Académique Documents
Professionnel Documents
Culture Documents
RCCA Form
RCCA Form
1. SSO No.:
4. QN No.:
2. N de article SSON:
3. Date (aaaa-mm-jj /
Part Description:
6. N de pice:
Part Number:
8. tape PCCF 1: Dcrire et comprendre la situation
Individual:
Function:
17. tape PCCF 3: Identifier, slectionner, classer les causes fondamentales probables par priorit
RCCA Step 3: Identify, Select, Prioritize Probable Root Cause(s) voir / see 17.X
18. tape PCCF 4: Valider les causes probables
Responsable de la
confirmation de la cause
Cause confirme?
Cause Confirmed?
Oui/Yes or
Non/No
(RCCA tape/Step 4)
17.1
Matriel
Material
17.2
Mthode
Method
17.3
Direction
Management
17.4
Milieu
Environment
17.5
Mesure
Measurement
17.6
Main-doeuvre
Manpower
17.7 Machine
18.1
18.2
18.3
18.4
18.5
18.6
18.7
Page 1 of 3
17.8
Autre
18.8
Other
20. tape PCCF 5: Identifier, slectionner, classer les solutions potentielles par priorit
RCCA Step 5: Identify, Select, Prioritize Potential Solution(s) voir / see 20.X
21. tape PCCF 5: Valider les solutions potentielles
Solutions potentielles
Potential Solutions
Solution confirme?
Solution Confirmed?
Oui/Yes or Non/ No
(RCCA tape/ Step 6)
20.1
21.1
20.2
21.2
20.3
21.3
20.4
21.4
20.5
21.5
23.Date:
24. tape PCCF 7: Mettre en oeuvre le plan daction et surveiller lefficacit des solutions choisies
26.
tapes majeures de la mise en oeuvre
Major Implementation Step
27.
Responsable
Responsibl
28.
Date de la mise en oeuvre
Implementation Dat
25.1
25.2
25.3
25.4
25.5
Date:
29.2
Date:
29.3
Date:
29.4
Date:
Page 2 of 3
29.5
Date:
32. Date:
Dans la ngative, quelle mesure doit-on prendre pour que ces pices deviennent ZNC?
If no, what actions are required to get these part numbers designated as ZNC?
PCCF approuve par (le titulaire de P&WC) (Signature ou signature lectronique):
RCCA Approved By (P&WC Owner) (Signature or Electronic Signature):
Date:
Page 3 of 3