Data Curah Hujan Maksimum

Tahun 2008-2017
Bulan
Tahun
Jan Feb Maret April Mei Juni Juli Agust Sept
2008 45.70 15.90 95.50 51.40 33.00 48.70 25.40 30.80 31.40
2009 35.00 42.00 44.20 44.90 71.40 17.80 51.80 11.80 1.10
2010 25.70 96.60 96.70 112.10 44.30 67.60 109.40 55.00 134.30
2011 39.40 34.00 67.40 21.60 79.40 38.60 48.00 5.60 71.90
2012 39.20 43.20 85.80 39.70 110.80 16.00 63.90 5.40 24.20
2013 71.20 34.00 40.30 146.50 57.10 38.40 115.50 12.30 12.20
2014 21.6 58.9 111.3 47.5 33.5 81.8 19.7 13.9 0
2015 42.2 89.2 53 95.3 59.1 44.7 12.1 3.7 17.1
2016 78.9 52.3 67.6 66.5 67.1 62.9 59.2 25.6 38.6
2017 94.7 130.1 43.6 47.1 41.8 71.9 51.7 23.6 33
Jumlah Curah Hujan Maksimum
Jumlah Curah Hujan Rata-Rata
m

Rata-Rata
Total CH Maks.
Okt Nov Des Per Tahun
63.60 74.30 22.80 538.50 44.88 95.50
31.30 62.50 44.30 458.10 38.18 71.40
98.80 162.70 48.30 1,051.50 87.63 162.70
43.10 41.50 45.20 535.70 44.64 79.40
77.00 22.40 32.70 560.30 46.69 110.80
13.30 58.90 93.50 693.20 57.77 146.50
12 26.7 49.8 476.70 39.73 111.30
13.4 15 48.3 493.10 41.09 95.30
178.9 68.8 130 896.40 74.70 178.90
46.5 54.3 62 700.30 58.36 130.10
1,051.80
105.18 118.19
Tahun CH Maks.
2008 95.5
Curah Hujan Maksimum Tahun
2009 71.4 2008 - 2017
2010 162.7
200.0
2011 79.4 178.90
180.0
2012 110.8 162.7
2013 146.5 160.0
146.5
2014 111 140.0

Curah Hujan (mm)


2015 95.30 120.0 110.8 111
2016 178.90 95.5 95.30
100.0
2017 130.10 79.4
80.0 71.4
60.0
40.0
20.0
0.0

2008 2009 2010 2011 2012


Tahun2013 2014 2015
Tahun

178.90

6.5
130.10
111
95.30

2014 2015 2016 2017


ANALISA CURAH HUJAN
Bulanan Maksimum
(Xi - X rata- Jumlah Data
No Tahun Xi m Yn (Yn-Yn rata-rata)2
rata)^2 (n)
1 2008 95.50 514.84 10 7 -0.012 0.257
2 2009 71.40 2189.30 10 10 -0.875 1.876
3 2010 162.70 1981.14 10 2 1.606 1.234
4 2011 79.40 1504.66 10 9 -0.533 1.058
5 2012 110.80 54.61 10 6 0.238 0.066
6 2013 146.50 801.46 10 3 1.144 0.421
7 2014 111.30 47.47 10 5 0.501 0.000
8 2015 95.30 523.95 10 8 -0.262 0.573
9 2016 178.90 3685.70 10 1 2.351 3.443
10 2017 130.10 141.85 10 4 0.794 0.089
Jumlah 1,181.90 11444.99 4.952 8.929
Rata-Rata 118.19 0.495

(Sn) (Sx) (PUH) (Yt) (Xt) (TL) RH (%) k


1 0 0 2 100 0
2 0.367 113.58 2 75 -0.129207618067
3 0.903 132.78 2 55.55556 0.409141458535
4 1.246 145.07 2 43.75 0.753690937207
5 1.500 154.16 2 36 1.008746204826
0.99602 35.66042
6 1.702 161.40 2 30.55556 1.2115965076477
7 1.870 167.41 2 26.53061 1.380108202889
8 2.013 172.55 2 23.4375 1.524275661598
9 2.139 177.04 2 20.98765 1.6502692111295
10 2.250 181.03 2 19 1.762170652212

Intensitas Curah Hujan (mm/jam)


No. Sumber
1 Mononobe Rumus : i = (R24/24) * (24/t)^2/3
R24 t (jam) I (mm/jam)
113.58 1 39.38 Ket : i = Intensitas Curah Hujan (mm/jam)
t = Lama waktu hujan atau waktu konstan (jam)
R24 = Curah hujan maksimum (mm).
2 Menurut Hasper
t (menit) t (jam) Xt (mm) R1 R (mm) I (mm/jam)
5 0.08 113.58 84.06 14.41 172.95
10 0.17 113.58 95.19 22.79 136.72
20 0.33 113.58 104.55 34.53 103.59
40 0.67 113.58 111.04 49.53 74.29
60 1.00 113.58 113.58 59.48 59.48
120 2.00 113.58 116.37 75.46 37.73
140 2.33 113.58 116.79 78.98 33.85
Rata-rata intensitas hujan 88.37

Kategori CH 59.48
Rumus : Xr = Xn + Sx/Sn (Yr - Yn)

Keterangan :
Xr = Curah Hujan Rencana (mm)
Xn = nilai curah hujan rata-rata dari data/sampel (mm)
Yn = nilai variansi reduksi rata-rata dari data/sampel
Yr = Reduced Variate
Sn = Reduced Standard Deviation
Sx = Standard Deviation

PUH = Periode Ulang Hujan

TL = Umur Tambang
113.5824 RH = Resiko Hidrologi (%)

Periode Ulang (T) tahun 2 3


Nilai Yt 0.367 0.903
Nilai Yn 0.495 0.495
Nilai Sn 0.996 0.996
Faktor Reduced Variate (k) -0.129 0.409
1 Nilai SD 35.66 35.66
Curah Hujan Maksimum Rata-rata (mm) 118.19 118.19
Curah Hujan Maksimum Rencana (mm) 113.58 132.78

Hujan (mm/jam)
an atau waktu konstan (jam)
maksimum (mm).
Rumus : I = R/T

Rt = Xt {(1218t + 54) / (Xt(1-t)+1272t)}

R = {11300t/(t+3.12) * (Xi/100)}^0.5

Ket : R,R1 = curah hujan menurut Hasper, mm


Xt = curah hujan maksimum yang dipilih, mm
t = durasi hujan, menit

Lebat
No Tahun Xi (PUH) Sx k Xt

1 2007 125 1 0 0

2 2008 74.3 2 0.63 116.7199


3 2009 80.5 3 0.66 118.2767
4 2010 75.5 4 42.44 1.26 143.393
5 2011 40.5 5 2.03 176.2909
6 2012 15.5 6 2.57 199.3224
7 2013 97.5 7 1.37 148.1306
8 2014 111 8 1.22 141.7768
9 2015 161 9 -0.21 81.10396
10 2016 120 10 1.10 136.9763
Jumlah 900.8
Rata-Rata 90.08

4 5 10
1.246 1.500 2.250
0.495 0.495 0.495
0.996 0.996 0.996
0.754 1.009 1.762
35.66 35.66 35.66
118.19 118.19 118.19
145.07 154.16 181.03
Volume Kolam Aktual
Panjang Atas Lebar Atas Panjang Dasar Lebar Dasar Volume Sump
(m) (m) (m) (m) Kedalaman (m) (m3)
151.2 72 141.2 66.5 3.5 35483.35 20276.2
10138.1
2.922908
Volume Air Tanah
Panjang Atas Lebar Atas Panjang Dasar Lebar Dasar Tinggi Air (m)
(m) (m) (m) (m) Volume Air (m3)
151.2 72 141.2 66.5 0.26 2635.906 109.8294
70966.7 35483.35 4.09 2.892
3.45
3.02
2.5

1.4
0.030508

2.5 2
2.24 0.24
Koefisien aliran C = Ct + Cs + Cv
Topografi, Ct Tanah, Cs Vegetasi, Cv
Datar Pasir dan
0.03 0.04 Hutan 0.04
(<1%) gravel
Bergelomb
Lempung
ang (1- 0.08 0.08 Pertanian 0.11
berpasir
10%)
Perbukitan Lempung Padang
0.16 0.16 0.21
(10-20%) dan lanau rumput
Pegununga Lapisan Tanpa
0.26 0.26 0.28
n (>20%) batu tanaman

DTH 1
Topografi, Ct Tanah, Cs Vegetasi, Cv C
0.16
0.16 0.42 0.28 0.86
0.16 0.26

DTH 2
Topografi, Ct Tanah, Cs Vegetasi, Cv C
0.16 0.24 0.08 0.34 0.28 0.86
0.08 0.26

DTH Kolam
Topografi, Ct Tanah, Cs Vegetasi, Cv C
0.16
0.3 0.3 0.42 0.28 1
0.26
Fuel Total Fuel Water
start end total Consume used Level Water Level Penuruna
hours end (m) n
(litre) (litre) Start (m)

4/8/18 8:15 AM 4/8/2018 2.00 PM 5.15 35 35 2.5 2 -0.5


5/8/18 8:30 AM 5/8/2018 2.30 PM 6 35 35 2.24 1.85 -0.39
6/8/18 8:10 AM 6/8/2018 2.00 PM 5.5 35 35 2.12 1.65 -0.47
7/8/18 8:15 AM 7/8/2018 2.15 PM 6 35 35 1.8 1.4 -0.4
8/8/18 8:15 AM 8/8/2018 2.15 PM 6 35 35 1.7 1.32 -0.38
9/8/18 8:15 AM 9/8/2018 2.15 PM 6 35 35 1.65 1.15 -0.5
5.775 -0.44
-0.24
-0.27
-0.15 0.255 0.010625 1.229745E-07
-0.3 -0.26
-0.33 0.26
86400
Luas Dth
(m2) Daerah m^2 km^2 Lokasi
6026.46
DTH 1 98,350.45 0.0984 DTH 1
DTH pit 93,146.29 0.0931 DTH pit
Intensitas Hujan Luas Catchment Q Q
Nilai Koefisien Limpasan
(mm/jam) (km²) (m³/detik) (m³/jam)
0.86 39.38 0.098 0.926 3333.21
0.9 39.38 0.093 0.918 3303.665
Waktu (jam) Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)
DTH 1 0.86 0.09835 0.9258917926 3333.21
1 39.38
DTH 2 0.9 0.093146 0.9176846858 3303.665

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


2 DTH 1 0.86 0.09835 0.5832752797 2099.791
24.81
DTH 2 0.9 0.093146 0.5781051264 2081.178

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


3 DTH 1 0.86 0.09835 0.4451223467 1602.44
18.93
DTH 2 0.9 0.093146 0.4411767812 1588.236

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


4 DTH 1 0.86 0.09835 0.3674404014 1322.785
15.63
DTH 2 0.9 0.093146 0.3641834089 1311.06

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


5 DTH 1 0.86 0.09835 0.3166505389 1139.942
13.47
DTH 2 0.9 0.093146 0.3138437479 1129.837

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


6 DTH 1 0.86 0.09835 0.2804095072 1009.474
11.93
DTH 2 0.9 0.093146 0.2779239567 1000.526

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


7 DTH 1 0.86 0.09835 0.2530238974 910.886
10.76
DTH 2 0.9 0.093146 0.250781093 902.8119

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


8 DTH 1 0.86 0.09835 0.2314729482 833.3026
9.84
DTH 2 0.9 0.093146 0.2294211714 825.9162

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


9 DTH 1 0.86 0.09835 0.2139925044 770.373
9.10
DTH 2 0.9 0.093146 0.2120956744 763.5444

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


10 DTH 1 0.86 0.09835 0.1994773397 718.1184
8.48
DTH 2 0.9 0.093146 0.1977091722 711.753

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


11 DTH 1 0.86 0.09835 0.1871968103 673.9085
7.96
DTH 2 0.9 0.093146 0.1855374973 667.935

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


12
12 DTH 1 0.86 0.09835 0.1766469204 635.9289
7.51
DTH 2 0.9 0.093146 0.1750811217 630.292

Lokasi I C LCA Q (m3/detik) Q Total Debit (m3/jam)


DTH 1 #REF! #REF! #REF! #REF!
5.7 DTH 2 #REF! #REF! #REF! #REF!
12.34
DTH 3 #REF! #REF! #REF! #REF!
DTH 4 #REF! #REF! #REF! #REF!
Waktu (jam) Lokasi I C LCA Q (m3/detik) Q
27660.44 DTH 1 0.86 0.09835045 0.16746781 602.8841047
13 7.12
DTH 2 0.9 0.093146286 0.16598337 597.5401387

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.15939507 573.8222421
14 6.78
DTH 2 0.9 0.093146286 0.15798219 568.7358805

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.1522297 548.0269244
15 6.47
DTH 2 0.9 0.093146286 0.15088034 543.1692126

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.14581882 524.9477518
16 6.20
DTH 2 0.9 0.093146286 0.14452628 520.2946137

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.14004285 504.1542751
17 5.96
DTH 2 0.9 0.093146286 0.13880151 499.6854505

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.13480683 485.3045895
18 5.73
DTH 2 0.9 0.093146286 0.1336119 481.0028486

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.13003427 468.1233826
19 5.53
DTH 2 0.9 0.093146286 0.12888165 463.9739359

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.12566285 452.3862587
20 5.34
DTH 2 0.9 0.093146286 0.12454897 448.376306

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.1216412 437.9083288
21 5.17
DTH 2 0.9 0.093146286 0.12056297 434.0267084

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.1179266 424.5357631
22 5.02
DTH 2 0.9 0.093146286 0.1168813 420.7726772

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.11448318 412.1394411
23 4.87
DTH 2 0.9 0.093146286 0.1134684 408.4862362

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.11128059 400.610112
24 4.73
DTH 2 0.9 0.093146286 0.1102942 397.0591031

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.10773768 387.8556507
DTH 2 0.9 0.093146286 0.10678269 384.4176974
25 4.58
DTH 3 #REF! #REF! #REF! #REF!
DTH 4 #REF! #REF! #REF! #REF!
Kolam #REF! #REF! #REF! #REF!

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


113 DTH 1 0.86 0.09835045 0.10495716 377.8457691
DTH 2 0.9 0.093146286 0.10402682 374.4965433
26 4.46
DTH 3 #REF! #REF! #REF! #REF!
DTH 4 #REF! #REF! #REF! #REF!

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.10234936 368.4576853
DTH 2 0.9 0.093146286 0.10144213 365.1916755
27 4.35
DTH 3 #REF! #REF! #REF! #REF!
DTH 4 #REF! #REF! #REF! #REF!

Waktu (jam) Lokasi I C LCA Q (m3/detik) Q


DTH 1 0.86 0.09835045 0.09989773 359.6318176
DTH 2 0.9 0.093146286 0.09901223 356.4440404
28 4.25
DTH 3 #REF! #REF! #REF! #REF!
DTH 4 #REF! #REF! #REF! #REF!
Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)


Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)

Total Debit (m3/jam)


Waktu Intensitas Debit V. Air ke sump Kap. Pompa Jumlah Q Pompa
(jam) (mm/jam) (m³/jam) (m³) (m³/jam) Pompa (m³/jam)
1 39.38 3303.665 3303.665
2 24.81 2081.178 4162.357
3 18.93 1588.236 4764.709
4 15.63 1311.060 5244.241
5 13.47 1129.837 5649.187
6 11.93 1000.526 6003.157
7 10.76 902.812 6319.684
8 9.84 825.916 6607.330
9 9.10 763.544 6871.900
10 8.48 711.753 7117.530
11 7.96 667.935 7347.285
12 7.51 630.292 7563.504
550 1 550
13 7.12 597.540 7768.022
14 6.78 568.736 7962.302
15 6.47 543.169 8147.538
16 6.20 520.295 8324.714
17 5.96 499.685 8494.653
18 5.73 481.003 8658.051
19 5.53 463.974 8815.505
20 5.34 448.376 8967.526
21 5.17 434.027 9114.561
22 5.02 420.773 9256.999
23 4.87 408.486 9395.183
24 4.73 397.059 9529.418
9529.418
50Hz - 6P
Estimasi waktu terkumpul air
(Volume kapasitas kolam - Volume air tanah)/Volum sumuran max

-20.4
V. Pemompaan V. Sumuran
(m³) (m³)
550 2753.66
1100 3062.36 Volume sump & Volume Pemompaan
1650 3114.71 Bukit Everest terhadap Waktu
2200 3044.24 30,000
2750 2899.19 28,000
3300 2703.16 26,000
24,000
3850 2469.68 22,000
4400 2207.33 20,000

VOLUME (m³)
18,000
4950 1921.90
16,000
5500 1617.53 14,000
6050 1297.28 12,000
10,000
6600 963.50 8,000
7150 618.02 6,000
7700 262.30 4,000
2,000
8250 -102.46 0
8800 -475.29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 2

9350 -855.35 Waktu (Jam)


9900 -1241.95
10450 -1634.50 V. Pemompaan (m³) V. Air ke sump (m³)
11000 -2032.47
11550 -2435.44
12100 -2843.00
12650 -3254.82
13200 -3670.58
3114.71

3114.71
& Volume Pemompaan
est terhadap Waktu

11 12 13 14 15 16 17 18 19 20 21 22 23 24

aktu (Jam)

n (m³) V. Air ke sump (m³)


Waktu Intensitas Debit Debit Air V. Air ke sump Kap. Pompa Jumlah
(jam) (mm/jam) (m³/jam) Tanah (m3/jam) (m³) (m³/jam) Pompa
1 39.38 0.000 39 39.000
2 24.81 0.000 39 39.000
3 18.93 0.000 39 39.000
4 15.63 0.000 39 39.000
5 13.47 0.000 39 39.000
6 11.93 0.000 39 39.000
7 10.76 0.000 39 39.000
8 9.84 0.000 39 39.000
9 9.10 0.000 39 39.000
10 8.48 0.000 39 39.000
11 7.96 0.000 39 39.000
12 7.51 0.000 39 39.000
550 1
13 7.12 0.000 39 39.000
14 6.78 0.000 39 39.000
15 6.47 0.000 39 39.000
16 6.20 0.000 39 39.000
17 5.96 0.000 39 39.000
18 5.73 0.000 39 39.000
19 5.53 0.000 39 39.000
20 5.34 0.000 39 39.000
21 5.17 0.000 39 39.000
22 5.02 0.000 39 39.000
23 4.87 0.000 39 39.000
24 4.73 0.000 39 39.000

Estimasi waktu terkumpul air


(Volume kapasitas kolam - Volume air tanah)/Volum sumuran max

-20.4
Q Pompa V. Pemompaan V. Sumuran
(m³/jam) (m³) (m³)
550 -511.00
1100 -1061.00
1650 -1611.00
2200 -2161.00
2750 -2711.00
3300 -3261.00 Volume sump &
3850 -3811.00 Bukit Everes
4400 -4361.00 30,000
4950 -4911.00 28,000
5500 -5461.00 26,000
24,000
6050 -6011.00
22,000
6600 -6561.00 20,000
550
7150 -7111.00 18,000

VOLUME (m³)
7700 -7661.00 16,000
14,000
8250 -8211.00
12,000
8800 -8761.00 10,000
9350 -9311.00 8,000
9900 -9861.00 6,000
10450 -10411.00 4,000
2,000
11000 -10961.00
0
11550 -11511.00 1 2 3 4 5 6 7 8 9 10
12100 -12061.00
12650 -12611.00
13200 -13161.00 V. Air ke sump (
-511.00
Volume sump & Volume Pemompaan
Bukit Everest terhadap Waktu

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Waktu (Jam)

V. Air ke sump (m³) V. Pemompaan (m³)


Waktu Intensitas Luas Debit Debit Debit Air V. Limpasan
Koefisien
(jam) (mm/jam) (km²) (m³/detik) (m³/jam) Tanah (m3/jam) (m³)
1 39.38 0.12000 0.75 0.99 3546.75 Err:509 Err:509
2 24.81 0.12000 0.75 0.62 2234.31 39 4507.62
3 18.93 0.12000 0.75 0.47 1705.10 39 5154.30
4 15.63 0.12000 0.75 0.39 1407.53 39 5669.11
5 13.47 0.12000 0.75 0.34 1212.97 39 6103.86
6 11.93 0.12000 0.75 0.30 1074.15 39 6483.87
7 10.76 0.12000 0.75 0.27 969.24 39 6823.69
8 9.84 0.12000 0.75 0.25 886.69 39 7132.50
9 9.10 0.12000 0.75 0.23 819.73 39 7416.53
10 8.48 0.12000 0.75 0.21 764.12 39 7680.24
11 7.96 0.12000 0.75 0.20 717.08 39 7926.90
12 7.51 0.12000 0.75 0.19 676.67 39 8159.03
13 7.12 0.12000 0.75 0.18 641.51 39 8378.59
14 6.78 0.12000 0.75 0.17 610.58 39 8587.17
15 6.47 0.12000 0.75 0.16 583.14 39 8786.03
16 6.20 0.12000 0.75 0.16 558.58 39 8976.25
17 5.96 0.12000 0.75 0.15 536.45 39 9158.69
18 5.73 0.12000 0.75 0.14 516.40 39 9334.11
19 5.53 0.12000 0.75 0.14 498.11 39 9503.15
20 5.34 0.12000 0.75 0.13 481.37 39 9666.36
21 5.17 0.12000 0.75 0.13 465.96 39 9824.21
22 5.02 0.12000 0.75 0.13 451.73 39 9977.13
23 4.87 0.12000 0.75 0.12 438.54 39 10125.48
24 4.73 0.12000 0.75 0.12 426.27 39 10269.59
Kap. Pompa Jumlah Q Pompa V. Pemompaan V. Sumuran
(m³/jam) Pompa (m³/jam) (m³) (m³)
550 Err:509
1100 3407.62
1650 3504.30
2200 3469.11
2750 3353.86 Faktor Reduced Variate
3300 3183.87
3850 2973.69 Curah Hujan Maksimum Rata-rata (
4400 2732.50 Curah Hujan Maksimum Rencana (
4950 2466.53 Curah Hujan Maksimum Rencana (
5500 2180.24
6050 1876.90
6600 1559.03
550 1 550
7150 1228.59
7700 887.17
8250 536.03
8800 176.25
9350 -191.31
9900 -565.89
10450 -946.85
11000 -1333.64
11550 -1725.79
12100 -2122.87
12650 -2524.52
11550 -1280.41
Err:509 Err:508
Periode Ulang (T) tahun
2 3 4 5 10
Nilai Yt 0.000 Debit (m³/jam) 3546.749 1074.145
Nilai Yn #REF! #REF! #REF! #REF! #REF!
Nilai Sn #REF! #REF! #REF! #REF! #REF!
Faktor Reduced Variate (k) #REF! #VALUE! #VALUE! #REF! #REF!
Nilai SD #REF! 73.87 73.87 73.87 73.87
jan Maksimum Rata-rata (mm) 118.19 139.72 139.72 139.72 139.72
jan Maksimum Rencana (mm) #REF! #VALUE! #VALUE! #REF! #REF!
jan Maksimum Rencana (mm) 113.58 #VALUE! #VALUE! #REF! #REF!

Volum

20,000

18,000

16,000

14,000
VOLUME (m³) 12,000

10,000

8,000

6,000

4,000

2,000

0
1 2 3 4 5 6
Volume Limpasan & Volume Pemompaan
Bukit Everest terhadap Waktu
0,000

8,000

6,000

4,000

2,000

0,000

8,000

6,000

4,000

2,000

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Waktu (Jam)

V. Limpasan (m³) V. Pemompaan (m³)


𝑇=(𝑉𝑜𝑙𝑢𝑚𝑒 𝐾𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 𝑆𝑢𝑚𝑝 −𝑉𝑜𝑙𝑢𝑚𝑒 𝐷𝑒𝑏𝑖𝑡 𝐴𝑖𝑟 𝑇𝑎𝑛𝑎ℎ)/(𝐷𝑒𝑏𝑖𝑡 𝑀𝑎𝑘𝑠𝑚𝑖𝑚𝑢𝑚 )

Estimasi Waktu Terkumpulnya Air

Err:509
Err:509
Err:509
Waktu Intensitas DTH 1 Debit Debit DTH 2 Debit
C C
(jam) (mm/jam) (km²) (m³/detik) (m³/jam) (km²) (m³/detik)
1 39.38 0.098 0.86 0.93 3333.21 0.09 0.9 0.917685
2 24.81 0.082 0.73 0.41 1486.07 0.09 0.86 0.533752
3 18.93 0.082 0.73 0.32 1134.08 0.09 0.86 0.407329
4 15.63 0.082 0.73 0.26 936.16 0.09 0.86 0.336243
5 13.47 0.082 0.73 0.22 806.76 0.09 0.86 0.289765
6 11.93 0.082 0.73 0.20 714.43 0.09 0.86 0.256601
7 10.76 0.082 0.73 0.18 644.65 0.09 0.86 0.231541
8 9.84 0.082 0.73 0.16 589.75 0.09 0.86 0.21182
9 9.10 0.082 0.73 0.15 545.21 0.09 0.86 0.195823
10 8.48 0.082 0.73 0.14 508.23 0.09 0.86 0.182541
11 7.96 0.082 0.73 0.13 476.94 0.09 0.86 0.171303
12 7.51 0.082 0.73 0.13 450.06 0.09 0.86 0.161649
13 7.12 0.082 0.73 0.12 426.67 0.09 0.86 0.153249
14 6.78 0.082 0.73 0.11 406.11 0.09 0.86 0.145862
15 6.47 0.082 0.73 0.11 387.85 0.09 0.86 0.139305
16 6.20 0.082 0.73 0.10 371.52 0.09 0.86 0.133438
17 5.96 0.082 0.73 0.10 356.80 0.09 0.86 0.128153
18 5.73 0.082 0.73 0.10 343.46 0.09 0.86 0.123361
19 5.53 0.082 0.73 0.09 331.30 0.09 0.86 0.118994
20 5.34 0.082 0.73 0.09 320.16 0.09 0.86 0.114993
21 5.17 0.082 0.73 0.09 309.92 0.09 0.86 0.111313
22 5.02 0.082 0.73 0.08 300.45 0.09 0.86 0.107914
23 4.87 0.082 0.73 0.08 291.68 0.09 0.86 0.104763
24 4.73 0.082 0.73 0.08 283.52 0.09 0.86 0.101832
3333.21
Err:509 Err:509
Err:509 Err:509
Waktu terkumpulnya Air
Err:509 Err:509
Volume sumuran Err:509 Err:509
3300 Err:509
2052

Err:509
Debit DTH 3 Debit Debit DTH 4 Debit
C C
(m³/jam) (km²) (m³/detik) (m³/jam) (km²) (m³/detik)
3303.665 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1921.508 0.08 0.78 0.430312 1549.123 0.02 0.86 0.118611613823
1466.385 0.08 0.78 0.328389 1182.202 0.02 0.86 0.090517602451
1210.474 0.08 0.78 0.27108 975.8862 0.02 0.86 0.074720634509
1043.155 0.08 0.78 0.233609 840.9933 0.02 0.86 0.064392290819
923.7648 0.08 0.78 0.206872 744.7406 0.02 0.86 0.057022516357
833.5472 0.08 0.78 0.186669 672.007 0.02 0.86 0.05145353121
762.551 0.08 0.78 0.170769 614.7698 0.02 0.86 0.04707105014
704.9645 0.08 0.78 0.157873 568.3434 0.02 0.86 0.043516324413
657.1465 0.08 0.78 0.147165 529.7926 0.02 0.86 0.040564601327
616.6903 0.08 0.78 0.138105 497.1767 0.02 0.86 0.038067301219
581.9353 0.08 0.78 0.130321 469.1572 0.02 0.86 0.035921934338
551.6962 0.08 0.78 0.12355 444.7783 0.02 0.86 0.034055320917
525.1018 0.08 0.78 0.117594 423.3379 0.02 0.86 0.032413693532
501.4967 0.08 0.78 0.112308 404.3074 0.02 0.86 0.030956584588
480.377 0.08 0.78 0.107578 387.2807 0.02 0.86 0.029652903456
461.349 0.08 0.78 0.103317 371.9403 0.02 0.86 0.028478335218
444.0998 0.08 0.78 0.099454 358.0339 0.02 0.86 0.027413566571
428.3773 0.08 0.78 0.095933 345.3585 0.02 0.86 0.026443045853
413.9764 0.08 0.78 0.092708 333.7484 0.02 0.86 0.025554097546
400.7277 0.08 0.78 0.089741 323.0673 0.02 0.86 0.02473627776
388.4905 0.08 0.78 0.087 313.2017 0.02 0.86 0.023980897059
377.1467 0.08 0.78 0.08446 304.0563 0.02 0.86 0.023280661774
366.5963 0.08 0.78 0.082097 295.5505 0.02 0.86 0.022629400613
3303.665 Err:509

Err:509
Err:509 `

Err:509 Err:509
3135
Debit
(m³/jam)
Err:509
427.001809764585
325.863368822379
268.994284232804
231.812246948579
205.281058884486
185.232712357441
169.455780503157
156.658767887667
146.032564776972
137.04228438942
129.318963616637
122.599155302113
116.689296714131
111.443704517861
106.750452441146
102.522006785504
98.6888396561334
95.1949650694922
91.9947511663217
89.0505999347985
86.3312294139549
83.8103823857222
81.4658422055949
Err:509
Jenis Pompa Kapasitas Debit Air Yg Masuk Jam Kerja Pompa Debit yg diatasi
360 Err:509 5.7 2052
420 Err:509 5.7 2394
550 Err:509 5.7 3135
650 Err:509 5.7 3705
750 Err:509 5.7 4275
Jumlah yg digunakan
Err:509
Err:509
Err:509
Err:509
Err:509
Debit
Saluran Terbuka Debit yang Berpengaruh Koefisien Kekasaran Manning
(m³/detik)
DTH 1 0.926 0.03
Dimensi
Kemiringan Saluran, ɑ (°) Kedalaman Air, d (m) Pj Sisi Luar Saluran, a (m) Lebar Dasar Saluran, b (m)
0.58 0.78 0.90 0.895
Lebar Permukaan, B (m) Kedalaman, h (m)
1.79 0.89
Gorong- Debit Koefisien Kekasaran
Debit yang akan Masuk
gorong (m³/detik) Dinding Pipa
I DTH 1+ DTH 2 (Saluran Terbuka I) 0.926 0.024
II DTH 2+DTH 4 0.000 0.024
Diameter gorong-gorong Koefisien Kekasaran Dinding Pipa
d (m) Pipa Koefisien Manning
0.96 Besi 0.017
0.00 Kaca, Kuningan 0.013
Pemukaan Semen Halus 0.012
Besi Tulang 0.015
Batu dengan Semen 0.024 0.666667
Baja Keling 0.02

0
2
Nilai W
4 1.732051 2.309401
4.618802

338.56
87.50497
Jam Operasi Level Air (m)
Hari/Tgl BBM
Start End Total Hours Awal Akhir RPM
4/8/2018 8.00 14.00 6 2.5 2 35 750
Head Pompa Koordinat
X Y
H1 46 347934 9537354
H2 40 347914 9537344
TSS TSS Q Berpengaruh Q Berpengaruh Residu Terlarut Massa Jenis
(Mg/Liter) (gr/Cm3) (m3/detik) (cm3/detik) (gr/dtk) Lempung (gr/m3)

224.32 0.00022432 1.844 1843576.478405 413.55 1700000


6636.875322259

80
80
60
60
180
180
140
120
180
180
280
280
280
280
280
220
220
240
240
260
260
260
260
240
240
200
280
300
280
260
240
260
280
280
260
280
280
224.324324
Volume
% Padatan % AIR
Padatan (m3)

0.0002433 0.0001320 0.999868 217


SETTLING POND 1 Letak dekat PIT 1 (sudah land clearing)

Berat Jenis Partikel 1700 kg/m3


Berat Jenis Air 1000 kg/m3
% Solid 0.000131952941176471 %
% Air 0.999868064468105 %
D partikel 0.000002 m
Viskositas Air 0.00000131 kg/m.det

TOTAL VOLUME PER DETIK


Q Total Berat Padatan per m³ Berat Air Per m³
(m³/jam) (kg/jam) (kg/jam)
6637 1488.784 6636000
1.84357647840535
KECEPATAN PENGENDAPAN
Percepatan Gravitasi Kecepatan Pengendapan, Vt g  D 2  ρ
(m/s²) (m/detik) Vt 
9.8 0.001164
18μ

LUAS KOLAM PENGENDA


Total Volume Per Detik Kecepatan Pengendapan, Vt Luas Kolam Pengendapan
(m³/detik) (m/detik) (m²)
1.844 0.001164 1584.2

L Kompartemen Waktu Partikel Mengendap, tv


(m) (detik) (menit)
4 2578.0 42.97
1 (sudah land clearing)

AL VOLUME PER DETIK


Volume Padatan per detik Volume Air per detik Total Volume Per Detik
(m³/detik) (m³/detik) (m³/detik)
0.00024327 1.8433332 1.843577

g  D 2  ρp  ρa  T =
Volume kolam pengendapan
 Volume total padat yang berhasil diendapan
18μ

LUAS KOLAM PENGENDAPAN


Dimensi
Panjang, m Lebar, m Kedalaman, m
50.0 31.7 3

VOLUME SETTLING POND


Kecepatan Air Dalam Kolam, vh Kecepatan Mengendap, th
(m/detik) (detik) (menit)
2920.7 146033.3 2433.9

0.811296355428495
Luas Actual 2275

0.0300000000000011

0.0010427468769261

6636.87543780249 2577.98833819242
42.966472303207

ume kolam pengendapan


al padat yang berhasil diendapan 2275
1.43602017428497

49
volume, m³ 19.7 15842.3958154542
4752.72 4.9211979077271

Persen Pengendapan Total Padatan yang masuk Endapan dalam Sehari Waktu Pengerukan
(%) (m³/jam) (m³/hari) (hari)
0.9827 0.88 20.65 230