THDC INDIA LIMITED

(A JV OF GOVT. OF INDIA & GOVT. OF U.P)


KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
01 D (901) -16 -14095 -1859 69 97 -1.400 -7.000 5.600
01 L (902) 84 -7276 -428 92 -404 -1.400 -7.000 5.600
01 Q1 (903) -16 1695 493 139 135 -1.400 -7.000 5.600
01 Q2 (904) -55 497 301 79 508 -1.400 -7.000 5.600
01 +Wx (905) 277 1510 -74 -316 -2096 -1.400 -7.000 5.600
01 -Wx (906) -284 -801 90 48 2357 -1.400 -7.000 5.600
01 +Wz (907) 65 4748 1014 239 -1038 -1.400 -7.000 5.600
01 -Wz (908) -273 -5172 -1055 -240 2163 -1.400 -7.000 5.600
01 +Ex1 (909) 211 3306 393 37 -2045 -1.400 -7.000 5.600
01 -Ex1 (910) -211 -3306 -393 -37 2044 -1.400 -7.000 5.600
01 +Ez1 (911) 33 11000 2771 698 -275 -1.400 -7.000 5.600
01 -Ez1 (912) -32 -10957 -2763 -696 260 -1.400 -7.000 5.600
01 +Ey1 (913) 3 728 90 -4 -26 -1.400 -7.000 5.600
01 -Ey1 (914) -3 -728 -90 4 26 -1.400 -7.000 5.600
01 +Ex2 (915) 179 2445 262 12 -1732 -1.400 -7.000 5.600
01 -Ex2 (916) -179 -2444 -262 -12 1731 -1.400 -7.000 5.600
01 +Ez2 (917) 35 7787 1939 480 -296 -1.400 -7.000 5.600
01 -Ez2 (918) -33 -7743 -1930 -478 281 -1.400 -7.000 5.600
01 +Ey2 (919) 3 450 51 -3 -29 -1.400 -7.000 5.600
01 -Ey2 (920) -3 -450 -51 3 29 -1.400 -7.000 5.600
01 +T (921) -82 -1646 -970 -249 765 -1.400 -7.000 5.600
01 -T (922) -76 -1438 -972 -211 712 -1.400 -7.000 5.600
01 DS (923) -12 -51 -7 -35 112 -1.400 -7.000 5.600
01 C (924) 5 -6559 -935 25 -60 -1.400 -7.000 5.600
01 H (925) -12 -51 -7 -35 112 -1.400 -7.000 5.600
02 D (901) -29 -9020 21 123 242 -1.400 -7.000 5.600
02 L (902) -11 -4020 22 153 121 -1.400 -7.000 5.600
02 Q1 (903) -23 -1990 8 121 220 -1.400 -7.000 5.600
02 Q2 (904) -36 -907 5 68 383 -1.400 -7.000 5.600
02 +Wx (905) 203 966 -8 -57 -1486 -1.400 -7.000 5.600
02 -Wx (906) -165 -806 6 51 1340 -1.400 -7.000 5.600
02 +Wz (907) -77 -2668 13 204 201 -1.400 -7.000 5.600
02 -Wz (908) -145 2684 -12 -203 1032 -1.400 -7.000 5.600
02 +Ex1 (909) 99 97 -2 23 -1240 -1.400 -7.000 5.600
02 -Ex1 (910) -99 -97 2 -23 1240 -1.400 -7.000 5.600
02 +Ez1 (911) -2 -8865 44 632 17 -1.400 -7.000 5.600
02 -Ez1 (912) 2 8844 -44 -631 -19 -1.400 -7.000 5.600
02 +Ey1 (913) 3 444 -2 -8 -30 -1.400 -7.000 5.600
02 -Ey1 (914) -3 -444 2 8 30 -1.400 -7.000 5.600
02 +Ex2 (915) 85 364 -3 3 -1063 -1.400 -7.000 5.600
02 -Ex2 (916) -85 -365 3 -3 1062 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
02 +Ez2 (917) -3 -6037 30 434 37 -1.400 -7.000 5.600
02 -Ez2 (918) 4 6016 -30 -433 -39 -1.400 -7.000 5.600
02 +Ey2 (919) 3 276 -1 -5 -30 -1.400 -7.000 5.600
02 -Ey2 (920) -3 -276 1 5 30 -1.400 -7.000 5.600
02 +T (921) -74 1349 -9 -103 711 -1.400 -7.000 5.600
02 -T (922) -73 1440 -10 -112 701 -1.400 -7.000 5.600
02 DS (923) -11 -27 1 3 97 -1.400 -7.000 5.600
02 C (924) -1 -3975 10 50 17 -1.400 -7.000 5.600
02 H (925) -11 -27 1 3 97 -1.400 -7.000 5.600
03 D (901) -55 -13834 -9 -78 444 -1.400 -7.000 5.600
03 L (902) -52 -2750 11 74 362 -1.400 -7.000 5.600
03 Q1 (903) -28 -678 7 117 296 -1.400 -7.000 5.600
03 Q2 (904) -36 -150 3 56 422 -1.400 -7.000 5.600
03 +Wx (905) 182 462 -4 -28 -1386 -1.400 -7.000 5.600
03 -Wx (906) -130 -16 4 41 1057 -1.400 -7.000 5.600
03 +Wz (907) -117 165 17 231 710 -1.400 -7.000 5.600
03 -Wz (908) -119 -25 -17 -236 793 -1.400 -7.000 5.600
03 +Ex1 (909) 66 471 4 57 -1023 -1.400 -7.000 5.600
03 -Ex1 (910) -66 -471 -4 -57 1023 -1.400 -7.000 5.600
03 +Ez1 (911) -9 21 54 697 106 -1.400 -7.000 5.600
03 -Ez1 (912) 9 -20 -54 -695 -102 -1.400 -7.000 5.600
03 +Ey1 (913) 5 643 1 4 -44 -1.400 -7.000 5.600
03 -Ey1 (914) -5 -643 -1 -4 44 -1.400 -7.000 5.600
03 +Ex2 (915) 59 405 2 30 -887 -1.400 -7.000 5.600
03 -Ex2 (916) -59 -405 -2 -30 887 -1.400 -7.000 5.600
03 +Ez2 (917) -10 58 37 481 109 -1.400 -7.000 5.600
03 -Ez2 (918) 9 -58 -37 -480 -106 -1.400 -7.000 5.600
03 +Ey2 (919) 6 356 1 1 -45 -1.400 -7.000 5.600
03 -Ey2 (920) -6 -356 -1 -1 45 -1.400 -7.000 5.600
03 +T (921) -60 49 -7 -76 616 -1.400 -7.000 5.600
03 -T (922) -61 125 -8 -83 616 -1.400 -7.000 5.600
03 DS (923) -4 -17 1 1 51 -1.400 -7.000 5.600
03 C (924) 10 -6723 -6 -51 -13 -1.400 -7.000 5.600
03 H (925) -4 -17 1 1 51 -1.400 -7.000 5.600
04 D (901) -8 -11524 -46 -335 112 -1.400 -7.000 5.600
04 L (902) -20 -2178 -4 -24 194 -1.400 -7.000 5.600
04 Q1 (903) -22 803 9 121 195 -1.400 -7.000 5.600
04 Q2 (904) -34 452 12 100 383 -1.400 -7.000 5.600
04 +Wx (905) 225 575 3 15 -1685 -1.400 -7.000 5.600
04 -Wx (906) -154 135 1 19 1201 -1.400 -7.000 5.600
04 +Wz (907) -155 3228 14 220 1038 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
04 -Wz (908) -143 -3345 -15 -225 931 -1.400 -7.000 5.600
04 +Ex1 (909) 99 1748 8 90 -1287 -1.400 -7.000 5.600
04 -Ex1 (910) -99 -1748 -8 -90 1286 -1.400 -7.000 5.600
04 +Ez1 (911) -16 9375 43 646 132 -1.400 -7.000 5.600
04 -Ez1 (912) 16 -9348 -43 -644 -128 -1.400 -7.000 5.600
04 +Ey1 (913) 3 554 3 16 -29 -1.400 -7.000 5.600
04 -Ey1 (914) -3 -554 -3 -16 29 -1.400 -7.000 5.600
04 +Ex2 (915) 87 1214 6 60 -1103 -1.400 -7.000 5.600
04 -Ex2 (916) -87 -1213 -6 -60 1103 -1.400 -7.000 5.600
04 +Ez2 (917) -13 6488 30 449 106 -1.400 -7.000 5.600
04 -Ez2 (918) 12 -6461 -30 -447 -101 -1.400 -7.000 5.600
04 +Ey2 (919) 3 319 2 9 -27 -1.400 -7.000 5.600
04 -Ey2 (920) -3 -319 -2 -9 27 -1.400 -7.000 5.600
04 +T (921) -52 164 -8 -67 533 -1.400 -7.000 5.600
04 -T (922) -52 -1 -10 -76 527 -1.400 -7.000 5.600
04 DS (923) -3 -32 -1 -1 41 -1.400 -7.000 5.600
04 C (924) -4 -5511 -24 -174 52 -1.400 -7.000 5.600
04 H (925) -3 -32 -1 -1 41 -1.400 -7.000 5.600
05 D (901) -8 -16762 1296 -316 117 -1.400 -7.000 5.600
05 L (902) -28 -2905 343 -27 236 -1.400 -7.000 5.600
05 Q1 (903) -20 -3347 672 105 200 -1.400 -7.000 5.600
05 Q2 (904) -35 -1330 359 78 389 -1.400 -7.000 5.600
05 +Wx (905) 223 996 -96 39 -1672 -1.400 -7.000 5.600
05 -Wx (906) -152 -684 130 5 1183 -1.400 -7.000 5.600
05 +Wz (907) -153 -3355 901 220 1046 -1.400 -7.000 5.600
05 -Wz (908) -146 3436 -927 -227 933 -1.400 -7.000 5.600
05 +Ex1 (909) 106 242 161 110 -1364 -1.400 -7.000 5.600
05 -Ex1 (910) -106 -242 -161 -110 1363 -1.400 -7.000 5.600
05 +Ez1 (911) 10 -9483 2568 664 -80 -1.400 -7.000 5.600
05 -Ez1 (912) -11 9451 -2559 -662 85 -1.400 -7.000 5.600
05 +Ey1 (913) 3 787 -61 16 -29 -1.400 -7.000 5.600
05 -Ey1 (914) -3 -787 61 -16 29 -1.400 -7.000 5.600
05 +Ex2 (915) 92 535 69 77 -1172 -1.400 -7.000 5.600
05 -Ex2 (916) -92 -535 -69 -77 1172 -1.400 -7.000 5.600
05 +Ez2 (917) 9 -6580 1800 463 -75 -1.400 -7.000 5.600
05 -Ez2 (918) -9 6548 -1792 -461 80 -1.400 -7.000 5.600
05 +Ey2 (919) 3 428 -34 9 -28 -1.400 -7.000 5.600
05 -Ey2 (920) -3 -428 34 -9 28 -1.400 -7.000 5.600
05 +T (921) -52 -255 175 -34 533 -1.400 -7.000 5.600
05 -T (922) -52 -669 183 -34 528 -1.400 -7.000 5.600
05 DS (923) -3 -47 5 -2 41 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
05 C (924) -2 -8388 635 -156 38 -1.400 -7.000 5.600
05 H (925) -3 -47 5 -2 41 -1.400 -7.000 5.600
06 D (901) -59 -14181 -41 -297 476 -1.400 -7.000 5.600
06 L (902) -51 -2645 -4 -29 374 -1.400 -7.000 5.600
06 Q1 (903) -24 -965 8 121 275 -1.400 -7.000 5.600
06 Q2 (904) -33 -155 1 45 406 -1.400 -7.000 5.600
06 +Wx (905) 181 491 9 59 -1381 -1.400 -7.000 5.600
06 -Wx (906) -129 -50 -3 -5 1047 -1.400 -7.000 5.600
06 +Wz (907) -129 -46 18 233 921 -1.400 -7.000 5.600
06 -Wz (908) -110 157 -19 -246 613 -1.400 -7.000 5.600
06 +Ex1 (909) 76 581 15 136 -1200 -1.400 -7.000 5.600
06 -Ex1 (910) -76 -581 -15 -136 1200 -1.400 -7.000 5.600
06 +Ez1 (911) 8 1 58 727 -87 -1.400 -7.000 5.600
06 -Ez1 (912) -8 -3 -58 -725 92 -1.400 -7.000 5.600
06 +Ey1 (913) 5 661 2 14 -45 -1.400 -7.000 5.600
06 -Ey1 (914) -5 -661 -2 -14 45 -1.400 -7.000 5.600
06 +Ex2 (915) 69 505 11 97 -1056 -1.400 -7.000 5.600
06 -Ex2 (916) -69 -505 -11 -97 1056 -1.400 -7.000 5.600
06 +Ez2 (917) 9 -34 40 503 -101 -1.400 -7.000 5.600
06 -Ez2 (918) -9 32 -40 -501 106 -1.400 -7.000 5.600
06 +Ey2 (919) 6 367 2 9 -46 -1.400 -7.000 5.600
06 -Ey2 (920) -6 -367 -2 -9 46 -1.400 -7.000 5.600
06 +T (921) -61 38 -1 22 618 -1.400 -7.000 5.600
06 -T (922) -61 123 1 26 616 -1.400 -7.000 5.600
06 DS (923) -4 -18 -1 -3 51 -1.400 -7.000 5.600
06 C (924) 8 -6881 -20 -138 -8 -1.400 -7.000 5.600
06 H (925) -4 -18 -1 -3 51 -1.400 -7.000 5.600
07 D (901) -33 -10197 -46 -332 278 -1.400 -7.000 5.600
07 L (902) -24 -1881 -6 -41 193 -1.400 -7.000 5.600
07 Q1 (903) -26 1181 17 165 265 -1.400 -7.000 5.600
07 Q2 (904) -38 571 15 115 399 -1.400 -7.000 5.600
07 +Wx (905) 210 1009 11 76 -1564 -1.400 -7.000 5.600
07 -Wx (906) -175 -248 -4 -15 1440 -1.400 -7.000 5.600
07 +Wz (907) -168 2469 14 208 1304 -1.400 -7.000 5.600
07 -Wz (908) -65 -2718 -16 -226 54 -1.400 -7.000 5.600
07 +Ex1 (909) 136 2316 17 151 -1682 -1.400 -7.000 5.600
07 -Ex1 (910) -136 -2315 -17 -151 1682 -1.400 -7.000 5.600
07 +Ez1 (911) 2 8901 52 689 -11 -1.400 -7.000 5.600
07 -Ez1 (912) -3 -8883 -52 -687 23 -1.400 -7.000 5.600
07 +Ey1 (913) 4 487 3 17 -31 -1.400 -7.000 5.600
07 -Ey1 (914) -4 -487 -3 -17 31 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
07 +Ex2 (915) 119 1756 13 111 -1468 -1.400 -7.000 5.600
07 -Ex2 (916) -118 -1756 -13 -111 1468 -1.400 -7.000 5.600
07 +Ez2 (917) 4 6075 36 475 -37 -1.400 -7.000 5.600
07 -Ez2 (918) -5 -6057 -36 -473 49 -1.400 -7.000 5.600
07 +Ey2 (919) 4 292 2 10 -30 -1.400 -7.000 5.600
07 -Ey2 (920) -4 -292 -2 -10 30 -1.400 -7.000 5.600
07 +T (921) -73 1214 6 78 707 -1.400 -7.000 5.600
07 -T (922) -72 1378 7 84 693 -1.400 -7.000 5.600
07 DS (923) -11 -29 -1 -3 98 -1.400 -7.000 5.600
07 C (924) -3 -4575 -22 -152 32 -1.400 -7.000 5.600
07 H (925) -11 -29 -1 -3 98 -1.400 -7.000 5.600
08 D (901) -25 -13125 1131 -258 157 -1.400 -7.000 5.600
08 L (902) -32 -1741 240 -22 112 -1.400 -7.000 5.600
08 Q1 (903) -53 -2869 641 125 485 -1.400 -7.000 5.600
08 Q2 (904) -54 -1368 345 62 504 -1.400 -7.000 5.600
08 +Wx (905) 297 1754 113 333 -2302 -1.400 -7.000 5.600
08 -Wx (906) -307 -1847 101 -6 2580 -1.400 -7.000 5.600
08 +Wz (907) -310 -5387 1027 240 2526 -1.400 -7.000 5.600
08 -Wz (908) 78 4973 -1043 -258 -1153 -1.400 -7.000 5.600
08 +Ex1 (909) 308 1949 214 144 -2979 -1.400 -7.000 5.600
08 -Ex1 (910) -307 -1948 -214 -144 2977 -1.400 -7.000 5.600
08 +Ez1 (911) -36 -11133 2779 743 303 -1.400 -7.000 5.600
08 -Ez1 (912) 33 11078 -2770 -742 -273 -1.400 -7.000 5.600
08 +Ey1 (913) 4 610 -52 13 -31 -1.400 -7.000 5.600
08 -Ey1 (914) -4 -610 52 -13 31 -1.400 -7.000 5.600
08 +Ex2 (915) 265 2045 100 103 -2567 -1.400 -7.000 5.600
08 -Ex2 (916) -265 -2045 -100 -103 2565 -1.400 -7.000 5.600
08 +Ez2 (917) -35 -7882 1946 515 300 -1.400 -7.000 5.600
08 -Ez2 (918) 32 7827 -1937 -513 -270 -1.400 -7.000 5.600
08 +Ey2 (919) 4 356 -27 8 -31 -1.400 -7.000 5.600
08 -Ey2 (920) -4 -356 27 -8 31 -1.400 -7.000 5.600
08 +T (921) -82 -1507 836 225 765 -1.400 -7.000 5.600
08 -T (922) -74 -1245 806 172 696 -1.400 -7.000 5.600
08 DS (923) -12 -48 4 34 111 -1.400 -7.000 5.600
08 C (924) -2 -5966 586 -115 3 -1.400 -7.000 5.600
08 H (925) -12 -48 4 34 111 -1.400 -7.000 5.600
09 D (901) -7 -15560 -668 -392 25 -1.400 -7.000 5.600
09 L (902) -75 -7242 -87 -99 154 -1.400 -7.000 5.600
09 Q1 (903) -20 2047 510 301 194 -1.400 -7.000 5.600
09 Q2 (904) -64 -236 93 80 667 -1.400 -7.000 5.600
09 +Wx (905) 251 2 -155 -346 -2395 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
09 -Wx (906) -334 1323 106 186 3018 -1.400 -7.000 5.600
09 +Wz (907) 233 12014 2055 1109 -1893 -1.400 -7.000 5.600
09 -Wz (908) -165 -11424 -2011 -1097 2271 -1.400 -7.000 5.600
09 +Ex1 (909) 225 1657 245 67 -2543 -1.400 -7.000 5.600
09 -Ex1 (910) -225 -1657 -245 -67 2543 -1.400 -7.000 5.600
09 +Ez1 (911) 12 23446 3571 1932 -188 -1.400 -7.000 5.600
09 -Ez1 (912) -11 -23331 -3551 -1922 168 -1.400 -7.000 5.600
09 +Ey1 (913) 5 863 41 24 -36 -1.400 -7.000 5.600
09 -Ey1 (914) -5 -863 -41 -24 36 -1.400 -7.000 5.600
09 +Ex2 (915) 193 1108 136 20 -2163 -1.400 -7.000 5.600
09 -Ex2 (916) -193 -1108 -136 -20 2162 -1.400 -7.000 5.600
09 +Ez2 (917) 18 17523 2675 1437 -240 -1.400 -7.000 5.600
09 -Ez2 (918) -16 -17408 -2655 -1426 221 -1.400 -7.000 5.600
09 +Ey2 (919) 5 597 29 17 -42 -1.400 -7.000 5.600
09 -Ey2 (920) -5 -597 -29 -17 42 -1.400 -7.000 5.600
09 +T (921) -80 -1666 -562 -561 755 -1.400 -7.000 5.600
09 -T (922) -81 -1217 -531 -522 745 -1.400 -7.000 5.600
09 DS (923) -15 418 -6 -41 156 -1.400 -7.000 5.600
09 C (924) 14 -6335 -288 -161 -118 -1.400 -7.000 5.600
09 H (925) -15 418 -6 -41 156 -1.400 -7.000 5.600
10 D (901) -94 -11493 -489 -263 544 -1.400 -7.000 5.600
10 L (902) -57 -4510 -44 -59 315 -1.400 -7.000 5.600
10 Q1 (903) -27 -3738 530 84 237 -1.400 -7.000 5.600
10 Q2 (904) -38 -1877 103 -5 383 -1.400 -7.000 5.600
10 +Wx (905) 100 1446 -132 -191 -1057 -1.400 -7.000 5.600
10 -Wx (906) -89 -543 19 -130 1009 -1.400 -7.000 5.600
10 +Wz (907) -29 -6615 2162 640 18 -1.400 -7.000 5.600
10 -Wz (908) 12 6578 -2083 -537 444 -1.400 -7.000 5.600
10 +Ex1 (909) 100 590 263 63 -1224 -1.400 -7.000 5.600
10 -Ex1 (910) -100 -590 -263 -63 1224 -1.400 -7.000 5.600
10 +Ez1 (911) 6 -12001 3652 827 -16 -1.400 -7.000 5.600
10 -Ez1 (912) -6 11936 -3631 -823 16 -1.400 -7.000 5.600
10 +Ey1 (913) 7 608 33 16 -48 -1.400 -7.000 5.600
10 -Ey1 (914) -7 -608 -33 -16 48 -1.400 -7.000 5.600
10 +Ex2 (915) 87 920 148 38 -1055 -1.400 -7.000 5.600
10 -Ex2 (916) -87 -919 -148 -38 1054 -1.400 -7.000 5.600
10 +Ez2 (917) -4 -8940 2738 618 45 -1.400 -7.000 5.600
10 -Ez2 (918) 4 8875 -2717 -613 -45 -1.400 -7.000 5.600
10 +Ey2 (919) 8 429 21 11 -48 -1.400 -7.000 5.600
10 -Ey2 (920) -8 -429 -21 -11 48 -1.400 -7.000 5.600
10 +T (921) -66 1613 -523 -93 563 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
10 -T (922) -67 1834 -486 -59 562 -1.400 -7.000 5.600
10 DS (923) -11 333 2 1 104 -1.400 -7.000 5.600
10 C (924) -1 -4284 -269 -120 23 -1.400 -7.000 5.600
10 H (925) -11 333 2 1 104 -1.400 -7.000 5.600
11 D (901) -51 -10181 -34 -60 320 -1.400 -7.000 5.600
11 L (902) 3 -3136 -114 239 54 -1.400 -7.000 5.600
11 Q1 (903) -30 -2883 13 145 313 -1.400 -7.000 5.600
11 Q2 (904) -38 -2132 4 39 404 -1.400 -7.000 5.600
11 +Wx (905) 34 752 -1 -12 -581 -1.400 -7.000 5.600
11 -Wx (906) -27 -432 2 26 467 -1.400 -7.000 5.600
11 +Wz (907) -8 -397 48 533 170 -1.400 -7.000 5.600
11 -Wz (908) -13 762 -49 -535 246 -1.400 -7.000 5.600
11 +Ex1 (909) 50 780 6 60 -757 -1.400 -7.000 5.600
11 -Ex1 (910) -50 -780 -6 -60 757 -1.400 -7.000 5.600
11 +Ez1 (911) -5 -1687 81 926 67 -1.400 -7.000 5.600
11 -Ez1 (912) 5 1681 -81 -921 -63 -1.400 -7.000 5.600
11 +Ey1 (913) 4 595 1 7 -34 -1.400 -7.000 5.600
11 -Ey1 (914) -4 -595 -1 -7 34 -1.400 -7.000 5.600
11 +Ex2 (915) 44 834 3 30 -653 -1.400 -7.000 5.600
11 -Ex2 (916) -44 -834 -3 -30 653 -1.400 -7.000 5.600
11 +Ez2 (917) -5 -1077 61 693 74 -1.400 -7.000 5.600
11 -Ez2 (918) 5 1070 -60 -688 -70 -1.400 -7.000 5.600
11 +Ey2 (919) 5 440 1 5 -34 -1.400 -7.000 5.600
11 -Ey2 (920) -5 -440 -1 -5 34 -1.400 -7.000 5.600
11 +T (921) -64 121 -8 -80 538 -1.400 -7.000 5.600
11 -T (922) -64 498 -7 -78 538 -1.400 -7.000 5.600
11 DS (923) -4 79 1 1 45 -1.400 -7.000 5.600
11 C (924) 4 -3725 -7 -56 -4 -1.400 -7.000 5.600
11 H (925) -4 79 1 1 45 -1.400 -7.000 5.600
12 D (901) 14 -13454 -8 -70 -13 -1.400 -7.000 5.600
12 L (902) -20 -3367 -3 -3 187 -1.400 -7.000 5.600
12 Q1 (903) -12 -3505 25 264 134 -1.400 -7.000 5.600
12 Q2 (904) -27 -2277 8 83 327 -1.400 -7.000 5.600
12 +Wx (905) 109 639 -1 -15 -1237 -1.400 -7.000 5.600
12 -Wx (906) -75 -263 6 63 888 -1.400 -7.000 5.600
12 +Wz (907) -62 -1115 79 822 688 -1.400 -7.000 5.600
12 -Wz (908) -56 1787 -80 -829 613 -1.400 -7.000 5.600
12 +Ex1 (909) 98 349 8 77 -1225 -1.400 -7.000 5.600
12 -Ex1 (910) -98 -349 -8 -77 1225 -1.400 -7.000 5.600
12 +Ez1 (911) -7 -3707 136 1446 82 -1.400 -7.000 5.600
12 -Ez1 (912) 7 3694 -135 -1438 -78 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
12 +Ey1 (913) 2 742 1 5 -24 -1.400 -7.000 5.600
12 -Ey1 (914) -2 -742 -1 -5 24 -1.400 -7.000 5.600
12 +Ex2 (915) 86 466 4 32 -1051 -1.400 -7.000 5.600
12 -Ex2 (916) -86 -466 -4 -32 1051 -1.400 -7.000 5.600
12 +Ez2 (917) -5 -2986 102 1082 67 -1.400 -7.000 5.600
12 -Ez2 (918) 5 2973 -101 -1074 -62 -1.400 -7.000 5.600
12 +Ey2 (919) 3 503 1 3 -24 -1.400 -7.000 5.600
12 -Ey2 (920) -3 -503 -1 -3 24 -1.400 -7.000 5.600
12 +T (921) -29 92 -5 -42 291 -1.400 -7.000 5.600
12 -T (922) -29 136 -5 -44 285 -1.400 -7.000 5.600
12 DS (923) 6 192 1 1 -1 -1.400 -7.000 5.600
12 C (924) 8 -5696 -5 -41 -4 -1.400 -7.000 5.600
12 H (925) 6 192 1 1 -1 -1.400 -7.000 5.600
13 D (901) 15 -13762 3 10 -14 -1.400 -7.000 5.600
13 L (902) -16 -3599 -1 5 171 -1.400 -7.000 5.600
13 Q1 (903) -10 -2233 25 278 141 -1.400 -7.000 5.600
13 Q2 (904) -29 -1908 7 94 336 -1.400 -7.000 5.600
13 +Wx (905) 107 554 -3 -20 -1220 -1.400 -7.000 5.600
13 -Wx (906) -73 239 9 83 868 -1.400 -7.000 5.600
13 +Wz (907) -66 1978 80 822 722 -1.400 -7.000 5.600
13 -Wz (908) -53 -1227 -79 -827 588 -1.400 -7.000 5.600
13 +Ex1 (909) 104 680 4 55 -1292 -1.400 -7.000 5.600
13 -Ex1 (910) -104 -680 -4 -55 1292 -1.400 -7.000 5.600
13 +Ez1 (911) 2 3938 136 1444 -35 -1.400 -7.000 5.600
13 -Ez1 (912) -2 -3926 -135 -1436 39 -1.400 -7.000 5.600
13 +Ey1 (913) 2 764 1 1 -23 -1.400 -7.000 5.600
13 -Ey1 (914) -2 -764 -1 -1 23 -1.400 -7.000 5.600
13 +Ex2 (915) 91 588 1 14 -1112 -1.400 -7.000 5.600
13 -Ex2 (916) -91 -587 -1 -14 1112 -1.400 -7.000 5.600
13 +Ez2 (917) 2 3178 102 1080 -39 -1.400 -7.000 5.600
13 -Ez2 (918) -3 -3166 -101 -1072 44 -1.400 -7.000 5.600
13 +Ey2 (919) 3 519 1 1 -24 -1.400 -7.000 5.600
13 -Ey2 (920) -3 -519 -1 -1 24 -1.400 -7.000 5.600
13 +T (921) -29 87 4 32 291 -1.400 -7.000 5.600
13 -T (922) -29 -309 3 31 284 -1.400 -7.000 5.600
13 DS (923) 6 192 -1 -1 -1 -1.400 -7.000 5.600
13 C (924) 9 -5836 1 -2 -13 -1.400 -7.000 5.600
13 H (925) 6 192 -1 -1 -1 -1.400 -7.000 5.600
14 D (901) -55 -10416 31 14 358 -1.400 -7.000 5.600
14 L (902) -5 -3139 372 264 100 -1.400 -7.000 5.600
14 Q1 (903) -26 -2271 20 211 274 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
14 Q2 (904) -37 -1796 9 87 393 -1.400 -7.000 5.600
14 +Wx (905) 32 681 -2 -11 -565 -1.400 -7.000 5.600
14 -Wx (906) -24 -257 8 69 448 -1.400 -7.000 5.600
14 +Wz (907) -15 765 48 527 309 -1.400 -7.000 5.600
14 -Wz (908) -3 -384 -47 -533 106 -1.400 -7.000 5.600
14 +Ex1 (909) 58 1250 2 24 -892 -1.400 -7.000 5.600
14 -Ex1 (910) -58 -1250 -2 -24 892 -1.400 -7.000 5.600
14 +Ez1 (911) 5 1668 81 921 -65 -1.400 -7.000 5.600
14 -Ez1 (912) -5 -1666 -80 -916 68 -1.400 -7.000 5.600
14 +Ey1 (913) 5 611 -1 -4 -36 -1.400 -7.000 5.600
14 -Ey1 (914) -5 -611 1 4 36 -1.400 -7.000 5.600
14 +Ex2 (915) 52 1131 -1 -2 -786 -1.400 -7.000 5.600
14 -Ex2 (916) -52 -1130 1 2 785 -1.400 -7.000 5.600
14 +Ez2 (917) 6 1055 60 690 -76 -1.400 -7.000 5.600
14 -Ez2 (918) -6 -1052 -60 -684 79 -1.400 -7.000 5.600
14 +Ey2 (919) 5 451 -1 -2 -37 -1.400 -7.000 5.600
14 -Ey2 (920) -5 -451 1 2 37 -1.400 -7.000 5.600
14 +T (921) -64 114 7 74 538 -1.400 -7.000 5.600
14 -T (922) -64 449 7 73 541 -1.400 -7.000 5.600
14 DS (923) -4 78 -1 -1 44 -1.400 -7.000 5.600
14 C (924) 3 -3851 5 29 1 -1.400 -7.000 5.600
14 H (925) -4 78 -1 -1 44 -1.400 -7.000 5.600
15 D (901) -102 -12236 347 230 595 -1.400 -7.000 5.600
15 L (902) -39 -3275 99 59 250 -1.400 -7.000 5.600
15 Q1 (903) -28 743 875 228 262 -1.400 -7.000 5.600
15 Q2 (904) -49 -273 370 111 440 -1.400 -7.000 5.600
15 +Wx (905) 104 1066 38 167 -1112 -1.400 -7.000 5.600
15 -Wx (906) -95 664 390 337 1077 -1.400 -7.000 5.600
15 +Wz (907) -89 6667 2106 520 914 -1.400 -7.000 5.600
15 -Wz (908) 73 -6693 -2219 -638 -354 -1.400 -7.000 5.600
15 +Ex1 (909) 131 2209 76 10 -1622 -1.400 -7.000 5.600
15 -Ex1 (910) -131 -2208 -76 -10 1622 -1.400 -7.000 5.600
15 +Ez1 (911) -5 12177 3711 806 18 -1.400 -7.000 5.600
15 -Ez1 (912) 4 -12116 -3690 -802 -7 -1.400 -7.000 5.600
15 +Ey1 (913) 7 651 -20 -13 -48 -1.400 -7.000 5.600
15 -Ey1 (914) -7 -651 20 13 48 -1.400 -7.000 5.600
15 +Ex2 (915) 117 1765 -26 -14 -1429 -1.400 -7.000 5.600
15 -Ex2 (916) -117 -1764 26 14 1429 -1.400 -7.000 5.600
15 +Ez2 (917) 5 9069 2782 602 -47 -1.400 -7.000 5.600
15 -Ez2 (918) -6 -9008 -2761 -598 59 -1.400 -7.000 5.600
15 +Ey2 (919) 7 455 -13 -9 -47 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
15 -Ey2 (920) -7 -455 13 9 47 -1.400 -7.000 5.600
15 +T (921) -65 1579 513 86 560 -1.400 -7.000 5.600
15 -T (922) -65 1772 505 78 554 -1.400 -7.000 5.600
15 DS (923) -11 329 -3 -1 104 -1.400 -7.000 5.600
15 C (924) -3 -4677 167 95 43 -1.400 -7.000 5.600
15 H (925) -11 329 -3 -1 104 -1.400 -7.000 5.600
16 D (901) -9 -14960 530 290 189 -1.400 -7.000 5.600
16 L (902) 11 -3307 129 124 413 -1.400 -7.000 5.600
16 Q1 (903) -54 -6752 856 408 582 -1.400 -7.000 5.600
16 Q2 (904) -61 -3014 363 158 642 -1.400 -7.000 5.600
16 +Wx (905) 272 448 78 311 -2643 -1.400 -7.000 5.600
16 -Wx (906) -358 -829 254 14 3286 -1.400 -7.000 5.600
16 +Wz (907) -211 -11340 2028 1047 2754 -1.400 -7.000 5.600
16 -Wz (908) 250 12203 -2097 -1081 -2060 -1.400 -7.000 5.600
16 +Ex1 (909) 336 -736 90 132 -3751 -1.400 -7.000 5.600
16 -Ex1 (910) -336 736 -90 -132 3748 -1.400 -7.000 5.600
16 +Ez1 (911) -17 -23700 3622 1863 229 -1.400 -7.000 5.600
16 -Ez1 (912) 13 23583 -3601 -1853 -192 -1.400 -7.000 5.600
16 +Ey1 (913) 4 757 -28 -16 -34 -1.400 -7.000 5.600
16 -Ey1 (914) -4 -757 28 16 34 -1.400 -7.000 5.600
16 +Ex2 (915) 291 141 -13 64 -3237 -1.400 -7.000 5.600
16 -Ex2 (916) -291 -141 13 -64 3235 -1.400 -7.000 5.600
16 +Ez2 (917) -19 -17718 2714 1389 251 -1.400 -7.000 5.600
16 -Ez2 (918) 15 17601 -2693 -1378 -214 -1.400 -7.000 5.600
16 +Ey2 (919) 4 516 -21 -13 -37 -1.400 -7.000 5.600
16 -Ey2 (920) -4 -516 21 13 37 -1.400 -7.000 5.600
16 +T (921) -80 -1627 551 540 758 -1.400 -7.000 5.600
16 -T (922) -76 -1158 532 488 699 -1.400 -7.000 5.600
16 DS (923) -15 418 5 42 157 -1.400 -7.000 5.600
16 C (924) 6 -5733 185 89 -34 -1.400 -7.000 5.600
16 H (925) -15 418 5 42 157 -1.400 -7.000 5.600
17 D (901) -173 -3746 18 83 742 -1.400 -7.000 5.600
17 L (902) -56 -2488 3 13 236 -1.400 -7.000 5.600
17 Q1 (903) -3 -230 12 79 28 -1.400 -7.000 5.600
17 Q2 (904) -10 -140 6 31 88 -1.400 -7.000 5.600
17 +Wx (905) 36 -130 5 29 -331 -1.400 -7.000 5.600
17 -Wx (906) -24 126 -4 -23 234 -1.400 -7.000 5.600
17 +Wz (907) -21 61 33 262 188 -1.400 -7.000 5.600
17 -Wz (908) -21 82 -35 -278 174 -1.400 -7.000 5.600
17 +Ex1 (909) 27 -269 1 6 -300 -1.400 -7.000 5.600
17 -Ex1 (910) -27 269 -1 -6 300 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
17 +Ez1 (911) -2 -47 30 263 19 -1.400 -7.000 5.600
17 -Ez1 (912) 2 47 -30 -261 -18 -1.400 -7.000 5.600
17 +Ey1 (913) 8 183 1 1 -35 -1.400 -7.000 5.600
17 -Ey1 (914) -8 -183 -1 -1 35 -1.400 -7.000 5.600
17 +Ex2 (915) 24 -202 -1 1 -260 -1.400 -7.000 5.600
17 -Ex2 (916) -24 202 1 -1 260 -1.400 -7.000 5.600
17 +Ez2 (917) -2 -40 25 212 16 -1.400 -7.000 5.600
17 -Ez2 (918) 2 41 -25 -210 -15 -1.400 -7.000 5.600
17 +Ey2 (919) 8 175 1 1 -35 -1.400 -7.000 5.600
17 -Ey2 (920) -8 -175 -1 -1 35 -1.400 -7.000 5.600
17 +T (921) -6 34 -2 -10 53 -1.400 -7.000 5.600
17 -T (922) -6 30 -2 -10 52 -1.400 -7.000 5.600
17 DS (923) 5 -190 2 6 -16 -1.400 -7.000 5.600
17 C (924) -3 -263 1 -1 17 -1.400 -7.000 5.600
17 H (925) 5 -190 2 6 -16 -1.400 -7.000 5.600
18 D (901) -172 -3749 -20 -95 749 -1.400 -7.000 5.600
18 L (902) -49 -2321 -2 -8 229 -1.400 -7.000 5.600
18 Q1 (903) -2 -234 2 33 30 -1.400 -7.000 5.600
18 Q2 (904) -8 -151 -5 -14 80 -1.400 -7.000 5.600
18 +Wx (905) 35 -127 4 22 -326 -1.400 -7.000 5.600
18 -Wx (906) -24 133 -3 -14 229 -1.400 -7.000 5.600
18 +Wz (907) -23 105 34 268 201 -1.400 -7.000 5.600
18 -Wz (908) -19 40 -34 -272 163 -1.400 -7.000 5.600
18 +Ex1 (909) 28 -273 -1 1 -316 -1.400 -7.000 5.600
18 -Ex1 (910) -28 273 1 -1 316 -1.400 -7.000 5.600
18 +Ez1 (911) 1 60 30 263 -9 -1.400 -7.000 5.600
18 -Ez1 (912) -1 -59 -30 -261 10 -1.400 -7.000 5.600
18 +Ey1 (913) 8 183 1 1 -35 -1.400 -7.000 5.600
18 -Ey1 (914) -8 -183 -1 -1 35 -1.400 -7.000 5.600
18 +Ex2 (915) 25 -208 -1 -4 -275 -1.400 -7.000 5.600
18 -Ex2 (916) -25 208 1 4 275 -1.400 -7.000 5.600
18 +Ez2 (917) 1 51 25 212 -10 -1.400 -7.000 5.600
18 -Ez2 (918) -1 -50 -25 -210 11 -1.400 -7.000 5.600
18 +Ey2 (919) 8 175 1 1 -35 -1.400 -7.000 5.600
18 -Ey2 (920) -8 -175 -1 -1 35 -1.400 -7.000 5.600
18 +T (921) -6 34 2 9 53 -1.400 -7.000 5.600
18 -T (922) -6 16 2 9 52 -1.400 -7.000 5.600
18 DS (923) 5 -190 -2 -5 -16 -1.400 -7.000 5.600
18 C (924) -3 -264 -1 -4 14 -1.400 -7.000 5.600
18 H (925) 5 -190 -2 -5 -16 -1.400 -7.000 5.600
19 D (901) 20 -5386 -27 -132 -53 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
19 L (902) 1 -2662 1 15 16 -1.400 -7.000 5.600
19 Q1 (903) -9 -1855 8 130 65 -1.400 -7.000 5.600
19 Q2 (904) -14 -2018 -10 -43 108 -1.400 -7.000 5.600
19 +Wx (905) 36 3175 -83 -234 -292 -1.400 -7.000 5.600
19 -Wx (906) -34 -2768 -106 -402 281 -1.400 -7.000 5.600
19 +Wz (907) 2 760 188 1270 -22 -1.400 -7.000 5.600
19 -Wz (908) -22 -2121 -137 -1086 183 -1.400 -7.000 5.600
19 +Ex1 (909) 41 4109 13 99 -351 -1.400 -7.000 5.600
19 -Ex1 (910) -41 -4108 -13 -99 351 -1.400 -7.000 5.600
19 +Ez1 (911) 1 153 82 930 -2 -1.400 -7.000 5.600
19 -Ez1 (912) -1 -146 -81 -920 1 -1.400 -7.000 5.600
19 +Ey1 (913) -1 369 2 11 -3 -1.400 -7.000 5.600
19 -Ey1 (914) 1 -369 -2 -11 3 -1.400 -7.000 5.600
19 +Ex2 (915) 36 3538 9 65 -301 -1.400 -7.000 5.600
19 -Ex2 (916) -36 -3538 -9 -65 301 -1.400 -7.000 5.600
19 +Ez2 (917) -2 -40 66 740 13 -1.400 -7.000 5.600
19 -Ez2 (918) 2 47 -65 -731 -13 -1.400 -7.000 5.600
19 +Ey2 (919) -1 334 2 10 -2 -1.400 -7.000 5.600
19 -Ey2 (920) 1 -334 -2 -10 2 -1.400 -7.000 5.600
19 +T (921) -12 -358 -19 -166 91 -1.400 -7.000 5.600
19 -T (922) -12 -560 -18 -159 92 -1.400 -7.000 5.600
19 DS (923) -1 -906 -4 -18 16 -1.400 -7.000 5.600
19 C (924) -2 -946 -2 -16 13 -1.400 -7.000 5.600
19 H (925) -1 -906 -4 -18 16 -1.400 -7.000 5.600
20 D (901) 43 -6522 19 30 -138 -1.400 -7.000 5.600
20 L (902) -9 -2763 33 141 76 -1.400 -7.000 5.600
20 Q1 (903) -11 -10133 25 362 158 -1.400 -7.000 5.600
20 Q2 (904) -19 -8981 -11 -44 222 -1.400 -7.000 5.600
20 +Wx (905) 44 3825 9 -24 -416 -1.400 -7.000 5.600
20 -Wx (906) -35 -2624 -46 -398 337 -1.400 -7.000 5.600
20 +Wz (907) -14 -962 226 2480 130 -1.400 -7.000 5.600
20 -Wz (908) -22 -406 -221 -2360 188 -1.400 -7.000 5.600
20 +Ex1 (909) 51 5518 28 216 -518 -1.400 -7.000 5.600
20 -Ex1 (910) -51 -5517 -28 -217 518 -1.400 -7.000 5.600
20 +Ez1 (911) -5 -881 170 2213 47 -1.400 -7.000 5.600
20 -Ez1 (912) 5 852 -169 -2191 -44 -1.400 -7.000 5.600
20 +Ey1 (913) -1 791 -2 -2 -8 -1.400 -7.000 5.600
20 -Ey1 (914) 1 -791 2 2 8 -1.400 -7.000 5.600
20 +Ex2 (915) 44 4788 21 141 -444 -1.400 -7.000 5.600
20 -Ex2 (916) -44 -4787 -21 -141 444 -1.400 -7.000 5.600
20 +Ez2 (917) -5 -765 138 1760 52 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
20 -Ez2 (918) 5 736 -136 -1738 -49 -1.400 -7.000 5.600
20 +Ey2 (919) -1 769 -2 -4 -9 -1.400 -7.000 5.600
20 -Ey2 (920) 1 -769 2 4 9 -1.400 -7.000 5.600
20 +T (921) -26 -60 -27 -247 219 -1.400 -7.000 5.600
20 -T (922) -26 -221 -26 -233 219 -1.400 -7.000 5.600
20 DS (923) -4 -174 -5 -23 30 -1.400 -7.000 5.600
20 C (924) 1 -829 -5 -35 2 -1.400 -7.000 5.600
20 H (925) -4 -174 -5 -23 30 -1.400 -7.000 5.600
21 D (901) 40 -6888 -23 -108 -122 -1.400 -7.000 5.600
21 L (902) -9 -2910 -5 11 77 -1.400 -7.000 5.600
21 Q1 (903) -8 -9721 52 629 128 -1.400 -7.000 5.600
21 Q2 (904) -17 -8825 20 228 211 -1.400 -7.000 5.600
21 +Wx (905) 43 3717 1 8 -407 -1.400 -7.000 5.600
21 -Wx (906) -33 -2550 53 589 321 -1.400 -7.000 5.600
21 +Wz (907) -27 -763 219 2369 235 -1.400 -7.000 5.600
21 -Wz (908) -10 -627 -234 -2529 86 -1.400 -7.000 5.600
21 +Ex1 (909) 61 6556 -43 -306 -612 -1.400 -7.000 5.600
21 -Ex1 (910) -61 -6555 43 306 612 -1.400 -7.000 5.600
21 +Ez1 (911) 5 865 170 2218 -45 -1.400 -7.000 5.600
21 -Ez1 (912) -5 -877 -168 -2195 47 -1.400 -7.000 5.600
21 +Ey1 (913) -1 804 3 10 -9 -1.400 -7.000 5.600
21 -Ey1 (914) 1 -804 -3 -10 9 -1.400 -7.000 5.600
21 +Ex2 (915) 53 5803 -40 -302 -536 -1.400 -7.000 5.600
21 -Ex2 (916) -53 -5801 40 302 536 -1.400 -7.000 5.600
21 +Ez2 (917) 5 773 138 1760 -53 -1.400 -7.000 5.600
21 -Ez2 (918) -6 -785 -136 -1737 55 -1.400 -7.000 5.600
21 +Ey2 (919) -1 780 3 11 -9 -1.400 -7.000 5.600
21 -Ey2 (920) 1 -780 -3 -11 9 -1.400 -7.000 5.600
21 +T (921) -26 -61 25 231 220 -1.400 -7.000 5.600
21 -T (922) -26 -257 24 220 222 -1.400 -7.000 5.600
21 DS (923) -4 -177 5 25 30 -1.400 -7.000 5.600
21 C (924) 1 -889 3 5 3 -1.400 -7.000 5.600
21 H (925) -4 -177 5 25 30 -1.400 -7.000 5.600
22 D (901) 18 -5764 22 84 -40 -1.400 -7.000 5.600
22 L (902) 2 -2477 -21 -125 3 -1.400 -7.000 5.600
22 Q1 (903) -9 -2208 32 299 67 -1.400 -7.000 5.600
22 Q2 (904) -14 -2095 16 126 112 -1.400 -7.000 5.600
22 +Wx (905) 38 3289 84 211 -309 -1.400 -7.000 5.600
22 -Wx (906) -37 -2938 107 484 303 -1.400 -7.000 5.600
22 +Wz (907) -30 -2692 138 1102 246 -1.400 -7.000 5.600
22 -Wz (908) 6 1053 -190 -1280 -54 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
22 +Ex1 (909) 55 5478 -19 -137 -467 -1.400 -7.000 5.600
22 -Ex1 (910) -55 -5476 19 137 467 -1.400 -7.000 5.600
22 +Ez1 (911) -1 -173 82 932 4 -1.400 -7.000 5.600
22 -Ez1 (912) 1 126 -81 -923 1 -1.400 -7.000 5.600
22 +Ey1 (913) -1 376 -2 -8 -2 -1.400 -7.000 5.600
22 -Ey1 (914) 1 -376 2 8 2 -1.400 -7.000 5.600
22 +Ex2 (915) 48 4824 -17 -133 -410 -1.400 -7.000 5.600
22 -Ex2 (916) -48 -4822 17 133 410 -1.400 -7.000 5.600
22 +Ez2 (917) 2 33 66 741 -13 -1.400 -7.000 5.600
22 -Ez2 (918) -2 -80 -65 -731 16 -1.400 -7.000 5.600
22 +Ey2 (919) -1 338 -2 -8 -2 -1.400 -7.000 5.600
22 -Ey2 (920) 1 -338 2 8 2 -1.400 -7.000 5.600
22 +T (921) -12 -362 18 160 90 -1.400 -7.000 5.600
22 -T (922) -12 -457 17 152 89 -1.400 -7.000 5.600
22 DS (923) -1 -905 4 19 16 -1.400 -7.000 5.600
22 C (924) -2 -1014 2 3 17 -1.400 -7.000 5.600
22 H (925) -1 -905 4 19 16 -1.400 -7.000 5.600
23 D (901) 551 -5111 -21 -115 21 -1.400 -7.000 5.600
23 L (902) 252 -2505 -14 -90 11 -1.400 -7.000 5.600
23 Q1 (903) -20 -1469 16 184 27 -1.400 -7.000 5.600
23 Q2 (904) -305 -548 1 22 53 -1.400 -7.000 5.600
23 +Wx (905) 1389 -2476 -101 -391 -162 -1.400 -7.000 5.600
23 -Wx (906) -1412 2793 -102 -384 156 -1.400 -7.000 5.600
23 +Wz (907) 28 283 168 1100 -6 -1.400 -7.000 5.600
23 -Wz (908) -861 1598 -110 -858 99 -1.400 -7.000 5.600
23 +Ex1 (909) 1725 -3612 7 45 -210 -1.400 -7.000 5.600
23 -Ex1 (910) -1724 3611 -7 -45 210 -1.400 -7.000 5.600
23 +Ez1 (911) -29 315 56 658 8 -1.400 -7.000 5.600
23 -Ez1 (912) 29 -308 -55 -647 -7 -1.400 -7.000 5.600
23 +Ey1 (913) -13 279 2 8 -4 -1.400 -7.000 5.600
23 -Ey1 (914) 13 -279 -2 -8 4 -1.400 -7.000 5.600
23 +Ex2 (915) 1479 -3085 5 26 -181 -1.400 -7.000 5.600
23 -Ex2 (916) -1478 3084 -5 -26 181 -1.400 -7.000 5.600
23 +Ez2 (917) -89 379 44 515 16 -1.400 -7.000 5.600
23 -Ez2 (918) 89 -372 -43 -504 -16 -1.400 -7.000 5.600
23 +Ey2 (919) -8 248 2 8 -4 -1.400 -7.000 5.600
23 -Ey2 (920) 8 -248 -2 -8 4 -1.400 -7.000 5.600
23 +T (921) -203 404 -13 -109 35 -1.400 -7.000 5.600
23 -T (922) -146 37 -13 -110 28 -1.400 -7.000 5.600
23 DS (923) -15 -432 -6 -25 18 -1.400 -7.000 5.600
23 C (924) 118 -800 -1 -2 5 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
23 H (925) -15 -432 -6 -25 18 -1.400 -7.000 5.600
24 D (901) -25 -6771 2 -80 185 -1.400 -7.000 5.600
24 L (902) -16 -3133 4 -104 109 -1.400 -7.000 5.600
24 Q1 (903) -27 -13183 37 570 280 -1.400 -7.000 5.600
24 Q2 (904) -35 -11718 -7 50 349 -1.400 -7.000 5.600
24 +Wx (905) 51 2539 -58 -555 -484 -1.400 -7.000 5.600
24 -Wx (906) -42 -1400 -61 -525 409 -1.400 -7.000 5.600
24 +Wz (907) -16 -655 230 2798 149 -1.400 -7.000 5.600
24 -Wz (908) -22 -81 -192 -2399 190 -1.400 -7.000 5.600
24 +Ex1 (909) 70 2649 17 123 -677 -1.400 -7.000 5.600
24 -Ex1 (910) -70 -2649 -17 -123 677 -1.400 -7.000 5.600
24 +Ez1 (911) -7 -647 136 2083 67 -1.400 -7.000 5.600
24 -Ez1 (912) 7 621 -134 -2050 -64 -1.400 -7.000 5.600
24 +Ey1 (913) 3 923 1 11 -24 -1.400 -7.000 5.600
24 -Ey1 (914) -3 -923 -1 -11 24 -1.400 -7.000 5.600
24 +Ex2 (915) 60 2204 12 66 -582 -1.400 -7.000 5.600
24 -Ex2 (916) -60 -2203 -12 -66 582 -1.400 -7.000 5.600
24 +Ez2 (917) -8 -557 106 1630 73 -1.400 -7.000 5.600
24 -Ez2 (918) 8 531 -105 -1598 -70 -1.400 -7.000 5.600
24 +Ey2 (919) 3 921 1 11 -24 -1.400 -7.000 5.600
24 -Ey2 (920) -3 -921 -1 -11 24 -1.400 -7.000 5.600
24 +T (921) -22 -66 -14 -154 186 -1.400 -7.000 5.600
24 -T (922) -22 -335 -16 -159 183 -1.400 -7.000 5.600
24 DS (923) -4 33 -8 -34 38 -1.400 -7.000 5.600
24 C (924) -1 -451 -2 -10 5 -1.400 -7.000 5.600
24 H (925) -4 33 -8 -34 38 -1.400 -7.000 5.600
25 D (901) -29 -7266 -3 19 214 -1.400 -7.000 5.600
25 L (902) -22 -3453 16 198 145 -1.400 -7.000 5.600
25 Q1 (903) -26 -12824 52 718 252 -1.400 -7.000 5.600
25 Q2 (904) -34 -11552 17 180 340 -1.400 -7.000 5.600
25 +Wx (905) 50 2488 34 252 -478 -1.400 -7.000 5.600
25 -Wx (906) -39 -1243 141 1319 387 -1.400 -7.000 5.600
25 +Wz (907) -28 -261 224 2702 246 -1.400 -7.000 5.600
25 -Wz (908) -11 -482 -250 -2920 99 -1.400 -7.000 5.600
25 +Ex1 (909) 82 3018 -52 -433 -795 -1.400 -7.000 5.600
25 -Ex1 (910) -82 -3017 52 433 794 -1.400 -7.000 5.600
25 +Ez1 (911) 7 665 146 2169 -67 -1.400 -7.000 5.600
25 -Ez1 (912) -7 -669 -144 -2138 69 -1.400 -7.000 5.600
25 +Ey1 (913) 3 944 1 4 -26 -1.400 -7.000 5.600
25 -Ey1 (914) -3 -944 -1 -4 26 -1.400 -7.000 5.600
25 +Ex2 (915) 72 2564 -47 -406 -698 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
25 -Ex2 (916) -72 -2563 47 406 698 -1.400 -7.000 5.600
25 +Ez2 (917) 8 592 114 1693 -75 -1.400 -7.000 5.600
25 -Ez2 (918) -8 -596 -111 -1662 78 -1.400 -7.000 5.600
25 +Ey2 (919) 3 941 1 3 -26 -1.400 -7.000 5.600
25 -Ey2 (920) -3 -941 -1 -3 26 -1.400 -7.000 5.600
25 +T (921) -23 -75 7 98 189 -1.400 -7.000 5.600
25 -T (922) -22 -370 6 85 188 -1.400 -7.000 5.600
25 DS (923) -4 33 10 51 38 -1.400 -7.000 5.600
25 C (924) -1 -483 1 -12 9 -1.400 -7.000 5.600
25 H (925) -4 33 10 51 38 -1.400 -7.000 5.600
26 D (901) 550 -5683 -22 -7 39 -1.400 -7.000 5.600
26 L (902) 179 -2306 -12 48 15 -1.400 -7.000 5.600
26 Q1 (903) 11 -1933 -26 172 17 -1.400 -7.000 5.600
26 Q2 (904) -341 -476 6 55 57 -1.400 -7.000 5.600
26 +Wx (905) 1477 -2594 92 293 -168 -1.400 -7.000 5.600
26 -Wx (906) -1527 2876 123 615 166 -1.400 -7.000 5.600
26 +Wz (907) -1182 2161 121 951 130 -1.400 -7.000 5.600
26 -Wz (908) 194 -41 -174 -1138 -24 -1.400 -7.000 5.600
26 +Ex1 (909) 2283 -4629 -20 -143 -289 -1.400 -7.000 5.600
26 -Ex1 (910) -2282 4628 20 143 288 -1.400 -7.000 5.600
26 +Ez1 (911) 21 -318 60 685 -7 -1.400 -7.000 5.600
26 -Ez1 (912) -36 338 -59 -675 9 -1.400 -7.000 5.600
26 +Ey1 (913) -13 297 -2 -6 -5 -1.400 -7.000 5.600
26 -Ey1 (914) 13 -297 2 6 5 -1.400 -7.000 5.600
26 +Ex2 (915) 2001 -4029 -18 -134 -256 -1.400 -7.000 5.600
26 -Ex2 (916) -2000 4027 18 134 256 -1.400 -7.000 5.600
26 +Ez2 (917) 90 -396 47 535 -17 -1.400 -7.000 5.600
26 -Ez2 (918) -105 416 -46 -525 18 -1.400 -7.000 5.600
26 +Ey2 (919) -9 268 -2 -6 -4 -1.400 -7.000 5.600
26 -Ey2 (920) 9 -268 2 6 4 -1.400 -7.000 5.600
26 +T (921) -199 401 10 92 35 -1.400 -7.000 5.600
26 -T (922) -157 164 10 88 33 -1.400 -7.000 5.600
26 DS (923) -16 -433 6 30 18 -1.400 -7.000 5.600
26 C (924) 97 -756 -1 -5 8 -1.400 -7.000 5.600
26 H (925) -16 -433 6 30 18 -1.400 -7.000 5.600
27 D (901) -592 -5389 -39 -156 9 -1.400 -7.000 5.600
27 L (902) -375 -3178 -27 -102 -4 -1.400 -7.000 5.600
27 Q1 (903) -520 -2751 26 328 25 -1.400 -7.000 5.600
27 Q2 (904) -645 -2717 -4 34 65 -1.400 -7.000 5.600
27 +Wx (905) 1171 2051 -90 -293 -222 -1.400 -7.000 5.600
27 -Wx (906) -1111 -1502 -84 -213 218 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
27 +Wz (907) 142 1167 186 1293 4 -1.400 -7.000 5.600
27 -Wz (908) -819 -2000 -132 -1101 130 -1.400 -7.000 5.600
27 +Ex1 (909) 1542 2388 3 3 -294 -1.400 -7.000 5.600
27 -Ex1 (910) -1542 -2388 -3 -3 294 -1.400 -7.000 5.600
27 +Ez1 (911) 74 1028 70 818 20 -1.400 -7.000 5.600
27 -Ez1 (912) -74 -1015 -69 -801 -20 -1.400 -7.000 5.600
27 +Ey1 (913) 72 425 4 13 -3 -1.400 -7.000 5.600
27 -Ey1 (914) -72 -425 -4 -13 3 -1.400 -7.000 5.600
27 +Ex2 (915) 1325 2052 2 -11 -254 -1.400 -7.000 5.600
27 -Ex2 (916) -1325 -2052 -2 11 254 -1.400 -7.000 5.600
27 +Ez2 (917) -38 712 54 632 31 -1.400 -7.000 5.600
27 -Ez2 (918) 38 -699 -53 -616 -31 -1.400 -7.000 5.600
27 +Ey2 (919) 72 422 4 13 -3 -1.400 -7.000 5.600
27 -Ey2 (920) -72 -422 -4 -13 3 -1.400 -7.000 5.600
27 +T (921) -168 -236 -27 -223 14 -1.400 -7.000 5.600
27 -T (922) -203 185 -22 -206 4 -1.400 -7.000 5.600
27 DS (923) -221 -726 -12 -50 22 -1.400 -7.000 5.600
27 C (924) -36 -238 -2 -9 5 -1.400 -7.000 5.600
27 H (925) -221 -726 -12 -50 22 -1.400 -7.000 5.600
28 D (901) 590 -9013 10 75 88 -1.400 -7.000 5.600
28 L (902) 255 -4065 12 78 66 -1.400 -7.000 5.600
28 Q1 (903) 986 -18217 101 1121 461 -1.400 -7.000 5.600
28 Q2 (904) 428 -17101 16 234 621 -1.400 -7.000 5.600
28 +Wx (905) 1800 -658 -19 -201 -728 -1.400 -7.000 5.600
28 -Wx (906) -1702 1661 -5 43 647 -1.400 -7.000 5.600
28 +Wz (907) -568 20 247 3066 239 -1.400 -7.000 5.600
28 -Wz (908) -801 1771 -230 -2885 240 -1.400 -7.000 5.600
28 +Ex1 (909) 2731 -1593 6 -16 -1083 -1.400 -7.000 5.600
28 -Ex1 (910) -2731 1593 -6 16 1083 -1.400 -7.000 5.600
28 +Ez1 (911) -211 -957 164 2374 143 -1.400 -7.000 5.600
28 -Ez1 (912) 199 958 -161 -2328 -138 -1.400 -7.000 5.600
28 +Ey1 (913) -61 1235 -2 -10 -31 -1.400 -7.000 5.600
28 -Ey1 (914) 61 -1235 2 10 31 -1.400 -7.000 5.600
28 +Ex2 (915) 2364 -1281 2 -53 -941 -1.400 -7.000 5.600
28 -Ex2 (916) -2363 1281 -2 53 941 -1.400 -7.000 5.600
28 +Ez2 (917) -253 -659 127 1835 145 -1.400 -7.000 5.600
28 -Ez2 (918) 240 660 -123 -1789 -140 -1.400 -7.000 5.600
28 +Ey2 (919) -60 1240 -2 -11 -30 -1.400 -7.000 5.600
28 -Ey2 (920) 60 -1240 2 11 30 -1.400 -7.000 5.600
28 +T (921) -193 489 -48 -413 147 -1.400 -7.000 5.600
28 -T (922) -138 98 -61 -483 142 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
28 DS (923) -185 499 -6 -25 64 -1.400 -7.000 5.600
28 C (924) 45 -434 1 -6 14 -1.400 -7.000 5.600
28 H (925) -185 499 -6 -25 64 -1.400 -7.000 5.600
29 D (901) 199 -5320 -1 -2 -74 -1.400 -7.000 5.600
29 L (902) 67 -3263 -1 1 23 -1.400 -7.000 5.600
29 Q1 (903) -29 -162 14 95 16 -1.400 -7.000 5.600
29 Q2 (904) -114 -411 4 23 53 -1.400 -7.000 5.600
29 +Wx (905) 302 1419 -2 -13 -171 -1.400 -7.000 5.600
29 -Wx (906) -337 -1501 2 12 186 -1.400 -7.000 5.600
29 +Wz (907) -166 -659 36 262 88 -1.400 -7.000 5.600
29 -Wz (908) -142 -541 -35 -249 73 -1.400 -7.000 5.600
29 +Ex1 (909) 447 2420 -1 -5 -268 -1.400 -7.000 5.600
29 -Ex1 (910) -447 -2419 1 5 268 -1.400 -7.000 5.600
29 +Ez1 (911) -1 6 29 212 1 -1.400 -7.000 5.600
29 -Ez1 (912) -3 -25 -28 -208 2 -1.400 -7.000 5.600
29 +Ey1 (913) -4 235 1 -1 2 -1.400 -7.000 5.600
29 -Ey1 (914) 4 -235 -1 1 -2 -1.400 -7.000 5.600
29 +Ex2 (915) 403 2194 -1 -8 -242 -1.400 -7.000 5.600
29 -Ex2 (916) -402 -2193 1 8 242 -1.400 -7.000 5.600
29 +Ez2 (917) -1 4 22 163 2 -1.400 -7.000 5.600
29 -Ez2 (918) -3 -23 -22 -159 1 -1.400 -7.000 5.600
29 +Ey2 (919) -5 236 1 -1 3 -1.400 -7.000 5.600
29 -Ey2 (920) 5 -236 -1 1 -3 -1.400 -7.000 5.600
29 +T (921) -256 -256 1 2 98 -1.400 -7.000 5.600
29 -T (922) -246 -236 -1 -1 94 -1.400 -7.000 5.600
29 DS (923) -148 -309 -1 -1 61 -1.400 -7.000 5.600
29 C (924) -12 -80 -1 -1 8 -1.400 -7.000 5.600
29 H (925) -148 -309 -1 -1 61 -1.400 -7.000 5.600
30 D (901) 590 -9385 63 288 92 -1.400 -7.000 5.600
30 L (902) 237 -4535 48 229 51 -1.400 -7.000 5.600
30 Q1 (903) 1165 -17951 102 1129 337 -1.400 -7.000 5.600
30 Q2 (904) 460 -17023 26 281 591 -1.400 -7.000 5.600
30 +Wx (905) 1784 -708 -6 -96 -725 -1.400 -7.000 5.600
30 -Wx (906) -1661 1762 10 182 643 -1.400 -7.000 5.600
30 +Wz (907) -1044 1892 240 3022 347 -1.400 -7.000 5.600
30 -Wz (908) -358 -22 -231 -2905 145 -1.400 -7.000 5.600
30 +Ex1 (909) 3226 -1897 2 -52 -1289 -1.400 -7.000 5.600
30 -Ex1 (910) -3225 1897 -2 52 1288 -1.400 -7.000 5.600
30 +Ez1 (911) 205 932 160 2359 -136 -1.400 -7.000 5.600
30 -Ez1 (912) -216 -913 -156 -2312 139 -1.400 -7.000 5.600
30 +Ey1 (913) -60 1261 -4 -16 -32 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
30 -Ey1 (914) 60 -1261 4 16 32 -1.400 -7.000 5.600
30 +Ex2 (915) 2855 -1627 -2 -83 -1143 -1.400 -7.000 5.600
30 -Ex2 (916) -2854 1626 2 83 1143 -1.400 -7.000 5.600
30 +Ez2 (917) 259 634 124 1824 -143 -1.400 -7.000 5.600
30 -Ez2 (918) -270 -615 -120 -1777 147 -1.400 -7.000 5.600
30 +Ey2 (919) -60 1265 -4 -17 -31 -1.400 -7.000 5.600
30 -Ey2 (920) 60 -1265 4 17 31 -1.400 -7.000 5.600
30 +T (921) -201 489 54 458 151 -1.400 -7.000 5.600
30 -T (922) -148 84 53 434 148 -1.400 -7.000 5.600
30 DS (923) -184 499 4 8 66 -1.400 -7.000 5.600
30 C (924) 33 -442 -1 -8 21 -1.400 -7.000 5.600
30 H (925) -184 499 4 8 66 -1.400 -7.000 5.600
31 D (901) -641 -6140 -7 13 -14 -1.400 -7.000 5.600
31 L (902) -325 -2685 -3 17 -16 -1.400 -7.000 5.600
31 Q1 (903) -456 -3282 86 613 99 -1.400 -7.000 5.600
31 Q2 (904) -695 -2861 20 142 70 -1.400 -7.000 5.600
31 +Wx (905) 1210 2179 80 189 -228 -1.400 -7.000 5.600
31 -Wx (906) -1163 -1718 101 323 229 -1.400 -7.000 5.600
31 +Wz (907) -1041 -2366 144 1183 172 -1.400 -7.000 5.600
31 -Wz (908) 283 1331 -189 -1278 -24 -1.400 -7.000 5.600
31 +Ex1 (909) 2051 3356 -1 -18 -396 -1.400 -7.000 5.600
31 -Ex1 (910) -2050 -3355 1 18 396 -1.400 -7.000 5.600
31 +Ez1 (911) -87 -1039 80 861 -18 -1.400 -7.000 5.600
31 -Ez1 (912) 72 993 -78 -844 20 -1.400 -7.000 5.600
31 +Ey1 (913) 61 414 -2 -9 -3 -1.400 -7.000 5.600
31 -Ey1 (914) -61 -414 2 9 3 -1.400 -7.000 5.600
31 +Ex2 (915) 1812 2977 -2 -28 -350 -1.400 -7.000 5.600
31 -Ex2 (916) -1811 -2975 2 28 350 -1.400 -7.000 5.600
31 +Ez2 (917) 31 -729 62 668 -30 -1.400 -7.000 5.600
31 -Ez2 (918) -46 683 -61 -651 33 -1.400 -7.000 5.600
31 +Ey2 (919) 59 410 -2 -9 -2 -1.400 -7.000 5.600
31 -Ey2 (920) -59 -410 2 9 2 -1.400 -7.000 5.600
31 +T (921) -165 -232 30 238 13 -1.400 -7.000 5.600
31 -T (922) -192 -447 29 230 10 -1.400 -7.000 5.600
31 DS (923) -222 -720 10 39 23 -1.400 -7.000 5.600
31 C (924) -56 -264 -1 -4 9 -1.400 -7.000 5.600
31 H (925) -222 -720 10 39 23 -1.400 -7.000 5.600
32 D (901) 6 -3490 -36 -144 -38 -1.400 -7.000 5.600
32 L (902) 4 -2066 -22 -85 -27 -1.400 -7.000 5.600
32 Q1 (903) -1 -1873 -19 42 2 -1.400 -7.000 5.600
32 Q2 (904) -5 -874 -17 -30 36 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
32 +Wx (905) 22 -3035 -74 -228 -178 -1.400 -7.000 5.600
32 -Wx (906) -22 3201 -78 -198 178 -1.400 -7.000 5.600
32 +Wz (907) 1 673 90 685 1 -1.400 -7.000 5.600
32 -Wz (908) -14 1451 -49 -555 111 -1.400 -7.000 5.600
32 +Ex1 (909) 30 -4632 8 10 -248 -1.400 -7.000 5.600
32 -Ex1 (910) -30 4632 -8 -10 248 -1.400 -7.000 5.600
32 +Ez1 (911) -2 1064 -1 336 15 -1.400 -7.000 5.600
32 -Ez1 (912) 2 -1046 1 -330 -14 -1.400 -7.000 5.600
32 +Ey1 (913) 1 262 4 14 -1 -1.400 -7.000 5.600
32 -Ey1 (914) -1 -262 -4 -14 1 -1.400 -7.000 5.600
32 +Ex2 (915) 26 -4034 7 3 -214 -1.400 -7.000 5.600
32 -Ex2 (916) -26 4033 -7 -4 214 -1.400 -7.000 5.600
32 +Ez2 (917) -3 1145 1 261 27 -1.400 -7.000 5.600
32 -Ez2 (918) 3 -1127 -1 -255 -26 -1.400 -7.000 5.600
32 +Ey2 (919) 1 264 4 15 -1 -1.400 -7.000 5.600
32 -Ey2 (920) -1 -264 -4 -15 1 -1.400 -7.000 5.600
32 +T (921) 3 223 -25 -200 -18 -1.400 -7.000 5.600
32 -T (922) 4 -302 -28 -211 -27 -1.400 -7.000 5.600
32 DS (923) -3 -75 -8 -37 18 -1.400 -7.000 5.600
32 C (924) -1 -47 -1 -2 2 -1.400 -7.000 5.600
32 H (925) -3 -75 -8 -37 18 -1.400 -7.000 5.600
33 D (901) 874 -9205 -3 45 60 -1.400 -7.000 5.600
33 L (902) 386 -3637 5 59 35 -1.400 -7.000 5.600
33 Q1 (903) 1845 -17934 16 633 213 -1.400 -7.000 5.600
33 Q2 (904) 1290 -16906 4 223 321 -1.400 -7.000 5.600
33 +Wx (905) 2421 -3413 -10 -179 -548 -1.400 -7.000 5.600
33 -Wx (906) -2343 4037 12 136 493 -1.400 -7.000 5.600
33 +Wz (907) -722 680 38 2124 183 -1.400 -7.000 5.600
33 -Wz (908) -1030 3224 -34 -2011 190 -1.400 -7.000 5.600
33 +Ex1 (909) 3756 -6139 1 -116 -798 -1.400 -7.000 5.600
33 -Ex1 (910) -3755 6138 -1 116 798 -1.400 -7.000 5.600
33 +Ez1 (911) -259 -782 -18 1537 120 -1.400 -7.000 5.600
33 -Ez1 (912) 240 789 18 -1507 -116 -1.400 -7.000 5.600
33 +Ey1 (913) -110 1194 -3 -17 -17 -1.400 -7.000 5.600
33 -Ey1 (914) 110 -1194 3 17 17 -1.400 -7.000 5.600
33 +Ex2 (915) 3244 -5268 3 -116 -695 -1.400 -7.000 5.600
33 -Ex2 (916) -3243 5267 -3 116 695 -1.400 -7.000 5.600
33 +Ez2 (917) -311 -435 -11 1182 113 -1.400 -7.000 5.600
33 -Ez2 (918) 291 442 10 -1151 -109 -1.400 -7.000 5.600
33 +Ey2 (919) -112 1214 -3 -18 -17 -1.400 -7.000 5.600
33 -Ey2 (920) 112 -1214 3 18 17 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
33 +T (921) 167 -193 -57 -512 -14 -1.400 -7.000 5.600
33 -T (922) 237 -793 -58 -508 -16 -1.400 -7.000 5.600
33 DS (923) -291 1080 -3 -18 69 -1.400 -7.000 5.600
33 C (924) 9 -58 -2 -12 12 -1.400 -7.000 5.600
33 H (925) -291 1080 -3 -18 69 -1.400 -7.000 5.600
34 D (901) -9 -2426 -1 -3 11 -1.400 -7.000 5.600
34 L (902) -3 -1085 -1 -1 3 -1.400 -7.000 5.600
34 Q1 (903) -4 7 7 46 17 -1.400 -7.000 5.600
34 Q2 (904) -6 484 3 16 41 -1.400 -7.000 5.600
34 +Wx (905) 10 -1334 -1 -6 -95 -1.400 -7.000 5.600
34 -Wx (906) -11 1442 3 15 106 -1.400 -7.000 5.600
34 +Wz (907) -6 643 23 158 51 -1.400 -7.000 5.600
34 -Wz (908) -5 508 -22 -153 42 -1.400 -7.000 5.600
34 +Ex1 (909) 14 -2291 -2 -9 -146 -1.400 -7.000 5.600
34 -Ex1 (910) -14 2291 2 9 146 -1.400 -7.000 5.600
34 +Ez1 (911) -1 11 19 130 1 -1.400 -7.000 5.600
34 -Ez1 (912) -1 8 -18 -127 1 -1.400 -7.000 5.600
34 +Ey1 (913) 1 109 -1 -1 -2 -1.400 -7.000 5.600
34 -Ey1 (914) -1 -109 1 1 2 -1.400 -7.000 5.600
34 +Ex2 (915) 13 -2077 -2 -9 -132 -1.400 -7.000 5.600
34 -Ex2 (916) -13 2077 2 9 132 -1.400 -7.000 5.600
34 +Ez2 (917) -1 11 14 100 1 -1.400 -7.000 5.600
34 -Ez2 (918) 1 8 -14 -97 1 -1.400 -7.000 5.600
34 +Ey2 (919) 1 114 -1 -1 -2 -1.400 -7.000 5.600
34 -Ey2 (920) -1 -114 1 1 2 -1.400 -7.000 5.600
34 +T (921) -4 267 1 1 27 -1.400 -7.000 5.600
34 -T (922) -3 240 1 1 24 -1.400 -7.000 5.600
34 DS (923) -6 213 -1 -1 42 -1.400 -7.000 5.600
34 C (924) -1 73 -1 -1 4 -1.400 -7.000 5.600
34 H (925) -6 213 -1 -1 42 -1.400 -7.000 5.600
35 D (901) 848 -9604 73 263 122 -1.400 -7.000 5.600
35 L (902) 374 -4020 51 192 105 -1.400 -7.000 5.600
35 Q1 (903) 2067 -17736 20 621 151 -1.400 -7.000 5.600
35 Q2 (904) 1387 -16999 12 235 290 -1.400 -7.000 5.600
35 +Wx (905) 2425 -3499 7 22 -548 -1.400 -7.000 5.600
35 -Wx (906) -2389 4274 17 316 514 -1.400 -7.000 5.600
35 +Wz (907) -1390 3710 27 2030 272 -1.400 -7.000 5.600
35 -Wz (908) -431 368 -31 -2014 115 -1.400 -7.000 5.600
35 +Ex1 (909) 4460 -7465 8 -59 -955 -1.400 -7.000 5.600
35 -Ex1 (910) -4459 7462 -8 59 955 -1.400 -7.000 5.600
35 +Ez1 (911) 241 779 -19 1516 -116 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
35 -Ez1 (912) -256 -733 19 -1483 119 -1.400 -7.000 5.600
35 +Ey1 (913) -111 1211 -4 -15 -20 -1.400 -7.000 5.600
35 -Ey1 (914) 111 -1211 4 15 20 -1.400 -7.000 5.600
35 +Ex2 (915) 3944 -6609 7 -73 -847 -1.400 -7.000 5.600
35 -Ex2 (916) -3943 6607 -7 73 847 -1.400 -7.000 5.600
35 +Ez2 (917) 313 388 -13 1164 -112 -1.400 -7.000 5.600
35 -Ez2 (918) -327 -341 13 -1131 115 -1.400 -7.000 5.600
35 +Ey2 (919) -114 1234 -4 -16 -20 -1.400 -7.000 5.600
35 -Ey2 (920) 114 -1234 4 16 20 -1.400 -7.000 5.600
35 +T (921) 161 -186 59 519 -13 -1.400 -7.000 5.600
35 -T (922) 228 -755 61 529 -9 -1.400 -7.000 5.600
35 DS (923) -296 1089 6 23 69 -1.400 -7.000 5.600
35 C (924) -15 -23 1 -5 18 -1.400 -7.000 5.600
35 H (925) -296 1089 6 23 69 -1.400 -7.000 5.600
36 D (901) 7 -3800 10 38 -43 -1.400 -7.000 5.600
36 L (902) 3 -1732 3 11 -19 -1.400 -7.000 5.600
36 Q1 (903) 6 -2120 15 181 -30 -1.400 -7.000 5.600
36 Q2 (904) -6 -800 11 89 44 -1.400 -7.000 5.600
36 +Wx (905) 22 -3003 74 197 -181 -1.400 -7.000 5.600
36 -Wx (906) -23 3059 127 414 180 -1.400 -7.000 5.600
36 +Wz (907) -18 1911 64 629 143 -1.400 -7.000 5.600
36 -Wz (908) 3 340 -105 -731 -21 -1.400 -7.000 5.600
36 +Ex1 (909) 40 -5884 -6 -42 -324 -1.400 -7.000 5.600
36 -Ex1 (910) -40 5882 6 42 324 -1.400 -7.000 5.600
36 +Ez1 (911) 2 -1086 14 393 -16 -1.400 -7.000 5.600
36 -Ez1 (912) -2 1107 -13 -384 18 -1.400 -7.000 5.600
36 +Ey1 (913) -1 216 -2 -5 1 -1.400 -7.000 5.600
36 -Ey1 (914) 1 -216 2 5 -1 -1.400 -7.000 5.600
36 +Ex2 (915) 35 -5211 -5 -43 -286 -1.400 -7.000 5.600
36 -Ex2 (916) -35 5209 5 43 286 -1.400 -7.000 5.600
36 +Ez2 (917) 4 -1188 10 298 -29 -1.400 -7.000 5.600
36 -Ez2 (918) -4 1209 -10 -290 31 -1.400 -7.000 5.600
36 +Ey2 (919) -1 221 -2 -6 1 -1.400 -7.000 5.600
36 -Ey2 (920) 1 -221 2 6 -1 -1.400 -7.000 5.600
36 +T (921) 3 228 24 200 -18 -1.400 -7.000 5.600
36 -T (922) 4 -27 25 202 -23 -1.400 -7.000 5.600
36 DS (923) -3 -76 7 30 18 -1.400 -7.000 5.600
36 C (924) -1 20 1 -1 5 -1.400 -7.000 5.600
36 H (925) -3 -76 7 30 18 -1.400 -7.000 5.600
37 D (901) 23 -6372 -54 -227 -134 -1.400 -7.000 5.600
37 L (902) 9 -2522 -3 -7 -52 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
37 Q1 (903) -8 -5160 -27 15 43 -1.400 -7.000 5.600
37 Q2 (904) -16 -5228 -18 -12 116 -1.400 -7.000 5.600
37 +Wx (905) 39 -401 -106 -330 -372 -1.400 -7.000 5.600
37 -Wx (906) -40 1090 -100 -289 380 -1.400 -7.000 5.600
37 +Wz (907) -3 4330 78 653 21 -1.400 -7.000 5.600
37 -Wz (908) -24 -3698 -20 -467 221 -1.400 -7.000 5.600
37 +Ex1 (909) 54 -1299 -5 -52 -519 -1.400 -7.000 5.600
37 -Ex1 (910) -54 1298 5 52 519 -1.400 -7.000 5.600
37 +Ez1 (911) -4 5015 -45 196 44 -1.400 -7.000 5.600
37 -Ez1 (912) 4 -4940 44 -192 -43 -1.400 -7.000 5.600
37 +Ey1 (913) -1 627 4 13 3 -1.400 -7.000 5.600
37 -Ey1 (914) 1 -627 -4 -13 -3 -1.400 -7.000 5.600
37 +Ex2 (915) 46 -1358 -4 -50 -449 -1.400 -7.000 5.600
37 -Ex2 (916) -46 1358 4 50 448 -1.400 -7.000 5.600
37 +Ez2 (917) -7 3871 -34 127 73 -1.400 -7.000 5.600
37 -Ez2 (918) 7 -3796 33 -123 -72 -1.400 -7.000 5.600
37 +Ey2 (919) -1 650 4 13 4 -1.400 -7.000 5.600
37 -Ey2 (920) 1 -650 -4 -13 -4 -1.400 -7.000 5.600
37 +T (921) 10 19 -63 -481 -79 -1.400 -7.000 5.600
37 -T (922) 12 10 -65 -488 -90 -1.400 -7.000 5.600
37 DS (923) -6 -1340 -30 -124 54 -1.400 -7.000 5.600
37 C (924) -1 269 1 4 6 -1.400 -7.000 5.600
37 H (925) -6 -1340 -30 -124 54 -1.400 -7.000 5.600
38 D (901) 12 -10625 -2224 137 -41 -1.400 -7.000 5.600
38 L (902) 10 -2606 -382 7 -28 -1.400 -7.000 5.600
38 Q1 (903) -7 -9746 -167 153 125 -1.400 -7.000 5.600
38 Q2 (904) -17 -8237 -420 73 209 -1.400 -7.000 5.600
38 +Wx (905) 34 -581 -54 -70 -385 -1.400 -7.000 5.600
38 -Wx (906) -31 1427 6 -54 347 -1.400 -7.000 5.600
38 +Wz (907) -19 -28 3499 629 176 -1.400 -7.000 5.600
38 -Wz (908) -7 883 -3317 -583 92 -1.400 -7.000 5.600
38 +Ex1 (909) 47 -1869 -182 -42 -555 -1.400 -7.000 5.600
38 -Ex1 (910) -47 1868 182 42 555 -1.400 -7.000 5.600
38 +Ez1 (911) -14 -993 2829 365 121 -1.400 -7.000 5.600
38 -Ez1 (912) 14 964 -2776 -358 -118 -1.400 -7.000 5.600
38 +Ey1 (913) 1 915 150 -9 -6 -1.400 -7.000 5.600
38 -Ey1 (914) -1 -915 -150 9 6 -1.400 -7.000 5.600
38 +Ex2 (915) 42 -1799 -209 -43 -487 -1.400 -7.000 5.600
38 -Ex2 (916) -42 1799 209 43 487 -1.400 -7.000 5.600
38 +Ez2 (917) -12 -858 1980 242 108 -1.400 -7.000 5.600
38 -Ez2 (918) 12 830 -1927 -235 -104 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
38 +Ey2 (919) -1 951 153 -9 -6 -1.400 -7.000 5.600
38 -Ey2 (920) 1 -951 -153 9 6 -1.400 -7.000 5.600
38 +T (921) 11 -1059 -1463 -472 -91 -1.400 -7.000 5.600
38 -T (922) 11 -1278 -1512 -476 -91 -1.400 -7.000 5.600
38 DS (923) -7 2470 1494 -65 59 -1.400 -7.000 5.600
38 C (924) -1 429 4 -2 10 -1.400 -7.000 5.600
38 H (925) -7 2470 1494 -65 59 -1.400 -7.000 5.600
39 D (901) 189 -15280 4 14 -1123 -1.400 -7.000 5.600
39 L (902) 61 -2477 3 10 -301 -1.400 -7.000 5.600
39 Q1 (903) -1 -7285 -35 -40 23 -1.400 -7.000 5.600
39 Q2 (904) -1 -5938 -21 -35 200 -1.400 -7.000 5.600
39 +Wx (905) 35 368 5 8 -812 -1.400 -7.000 5.600
39 -Wx (906) -45 138 -3 -12 927 -1.400 -7.000 5.600
39 +Wz (907) -28 234 -117 -89 469 -1.400 -7.000 5.600
39 -Wz (908) -26 347 114 86 401 -1.400 -7.000 5.600
39 +Ex1 (909) 31 352 10 16 -1162 -1.400 -7.000 5.600
39 -Ex1 (910) -31 -351 -10 -16 1162 -1.400 -7.000 5.600
39 +Ez1 (911) -1 4 -125 -204 4 -1.400 -7.000 5.600
39 -Ez1 (912) 1 -29 123 200 4 -1.400 -7.000 5.600
39 +Ey1 (913) -9 1028 -1 -3 50 -1.400 -7.000 5.600
39 -Ey1 (914) 9 -1028 1 3 -50 -1.400 -7.000 5.600
39 +Ex2 (915) 27 297 11 18 -1046 -1.400 -7.000 5.600
39 -Ex2 (916) -27 -297 -11 -18 1045 -1.400 -7.000 5.600
39 +Ez2 (917) -1 1 -88 -144 6 -1.400 -7.000 5.600
39 -Ez2 (918) 1 -26 86 140 2 -1.400 -7.000 5.600
39 +Ey2 (919) -10 1050 -1 -4 52 -1.400 -7.000 5.600
39 -Ey2 (920) 10 -1050 1 4 -52 -1.400 -7.000 5.600
39 +T (921) -18 2166 1 1 108 -1.400 -7.000 5.600
39 -T (922) -15 1863 2 5 76 -1.400 -7.000 5.600
39 DS (923) -58 -3298 -1 -2 489 -1.400 -7.000 5.600
39 C (924) -1 57 -1 -1 32 -1.400 -7.000 5.600
39 H (925) -58 -3298 -1 -2 489 -1.400 -7.000 5.600
40 D (901) 17 -11024 2220 -106 -56 -1.400 -7.000 5.600
40 L (902) 15 -3089 363 32 -42 -1.400 -7.000 5.600
40 Q1 (903) 1 -9585 2003 155 58 -1.400 -7.000 5.600
40 Q2 (904) -13 -8803 1354 99 172 -1.400 -7.000 5.600
40 +Wx (905) 33 -580 -147 45 -380 -1.400 -7.000 5.600
40 -Wx (906) -34 1773 -29 9 368 -1.400 -7.000 5.600
40 +Wz (907) -12 909 3424 587 146 -1.400 -7.000 5.600
40 -Wz (908) -14 -59 -3423 -604 128 -1.400 -7.000 5.600
40 +Ex1 (909) 56 -2526 -281 -11 -658 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
40 -Ex1 (910) -56 2526 281 11 658 -1.400 -7.000 5.600
40 +Ez1 (911) 14 1017 2827 363 -118 -1.400 -7.000 5.600
40 -Ez1 (912) -14 -995 -2767 -356 120 -1.400 -7.000 5.600
40 +Ey1 (913) -1 933 -152 4 -6 -1.400 -7.000 5.600
40 -Ey1 (914) 1 -933 152 -4 6 -1.400 -7.000 5.600
40 +Ex2 (915) 50 -2439 -293 -17 -585 -1.400 -7.000 5.600
40 -Ex2 (916) -50 2438 293 17 585 -1.400 -7.000 5.600
40 +Ez2 (917) 12 881 1980 242 -106 -1.400 -7.000 5.600
40 -Ez2 (918) -12 -860 -1919 -234 108 -1.400 -7.000 5.600
40 +Ey2 (919) -1 970 -156 4 -6 -1.400 -7.000 5.600
40 -Ey2 (920) 1 -970 156 -4 6 -1.400 -7.000 5.600
40 +T (921) 11 -1062 1466 474 -91 -1.400 -7.000 5.600
40 -T (922) 10 -1265 1512 485 -84 -1.400 -7.000 5.600
40 DS (923) -7 2469 -1497 63 59 -1.400 -7.000 5.600
40 C (924) -2 439 -13 -3 15 -1.400 -7.000 5.600
40 H (925) -7 2469 -1497 63 59 -1.400 -7.000 5.600
41 D (901) 23 -6588 52 220 -133 -1.400 -7.000 5.600
41 L (902) 8 -2357 3 9 -45 -1.400 -7.000 5.600
41 Q1 (903) 3 -7450 8 157 -15 -1.400 -7.000 5.600
41 Q2 (904) -12 -5650 13 118 106 -1.400 -7.000 5.600
41 +Wx (905) 40 -147 105 303 -376 -1.400 -7.000 5.600
41 -Wx (906) -39 506 58 167 368 -1.400 -7.000 5.600
41 +Wz (907) -30 -3878 22 484 284 -1.400 -7.000 5.600
41 -Wz (908) 3 4278 -80 -647 -25 -1.400 -7.000 5.600
41 +Ex1 (909) 70 -1010 8 4 -677 -1.400 -7.000 5.600
41 -Ex1 (910) -70 1010 -8 -4 677 -1.400 -7.000 5.600
41 +Ez1 (911) 4 -5057 -45 197 -44 -1.400 -7.000 5.600
41 -Ez1 (912) -5 4977 44 -192 47 -1.400 -7.000 5.600
41 +Ey1 (913) -1 546 -4 -14 3 -1.400 -7.000 5.600
41 -Ey1 (914) 1 -546 4 14 -3 -1.400 -7.000 5.600
41 +Ex2 (915) 62 -949 8 -1 -600 -1.400 -7.000 5.600
41 -Ex2 (916) -62 949 -8 1 600 -1.400 -7.000 5.600
41 +Ez2 (917) 8 -3902 -34 127 -76 -1.400 -7.000 5.600
41 -Ez2 (918) -8 3821 33 -123 79 -1.400 -7.000 5.600
41 +Ey2 (919) -1 570 -4 -15 3 -1.400 -7.000 5.600
41 -Ey2 (920) 1 -570 4 15 -3 -1.400 -7.000 5.600
41 +T (921) 10 20 64 482 -80 -1.400 -7.000 5.600
41 -T (922) 10 132 66 490 -78 -1.400 -7.000 5.600
41 DS (923) -6 -1341 30 124 55 -1.400 -7.000 5.600
41 C (924) -2 293 -1 -4 13 -1.400 -7.000 5.600
41 H (925) -6 -1341 30 124 55 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
42 D (901) -902 -14582 43 -200 930 -1.400 -7.000 5.600
42 L (902) -222 -3211 10 -38 -55 -1.400 -7.000 5.600
42 Q1 (903) -109 -1484 18 1157 -10 -1.400 -7.000 5.600
42 Q2 (904) -507 -2031 21 749 166 -1.400 -7.000 5.600
42 +Wx (905) 2354 3727 -174 -980 -879 -1.400 -7.000 5.600
42 -Wx (906) -2391 -3594 -197 -1150 890 -1.400 -7.000 5.600
42 +Wz (907) -127 868 257 5081 48 -1.400 -7.000 5.600
42 -Wz (908) -1619 -3448 -121 -4299 578 -1.400 -7.000 5.600
42 +Ex1 (909) 3234 5195 3 -326 -1225 -1.400 -7.000 5.600
42 -Ex1 (910) -3233 -5194 -3 326 1225 -1.400 -7.000 5.600
42 +Ez1 (911) -279 585 -1 2946 113 -1.400 -7.000 5.600
42 -Ez1 (912) 268 -587 1 -2888 -110 -1.400 -7.000 5.600
42 +Ey1 (913) 67 800 -3 9 -47 -1.400 -7.000 5.600
42 -Ey1 (914) -67 -800 3 -9 47 -1.400 -7.000 5.600
42 +Ex2 (915) 2811 4477 2 -361 -1068 -1.400 -7.000 5.600
42 -Ex2 (916) -2810 -4476 -2 361 1067 -1.400 -7.000 5.600
42 +Ez2 (917) -566 -304 -8 1754 203 -1.400 -7.000 5.600
42 -Ez2 (918) 556 301 8 -1696 -200 -1.400 -7.000 5.600
42 +Ey2 (919) 65 813 -3 9 -47 -1.400 -7.000 5.600
42 -Ey2 (920) -65 -813 3 -9 47 -1.400 -7.000 5.600
42 +T (921) 784 954 -82 -808 -332 -1.400 -7.000 5.600
42 -T (922) 639 2100 -75 -762 -285 -1.400 -7.000 5.600
42 DS (923) 734 2190 1 -8 139 -1.400 -7.000 5.600
42 C (924) -63 -70 1 6 31 -1.400 -7.000 5.600
42 H (925) 734 2190 1 -8 139 -1.400 -7.000 5.600
43 D (901) -1449 -31499 8 -30 3080 -1.400 -7.000 5.600
43 L (902) -126 -3729 -2 -133 -153 -1.400 -7.000 5.600
43 Q1 (903) -54 -2161 50 2205 -27 -1.400 -7.000 5.600
43 Q2 (904) -219 -2851 37 1318 256 -1.400 -7.000 5.600
43 +Wx (905) 1076 652 2 -154 -1466 -1.400 -7.000 5.600
43 -Wx (906) -1239 -688 -12 -311 1683 -1.400 -7.000 5.600
43 +Wz (907) -665 -366 247 8811 884 -1.400 -7.000 5.600
43 -Wz (908) -580 -347 -246 -8652 765 -1.400 -7.000 5.600
43 +Ex1 (909) 1482 825 -23 -775 -2011 -1.400 -7.000 5.600
43 -Ex1 (910) -1482 -824 23 774 2011 -1.400 -7.000 5.600
43 +Ez1 (911) -5 23 115 6514 7 -1.400 -7.000 5.600
43 -Ez1 (912) -5 -25 -112 -6389 7 -1.400 -7.000 5.600
43 +Ey1 (913) 76 1667 -1 6 -142 -1.400 -7.000 5.600
43 -Ey1 (914) -76 -1667 1 -6 142 -1.400 -7.000 5.600
43 +Ex2 (915) 1337 722 -24 -845 -1810 -1.400 -7.000 5.600
43 -Ex2 (916) -1337 -722 24 845 1810 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
43 +Ez2 (917) -6 14 60 3894 9 -1.400 -7.000 5.600
43 -Ez2 (918) -4 -16 -57 -3768 5 -1.400 -7.000 5.600
43 +Ey2 (919) 76 1701 -1 7 -143 -1.400 -7.000 5.600
43 -Ey2 (920) -76 -1701 1 -7 143 -1.400 -7.000 5.600
43 +T (921) 432 474 -1 -7 -706 -1.400 -7.000 5.600
43 -T (922) 427 1822 12 82 -730 -1.400 -7.000 5.600
43 DS (923) 342 1351 1 10 711 -1.400 -7.000 5.600
43 C (924) -39 13 1 7 56 -1.400 -7.000 5.600
43 H (925) 342 1351 1 10 711 -1.400 -7.000 5.600
44 D (901) -914 -14727 -45 122 929 -1.400 -7.000 5.600
44 L (902) -222 -3155 -7 -68 -44 -1.400 -7.000 5.600
44 Q1 (903) -72 -1978 -11 949 -24 -1.400 -7.000 5.600
44 Q2 (904) -602 -2282 -8 578 209 -1.400 -7.000 5.600
44 +Wx (905) 2374 3790 164 722 -887 -1.400 -7.000 5.600
44 -Wx (906) -2311 -3540 88 317 858 -1.400 -7.000 5.600
44 +Wz (907) -1970 -4077 123 4411 709 -1.400 -7.000 5.600
44 -Wz (908) 120 1274 -250 -4954 -46 -1.400 -7.000 5.600
44 +Ex1 (909) 4195 6889 -17 -407 -1588 -1.400 -7.000 5.600
44 -Ex1 (910) -4193 -6887 17 407 1588 -1.400 -7.000 5.600
44 +Ez1 (911) 263 -647 1 2966 -109 -1.400 -7.000 5.600
44 -Ez1 (912) -285 591 -1 -2908 117 -1.400 -7.000 5.600
44 +Ey1 (913) 72 797 3 -4 -49 -1.400 -7.000 5.600
44 -Ey1 (914) -72 -797 -3 4 49 -1.400 -7.000 5.600
44 +Ex2 (915) 3746 6175 -15 -430 -1420 -1.400 -7.000 5.600
44 -Ex2 (916) -3745 -6173 15 430 1419 -1.400 -7.000 5.600
44 +Ez2 (917) 571 291 -9 1759 -206 -1.400 -7.000 5.600
44 -Ez2 (918) -593 -347 9 -1701 215 -1.400 -7.000 5.600
44 +Ey2 (919) 68 807 3 -4 -48 -1.400 -7.000 5.600
44 -Ey2 (920) -68 -807 -3 4 48 -1.400 -7.000 5.600
44 +T (921) 783 949 84 824 -331 -1.400 -7.000 5.600
44 -T (922) 624 2120 67 684 -277 -1.400 -7.000 5.600
44 DS (923) 734 2190 -3 -3 139 -1.400 -7.000 5.600
44 C (924) -105 -136 -1 1 47 -1.400 -7.000 5.600
44 H (925) 734 2190 -3 -3 139 -1.400 -7.000 5.600
45 D (901) 216 -8209 -58 -258 -1077 -1.400 -7.000 5.600
45 L (902) 13 -2164 -2 -44 -69 -1.400 -7.000 5.600
45 Q1 (903) 1 -306 77 805 3 -1.400 -7.000 5.600
45 Q2 (904) -15 1151 37 450 124 -1.400 -7.000 5.600
45 +Wx (905) 139 -5376 -55 -200 -781 -1.400 -7.000 5.600
45 -Wx (906) -173 5344 -70 -307 875 -1.400 -7.000 5.600
45 +Wz (907) -83 619 345 3498 249 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
45 -Wz (908) -124 2825 -301 -3326 589 -1.400 -7.000 5.600
45 +Ex1 (909) 103 -8079 -20 -285 -857 -1.400 -7.000 5.600
45 -Ex1 (910) -103 8078 20 285 857 -1.400 -7.000 5.600
45 +Ez1 (911) -12 1193 181 2229 96 -1.400 -7.000 5.600
45 -Ez1 (912) 12 -1163 -178 -2185 -93 -1.400 -7.000 5.600
45 +Ey1 (913) -10 387 -1 2 45 -1.400 -7.000 5.600
45 -Ey1 (914) 10 -387 1 -2 -45 -1.400 -7.000 5.600
45 +Ex2 (915) 90 -7139 -23 -314 -749 -1.400 -7.000 5.600
45 -Ex2 (916) -90 7137 23 314 749 -1.400 -7.000 5.600
45 +Ez2 (917) -20 1580 103 1231 160 -1.400 -7.000 5.600
45 -Ez2 (918) 20 -1550 -100 -1187 -158 -1.400 -7.000 5.600
45 +Ey2 (919) -10 411 -1 2 47 -1.400 -7.000 5.600
45 -Ey2 (920) 10 -411 1 -2 -47 -1.400 -7.000 5.600
45 +T (921) 52 -1055 -62 -543 -403 -1.400 -7.000 5.600
45 -T (922) 48 -1224 -63 -551 -376 -1.400 -7.000 5.600
45 DS (923) -6 -1798 1 4 95 -1.400 -7.000 5.600
45 C (924) -3 377 1 3 23 -1.400 -7.000 5.600
45 H (925) -6 -1798 1 4 95 -1.400 -7.000 5.600
46 D (901) 617 -19936 -2 -39 -3143 -1.400 -7.000 5.600
46 L (902) 35 -3658 -9 -97 -204 -1.400 -7.000 5.600
46 Q1 (903) -2 -571 130 1384 12 -1.400 -7.000 5.600
46 Q2 (904) -16 881 87 861 166 -1.400 -7.000 5.600
46 +Wx (905) 221 -1507 -7 -89 -1114 -1.400 -7.000 5.600
46 -Wx (906) -301 1582 -21 -214 1397 -1.400 -7.000 5.600
46 +Wz (907) -208 505 517 5874 859 -1.400 -7.000 5.600
46 -Wz (908) -200 350 -509 -5773 795 -1.400 -7.000 5.600
46 +Ex1 (909) 124 -2437 -49 -555 -1076 -1.400 -7.000 5.600
46 -Ex1 (910) -124 2436 49 555 1076 -1.400 -7.000 5.600
46 +Ez1 (911) -1 10 326 3935 4 -1.400 -7.000 5.600
46 -Ez1 (912) -1 27 -319 -3857 4 -1.400 -7.000 5.600
46 +Ey1 (913) -28 1003 1 5 140 -1.400 -7.000 5.600
46 -Ey1 (914) 28 -1003 -1 -5 -140 -1.400 -7.000 5.600
46 +Ex2 (915) 112 -2193 -52 -603 -971 -1.400 -7.000 5.600
46 -Ex2 (916) -112 2192 52 603 971 -1.400 -7.000 5.600
46 +Ez2 (917) -1 7 184 2169 5 -1.400 -7.000 5.600
46 -Ez2 (918) -1 29 -178 -2091 4 -1.400 -7.000 5.600
46 +Ey2 (919) -29 1029 1 6 144 -1.400 -7.000 5.600
46 -Ey2 (920) 29 -1029 -1 -6 -144 -1.400 -7.000 5.600
46 +T (921) 101 -464 -1 -4 -791 -1.400 -7.000 5.600
46 -T (922) 101 -1005 -2 -20 -807 -1.400 -7.000 5.600
46 DS (923) -20 -864 1 6 286 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
46 C (924) -4 121 1 9 30 -1.400 -7.000 5.600
46 H (925) -20 -864 1 6 286 -1.400 -7.000 5.600
47 D (901) 216 -8167 56 212 -1076 -1.400 -7.000 5.600
47 L (902) 13 -2173 -8 -68 -72 -1.400 -7.000 5.600
47 Q1 (903) 3 -497 72 782 -16 -1.400 -7.000 5.600
47 Q2 (904) -17 1177 64 545 141 -1.400 -7.000 5.600
47 +Wx (905) 140 -5340 47 100 -784 -1.400 -7.000 5.600
47 -Wx (906) -171 5135 49 66 853 -1.400 -7.000 5.600
47 +Wz (907) -135 3563 306 3384 678 -1.400 -7.000 5.600
47 -Wz (908) -75 64 -340 -3443 186 -1.400 -7.000 5.600
47 +Ex1 (909) 133 -10365 -34 -345 -1108 -1.400 -7.000 5.600
47 -Ex1 (910) -133 10362 34 345 1107 -1.400 -7.000 5.600
47 +Ez1 (911) 12 -1174 181 2229 -92 -1.400 -7.000 5.600
47 -Ez1 (912) -13 1228 -178 -2185 98 -1.400 -7.000 5.600
47 +Ey1 (913) -9 379 1 5 44 -1.400 -7.000 5.600
47 -Ey1 (914) 9 -379 -1 -5 -44 -1.400 -7.000 5.600
47 +Ex2 (915) 119 -9349 -35 -369 -992 -1.400 -7.000 5.600
47 -Ex2 (916) -119 9346 35 369 992 -1.400 -7.000 5.600
47 +Ez2 (917) 20 -1601 103 1231 -162 -1.400 -7.000 5.600
47 -Ez2 (918) -21 1654 -100 -1187 168 -1.400 -7.000 5.600
47 +Ey2 (919) -10 407 1 5 46 -1.400 -7.000 5.600
47 -Ey2 (920) 10 -407 -1 -5 -46 -1.400 -7.000 5.600
47 +T (921) 52 -1048 61 538 -403 -1.400 -7.000 5.600
47 -T (922) 47 -1193 60 523 -372 -1.400 -7.000 5.600
47 DS (923) -6 -1799 -1 4 94 -1.400 -7.000 5.600
47 C (924) -4 480 1 7 35 -1.400 -7.000 5.600
47 H (925) -6 -1799 -1 4 94 -1.400 -7.000 5.600
16A D (901) 1 -255 10 61 23 -1.400 -7.000 5.600
16A L (902) 4 -132 7 26 49 -1.400 -7.000 5.600
16A Q1 (903) -11 -60 11 75 96 -1.400 -7.000 5.600
16A Q2 (904) -10 -23 5 33 80 -1.400 -7.000 5.600
16A +Wx (905) 58 20 70 217 -373 -1.400 -7.000 5.600
16A -Wx (906) -78 44 74 246 482 -1.400 -7.000 5.600
16A +Wz (907) -17 -92 46 236 301 -1.400 -7.000 5.600
16A -Wz (908) 61 84 -102 -415 -375 -1.400 -7.000 5.600
16A +Ex1 (909) 50 -50 1 5 -434 -1.400 -7.000 5.600
16A -Ex1 (910) -50 50 -1 -5 433 -1.400 -7.000 5.600
16A +Ez1 (911) -16 -260 42 297 134 -1.400 -7.000 5.600
16A -Ez1 (912) 15 259 -42 -296 -129 -1.400 -7.000 5.600
16A +Ey1 (913) 1 15 -1 -4 -5 -1.400 -7.000 5.600
16A -Ey1 (914) -1 -15 1 4 5 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
16A +Ex2 (915) 43 -37 -1 -4 -375 -1.400 -7.000 5.600
16A -Ex2 (916) -43 37 1 4 375 -1.400 -7.000 5.600
16A +Ez2 (917) -14 -194 31 223 117 -1.400 -7.000 5.600
16A -Ez2 (918) 13 193 -31 -222 -112 -1.400 -7.000 5.600
16A +Ey2 (919) 1 15 -1 -3 -4 -1.400 -7.000 5.600
16A -Ey2 (920) -1 -15 1 3 4 -1.400 -7.000 5.600
16A +T (921) -9 -20 7 48 71 -1.400 -7.000 5.600
16A -T (922) -9 29 -2 3 74 -1.400 -7.000 5.600
16A DS (923) -2 -33 5 26 16 -1.400 -7.000 5.600
16A C (924) -2 -25 4 25 18 -1.400 -7.000 5.600
16A H (925) -2 -33 5 26 16 -1.400 -7.000 5.600
08A D (901) -11 -1222 4 10 79 -1.400 -7.000 5.600
08A L (902) -10 -12 1 3 3 -1.400 -7.000 5.600
08A Q1 (903) -11 -38 5 31 95 -1.400 -7.000 5.600
08A Q2 (904) -10 -23 3 16 80 -1.400 -7.000 5.600
08A +Wx (905) 70 73 71 224 -416 -1.400 -7.000 5.600
08A -Wx (906) -65 -7 72 230 440 -1.400 -7.000 5.600
08A +Wz (907) -75 -79 32 129 497 -1.400 -7.000 5.600
08A -Wz (908) 3 36 -87 -303 -178 -1.400 -7.000 5.600
08A +Ex1 (909) 50 50 1 12 -434 -1.400 -7.000 5.600
08A -Ex1 (910) -50 -50 -1 -12 434 -1.400 -7.000 5.600
08A +Ez1 (911) -16 -130 21 149 132 -1.400 -7.000 5.600
08A -Ez1 (912) 15 129 -21 -148 -127 -1.400 -7.000 5.600
08A +Ey1 (913) 1 57 -1 -1 -7 -1.400 -7.000 5.600
08A -Ey1 (914) -1 -57 1 1 7 -1.400 -7.000 5.600
08A +Ex2 (915) 43 47 1 6 -375 -1.400 -7.000 5.600
08A -Ex2 (916) -43 -47 -1 -6 375 -1.400 -7.000 5.600
08A +Ez2 (917) -14 -93 15 103 115 -1.400 -7.000 5.600
08A -Ez2 (918) 13 92 -15 -103 -110 -1.400 -7.000 5.600
08A +Ey2 (919) 1 57 -1 1 -7 -1.400 -7.000 5.600
08A -Ey2 (920) -1 -57 1 -1 7 -1.400 -7.000 5.600
08A +T (921) -12 -27 5 38 102 -1.400 -7.000 5.600
08A -T (922) -8 21 -2 3 62 -1.400 -7.000 5.600
08A DS (923) -2 -36 5 27 16 -1.400 -7.000 5.600
08A C (924) -2 -27 3 9 17 -1.400 -7.000 5.600
08A H (925) -2 -36 5 27 16 -1.400 -7.000 5.600
09A D (901) 2 -256 -11 -71 5 -1.400 -7.000 5.600
09A L (902) 6 -135 1 -5 25 -1.400 -7.000 5.600
09A Q1 (903) -2 35 6 39 10 -1.400 -7.000 5.600
09A Q2 (904) -9 12 1 5 76 -1.400 -7.000 5.600
09A +Wx (905) 53 17 -71 -224 -336 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
09A -Wx (906) -73 64 -71 -218 436 -1.400 -7.000 5.600
09A +Wz (907) 60 84 102 414 -360 -1.400 -7.000 5.600
09A -Wz (908) -11 -98 -46 -237 249 -1.400 -7.000 5.600
09A +Ex1 (909) 34 -10 4 24 -294 -1.400 -7.000 5.600
09A -Ex1 (910) -34 10 -4 -24 294 -1.400 -7.000 5.600
09A +Ez1 (911) 15 258 42 297 -130 -1.400 -7.000 5.600
09A -Ez1 (912) -15 -257 -42 -296 127 -1.400 -7.000 5.600
09A +Ey1 (913) 1 16 1 5 -5 -1.400 -7.000 5.600
09A -Ey1 (914) -1 -16 -1 -5 5 -1.400 -7.000 5.600
09A +Ex2 (915) 29 -13 2 14 -248 -1.400 -7.000 5.600
09A -Ex2 (916) -29 13 -2 -14 248 -1.400 -7.000 5.600
09A +Ez2 (917) 14 192 31 223 -117 -1.400 -7.000 5.600
09A -Ez2 (918) -14 -191 -31 -222 114 -1.400 -7.000 5.600
09A +Ey2 (919) 1 15 1 3 -5 -1.400 -7.000 5.600
09A -Ey2 (920) -1 -15 -1 -3 5 -1.400 -7.000 5.600
09A +T (921) -8 -21 -7 -49 69 -1.400 -7.000 5.600
09A -T (922) -11 34 3 8 95 -1.400 -7.000 5.600
09A DS (923) -2 -33 -5 -26 16 -1.400 -7.000 5.600
09A C (924) -1 -33 -6 -33 4 -1.400 -7.000 5.600
09A H (925) -2 -33 -5 -26 16 -1.400 -7.000 5.600
01A D (901) -8 -1225 -6 -31 54 -1.400 -7.000 5.600
01A L (902) -6 -29 -4 -14 -32 -1.400 -7.000 5.600
01A Q1 (903) -2 20 4 28 10 -1.400 -7.000 5.600
01A Q2 (904) -9 1 2 14 75 -1.400 -7.000 5.600
01A +Wx (905) 66 67 -71 -224 -378 -1.400 -7.000 5.600
01A -Wx (906) -60 8 -71 -219 394 -1.400 -7.000 5.600
01A +Wz (907) 1 33 87 300 -163 -1.400 -7.000 5.600
01A -Wz (908) -69 -73 -32 -130 444 -1.400 -7.000 5.600
01A +Ex1 (909) 34 54 3 19 -294 -1.400 -7.000 5.600
01A -Ex1 (910) -34 -54 -3 -19 294 -1.400 -7.000 5.600
01A +Ez1 (911) 15 131 21 147 -128 -1.400 -7.000 5.600
01A -Ez1 (912) -15 -130 -21 -146 125 -1.400 -7.000 5.600
01A +Ey1 (913) 1 57 1 2 -7 -1.400 -7.000 5.600
01A -Ey1 (914) -1 -57 -1 -2 7 -1.400 -7.000 5.600
01A +Ex2 (915) 29 42 2 12 -248 -1.400 -7.000 5.600
01A -Ex2 (916) -29 -42 -2 -12 247 -1.400 -7.000 5.600
01A +Ez2 (917) 14 94 15 102 -116 -1.400 -7.000 5.600
01A -Ez2 (918) -13 -94 -15 -101 113 -1.400 -7.000 5.600
01A +Ey2 (919) 1 57 1 1 -7 -1.400 -7.000 5.600
01A -Ey2 (920) -1 -57 -1 -1 7 -1.400 -7.000 5.600
01A +T (921) -12 -28 -6 -41 100 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap
01A -T (922) -8 22 4 10 64 -1.400 -7.000 5.600
01A DS (923) -2 -36 -5 -27 16 -1.400 -7.000 5.600
01A C (924) -1 -30 -4 -20 3 -1.400 -7.000 5.600
01A H (925) -2 -36 -5 -27 16 -1.400 -7.000 5.600
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Input Load Data
Moment- Moment- Bottom
Force-X Force-Y Force-Z U/S Base Lever Arm
Node L/C X Z of
(kN) (kN) (kN) Plate H
(kN-m) (kN-m) Pilecap

+X +Y

+Z +X
BOILER AXIS SAFE AXIS

Fx(Safe) Fx (Boiler)
Fgrav (Safe) -Fy(Boiler)
Fy(Safe) -Fz(Boiler)
Mx(safe) Mx(Boiler)+FZ*H
My (Safe) -Mz(Boiler)+Fx*H
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

01 D -16 1859 14095 -10341 -187 0


01 L 84 428 7276 -2305 874 0
01 Q1 -16 -493 -1695 2900 -225 0
01 Q2 -55 -301 -497 1765 -816 0
01 +Wx 277 74 -1510 -730 3647 0
01 -Wx -284 -90 801 552 -3947 0
01 +Wz 65 -1014 -4748 5917 1402 0
01 -Wz -273 1055 5172 -6148 -3692 0
01 +Ex1 211 -393 -3306 2238 3227 0
01 -Ex1 -211 393 3306 -2238 -3226 0
01 +Ez1 33 -2771 -11000 16216 460 0
01 -Ez1 -32 2763 10957 -16169 -439 0
01 +Ey1 3 -90 -728 500 43 0
01 -Ey1 -3 90 728 -500 -43 0
01 +Ex2 179 -262 -2445 1479 2734 0
01 -Ex2 -179 262 2444 -1479 -2733 0
01 +Ez2 35 -1939 -7787 11338 492 0
01 -Ez2 -33 1930 7743 -11286 -466 0
01 +Ey2 3 -51 -450 283 46 0
01 -Ey2 -3 51 450 -283 -46 0
01 +T -82 970 1646 -5681 -1224 0
01 -T -76 972 1438 -5654 -1138 0
01 DS -12 7 51 -74 -179 0
01 C 5 935 6559 -5211 88 0
01 H -12 7 51 -74 -179 0
02 D -29 -21 9020 241 -404 0
02 L -11 -22 4020 276 -183 0
02 Q1 -23 -8 1990 166 -349 0
02 Q2 -36 -5 907 96 -585 0
02 +Wx 203 8 -966 -102 2623 0
02 -Wx -165 -6 806 85 -2264 0
02 +Wz -77 -13 2668 277 -632 0
02 -Wz -145 12 -2684 -270 -1844 0
02 +Ex1 99 2 -97 12 1794 0
02 -Ex1 -99 -2 97 -12 -1794 0
02 +Ez1 -2 -44 8865 878 -28 0
02 -Ez1 2 44 -8844 -877 30 0
02 +Ey1 3 2 -444 -19 47 0
02 -Ey1 -3 -2 444 19 -47 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

02 +Ex2 85 3 -364 -14 1539 0


02 -Ex2 -85 -3 365 14 -1538 0
02 +Ez2 -3 -30 6037 602 -54 0
02 -Ez2 4 30 -6016 -601 61 0
02 +Ey2 3 1 -276 -11 47 0
02 -Ey2 -3 -1 276 11 -47 0
02 +T -74 9 -1349 -153 -1125 0
02 -T -73 10 -1440 -168 -1110 0
02 DS -11 -1 27 9 -159 0
02 C -1 -10 3975 106 -23 0
02 H -11 -1 27 9 -159 0
03 D -55 9 13834 -128 -752 0
03 L -52 -11 2750 136 -653 0
03 Q1 -28 -7 678 156 -453 0
03 Q2 -36 -3 150 73 -624 0
03 +Wx 182 4 -462 -50 2405 0
03 -Wx -130 -4 16 63 -1785 0
03 +Wz -117 -17 -165 326 -1365 0
03 -Wz -119 17 25 -331 -1459 0
03 +Ex1 66 -4 -471 79 1393 0
03 -Ex1 -66 4 471 -79 -1393 0
03 +Ez1 -9 -54 -21 999 -156 0
03 -Ez1 9 54 20 -997 152 0
03 +Ey1 5 -1 -643 10 72 0
03 -Ey1 -5 1 643 -10 -72 0
03 +Ex2 59 -2 -405 41 1217 0
03 -Ex2 -59 2 405 -41 -1217 0
03 +Ez2 -10 -37 -58 688 -165 0
03 -Ez2 9 37 58 -687 156 0
03 +Ey2 6 -1 -356 7 79 0
03 -Ey2 -6 1 356 -7 -79 0
03 +T -60 7 -49 -115 -952 0
03 -T -61 8 -125 -128 -958 0
03 DS -4 -1 17 7 -73 0
03 C 10 6 6723 -85 69 0
03 H -4 -1 17 7 -73 0
04 D -8 46 11524 -593 -157 0
04 L -20 4 2178 -46 -306 0
04 Q1 -22 -9 -803 171 -318 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

04 Q2 -34 -12 -452 167 -573 0


04 +Wx 225 -3 -575 32 2945 0
04 -Wx -154 -1 -135 25 -2063 0
04 +Wz -155 -14 -3228 298 -1906 0
04 -Wz -143 15 3345 -309 -1732 0
04 +Ex1 99 -8 -1748 135 1841 0
04 -Ex1 -99 8 1748 -135 -1840 0
04 +Ez1 -16 -43 -9375 887 -222 0
04 -Ez1 16 43 9348 -885 218 0
04 +Ey1 3 -3 -554 33 46 0
04 -Ey1 -3 3 554 -33 -46 0
04 +Ex2 87 -6 -1214 94 1590 0
04 -Ex2 -87 6 1213 -94 -1590 0
04 +Ez2 -13 -30 -6488 617 -179 0
04 -Ez2 12 30 6461 -615 168 0
04 +Ey2 3 -2 -319 20 44 0
04 -Ey2 -3 2 319 -20 -44 0
04 +T -52 8 -164 -112 -824 0
04 -T -52 10 1 -132 -818 0
04 DS -3 1 32 -7 -58 0
04 C -4 24 5511 -308 -74 0
04 H -3 1 32 -7 -58 0
05 D -8 -1296 16762 6942 -162 0
05 L -28 -343 2905 1894 -393 0
05 Q1 -20 -672 3347 3868 -312 0
05 Q2 -35 -359 1330 2088 -585 0
05 +Wx 223 96 -996 -499 2921 0
05 -Wx -152 -130 684 733 -2034 0
05 +Wz -153 -901 3355 5266 -1903 0
05 -Wz -146 927 -3436 -5418 -1751 0
05 +Ex1 106 -161 -242 1012 1958 0
05 -Ex1 -106 161 242 -1012 -1957 0
05 +Ez1 10 -2568 9483 15045 136 0
05 -Ez1 -11 2559 -9451 -14992 -147 0
05 +Ey1 3 61 -787 -326 46 0
05 -Ey1 -3 -61 787 326 -46 0
05 +Ex2 92 -69 -535 463 1687 0
05 -Ex2 -92 69 535 -463 -1687 0
05 +Ez2 9 -1800 6580 10543 125 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

05 -Ez2 -9 1792 -6548 -10496 -130 0


05 +Ey2 3 34 -428 -181 45 0
05 -Ey2 -3 -34 428 181 -45 0
05 +T -52 -175 255 946 -824 0
05 -T -52 -183 669 991 -819 0
05 DS -3 -5 47 26 -58 0
05 C -2 -635 8388 3400 -49 0
05 H -3 -5 47 26 -58 0
06 D -59 41 14181 -527 -806 0
06 L -51 4 2645 -51 -660 0
06 Q1 -24 -8 965 166 -409 0
06 Q2 -33 -1 155 51 -591 0
06 +Wx 181 -9 -491 109 2395 0
06 -Wx -129 3 50 -22 -1769 0
06 +Wz -129 -18 46 334 -1643 0
06 -Wz -110 19 -157 -352 -1229 0
06 +Ex1 76 -15 -581 220 1626 0
06 -Ex1 -76 15 581 -220 -1626 0
06 +Ez1 8 -58 -1 1052 132 0
06 -Ez1 -8 58 3 -1050 -137 0
06 +Ey1 5 -2 -661 25 73 0
06 -Ey1 -5 2 661 -25 -73 0
06 +Ex2 69 -11 -505 159 1442 0
06 -Ex2 -69 11 505 -159 -1442 0
06 +Ez2 9 -40 34 727 151 0
06 -Ez2 -9 40 -32 -725 -156 0
06 +Ey2 6 -2 -367 20 80 0
06 -Ey2 -6 2 367 -20 -80 0
06 +T -61 1 -38 16 -960 0
06 -T -61 -1 -123 32 -958 0
06 DS -4 1 18 -9 -73 0
06 C 8 20 6881 -250 53 0
06 H -4 1 18 -9 -73 0
07 D -33 46 10197 -590 -463 0
07 L -24 6 1881 -75 -327 0
07 Q1 -26 -17 -1181 260 -411 0
07 Q2 -38 -15 -571 199 -612 0
07 +Wx 210 -11 -1009 138 2740 0
07 -Wx -175 4 248 -37 -2420 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

07 +Wz -168 -14 -2469 286 -2245 0


07 -Wz -65 16 2718 -316 -418 0
07 +Ex1 136 -17 -2316 246 2444 0
07 -Ex1 -136 17 2315 -246 -2444 0
07 +Ez1 2 -52 -8901 980 22 0
07 -Ez1 -3 52 8883 -978 -40 0
07 +Ey1 4 -3 -487 34 53 0
07 -Ey1 -4 3 487 -34 -53 0
07 +Ex2 119 -13 -1756 184 2134 0
07 -Ex2 -118 13 1756 -184 -2129 0
07 +Ez2 4 -36 -6075 677 59 0
07 -Ez2 -5 36 6057 -675 -77 0
07 +Ey2 4 -2 -292 21 52 0
07 -Ey2 -4 2 292 -21 -52 0
07 +T -73 -6 -1214 112 -1116 0
07 -T -72 -7 -1378 123 -1096 0
07 DS -11 1 29 -9 -160 0
07 C -3 22 4575 -275 -49 0
07 H -11 1 29 -9 -160 0
08 D -25 -1131 13125 6076 -297 0
08 L -32 -240 1741 1322 -291 0
08 Q1 -53 -641 2869 3715 -782 0
08 Q2 -54 -345 1368 1994 -806 0
08 +Wx 297 -113 -1754 966 3965 0
08 -Wx -307 -101 1847 560 -4299 0
08 +Wz -310 -1027 5387 5991 -4262 0
08 -Wz 78 1043 -4973 -6099 1590 0
08 +Ex1 308 -214 -1949 1342 4704 0
08 -Ex1 -307 214 1948 -1342 -4696 0
08 +Ez1 -36 -2779 11133 16305 -505 0
08 -Ez1 33 2770 -11078 -16254 458 0
08 +Ey1 4 52 -610 -278 53 0
08 -Ey1 -4 -52 610 278 -53 0
08 +Ex2 265 -100 -2045 663 4051 0
08 -Ex2 -265 100 2045 -663 -4049 0
08 +Ez2 -35 -1946 7882 11413 -496 0
08 -Ez2 32 1937 -7827 -11360 449 0
08 +Ey2 4 27 -356 -143 53 0
08 -Ey2 -4 -27 356 143 -53 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

08 +T -82 -836 1507 4907 -1224 0


08 -T -74 -806 1245 4686 -1110 0
08 DS -12 -4 48 56 -178 0
08 C -2 -586 5966 3167 -14 0
08 H -12 -4 48 56 -178 0
09 D -7 668 15560 -4133 -64 0
09 L -75 87 7242 -586 -574 0
09 Q1 -20 -510 -2047 3157 -306 0
09 Q2 -64 -93 236 601 -1025 0
09 +Wx 251 155 -2 -1214 3801 0
09 -Wx -334 -106 -1323 780 -4888 0
09 +Wz 233 -2055 -12014 12617 3198 0
09 -Wz -165 2011 11424 -12359 -3195 0
09 +Ex1 225 -245 -1657 1439 3803 0
09 -Ex1 -225 245 1657 -1439 -3803 0
09 +Ez1 12 -3571 -23446 21930 255 0
09 -Ez1 -11 3551 23331 -21808 -230 0
09 +Ey1 5 -41 -863 254 64 0
09 -Ey1 -5 41 863 -254 -64 0
09 +Ex2 193 -136 -1108 782 3244 0
09 -Ex2 -193 136 1108 -782 -3243 0
09 +Ez2 18 -2675 -17523 16417 341 0
09 -Ez2 -16 2655 17408 -16294 -311 0
09 +Ey2 5 -29 -597 179 70 0
09 -Ey2 -5 29 597 -179 -70 0
09 +T -80 562 1666 -3708 -1203 0
09 -T -81 531 1217 -3496 -1199 0
09 DS -15 6 -418 -75 -240 0
09 C 14 288 6335 -1774 196 0
09 H -15 6 -418 -75 -240 0
10 D -94 489 11493 -3001 -1070 0
10 L -57 44 4510 -305 -634 0
10 Q1 -27 -530 3738 3052 -388 0
10 Q2 -38 -103 1877 572 -596 0
10 +Wx 100 132 -1446 -930 1617 0
10 -Wx -89 -19 543 -24 -1507 0
10 +Wz -29 -2162 6615 12747 -180 0
10 -Wz 12 2083 -6578 -12202 -377 0
10 +Ex1 100 -263 -590 1536 1784 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

10 -Ex1 -100 263 590 -1536 -1784 0


10 +Ez1 6 -3652 12001 21278 50 0
10 -Ez1 -6 3631 -11936 -21157 -50 0
10 +Ey1 7 -33 -608 201 87 0
10 -Ey1 -7 33 608 -201 -87 0
10 +Ex2 87 -148 -920 867 1542 0
10 -Ex2 -87 148 919 -867 -1541 0
10 +Ez2 -4 -2738 8940 15951 -67 0
10 -Ez2 4 2717 -8875 -15828 67 0
10 +Ey2 8 -21 -429 129 93 0
10 -Ey2 -8 21 429 -129 -93 0
10 +T -66 523 -1613 -3022 -933 0
10 -T -67 486 -1834 -2781 -937 0
10 DS -11 -2 -333 12 -166 0
10 C -1 269 4284 -1626 -29 0
10 H -11 -2 -333 12 -166 0
11 D -51 34 10181 -250 -606 0
11 L 3 114 3136 -399 -37 0
11 Q1 -30 -13 2883 218 -481 0
11 Q2 -38 -4 2132 61 -617 0
11 +Wx 34 1 -752 -18 771 0
11 -Wx -27 -2 432 37 -618 0
11 +Wz -8 -48 397 802 -215 0
11 -Wz -13 49 -762 -809 -319 0
11 +Ex1 50 -6 -780 94 1037 0
11 -Ex1 -50 6 780 -94 -1037 0
11 +Ez1 -5 -81 1687 1380 -95 0
11 -Ez1 5 81 -1681 -1375 91 0
11 +Ey1 4 -1 -595 13 56 0
11 -Ey1 -4 1 595 -13 -56 0
11 +Ex2 44 -3 -834 47 899 0
11 -Ex2 -44 3 834 -47 -899 0
11 +Ez2 -5 -61 1077 1035 -102 0
11 -Ez2 5 60 -1070 -1024 98 0
11 +Ey2 5 -1 -440 11 62 0
11 -Ey2 -5 1 440 -11 -62 0
11 +T -64 8 -121 -125 -896 0
11 -T -64 7 -498 -117 -896 0
11 DS -4 -1 -79 7 -67 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

11 C 4 7 3725 -95 26 0
11 H -4 -1 -79 7 -67 0
12 D 14 8 13454 -115 91 0
12 L -20 3 3367 -20 -299 0
12 Q1 -12 -25 3505 404 -201 0
12 Q2 -27 -8 2277 128 -478 0
12 +Wx 109 1 -639 -21 1847 0
12 -Wx -75 -6 263 97 -1308 0
12 +Wz -62 -79 1115 1264 -1035 0
12 -Wz -56 80 -1787 -1277 -927 0
12 +Ex1 98 -8 -349 122 1774 0
12 -Ex1 -98 8 349 -122 -1774 0
12 +Ez1 -7 -136 3707 2208 -121 0
12 -Ez1 7 135 -3694 -2194 117 0
12 +Ey1 2 -1 -742 11 35 0
12 -Ey1 -2 1 742 -11 -35 0
12 +Ex2 86 -4 -466 54 1533 0
12 -Ex2 -86 4 466 -54 -1533 0
12 +Ez2 -5 -102 2986 1653 -95 0
12 -Ez2 5 101 -2973 -1640 90 0
12 +Ey2 3 -1 -503 9 41 0
12 -Ey2 -3 1 503 -9 -41 0
12 +T -29 5 -92 -70 -453 0
12 -T -29 5 -136 -72 -447 0
12 DS 6 -1 -192 7 35 0
12 C 8 5 5696 -69 49 0
12 H 6 -1 -192 7 35 0
13 D 15 -3 13762 27 98 0
13 L -16 1 3599 -1 -261 0
13 Q1 -10 -25 2233 418 -197 0
13 Q2 -29 -7 1908 133 -498 0
13 +Wx 107 3 -554 -37 1819 0
13 -Wx -73 -9 -239 133 -1277 0
13 +Wz -66 -80 -1978 1270 -1092 0
13 -Wz -53 79 1227 -1269 -885 0
13 +Ex1 104 -4 -680 77 1874 0
13 -Ex1 -104 4 680 -77 -1874 0
13 +Ez1 2 -136 -3938 2206 46 0
13 -Ez1 -2 135 3926 -2192 -50 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

13 +Ey1 2 -1 -764 7 34 0
13 -Ey1 -2 1 764 -7 -34 0
13 +Ex2 91 -1 -588 20 1622 0
13 -Ex2 -91 1 587 -20 -1622 0
13 +Ez2 2 -102 -3178 1651 50 0
13 -Ez2 -3 101 3166 -1638 -61 0
13 +Ey2 3 -1 -519 7 41 0
13 -Ey2 -3 1 519 -7 -41 0
13 +T -29 -4 -87 54 -453 0
13 -T -29 -3 309 48 -446 0
13 DS 6 1 -192 -7 35 0
13 C 9 -1 5836 4 63 0
13 H 6 1 -192 -7 35 0
14 D -55 -31 10416 188 -666 0
14 L -5 -372 3139 2347 -128 0
14 Q1 -26 -20 2271 323 -420 0
14 Q2 -37 -9 1796 137 -600 0
14 +Wx 32 2 -681 -22 744 0
14 -Wx -24 -8 257 114 -582 0
14 +Wz -15 -48 -765 796 -393 0
14 -Wz -3 47 384 -796 -123 0
14 +Ex1 58 -2 -1250 35 1217 0
14 -Ex1 -58 2 1250 -35 -1217 0
14 +Ez1 5 -81 -1668 1375 93 0
14 -Ez1 -5 80 1666 -1364 -96 0
14 +Ey1 5 1 -611 -10 64 0
14 -Ey1 -5 -1 611 10 -64 0
14 +Ex2 52 1 -1131 -8 1077 0
14 -Ex2 -52 -1 1130 8 -1076 0
14 +Ez2 6 -60 -1055 1026 110 0
14 -Ez2 -6 60 1052 -1020 -113 0
14 +Ey2 5 1 -451 -8 65 0
14 -Ey2 -5 -1 451 8 -65 0
14 +T -64 -7 -114 113 -896 0
14 -T -64 -7 -449 112 -899 0
14 DS -4 1 -78 -7 -66 0
14 C 3 -5 3851 57 16 0
14 H -4 1 -78 -7 -66 0
15 D -102 -347 12236 2173 -1166 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

15 L -39 -99 3275 613 -468 0


15 Q1 -28 -875 -743 5128 -419 0
15 Q2 -49 -370 273 2183 -714 0
15 +Wx 104 -38 -1066 380 1694 0
15 -Wx -95 -390 -664 2521 -1609 0
15 +Wz -89 -2106 -6667 12314 -1412 0
15 -Wz 73 2219 6693 -13064 763 0
15 +Ex1 131 -76 -2209 436 2356 0
15 -Ex1 -131 76 2208 -436 -2356 0
15 +Ez1 -5 -3711 -12177 21588 -46 0
15 -Ez1 4 3690 12116 -21466 29 0
15 +Ey1 7 20 -651 -125 87 0
15 -Ey1 -7 -20 651 125 -87 0
15 +Ex2 117 26 -1765 -160 2084 0
15 -Ex2 -117 -26 1764 160 -2084 0
15 +Ez2 5 -2782 -9069 16181 75 0
15 -Ez2 -6 2761 9008 -16060 -93 0
15 +Ey2 7 13 -455 -82 86 0
15 -Ey2 -7 -13 455 82 -86 0
15 +T -65 -513 -1579 2959 -924 0
15 -T -65 -505 -1772 2906 -918 0
15 DS -11 3 -329 -18 -166 0
15 C -3 -167 4677 1030 -60 0
15 H -11 3 -329 -18 -166 0
16 D -9 -530 14960 3258 -239 0
16 L 11 -129 3307 846 -351 0
16 Q1 -54 -856 6752 5202 -884 0
16 Q2 -61 -363 3014 2191 -984 0
16 +Wx 272 -78 -448 748 4166 0
16 -Wx -358 -254 829 1436 -5291 0
16 +Wz -211 -2028 11340 12404 -3936 0
16 -Wz 250 2097 -12203 -12824 3460 0
16 +Ex1 336 -90 736 636 5633 0
16 -Ex1 -336 90 -736 -636 -5630 0
16 +Ez1 -17 -3622 23700 22146 -324 0
16 -Ez1 13 3601 -23583 -22019 265 0
16 +Ey1 4 28 -757 -173 56 0
16 -Ey1 -4 -28 757 173 -56 0
16 +Ex2 291 13 -141 -9 4867 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

16 -Ex2 -291 -13 141 9 -4865 0


16 +Ez2 -19 -2714 17718 16587 -357 0
16 -Ez2 15 2693 -17601 -16459 298 0
16 +Ey2 4 21 -516 -131 59 0
16 -Ey2 -4 -21 516 131 -59 0
16 +T -80 -551 1627 3626 -1206 0
16 -T -76 -532 1158 3467 -1125 0
16 DS -15 -5 -418 70 -241 0
16 C 6 -185 5733 1125 68 0
16 H -15 -5 -418 70 -241 0
17 D -173 -18 3746 184 -1711 0
17 L -56 -3 2488 30 -550 0
17 Q1 -3 -12 230 146 -45 0
17 Q2 -10 -6 140 65 -144 0
17 +Wx 36 -5 130 57 533 0
17 -Wx -24 4 -126 -45 -368 0
17 +Wz -21 -33 -61 447 -306 0
17 -Wz -21 35 -82 -474 -292 0
17 +Ex1 27 -1 269 12 451 0
17 -Ex1 -27 1 -269 -12 -451 0
17 +Ez1 -2 -30 47 431 -30 0
17 -Ez1 2 30 -47 -429 29 0
17 +Ey1 8 -1 -183 7 80 0
17 -Ey1 -8 1 183 -7 -80 0
17 +Ex2 24 1 202 -5 394 0
17 -Ex2 -24 -1 -202 5 -394 0
17 +Ez2 -2 -25 40 352 -27 0
17 -Ez2 2 25 -41 -350 26 0
17 +Ey2 8 -1 -175 7 80 0
17 -Ey2 -8 1 175 -7 -80 0
17 +T -6 2 -34 -21 -87 0
17 -T -6 2 -30 -21 -86 0
17 DS 5 -2 190 17 44 0
17 C -3 -1 263 5 -34 0
17 H 5 -2 190 17 44 0
18 D -172 20 3749 -207 -1712 0
18 L -49 2 2321 -19 -503 0
18 Q1 -2 -2 234 44 -41 0
18 Q2 -8 5 151 -42 -125 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

18 +Wx 35 -4 127 44 522 0


18 -Wx -24 3 -133 -31 -363 0
18 +Wz -23 -34 -105 458 -330 0
18 -Wz -19 34 -40 -462 -269 0
18 +Ex1 28 1 273 -5 473 0
18 -Ex1 -28 -1 -273 5 -473 0
18 +Ez1 1 -30 -60 431 15 0
18 -Ez1 -1 30 59 -429 -16 0
18 +Ey1 8 -1 -183 7 80 0
18 -Ey1 -8 1 183 -7 -80 0
18 +Ex2 25 1 208 -10 415 0
18 -Ex2 -25 -1 -208 10 -415 0
18 +Ez2 1 -25 -51 352 16 0
18 -Ez2 -1 25 50 -350 -17 0
18 +Ey2 8 -1 -175 7 80 0
18 -Ey2 -8 1 175 -7 -80 0
18 +T -6 -2 -34 20 -87 0
18 -T -6 -2 -16 20 -86 0
18 DS 5 2 190 -16 44 0
18 C -3 1 264 -10 -31 0
18 H 5 2 190 -16 44 0
19 D 20 27 5386 -283 165 0
19 L 1 -1 2662 21 -10 0
19 Q1 -9 -8 1855 175 -115 0
19 Q2 -14 10 2018 -99 -186 0
19 +Wx 36 83 -3175 -699 494 0
19 -Wx -34 106 2768 -996 -471 0
19 +Wz 2 -188 -760 2323 33 0
19 -Wz -22 137 2121 -1853 -306 0
19 +Ex1 41 -13 -4109 172 581 0
19 -Ex1 -41 13 4108 -172 -581 0
19 +Ez1 1 -82 -153 1389 8 0
19 -Ez1 -1 81 146 -1374 -7 0
19 +Ey1 -1 -2 -369 22 -3 0
19 -Ey1 1 2 369 -22 3 0
19 +Ex2 36 -9 -3538 115 503 0
19 -Ex2 -36 9 3538 -115 -503 0
19 +Ez2 -2 -66 40 1110 -24 0
19 -Ez2 2 65 -47 -1095 24 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

19 +Ey2 -1 -2 -334 21 -4 0
19 -Ey2 1 2 334 -21 4 0
19 +T -12 19 358 -272 -158 0
19 -T -12 18 560 -260 -159 0
19 DS -1 4 906 -40 -22 0
19 C -2 2 946 -27 -24 0
19 H -1 4 906 -40 -22 0
20 D 43 -19 6522 136 379 0
20 L -9 -33 2763 326 -126 0
20 Q1 -11 -25 10133 502 -220 0
20 Q2 -19 11 8981 -106 -328 0
20 +Wx 44 -9 -3825 26 662 0
20 -Wx -35 46 2624 -656 -533 0
20 +Wz -14 -226 962 3746 -208 0
20 -Wz -22 221 406 -3598 -311 0
20 +Ex1 51 -28 -5518 373 804 0
20 -Ex1 -51 28 5517 -374 -804 0
20 +Ez1 -5 -170 881 3165 -75 0
20 -Ez1 5 169 -852 -3137 72 0
20 +Ey1 -1 2 -791 -13 2 0
20 -Ey1 1 -2 791 13 -2 0
20 +Ex2 44 -21 -4788 259 690 0
20 -Ex2 -44 21 4787 -259 -690 0
20 +Ez2 -5 -138 765 2533 -80 0
20 -Ez2 5 136 -736 -2500 77 0
20 +Ey2 -1 2 -769 -15 3 0
20 -Ey2 1 -2 769 15 -3 0
20 +T -26 27 60 -398 -365 0
20 -T -26 26 221 -379 -365 0
20 DS -4 5 174 -51 -52 0
20 C 1 5 829 -63 4 0
20 H -4 5 174 -51 -52 0
21 D 40 23 6888 -237 346 0
21 L -9 5 2910 -17 -127 0
21 Q1 -8 -52 9721 920 -173 0
21 Q2 -17 -20 8825 340 -306 0
21 +Wx 43 -1 -3717 14 648 0
21 -Wx -33 -53 2550 886 -506 0
21 +Wz -27 -219 763 3595 -386 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

21 -Wz -10 234 627 -3839 -142 0


21 +Ex1 61 43 -6556 -547 954 0
21 -Ex1 -61 -43 6555 547 -954 0
21 +Ez1 5 -170 -865 3170 73 0
21 -Ez1 -5 168 877 -3136 -75 0
21 +Ey1 -1 -3 -804 27 3 0
21 -Ey1 1 3 804 -27 -3 0
21 +Ex2 53 40 -5803 -526 833 0
21 -Ex2 -53 -40 5801 526 -833 0
21 +Ez2 5 -138 -773 2533 81 0
21 -Ez2 -6 136 785 -2499 -89 0
21 +Ey2 -1 -3 -780 28 3 0
21 -Ey2 1 3 780 -28 -3 0
21 +T -26 -25 61 371 -366 0
21 -T -26 -24 257 354 -368 0
21 DS -4 -5 177 53 -52 0
21 C 1 -3 889 22 3 0
21 H -4 -5 177 53 -52 0
22 D 18 -22 5764 207 141 0
22 L 2 21 2477 -243 8 0
22 Q1 -9 -32 2208 478 -117 0
22 Q2 -14 -16 2095 216 -190 0
22 +Wx 38 -84 -3289 681 522 0
22 -Wx -37 -107 2938 1083 -510 0
22 +Wz -30 -138 2692 1875 -414 0
22 -Wz 6 190 -1053 -2344 88 0
22 +Ex1 55 19 -5478 -243 775 0
22 -Ex1 -55 -19 5476 243 -775 0
22 +Ez1 -1 -82 173 1391 -10 0
22 -Ez1 1 81 -126 -1377 5 0
22 +Ey1 -1 2 -376 -19 -4 0
22 -Ey1 1 -2 376 19 4 0
22 +Ex2 48 17 -4824 -228 679 0
22 -Ex2 -48 -17 4822 228 -679 0
22 +Ez2 2 -66 -33 1111 24 0
22 -Ez2 -2 65 80 -1095 -27 0
22 +Ey2 -1 2 -338 -19 -4 0
22 -Ey2 1 -2 338 19 4 0
22 +T -12 -18 362 261 -157 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

22 -T -12 -17 457 247 -156 0


22 DS -1 -4 905 41 -22 0
22 C -2 -2 1014 14 -28 0
22 H -1 -4 905 41 -22 0
23 D 551 21 5111 -233 3065 0
23 L 252 14 2505 -168 1400 0
23 Q1 -20 -16 1469 274 -139 0
23 Q2 -305 -1 548 28 -1761 0
23 +Wx 1389 101 2476 -957 7940 0
23 -Wx -1412 102 -2793 -955 -8063 0
23 +Wz 28 -168 -283 2041 163 0
23 -Wz -861 110 -1598 -1474 -4921 0
23 +Ex1 1725 -7 3612 84 9870 0
23 -Ex1 -1724 7 -3611 -84 -9864 0
23 +Ez1 -29 -56 -315 972 -170 0
23 -Ez1 29 55 308 -955 169 0
23 +Ey1 -13 -2 -279 19 -69 0
23 -Ey1 13 2 279 -19 69 0
23 +Ex2 1479 -5 3085 54 8463 0
23 -Ex2 -1478 5 -3084 -54 -8458 0
23 +Ez2 -89 -44 -379 761 -514 0
23 -Ez2 89 43 372 -745 514 0
23 +Ey2 -8 -2 -248 19 -41 0
23 -Ey2 8 2 248 -19 41 0
23 +T -203 13 -404 -182 -1172 0
23 -T -146 13 -37 -183 -846 0
23 DS -15 6 432 -59 -102 0
23 C 118 1 800 -8 656 0
23 H -15 6 432 -59 -102 0
24 D -25 -2 6771 -69 -325 0
24 L -16 -4 3133 -82 -199 0
24 Q1 -27 -37 13183 777 -431 0
24 Q2 -35 7 11718 11 -545 0
24 +Wx 51 58 -2539 -880 770 0
24 -Wx -42 61 1400 -867 -644 0
24 +Wz -16 -230 655 4086 -239 0
24 -Wz -22 192 81 -3474 -313 0
24 +Ex1 70 -17 -2649 218 1069 0
24 -Ex1 -70 17 2649 -218 -1069 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

24 +Ez1 -7 -136 647 2845 -106 0


24 -Ez1 7 134 -621 -2800 103 0
24 +Ey1 3 -1 -923 17 41 0
24 -Ey1 -3 1 923 -17 -41 0
24 +Ex2 60 -12 -2204 133 918 0
24 -Ex2 -60 12 2203 -133 -918 0
24 +Ez2 -8 -106 557 2224 -118 0
24 -Ez2 8 105 -531 -2186 115 0
24 +Ey2 3 -1 -921 17 41 0
24 -Ey2 -3 1 921 -17 -41 0
24 +T -22 14 66 -232 -309 0
24 -T -22 16 335 -249 -306 0
24 DS -4 8 -33 -79 -60 0
24 C -1 2 451 -21 -11 0
24 H -4 8 -33 -79 -60 0
25 D -29 3 7266 2 -376 0
25 L -22 -16 3453 288 -268 0
25 Q1 -26 -52 12824 1009 -398 0
25 Q2 -34 -17 11552 275 -530 0
25 +Wx 50 -34 -2488 442 758 0
25 -Wx -39 -141 1243 2109 -605 0
25 +Wz -28 -224 261 3956 -403 0
25 -Wz -11 250 482 -4320 -161 0
25 +Ex1 82 52 -3018 -724 1254 0
25 -Ex1 -82 -52 3017 724 -1253 0
25 +Ez1 7 -146 -665 2987 106 0
25 -Ez1 -7 144 669 -2944 -108 0
25 +Ey1 3 -1 -944 10 43 0
25 -Ey1 -3 1 944 -10 -43 0
25 +Ex2 72 47 -2564 -669 1101 0
25 -Ex2 -72 -47 2563 669 -1101 0
25 +Ez2 8 -114 -592 2331 120 0
25 -Ez2 -8 111 596 -2284 -123 0
25 +Ey2 3 -1 -941 9 43 0
25 -Ey2 -3 1 941 -9 -43 0
25 +T -23 -7 75 137 -318 0
25 -T -22 -6 370 119 -311 0
25 DS -4 -10 -33 107 -60 0
25 C -1 -1 483 -6 -15 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

25 H -4 -10 -33 107 -60 0


26 D 550 22 5683 -130 3041 0
26 L 179 12 2306 -19 987 0
26 Q1 11 26 1933 26 45 0
26 Q2 -341 -6 476 89 -1967 0
26 +Wx 1477 -92 2594 808 8439 0
26 -Wx -1527 -123 -2876 1304 -8717 0
26 +Wz -1182 -121 -2161 1629 -6749 0
26 -Wz 194 174 41 -2112 1110 0
26 +Ex1 2283 20 4629 -255 13074 0
26 -Ex1 -2282 -20 -4628 255 -13067 0
26 +Ez1 21 -60 318 1021 125 0
26 -Ez1 -36 59 -338 -1005 -211 0
26 +Ey1 -13 2 -297 -17 -68 0
26 -Ey1 13 -2 297 17 68 0
26 +Ex2 2001 18 4029 -235 11462 0
26 -Ex2 -2000 -18 -4027 235 -11456 0
26 +Ez2 90 -47 396 798 521 0
26 -Ez2 -105 46 -416 -783 -606 0
26 +Ey2 -9 2 -268 -17 -46 0
26 -Ey2 9 -2 268 17 46 0
26 +T -199 -10 -401 148 -1149 0
26 -T -157 -10 -164 144 -912 0
26 DS -16 -6 433 64 -108 0
26 C 97 1 756 -11 535 0
26 H -16 -6 433 64 -108 0
27 D -592 39 5389 -374 -3324 0
27 L -375 27 3178 -253 -2096 0
27 Q1 -520 -26 2751 474 -2937 0
27 Q2 -645 4 2717 12 -3677 0
27 +Wx 1171 90 -2051 -797 6780 0
27 -Wx -1111 84 1502 -683 -6440 0
27 +Wz 142 -186 -1167 2335 791 0
27 -Wz -819 132 2000 -1840 -4716 0
27 +Ex1 1542 -3 -2388 20 8929 0
27 -Ex1 -1542 3 2388 -20 -8929 0
27 +Ez1 74 -70 -1028 1210 394 0
27 -Ez1 -74 69 1015 -1187 -394 0
27 +Ey1 72 -4 -425 35 406 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

27 -Ey1 -72 4 425 -35 -406 0


27 +Ex2 1325 -2 -2052 0 7674 0
27 -Ex2 -1325 2 2052 0 -7674 0
27 +Ez2 -38 -54 -712 934 -244 0
27 -Ez2 38 53 699 -913 244 0
27 +Ey2 72 -4 -422 35 406 0
27 -Ey2 -72 4 422 -35 -406 0
27 +T -168 27 236 -374 -955 0
27 -T -203 22 -185 -329 -1141 0
27 DS -221 12 726 -117 -1260 0
27 C -36 2 238 -20 -207 0
27 H -221 12 726 -117 -1260 0
28 D 590 -10 9013 131 3216 0
28 L 255 -12 4065 145 1362 0
28 Q1 986 -101 18217 1687 5061 0
28 Q2 428 -16 17101 324 1776 0
28 +Wx 1800 19 658 -307 10808 0
28 -Wx -1702 5 -1661 15 -10178 0
28 +Wz -568 -247 -20 4449 -3420 0
28 -Wz -801 230 -1771 -4173 -4726 0
28 +Ex1 2731 -6 1593 18 16377 0
28 -Ex1 -2731 6 -1593 -18 -16377 0
28 +Ez1 -211 -164 957 3292 -1325 0
28 -Ez1 199 161 -958 -3230 1252 0
28 +Ey1 -61 2 -1235 -21 -311 0
28 -Ey1 61 -2 1235 21 311 0
28 +Ex2 2364 -2 1281 -42 14179 0
28 -Ex2 -2363 2 -1281 42 -14174 0
28 +Ez2 -253 -127 659 2546 -1562 0
28 -Ez2 240 123 -660 -2478 1484 0
28 +Ey2 -60 2 -1240 -22 -306 0
28 -Ey2 60 -2 1240 22 306 0
28 +T -193 48 -489 -682 -1228 0
28 -T -138 61 -98 -825 -915 0
28 DS -185 6 -499 -59 -1100 0
28 C 45 -1 434 0 238 0
28 H -185 6 -499 -59 -1100 0
29 D 199 1 5320 -8 1188 0
29 L 67 1 3263 -5 352 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

29 Q1 -29 -14 162 173 -178 0


29 Q2 -114 -4 411 45 -691 0
29 +Wx 302 2 -1419 -24 1862 0
29 -Wx -337 -2 1501 23 -2073 0
29 +Wz -166 -36 659 464 -1018 0
29 -Wz -142 35 541 -445 -868 0
29 +Ex1 447 1 -2420 -11 2771 0
29 -Ex1 -447 -1 2419 11 -2771 0
29 +Ez1 -1 -29 -6 374 -7 0
29 -Ez1 -3 28 25 -365 -19 0
29 +Ey1 -4 -1 -235 5 -24 0
29 -Ey1 4 1 235 -5 24 0
29 +Ex2 403 1 -2194 -14 2499 0
29 -Ex2 -402 -1 2193 14 -2493 0
29 +Ez2 -1 -22 -4 286 -8 0
29 -Ez2 -3 22 23 -282 -18 0
29 +Ey2 -5 -1 -236 5 -31 0
29 -Ey2 5 1 236 -5 31 0
29 +T -256 -1 256 8 -1532 0
29 -T -246 1 236 -7 -1472 0
29 DS -148 1 309 -7 -890 0
29 C -12 1 80 -7 -75 0
29 H -148 1 309 -7 -890 0
30 D 590 -63 9385 641 3212 0
30 L 237 -48 4535 498 1276 0
30 Q1 1165 -102 17951 1700 6187 0
30 Q2 460 -26 17023 427 1985 0
30 +Wx 1784 6 708 -130 10715 0
30 -Wx -1661 -10 -1762 238 -9945 0
30 +Wz -1044 -240 -1892 4366 -6193 0
30 -Wz -358 231 22 -4199 -2150 0
30 +Ex1 3226 -2 1897 -41 19355 0
30 -Ex1 -3225 2 -1897 41 -19348 0
30 +Ez1 205 -160 -932 3255 1284 0
30 -Ez1 -216 156 913 -3186 -1349 0
30 +Ey1 -60 4 -1261 -38 -304 0
30 -Ey1 60 -4 1261 38 304 0
30 +Ex2 2855 2 1627 -94 17131 0
30 -Ex2 -2854 -2 -1626 94 -17125 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

30 +Ez2 259 -124 -634 2518 1593 0


30 -Ez2 -270 120 615 -2449 -1659 0
30 +Ey2 -60 4 -1265 -39 -305 0
30 -Ey2 60 -4 1265 39 305 0
30 +T -201 -54 -489 760 -1277 0
30 -T -148 -53 -84 731 -977 0
30 DS -184 -4 -499 30 -1096 0
30 C 33 1 442 -14 164 0
30 H -184 -4 -499 30 -1096 0
31 D -641 7 6140 -26 -3576 0
31 L -325 3 2685 0 -1804 0
31 Q1 -456 -86 3282 1095 -2653 0
31 Q2 -695 -20 2861 254 -3962 0
31 +Wx 1210 -80 -2179 637 7004 0
31 -Wx -1163 -101 1718 889 -6742 0
31 +Wz -1041 -144 2366 1989 -6002 0
31 -Wz 283 189 -1331 -2336 1609 0
31 +Ex1 2051 1 -3356 -24 11882 0
31 -Ex1 -2050 -1 3355 24 -11876 0
31 +Ez1 -87 -80 1039 1309 -469 0
31 -Ez1 72 78 -993 -1281 383 0
31 +Ey1 61 2 -414 -20 345 0
31 -Ey1 -61 -2 414 20 -345 0
31 +Ex2 1812 2 -2977 -39 10497 0
31 -Ex2 -1811 -2 2975 39 -10492 0
31 +Ez2 31 -62 729 1015 204 0
31 -Ez2 -46 61 -683 -993 -291 0
31 +Ey2 59 2 -410 -20 332 0
31 -Ey2 -59 -2 410 20 -332 0
31 +T -165 -30 232 406 -937 0
31 -T -192 -29 447 392 -1085 0
31 DS -222 -10 720 95 -1266 0
31 C -56 1 264 -10 -323 0
31 H -222 -10 720 95 -1266 0
32 D 6 36 3490 -346 72 0
32 L 4 22 2066 -208 49 0
32 Q1 -1 19 1873 -64 -8 0
32 Q2 -5 17 874 -125 -64 0
32 +Wx 22 74 3035 -642 301 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

32 -Wx -22 78 -3201 -635 -301 0


32 +Wz 1 -90 -673 1189 5 0
32 -Wz -14 49 -1451 -829 -189 0
32 +Ex1 30 -8 4632 55 416 0
32 -Ex1 -30 8 -4632 -55 -416 0
32 +Ez1 -2 1 -1064 330 -26 0
32 -Ez1 2 -1 1046 -324 25 0
32 +Ey1 1 -4 -262 36 7 0
32 -Ey1 -1 4 262 -36 -7 0
32 +Ex2 26 -7 4034 42 360 0
32 -Ex2 -26 7 -4033 -43 -360 0
32 +Ez2 -3 -1 -1145 267 -44 0
32 -Ez2 3 1 1127 -261 43 0
32 +Ey2 1 -4 -264 37 7 0
32 -Ey2 -1 4 264 -37 -7 0
32 +T 3 25 -223 -340 35 0
32 -T 4 28 302 -368 49 0
32 DS -3 8 75 -82 -35 0
32 C -1 1 47 -8 -8 0
32 H -3 8 75 -82 -35 0
33 D 874 3 9205 28 4834 0
33 L 386 -5 3637 87 2127 0
33 Q1 1845 -16 17934 723 10119 0
33 Q2 1290 -4 16906 245 6903 0
33 +Wx 2421 10 3413 -235 14106 0
33 -Wx -2343 -12 -4037 203 -13614 0
33 +Wz -722 -38 -680 2337 -4226 0
33 -Wz -1030 34 -3224 -2201 -5958 0
33 +Ex1 3756 -1 6139 -110 21832 0
33 -Ex1 -3755 1 -6138 110 -21826 0
33 +Ez1 -259 18 782 1436 -1570 0
33 -Ez1 240 -18 -789 -1406 1460 0
33 +Ey1 -110 3 -1194 -34 -599 0
33 -Ey1 110 -3 1194 34 599 0
33 +Ex2 3244 -3 5268 -99 18861 0
33 -Ex2 -3243 3 -5267 99 -18856 0
33 +Ez2 -311 11 435 1120 -1855 0
33 -Ez2 291 -10 -442 -1095 1739 0
33 +Ey2 -112 3 -1214 -35 -610 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

33 -Ey2 112 -3 1214 35 610 0


33 +T 167 57 193 -831 949 0
33 -T 237 58 793 -833 1343 0
33 DS -291 3 -1080 -35 -1699 0
33 C 9 2 58 -23 38 0
33 H -291 3 -1080 -35 -1699 0
34 D -9 1 2426 -9 -61 0
34 L -3 1 1085 -7 -20 0
34 Q1 -4 -7 -7 85 -39 0
34 Q2 -6 -3 -484 33 -75 0
34 +Wx 10 1 1334 -12 151 0
34 -Wx -11 -3 -1442 32 -168 0
34 +Wz -6 -23 -643 287 -85 0
34 -Wz -5 22 -508 -276 -70 0
34 +Ex1 14 2 2291 -20 224 0
34 -Ex1 -14 -2 -2291 20 -224 0
34 +Ez1 -1 -19 -11 236 -7 0
34 -Ez1 -1 18 -8 -228 -7 0
34 +Ey1 1 1 -109 -7 8 0
34 -Ey1 -1 -1 109 7 -8 0
34 +Ex2 13 2 2077 -20 205 0
34 -Ex2 -13 -2 -2077 20 -205 0
34 +Ez2 -1 -14 -11 178 -7 0
34 -Ez2 1 14 -8 -175 5 0
34 +Ey2 1 1 -114 -7 8 0
34 -Ey2 -1 -1 114 7 -8 0
34 +T -4 -1 -267 7 -49 0
34 -T -3 -1 -240 7 -41 0
34 DS -6 1 -213 -7 -76 0
34 C -1 1 -73 -7 -10 0
34 H -6 1 -213 -7 -76 0
35 D 848 -73 9604 672 4627 0
35 L 374 -51 4020 478 1989 0
35 Q1 2067 -20 17736 733 11424 0
35 Q2 1387 -12 16999 302 7477 0
35 +Wx 2425 -7 3499 61 14128 0
35 -Wx -2389 -17 -4274 411 -13892 0
35 +Wz -1390 -27 -3710 2181 -8056 0
35 -Wz -431 31 -368 -2188 -2529 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

35 +Ex1 4460 -8 7465 -14 25931 0


35 -Ex1 -4459 8 -7462 14 -25925 0
35 +Ez1 241 19 -779 1410 1466 0
35 -Ez1 -256 -19 733 -1377 -1553 0
35 +Ey1 -111 4 -1211 -37 -602 0
35 -Ey1 111 -4 1211 37 602 0
35 +Ex2 3944 -7 6609 -34 22933 0
35 -Ex2 -3943 7 -6607 34 -22928 0
35 +Ez2 313 13 -388 1091 1865 0
35 -Ez2 -327 -13 341 -1058 -1946 0
35 +Ey2 -114 4 -1234 -38 -618 0
35 -Ey2 114 -4 1234 38 618 0
35 +T 161 -59 186 849 915 0
35 -T 228 -61 755 871 1286 0
35 DS -296 -6 -1089 57 -1727 0
35 C -15 -1 23 1 -102 0
35 H -296 -6 -1089 57 -1727 0
36 D 7 -10 3800 94 82 0
36 L 3 -3 1732 28 36 0
36 Q1 6 -15 2120 265 64 0
36 Q2 -6 -11 800 151 -78 0
36 +Wx 22 -74 3003 611 304 0
36 -Wx -23 -127 -3059 1125 -309 0
36 +Wz -18 -64 -1911 987 -244 0
36 -Wz 3 105 -340 -1319 38 0
36 +Ex1 40 6 5884 -76 548 0
36 -Ex1 -40 -6 -5882 76 -548 0
36 +Ez1 2 -14 1086 471 27 0
36 -Ez1 -2 13 -1107 -457 -29 0
36 +Ey1 -1 2 -216 -16 -7 0
36 -Ey1 1 -2 216 16 7 0
36 +Ex2 35 5 5211 -71 482 0
36 -Ex2 -35 -5 -5209 71 -482 0
36 +Ez2 4 -10 1188 354 51 0
36 -Ez2 -4 10 -1209 -346 -53 0
36 +Ey2 -1 2 -221 -17 -7 0
36 -Ey2 1 -2 221 17 7 0
36 +T 3 -24 -228 334 35 0
36 -T 4 -25 27 342 45 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

36 DS -3 -7 76 69 -35 0
36 C -1 -1 -20 5 -11 0
36 H -3 -7 76 69 -35 0
37 D 23 54 6372 -529 263 0
37 L 9 3 2522 -24 102 0
37 Q1 -8 27 5160 -136 -88 0
37 Q2 -16 18 5228 -113 -206 0
37 +Wx 39 106 401 -924 590 0
37 -Wx -40 100 -1090 -849 -604 0
37 +Wz -3 -78 -4330 1090 -38 0
37 -Wz -24 20 3698 -579 -355 0
37 +Ex1 54 5 1299 -80 821 0
37 -Ex1 -54 -5 -1298 80 -821 0
37 +Ez1 -4 45 -5015 -56 -66 0
37 -Ez1 4 -44 4940 54 65 0
37 +Ey1 -1 -4 -627 35 -9 0
37 -Ey1 1 4 627 -35 9 0
37 +Ex2 46 4 1358 -72 707 0
37 -Ex2 -46 -4 -1358 72 -706 0
37 +Ez2 -7 34 -3871 -63 -112 0
37 -Ez2 7 -33 3796 62 111 0
37 +Ey2 -1 -4 -650 35 -10 0
37 -Ey2 1 4 650 -35 10 0
37 +T 10 63 -19 -834 135 0
37 -T 12 65 -10 -852 157 0
37 DS -6 30 1340 -292 -88 0
37 C -1 -1 -269 10 -12 0
37 H -6 30 1340 -292 -88 0
38 D 12 2224 10625 -12317 108 0
38 L 10 382 2606 -2132 84 0
38 Q1 -7 167 9746 -782 -164 0
38 Q2 -17 420 8237 -2279 -304 0
38 +Wx 34 54 581 -372 575 0
38 -Wx -31 -6 -1427 -20 -521 0
38 +Wz -19 -3499 28 20223 -282 0
38 -Wz -7 3317 -883 -19158 -131 0
38 +Ex1 47 182 1869 -1061 818 0
38 -Ex1 -47 -182 -1868 1061 -818 0
38 +Ez1 -14 -2829 993 16207 -199 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

38 -Ez1 14 2776 -964 -15904 196 0


38 +Ey1 1 -150 -915 831 12 0
38 -Ey1 -1 150 915 -831 -12 0
38 +Ex2 42 209 1799 -1213 722 0
38 -Ex2 -42 -209 -1799 1213 -722 0
38 +Ez2 -12 -1980 858 11330 -175 0
38 -Ez2 12 1927 -830 -11026 171 0
38 +Ey2 -1 -153 -951 848 0 0
38 -Ey2 1 153 951 -848 0 0
38 +T 11 1463 1059 -8665 153 0
38 -T 11 1512 1278 -8943 153 0
38 DS -7 -1494 -2470 8301 -98 0
38 C -1 -4 -429 20 -16 0
38 H -7 -1494 -2470 8301 -98 0
39 D 189 -4 15280 36 2181 0
39 L 61 -3 2477 27 643 0
39 Q1 -1 35 7285 -236 -29 0
39 Q2 -1 21 5938 -153 -206 0
39 +Wx 35 -5 -368 36 1008 0
39 -Wx -45 3 -138 -29 -1179 0
39 +Wz -28 117 -234 -744 -626 0
39 -Wz -26 -114 -347 724 -547 0
39 +Ex1 31 -10 -352 72 1336 0
39 -Ex1 -31 10 351 -72 -1336 0
39 +Ez1 -1 125 -4 -904 -10 0
39 -Ez1 1 -123 29 889 2 0
39 +Ey1 -9 1 -1028 -9 -100 0
39 -Ey1 9 -1 1028 9 100 0
39 +Ex2 27 -11 -297 80 1197 0
39 -Ex2 -27 11 297 -80 -1196 0
39 +Ez2 -1 88 -1 -637 -12 0
39 -Ez2 1 -86 26 622 4 0
39 +Ey2 -10 1 -1050 -10 -108 0
39 -Ey2 10 -1 1050 10 108 0
39 +T -18 -1 -2166 7 -209 0
39 -T -15 -2 -1863 16 -160 0
39 DS -58 1 3298 -8 -814 0
39 C -1 1 -57 -7 -38 0
39 H -58 1 3298 -8 -814 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

40 D 17 -2220 11024 12326 151 0


40 L 15 -363 3089 2065 126 0
40 Q1 1 -2003 9585 11372 -52 0
40 Q2 -13 -1354 8803 7681 -245 0
40 +Wx 33 147 580 -778 565 0
40 -Wx -34 29 -1773 -153 -558 0
40 +Wz -12 -3424 -909 19761 -213 0
40 -Wz -14 3423 59 -19773 -206 0
40 +Ex1 56 281 2526 -1585 972 0
40 -Ex1 -56 -281 -2526 1585 -972 0
40 +Ez1 14 -2827 -1017 16194 196 0
40 -Ez1 -14 2767 995 -15851 -198 0
40 +Ey1 -1 152 -933 -847 0 0
40 -Ey1 1 -152 933 847 0 0
40 +Ex2 50 293 2439 -1658 865 0
40 -Ex2 -50 -293 -2438 1658 -865 0
40 +Ez2 12 -1980 -881 11330 173 0
40 -Ez2 -12 1919 860 -10980 -175 0
40 +Ey2 -1 156 -970 -870 0 0
40 -Ey2 1 -156 970 870 0 0
40 +T 11 -1466 1062 8684 153 0
40 -T 10 -1512 1265 8952 140 0
40 DS -7 1497 -2469 -8320 -98 0
40 C -2 13 -439 -76 -26 0
40 H -7 1497 -2469 -8320 -98 0
41 D 23 -52 6588 511 262 0
41 L 8 -3 2357 26 90 0
41 Q1 3 -8 7450 202 32 0
41 Q2 -12 -13 5650 191 -173 0
41 +Wx 40 -105 147 891 600 0
41 -Wx -39 -58 -506 492 -586 0
41 +Wz -30 -22 3878 607 -452 0
41 -Wz 3 80 -4278 -1095 42 0
41 +Ex1 70 -8 1010 49 1069 0
41 -Ex1 -70 8 -1010 -49 -1069 0
41 +Ez1 4 45 5057 -55 66 0
41 -Ez1 -5 -44 -4977 54 -75 0
41 +Ey1 -1 4 -546 -36 -9 0
41 -Ey1 1 -4 546 36 9 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

41 +Ex2 62 -8 949 44 947 0


41 -Ex2 -62 8 -949 -44 -947 0
41 +Ez2 8 34 3902 -63 121 0
41 -Ez2 -8 -33 -3821 62 -124 0
41 +Ey2 -1 4 -570 -37 -9 0
41 -Ey2 1 -4 570 37 9 0
41 +T 10 -64 -20 840 136 0
41 -T 10 -66 -132 860 134 0
41 DS -6 -30 1341 292 -89 0
41 C -2 1 -293 -10 -24 0
41 H -6 -30 1341 292 -89 0
42 D -902 -43 14582 41 -5981 0
42 L -222 -10 3211 18 -1188 0
42 Q1 -109 -18 1484 1258 -600 0
42 Q2 -507 -21 2031 867 -3005 0
42 +Wx 2354 174 -3727 -1954 14061 0
42 -Wx -2391 197 3594 -2253 -14280 0
42 +Wz -127 -257 -868 6520 -759 0
42 -Wz -1619 121 3448 -4977 -9644 0
42 +Ex1 3234 -3 -5195 -309 19335 0
42 -Ex1 -3233 3 5194 309 -19330 0
42 +Ez1 -279 1 -585 2940 -1675 0
42 -Ez1 268 -1 587 -2882 1611 0
42 +Ey1 67 3 -800 -8 422 0
42 -Ey1 -67 -3 800 8 -422 0
42 +Ex2 2811 -2 -4477 -350 16810 0
42 -Ex2 -2810 2 4476 350 -16803 0
42 +Ez2 -566 8 304 1709 -3373 0
42 -Ez2 556 -8 -301 -1651 3314 0
42 +Ey2 65 3 -813 -8 411 0
42 -Ey2 -65 -3 813 8 -411 0
42 +T 784 82 -954 -1267 4722 0
42 -T 639 75 -2100 -1182 3863 0
42 DS 734 -1 -2190 -2 3971 0
42 C -63 -1 70 12 -384 0
42 H 734 -1 -2190 -2 3971 0
43 D -1449 -8 31499 15 -11194 0
43 L -126 2 3729 -144 -553 0
43 Q1 -54 -50 2161 2485 -275 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

43 Q2 -219 -37 2851 1525 -1482 0


43 +Wx 1076 -2 -652 -143 7492 0
43 -Wx -1239 12 688 -378 -8621 0
43 +Wz -665 -247 366 10194 -4608 0
43 -Wz -580 246 347 -10030 -4013 0
43 +Ex1 1482 23 -825 -904 10310 0
43 -Ex1 -1482 -23 824 903 -10310 0
43 +Ez1 -5 -115 -23 7158 -35 0
43 -Ez1 -5 112 25 -7016 -35 0
43 +Ey1 76 1 -1667 0 568 0
43 -Ey1 -76 -1 1667 0 -568 0
43 +Ex2 1337 24 -722 -979 9297 0
43 -Ex2 -1337 -24 722 979 -9297 0
43 +Ez2 -6 -60 -14 4230 -43 0
43 -Ez2 -4 57 16 -4087 -27 0
43 +Ey2 76 1 -1701 1 569 0
43 -Ey2 -76 -1 1701 -1 -569 0
43 +T 432 1 -474 -13 3125 0
43 -T 427 -12 -1822 149 3121 0
43 DS 342 -1 -1351 16 1204 0
43 C -39 -1 -13 13 -274 0
43 H 342 -1 -1351 16 1204 0
44 D -914 45 14727 -130 -6047 0
44 L -222 7 3155 -107 -1199 0
44 Q1 -72 11 1978 887 -379 0
44 Q2 -602 8 2282 533 -3580 0
44 +Wx 2374 -164 -3790 1640 14181 0
44 -Wx -2311 -88 3540 810 -13800 0
44 +Wz -1970 -123 4077 5100 -11741 0
44 -Wz 120 250 -1274 -6354 718 0
44 +Ex1 4195 17 -6889 -502 25080 0
44 -Ex1 -4193 -17 6887 502 -25069 0
44 +Ez1 263 -1 647 2972 1582 0
44 -Ez1 -285 1 -591 -2914 -1713 0
44 +Ey1 72 -3 -797 13 452 0
44 -Ey1 -72 3 797 -13 -452 0
44 +Ex2 3746 15 -6175 -514 22398 0
44 -Ex2 -3745 -15 6173 514 -22391 0
44 +Ez2 571 9 -291 1709 3404 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

44 -Ez2 -593 -9 347 -1651 -3536 0


44 +Ey2 68 -3 -807 13 429 0
44 -Ey2 -68 3 807 -13 -429 0
44 +T 783 -84 -949 1294 4716 0
44 -T 624 -67 -2120 1059 3771 0
44 DS 734 3 -2190 -20 3971 0
44 C -105 1 136 -5 -635 0
44 H 734 3 -2190 -20 3971 0
45 D 216 58 8209 -583 2287 0
45 L 13 2 2164 -55 142 0
45 Q1 1 -77 306 1236 3 0
45 Q2 -15 -37 -1151 657 -208 0
45 +Wx 139 55 5376 -508 1559 0
45 -Wx -173 70 -5344 -699 -1844 0
45 +Wz -83 -345 -619 5430 -714 0
45 -Wz -124 301 -2825 -5012 -1283 0
45 +Ex1 103 20 8079 -397 1434 0
45 -Ex1 -103 -20 -8078 397 -1434 0
45 +Ez1 -12 -181 -1193 3243 -163 0
45 -Ez1 12 178 1163 -3182 160 0
45 +Ey1 -10 1 -387 -4 -101 0
45 -Ey1 10 -1 387 4 101 0
45 +Ex2 90 23 7139 -443 1253 0
45 -Ex2 -90 -23 -7137 443 -1253 0
45 +Ez2 -20 -103 -1580 1808 -272 0
45 -Ez2 20 100 1550 -1747 270 0
45 +Ey2 -10 1 -411 -4 -103 0
45 -Ey2 10 -1 411 4 103 0
45 +T 52 62 1055 -890 694 0
45 -T 48 63 1224 -904 645 0
45 DS -6 -1 1798 10 -129 0
45 C -3 -1 -377 9 -40 0
45 H -6 -1 1798 10 -129 0
46 D 617 2 19936 -50 6598 0
46 L 35 9 3658 -147 400 0
46 Q1 -2 -130 571 2112 -23 0
46 Q2 -16 -87 -881 1348 -256 0
46 +Wx 221 7 1507 -128 2352 0
46 -Wx -301 21 -1582 -332 -3083 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

46 +Wz -208 -517 -505 8769 -2024 0


46 -Wz -200 509 -350 -8623 -1915 0
46 +Ex1 124 49 2437 -829 1770 0
46 -Ex1 -124 -49 -2436 829 -1770 0
46 +Ez1 -1 -326 -10 5761 -10 0
46 -Ez1 -1 319 -27 -5643 -10 0
46 +Ey1 -28 -1 -1003 11 -297 0
46 -Ey1 28 1 1003 -11 297 0
46 +Ex2 112 52 2193 -894 1598 0
46 -Ex2 -112 -52 -2192 894 -1598 0
46 +Ez2 -1 -184 -7 3199 -11 0
46 -Ez2 -1 178 -29 -3088 -10 0
46 +Ey2 -29 -1 -1029 12 -306 0
46 -Ey2 29 1 1029 -12 306 0
46 +T 101 1 464 -10 1357 0
46 -T 101 2 1005 -31 1373 0
46 DS -20 -1 864 12 -398 0
46 C -4 -1 -121 15 -52 0
46 H -20 -1 864 12 -398 0
47 D 216 -56 8167 526 2286 0
47 L 13 8 2173 -113 145 0
47 Q1 3 -72 497 1185 33 0
47 Q2 -17 -64 -1177 903 -236 0
47 +Wx 140 -47 5340 363 1568 0
47 -Wx -171 -49 -5135 340 -1811 0
47 +Wz -135 -306 -3563 5098 -1434 0
47 -Wz -75 340 -64 -5347 -606 0
47 +Ex1 133 34 10365 -535 1853 0
47 -Ex1 -133 -34 -10362 535 -1852 0
47 +Ez1 12 -181 1174 3243 159 0
47 -Ez1 -13 178 -1228 -3182 -171 0
47 +Ey1 -9 -1 -379 11 -94 0
47 -Ey1 9 1 379 -11 94 0
47 +Ex2 119 35 9349 -565 1658 0
47 -Ex2 -119 -35 -9346 565 -1658 0
47 +Ez2 20 -103 1601 1808 274 0
47 -Ez2 -21 100 -1654 -1747 -286 0
47 +Ey2 -10 -1 -407 11 -102 0
47 -Ey2 10 1 407 -11 102 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

47 +T 52 -61 1048 880 694 0


47 -T 47 -60 1193 859 635 0
47 DS -6 1 1799 -2 -128 0
47 C -4 -1 -480 13 -57 0
47 H -6 1 1799 -2 -128 0
16A D 1 -10 255 117 -17 0
16A L 4 -7 132 65 -27 0
16A Q1 -11 -11 60 137 -158 0
16A Q2 -10 -5 23 61 -136 0
16A +Wx 58 -70 -20 609 698 0
16A -Wx -78 -74 -44 660 -919 0
16A +Wz -17 -46 92 494 -396 0
16A -Wz 61 102 -84 -986 717 0
16A +Ex1 50 -1 50 11 714 0
16A -Ex1 -50 1 -50 -11 -713 0
16A +Ez1 -16 -42 260 532 -224 0
16A -Ez1 15 42 -259 -531 213 0
16A +Ey1 1 1 -15 -10 11 0
16A -Ey1 -1 -1 15 10 -11 0
16A +Ex2 43 1 37 -10 616 0
16A -Ex2 -43 -1 -37 10 -616 0
16A +Ez2 -14 -31 194 397 -195 0
16A -Ez2 13 31 -193 -396 185 0
16A +Ey2 1 1 -15 -9 10 0
16A -Ey2 -1 -1 15 9 -10 0
16A +T -9 -7 20 87 -121 0
16A -T -9 2 -29 -8 -124 0
16A DS -2 -5 33 54 -27 0
16A C -2 -4 25 47 -29 0
16A H -2 -5 33 54 -27 0
08A D -11 -4 1222 32 -141 0
08A L -10 -1 12 9 -59 0
08A Q1 -11 -5 38 59 -157 0
08A Q2 -10 -3 23 33 -136 0
08A +Wx 70 -71 -73 622 808 0
08A -Wx -65 -72 7 633 -804 0
08A +Wz -75 -32 79 308 -917 0
08A -Wz 3 87 -36 -790 195 0
08A +Ex1 50 -1 -50 18 714 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

08A -Ex1 -50 1 50 -18 -714 0


08A +Ez1 -16 -21 130 267 -222 0
08A -Ez1 15 21 -129 -266 211 0
08A +Ey1 1 1 -57 -7 13 0
08A -Ey1 -1 -1 57 7 -13 0
08A +Ex2 43 -1 -47 12 616 0
08A -Ex2 -43 1 47 -12 -616 0
08A +Ez2 -14 -15 93 187 -193 0
08A -Ez2 13 15 -92 -187 183 0
08A +Ey2 1 1 -57 -5 13 0
08A -Ey2 -1 -1 57 5 -13 0
08A +T -12 -5 27 66 -169 0
08A -T -8 2 -21 -8 -107 0
08A DS -2 -5 36 55 -27 0
08A C -2 -3 27 26 -28 0
08A H -2 -5 36 55 -27 0
09A D 2 11 256 -133 6 0
09A L 6 -1 135 1 9 0
09A Q1 -2 -6 -35 73 -21 0
09A Q2 -9 -1 -12 11 -126 0
09A +Wx 53 71 -17 -622 633 0
09A -Wx -73 71 -64 -616 -845 0
09A +Wz 60 -102 -84 985 696 0
09A -Wz -11 46 98 -495 -311 0
09A +Ex1 34 -4 10 46 484 0
09A -Ex1 -34 4 -10 -46 -484 0
09A +Ez1 15 -42 -258 532 214 0
09A -Ez1 -15 42 257 -531 -211 0
09A +Ey1 1 -1 -16 11 11 0
09A -Ey1 -1 1 16 -11 -11 0
09A +Ex2 29 -2 13 25 410 0
09A -Ex2 -29 2 -13 -25 -410 0
09A +Ez2 14 -31 -192 397 195 0
09A -Ez2 -14 31 191 -396 -192 0
09A +Ey2 1 -1 -15 9 11 0
09A -Ey2 -1 1 15 -9 -11 0
09A +T -8 7 21 -88 -114 0
09A -T -11 -3 -34 25 -157 0
09A DS -2 5 33 -54 -27 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)

KHURJA SUER THERMAL POWER PROJECT


(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Rev:00
Foundation

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Boiler Main Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)

09A C -1 6 33 -67 -10 0


09A H -2 5 33 -54 -27 0
01A D -8 6 1225 -65 -99 0
01A L -6 4 29 -36 -2 0
01A Q1 -2 -4 -20 50 -21 0
01A Q2 -9 -2 -1 25 -125 0
01A +Wx 66 71 -67 -622 748 0
01A -Wx -60 71 -8 -617 -730 0
01A +Wz 1 -87 -33 787 169 0
01A -Wz -69 32 73 -309 -830 0
01A +Ex1 34 -3 -54 36 484 0
01A -Ex1 -34 3 54 -36 -484 0
01A +Ez1 15 -21 -131 265 212 0
01A -Ez1 -15 21 130 -264 -209 0
01A +Ey1 1 -1 -57 8 13 0
01A -Ey1 -1 1 57 -8 -13 0
01A +Ex2 29 -2 -42 23 410 0
01A -Ex2 -29 2 42 -23 -409 0
01A +Ez2 14 -15 -94 186 194 0
01A -Ez2 -13 15 94 -185 -186 0
01A +Ey2 1 -1 -57 7 13 0
01A -Ey2 -1 1 57 -7 -13 0
01A +T -12 6 28 -75 -167 0
01A -T -8 -4 -22 32 -109 0
01A DS -2 5 36 -55 -27 0
01A C -1 4 30 -42 -9 0
01A H -2 5 36 -55 -27 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00
Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A
Attachment C : Load input to SAFE for combined Pile Group Analysis
Bottom Ash Hopper (BAH) Input Load Data (Reference)

Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)

P1 D 4 214 9 20 0 0 +/-0.00 -7.000 7


P1 L 5 279 15 36 0 0 +/-0.00 -7.000 7
P1 +Ex1 219 558 0 0 0 0 +/-0.00 -7.000 7
P1 -Ex1 -219 -558 0 0 0 0 +/-0.00 -7.000 7
P1 +Ez1 0 202 151 682 0 0 +/-0.00 -7.000 7
P1 -Ez1 0 -202 -151 -682 0 0 +/-0.00 -7.000 7

+X +X
+Y

+Z +Z
+X
BOILER AXIS
SAFE AXIS BAH AXIS

Fx(Safe) Fz (BAH)
Fgrav (Safe) Fy (BAH)
Fy(Safe) Fx (BAH)
Mx(safe) Mz(BAH)
My (Safe) Mx(BAH)
MZ (Safe) My(BAH)
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Bottom Ash Hopper Column Loading (Reference)

Node L/C Fx Fy Fgrav Mx My Mz


kN kN kN kNm kNm kNm
BAH_A1 D 9 4 214 -28 83 0
BAH_A1 L 15 5 279 -35 141 0
BAH_A1 +Ez1 0 219 558 -1533 0 0
BAH_A1 -Ez1 0 -219 -558 1533 0 0
BAH_A1 +Ex1 151 0 202 0 1739 0
BAH_A1 -Ex1 -151 0 -202 0 -1739 0
BAH_B1 D 9 4 214 -28 83 0
BAH_B1 L 15 5 279 -35 141 0
BAH_B1 +Ez1 0 219 558 -1533 0 0
BAH_B1 -Ez1 0 -219 -558 1533 0 0
BAH_B1 +Ex1 151 0 202 0 1739 0
BAH_B1 -Ex1 -151 0 -202 0 -1739 0
BAH_A10 D 9 4 214 -28 83 0
BAH_A10 L 15 5 279 -35 141 0
BAH_A10 +Ez1 0 219 558 -1533 0 0
BAH_A10 -Ez1 0 -219 -558 1533 0 0
BAH_A10 +Ex1 151 0 202 0 1739 0
BAH_A10 -Ex1 -151 0 -202 0 -1739 0
BAH_B10 D 9 4 214 -28 83 0
BAH_B10 L 15 5 279 -35 141 0
BAH_B10 +Ez1 0 219 558 -1533 0 0
BAH_B10 -Ez1 0 -219 -558 1533 0 0
BAH_B10 +Ex1 151 0 202 0 1739 0
BAH_B10 -Ex1 -151 0 -202 0 -1739 0
BAH_A1 +Ez2 0 219 558 -1533 0 0
BAH_A1 -Ez2 0 -219 -558 1533 0 0
BAH_A1 +Ex2 151 0 202 0 1739 0
BAH_A1 -Ex2 -151 0 -202 0 -1739 0
BAH_B1 +Ez2 0 219 558 -1533 0 0
BAH_B1 -Ez2 0 -219 -558 1533 0 0
BAH_B1 +Ex2 151 0 202 0 1739 0
BAH_B1 -Ex2 -151 0 -202 0 -1739 0
BAH_A10 +EZ2 0 219 558 -1533 0 0
BAH_A10 -Ez2 0 -219 -558 1533 0 0
BAH_A10 +Ex2 151 0 202 0 1739 0
BAH_A10 -Ex2 -151 0 -202 0 -1739 0
BAH_B10 +Ez2 0 219 558 -1533 0 0
BAH_B10 -Ez2 0 -219 -558 1533 0 0
BAH_B10 +Ex2 151 0 202 0 1739 0
BAH_B10 -Ex2 -151 0 -202 0 -1739 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Drain Receiving Tank Column Input Load Data (Reference)
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
Node 1 De 0 -195 0 0 0 0 1.790 -7.000 8.790
Node 1 Df 0 -954 0 0 0 0 1.790 -7.000 8.790
Node 1 Fric 0 0 165 0 0 0 1.790 -7.000 8.790
Node 1 +Ex1 0 82 0 0 0 0 1.790 -7.000 8.790
Node 1 -Ex1 0 -82 0 0 0 0 1.790 -7.000 8.790
Node 1 +Ez1 0 0 153 328 0 0 1.790 -7.000 8.790
Node 1 -Ez1 0 0 -153 -328 0 0 1.790 -7.000 8.790
Node 2 De 0 -304 0 0 0 0 1.790 -7.000 8.790
Node 2 Df 0 -1443 0 0 0 0 1.790 -7.000 8.790
Node 2 Fric 858 0 539 0 0 0 1.790 -7.000 8.790
Node 2 +Ex1 458 0 0 0 0 0 1.790 -7.000 8.790
Node 2 -Ex1 -458 0 0 0 0 0 1.790 -7.000 8.790
Node 2 +Ez1 0 0 229 490 0 0 1.790 -7.000 8.790
Node 2 -Ez1 0 0 -229 -490 0 0 1.790 -7.000 8.790
Node 3 De 0 -195 0 0 0 0 1.790 -7.000 8.790
Node 3 Df 0 -954 0 0 0 0 1.790 -7.000 8.790
Node 3 Fric 0 0 165 0 0 0 1.790 -7.000 8.790
Node 3 +Ex1 0 -82 0 0 0 0 1.790 -7.000 8.790
Node 3 -Ex1 0 82 0 0 0 0 1.790 -7.000 8.790
Node 3 +Ez1 0 0 153 328 0 0 1.790 -7.000 8.790
Node 3 -Ez1 0 0 -153 -328 0 0 1.790 -7.000 8.790

Bottom Lever
As per Fx Fy Fz Mx My Mz U/S Base
Load case of Arm
Vendor (kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
Node 1 D=De+Df 0 -1149 0 0 0 0 1.790 -7.000 8.790
Node 1 +T 0 0 165 0 0 0 1.790 -7.000 8.790
Node 1 -T 0 0 -165 0 0 0 1.790 -7.000 8.790
Node 1 +Ex1 0 82 0 0 0 0 1.790 -7.000 8.790
Node 1 -Ex1 0 -82 0 0 0 0 1.790 -7.000 8.790
Node 1 +Ez1 0 0 153 328 0 0 1.790 -7.000 8.790
Node 1 -Ez1 0 0 -153 -328 0 0 1.790 -7.000 8.790
Node 2 D=De+Df 0 -1747 0 0 0 0 1.790 -7.000 8.790
Node 2 +T 858 0 539 0 0 0 1.790 -7.000 8.790
Node 2 -T -858 0 -539 0 0 0 1.790 -7.000 8.790
Node 2 +Ex1 458 0 0 0 0 0 1.790 -7.000 8.790
Node 2 -Ex1 -458 0 0 0 0 0 1.790 -7.000 8.790
Node 2 +Ez1 0 0 229 490 0 0 1.790 -7.000 8.790
Node 2 -Ez1 0 0 -229 -490 0 0 1.790 -7.000 8.790
Node 3 D=De+Df 0 -1149 0 0 0 0 1.790 -7.000 8.790
Node 3 +T 0 0 165 0 0 0 1.790 -7.000 8.790
Node 3 -T 0 0 -165 0 0 0 1.790 -7.000 8.790
Node 3 +Ex1 0 -82 0 0 0 0 1.790 -7.000 8.790
Node 3 -Ex1 0 82 0 0 0 0 1.790 -7.000 8.790
Node 3 +Ez1 0 0 153 328 0 0 1.790 -7.000 8.790
Node 3 -Ez1 0 0 -153 -328 0 0 1.790 -7.000 8.790
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis

+X +X
+Y

+Z +Z
+X
BOILER AXIS
SAFE AXIS DRT AXIS

Fx(Safe) Fz (DRT)
Fgrav (Safe) -Fy (DRT)
Fy(Safe) Fx (DRT)
Mx(safe) Mz(DRT)
My (Safe) Mx(DRT)
MZ (Safe) -My(DRT)
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Drain Receiving Tank Column Loading (Reference)

Node L/C Fx Fy Fgrav Mx My Mz


kN kN kN kNm kNm kNm
DRTP1 D 0 0 1149 0 0 0
DRTP1 +T 165 0 0 0 1450.35 0
DRTP1 -T -165 0 0 0 -1450.35 0
DRTP1 +Ez1 0 0 -82 0 0 0
DRTP1 -Ez1 0 0 82 0 0 0
DRTP1 +Ex1 153 0 0 0 1672.87 0
DRTP1 -Ex1 -153 0 0 0 -1672.87 0
DRTP2 D 0 0 1747 0 0 0
DRTP2 +T 539 858 0 -7541.82 4737.81 0
DRTP2 -T -539 -858 0 7541.82 -4737.81 0
DRTP2 +Ez1 0 458 0 -4025.82 0 0
DRTP2 -Ez1 0 -458 0 4025.82 0 0
DRTP2 +Ex1 229 0 0 0 2502.91 0
DRTP2 -Ex1 -229 0 0 0 -2502.91 0
DRTP3 D 0 0 1149 0 0 0
DRTP3 +T 165 0 0 0 1450.35 0
DRTP3 -T -165 0 0 0 -1450.35 0
DRTP3 +Ez1 0 0 82 0 0 0
DRTP3 -Ez1 0 0 -82 0 0 0
DRTP3 +Ex1 153 0 0 0 1672.87 0
DRTP3 -Ex1 -153 0 0 0 -1672.87 0
DRTP1 +Ez2 0 0 -82 0 0 0
DRTP1 -Ez2 0 0 82 0 0 0
DRTP1 +Ex2 153 0 0 0 1672.87 0
DRTP1 -Ex2 -153 0 0 0 -1672.87 0
DRTP2 +Ez2 0 458 0 -4025.82 0 0
DRTP2 -Ez2 0 -458 0 4025.82 0 0
DRTP2 +Ex2 229 0 0 0 2502.91 0
DRTP2 -Ex2 -229 0 0 0 -2502.91 0
DRTP3 +Ez2 0 0 82 0 0 0
DRTP3 -Ez2 0 0 -82 0 0 0
DRTP3 +Ex2 153 0 0 0 1672.87 0
DRTP3 -Ex2 -153 0 0 0 -1672.87 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
STC-1 D1 -1.0 -429.7 -13.3 0.8 0 2.3 +/-0.00 -7.000 7.000
STC-1 D2 0.1 -86.0 -3.2 0.2 0 -0.1 +/-0.00 -7.000 7.000
STC-1 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1 L 0.6 -859.9 -31.6 1.7 0 -1.1 +/-0.00 -7.000 7.000
STC-1 +Ex1 -0.1 0.0 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-1 +Ez1 0.0 0.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1 +EY1 0.0 21.6 0.7 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1 +Wx 13.1 0.0 0.0 0.0 0 -26.2 +/-0.00 -7.000 7.000
STC-1 -Wx -13.4 0.0 0.0 0.0 0 26.5 +/-0.00 -7.000 7.000
STC-1 +Wz -1.5 2.2 2.9 1.4 0 2.9 +/-0.00 -7.000 7.000
STC-1 -Wz 0.5 -2.1 -2.3 -1.0 0 -1.6 +/-0.00 -7.000 7.000
STC-2 D1 0.1 -376.2 0.7 1.0 0 -0.1 +/-0.00 -7.000 7.000
STC-2 D2 0.0 -86.0 0.2 0.3 0 -0.1 +/-0.00 -7.000 7.000
STC-2 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2 L 0.2 -860.3 2.2 2.9 0 -0.8 +/-0.00 -7.000 7.000
STC-2 +Ex1 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2 +Ez1 0.0 -0.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2 +EY1 0.0 19.8 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2 +Wx 6.4 0.0 0.0 0.0 0 -14.4 +/-0.00 -7.000 7.000
STC-2 -Wx -6.4 0.0 0.0 0.0 0 14.6 +/-0.00 -7.000 7.000
STC-2 +Wz -0.1 -2.2 0.9 0.5 0 0.3 +/-0.00 -7.000 7.000
STC-2 -Wz -0.1 2.1 -1.2 -0.7 0 0.2 +/-0.00 -7.000 7.000
STC-3 D1 9.8 -740.6 1.0 0.5 0 2.2 +/-0.00 -7.000 7.000
STC-3 D2 1.4 -92.8 -0.2 -0.1 0 0.2 +/-0.00 -7.000 7.000
STC-3 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-3 L 7.9 -495.6 -2.8 -1.6 0 0.3 +/-0.00 -7.000 7.000
STC-3 +Ex1 -0.2 4.2 -0.1 -0.1 0 0.1 +/-0.00 -7.000 7.000
STC-3 +Ez1 0.0 4.1 0.1 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-3 +EY1 -0.4 28.8 0.0 0.0 0 -0.1 +/-0.00 -7.000 7.000
STC-3 +Wx 27.5 100.4 -3.1 -1.6 0 -22.5 +/-0.00 -7.000 7.000
STC-3 -Wx -31.9 -91.8 7.3 4.1 0 24.5 +/-0.00 -7.000 7.000
STC-3 +Wz -4.4 -47.4 30.8 17.1 0 2.3 +/-0.00 -7.000 7.000
STC-3 -Wz -5.2 46.9 -30.8 -17.1 0 2.1 +/-0.00 -7.000 7.000
STC-4 D1 -5.7 -786.9 -0.6 -0.2 0 3.8 +/-0.00 -7.000 7.000
STC-4 D2 0.2 -90.4 -0.3 -0.2 0 -0.1 +/-0.00 -7.000 7.000
STC-4 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4 L 2.4 -452.4 -3.3 -1.8 0 -1.8 +/-0.00 -7.000 7.000
STC-4 +Ex1 -0.2 5.7 -0.1 -0.1 0 0.1 +/-0.00 -7.000 7.000
STC-4 +Ez1 0.0 6.2 0.1 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4 +EY1 0.0 30.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4 +Wx 59.0 280.8 -7.6 -4.3 0 -41.6 +/-0.00 -7.000 7.000
STC-4 -Wx -60.4 -272.0 2.6 1.4 0 42.4 +/-0.00 -7.000 7.000
STC-4 +Wz -7.0 38.7 31.5 17.6 0 4.9 +/-0.00 -7.000 7.000
STC-4 -Wz 2.7 -39.1 -30.9 -17.3 0 -2.2 +/-0.00 -7.000 7.000
STC-5 D1 0.1 -36.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 D2 0.0 -4.7 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
STC-5 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 L 0.1 -25.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 +Ex1 0.0 0.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 +Ez1 0.0 0.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 +EY1 0.0 1.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 +Wx 0.0 -26.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 -Wx 0.0 26.9 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 +Wz 0.0 -0.9 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5 -Wz 0.0 1.9 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 D1 -0.1 -37.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 D2 0.0 -4.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 L -0.1 -18.6 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 +Ex1 0.0 -0.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 +Ez1 0.0 0.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 +EY1 0.0 1.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 +Wx 0.0 28.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 -Wx 0.0 -27.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 +Wz 0.0 -0.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6 -Wz 0.0 1.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7 D1 -9.8 -738.9 1.6 -0.2 0 -2.7 +/-0.00 -7.000 7.000
STC-7 D2 -1.0 -87.8 -0.3 -0.5 0 -0.4 +/-0.00 -7.000 7.000
STC-7 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7 L -4.2 -443.9 -3.7 -5.4 0 -2.8 +/-0.00 -7.000 7.000
STC-7 +Ex1 -0.2 -4.9 0.1 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-7 +Ez1 0.1 4.8 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7 +EY1 0.4 28.3 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-7 +Wx 32.3 -63.7 -4.1 -2.3 0 -24.5 +/-0.00 -7.000 7.000
STC-7 -Wx -27.8 71.7 7.5 4.4 0 22.4 +/-0.00 -7.000 7.000
STC-7 +Wz 4.6 -27.1 22.3 12.3 0 -2.3 +/-0.00 -7.000 7.000
STC-7 -Wz 5.1 26.5 -22.4 -12.4 0 -2.3 +/-0.00 -7.000 7.000
STC-8 D1 -3.2 -738.9 -0.5 0.2 0 2.8 +/-0.00 -7.000 7.000
STC-8 D2 0.4 -86.0 -0.4 -0.1 0 -0.2 +/-0.00 -7.000 7.000
STC-8 D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8 L 3.4 -408.3 -3.9 -1.2 0 -2.3 +/-0.00 -7.000 7.000
STC-8 +Ex1 -0.2 -8.0 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-8 +Ez1 0.0 7.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8 +EY1 -0.1 28.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8 +Wx 61.9 -315.6 -8.1 -4.7 0 -44.6 +/-0.00 -7.000 7.000
STC-8 -Wx -59.2 320.5 4.2 2.3 0 42.8 +/-0.00 -7.000 7.000
STC-8 +Wz -2.6 67.4 22.5 12.3 0 2.2 +/-0.00 -7.000 7.000
STC-8 -Wz 7.4 -66.7 -22.5 -12.3 0 -5.3 +/-0.00 -7.000 7.000
STC-1A D1 -1.0 -429.2 -13.2 0.8 0 2.2 +/-0.00 -7.000 7.000
STC-1A D2 0.0 -85.7 -3.1 0.2 0 -0.1 +/-0.00 -7.000 7.000
STC-1A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1A L 0.5 -857.3 -31.4 1.7 0 -0.9 +/-0.00 -7.000 7.000
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
STC-1A +Ex1 -0.1 0.0 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-1A +Ez1 0.0 0.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1A +EY1 0.0 15.1 0.5 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-1A +Wx 12.4 0.0 0.0 0.0 0 -25.2 +/-0.00 -7.000 7.000
STC-1A -Wx -12.7 0.0 0.0 0.0 0 25.5 +/-0.00 -7.000 7.000
STC-1A +Wz -1.2 2.2 2.9 1.4 0 2.4 +/-0.00 -7.000 7.000
STC-1A -Wz 0.3 -2.1 -2.3 -1.0 0 -1.2 +/-0.00 -7.000 7.000
STC-2A D1 0.1 -375.7 0.7 1.0 0 -0.1 +/-0.00 -7.000 7.000
STC-2A D2 0.0 -85.7 0.2 0.3 0 -0.1 +/-0.00 -7.000 7.000
STC-2A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2A L 0.3 -857.0 2.2 2.9 0 -0.8 +/-0.00 -7.000 7.000
STC-2A +Ex1 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2A +Ez1 0.0 -0.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2A +EY1 0.0 13.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-2A +Wx 6.4 0.0 0.0 0.0 0 -14.6 +/-0.00 -7.000 7.000
STC-2A -Wx -6.5 0.0 0.0 0.0 0 14.8 +/-0.00 -7.000 7.000
STC-2A +Wz -0.1 -2.2 0.9 0.5 0 0.2 +/-0.00 -7.000 7.000
STC-2A -Wz -0.1 2.1 -1.3 -0.7 0 0.1 +/-0.00 -7.000 7.000
STC-3A D1 9.5 -731.9 1.1 0.5 0 2.2 +/-0.00 -7.000 7.000
STC-3A D2 1.3 -87.7 -0.2 -0.1 0 0.1 +/-0.00 -7.000 7.000
STC-3A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-3A L 7.5 -462.8 -2.5 -1.4 0 0.1 +/-0.00 -7.000 7.000
STC-3A +Ex1 -0.1 2.2 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-3A +Ez1 -0.1 4.9 0.1 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-3A +EY1 -0.3 25.3 0.0 0.0 0 -0.1 +/-0.00 -7.000 7.000
STC-3A +Wx 28.0 95.7 -3.5 -1.9 0 -22.7 +/-0.00 -7.000 7.000
STC-3A -Wx -32.3 -95.1 7.0 3.9 0 24.7 +/-0.00 -7.000 7.000
STC-3A +Wz -4.5 -35.4 21.7 12.1 0 2.3 +/-0.00 -7.000 7.000
STC-3A -Wz -5.0 34.9 -21.5 -11.9 0 2.1 +/-0.00 -7.000 7.000
STC-4A D1 -5.4 -779.3 -0.5 -0.2 0 3.7 +/-0.00 -7.000 7.000
STC-4A D2 0.1 -85.7 -0.3 -0.2 0 -0.1 +/-0.00 -7.000 7.000
STC-4A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4A L 1.7 -426.1 -2.9 -1.6 0 -1.4 +/-0.00 -7.000 7.000
STC-4A +Ex1 -0.2 2.3 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-4A +Ez1 0.0 6.7 0.1 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4A +EY1 0.0 26.8 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-4A +Wx 53.5 273.8 -7.2 -4.1 0 -39.0 +/-0.00 -7.000 7.000
STC-4A -Wx -54.8 -273.4 3.1 1.6 0 39.8 +/-0.00 -7.000 7.000
STC-4A +Wz -5.5 22.0 22.1 12.4 0 3.9 +/-0.00 -7.000 7.000
STC-4A -Wz 1.6 -22.1 -21.7 -12.1 0 -1.5 +/-0.00 -7.000 7.000
STC-5A D1 0.1 -36.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A D2 0.0 -4.5 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A L 0.1 -24.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A +Ex1 0.0 0.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A +Ez1 0.0 0.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
STC-5A +EY1 0.0 1.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A +Wx 0.0 -25.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A -Wx 0.0 25.8 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A +Wz 0.0 -0.6 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-5A -Wz 0.0 1.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A D1 -0.1 -37.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
STC-6A D2 0.0 -4.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A L -0.1 -18.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A +Ex1 0.0 -0.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A +Ez1 0.0 0.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A +EY1 0.0 1.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A +Wx 0.0 27.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A -Wx 0.0 -26.8 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A +Wz 0.0 -0.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-6A -Wz 0.0 1.4 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7A D1 -9.6 -731.2 1.7 -0.1 0 -2.6 +/-0.00 -7.000 7.000
STC-7A D2 -1.0 -83.9 -0.3 -0.5 0 -0.4 +/-0.00 -7.000 7.000
STC-7A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7A L -3.8 -424.1 -3.4 -4.9 0 -2.8 +/-0.00 -7.000 7.000
STC-7A +Ex1 -0.1 -3.0 0.1 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-7A +Ez1 0.1 5.3 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-7A +EY1 0.3 25.2 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-7A +Wx 32.7 -66.2 -4.6 -2.6 0 -24.6 +/-0.00 -7.000 7.000
STC-7A -Wx -28.4 66.1 7.4 4.3 0 22.6 +/-0.00 -7.000 7.000
STC-7A +Wz 4.5 -24.3 18.4 10.2 0 -2.2 +/-0.00 -7.000 7.000
STC-7A -Wz 5.1 23.8 -18.6 -10.2 0 -2.3 +/-0.00 -7.000 7.000
STC-8A D1 -2.8 -727.3 -0.5 0.2 0 2.7 +/-0.00 -7.000 7.000
STC-8A D2 0.3 -82.1 -0.4 -0.1 0 -0.2 +/-0.00 -7.000 7.000
STC-8A D3 0.0 0.0 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8A L 2.9 -389.9 -3.6 -1.1 0 -1.9 +/-0.00 -7.000 7.000
STC-8A +Ex1 -0.2 -4.4 0.0 0.0 0 0.1 +/-0.00 -7.000 7.000
STC-8A +Ez1 0.0 7.2 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8A +EY1 -0.1 25.1 0.0 0.0 0 0.0 +/-0.00 -7.000 7.000
STC-8A +Wx 56.0 -317.6 -7.9 -4.6 0 -41.7 +/-0.00 -7.000 7.000
STC-8A -Wx -53.6 314.6 4.8 2.6 0 40.1 +/-0.00 -7.000 7.000
STC-8A +Wz -1.5 54.1 18.6 10.2 0 1.5 +/-0.00 -7.000 7.000
STC-8A -Wz 5.9 -53.4 -18.6 -10.2 0 -4.3 +/-0.00 -7.000 7.000

+X +Y

+Z +X
BOILER AXIS SAFE AXIS

Fx(Safe) Fx (Boiler)
Fgrav (Safe) -Fy(Boiler)
Fy(Safe) -Fz(Boiler)
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Input Load Data
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
Mx(safe) Mx(Boiler)+FZ*H
My (Safe) -Mz(Boiler)+Fx*H
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)


STC-1 D -1 16 516 116 7 0
STC-1 L 1 32 860 223 -4 0
STC-1 +Ex1 0 0 0 0 0 0
STC-1 +Ez1 0 0 0 0 0 0
STC-1 +EY1 0 -1 -22 -5 0 0
STC-1 +Wx 13 0 0 0 -92 0
STC-1 -Wx -13 0 0 0 94 0
STC-1 +Wz -1 -3 -2 -19 10 0
STC-1 -Wz 0 2 2 15 -3 0
STC-2 D 0 -1 462 -5 -1 0
STC-2 L 0 -2 860 -12 -2 0
STC-2 +Ex1 0 0 0 0 0 0
STC-2 +Ez1 0 0 0 0 0 0
STC-2 +EY1 0 0 -20 0 0 0
STC-2 +Wx 6 0 0 0 -45 0
STC-2 -Wx -6 0 0 0 45 0
STC-2 +Wz 0 -1 2 -6 1 0
STC-2 -Wz 0 1 -2 8 1 0
STC-3 D 11 -1 833 -5 -78 0
STC-3 L 8 3 496 18 -55 0
STC-3 +Ex1 0 0 -4 1 1 0
STC-3 +Ez1 0 0 -4 0 0 0
STC-3 +EY1 0 0 -29 0 3 0
STC-3 +Wx 27 3 -100 20 -192 0
STC-3 -Wx -32 -7 92 -47 223 0
STC-3 +Wz -4 -31 47 -199 31 0
STC-3 -Wz -5 31 -47 199 36 0
STC-4 D -6 1 877 6 39 0
STC-4 L 2 3 452 21 -17 0
STC-4 +Ex1 0 0 -6 1 1 0
STC-4 +Ez1 0 0 -6 0 0 0
STC-4 +EY1 0 0 -30 0 0 0
STC-4 +Wx 59 8 -281 49 -413 0
STC-4 -Wx -60 -3 272 -17 423 0
STC-4 +Wz -7 -31 -39 -203 49 0
STC-4 -Wz 3 31 39 199 -19 0
STC-5 D 0 0 41 0 -1 0
STC-5 L 0 0 25 0 -1 0
STC-5 +Ex1 0 0 0 0 0 0
STC-5 +Ez1 0 0 0 0 0 0
STC-5 +EY1 0 0 -1 0 0 0
STC-5 +Wx 0 0 26 0 0 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)


STC-5 -Wx 0 0 -27 0 0 0
STC-5 +Wz 0 0 1 0 0 0
STC-5 -Wz 0 0 -2 0 0 0
STC-6 D 0 0 41 0 1 0
STC-6 L 0 0 19 0 0 0
STC-6 +Ex1 0 0 0 0 0 0
STC-6 +Ez1 0 0 0 0 0 0
STC-6 +EY1 0 0 -1 0 0 0
STC-6 +Wx 0 0 -28 0 0 0
STC-6 -Wx 0 0 27 0 0 0
STC-6 +Wz 0 0 0 0 0 0
STC-6 -Wz 0 0 -1 0 0 0
STC-7 D -11 -1 827 -10 76 0
STC-7 L -4 4 444 20 30 0
STC-7 +Ex1 0 0 5 0 1 0
STC-7 +Ez1 0 0 -5 0 -1 0
STC-7 +EY1 0 0 -28 0 -3 0
STC-7 +Wx 32 4 64 26 -226 0
STC-7 -Wx -28 -7 -72 -48 195 0
STC-7 +Wz 5 -22 27 -144 -32 0
STC-7 -Wz 5 22 -26 145 -36 0
STC-8 D -3 1 825 7 20 0
STC-8 L 3 4 408 26 -23 0
STC-8 +Ex1 0 0 8 0 1 0
STC-8 +Ez1 0 0 -7 0 0 0
STC-8 +EY1 0 0 -28 0 1 0
STC-8 +Wx 62 8 316 52 -433 0
STC-8 -Wx -59 -4 -320 -27 414 0
STC-8 +Wz -3 -23 -67 -145 18 0
STC-8 -Wz 7 23 67 145 -52 0
STC-1A D -1 16 515 116 6 0
STC-1A L 0 31 857 222 -3 0
STC-1A +Ex1 0 0 0 0 0 0
STC-1A +Ez1 0 0 0 0 0 0
STC-1A +EY1 0 0 -15 -3 0 0
STC-1A +Wx 12 0 0 0 -87 0
STC-1A -Wx -13 0 0 0 89 0
STC-1A +Wz -1 -3 -2 -19 8 0
STC-1A -Wz 0 2 2 15 -2 0
STC-2A D 0 -1 461 -5 -1 0
STC-2A L 0 -2 857 -12 -2 0
STC-2A +Ex1 0 0 0 0 0 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)


STC-2A +Ez1 0 0 0 0 0 0
STC-2A +EY1 0 0 -13 0 0 0
STC-2A +Wx 6 0 0 0 -45 0
STC-2A -Wx -6 0 0 0 45 0
STC-2A +Wz 0 -1 2 -6 1 0
STC-2A -Wz 0 1 -2 8 0 0
STC-3A D 11 -1 820 -6 -76 0
STC-3A L 8 2 463 16 -53 0
STC-3A +Ex1 0 0 -2 0 1 0
STC-3A +Ez1 0 0 -5 0 0 0
STC-3A +EY1 0 0 -25 0 2 0
STC-3A +Wx 28 4 -96 23 -196 0
STC-3A -Wx -32 -7 95 -45 226 0
STC-3A +Wz -4 -22 35 -140 31 0
STC-3A -Wz -5 21 -35 139 35 0
STC-4A D -5 1 865 5 37 0
STC-4A L 2 3 426 19 -12 0
STC-4A +Ex1 0 0 -2 0 1 0
STC-4A +Ez1 0 0 -7 0 0 0
STC-4A +EY1 0 0 -27 0 0 0
STC-4A +Wx 54 7 -274 47 -375 0
STC-4A -Wx -55 -3 273 -20 384 0
STC-4A +Wz -6 -22 -22 -142 39 0
STC-4A -Wz 2 22 22 139 -12 0
STC-5A D 0 0 41 0 -1 0
STC-5A L 0 0 24 0 -1 0
STC-5A +Ex1 0 0 0 0 0 0
STC-5A +Ez1 0 0 0 0 0 0
STC-5A +EY1 0 0 -1 0 0 0
STC-5A +Wx 0 0 25 0 0 0
STC-5A -Wx 0 0 -26 0 0 0
STC-5A +Wz 0 0 1 0 0 0
STC-5A -Wz 0 0 -1 0 0 0
STC-6A D 0 0 41 0 1 0
STC-6A L 0 0 18 0 0 0
STC-6A +Ex1 0 0 0 0 0 0
STC-6A +Ez1 0 0 0 0 0 0
STC-6A +EY1 0 0 -1 0 0 0
STC-6A +Wx 0 0 -27 0 0 0
STC-6A -Wx 0 0 27 0 0 0
STC-6A +Wz 0 0 0 0 0 0
STC-6A -Wz 0 0 -1 0 0 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)


STC-7A D -11 -1 815 -10 74 0
STC-7A L -4 3 424 19 27 0
STC-7A +Ex1 0 0 3 0 1 0
STC-7A +Ez1 0 0 -5 0 -1 0
STC-7A +EY1 0 0 -25 0 -2 0
STC-7A +Wx 33 5 66 29 -229 0
STC-7A -Wx -28 -7 -66 -47 199 0
STC-7A +Wz 4 -18 24 -119 -31 0
STC-7A -Wz 5 19 -24 120 -36 0
STC-8A D -2 1 809 6 17 0
STC-8A L 3 4 390 24 -20 0
STC-8A +Ex1 0 0 4 0 1 0
STC-8A +Ez1 0 0 -7 0 0 0
STC-8A +EY1 0 0 -25 0 0 0
STC-8A +Wx 56 8 318 51 -392 0
STC-8A -Wx -54 -5 -315 -31 375 0
STC-8A +Wz -1 -19 -54 -120 10 0
STC-8A -Wz 6 19 53 120 -41 0
STC-1 +Ex2 0 0 0 0 0 0
STC-1 +Ez2 0 0 0 0 0 0
STC-1 +EY2 0 -1 -22 -5 0 0
STC-2 +Ex2 0 0 0 0 0 0
STC-2 +Ez2 0 0 0 0 0 0
STC-2 +EY2 0 0 -20 0 0 0
STC-3 +Ex2 0 0 -4 1 1 0
STC-3 +Ez2 0 0 -4 0 0 0
STC-3 +EY2 0 0 -29 0 3 0
STC-4 +Ex2 0 0 -6 1 1 0
STC-4 +Ez2 0 0 -6 0 0 0
STC-4 +EY2 0 0 -30 0 0 0
STC-5 +Ex2 0 0 0 0 0 0
STC-5 +Ez2 0 0 0 0 0 0
STC-5 +EY2 0 0 -1 0 0 0
STC-6 +Ex2 0 0 0 0 0 0
STC-6 +Ez2 0 0 0 0 0 0
STC-6 +EY2 0 0 -1 0 0 0
STC-7 +Ex2 0 0 5 0 1 0
STC-7 +Ez2 0 0 -5 0 -1 0
STC-7 +EY2 0 0 -28 0 -3 0
STC-8 +Ex2 0 0 8 0 1 0
STC-8 +Ez2 0 0 -7 0 0 0
STC-8 +EY2 0 0 -28 0 1 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Staircase Column Loading

Node L/C Fx (kN) Fy (kN) Fgrav (kN) Mx (kNm) My (kNm) Mz (kNm)


STC-1A +Ex2 0 0 0 0 0 0
STC-1A +Ez2 0 0 0 0 0 0
STC-1A +EY2 0 0 -15 -3 0 0
STC-2A +Ex2 0 0 0 0 0 0
STC-2A +Ez2 0 0 0 0 0 0
STC-2A +EY2 0 0 -13 0 0 0
STC-3A +Ex2 0 0 -2 0 1 0
STC-3A +Ez2 0 0 -5 0 0 0
STC-3A +EY2 0 0 -25 0 2 0
STC-4A +Ex2 0 0 -2 0 1 0
STC-4A +Ez2 0 0 -7 0 0 0
STC-4A +EY2 0 0 -27 0 0 0
STC-4A +Ex2 0 0 -2 0 1 0
STC-4A +Ez2 0 0 -7 0 0 0
STC-4A +EY2 0 0 -27 0 0 0
STC-5A +Ex2 0 0 0 0 0 0
STC-5A +Ez2 0 0 0 0 0 0
STC-5A +EY2 0 0 -1 0 0 0
STC-6A +Ex2 0 0 0 0 0 0
STC-6A +Ez2 0 0 0 0 0 0
STC-6A +EY2 0 0 -1 0 0 0
STC-7A +Ex2 0 0 3 0 1 0
STC-7A +Ez2 0 0 -5 0 -1 0
STC-7A +EY2 0 0 -25 0 -2 0
STC-8A +Ex2 0 0 4 0 1 0
STC-8A +Ez2 0 0 -7 0 0 0
STC-8A +EY2 0 0 -25 0 0 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Atmosphearic Flush Tank Column Input Load Data (Reference)
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
2 D 0 -41.02 0 0 0 0 +/-0.00 -7 7
2 WW 0 -82.05 0 0 0 0 +/-0.00 -7 7
2 SL -0.94 15.21 -2.06 -11.37 0 7.65 +/-0.00 -7 7
2 OPL 20.81 -33.21 -5.25 5.83 0 -92.56 +/-0.00 -7 7
2 OCL 4.73 -17.8 -2.58 -5.38 0 -18.97 +/-0.00 -7 7
2 W (+)X 1.84 -3.1 1.04 7.75 0 -10.42 +/-0.00 -7 7
2 W(-)X -1.84 3.1 -1.04 -7.75 0 10.42 +/-0.00 -7 7
2 W(+)Z 1.04 3.1 1.84 10.42 0 -7.75 +/-0.00 -7 7
2 W(-)Z -1.04 -3.1 -1.84 -10.42 0 7.75 +/-0.00 -7 7
2 EQX 24.38 -38.57 13.74 102.85 0 -138.27 +/-0.00 -7 7
2 EQZ 13.74 38.57 24.38 138.27 0 -102.85 +/-0.00 -7 7
3 D 0 -41.02 0 0 0 0 +/-0.00 -7 7
3 WW 0 -82.05 0 0 0 0 +/-0.00 -7 7
3 SL -0.81 -37.58 -1.93 -10.55 0 6.82 +/-0.00 -7 7
3 OPL 41.81 38.5 15.75 138.7 0 -225.42 +/-0.00 -7 7
3 OCL -1.45 17.87 -8.77 -44.49 0 20.14 +/-0.00 -7 7
3 W (+)X 1.84 3.1 1.04 7.75 0 -10.42 +/-0.00 -7 7
3 W(-)X -1.84 -3.1 -1.04 -7.75 0 10.42 +/-0.00 -7 7
3 W(+)Z 1.04 -3.1 1.84 10.42 0 -7.75 +/-0.00 -7 7
3 W(-)Z -1.04 3.1 -1.84 -10.42 0 7.75 +/-0.00 -7 7
3 EQX 24.38 38.57 13.74 102.85 0 -138.27 +/-0.00 -7 7
3 EQZ 13.74 -38.57 24.38 138.27 0 -102.85 +/-0.00 -7 7
4 D 0 -41.02 0 0 0 0 +/-0.00 -7 7
4 WW 0 -82.05 0 0 0 0 +/-0.00 -7 7
4 SL 1.51 -31.28 -1.51 -11.24 0 -11.24 +/-0.00 -7 7
4 OPL 44.13 -77.65 -44.13 -318.32 0 -318.32 +/-0.00 -7 7
4 OCL 6.35 4.84 -6.35 -51.15 0 -51.15 +/-0.00 -7 7
4 W (+)X 1.04 -3.1 -1.04 -7.75 0 -7.75 +/-0.00 -7 7
4 W(-)X -1.04 3.1 1.04 7.75 0 7.75 +/-0.00 -7 7
4 W(+)Z -1.04 -3.1 1.04 7.75 0 7.75 +/-0.00 -7 7
4 W(-)Z 1.04 3.1 -1.04 -7.75 0 -7.75 +/-0.00 -7 7
4 EQX 13.74 -38.6 -13.74 -102.88 0 -102.88 +/-0.00 -7 7
4 EQZ -13.74 -38.6 13.74 102.88 0 102.88 +/-0.00 -7 7
5 D 0 -41.02 0 0 0 0 +/-0.00 -7 7
5 WW 0 -82.05 0 0 0 0 +/-0.00 -7 7
5 SL 1.38 8.91 -1.38 -10.41 0 -10.41 +/-0.00 -7 7
5 OPL 23.13 82.83 -23.13 -185.45 0 -185.45 +/-0.00 -7 7
5 OCL 12.53 -4.77 -12.53 -90.27 0 -90.27 +/-0.00 -7 7
5 W (+)X 1.04 3.1 -1.04 -7.75 0 -7.75 +/-0.00 -7 7
5 W(-)X -1.04 -3.1 1.04 7.75 0 7.75 +/-0.00 -7 7
5 W(+)Z -1.04 3.1 1.04 7.75 0 7.75 +/-0.00 -7 7
5 W(-)Z 1.04 -3.1 -1.04 -7.75 0 -7.75 +/-0.00 -7 7
5 EQX 13.74 38.6 -13.74 -102.88 0 -102.88 +/-0.00 -7 7
5 EQZ -13.74 38.6 13.74 102.88 0 102.88 +/-0.00 -7 7
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Atmosphearic Flush Tank Column Input Load Data (Reference)
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)

+X +X
+Y

+Z +Z
+X
BOILER AXIS
SAFE AXIS DRT AXIS

Fx(Safe) Fz (DRT)
Fgrav (Safe) -Fy (DRT)
Fy(Safe) Fx (DRT)
Mx(safe) Mz(DRT)
My (Safe) Mx(DRT)
MZ (Safe) -My(DRT)
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Atmosphearic Flush Tank Column Loading (Reference)
Node L/C Fx Fy Fgrav Mx My Mz
kN kN kN kNm kNm kNm
ATM-2 D -7.31 19.87 141.07 -224 -56.71 -84.91
ATM-2 L -2.58 4.73 17.8 -52.08 -23.44 -18.97
ATM-2 +Ez1 13.74 24.38 38.57 -308.93 199.03 -138.27
ATM-2 -Ez1 -13.74 -24.38 -38.57 308.93 -199.03 138.27
ATM-2 +Ex1 24.38 13.74 -38.57 -199.03 308.93 -102.85
ATM-2 -Ex1 -24.38 -13.74 38.57 199.03 -308.93 102.85
ATM-2 +Wz 1.04 1.84 3.1 -23.3 15.03 -10.42
ATM-2 -Wz -1.04 -1.84 -3.1 23.3 -15.03 10.42
ATM-2 +Wx 1.84 1.04 -3.1 -15.03 23.3 -7.75
ATM-2 -Wx -1.84 -1.04 3.1 15.03 -23.3 7.75
ATM-3 D 13.82 41 122.15 -505.6 224.89 -218.6
ATM-3 D 13.82 41 122.15 -505.6 224.89 -218.6
ATM-3 L -8.77 -1.45 -17.87 30.29 -105.88 20.14
ATM-3 +Ez1 13.74 24.38 -38.57 -308.93 199.03 -138.27
ATM-3 -Ez1 -13.74 -24.38 38.57 308.93 -199.03 138.27
ATM-3 +Ex1 24.38 13.74 38.57 -199.03 308.93 -102.85
ATM-3 -Ex1 -24.38 -13.74 -38.57 199.03 -308.93 102.85
ATM-3 +Wz 1.04 1.84 -3.1 -23.3 15.03 -10.42
ATM-3 -Wz -1.04 -1.84 3.1 23.3 -15.03 10.42
ATM-3 +Wx 1.84 1.04 3.1 -15.03 23.3 -7.75
ATM-3 -Wx -1.84 -1.04 -3.1 15.03 -23.3 7.75
ATM-4 D -45.64 45.64 232 -649.04 -649.04 -329.56
ATM-4 L -6.35 6.35 -4.84 -95.6 -95.6 -51.15
ATM-4 +Ez1 -13.74 13.74 38.6 -199.06 -199.06 -102.88
ATM-4 -Ez1 13.74 -13.74 -38.6 199.06 199.06 102.88
ATM-4 +Ex1 13.74 -13.74 38.6 199.06 199.06 102.88
ATM-4 -Ex1 -13.74 13.74 -38.6 -199.06 -199.06 -102.88
ATM-4 +Wz -1.04 1.04 3.1 -15.03 -15.03 -7.75
ATM-4 -Wz 1.04 -1.04 -3.1 15.03 15.03 7.75
ATM-4 +Wx 1.04 -1.04 3.1 15.03 15.03 7.75
ATM-4 -Wx -1.04 1.04 -3.1 -15.03 -15.03 -7.75
ATM-5 D -24.51 24.51 31.33 -367.43 -367.43 -195.86
ATM-5 L -12.53 12.53 4.77 -177.98 -177.98 -90.27
ATM-5 +Ez1 -13.74 13.74 -38.6 -199.06 -199.06 -102.88
ATM-5 -Ez1 13.74 -13.74 38.6 199.06 199.06 102.88
ATM-5 +Ex1 13.74 -13.74 -38.6 199.06 199.06 102.88
ATM-5 -Ex1 -13.74 13.74 38.6 -199.06 -199.06 -102.88
ATM-5 +Wz -1.04 1.04 -3.1 -15.03 -15.03 -7.75
ATM-5 -Wz 1.04 -1.04 3.1 15.03 15.03 7.75
ATM-5 +Wx 1.04 -1.04 -3.1 15.03 15.03 7.75
ATM-5 -Wx -1.04 1.04 3.1 -15.03 -15.03 -7.75
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Atmosphearic Flush Tank Column Loading (Reference)
Node L/C Fx Fy Fgrav Mx My Mz
kN kN kN kNm kNm kNm
ATM-2 +Ez2 13.74 24.38 38.57 -308.93 199.03 -138.27
ATM-2 -Ez2 -13.74 -24.38 -38.57 308.93 -199.03 138.27
ATM-2 +Ex2 24.38 13.74 -38.57 -199.03 308.93 -102.85
ATM-2 -Ex2 -24.38 -13.74 38.57 199.03 -308.93 102.85
ATM-3 +Ez2 13.74 24.38 -38.57 -308.93 199.03 -138.27
ATM-3 -Ez2 -13.74 -24.38 38.57 308.93 -199.03 138.27
ATM-3 +Ex2 24.38 13.74 38.57 -199.03 308.93 -102.85
ATM-3 -Ex2 -24.38 -13.74 -38.57 199.03 -308.93 102.85
ATM-4 +Ez2 -13.74 13.74 38.6 -199.06 -199.06 -102.88
ATM-4 -Ez2 13.74 -13.74 -38.6 199.06 199.06 102.88
ATM-4 +Ex2 13.74 -13.74 38.6 199.06 199.06 102.88
ATM-4 -Ex2 -13.74 13.74 -38.6 -199.06 -199.06 -102.88
ATM-5 +Ez2 -13.74 13.74 -38.6 -199.06 -199.06 -102.88
ATM-5 -Ez2 13.74 -13.74 38.6 199.06 199.06 102.88
ATM-5 +Ex2 13.74 -13.74 -38.6 199.06 199.06 102.88
ATM-5 -Ex2 -13.74 13.74 38.6 -199.06 -199.06 -102.88
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Air Receiver Tank Column Loading (Reference)
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)

1 Empty Weight 0 -82 0 0 0 0 +/-0.00 -7 7


Flooded
1 Weight 0 -400 0 0 0 0 +/-0.00 -7 7
1 +EQX 152 71 0 0 0 0 +/-0.00 -7 7
1 -EQX -152 -71 0 0 0 0 +/-0.00 -7 7
1 +EQZ 0 0 76 171 0 0 +/-0.00 -7 7
1 -EQZ 0 0 -76 -171 0 0 +/-0.00 -7 7
1 W(+)X 18 9 0 0 0 0 +/-0.00 -7 7
1 W(-)X -18 -9 0 0 0 0 +/-0.00 -7 7
1 W(+)Z 0 0 22 48 0 0 +/-0.00 -7 7
1 W(-)Z 0 0 -22 -48 0 0 +/-0.00 -7 7
1 Friction+ 284 0 142 0 0 0 +/-0.00 -7 7
1 Friction- -284 0 -142 0 0 0 +/-0.00 -7 7

2 Empty Weight 0 -82 0 0 0 0 +/-0.00 -7 7


Flooded
2 Weight 0 -400 0 0 0 0 +/-0.00 -7 7
2 +EQX 0 -71 0 0 0 0 +/-0.00 -7 7
2 -EQX 0 71 0 0 0 0 +/-0.00 -7 7
2 +EQZ 0 0 76 171 0 0 +/-0.00 -7 7
2 -EQZ 0 0 -76 -171 0 0 +/-0.00 -7 7
2 W(+)X 0 -9 0 0 0 0 +/-0.00 -7 7
2 W(-)X 0 9 0 0 0 0 +/-0.00 -7 7
2 W(+)Z 0 0 22 48 0 +/-0.00 -7 7
2 W(-)Z 0 0 -22 -48 0 0 +/-0.00 -7 7
2 Friction+ 0 0 142 0 0 0 +/-0.00 -7 7
2 Friction- 0 0 -142 0 0 0 +/-0.00 -7 7
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Air Receiver Tank Column Loading (Reference)
Bottom Lever
Fx Fy Fz Mx My Mz U/S Base
Node Load case of Arm
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Plate
Pilecap H (m)
1 D 0 -482 0 0 0 0 +/-0.00 -7 7
1 +Ex1 152 71 0 0 0 0 +/-0.00 -7 7
1 -Ex1 -152 -71 0 0 0 0 +/-0.00 -7 7
1 +Ez1 0 0 76 171 0 0 +/-0.00 -7 7
1 -Ez1 0 0 -76 -171 0 0 +/-0.00 -7 7
1 W (+)X 18 9 0 0 0 0 +/-0.00 -7 7
1 W(-)X -18 -9 0 0 0 0 +/-0.00 -7 7
1 W(+)Z 0 0 22 48 0 0 +/-0.00 -7 7
1 W(-)Z 0 0 -22 -48 0 0 +/-0.00 -7 7
1 +T 284 0 142 0 0 0 +/-0.00 -7 7
1 -T -284 0 -142 0 0 0 +/-0.00 -7 7
1 D 0 -482 0 0 0 0 +/-0.00 -7 7
2 +Ex1 0 -71 0 0 0 0 +/-0.00 -7 7
2 -Ex1 0 71 0 0 0 0 +/-0.00 -7 7
2 +Ez1 0 0 76 171 0 0 +/-0.00 -7 7
2 -Ez1 0 0 -76 -171 0 0 +/-0.00 -7 7
2 W (+)X 0 -9 0 0 0 0 +/-0.00 -7 7
2 W(-)X 0 9 0 0 0 0 +/-0.00 -7 7
2 W(+)Z 0 0 22 48 0 0 +/-0.00 -7 7
2 W(-)Z 0 0 -22 -48 0 0 +/-0.00 -7 7
2 +T 0 0 142 0 0 0 +/-0.00 -7 7
2 -T 0 0 -142 0 0 0 +/-0.00 -7 7

+X +X
+Y

+Z +Z
+X
BOILER AXIS
SAFE AXIS ART AXIS

Fx(Safe) Fz (DRT)
Fgrav (Safe) -Fy (DRT)
Fy(Safe) Fx (DRT)
Mx(safe) Mz(DRT)
My (Safe) Mx(DRT)
MZ (Safe) -My(DRT)
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Air Receiver Tank Column Loading (Reference)
Node L/C Fx Fy Fgrav Mx My Mz
kN kN kN kNm kNm kNm
ART-1 D 0 0 482 0 0 0
ART-1 +Ez1 0 152 -71 -1064 0 0
ART-1 -Ez1 0 -152 71 1064 0 0
ART-1 +Ex1 76 0 0 0 703 0
ART-1 -Ex1 -76 0 0 0 -703 0
ART-1 +Wz 0 18 -9 -126 0 0
ART-1 -Wz 0 -18 9 126 0 0
ART-1 +Wx 22 0 0 0 202 0
ART-1 -Wx -22 0 0 0 -202 0
ART-1 +T 142 284 0 -1988 994 0
ART-1 -T -142 -284 0 1988 -994 0
ART-2 D 0 0 482 0 0 0
ART-2 +Ez1 0 0 71 0 0 0
ART-2 -Ez1 0 0 -71 0 0 0
ART-2 +Ex1 76 0 0 0 703 0
ART-2 -Ex1 -76 0 0 0 -703 0
ART-2 +Wz 0 0 9 0 0 0
ART-2 -Wz 0 0 -9 0 0 0
ART-2 +Wx 22 0 0 0 202 0
ART-2 -Wx -22 0 0 0 -202 0
ART-2 +T 142 0 0 0 994 0
ART-2 -T -142 0 0 0 -994 0
ART-1A D 0 0 482 0 0 0
ART-1A +Ez1 0 152 -71 -1064 0 0
ART-1A -Ez1 0 -152 71 1064 0 0
ART-1A +Ex1 76 0 0 0 703 0
ART-1A -Ex1 -76 0 0 0 -703 0
ART-1A +Wz 0 18 -9 -126 0 0
ART-1A -Wz 0 -18 9 126 0 0
ART-1A +Wx 22 0 0 0 202 0
ART-1A -Wx -22 0 0 0 -202 0
ART-1A +T 142 284 0 -1988 994 0
ART-1A -T -142 -284 0 1988 -994 0
ART-2A D 0 0 482 0 0 0
ART-2A +Ez1 0 0 71 0 0 0
ART-2A -Ez1 0 0 -71 0 0 0
ART-2A +Ex1 76 0 0 0 703 0
ART-2A -Ex1 -76 0 0 0 -703 0
ART-2A +Wz 0 0 9 0 0 0
ART-2A -Wz 0 0 -9 0 0 0
ART-2A +Wx 22 0 0 0 202 0
THDC INDIA LIMITED
(A JV OF GOVT. OF INDIA & GOVT. OF U.P)
KHURJA SUER THERMAL POWER PROJECT
(2×660 MW) L&T-S&L LIMITED
Boiler Foundation (Unit#1 and Unit#2) - Analysis and Design of
Foundation Rev:00

Job No.: 11015Z Document No.: 9915-370-301-PVC-U-001A


Attachment C : Load input to SAFE for combined Pile Group Analysis
Air Receiver Tank Column Loading (Reference)
Node L/C Fx Fy Fgrav Mx My Mz
kN kN kN kNm kNm kNm
ART-2A -Wx -22 0 0 0 -202 0
ART-2A +T 142 0 0 0 994 0
ART-2A -T -142 0 0 0 -994 0
ART-1 +Ez2 0 152 -71 -1064 0 0
ART-1 -Ez2 0 -152 71 1064 0 0
ART-1 +Ex2 76 0 0 0 703 0
ART-1 -Ex2 -76 0 0 0 -703 0
ART-2 +Ez2 0 0 71 0 0 0
ART-2 -Ez2 0 0 -71 0 0 0
ART-2 +Ex2 76 0 0 0 703 0
ART-2 -Ex2 -76 0 0 0 -703 0
ART-1A +Ez2 0 152 -71 -1064 0 0
ART-1A -Ez2 0 -152 71 1064 0 0
ART-1A +Ex2 76 0 0 0 703 0
ART-1A -Ex2 -76 0 0 0 -703 0
ART-2A +Ez2 0 0 71 0 0 0
ART-2A -Ez2 0 0 -71 0 0 0
ART-2A +Ex2 76 0 0 0 703 0
ART-2A -Ex2 -76 0 0 0 -703 0