN & SLIPPERY
11:00-13:00 IBADAH JUM'AT & OVER SHIFT, 13:00-13:10 WAITING UNIT DARI
BLOK, 13:10-14:35 SLOWLY JALAN BONYOK, 14:35-16:30 SLOWLY
KEKURANGAN UNIT, 16:30-17:00 MINING OFF HUJAN & SLIPPERY

WP3 07:00-08:00 REPAIR MINEROAD, 14:43-16:17 SLOWLY KURANG DT,


WP3 19:00-05:00 OFF, WP4 19:00-19:39 SLIPPERY, 01:00-02:00 SLOWLY
11/03/2023 228 2.213,12 - - 100 1.200,00 - - 328 3.413,12 10,41 - - - - - - 0:22 7 14 - - - 0:25 7 19 0:08 2 50 16:20-16:37 BOLDER, WP4 07:00-08:08 SLIPPERY & REPAIR MINEROAD,
HUJAN, 03:16-04:55 LSOWLY KURANG DT
14:41-17:00 OFF PART BPP PROBLEM

WP3 07:00-09:43 SLIPPERY & REPAIR MINEROAD + PART BPP PROBLEM,


WP4 07:00-07:27 SLIPPERY & PREPARE LOADING INTERMEDIET, 07:44-08:03 WP3 19:00-05:00 OFF, WP4 19:00-19:52 SLIPPERY & PREPARE LOADING
12/03/2023 218 2.312,88 - - 103 1.236,00 - - 321 3.548,88 11,06 - - - - - - - - - - - - 0:26 8 11 0:10 2 29
PART BPP PROBLEM, 08:03-08:23 PINDAH POST LOADING, 13:15-14:57, 15:00- INTERMEDIET
16:00 SLOWLY KURANG DT
WP3 07:00-08:34 PART BPP PROBLEM, 15:00-17:00 OFF HUJAN, WP4 07:00-
07:35 REPAIR ROAD TANJAKAN WP, 08:47-09:00 PINDAH POST BLOK WP3 19:00-05:00 OFF, WP4 19:00-19:31 HUJAN & PREPARE A2B LOADING
13/03/2023 192 1.978,08 - - 122 1.464,00 - - 314 3.442,08 10,96 - - - - - - - - - - - - 0:29 8 10 0:08 2 36
LOADING, 14:55-15:06 HUJAN & PREPARE PINDAH POT LOADING INTERMEDIET
INTERMEDIET

WP3 07:00-09:30 SLIPPERY MINEROAD, 15:21-15:38 PINDAH SHAFT, 16:00- WP3 19:00-19:28 P2H & TRAVEL A2B LOADING, 19:29-20:00, 21:37-22:00,
16:55 SLOWLY KURANG DT, WP4 07:00-08:06 SLIPPERY & REPAIR 23:26-00:00, 01:00-02:00, 02:20-04:50 SLOWLY KURANG DT, WP4 19:00-
14/03/2023 201 1.972,96 - - 209 2.082,40 - - 410 4.055,36 9,89 - - - - - - - - - - - - 0:27 8 13 - - -
MINEROAD, 10:47-11:06 BOLDER, 13:57-14:16 PART BPP PROBLEM, 16:40- 19:19 P2H & TRAVEL A2B LOADING, 02:07-04:00, 04:10-04:50 SLOWLY
17:00 OFF KURANG DT KURANG DT

WP3 07:00-07:22 PREPARE A2B LOADING, 09:07-10:00 SLOWLY KURANG DT, WP3 19:57-21:00, 22:00-23:00 SLOWLY KURANG DT, 03:18-05:00 OFF HUJAN
15/03/2023 243 2.585,52 - - 259 2.629,12 - - 502 5.214,64 10,39 - - - - - - - - - - - - 0:26 8 12 0:09 2 9 WP4 07:00-07:22 PREPARE A2B LOADING, 11:13-11:55, 13:00-14:00, 16:12- & SLIPPERY, WP4 19:00-19:15 WAITING UNIT, 23:05-23:42 SLOWLY KURANG
16:50 SLOWLY KURANG DT DT, 03:27-03:41 OFF HUJAN PREPARE LOADING INTERMEDIET

WP3 19:00-19:23 REPAIR MINEROAD, 23:00-23:58 SLOWLY KURANG DT,


WP3 07:00-15:00 SLIPPERY, 16:08-16:25 BOLDER, WP4 07:00-07:48 REPAIR
16/03/2023 126 1.149,12 - - 231 2.106,72 - - 357 3.255,84 9,12 - - - - - - - - - - - - 0:26 8 10 0:10 2 21 MINEROAD, 13:00-13:50, 16:35-17:00 SLOWLY KURANG DT
02:38-04:17 SLOWLY KURANG DT, WP4 19:00-19:30 REPAIR MINEROAD,
04:24-05:0 SLOWLY KURANG DT

WP3 07:00-07:30 PREPARE A2B LOADING, 11:00-12:00 OFF IBADAH JUM'AT,


WP3 19:00-05:00 OFF HUJAN & SLIPPERY, WP4 19:00-19:40 PREPARE
13:00-13:23 REFUELING A2B LOADING, 16:03-16:58 SLOWLY KURANG DT,
17/03/2023 248 2.261,76 - - 109 994,08 - - 357 3.255,84 9,12 - - - - - - - - - - - - 0:24 8 12 0:09 2 55 LOADING INTERMEDIET, 21:00-22:00 MATERIAL LENGKET, 03:18-03:31
WP4 07:00-07:24 PREPARE A2B LOADING, 11:00-12:00 OFF IBADAH JUM'AT,
BOLDER
13:00-13:15 REFUELING A2B LOADING, 15:42-16:50 SLOWLY KURANG DT

WP3 19:00-19:54 SLIPPERY & PART BPP PROBLEM, 20:00-21:00 SLOWLY


JALAN BONYOK, 22:44-23:23 SLOWLY KURANG DT, 03:13-04:50 SLOWLY
18/03/2023 - - 255 2.325,60 - - 255 2.325,60 9,12 - - - - - - - - - - - - 0:26 8 15 - - - WP3-4 07:00-17:00 OFF HUJAN & SLIPPERY
KURANG DT, WP4 19:00-19:17 WAITING UNIT, 20:00-20:59 SLOWLY WATER
SPRAY, 22:26-23:00, 02:25-04:55 SLOWLY KURANG DT

WP3 07:00-07:20 P2H & WAITING UNIT, 13:00-13:10 PART BPP PROBLEM,
WP3 22:08-23:20 SLOWLY KURANG DT, 23:30-00:00 OFF HUJAN & SLIPPERY
WP4 07:00-07:30 P2H & WAITING UNIT, 0820-08:31 PART BPP PROBLEM,
19/03/2023 254 2.316,48 - - 123 1.121,76 - - 377 3.438,24 9,12 - - - - - - - - - - - - 0:26 8 11 - - - 10:12-11:58 SLOWLY KURANG DT, 13:00-13:10 PART BPP PROBLEM, 15:22-
23:00-23:40 SLOWLY HUJAN, 01:00-01:19 WAITING UNIT, 01:38-02:00
SLOWLY KURANG DT
16:50 SLOWLY KURANG DT
SHIFT 1 SHIFT 2 TOTAL BLOK - WP

6 20 69 70 INTERMEDIET/BOLDER - WP
DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER DUMP TRUK - HOPPER WHEALOADER - HOPPER
DATE JARAK = KM JARAK = KM JARAK = KM JARAK = KM

AVG AVG AVG AVG AVG


AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG AVG UNIT AVG
RIT TON BUCKET TON RIT TON BUCKET TON RIT TON TON/RIT BUCKET TON TON/RIT CIRCLE CIRCLE CIRCLE CIRCLE CIRCLE SHIFT 1 SHIFT 2
OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT OPERASI RIT/DT
TIME TIME TIME TIME TIME

WP3 07:00-17:00 OFF BROKEN MINEROAD, WP4 07:00-08:33 REPAIR


20/03/2023 64 583,68 - - - - 64 583,68 9,12 - - - - - - - - - - - - 0:25 8 6 - - - MINEROAD, 10:58-14:00 OFF HUJAN & SLIPPERY, 15:26-17:00 OFF HUJAN & WP3-4 19:00-05:00 OFF BROKEN MINEROAD
SLIPPERY

WP3 07:00-07:33 SLIPPERY & REPAIR MINEROAD, 14:22-15:00, 16:25-16:50 WP3 20:18-20:29, 22:24-22:45 BOLDER, 03:00-04:50 SLOWLY KURANG DT,
21/03/2023 246 2.380,32 - - 228 2.296,72 - - 474 4.677,04 9,87 - - - 0:26 5 18 - - - - - - 0:27 8 14 - - - SLOWLY KURANG DT, WP4 07:00-07:30 SLIPPERY & REPAIR MINEROAD, WP4 20:09-22:02 SLOWLY KURANG DT, 02:33-02:40 BOLDER, 03:00-04:00
11:02-11:05 GANTI A2B LOADING, 14:17-15:00 SLOLWY KURANG DT SLOWLY KURANG DT

WP3 07:00-07:21 TRAVEL A2B LOADING & DT, 10:00-11:00 SLOWLY KURANG
DT, 16:35-17:00 OFF LEBIH AWAL, WP4 07:00-07:19 WAITING UNIT, 09:00-
22/03/2023 206 2.003,36 - - - - 206 2.003,36 9,73 - - - 0:20 5 18 - - - - - - 0:27 8 7 - - - LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN)
10:00, 11:18-11:50 SLOWLY KURANG DT, 14:06-14:24, 14:34-17:00 PART BPP
PROBLEM DT DUMPING STOCK INTERMEDIET

WP3 19:00-19:30 PART BPP PROBLEM, 02:31-03:36 OFF SAHUR, 04:00-05:00


23/03/2023 - - 202 1.971,44 - - 202 1.971,44 9,76 - - - - - - - - - - - - 0:27 8 15 0:12 2 43 LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN) SLOWLY MATERIAL HALUS, WP4 19:00-19:57 REPAIR MINEROAD, 02:38-
03:32 SAHUR, 04:00-05:00 SLOWLY KURANG DT

WP3 07:00-07:35 WAITING UNIT, 09:33-11:00 OFF AIR RESERVOIR KERUH,


11:00-12:00 IBADAH JUM'AT, 15:40-17:00 OFF HUJAN & SLIPPERY, WP4 07:00-
WP3 19:00-05:00 OFF HUJAN & SLIPPERY, WP4 19:00-1910 PREPARE
24/03/2023 121 1.202,32 - - 66 702,24 - - 187 1.904,56 10,18 - - - - - - - - - - - - 0:26 8 7 0:09 2 33 07:38 WAITING UNIT, 09:33-11:00 OFF KOLAM RESERVOIR PROBLEM, 11:00-
LOADING INTERMEDIET, 01:00-05:00 OFF STOCK INTERMEDEIT HABIS
12:00 OFF IBADAH JUM'AT, 13:00-13:20 WAITING UNIT, 15:32-17:00 OFF
HUJAN & SLIPPERY
WP3 07:00-07:48 REPAIR MINEROAD, 08:58-10:00, 10:32-11:20 SLOWLY
KURANG DT, 14:31-14:48 BOLDER, 16:30-17:00 OFF AWAL (PUASA
RAMADHAN), WP407:00-08:36 SLIPPERY & REPAIR MINEROAD, 09:46-10:25, WP3 19:00-05:00 HUJAN & SLIPPERY, WP4 19:00-19:19 WAITING UNIT, 20:57-
25/03/2023 209 1.906,08 - - 35 319,20 - - 244 2.225,28 9,12 - - - - - - - - - - - - 0:29 8 8 - - - 11:02-11:34, 13:00-14:00 SLOWLY KURANG DT, 14:33-15:19 PART BPP 21:03 PART BPP PROBLEM, 21:45-05:00 OFF HUJAN & SLIPPERY
PROBLEM, 14:33-15:19 PINDAH SHAFT LOADING, 16:12-16:30 PART BPP
PROBLEM, 16:30-17:00 OFF AWAL (PUASA RAMADHAN)
WP3 07:00-07:35 REPAIR MINEROAD, 07:35-12:00 SLOWLY KEKURANGAN
UNIT, 13:00-114:00 SLOWLY KEKURANGAN UNIT, 14:00-15:00 SLOWLY
KEKURANGAN UNIT & LOW WATER SPRAY, 15:00-16:30 SLOWLY
WP3 19:00-05:00 OFF KEKURANGAN UNIT DT, WP4 19:00-19:13 WAITING
KEKURANGAN UNIT, 16:30-17:00 OFF AWAL (BUKA PUASA), WP4 07:00-07:37
UNIT DARI BLOK, 19:33-19:48 PART BPP PROBLEM, 22:00-24:00 SLOWLY
26/03/2023 243 2.299,76 - - 123 1.121,76 - - 366 3.421,52 9,35 - - - 0:24 5 20 - - - - - - 0:26 8 15 - - - REPAIR MINEROAD, 07:37-10:00 SLOWLY KEKURANGAN UNIT, 08:27-08:32
KEKURANGAN UNIT, 02:30-03:30 SAHUR, 03:30-05:00 SLOWLY KEKURANGAN
PENAMBAHAN JUMLAH BUCKET LOADINGAN, 10:00-11:00 SLOWLY JALAN
UNIT
FRONT BONYOK, 11:00-12:00 SLOWLY KEKURANGAN UNIT, 13:00-14:00
KEKURANGAN UNIT, 14:00-15:00 SLOWLY LOW WATER SPRAY, 16:30-17:00
OFF AWAL

WP3 07:00-07:18 WAITING UNIT, 11:26-11:38 BOLDER, 14:03-14:15 PART


BPP PROBLEM, 16:30-17:00 OFF AWAL PUASA RAMADHAN, WP4 07:00-07:24
27/03/2023 231 2.184,24 - - - - 231 2.184,24 9,46 - - - 0:25 5 17 - - - - - - 0:26 8 12 - - - WP3-4 19:00-05:00 OFF HUJAN & SLIPPERY
WAITING UNIT, 07:54-09:00, 10:05-11:00, 15:26-16:00 SLOWLY KURANG DT,
16:30-17:00 OFF AWAL PUASA RAMADHAN

WP3 19:00-19:25 WAITING UNIT, 19:27-20:24 PART BPP PROBLEM, 20:05-


22:52 SLOWLY KURANG DT, 02:30-03:30 OFF ISTIRAHAT SAHUR, 04:11-04:20
28/03/2023 - - 199 1.814,88 - - 199 1.814,88 9,12 - - - - - - - - - - - - 0:29 8 12 - - - WP3-4 07:00-17:00 OFF SLOWLY KURANG DT, 04:20-05:00 OFF AWAL, WP4 19:00-19:20 WAITING DT,
21:05-21:32 BOLDER, 22:26-23:00, 02:09-02:28 SLOWLY KURANG DT, 02:30-
03:30 OFF ISTIRAHAT SAHUR, 04:04-05:00 SLOWLY KURANG DT

WP3 19:00-19:20 WAITING UNIT, 23:15-23:58 SLOWLY KURANG DT, 02:38-


WP3 07:00-17:00 OFF TARGET COMPLETE, WP4 08:32-09:38, 09:52-10:54,
03:40 OFF BREAK SAHUR, 04:00-04:50 SLOWLY KURANG DT, WP3 19:00-
29/03/2023 110 1.170,40 - - 224 2.042,88 - - 334 3.213,28 9,62 - - - - - - - - - - - - 0:27 8 13 - - - 14:18-15:00 SLOWLY KURANG DT, 16:30-17:00 OFF AWAL PUASA
19:22 WAITING UNIT, 19:25-20:21 SLOWLY KURANG DT, 02:39-03:40 OFF
RAMADHAN
BREAK SAHUR, 04:00-04:50 SLOWLY KURANG DT

WP3 07:00-17:00 OFF DT SUPPORT HAULING, WP4 07:00-07:20 TRAVEL TIME WP3 19:00-05:00 OFF HUJAN & BROKEN MINEROAD,WP4 19:00-19:22
30/03/2023 101 1.074,64 - - 74 844,48 - - 175 1.919,12 10,97 - - - - - - - - - - - - 0:26 8 10 0:08 2 37 DT, 07:23-07:42 PART BPP PROBLEM, 09:33-11:00, 13:00-14:00 SLOWLY PREPARE ROAD WP AREA, 22:04-00:00 OFF PROBLEM A2B HANDEL CHUTE
KURANG DT, 15:50-17:00 OFF HUJAN & BROKEN MINEROAD TROUBLE, 02:37-03:40 OFF SAHUR, 03:45-05:00 REWASHED

TOTAL 5127 50.138,08 - - 4599 45.253,84 - - 9.726 95.391,92 9,81 - - - 0:24 5 18 0:23 7 14 0:21 5 19 0:26 8 12 0:09 2 29

CATATAN
PW ANGKUTAN DARI BLOK KE WP
PH ANGKUTAN DARI BLOK KE SAMPING WP
PI ANGKUTAN DARI BLOK KE INTERMEDIET (SW)
IW ANGKUTAN DARI STOCK INTERMEDIET KE WP
PT.JAGA USAHA SANDAI
DAILY REPORT PRODUCTION TAILING - DISPOSAL WP 1-2 DAN WP 3-4
PERIODE MARET 2023
WP 1-2 WP 3-4
KETERANGAN
DATE SHIFT 1 SHIFT 2 TOTAL UNIT STATISTIK/RIT/SHIFT SHIFT 1 SHIFT 2 TOTAL UNIT STATISTIK/RIT/SHIFT

RIT 3 RIT 3 RIT 3 3 OPERASI MAX MIN AVERAGE CIRCLE RIT 3 RIT 3 RIT 3 3 OPERASI MAX MIN AVERAGE CIRCLE SHIFT 1 SHIFT 2
M M M M /RIT M M M M /RIT

01/03/2023 - - - - - - - - - - - - - - 77 1.372,14 77 1.372,14 17,82 3 28 21 26 0:09 KEGIATAN OFF WP1-2 OFF, WP3-4 RUNNING (20:00-23:55)

02/03/2023 73 1.156,32 35 554,40 108 1.710,72 15,84 4 28 5 14 0:17 159 2.833,38 - - 159 2.833,38 17,82 3 53 53 53 0:08 WP1-2 RUNNING (08:04-16:38), WP3-4 RUNNING (07:00-16:50) WP1-2 RUNNING (19:05-21:11), WP3-4 OFF

03/03/2023 50 792,00 43 681,12 93 1.473,12 15,84 4 16 6 13 0:13 198 3.528,36 85 1.514,70 283 5.043,06 17,82 4 51 21 35 0:08 WP1-2 RUNNING (13:34-16:50), WP3-4 RUNNING (07:50-16:54) WP1-2 RUNNING (19:04-21:49), WP3-4 RUNNING (19:05-21:56)

04/03/2023 105 1.663,20 28 443,52 133 2.106,72 15,84 5 29 4 14 0:16 201 3.581,82 66 1.176,12 267 4.757,94 17,82 4 62 22 36 0:08 WP1-2 RUNNING (07:11-16:33), WP3-4 RUNNING (07:07-16:56) WP1-2 RUNNING (19:20-21:20), WP3-4 RUNNING (19:00-21:55)

05/03/2023 64 1.013,76 40 633,60 104 1.647,36 15,84 4 22 3 13 0:17 99 1.764,18 86 1.532,52 185 3.296,70 17,82 4 29 13 23 0:08 WP1-2 RUNNING (9:34-16:43), WP3-4 RUNNING (13:05-16:52) WP1-2 RUNNING (19:12-21:52), WP3-4 RUNNING (19:05-21:59)

06/03/2023 73 1.156,32 36 570,24 109 1.726,56 15,84 4 24 5 14 0:17 179 2.434,40 83 1.128,80 262 3.563,20 13,60 4 61 19 40 0:08 WP1-2 RUNNING (07:31-16:04), WP3-4 RUNNING (07:02-16:55) WP1-2 RUNNING (19:27-21:51), WP3-4 RUNNING (19:00-21:58)

07/03/2023 68 1.077,12 - - 68 1.077,12 15,84 4 23 12 17 0:14 153 2.080,80 65 884,00 218 2.964,80 13,60 4 60 14 30 0:09 WP1-2 RUNNING (07:38-14:03), WP3-4 RUNNING (07:15-16:53) WP1-2 OFF, WP3-4 RUNNING (19:10-21:59)

08/03/2023 64 1.013,76 32 506,88 96 1.520,64 15,84 3 25 10 16 0:18 183 3.261,06 67 1.193,94 250 4.455,00 17,82 3 63 21 42 0:08 WP1-2 RUNNING (07:40-16:26), WP3-4 RUNNING (07:09-16:52) WP1-2 RUNNING (19:16-21:46), WP3-4 RUNNING (19:00-21:56)

09/03/2023 - - - - - - - - - - - - - - - - - - - - - - - - KEGIATAN OFF KEGIATAN OFF

10/03/2023 66 1.045,44 - - 66 1.045,44 15,84 3 30 13 22 0:14 169 2.298,40 - - 169 2.298,40 13,60 3 57 56 56 0:08 WP1-2 RUNNING (07:45-16:20), WP3-4 RUNNING (07:17-16:50) KEGIATAN OFF HUJAN & SLIPPERY

11/03/2023 - - - - - - - - - - - - 191 3.403,62 - - 191 3.403,62 17,82 4 49 45 48 0:08 WP1-2 OFF, WP3-4 RUNNING (07:00-17:00) KEGIATAN OFF HUJAN & SLIPPERY

12/03/2023 40 633,60 - - 40 633,60 15,84 4 15 2 10 0:18 221 3.005,60 - - 221 3.005,60 13,60 4 56 55 55 0:08 WP1-2 RUNNING (08:42-14:25), WP3-4 RUNNING (07:00-16:45) KEGIATAN OFF HUJAN & SLIPPERY

13/03/2023 42 665,28 - - 42 665,28 15,84 4 13 7 11 0:13 122 1.659,20 - - 122 1.659,20 13,60 6 32 2 20 0:08 WP1-2 RUNNING (10:15-14:58), WP3-4 RUNNING (07:00-14:30) KEGIATAN OFF HUJAN & SLIPPERY

14/03/2023 94 1.488,96 36 570,24 130 2.059,20 15,84 4 26 10 18 0:13 133 1.808,80 - - 133 1.808,80 13,60 4 55 26 33 0:08 WP1-2 RUNNING (09:47-16:35), WP3-4 RUNNING (07:00-16:45) WP1-2 RUNNING (19:09-21:45), WP3-4 OFF

15/03/2023 113 1.789,92 50 792,00 163 2.581,92 15,84 4 29 9 20 0:15 - - - - - - - - - - - - WP1-2 RUNNING (07:45-16:37), WP3-4 OFF WP1-2 RUNNING (19:10-20:00), WP3-4 OFF

16/03/2023 32 506,88 38 601,92 70 1.108,80 15,84 4 11 7 9 0:14 - - - - - - - - - - - - WP1-2 RUNNING (14:36-16:45), WP3-4 OFF WP1-2 RUNNING (19:02-20:46), WP3-4 OFF

17/03/2023 109 1.726,56 - - 109 1.726,56 15,84 4 30 26 27 0:13 184 3.278,88 - - 184 3.278,88 17,82 4 49 44 46 0:09 WP1-2 RUNNING (08:00-16:53), WP3-4 RUNNING (07:00-16:45) KEGIATAN OFF HUJAN & SLIPPERY

18/03/2023 - - 136 2.154,24 136 2.154,24 15,84 7 35 1 24 0:13 - - - - - - - - - - - - KEGIATAN OFF HUJAN & SLIPPERY WP1-2 RUNNING (19:08-04:03), WP3-4 OFF

19/03/2023 137 2.170,08 47 744,48 184 2.914,56 15,84 4 42 13 25 0:13 164 2.922,48 61 1.087,02 225 4.009,50 17,82 4 55 2 35 0:08 WP1-2 RUNNING (07:34-16:40), WP3-4 RUNNING (08:09-16:57) WP1-2 RUNNING (19:13-23:37), WP3-4 RUNNING (19:00-21:58)

20/03/2023 173 2.740,32 211 3.342,24 384 6.082,56 15,84 5 48 26 38 0:10 117 2.084,94 - - 117 2.084,94 17,82 6 27 12 20 0:10 WP1-2 RUNNING (09:18-16:45), WP3-4 RUNNING (08:15-15:37) WP1-2 RUNNING (18:50-04:50), WP3-4 OFF

21/03/2023 149 2.360,16 185 2.930,40 334 5.290,56 15,84 5 52 1 37 0:10 201 3.581,82 - - 201 3.581,82 17,82 4 56 42 50 0:08 WP1-2 RUNNING (08:20-16:44), WP3-4 RUNNING (07:50-16:55) WP1-2 RUNNING (19:00-04:55), WP3-4 OFF

22/03/2023 165 2.613,60 - - 165 2.613,60 15,84 5 55 6 33 0:08 165 2.940,30 - - 165 2.940,30 17,82 3 57 54 55 0:08 WP1-2 RUNNING (07:23-16:30), WP3-4 RUNNING (08:04-16:30) LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN)

23/03/2023 - - 179 2.835,36 179 2.835,36 15,84 6 45 1 18 0:11 - - 146 2.601,72 146 2.601,72 17,82 3 51 11 34 0:10 LIBUR BERSAMA (MENYAMBUT BULAN RAMADHAN) WP1-2 RUNNING (19:21-04:50), WP3-4 RUNNING (19:00-04:50)

24/03/2023 106 1.679,04 117 1.853,28 223 3.532,32 15,84 3 42 23 33 0:11 138 2.459,16 162 2.886,84 300 5.346,00 17,82 3 54 36 50 0:09 WP1-2 RUNNING (07:52-16:36), WP3-4 RUNNING (07:30-16:10) WP1-2 RUNNING (19:47-04:40), WP3-4 RUNNING (19:17-04:57)

25/03/2023 105 1.663,20 102 1.615,68 207 3.278,88 15,84 5 29 9 23 0:13 150 2.673,00 166 2.958,12 316 5.631,12 17,82 4 55 26 40 0:09 WP1-2 RUNNING (08:03-16:36), WP3-4 RUNNING (07:00-16:31) WP1-2 RUNNING (19:10-23:45), WP3-4 RUNNING (19:05-04:55)

26/03/2023 126 1.995,84 97 1.536,48 223 3.532,32 15,84 5 30 9 23 0:13 170 3.029,40 77 1.372,14 247 4.401,54 17,82 5 46 12 27 0:09 WP1-2 RUNNING (08:07-16:23), WP3-4 RUNNING (07:55-16:33) WP1-2 RUNNING (19:13-23:54), WP3-4 RUNNING (19:03-21:55)

27/03/2023 103 1.631,52 - - 103 1.631,52 15,84 5 30 11 21 0:13 167 2.975,94 - - 167 2.975,94 17,82 3 57 54 56 0:08 WP1-2 RUNNING (08:07-16:23), WP3-4 RUNNING (07:55-16:33) KEGIATAN OFF HUJAN & SLIPPERY

28/03/2023 127 2.011,68 251 3.975,84 378 5.987,52 15,84 7 56 6 29 0:12 154 2.258,98 - - 154 2.258,98 14,67 4 51 15 39 0:08 WP1-2 RUNNING (09:00-16:28), WP3-4 RUNNING (08:40-16:37) WP1-2 RUNNING (19:18-05:00), WP3-4 OFF

29/03/2023 140 2.217,60 204 3.231,36 344 5.448,96 15,84 6 45 7 32 0:13 129 2.298,78 - - 129 2.298,78 17,82 3 44 41 43 0:08 WP1-2 RUNNING (07:07-16:21), WP3-4 RUNNING (07:00-16:40) WP1-2 RUNNING (19:13-05:00), WP3-4 OFF

30/03/2023 165 2.613,60 109 1.726,56 274 4.340,16 15,84 5 40 21 28 0:10 197 3.510,54 - - 197 3.510,54 17,82 4 54 42 49 0:09 WP1-2 RUNNING (08:39-16:26), WP3-4 RUNNING (07:00-16:36) WP1-2 RUNNING (19:03-22:00), WP3-4 OFF

TOTAL 2489 39.425,76 1976 31.299,84 4465 70.725,60 15,84 4 32 9 21 0:14 3944 65.673,84 1141 19.708,06 5085 85.381,90 16,79 4 50 29 40 0:08

Perhitungan Angkutan Tailing


Ritase X Volume Bucket X Jumlah Bucket = M 3
EXCA PC CLAS 200 VOLUME 0,80 X (BUCKET 17) X Ritase = 13,60 M3

EXCA PC CLAS 350 VOLUME 1,98 X (BUCKET 8) X Ritase = 15,84 M3


PT.JAGA USAHA SANDAI
MONITORING HAULING BPP 1,2,3,4
PERIODE MARET 2023

PT.JAGA USAHA SANDAI 1 CV.FRAND USAHA KITA PT.SARANA KARYA DUA SATU PT.SARWA INSPIRASI KONTRUKSI PT.BULAWAN GATRA WANI PT.CITA MINERAL INVESTINDO TOTAL
TANGGAL
RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT AVG RIT RIT TON UNIT

01 Maret 2023 96 2.834,05 35 2,7 13 328,15 3 4,3 24 834,00 6 4,0 43 1.210,45 21 2,0 8 223,35 6 1,3 22 638,25 10 2,2 206 6.068,25 81

02 Maret 2023 145 4.156,10 42 3,5 13 317,55 3 4,3 30 924,15 6 5,0 71 1.833,10 22 3,2 4 114,20 2 2,0 96 2.523,15 21 4,6 359 9.868,25 96

03 Maret 2023 104 3.056,30 32 3,3 8 200,00 3 2,7 33 1.093,25 7 4,7 76 2.012,35 21 3,6 8 252,45 5 1,6 85 2.239,00 18 4,7 314 8.853,35 86

04 Maret 2023 141 4.235,45 42 3,4 14 321,95 4 3,5 28 913,70 7 4,0 86 2.012,60 21 4,1 8 225,40 6 1,3 86 2.067,45 20 4,3 363 9.776,55 100

05 Maret 2023 133 4.036,20 38 3,5 16 400,25 3 5,3 29 963,85 7 4,1 67 1.781,60 21 3,2 6 188,00 4 1,5 82 2.156,30 21 3,9 333 9.526,20 94

06 Maret 2023 135 3.901,25 39 3,5 10 271,15 3 3,3 26 827,25 7 3,7 66 1.768,30 19 3,5 6 192,45 4 1,5 94 2.579,10 19 4,9 337 9.539,50 91

07 Maret 2023 138 4.122,70 46 3,0 14 364,55 4 3,5 15 498,60 6 2,5 51 1.396,05 18 2,8 23 647,90 10 2,3 72 1.933,25 19 3,8 313 8.963,05 103

08 Maret 2023 120 3.449,95 30 4,0 14 343,10 4 3,5 36 1.171,20 6 6,0 80 2.120,15 18 4,4 7 218,85 4 1,8 94 2.526,90 20 4,7 351 9.830,15 82

09 Maret 2023 - - - - 1 22,45 1 1,0 3 86,80 3 1,0 11 295,25 11 1,0 - - - - 6 162,30 6 1,0 21 566,80 21

10 Maret 2023 61 1.974,50 20 3,1 7 180,70 3 2,3 15 508,55 5 3,0 51 1.423,10 20 2,6 5 169,25 3 1,7 - - - - 139 4.256,10 51

11 Maret 2023 101 2.987,25 36 2,8 10 261,40 4 2,5 13 418,50 4 3,3 59 1.624,50 21 2,8 20 547,30 10 2,0 - - - - 203 5.838,95 75

12 Maret 2023 86 2.573,20 36 2,4 10 255,50 4 2,5 20 634,30 6 3,3 40 1.053,00 18 2,2 21 585,80 9 2,3 - - - - 177 5.101,80 73

13 Maret 2023 118 3.529,00 44 2,7 9 231,85 4 2,3 13 433,40 5 2,6 54 1.489,65 20 2,7 4 113,45 4 1,0 - - - - 198 5.797,35 77

14 Maret 2023 137 4.186,15 39 3,5 10 267,65 4 2,5 25 806,75 6 4,2 50 1.423,90 19 2,6 9 285,45 6 1,5 12 340,60 11 1,1 243 7.310,50 85

15 Maret 2023 151 4.530,35 47 3,2 13 335,90 4 3,3 26 810,95 6 4,3 47 1.279,45 18 2,6 12 355,80 5 2,4 1 28,50 1 1,0 250 7.340,95 81

16 Maret 2023 43 1.182,80 21 2,0 8 197,05 4 2,0 9 255,55 4 2,3 9 239,00 6 1,5 - - - - - - - - 69 1.874,40 35

17 Maret 2023 111 3.252,50 43 2,6 13 318,20 4 3,3 15 447,60 7 2,1 48 1.252,80 20 2,4 18 512,70 11 1,6 2 55,15 2 1,0 207 5.838,95 87

18 Maret 2023 72 1.950,00 33 2,2 11 272,80 5 2,2 - - - - 29 780,20 19 1,5 4 116,95 4 1,0 - - - - 116 3.119,95 61

19 Maret 2023 126 3.961,85 38 3,3 20 523,25 5 4,0 13 379,35 4 3,3 59 1.631,60 22 2,7 15 464,80 9 1,7 128 3.344,75 36 3,6 361 10.305,60 114

20 Maret 2023 - - - - 1 26,05 1 1,0 - - - - - - - - - - - - 22 603,25 22 1,0 23 629,30 23

21 Maret 2023 119 3.560,15 39 3,1 19 457,35 4 4,8 21 609,50 6 3,5 81 2.159,10 22 3,7 33 900,50 10 3,3 168 4.064,65 36 4,7 441 11.751,25 117

22 Maret 2023 56 1.890,80 24 2,3 11 261,65 4 2,8 13 393,90 6 2,2 50 1.271,70 20 2,5 9 287,85 6 1,5 97 2.275,00 34 2,9 236 6.380,90 94

23 Maret 2023 - - - - - - - - - - - - - - - - - - - - - - - - - - -

24 Maret 2023 72 2.309,10 29 2,5 14 368,00 5 2,8 21 659,90 6 3,5 55 1.480,50 21 2,6 6 195,55 3 2,0 - - - - 168 5.013,05 64

25 Maret 2023 105 3.185,90 43 2,4 20 515,55 5 4,0 23 668,50 5 4,6 50 1.366,65 21 2,4 4 108,15 4 1,0 - - - - 202 5.844,75 78

26 Maret 2023 67 2.038,85 36 1,9 17 438,25 5 3,4 24 720,05 6 4,0 50 1.357,85 21 2,4 16 462,85 8 2,0 - - - - 174 5.017,85 76

27 Maret 2023 60 2.020,30 24 2,5 11 258,90 5 2,2 13 388,20 6 2,2 68 1.730,25 22 3,1 7 214,35 6 1,2 - - - - 159 4.612,00 63

28 Maret 2023 152 4.529,95 53 2,9 12 304,90 4 3,0 18 527,90 5 3,6 58 1.569,40 21 2,8 6 168,85 4 1,5 30 850,55 13 2,3 276 7.951,55 100

29 Maret 2023 167 5.126,35 49 3,4 19 479,00 4 4,8 19 546,55 5 3,8 68 1.810,40 21 3,2 25 679,45 10 2,5 20 539,40 8 2,5 318 9.181,15 97

30 Maret 2023 145 4.333,35 46 3,2 12 314,50 4 3,0 16 484,40 5 3,2 72 1.946,05 21 3,4 8 259,65 4 2,0 20 567,60 17 1,2 273 7.905,55 97

TOTAL 2.961 88.914,35 37 2,9 350 8.837,60 4 3,2 541 17.006,65 6 3,6 1.549 41.318,95 19 2,8 292 8.491,30 6 1,9 1.137 29.495,15 18 3,4 6.830 194.064,00 90
27 29 27 28 26 CMI 19 29

BPP 1-2 BPP 3-4 TOTAL TABULASI HAULING ALL KONTRAKTOR WP 1,2,3,4
PERUSAHAAN UNIT/HR AVERAGE AVERAGE AVERAGE
RIT/HR TON/HR RIT/UNIT/HR
rit ton ton/rit % rit ton ton/rit % rit ton ton/rit %
88.914,35
PT.Jaga Usaha Sandai 1 37 2.040 62.569,90 30,7 71,91% 921 26.344,45 28,60 24,61% 2.961 88.914,35 30 45,82% 110 3.293,12 2,9

PT.Sarwa Inspirasi Kontruksi 19 262 7.029,60 26,83 8,08% 1.287 34.289,35 26,64 32,03% 1.549 41.318,95 27 21,29% 55 1.475,68 2,8 41.318,95
29.495,15
17.006,65 8.837,60 8.491,30
PT.Cita Mineral Investindo 18 163 4.275,90 26,23 4,91% 974 25.219,25 25,89 23,56% 1.137 29.495,15 26 15,20% 60 1.552,38 3,4

PT.Sarana Karya Dua Satu 6 212 6.852,85 32,32 7,88% 329 10.153,80 30,86 9,48% 541 17.006,65 31 8,76% 20 629,88 3,6

CV.Frand Usaha Kita 4 69 1.704,00 24,70 1,96% 281 7.133,60 25,39 6,66% 350 8.837,60 25 4,55% 12 304,74 3,2

PT.Bulawan Gatra Wani 6 155 4.575,30 29,52 5,26% 137 3.916,00 28,58 3,66% 292 8.491,30 29 4,38% 11 326,59 1,9

TOTAL 90 2901 87.007,55 29,99 100% 3929 107.056,45 27,25 100% 6.830 194.064,00 28 100% 268 7.582,39 3,0
UPDATE MONITORING MUATAN RATA-RATA DT HAULING WP 1,2,3,4

PERUSAHAAN UNIT TYPE RIT TON TON/RIT


PT.JUS HINO 1798 50.230,95 27,94
FUSO 848 24.112,25 28,43
ACTROS 107 3.978,35 37,18
AROCS 82 3.229,20 39,38
TRAILER 126 7.363,60 58,44
PT.BGW HINO 153 4.168,30 27,24
TRINTON 75 2.635,55 35,14
FUSO 64 1.687,45 26,37
CV.FUK HINO 297 7.479,10 25,18
ISSUZU 1 53 1.358,50 25,63
PT.SIK HINO 1549 41.318,95 26,67
PT. AK HINO 24 652,80 27,20
PT.CMI AXOR 20 597,95 29,90
NISSAN 10 252,60 25,26
PT. HWA HINO 189 4.450,10 23,55
PT. KMP HINO 12 258,35 21,53
PT.SKDS SITRAK 205 7.779,80 37,95
HINO 336 9.226,85 27,46
PT. BKM HINO 22 638,25 29,01
PT. DEK FUSO 15 402,90 26,86
PT. CSK HINO 834 21.846,00 26,19
PT.MEG HINO 11 396,20 36,02
GRAND TOTAL 6.830 194.064,00 28,41

DATA INI BERDASARKAN TIMBANGAN NORMAL


PERIODE 01-Mar-23 SAMPAI 30-Mar-23