Uraian Panjang Lebar Row Drainase Sisa Full Pemasangan Sirtu

1 Jalan A1 73.6 5.2 1.4 3.8 4 44.16


2 Jalan A2 40 6.5 1.4 5.1 4 24
3 Jalan AB1 35 6.5 1.4 5.1 4 21
4 Jalan AB2 36.5 7.5 1.4 6.1 4 21.9
5 Jalan BC1 36 6.1 1.4 4.7 4 21.6
6 Jalan BC2 64.5 6.6 1.4 5.2 4 38.7
7 Jalan CD1 50.5 6.8 1.4 5.4 4 30.3
8 Jalan DE1 92.45 6 1.4 4.6 4 55.47
9 Jalan EF1 92.3 6.5 1.4 5.1 4 55.38
10 Jalan FG1 110.3 6 1.4 4.6 4 66.18
11 Jalan GH1 107.8 6.2 1.4 4.8 4 64.68
12 Jalan H1 43.3 5.8 1.4 4.4 4 25.98
13 Jalan I 1 38 6.5 1.4 5.1 4 22.8
14 Jalan IJ 1 86 5.8 1.4 4.4 4 51.6
15 Jalan JK 1 92.35 6.6 1.4 5.2 4 55.41
16 Jalan L 1 97.8 6.7 1.4 5.3 4 58.68
17 Jalan U1 63.6 7.5 1.4 6.1 4 38.16
18 Jalan U2 71.75 7.94 1.4 6.54 4 43.05
19 Jalan U3 50.75 7 1.4 5.6 4 30.45
20 Jalan U4 50.25 7.6 1.4 6.2 4 30.15
21 Jalan U5 48 6.8 1.4 5.4 4 28.8
22 Jalan U6 110.5 6 1.4 4.6 4 66.3
894.75

YANG SUDAH TERPASANG


Uraian PANJANG LEBAR SIRTU TELFORD
U1 63.6 6.1 155.184
U2 71.75 6.54 70.38675 117.3113
U4 50.25 6.2 46.7325 77.8875
U5 48 5.4 38.88 64.8
U6 99 4.6 68.31 113.85
CD1 50.5 5.4 109.08
EF1 92.45 5.1 70.72425 117.8738
FG1 16.3 4.6 11.247 18.745
I1 38 5.1 29.07 48.45
IJ1 70 4.4 46.2 77
645.8145 635.9175
JALAN drainase
Telford beton Rucuk pas. Bata sirtu pas tpt buis betonplstran bawah
73.6 35.328 36.8 22.08 11.04 66.24
40 19.2 20 4.8 12 6 36
35 16.8 39.2 17.5 4.2 10.5 5.25 31.5
36.5 17.52 18.25 9.855 10.95 5.475 32.85
36 17.28 40.32 18 2.16 10.8 5.4 32.4
64.5 30.96 32.25 8.7075 19.35 9.675 58.05
50.5 24.24 56.56 25.25 8.3325 15.15 7.575 45.45
92.45 44.376 103.544 46.225 4.16025 27.735 13.8675 83.205
92.3 44.304 103.376 46.15 11.076 27.69 13.845 83.07
110.3 52.944 123.536 55.15 4.9635 33.09 16.545 99.27
107.8 51.744 120.736 53.9 8.085 32.34 16.17 97.02
43.3 20.784 48.496 21.65 0.6495 12.99 6.495 38.97
38 18.24 42.56 19 4.56 11.4 5.7 34.2
86 41.28 96.32 43 1.29 25.8 12.9 77.4
92.35 44.328 103.432 46.175 12.46725 27.705 13.8525 83.115
97.8 46.944 109.536 48.9 14.67 29.34 14.67 88.02
63.6 30.528 31.8 17.172 19.08 9.54 57.24
71.75 34.44 35.875 24.108 21.525 10.7625 64.575
50.75 24.36 25.375 9.89625 15.225 7.6125 45.675
50.25 24.12 25.125 14.32125 15.075 7.5375 45.225
48 23.04 24 7.92 14.4 7.2 43.2
110.5 53.04 55.25 4.9725 33.15 16.575 99.45
1491.25 715.8 987.616 745.625 178.3665 447.375 223.6875 1342.125
PLAT DUIKER SIRTU TOTAL acian selimut beton plat
102.05 44.16 29.44 2.6
127.56 28.80 16 3.25
127.56 25.20 14 3.25
147.19 31.76 14.6 3.75
119.71 23.76 14.4 3.05
129.53 47.41 25.8 3.3
133.45 38.63 20.2 3.4
117.75 59.63 36.98 3
127.56 66.46 36.92 3.25
117.75 71.14 44.12 3
121.68 72.77 43.12 3.1
113.83 26.63 17.32 2.9
127.56 27.36 15.2 3.25
113.83 52.89 34.4 2.9
129.53 67.88 36.94 3.3
131.49 73.35 39.12 3.35
147.19 55.33 25.44 3.75
155.82 67.16 28.7 3.97
137.38 40.35 20.3 3.5
149.15 44.47 20.1 3.8
133.45 36.72 19.2 3.4
117.75 71.27 44.2 3
2828.7475 3

0.4 0.15 0.25


0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
0.4 0.15 0.25
kubikasi drainase
bata drns tpt drns
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
0.4 0.9 0.15 0.25 0.12 0.56 0.5 0.3
sirtu
0.12 44.16
0.12 28.8
0.12 25.2
0.12 31.755
0.12 23.76
0.12 47.4075
0.12 38.6325
0.12 59.63025
0.12 66.456
0.12 71.1435
0.12 72.765
0.12 26.6295
0.12 27.36
0.12 52.89
0.12 67.87725
0.12 73.35
0.12 55.332
0.12 67.158
0.12 40.34625
0.12 44.47125
0.12 36.72
0.12 71.2725
RENCANA JALAN

Panjang Lebar Row Lebar Row Vol Rencana Jalan Vol Rencana Drainase
No Uraian Rencana Panjang Lapangan Rencana Lapangan
Sirtu Tengah Sirtu Pinggir Batu Telford Beton K-175 Pas. Batu Plesteran Acian
1 Jalan A1 73.71 73.60 5.60 5.20 44.16 26.50 73.60 49.46 4.416 14.72 14.72
2 Jalan A2 35.70 40.00 6.60 6.50 24.00 35.20 40.00 31.68 4.8 8 16
3 Jalan AB1 35.85 35.00 6.00 6.50 21.00 30.80 35.00 25.20 4.2 7 14
4 Jalan AB2 36.15 36.50 7.94 7.50 21.90 46.72 36.50 34.78 4.38 7.3 14.6
5 Jalan BC1 36.32 36.00 6.10 6.10 21.60 25.92 36.00 26.35 4.32 7.2 14.4
6 Jalan BC2 61.43 64.50 6.50 6.60 38.70 59.34 64.50 50.31 7.74 12.9 25.8
7 Jalan CD1 48.00 50.50 6.00 6.80 30.30 50.50 50.50 36.36 6.06 10.1 20.2
8 Jalan DE1 90.00 92.45 6.00 6.00 55.47 62.87 92.45 66.56 11.094 18.49 36.98
9 Jalan EF1 89.95 92.30 6.00 6.50 55.38 81.22 92.30 66.46 11.076 18.46 36.92
10 Jalan FG1 109.30 110.30 6.00 6.00 66.18 75.00 110.30 79.42 13.236 22.06 44.12
11 Jalan GH1 104.31 107.80 6.00 6.20 64.68 81.93 107.80 77.62 12.936 21.56 43.12
12 Jalan H1 37.13 43.30 6.00 5.80 25.98 25.98 43.30 31.18 5.196 8.66 17.32
13 Jalan I 1 31.10 38.00 6.00 6.50 22.80 33.44 38.00 27.36 4.56 7.6 15.2
14 Jalan IJ 1 87.86 86.00 6.60 5.80 51.60 51.60 86.00 68.11 10.32 17.2 34.4
15 Jalan JK 1 92.35 92.35 6.60 6.60 55.41 84.96 92.35 73.14 11.082 18.47 36.94
16 Jalan L 1 97.00 97.80 6.60 6.70 58.68 93.89 97.80 77.46 11.736 19.56 39.12
17 Jalan U1 63.60 7.50 38.16 81.41 63.60 0.00 7.632 12.72 25.44
18 Jalan U2 71.75 7.94 43.05 104.47 71.75 0.00 8.61 14.35 28.7
19 Jalan U3 47.30 50.75 7.00 7.00 30.45 54.81 50.75 42.63 6.09 10.15 20.3
20 Jalan U4 52.30 50.25 7.00 7.60 30.15 66.33 50.25 42.21 6.03 10.05 20.1
21 Jalan U5 46.00 48.00 6.00 6.80 28.80 48.00 48.00 34.56 5.76 9.6 19.2
22 Jalan U6 109.70 110.5 6.00 6.00 66.30 75.14 110.50 79.56 13.26 22.1 44.2
RAB JALAN DAN DRAINASE

Jumlah Harga per Unit


No Pekerjaan
( unit ) ( Rp )
1 Jalan A1
Sirtu 44.16 m3 139,440
Telford 73.60 m3 410,997
Pas. Beton 35.33 m3 1,251,740
Drainase
Urugan 4.42 m3 244,510
Pas. Bata 14.72 m3 193,183
Pas. TPT 18.40 m3 966,600
Plesteran 7.36 m3 92,930
Plat Duiker 13.00 m2 256,830
2 Jalan A2
Sirtu 28.80 m3 139,440
Telford 40.00 m3 410,997
Pas. Beton 19.20 m3 1,251,740
Drainase
Urugan 2.40 m3 244,510
Pas. Bata 8.00 m3 193,183
Pas. TPT 10.00 m3 966,600
Plesteran 4.00 m3 92,930
Plat Duiker 16.25 m2 256,830
3 Jalan AB1
Rucuk 39.20 m 4,000
Sirtu 25.20 m3 139,440
Telford 35.00 m3 410,997
Pas. Beton 16.80 m3 1,251,740
Drainase
Urugan 2.10 m3 244,510
Pas. Bata 7.00 m3 193,183
Pas. TPT 8.75 m3 966,600
Plesteran 3.50 m3 92,930
Plat Duiker 16.25 m2 256,830
4 Jalan AB2
Sirtu 31.76 m3 139,440
Telford 36.50 m3 410,997
Pas. Beton 17.52 m3 1,251,740
Drainase
Urugan 2.19 m3 244,510
Pas. Bata 7.30 m3 193,183
Pas. TPT 9.86 m3 966,600
Plesteran 3.65 m3 92,930
Plat Duiker 18.75 m2 256,830
5 Jalan BC1
Rucuk 40.32 m 4,000
Sirtu 23.76 m3 139,440
Telford 36.00 m3 410,997
Pas. Beton 17.28 m3 1,251,740
Drainase
Urugan 2.16 m3 244,510
Pas. Bata 7.20 m3 193,183
Pas. TPT 9.00 m3 966,600
Plesteran 3.60 m3 92,930
Plat Duiker 15.25 m2 256,830
6 Jalan BC2
Sirtu 47.41 m3 139,440
Telford 64.50 m3 410,997
Pas. Beton 30.96 m3 1,251,740
Drainase
Urugan 3.87 m3 244,510
Pas. Bata 12.90 m3 193,183
Pas. TPT 16.13 m3 966,600
Plesteran 6.45 m3 92,930
Plat Duiker 16.50 m2 256,830
7 Jalan CD1
Rucuk 56.56 m 4,000
Sirtu 38.63 m3 139,440
Telford 50.50 m3 410,997
Pas. Beton 24.24 m3 1,251,740
Drainase
Urugan 3.03 m3 244,510
Pas. Bata 10.10 m3 193,183
Pas. TPT 12.63 m3 966,600
Plesteran 5.05 m3 92,930
Plat Duiker 17.00 m2 256,830
8 Jalan DE1
Rucuk 103.54 m 4,000
Sirtu 59.63 m3 139,440
Telford 92.45 m3 410,997
Pas. Beton 44.38 m3 1,251,740
Drainase
Urugan 5.55 m3 244,510
Pas. Bata 18.49 m3 193,183
Pas. TPT 23.11 m3 966,600
Plesteran 9.25 m3 92,930
Plat Duiker 15.00 m2 256,830
9 Jalan EF1
Rucuk 103.38 m 4,000
Sirtu 66.46 m3 139,440
Telford 92.30 m3 410,997
Pas. Beton 44.30 m3 1,251,740
Drainase
Urugan 5.54 m3 244,510
Pas. Bata 18.46 m3 193,183
Pas. TPT 23.08 m3 966,600
Plesteran 9.23 m3 92,930
Plat Duiker 16.25 m2 256,830
10 Jalan FG1
Rucuk 123.54 m 4,000
Sirtu 71.14 m3 139,440
Telford 110.30 m3 410,997
Pas. Beton 52.94 m3 1,251,740
Drainase
Urugan 6.62 m3 244,510
Pas. Bata 22.06 m3 193,183
Pas. TPT 27.58 m3 966,600
Plesteran 11.03 m3 92,930
Plat Duiker 15.00 m2 256,830
11 Jalan GH1
Rucuk 120.74 m 4,000
Sirtu 72.77 m3 139,440
Telford 107.80 m3 410,997
Pas. Beton 51.74 m3 1,251,740
Drainase
Urugan 6.47 m3 244,510
Pas. Bata 21.56 m3 193,183
Pas. TPT 26.95 m3 966,600
Plesteran 10.78 m3 92,930
Plat Duiker 15.50 m2 256,830
12 Jalan H1
Rucuk 48.50 m 4,000
Sirtu 26.63 m3 139,440
Telford 43.30 m3 410,997
Pas. Beton 20.78 m3 1,251,740
Drainase
Urugan 2.60 m3 244,510
Pas. Bata 8.66 m3 193,183
Pas. TPT 10.83 m3 966,600
Plesteran 4.33 m3 92,930
Plat Duiker 14.50 m2 256,830
13 Jalan I1
Rucuk 42.56 m 4,000
Sirtu 27.36 m3 139,440
Telford 38.00 m3 410,997
Pas. Beton 18.24 m3 1,251,740
Drainase
Urugan 2.28 m3 244,510
Pas. Bata 7.60 m3 193,183
Pas. TPT 9.50 m3 966,600
Plesteran 3.80 m3 92,930
Plat Duiker 16.25 m2 256,830
14 Jalan IJ1
Rucuk 96.32 m 4,000
Sirtu 52.89 m3 139,440
Telford 86.00 m3 410,997
Pas. Beton 41.28 m3 1,251,740
Drainase
Urugan 5.16 m3 244,510
Pas. Bata 17.20 m3 193,183
Pas. TPT 21.50 m3 966,600
Plesteran 8.60 m3 92,930
Plat Duiker 14.50 m2 256,830
15 Jalan JK1
Rucuk 103.43 m 4,000
Sirtu 67.88 m3 139,440
Telford 92.35 m3 410,997
Pas. Beton 44.33 m3 1,251,740
Drainase
Urugan 5.54 m3 244,510
Pas. Bata 18.47 m3 193,183
Pas. TPT 23.09 m3 966,600
Plesteran 9.24 m3 92,930
Plat Duiker 16.50 m2 256,830
16 Jalan L1
Rucuk 109.54 m 4,000
Sirtu 73.35 m3 139,440
Telford 97.80 m3 410,997
Pas. Beton 46.94 m3 1,251,740
Drainase
Urugan 5.87 m3 244,510
Pas. Bata 19.56 m3 193,183
Pas. TPT 24.45 m3 966,600
Plesteran 9.78 m3 92,930
Plat Duiker 16.75 m2 256,830
17 Jalan U1
Sirtu 55.33 m3 139,440
Telford 63.60 m3 410,997
Pas. Beton 30.53 m3 1,251,740
Drainase
Urugan 3.82 m3 244,510
Pas. Bata 12.72 m3 193,183
Pas. TPT 15.90 m3 966,600
Plesteran 6.36 m3 92,930
Plat Duiker 18.75 m2 256,830
18 Jalan U2
Sirtu 67.16 m3 139,440
Telford 71.75 m3 410,997
Pas. Beton 34.44 m3 1,251,740
Drainase
Urugan 4.31 m3 244,510
Pas. Bata 14.35 m3 193,183
Pas. TPT 17.94 m3 966,600
Plesteran 7.18 m3 92,930
Plat Duiker 19.85 m2 256,830
19 Jalan U3
Sirtu 40.35 m3 139,440
Telford 50.75 m3 410,997
Pas. Beton 24.36 m3 1,251,740
Drainase
Urugan 3.05 m3 244,510
Pas. Bata 10.15 m3 193,183
Pas. TPT 12.69 m3 966,600
Plesteran 5.08 m3 92,930
Plat Duiker 17.50 m2 256,830
20 Jalan U4
Sirtu 44.47 m3 139,440
Telford 50.25 m3 410,997
Pas. Beton 24.12 m3 1,251,740
Drainase
Urugan 3.02 m3 244,510
Pas. Bata 10.05 m3 193,183
Pas. TPT 12.56 m3 966,600
Plesteran 5.03 m3 92,930
Plat Duiker 19.00 m2 256,830
21 Jalan U5
Sirtu 36.72 m3 139,440
Telford 48.00 m3 410,997
Pas. Beton 23.04 m3 1,251,740
Drainase
Urugan 2.88 m3 244,510
Pas. Bata 9.60 m3 193,183
Pas. TPT 12.00 m3 966,600
Plesteran 4.80 m3 92,930
Plat Duiker 17.00 m2 256,830
22 Jalan U6
Sirtu 71.27 m3 139,440
Telford 110.50 m3 410,997
Pas. Beton 53.04 m3 1,251,740
Drainase
Urugan 6.63 m3 244,510
Pas. Bata 22.10 m3 193,183
Pas. TPT 27.63 m3 966,600
Plesteran 11.05 m3 92,930
Plat Duiker 15.00 m2 256,830

TOTAL
Jumlah Harga
( Rp )

6,157,670
30,249,379
44,221,471
-
1,079,756
2,843,654
17,785,440
683,965
3,338,790
-
4,015,872
16,439,880
24,033,408
-
586,824
1,545,464
9,666,000
371,720
4,173,488
-
156,800
3,513,888
14,384,895
21,029,232
-
513,471
1,352,281
8,457,750
325,255
4,173,488
-
4,427,917
15,001,391
21,930,485
-
535,477
1,410,236
9,525,843
339,195
4,815,563
-
161,280
3,313,094
14,795,892
21,630,067
-
528,142
1,390,918
8,699,400
334,548
3,916,658
-
6,610,502
26,509,307
38,753,870
-
946,254
2,492,061
15,586,425
599,399
4,237,695
-
226,240
5,386,916
20,755,349
30,342,178
-
740,865
1,951,148
12,203,325
469,297
4,366,110
-
414,176
8,314,842
37,996,673
55,547,214
-
1,356,297
3,571,954
22,340,543
859,138
3,852,450
-
413,504
9,266,625
37,935,023
55,457,089
-
1,354,096
3,566,158
22,304,295
857,744
4,173,488
-
494,144
9,920,250
45,332,969
66,272,123
-
1,618,167
4,261,617
26,653,995
1,025,018
3,852,450
-
482,944
10,146,352
44,305,477
64,770,035
-
1,581,491
4,165,025
26,049,870
1,001,785
3,980,865
-
193,984
3,713,217
17,796,170
26,016,164
-
635,237
1,672,965
10,463,445
402,387
3,724,035
-
170,240
3,815,078
15,617,886
22,831,738
-
557,483
1,468,191
9,182,700
353,134
4,173,488
-
385,280
7,374,982
35,345,742
51,671,827
-
1,261,672
3,322,748
20,781,900
799,198
3,724,035
-
413,728
9,464,804
37,955,573
55,487,131
-
1,354,830
3,568,090
22,316,378
858,209
4,237,695
-
438,144
10,227,924
40,195,507
58,761,683
-
1,434,785
3,778,659
23,633,370
908,855
4,301,903
-
7,715,494
26,139,409
38,213,119
-
933,050
2,457,288
15,368,940
591,035
4,815,563
-
9,364,512
29,489,035
43,109,926
-
1,052,616
2,772,176
17,338,388
666,773
5,098,076
-
5,625,881
20,858,098
30,492,386
-
744,533
1,960,807
12,263,738
471,620
4,494,525
-
6,201,071
20,652,599
30,191,969
-
737,198
1,941,489
12,142,913
466,973
4,879,770
-
5,120,237
19,727,856
28,840,090
-
704,189
1,854,557
11,599,200
446,064
4,366,110
-
9,938,237
45,415,169
66,392,290
-
1,621,101
4,269,344
26,702,325
1,026,877
3,852,450

2,209,448,016