seismic
LOAD SHEAR MAX. MOMENT
HORIZONATL FORCE AT TRANSVERSE P1 P2 P3 P4 RESULTANT
SLS LOAD COMBINATIONS COMBINATIONS VERTICAL LONG. FORCE PER AT TOP OF
LOAD- N BASE OF PIER (t) MOMENT-MZ MOEMNT-MX (t) (t) (t) (t) SHEAR (KN)
(FROM ST1) PILE (Kn) PILE (KN-m)
(t) (kn-m) (t-m)
TRANS. -TZ LONG. -TX
3796.56 72.12 665.73 3872.79 969.00 1871 1548 257 580 669.63 167.4 580.40
2283.33 212.73 594.60 3525.11 434.26 1346 1201 26 171 631.51 157.9 547.36
3621.13 42.33 409.62 2497.66 84.80 1451 1422 590 618 411.80 103.0 356.93
3937.21 67.22 654.17 3807.16 950.36 1892 1575 306 623 657.62 164.4 569.99
3487.15 462.94 144.82 925.97 1654.44 1417 865 557 1108 485.06 121.3 420.43
3198.32 338.48 161.13 686.33 1754.66 1321 737 508 1093 374.87 93.7 324.92
3666.51 447.09 249.53 1414.09 2458.96 1677 858 386 1206 512.01 128.0 443.78
2412.06 31.82 178.35 1066.17 1257.31 1105 686 331 750 181.16 45.3 157.02
2778.25 245.36 582.03 3506.37 1171.33 1589 1199 30 420 631.63 157.9 547.46
3640.26 21.75 409.47 2354.62 596.95 1517 1318 533 732 410.04 102.5 355.41
2283.33 212.73 594.60 3525.11 400.13 1340 1207 32 165 631.51 157.9 547.36
2849.45 72.12 665.73 3872.79 888.35 1621 1325 34 330 669.63 167.4 580.40
0.00
HORIZONTAL FORCE PER
VERTIAL LOAD (KN)
LOAD CASE PILE (KN)
MAX. MIN. MAX.
NORMAL SLS 1424 446 102
SEISMIC SLS 1892 26 167
SUMMARY FOR OAYSIS FOR MIN VERTICAL LOAD
N MYY
CASE SECTION MZZ
OASYS FORCE (kN- (kN-m)
(kN) m)
SLS
200 1 Section Force 622 292
201 2 Section Force 446 373
202 3 Section Force 446 373
203 4 Section Force 622 292
204 5 Section Force 582 310
205 6 Section Force 674 129
206 7 Section Force 674 129
207 8 Section Force 582 310
208 9 Section Force 446 373
209 10 Section Force 622 292
210 11 Section Force 446 373
211 12 Section Force 622 292
200 13 Section Force 257 580
201 14 Section Force 26 547
202 15 Section Force 590 357
203 16 Section Force 306 570
204 17 Section Force 557 420
205 18 Section Force 508 325
206 19 Section Force 386 444
207 20 Section Force 331 157
208 21 Section Force 30 547
209 22 Section Force 533 355
210 23 Section Force 32 547
211 24 Section Force 34 580
25 Section Force 1424 292
26 Section Force 1219 373
27 Section Force 1219 373
28 Section Force 1424 292
29 Section Force 1178 310
30 Section Force 1277 129
31 Section Force 1277 129
32 Section Force 1178 310
33 Section Force 1219 373
34 Section Force 1424 292
35 Section Force 1219 373
36 Section Force 1424 292
37 Section Force 1871 580
38 Section Force 1346 547
39 Section Force 1451 357
40 Section Force 1892 570
41 Section Force 1417 420
42 Section Force 1321 325
43 Section Force 1677 444
44 Section Force 1105 157
45 Section Force 1589 547
46 Section Force 1517 355
47 Section Force 1340 547
48 Section Force 1621 580
SYSTRA ULS
Number of piles N = 4
ZL (1,2,3,4) = 6 m
ZT (1,2,3,4) = 6 m
SHEAR REINFORCEMENT
Where
Asv =Cross-sectional area of all the legs of the stirrup/links at a particular cross section
sv = Spacing of the stirrups along the member
b = Breadth of the section
fy = 415 N/mm2
Required Asv/sv = 16.08 cm2/m
Ash = 0.09SDk(Ag/Ac-1)fck/fy
202.5 mm2
OR
Ash = 0.024SDk(fck/fy)
176.4
Whichever is Greater
Ash = 0.24Sh(Ag/Ar-1)fck/fy
423.778546712802 mm2
OR
Ash = 0.096xSh(fck/fy)
1399.68
Whichever is Greater
ing of hoop
essie Stress of Concrete