Vous êtes sur la page 1sur 4

MES 1 MES 2 MES 3

CRONOGRAMA TORRE VALDELOMAR Oct-19 Nov-19 Dec-19


ITEM DESCRIPCION / SEMANA SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3
XX INICIO DE OBRA INI
1.00 OBRAS PRELIMINARES Y DEMOLICIÓN OP OP OP
2.00 MOV DE TIERRAS MASIVO Y MURO PANTALLA MOV MOV MOV MOV MOV MOV
3.00 OBRA CIVIL OOCC OOCC
3.01 EXCAVACION LOCALIZADA EXC EXC
3.02 CIMENTACIONES Y CISTERNA CIM
3.03 SOTANO (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.04 SEMI SOT (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.05 PISO 1 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.06 PISO 2 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.07 PISO 3 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.08 PISO 4 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.09 PISO 5 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.10 PISO 6 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.11 PISO 7 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.12 PISO 8 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.13 PISO 9 (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.14 AZOTEA (ELEMENTOS VERTICALES Y LOSA DE TECHO)
3.15 OOCC INSTALACIONES (ENTERRADAS Y TQE ELEV)
3.16 LOSA DE PISO SOTANO
4.00 ARQUITECTURA
4.01 TABIQUERIA
4.02 TARRAJEOS Y SOLAQUEOS INTERIORES
4.03 TARRAJEOS Y SOLAQUEOS EXTERIORES
4.04 CONTRAPISOS
4.05 ENCHAPES
4.06 APARATOS SANITARIOS Y GRIFERIAS
4.07 BASE Y PRIMERA MANO DE PINTURA
4.08 VENTANAS
4.09 MELAMINE Y GRANITO
4.10 PISOS LAMINADOS
4.11 PUERTAS Y CERRAJERIA
4.12 PINTURA FINAL
4.13 INGRESO, JARDINES Y LOBBY
4.14 ACABADO DE FACHADAS Y TRAGALUCES
4.15 REMATES Y ACABADOS VARIOS
6.00 INSTALACIONES Y EQUIPAMIENTO INS INS INS INS INS INS INS INS INS
YY FIN DE OBRA
MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3

MOV
OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC OOCC
EXC
CIM CIM
SOT SOT SOT
SEMI SEMI SEMI
P1 P1
P2 P2
P3 P3
P4 P4
P5 P5
P6 P6
P7 P7

SEMI SEMI P1 P1 P2 P2 P3 P3
SEMI SEMI P1 P1 P2 P2

P1 P1

INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS
MES 8 MES 9 MES 10 MES 11 MES 12 MES 13
May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20
SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3

OOCC OOCC OOCC OOCC OOCC OOCC OOCC

P8 P8
P9 P9
AZ
INST INST INST INST INST
LP LP LP

P4 P4 P5 P5 P6 P6 P7 P7 P8 P8 P9 P9 AZ SOT SOT
P3 P3 P4 P4 P5 P5 P6 P6 P7 P7 P8 P8 P9 P9 AZ SOT SOT
EXT EXT EXT EXT EXT EXT EXT EXT
P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7 P8 P8 P9 P9 AZ SOT SOT
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7 P8 P8 P9 P9 AZ SOT
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7 P8 P8 P9 P9
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7 P8 P8
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6 P7 P7
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 P6 P6
P1 P1 P2 P2 P3 P3 P4 P4 P5 P5
P1 P1 P2 P2 P3 P3 P4 P4

INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS
MES 13 MES 14 MES 15 MES 16 MES 17
Oct-20 Nov-20 Dec-20 Jan-21 Feb-21
SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4

SOT
AZ
P9 P9 AZ
P8 P8 P9 P9
P8 P8 P9 P9
P7 P7 P8 P8 P9 P9
P6 P6 P7 P7 P8 P8 P9 P9
P5 P5 P6 P6 P7 P7 P8 P8 P9 P9
LOB LOB LOB LOB
FA-TR FA-TR FA-TR FA-TR FA-TR FA-TR FA-TR
REM REM REM REM REM REM REM REM
INS INS INS INS INS INS INS INS INS INS INS INS INS INS INS
FIN

Vous aimerez peut-être aussi