Vous êtes sur la page 1sur 12

Kelompok 1 C

NO TAHUN Xi Ketentuan xi + ketentuan NO


1 2011 72.20 23.10 95.30 1
2 2012 77.10 23.10 100.20 2
3 2013 55.70 23.10 78.80 3
4 2014 89.00 23.10 112.10 4
5 2015 84.20 23.10 107.30 5
6 2016 65.00 23.10 88.10 6
7 2017 55.10 23.10 78.20 7
8 2018 45.60 23.10 68.70 8
9 2019 82.70 23.10 105.80 9
10 2020 69.60 23.10 92.70 10
rata-rata 92.72

Kelompok 2 C
NO TAHUN Xi Ketentuan xi + ketentuan NO
1 2011 72.20 48.40 120.60 1
2 2012 77.10 48.40 125.50 2
3 2013 55.70 48.40 104.10 3
4 2014 89.00 48.40 137.40 4
5 2015 84.20 48.40 132.60 5
6 2016 65.00 48.40 113.40 6
7 2017 55.10 48.40 103.50 7
8 2018 45.60 48.40 94.00 8
9 2019 82.70 48.40 131.10 9
10 2020 69.60 48.40 118.00 10
rata-rata 118.02

Kelompok 5 A
NO TAHUN Xi Ketentuan xi + ketentuan NO
1 2011 65.00 27.50 92.50 1
2 2012 55.10 27.50 82.60 2
3 2013 45.60 27.50 73.10 3
4 2014 82.70 27.50 110.20 4
5 2015 69.60 27.50 97.10 5
6 2016 72.20 27.50 99.70 6
7 2017 77.10 27.50 104.60 7
8 2018 55.70 27.50 83.20 8
9 2019 89.00 27.50 116.50 9
10 2020 84.20 27.50 111.70 10
rata-rata 97.12

Kelompok 7 A
NO TAHUN Xi Ketentuan xi + ketentuan NO
1 2011 65.00 53.90 118.90 1
2 2012 55.10 53.90 109.00 2
3 2013 45.60 53.90 99.50 3
4 2014 82.70 53.90 136.60 4
5 2015 69.60 53.90 123.50 5
6 2016 72.20 53.90 126.10 6
7 2017 77.10 53.90 131.00 7
8 2018 55.70 53.90 109.60 8
9 2019 89.00 53.90 142.90 9
10 2020 84.20 53.90 138.10 10
rata-rata 123.52
Kelompok 3 C
TAHUN Xi Ketentuan xi + ketentuan
2011 72.20 75.90 148.10
2012 77.10 75.90 153.00
2013 55.70 75.90 131.60
2014 89.00 75.90 164.90
2015 84.20 75.90 160.10
2016 65.00 75.90 140.90
2017 55.10 75.90 131.00
2018 45.60 75.90 121.50
2019 82.70 75.90 158.60
2020 69.60 75.90 145.50
rata-rata 145.52

Kelompok 4 C
TAHUN Xi Ketentuan xi + ketentuan
2011 72.20 127.60 199.80
2012 77.10 127.60 204.70
2013 55.70 127.60 183.30
2014 89.00 127.60 216.60
2015 84.20 127.60 211.80
2016 65.00 127.60 192.60
2017 55.10 127.60 182.70
2018 45.60 127.60 173.20
2019 82.70 127.60 210.30
2020 69.60 127.60 197.20
rata-rata 197.22

Kelompok 6 A
TAHUN Xi Ketentuan xi + ketentuan
2011 65.00 39.60 104.60
2012 55.10 39.60 94.70
2013 45.60 39.60 85.20
2014 82.70 39.60 122.30
2015 69.60 39.60 109.20
2016 72.20 39.60 111.80
2017 77.10 39.60 116.70
2018 55.70 39.60 95.30
2019 89.00 39.60 128.60
2020 84.20 39.60 123.80
rata-rata 109.22

Kelompok 8 A
TAHUN Xi Ketentuan xi + ketentuan
2011 65.00 70.40 135.40
2012 55.10 70.40 125.50
2013 45.60 70.40 116.00
2014 82.70 70.40 153.10
2015 69.60 70.40 140.00
2016 72.20 70.40 142.60
2017 77.10 70.40 147.50
2018 55.70 70.40 126.10
2019 89.00 70.40 159.40
2020 84.20 70.40 154.60
rata-rata 140.02
Data Hujan 10 Tahun

Tahun Xi Ketentuan Xi+Ketentuan


2011 72.20 23.10 95.30 Data Soal sesuaikan dengan kelompok kalian ya
2012 77.10 23.10 100.20
2013 55.70 23.10 78.80
2014 89.00 23.10 112.10
2015 84.20 23.10 107.30
2016 65.00 23.10 88.10
2017 55.10 23.10 78.20
2018 45.60 23.10 68.70
2019 82.70 23.10 105.80
2020 69.60 23.10 92.70
𝑋 ̅ 92.72

PENENTUAN DISTRIBUSI : Uji Dispersi

No X 𝑋 ̅ ( X -𝑋 ̅ )2 ( X𝑋 ̅


- )3 ( X -𝑋 ̅ )4
1 68.70 92.72 576.96 -13858.59 332883.30
2 78.20 92.72 210.83 -3061.26 44449.46
3 78.80 92.72 193.77 -2697.23 37545.42
4 88.10 92.72 21.34 -98.61 455.58
5 92.70 92.72 0.00 0.00 0.00
6 95.30 92.72 6.66 17.17 44.31
7 100.20 92.72 55.95 418.51 3130.45
8 105.80 92.72 171.09 2237.81 29270.56
9 107.30 92.72 212.58 3099.36 45188.73
10 112.10 92.72 375.58 7278.83 141063.64
Σ 927.20 1824.76 -6664.00 634031.44
S = 14.24 Cs = -0.32
Cv = 0.15 Ck = 3.06

Syarat Perhitungan
No Jenis Distribusi
Cv Cs Ck Cv Cs Ck
1 Normal 0 3
2 Log Normal 3Cv+Cv2 5.383
0.15 -0.32 3.06
3 Gumbel ≤ 1,1396 ≤ 5,4002
4 Log Pearson type III ≠0

Uji Frekuensi dengan metode Gumbel

Urutan Min-Max Grafik Prob


No. Urut Curah Hujan (mm) P (%) Rr (Ri-Rr)²
(Ri)
120.00
1 95.30 68.70 9.09 92.72 576.96
2 100.20 78.20 18.18 92.72 210.83 100.00
3 78.80 78.80 27.27 92.72 193.77
4 112.10 88.10 36.36 92.72 21.34 80.00
Curah Hujan (mm)

5 107.30 92.70 45.45 92.72 0.00


6 88.10 95.30 54.55 92.72 6.66
60.00
7 78.20 100.20 63.64 92.72 55.95
8 68.70 105.80 72.73 92.72 171.09
40.00
9 105.80 107.30 81.82 92.72 212.58
10 92.70 112.10 90.91 92.72 375.58
20.00
Σ 927.20 927.20 1824.76

0.00
0.00 10.00 20.00 30.00 40.
n Yn Sn Sx
10 0.4952 0.9497 14.24

Analisa Hujan Rencana Kala Ulang Metode Gumbel p

Kala Ulang
Yt K Rt (mm)
(Tahun)

2 0.3665 -0.1355 90.79


5 1.4999 1.0579 107.78
10 2.2502 1.8480 119.03
25 3.1985 2.8465 133.25
50 3.9019 3.5871 143.80
100 4.6001 4.3223 154.27

Uji Frekuensi dengan metode Log Pearson type III

(Log Ri - )² (Log Ri Log P


No Urutan Min-Max (Ri) Log Ri P (%)
- )3
1 68.70 1.84 1.96 0.0157 -0.0020 9.09 0.96
2 78.20 1.89 1.96 0.0048 -0.0003 18.18 1.26
3 78.80 1.90 1.96 0.0043 -0.0003 27.27 1.44
4 88.10 1.94 1.96 0.0003 0.0000 36.36 1.56
5 92.70 1.97 1.96 0.0000 0.0000 45.45 1.66
6 95.30 1.98 1.96 0.0003 0.0000 54.55 1.74
7 100.20 2.00 1.96 0.0015 0.0001 63.64 1.80
8 105.80 2.02 1.96 0.0039 0.0002 72.73 1.86
9 107.30 2.03 1.96 0.0047 0.0003 81.82 1.91
10 112.10 2.05 1.96 0.0076 0.0007 90.91 1.96
Σ 927.20 19.62 0.0431 -0.0013

n Cs
10 0.069 -0.549 ini di interpolasi ya dari tabel CS

Hitungan K Hitungan Log Rt = + (K*Sx)


K2 = 0,099 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (0,083-0,099) Log R2 = 1,96 + (0,091 x 0,069)
= 0.091 = 1.969
K5 = 0,857 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (0,856-0,857) Log R5 = 1,96 + (0,856 x 0,069)
= 0.856 = 2.022
K10 = 1,2 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (1,216-1,2) Log R10 = 1,96 + (1,208 x 0,069)
= 1.208 = 2.046
K25 = 1,528 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (1,567-1,528) Log R25 = 1,96 + (1,548 x 0,069)
= 1.548 = 2.069
K50 = 1,720 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (1,777-1,720) Log R50 = 1,96 + (1,749 x 0,069)
= 1.749 = 2.083
K100 = 1,880 + (-0,549-(-0,6))/(-0,5-(-0,6)) × (1,955-1,880) Log R100 = 1,96 + (1,919 x 0,069)
= 1.919 = 2.095

Analisa Hujan Rencana Kala Ulang Metode Log Pearson type III

Kala Ulang
K Log Rt Rt (mm)
(Tahun)

2 0.091 1.969 93.03


5 0.856 2.022 105.09
10 1.208 2.046 111.15
25 1.548 2.069 117.33
50 1.749 2.083 121.15
100 1.919 2.095 124.46

REKAPITULASI

Curah Hujan Harian Maksimum (mm)


No Metode Perhitungan PUH PUH PUH PUH PUH PUH
2 Tahun 5 Tahun 10 Tahun 25 Tahun 50 Tahun 100 Tahun
1 Gumbel 91 108 119 133 144 154
Uji Chi-Squared (Gumbel)

a. Jumlah data n = 10
b. Jumlah kelas interval dengan Rumus Sturges
G = 1 + 3,322 Log n = 4.322 = 5
c. Interval peluang = 20%
d. Nilai hujan rata-rata (Rr) = 92.72
e. Standar deviasi (Sx) = 14.24

Untuk n = 20
Pr T Yt K
Yn Sn
80 1.25 -0.476 0.4952 0.9497 -1.023
60 1.67 0.087 0.4952 0.9497 -0.429
40 2.50 0.672 0.4952 0.9497 0.186
20 5.00 1.500 0.4952 0.9497 1.058

No Pr K X Batas Kelas Oi Ei (Oi-Ei)2/Ei


1 80 -1.023 78.16 X<= 78.16 1 2 0.50
2 60 -0.429 86.61 78.16 <X<= 86.61 2 2 0.00
3 40 0.186 95.37 86.61 <X<= 95.37 3 2 0.50
4 20 1.058 107.78 95.37 <X<= 107.78 3 2 0.50
5 X> 107.78 1 2 0.50
10 10 2.00
f. Uji Chi Square Teoritis (dari tabel Chi-Kuadrat)
Jumlah sebaran kelas (dimana nilai R=2)
dk = G-R-1 dk = 2
Keyakinan bahwa keputusan yang diambil benar = 0.95
Tingkat Signifikan α = 0.05
Berdasarkan nilai dk dan α didapatkan nilai Chi-kuadrat dari tabel = 5.991
g. Analisa kecocokan
Nilai Chi-Kuadrat Matematis = 2.00
Nilai Chi-Kuadrat Teoritis = 5.991 DITERIMA

Nilai Chi-Kuadrat matematis < Nilai Chi-Kuadrat teoritis sehingga


hipotesis menggunakan distribusi Gumbel DAPAT DITERIMA

Uji Chi-Squared (Log Pearson type III)

a. Jumlah data n = 10
b. Jumlah kelas interval dengan Rumus Sturges
G = 1 + 3,322 Log n = 4.330 = 5
c. Interval peluang = 20%
d. Koefisien asimetris (Cs) = -0.549
= 1.962
= 0.069
e. Uji Chi-Square Matematis
Interval Ulang, tahun
1.25 2 5
Koefisien Asimetri (Cs)
Persen Peluang
80 60 50 40 20
-0.4 -0.816 -0.160 0.066 0.652 0.855
-0.6 -0.800 0.432 0.857 0.857 0.857

No Pr K Log X X Batas Kelas Oi Ei ((Oi-Ei)2)/Ei


1 80 -0.804 1.907 80.67 X<= 80.67 3 2 0.50
2 60 0.280 1.982 95.87 80.67 <X<= 95.87 3 2 0.50
3 40 0.804 2.018 104.23 95.87 <X<= 104.23 1 2 0.50
4 20 0.856 2.022 105.09 104.23 <X<= 105.09 0 2 2.00
5 X> 105.09 3 2 0.50
10 10 4.00

f. Uji Chi Square Teoritis (dari tabel Chi-Kuadrat)


Jumlah sebaran kelas (dimana nilai R=2)
dk = G-R-1 dk = 2
Keyakinan bahwa keputusan yang diambil benar = 0.95
Tingkat Signifikan α = 0.05
Berdasarkan nilai dk dan α didapatkan nilai Chi-kuadrat dari tabel = 5.991
g. Analisa kecocokan
Nilai Chi-Kuadrat Matematis = 4.00
Nilai Chi-Kuadrat Teoritis = 5.991 DITERIMA

Nilai Chi-Kuadrat matematis < Nilai Chi-Kuadrat teoritis sehingga


hipotesis menggunakan distribusi Log Person type III DAPAT
DITERIMA

Menentukan rancangan hujan harian maksimum


(R24)

Hasil Uji Chi-Kuadrat Gumbel Log Pearson type III Hujan Rancangan Harian Max
R2 91 93 91
R5 108 105 108
R10 119 111 119
R25 133 117 133
R50 144 121 144
R100 154 124 154

DITERIMA DITERIMA

Mencari Intensitas hujan dengan Mononobe dan grafik IDF

Curah Hujan Harian Maksimum (R 24)


2 Tahun 5 Tahun 10 Tahun 25 Tahun 50 Tahun 100 Tahun
Durasi (menit) Durasi (jam)
91 108 119 133 144 154
Intensitas Hujan Rencana (mm/jam)
5 0.08 164.98 195.86 216.30 242.13 261.30 280.32
10 0.17 103.93 123.38 136.26 152.53 164.61 176.59
20 0.33 65.47 77.73 85.84 96.09 103.70 111.24
40 0.67 41.24 48.96 54.07 60.53 65.32 70.08
60 1.00 31.48 37.37 41.27 46.20 49.85 53.48
80 1.33 25.98 30.85 34.06 38.13 41.15 44.15
120 2.00 19.83 23.54 26.00 29.10 31.40 33.69
240 4.00 12.49 14.83 16.38 18.33 19.78 21.22
300 5.00 10.76 12.78 14.11 15.80 17.05 18.29
360 6.00 9.53 11.32 12.50 13.99 15.10 16.20

Grafik IDF

Intensitas Hujan Rencana 2 Tahun Intensitas Hujan Rencana 5 Tahun Intensitas Hujan Rencana 10 Tahun Intensitas Hujan Rencana 25 Tahun

Intensitas Hujan Rencana 50 Tahun Intensitas Hujan Rencana 100 Tahun

300.00
/jam)

250.00
Grafik IDF

Intensitas Hujan Rencana 2 Tahun Intensitas Hujan Rencana 5 Tahun Intensitas Hujan Rencana 10 Tahun Intensitas Hujan Rencana 25 Tahun

Intensitas Hujan Rencana 50 Tahun Intensitas Hujan Rencana 100 Tahun

300.00
Intensitas Hujan, I (mm/jam)

250.00

200.00

150.00

100.00

50.00

0.00
5 10 20 40 60 80 120 240 300 360

Durasi (menit)
UJI SMIRNOV DISTRIBUSI GUMBEL & LOG PEARSON TYPE III
No P Max-Min Log Xi P (X) P (x<) P' (X) P'(x<) D
1 77.35 49.68 1.70 0.09 0.91 0.11 0.8889 0.02
2 66.63 61.46 1.79 0.18 0.82 0.22 0.7778 0.04
3 49.68 63.72 1.80 0.27 0.73 0.33 0.6667 0.06
4 61.46 66.63 1.82 0.36 0.64 0.44 0.5556 0.08
5 68.94 68.94 1.84 0.45 0.55 0.56 0.4444 0.10
6 63.72 77.35 1.89 0.55 0.45 0.67 0.3333 0.12
7 134.91 100.02 2.00 0.64 0.36 0.78 0.2222 0.14
8 119.55 102.84 2.01 0.73 0.27 0.89 0.1111 0.16
9 100.02 119.55 2.08 0.82 0.18 1.00 0.0000 0.18
10 102.84 134.91 2.13 0.91 0.09 1.11 -0.1111 0.20
Jumlah 845.12 19.06
Xrt 1.91
S 0.10
D max 0.20
α 0.05
D cr 0.41
∆ Cr DITERIMA
Nilai D cr Uji Smirnov Kolmogorov
α
n
0.2 0.1 0.05 0.01
5 0.5 0.51 0.56 0.67
10 0.3 0.37 0.41 0.49
15 0.3 0.3 0.34 0.4
20 0.2 0.26 0.29 0.36
25 0.2 0.24 0.27 0.32
30 0.2 0.22 0.24 0.29
35 0.2 0.2 0.23 0.27
40 0.2 0.19 0.21 0.25
45 0.2 0.18 0.2 0.24
Penentuan Hujan Rancangan

Uji Kecocokan
Distribusi Chi-Square Smirnov-Kolmogorof
Matematis Teoritis Ket. Dmax Dcr Ket.

Gumbel 2.00 5.991 OK 0.20


0.41 DITERIMA
Log Pearson
4.00 5.991 OK 0.20
Type III

Curah Hujan Rencana (mm)


Kala Ulang Yang
(Tahun) Log Pearson
Gumbel Dipakai
Type III
2 90.79 93.03 90.79
5 107.78 105.09 107.78
10 119.03 111.15 119.03
25 133.25 117.33 133.25
50 143.80 121.15 143.80
100 154.27 124.46 154.27
Uji Dispersi

OK

OK

Vous aimerez peut-être aussi