Data Saluran Tulangan Dowel Cover

No Segmen Jarak
T.O.D Tulangan Jarak Tulangan Tulangan Type
W (mm) Inv El (mm) L (mm) (mm) H (mm) Ts (mm) Tw (mm) Utama (mm) Sekunder Tulangan Slab (pcs) Wall (pcs) Cover
(mm)
1 1 500 3554 6050 4000 446 150 150 16 200 13 150 2 4
2 2 500 3541 15000 4000 459 150 150 16 200 13 150 2 4
3 28 1000 2277 15000 4000 1373 300 300 22 125 13 150 A2
4 38 1100 1632 15000 4000 2368 200 200 19 200 13 150 3 10
5 39 1100 1617 15000 4000 2383 200 200 19 200 13 150 3 10
6 40 1100 1602 15000 4000 2398 200 200 19 200 13 150 3 10
7 41 1100 1291 15000 4000 2709 250 250 19 150 13 150 3 10
8 42 1100 1272 15000 4000 2728 250 250 19 150 13 150 3 10
9 43 1100 1257 15000 4000 2743 250 250 19 150 13 150 3 10
10 44 1100 1242 15000 4000 2758 250 250 19 150 13 150 3 10
11 45 1100 1242 15000 4000 2758 250 250 19 150 13 150 3 10
12 46 1100 1242 15000 4000 2758 250 250 19 150 13 150 3 10
13 47 1100 1242 15000 4000 2758 250 250 19 150 13 150 3 10
14 53 1100 2018 15000 4000 1982 200 200 16 150 13 150 3 8
15 54 1100 2033 15000 4000 1967 200 200 16 150 13 150 3 8
16 55 1100 2048 15000 4000 1952 200 200 16 150 13 150 3 8
17 56 1100 2053 15000 4000 1947 200 200 16 150 13 150 3 8
18 57 1100 2079 4325 4000 1921 200 200 16 150 13 150 3 8
19 58 1100 2079 5657 4000 1921 200 200 16 150 13 150 3 8
20 59 1100 2089 4671 4000 1911 200 200 16 150 13 150 3 8
21 60 1100 2094 15000 4000 1906 200 200 16 150 13 150 3 8
22 61 1100 2109 15000 4000 1891 200 200 16 150 13 150 3 8
23 62 1100 2124 15000 4000 1876 200 200 16 150 13 150 3 8
24 63 1000 2342 15000 4000 1658 200 200 16 150 13 150 3 8
25 64 1000 2357 15000 4000 1643 200 200 16 150 13 150 3 8
26 65 1000 2371 15000 4000 1629 200 200 16 150 13 150 3 8
27 66 1000 2386 15000 4000 1614 200 200 16 150 13 150 3 8
28 67 1000 2401 15137 4000 1599 200 200 16 150 13 150 3 8
29 68 1000 2415 15000 4000 1585 200 200 16 150 13 150 3 8
30 69 1000 2430 15000 4000 1570 200 200 16 150 13 150 3 8
31 70 1000 2445 15000 4000 1555 200 200 16 150 13 150 3 8
32 71 900 2555 10000 4150 1195 350 350 19 125 13 150
33 72 900 2555 10000 4150 1195 350 350 19 125 13 150 3 8 A1
34 89 800 3110 15000 4000 890 150 150 16 200 13 150 2 4
PT. MAHIR KARYA SETIA
VOLUME OF EXCAVATION
DRAINAGE ANCILLARY PRECAST
Data Volume Galian

NO DECRIPTION Lebar Lebar Luas


W+2tw Panjang H+ts Kedalaman
Ts H galian Galian Penampang
(Lebar) Saluran (Tinggi) Galian
bawah Atas Galian
m' m' m' m' m' m' m' m' m2
1 Segmen. 1 Inv El. +3554 0.80 6.05 0.15 0.45 0.60 2.30 0.65 2.95 1.69
2 Segmen. 2 Inv El. +3541 0.80 15.00 0.15 0.46 0.61 2.30 0.66 2.96 1.73
3 Segmen. 28 Inv El. +2277 1.60 15.00 0.30 1.37 1.67 3.10 1.72 4.82 6.83
4 Segmen. 38 Inv El. +1632 1.50 15.00 0.20 2.37 2.57 3.00 2.62 5.62 11.28
5 Segmen. 39 Inv El. +1617 1.50 15.00 0.20 2.38 2.58 3.00 2.63 5.63 11.37
6 Segmen. 40 Inv El. +1602 1.50 15.00 0.20 2.40 2.60 3.00 2.65 5.65 11.45
7 Segmen. 41 Inv El. +1291 1.60 15.00 0.25 2.71 2.96 3.10 3.01 6.11 13.85
8 Segmen. 42 Inv El. +1272 1.60 15.00 0.25 2.73 2.98 3.10 3.03 6.13 13.97
9 Segmen. 43 Inv El. +1257 1.60 15.00 0.25 2.74 2.99 3.10 3.04 6.14 14.06
10 Segmen. 44 Inv El. +1242 1.60 15.00 0.25 2.76 3.01 3.10 3.06 6.16 14.16
11 Segmen. 45 Inv El. +1242 1.60 15.00 0.25 2.76 3.01 3.10 3.06 6.16 14.16
12 Segmen. 46 Inv El. +1242 1.60 15.00 0.25 2.76 3.01 3.10 3.06 6.16 14.16
13 Segmen. 47 Inv El. +1242 1.60 15.00 0.25 2.76 3.01 3.10 3.06 6.16 14.16
14 Segmen. 53 Inv El. +2018 1.50 15.00 0.20 1.98 2.18 3.00 2.23 5.23 9.19
15 Segmen. 54 Inv El. +2033 1.50 15.00 0.20 1.97 2.17 3.00 2.22 5.22 9.11
16 Segmen. 55 Inv El. +2048 1.50 15.00 0.20 1.95 2.15 3.00 2.20 5.20 9.03
17 Segmen. 56 Inv El. +2053 1.50 15.00 0.20 1.95 2.15 3.00 2.20 5.20 9.00
18 Segmen. 57 Inv El. +2079 1.50 4.33 0.20 1.92 2.12 3.00 2.17 5.17 8.87
19 Segmen. 58 Inv El. +2079 1.50 5.66 0.20 1.92 2.12 3.00 2.17 5.17 8.87
20 Segmen. 59 Inv El. +2089 1.50 4.67 0.20 1.91 2.11 3.00 2.16 5.16 8.82
21 Segmen. 60 Inv El. +2094 1.50 15.00 0.20 1.91 2.11 3.00 2.16 5.16 8.79
22 Segmen. 61 Inv El. +2109 1.50 15.00 0.20 1.89 2.09 3.00 2.14 5.14 8.71
23 Segmen. 62 Inv El. +2124 1.50 15.00 0.20 1.88 2.08 3.00 2.13 5.13 8.64
24 Segmen. 63 Inv El. +2342 1.40 15.00 0.20 1.66 1.86 2.90 1.91 4.81 7.35
25 Segmen. 64 Inv El. +2357 1.40 15.00 0.20 1.64 1.84 2.90 1.89 4.79 7.28
26 Segmen. 65 Inv El. +2371 1.40 15.00 0.20 1.63 1.83 2.90 1.88 4.78 7.21
27 Segmen. 66 Inv El. +2386 1.40 15.00 0.20 1.61 1.81 2.90 1.86 4.76 7.14
28 Segmen. 67 Inv El. +2401 1.40 15.14 0.20 1.60 1.80 2.90 1.85 4.75 7.07
29 Segmen. 68 Inv El. +2415 1.40 15.00 0.20 1.59 1.79 2.90 1.84 4.74 7.01
30 Segmen. 69 Inv El. +2430 1.40 15.00 0.20 1.57 1.77 2.90 1.82 4.72 6.93
31 Segmen. 70 Inv El. +2445 1.40 15.00 0.20 1.56 1.76 2.90 1.81 4.71 6.86
32 Segmen. 71 Inv El. +2555 1.60 10.00 0.35 1.20 1.55 3.10 1.60 4.70 6.22
33 Segmen. 72 Inv El. +2555 1.60 10.00 0.35 1.20 1.55 3.10 1.60 4.70 6.22
34 Segmen. 89 Inv El. +3110 1.10 15.00 0.15 0.89 1.04 2.60 1.09 3.69 3.43
PT. MAHIR KARYA SETIA
VOLUME OF EXCAVATION
DRAINAGE ANCILLARY PRECAST
Volume Galian

Volume Galian

m3
10.25
25.99
102.38
169.21
170.48
171.75
207.82
209.57
210.95
212.33
212.33
212.33
212.33
137.80
136.63
135.46
135.07
38.36
50.18
41.19
131.88
130.72
129.57
110.30
109.22
108.22
107.14
107.04
105.08
104.01
102.95
62.17
62.17
51.42
PT. MAHIR KARYA SETIA
VOLUME OF WORK
DRAINAGE RTH
PT. MAHIR KARYA SETIA PT. SMCC UTAMA INDONESIA
RESUME
Exc Disp. Borrow Soil Backfill Compaction Levelling LC Rebar Work Formwork Concrete Dowel Filter Cloth Joint Filler
1,388.94 1,388.94 3,711.35 3,711.35 782.87 508.18 25.41 58,507.03 4,153.58 487.56 357.00 376.00 151.00
m3 m3 m3 m3 m2 m2 m2 kg m2 m3 pcs pcs m'
DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Segmen. 1 Inv El. +3554


1 W : 500 Ts/Tw : 150 mm
Uk Saluran 6.05 0.80 0.60
Excavation 1 10.25 10.25 m3
Disposal in Site Area 1 10.25 10.25 m3
Borrow Soil 8.41 8.41 m3
Back Fill 1 8.41 8.41 m3
Compaction 2.00 15.13 15.13 m2
Layer 1 6.05 1.10 6.66
Layer 2 6.05 1.40 8.47
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 6.05 1.00 6.05 6.05 m2
Lean Concrete 1 6.05 1.00 0.05 0.30 0.30 m3
Rebar Work 1 184.26 Kg
Formwork 14.28 14.28 m2
Outside 2 6.05 0.60 7.21
Inside 2 6.05 0.45 5.40
Face 2 1.67
Slab 1 0.80 0.15 0.12
Wall 2 0.80 0.45 0.71
Concrete Work 1 1.54 1.54 m3
Slab 1 6.05 0.80 0.15 0.73
Wall 2 6.05 0.15 0.45 0.81
Dowel 1 6.00 6.00 6.00 pcs
Filter Cloth @3m Both Side 2 3.02 6.03 pcs
Joint Filler 1 1.34 1.34 m'
Top Saluran 2 0.15 0.30
Dalam Saluran 1 0.15 0.45 1.04
Segmen. 2 Inv El. +3541
2 W : 500 Ts/Tw : 150 mm
Uk Saluran 15 0.80 0.61
Excavation 1 25.99 25.99 m3
Disposal in Site Area 1 25.99 25.99 m3
Borrow Soil 21.38 21.38 m3
Back Fill 1 21.38 21.38 m3
Compaction 3.00 15.13 15.13 m2
Layer 1 6.05 1.10 6.66
Layer 2 6.05 1.40 8.47
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.00 15.00 15.00 m2
Lean Concrete 1 15.00 1.00 0.05 0.75 0.75 m3
Rebar Work 1 463.86 Kg
Formwork 33.75 33.75 m2
Outside 2 15.00 0.61 18.27
Inside 2 15.00 0.46 13.77
Face 2 1.71
Slab 1 0.80 0.15 0.12
Wall 2 0.80 0.46 0.73
Concrete Work 1 3.87 3.87 m3
Slab 1 15.00 0.80 0.15 1.80
Wall 2 15.00 0.15 0.46 2.07
Dowel 1 6.00 6.00 6.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 1.37 1.37 m'
Top Saluran 2 0.15 0.30
Dalam Saluran 1 0.15 0.46 1.07
Segmen. 28 Inv El. +2277
3 W : 1000 Ts/Tw : 300 mm
Uk Saluran 15 1.60 1.67
Excavation 1 102.38 102.38 m3
Disposal in Site Area 1 102.38 102.38 m3
Borrow Soil 81.48 81.48 m3
Back Fill 1 81.48 81.48 m3
Compaction 6.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31

MSP-VOL-DRG Halaman 6 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 1.35 m3
Rebar Work 1 2,346.84 Kg
Formwork 101.13 101.13 m2
Outside 2 15.00 1.67 50.19
Inside 2 15.00 1.37 41.19
Face 2 9.75
Slab 1 1.60 0.30 0.48
Wall 2 1.60 1.37 4.39
Concrete Work 1 19.56 19.56 m3
Slab 1 15.00 1.60 0.30 7.20
Wall 2 15.00 0.30 1.37 12.36
Dowel 1 - - - pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.65 3.65 m'
Top Saluran 2 0.30 0.60
Dalam Saluran 1 0.30 1.37 3.05
Segmen. 38 Inv El. +1632
4 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.57
Excavation 1 169.21 m3
Disposal in Site Area 1 169.21 m3
Borrow Soil 155.01 155.01 m3
Back Fill 1 155.01 155.01 m3
Compaction 9.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 m3
Rebar Work 1 1,704.96 Kg
Formwork 162.89 162.89 m2
Outside 2 15.00 2.57 77.04
Inside 2 15.00 2.37 71.04
Face 2 14.81
Slab 1 1.50 0.20 0.30
Wall 2 1.50 2.37 7.10
Concrete Work 1 14.21 14.21 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 2.37 14.21
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 5.34 5.34 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 2.37 4.94
Segmen. 39 Inv El. +1617
5 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.58
Excavation 1 170.48 m3
Disposal in Site Area 1 170.48 m3
Borrow Soil 156.18 156.18 m3
Back Fill 1 156.18 156.18 m3
Compaction 9.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 m3
Rebar Work 1 1,715.76 Kg
Formwork 163.88 163.88 m2
Outside 2 15.00 2.58 77.49

MSP-VOL-DRG Halaman 7 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Inside 2 15.00 2.38 71.49


Face 2 14.90
Slab 1 1.50 0.20 0.30
Wall 2 1.50 2.38 7.15
Concrete Work 1 14.30 14.30 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 2.38 14.30
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 5.37 5.37 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 2.38 4.97
Segmen. 40 Inv El. +1602
6 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.60
Excavation 1 171.75 m3
Disposal in Site Area 1 171.75 m3
Borrow Soil 157.36 157.36 m3
Back Fill 1 157.36 157.36 m3
Compaction 9.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 m3
Rebar Work 1 1,726.56 Kg
Formwork 164.87 164.87 m2
Outside 2 15.00 2.60 77.94
Inside 2 15.00 2.40 71.94
Face 2 14.99
Slab 1 1.50 0.20 0.30
Wall 2 1.50 2.40 7.19
Concrete Work 1 14.39 14.39 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 2.40 14.39
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 5.40 5.40 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 2.40 5.00
Segmen. 41 Inv El. +1291
7 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 2.96
Excavation 1 207.82 m3
Disposal in Site Area 1 207.82 m3
Borrow Soil 187.51 187.51 m3
Back Fill 1 187.51 187.51 m3
Compaction 10.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 m3
Rebar Work 1 2,438.10 Kg
Formwork 188.18 188.18 m2
Outside 2 15.00 2.96 88.77
Inside 2 15.00 2.71 81.27
Face 2 18.14
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.71 8.67
Concrete Work 1 20.32 20.32 m3
Slab 1 15.00 1.60 0.25
Wall 2 15.00 0.25 2.71 20.32
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.17 6.17 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.71 5.67
Segmen. 42 Inv El. +1272
8 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 2.98
Excavation 1 209.57 m3
Disposal in Site Area 1 209.57 m3
Borrow Soil 189.11 189.11 m3

MSP-VOL-DRG Halaman 8 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Back Fill 1 189.11 189.11 m3


Compaction 10.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 m3
Rebar Work 1 2,455.20 Kg
Formwork 189.44 189.44 m2
Outside 2 15.00 2.98 89.34
Inside 2 15.00 2.73 81.84
Face 2 18.26
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.73 8.73
Concrete Work 1 20.46 20.46 m3
Slab 1 15.00 1.60 0.25
Wall 2 15.00 0.25 2.73 20.46
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.21 6.21 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.73 5.71
Segmen. 43 Inv El. +1257
9 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 2.99
Excavation 1 210.95 m3
Disposal in Site Area 1 210.95 m3
Borrow Soil 190.38 190.38 m3
Back Fill 1 190.38 190.38 m3
Compaction 10.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 m3
Rebar Work 1 2,468.70 Kg
Formwork 190.44 190.44 m2
Outside 2 15.00 2.99 89.79
Inside 2 15.00 2.74 82.29
Face 2 18.36
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.74 8.78
Concrete Work 1 20.57 20.57 m3
Slab 1 15.00 1.60 0.25
Wall 2 15.00 0.25 2.74 20.57
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.24 6.24 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.74 5.74
Segmen. 44 Inv El. +1242
10 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 3.01
Excavation 1 212.33 m3
Disposal in Site Area 1 212.33 m3
Borrow Soil 184.30 184.30 m3
Back Fill 1 184.30 184.30 m3
Compaction 11.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 27.00 m2

MSP-VOL-DRG Halaman 9 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Lean Concrete 1 15.00 1.80 0.05 1.35 1.35 m3


Rebar Work 1 3,202.20 Kg
Formwork 191.43 191.43 m2
Outside 2 15.00 3.01 90.24
Inside 2 15.00 2.76 82.74
Face 2 18.45
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.76 8.83
Concrete Work 1 26.69 26.69 m3
Slab 1 15.00 1.60 0.25 6.00
Wall 2 15.00 0.25 2.76 20.69
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.27 6.27 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.76 5.77
Segmen. 45 Inv El. +1242
11 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 3.01
Excavation 1 212.33 m3
Disposal in Site Area 1 212.33 m3
Borrow Soil 184.30 184.30 m3
Back Fill 1 184.30 184.30 m3
Compaction 11.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 1.35 m3
Rebar Work 1 3,202.20 Kg
Formwork 191.43 191.43 m2
Outside 2 15.00 3.01 90.24
Inside 2 15.00 2.76 82.74
Face 2 18.45
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.76 8.83
Concrete Work 1 26.69 26.69 m3
Slab 1 15.00 1.60 0.25 6.00
Wall 2 15.00 0.25 2.76 20.69
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.27 6.27 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.76 5.77
Segmen. 46 Inv El. +1242
12 W : 1100 Ts/Tw : 250 mm
Uk Saluran 15 1.60 3.01
Excavation 1 212.33 m3
Disposal in Site Area 1 212.33 m3
Borrow Soil 184.30 184.30 m3
Back Fill 1 184.30 184.30 m3
Compaction 11.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 1.35 m3
Rebar Work 1 3,202.20 Kg
Formwork 191.43 191.43 m2
Outside 2 15.00 3.01 90.24
Inside 2 15.00 2.76 82.74
Face 2 18.45
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.76 8.83
Concrete Work 1 26.69 26.69 m3
Slab 1 15.00 1.60 0.25 6.00
Wall 2 15.00 0.25 2.76 20.69
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.27 6.27 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.76 5.77
Segmen. 47 Inv El. +1242
13 W : 1100 Ts/Tw : 250 mm

MSP-VOL-DRG Halaman 10 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Uk Saluran 15 1.60 3.01


Excavation 1 212.33 m3
Disposal in Site Area 1 212.33 m3
Borrow Soil 184.30 184.30 m3
Back Fill 1 184.30 184.30 m3
Compaction 11.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.80 27.00 27.00 m2
Lean Concrete 1 15.00 1.80 0.05 1.35 1.35 m3
Rebar Work 1 3,202.20 Kg
Formwork 191.43 191.43 m2
Outside 2 15.00 3.01 90.24
Inside 2 15.00 2.76 82.74
Face 2 18.45
Slab 1 1.60 0.25 0.40
Wall 2 1.60 2.76 8.83
Concrete Work 1 26.69 26.69 m3
Slab 1 15.00 1.60 0.25 6.00
Wall 2 15.00 0.25 2.76 20.69
Dowel 1 13.00 13.00 13.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 6.27 6.27 m'
Top Saluran 2 0.25 0.50
Dalam Saluran 1 0.25 2.76 5.77
Segmen. 53 Inv El. +2018
14 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.18
Excavation 1 137.80 m3
Disposal in Site Area 1 137.80 m3
Borrow Soil 125.91 125.91 m3
Back Fill 1 125.91 125.91 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 m3
Rebar Work 1 1,427.04 Kg
Formwork 137.41 137.41 m2
Outside 2 15.00 2.18 65.46
Inside 2 15.00 1.98 59.46
Face 2 12.49
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.98 5.95
Concrete Work 1 11.89 11.89 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 1.98 11.89
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.56 4.56 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.98 4.16
Segmen. 54 Inv El. +2033
15 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.17
Excavation 1 136.63 m3
Disposal in Site Area 1 136.63 m3
Borrow Soil 124.83 124.83 m3
Back Fill 1 124.83 124.83 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -

MSP-VOL-DRG Halaman 11 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 m3
Rebar Work 1 1,416.24 Kg
Formwork 136.42 136.42 m2
Outside 2 15.00 2.17 65.01
Inside 2 15.00 1.97 59.01
Face 2 12.40
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.97 5.90
Concrete Work 1 11.80 11.80 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 1.97 11.80
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.53 4.53 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.97 4.13
Segmen. 55 Inv El. +2048
16 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.15
Excavation 1 135.46 m3
Disposal in Site Area 1 135.46 m3
Borrow Soil 122.47 122.47 m3
Back Fill 1 122.47 122.47 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 1.28 m3
Rebar Work 1 1,405.44 Kg
Formwork 135.43 135.43 m2
Outside 2 15.00 2.15 64.56
Inside 2 15.00 1.95 58.56
Face 2 12.31
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.95 5.86
Concrete Work 1 11.71 11.71 m3
Slab 1 15.00 1.50 0.20
Wall 2 15.00 0.20 1.95 11.71
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.50 4.50 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.95 4.10
Segmen. 56 Inv El. +2053
17 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.15
Excavation 1 135.07 135.07 m3
Disposal in Site Area 1 135.07 135.07 m3
Borrow Soil 117.61 117.61 m3
Back Fill 1 117.61 117.61 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 1.28 m3
Rebar Work 1 1,941.84 Kg
Formwork 135.10 135.10 m2
Outside 2 15.00 2.15 64.41
Inside 2 15.00 1.95 58.41
Face 2 12.28
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.95 5.84
Concrete Work 1 16.18 16.18 m3
Slab 1 15.00 1.50 0.20 4.50
Wall 2 15.00 0.20 1.95 11.68
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.49 4.49 m'

MSP-VOL-DRG Halaman 12 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Top Saluran 2 0.20 0.40


Dalam Saluran 1 0.20 1.95 4.09
Segmen. 57 Inv El. +2079
18 W : 1100 Ts/Tw : 200 mm
Uk Saluran 4.325 1.50 2.12
Excavation 1 38.36 38.36 m3
Disposal in Site Area 1 38.36 38.36 m3
Borrow Soil 33.37 33.37 m3
Back Fill 1 33.37 33.37 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 4.33 1.70 7.35 7.35 m2
Lean Concrete 1 4.33 1.70 0.05 0.37 0.37 m3
Rebar Work 1 554.50 Kg
Formwork 47.09 47.09 m2
Outside 2 4.33 2.12 18.35
Inside 2 4.33 1.92 16.62
Face 2 12.13
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.92 5.76
Concrete Work 1 4.62 4.62 m3
Slab 1 4.33 1.50 0.20 1.30
Wall 2 4.33 0.20 1.92 3.32
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 2.44 4.88 pcs
Joint Filler 1 4.44 4.44 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.92 4.04
Segmen. 58 Inv El. +2079
19 W : 1100 Ts/Tw : 200 mm
Uk Saluran 5.657 1.50 2.12
Excavation 1 50.18 50.18 m3
Disposal in Site Area 1 50.18 50.18 m3
Borrow Soil 43.65 43.65 m3
Back Fill 1 43.65 43.65 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 5.66 1.70 9.62 9.62 m2
Lean Concrete 1 5.66 1.70 0.05 0.48 0.48 m3
Rebar Work 1 725.27 Kg
Formwork 57.86 57.86 m2
Outside 2 5.66 2.12 24.00
Inside 2 5.66 1.92 21.73
Face 2 12.13
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.92 5.76
Concrete Work 1 6.04 6.04 m3
Slab 1 5.66 1.50 0.20 1.70
Wall 2 5.66 0.20 1.92 4.35
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 2.89 5.77 pcs
Joint Filler 1 4.44 4.44 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.92 4.04
Segmen. 59 Inv El. +2089
20 W : 1100 Ts/Tw : 200 mm
Uk Saluran 4.671 1.50 2.11
Excavation 1 41.19 41.19 m3
Disposal in Site Area 1 41.19 41.19 m3
Borrow Soil 35.82 35.82 m3
Back Fill 1 35.82 35.82 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -

MSP-VOL-DRG Halaman 13 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 4.67 1.70 7.94 7.94 m2
Lean Concrete 1 4.67 1.70 0.05 0.40 0.40 m3
Rebar Work 1 596.62 Kg
Formwork 49.64 49.64 m2
Outside 2 4.67 2.11 19.72
Inside 2 4.67 1.91 17.85
Face 2 12.07
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.91 5.73
Concrete Work 1 4.97 4.97 m3
Slab 1 4.67 1.50 0.20 1.40
Wall 2 4.67 0.20 1.91 3.57
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 2.56 5.11 pcs
Joint Filler 1 4.42 4.42 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.91 4.02
Segmen. 60 Inv El. +2094
21 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.11
Excavation 1 131.88 131.88 m3
Disposal in Site Area 1 131.88 131.88 m3
Borrow Soil 114.67 114.67 m3
Back Fill 1 114.67 114.67 m3
Compaction 8.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 1.28 m3
Rebar Work 1 1,912.32 Kg
Formwork 132.40 132.40 m2
Outside 2 15.00 2.11 63.18
Inside 2 15.00 1.91 57.18
Face 2 12.04
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.91 5.72
Concrete Work 1 15.94 15.94 m3
Slab 1 15.00 1.50 0.20 4.50
Wall 2 15.00 0.20 1.91 11.44
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.41 4.41 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.91 4.01
Segmen. 61 Inv El. +2109
22 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.09
Excavation 1 130.72 130.72 m3
Disposal in Site Area 1 130.72 130.72 m3
Borrow Soil 113.60 113.60 m3
Back Fill 1 113.60 113.60 m3
Compaction 7.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 1.28 m3
Rebar Work 1 1,901.52 Kg
Formwork 131.41 131.41 m2
Outside 2 15.00 2.09 62.73
Inside 2 15.00 1.89 56.73
Face 2 11.95
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.89 5.67
Concrete Work 1 15.85 15.85 m3
Slab 1 15.00 1.50 0.20 4.50

MSP-VOL-DRG Halaman 14 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Wall 2 15.00 0.20 1.89 11.35


Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.38 4.38 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.89 3.98
Segmen. 62 Inv El. +2124
23 W : 1100 Ts/Tw : 200 mm
Uk Saluran 15 1.50 2.08
Excavation 1 129.57 129.57 m3
Disposal in Site Area 1 129.57 129.57 m3
Borrow Soil 112.54 112.54 m3
Back Fill 1 112.54 112.54 m3
Compaction 7.00 23.60 23.60 m2
Layer 1 6.05 1.80 10.89
Layer 2 6.05 2.10 12.71
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.70 25.50 25.50 m2
Lean Concrete 1 15.00 1.70 0.05 1.28 1.28 m3
Rebar Work 1 1,890.72 Kg
Formwork 130.42 130.42 m2
Outside 2 15.00 2.08 62.28
Inside 2 15.00 1.88 56.28
Face 2 11.86
Slab 1 1.50 0.20 0.30
Wall 2 1.50 1.88 5.63
Concrete Work 1 15.76 15.76 m3
Slab 1 15.00 1.50 0.20 4.50
Wall 2 15.00 0.20 1.88 11.26
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 4.35 4.35 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.88 3.95
Segmen. 63 Inv El. +2342
24 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.86
Excavation 1 110.30 110.30 m3
Disposal in Site Area 1 110.30 110.30 m3
Borrow Soil 94.95 94.95 m3
Back Fill 1 94.95 94.95 m3
Compaction 7.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 1.20 m3
Rebar Work 1 1,697.76 Kg
Formwork 115.32 115.32 m2
Outside 2 15.00 1.86 55.74
Inside 2 15.00 1.66 49.74
Face 2 9.84
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.66 4.64
Concrete Work 1 14.15 14.15 m3
Slab 1 15.00 1.40 0.20 4.20
Wall 2 15.00 0.20 1.66 9.95
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.92 3.92 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.66 3.52
Segmen. 64 Inv El. +2357
25 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.84
Excavation 1 109.22 109.22 m3
Disposal in Site Area 1 109.22 109.22 m3
Borrow Soil 93.96 93.96 m3
Back Fill 1 93.96 93.96 m3
Compaction 7.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -

MSP-VOL-DRG Halaman 15 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 1.20 m3
Rebar Work 1 1,686.96 Kg
Formwork 114.34 114.34 m2
Outside 2 15.00 1.84 55.29
Inside 2 15.00 1.64 49.29
Face 2 9.76
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.64 4.60
Concrete Work 1 14.06 14.06 m3
Slab 1 15.00 1.40 0.20 4.20
Wall 2 15.00 0.20 1.64 9.86
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.89 3.89 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.64 3.49
Segmen. 65 Inv El. +2371
26 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.83
Excavation 1 108.22 108.22 m3
Disposal in Site Area 1 108.22 108.22 m3
Borrow Soil 93.04 93.04 m3
Back Fill 1 93.04 93.04 m3
Compaction 7.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 1.20 m3
Rebar Work 1 1,676.88 Kg
Formwork 113.42 113.42 m2
Outside 2 15.00 1.83 54.87
Inside 2 15.00 1.63 48.87
Face 2 9.68
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.63 4.56
Concrete Work 1 13.97 13.97 m3
Slab 1 15.00 1.40 0.20 4.20
Wall 2 15.00 0.20 1.63 9.77
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.86 3.86 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.63 3.46
Segmen. 66 Inv El. +2386
27 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.81
Excavation 1 107.14 107.14 m3
Disposal in Site Area 1 107.14 107.14 m3
Borrow Soil 92.06 92.06 m3
Back Fill 1 92.06 92.06 m3
Compaction 7.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 1.20 m3
Rebar Work 1 1,666.08 Kg
Formwork 112.44 112.44 m2
Outside 2 15.00 1.81 54.42
Inside 2 15.00 1.61 48.42
Face 2 9.60

MSP-VOL-DRG Halaman 16 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Slab 1 1.40 0.20 0.28


Wall 2 1.40 1.61 4.52
Concrete Work 1 13.88 13.88 m3
Slab 1 15.00 1.40 0.20 4.20
Wall 2 15.00 0.20 1.61 9.68
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.83 3.83 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.61 3.43
Segmen. 67 Inv El. +2401
28 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15.137 1.40 1.80
Excavation 1 107.04 107.04 m3
Disposal in Site Area 1 107.04 107.04 m3
Borrow Soil 91.91 91.91 m3
Back Fill 1 91.91 91.91 m3
Compaction 6.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.14 1.60 24.22 24.22 m2
Lean Concrete 1 15.14 1.60 0.05 1.21 1.21 m3
Rebar Work 1 1,670.40 Kg
Formwork 112.39 112.39 m2
Outside 2 15.14 1.80 54.46
Inside 2 15.14 1.60 48.41
Face 2 9.51
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.60 4.48
Concrete Work 1 13.92 13.92 m3
Slab 1 15.14 1.40 0.20 4.24
Wall 2 15.14 0.20 1.60 9.68
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.05 12.09 pcs
Joint Filler 1 3.80 3.80 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.60 3.40
Segmen. 68 Inv El. +2415
29 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.79
Excavation 1 105.08 m3
Disposal in Site Area 1 105.08 m3
Borrow Soil 95.57 95.57 m3
Back Fill 1 95.57 95.57 m3
Compaction 6.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 m3
Rebar Work 1 1,141.20 Kg
Formwork 110.54 110.54 m2
Outside 2 15.00 1.79 53.55
Inside 2 15.00 1.59 47.55
Face 2 9.44
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.59 4.44
Concrete Work 1 9.51 9.51 m3
Slab 1 15.00 1.40 0.20
Wall 2 15.00 0.20 1.59 9.51
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.77 3.77 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.59 3.37
Segmen. 69 Inv El. +2430
30 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.77
Excavation 1 104.01 m3
Disposal in Site Area 1 104.01 m3
Borrow Soil 94.59 94.59 m3
Back Fill 1 94.59 94.59 m3
Compaction 6.00 22.39 22.39 m2

MSP-VOL-DRG Halaman 17 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Layer 1 6.05 1.70 10.29


Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 m3
Rebar Work 1 1,130.40 Kg
Formwork 109.55 109.55 m2
Outside 2 15.00 1.77 53.10
Inside 2 15.00 1.57 47.10
Face 2 9.35
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.57 4.40
Concrete Work 1 9.42 9.42 m3
Slab 1 15.00 1.40 0.20
Wall 2 15.00 0.20 1.57 9.42
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.74 3.74 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.57 3.34
Segmen. 70 Inv El. +2445
31 W : 1000 Ts/Tw : 200 mm
Uk Saluran 15 1.40 1.76
Excavation 1 102.95 m3
Disposal in Site Area 1 102.95 m3
Borrow Soil 88.22 88.22 m3
Back Fill 1 88.22 88.22 m3
Compaction 6.00 22.39 22.39 m2
Layer 1 6.05 1.70 10.29
Layer 2 6.05 2.00 12.10
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.60 24.00 24.00 m2
Lean Concrete 1 15.00 1.60 0.05 1.20 1.20 m3
Rebar Work 1 1,623.60 Kg
Formwork 108.57 108.57 m2
Outside 2 15.00 1.76 52.65
Inside 2 15.00 1.56 46.65
Face 2 9.27
Slab 1 1.40 0.20 0.28
Wall 2 1.40 1.56 4.35
Concrete Work 1 13.53 13.53 m3
Slab 1 15.00 1.40 0.20 4.20
Wall 2 15.00 0.20 1.56 9.33
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 3.71 3.71 m'
Top Saluran 2 0.20 0.40
Dalam Saluran 1 0.20 1.56 3.31
Segmen. 71 Inv El. +2555
32 W : 900 Ts/Tw : 350 mm
Uk Saluran 10 1.60 1.55
Excavation 1 62.17 m3
Disposal in Site Area 1 62.17 m3
Borrow Soil 47.30 47.30 m3
Back Fill 1 47.30 47.30 m3
Compaction 6.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 10.00 1.80 18.00 18.00 m2
Lean Concrete 1 10.00 1.80 0.05 0.90 0.90 m3
Rebar Work 1 1,675.80 Kg

MSP-VOL-DRG Halaman 18 dari 22 DRAINAGE


DESCRIPTION Qty Sat Panjang Lebar Tinggi Volume / Ea Total sat. SIGN

Formwork 63.57 63.57 m2


Outside 2 10.00 1.55 30.90
Inside 2 10.00 1.20 23.90
Face 2 8.77
Slab 1 1.60 0.35 0.56
Wall 2 1.60 1.20 3.82
Concrete Work 1 13.97 13.97 m3
Slab 1 10.00 1.60 0.35 5.60
Wall 2 10.00 0.35 1.20 8.37
Dowel 1 - - - pcs
Filter Cloth @3m Both Side 2 4.33 8.67 pcs
Joint Filler 1 3.44 3.44 m'
Top Saluran 2 0.35 0.70
Dalam Saluran 1 0.35 1.20 2.74
Segmen. 72 Inv El. +2555
33 W : 900 Ts/Tw : 350 mm
Uk Saluran 10 1.60 1.55
Excavation 1 62.17 m3
Disposal in Site Area 1 62.17 m3
Borrow Soil 47.30 47.30 m3
Back Fill 1 47.30 47.30 m3
Compaction 6.00 24.81 24.81 m2
Layer 1 6.05 1.90 11.50
Layer 2 6.05 2.20 13.31
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 10.00 1.80 18.00 18.00 m2
Lean Concrete 1 10.00 1.80 0.05 0.90 0.90 m3
Rebar Work 1 1,675.80 Kg
Formwork 63.57 63.57 m2
Outside 2 10.00 1.55 30.90
Inside 2 10.00 1.20 23.90
Face 2 8.77
Slab 1 1.60 0.35 0.56
Wall 2 1.60 1.20 3.82
Concrete Work 1 13.97 13.97 m3
Slab 1 10.00 1.60 0.35 5.60
Wall 2 10.00 0.35 1.20 8.37
Dowel 1 11.00 11.00 11.00 pcs
Filter Cloth @3m Both Side 2 4.33 8.67 pcs
Joint Filler 1 3.44 3.44 m'
Top Saluran 2 0.35 0.70
Dalam Saluran 1 0.35 1.20 2.74
Segmen. 89 Inv El. +3110
34 W : 800 Ts/Tw : 150 mm
Uk Saluran 15 1.10 1.04
Excavation 1 51.42 51.42 m3
Disposal in Site Area 1 51.42 51.42 m3
Borrow Soil 43.97 43.97 m3
Back Fill 1 43.97 43.97 m3
Compaction 4.00 18.76 18.76 m2
Layer 1 6.05 1.40 8.47
Layer 2 6.05 1.70 10.29
Layer 3 - - -
Layer 4 - - -
Layer 5 - - -
Layer 6 - - -
Layer 7 - - -
Layer 8 - - -
Layer 9 - - -
Layer 10 - - -
Layer 11 - - -
Layer 12 - - -
Layer 13 - - -
Layer 14 - - -
Layer 15 - - -
Leveling soil for LC 1 15.00 1.30 19.50 19.50 m2
Lean Concrete 1 15.00 1.30 0.05 0.98 0.98 m3
Rebar Work 1 777.60 Kg
Formwork 62.15 62.15 m2
Outside 2 15.00 1.04 31.20
Inside 2 15.00 0.89 26.70
Face 2 4.25
Slab 1 1.10 0.15 0.17
Wall 2 1.10 0.89 1.96
Concrete Work 1 6.48 6.48 m3
Slab 1 15.00 1.10 0.15 2.48
Wall 2 15.00 0.15 0.89 4.01
Dowel 1 6.00 6.00 6.00 pcs
Filter Cloth @3m Both Side 2 6.00 12.00 pcs
Joint Filler 1 2.23 2.23 m'
Top Saluran 2 0.15 0.30
Dalam Saluran 1 0.15 0.89 1.93

MSP-VOL-DRG Halaman 19 dari 22 DRAINAGE


PT. MAHIR KARYA SETIA
J
RESUME VOLUME o
DRAINAGE REFINERY TANKHOUSE i
n
Data Saluran t
Lean
Excavation Disposal Backfill Borrow Soil Compaction Levelling Rebar Work Formwork Concrete Filter Cloth
No DESCRIPTION Ts & Concrete F
Inv El L Tw Tulangan Tulangan i
Utama Sekunder lm
mm mm mm m3 m3 m3 m3 m2 m2 m3 kg m2 m3 pcs l'
1 SEGMEN 1 W: 500 3554 6050 150 16@200 13@150 10.25 10.25 8.41 8.41 15.13 6.05 0.30 184.26 14.28 1.54 ### e
6.03
r
2 SEGMEN 2 W: 500 3541 15000 150 16@200 13@150 25.99 25.99 21.38 21.38 15.13 15.00 0.75 463.86 33.75 3.87 12.00
###
Subtotal Sisi Barat 36.24 36.24 29.79 29.79 30.25 21.05 1.05 648.12 48.02 5.40 18.03
3 SEGMEN 28 W: 1000 2277 15000 300 22@125 13@150 102.38 102.38 81.48 81.48 24.81 27.00 1.35 2,346.84 155.01 19.56 12.00
###
4 SEGMEN 38 W: 1100 1632 15000 200 19@200 13@150 0.00 0.00 155.01 155.01 23.60 0.00 0.00 1,704.96 162.89 14.21 12.00
###
5 SEGMEN 39 W: 1100 1617 15000 200 19@200 13@150 0.00 0.00 156.18 156.18 23.60 0.00 0.00 1,715.76 163.88 14.30 12.00
###
6 SEGMEN 40 W: 1100 1602 15000 200 19@200 13@150 0.00 0.00 157.36 157.36 23.60 0.00 0.00 1,726.56 164.87 14.39 12.00
###
7 SEGMEN 41 W: 1100 1291 15000 250 19@150 13@150 0.00 0.00 187.51 187.51 24.81 0.00 0.00 2,438.10 188.18 20.32 12.00
###
8 SEGMEN 42 W: 1100 1272 15000 250 19@150 13@150 0.00 0.00 189.11 189.11 24.81 0.00 0.00 2,455.20 189.44 20.46 12.00
###
9 SEGMEN 43 W: 1100 1257 15000 250 19@150 13@150 0.00 0.00 190.38 190.38 24.81 0.00 0.00 2,468.70 190.44 20.57 12.00
###
10 SEGMEN 44 W: 1100 1242 15000 250 19@150 13@150 0.00 0.00 184.30 184.30 24.81 27.00 1.35 3,202.20 191.43 26.69 12.00
###
Subtotal Sisi Utara 102.38 102.38 1,301.32 1,301.32 194.81 54.00 2.70 18,058.32 1,406.12 150.49 96.00
###
11 SEGMEN 45 W: 1100 1242 15000 250 19@150 13@150 0.00 0.00 184.30 184.30 24.81 27.00 1.35 3,202.20 191.43 26.69 12.00
###
12 SEGMEN 46 W: 1100 1242 15000 250 19@150 13@150 0.00 0.00 184.30 184.30 24.81 27.00 1.35 3,202.20 191.43 26.69 12.00
###
13 SEGMEN 47 W: 1100 1242 15000 250 19@150 13@150 0.00 0.00 184.30 184.30 24.81 27.00 1.35 3,202.20 191.43 26.69 12.00
###
14 SEGMEN 53 W: 1100 2018 15000 200 16@150 13@150 0.00 0.00 125.91 125.91 23.60 0.00 0.00 1,427.04 137.41 11.89 12.00
###
15 SEGMEN 54 W: 1100 2033 15000 200 16@150 13@150 0.00 0.00 124.83 124.83 23.60 0.00 0.00 1,416.24 136.42 11.80 12.00
###
16 SEGMEN 55 W: 1100 2048 15000 200 16@150 13@150 0.00 0.00 122.47 122.47 23.60 25.50 1.28 1,405.44 135.43 11.71 12.00
###
17 SEGMEN 56 W: 1100 2053 15000 200 16@150 13@150 135.07 135.07 117.61 117.61 23.60 25.50 1.28 1,941.84 135.10 16.18 12.00
###
18 SEGMEN 57 W: 1100 2079 4325 200 16@150 13@150 38.36 38.36 33.37 33.37 23.60 7.35 0.37 554.50 47.09 4.62 4.00
###
19 SEGMEN 58 W: 1100 2079 5657 200 16@150 13@150 50.18 50.18 43.65 43.65 23.60 9.62 0.48 725.27 57.86 6.04 5.00
###
Subtotal Sisi Timur 223.60 223.60 1,120.73 1,120.73 215.99 148.97 7.45 17,076.93 1,223.61 142.31 93.00
20 SEGMEN 59 W: 1100 2089 4671 200 16@150 13@150 41.19 41.19 35.82 35.82 23.60 7.94 0.40 596.62 49.64 4.97 5.00
###
21 SEGMEN 60 W: 1100 2094 15000 200 16@150 13@150 131.88 131.88 114.67 114.67 23.60 25.50 1.28 1,912.32 132.40 15.94 12.00
###
22 SEGMEN 61 W: 1100 2109 15000 200 16@150 13@150 130.72 130.72 113.60 113.60 23.60 25.50 1.28 1,901.52 131.41 15.85 12.00
###
23 SEGMEN 62 W: 1100 2124 15000 200 16@150 13@150 129.57 129.57 112.54 112.54 23.60 25.50 1.28 1,890.72 130.42 15.76 12.00
###
24 SEGMEN 63 W: 1000 2342 15000 200 16@150 13@150 110.30 110.30 94.95 94.95 22.39 24.00 1.20 1,697.76 115.32 14.15 12.00
###
25 SEGMEN 64 W: 1000 2357 15000 200 16@150 13@150 109.22 109.22 93.96 93.96 22.39 24.00 1.20 1,686.96 114.34 14.06 12.00
###
26 SEGMEN 65 W: 1000 2371 15000 200 16@150 13@150 108.22 108.22 93.04 93.04 22.39 24.00 1.20 1,676.88 113.42 13.97 12.00
###
27 SEGMEN 66 W: 1000 2386 15000 200 16@150 13@150 107.14 107.14 92.06 92.06 22.39 24.00 1.20 1,666.08 112.44 13.88 12.00
###
28 SEGMEN 67 W: 1000 2401 15137 200 16@150 13@150 107.04 107.04 91.91 91.91 22.39 24.22 1.21 1,670.40 112.39 13.92 12.09
###
29 SEGMEN 68 W: 1000 2415 15000 200 16@150 13@150 0.00 0.00 95.57 95.57 22.39 0.00 0.00 1,141.20 110.54 9.51 12.00
###
30 SEGMEN 69 W: 1000 2430 15000 200 16@150 13@150 0.00 0.00 94.59 94.59 22.39 0.00 0.00 1,130.40 109.55 9.42 12.00
###
31 SEGMEN 70 W: 1000 2445 15000 200 16@150 13@150 0.00 0.00 88.22 88.22 22.39 24.00 1.20 1,623.60 108.57 13.53 12.00
###
32 SEGMEN 71 W: 900 2555 10000 350 19@125 13@150 0.00 0.00 47.30 47.30 24.81 18.00 0.90 1,675.80 63.57 13.97 8.00
###
33 SEGMEN 72 W: 900 2555 10000 350 19@125 13@150 0.00 0.00 47.30 47.30 24.81 18.00 0.90 1,675.80 63.57 13.97 8.00
###
34 SEGMEN 89 W: 800 3110 15000 150 16@200 13@150 51.42 51.42 43.97 43.97 18.76 19.50 0.98 777.60 62.15 6.48 12.00
###
Subtotal Sisi Selatan 1,026.71 1,026.71 1,259.51 1,259.51 341.83 284.16 14.21 22,723.66 1,529.71 189.36 165.09
###
PT. MAHIR KARYA SETIA
RESUME VOLUME
DRAINAGE REFINERY TANKHOUSE

Plastik Cor Plywood Kalbon Kawat Putih MU 200 Paku Roofing Kawat Bendrat

No DESCRIPTION Volume Volume Volume Volume Volume Volume Volume Volume Volume Volume Volume Volume Volume Volume
Kebutuhan Material Kebutuhan Material Kebutuhan Material Kebutuhan Material Kebutuhan Material Kebutuhan Material Kebutuhan Material
m2 Roll m2 lbr m' ltr m2 kg m2 sak m2 dus kg roll
1 SEGMEN 1 W: 500 6.05 0.12 14.28 4.96 12.10 1.21 14.28 3.57 6.42 0.64 14.28 0.23 184.26 0.14
2 SEGMEN 2 W: 500 15.00 0.30 33.75 11.72 30.00 3.00 33.75 8.44 15.19 1.52 33.75 0.54 463.86 0.35
Subtotal Sisi Barat 0.42 17 4.21 12.01 2.16 0.77 0.49
3 SEGMEN 28 W: 1000 27.00 0.54 155.01 53.82 30.00 3.00 155.01 38.75 69.75 6.98 155.01 2.48 2346.84 1.76
4 SEGMEN 38 W: 1100 0.00 0.00 162.89 56.56 30.00 3.00 162.89 40.72 73.30 7.33 162.89 2.61 1704.96 1.28
5 SEGMEN 39 W: 1100 0.00 0.00 163.88 56.90 30.00 3.00 163.88 40.97 73.75 7.37 163.88 2.62 1715.76 1.29
6 SEGMEN 40 W: 1100 0.00 0.00 164.87 57.25 30.00 3.00 164.87 41.22 74.19 7.42 164.87 2.64 1726.56 1.29
7 SEGMEN 41 W: 1100 0.00 0.00 188.18 65.34 30.00 3.00 188.18 47.04 84.68 8.47 188.18 3.01 2438.10 1.83
8 SEGMEN 42 W: 1100 0.00 0.00 189.44 65.78 30.00 3.00 189.44 47.36 85.25 8.52 189.44 3.03 2455.20 1.84
9 SEGMEN 43 W: 1100 0.00 0.00 190.44 66.12 30.00 3.00 190.44 47.61 85.70 8.57 190.44 3.05 2468.70 1.85
10 SEGMEN 44 W: 1100 27.00 0.54 191.43 66.47 30.00 3.00 191.43 47.86 86.14 8.61 191.43 3.06 3202.20 2.40
Subtotal Sisi Utara 1.08 488 24.00 351.53 63.28 22.50 13.54
11 SEGMEN 45 W: 1100 27.00 0.54 191.43 66.47 30.00 3.00 191.43 47.86 86.14 8.61 191.43 3.06 3202.20 2.40
12 SEGMEN 46 W: 1100 27.00 0.54 191.43 66.47 30.00 3.00 191.43 47.86 86.14 8.61 191.43 3.06 3202.20 2.40
13 SEGMEN 47 W: 1100 27.00 0.54 191.43 66.47 30.00 3.00 191.43 47.86 86.14 8.61 191.43 3.06 3202.20 2.40
14 SEGMEN 53 W: 1100 0.00 0.00 137.41 47.71 30.00 3.00 137.41 34.35 61.84 6.18 137.41 2.20 1427.04 1.07
15 SEGMEN 54 W: 1100 0.00 0.00 136.42 47.37 30.00 3.00 136.42 34.11 61.39 6.14 136.42 2.18 1416.24 1.06
16 SEGMEN 55 W: 1100 25.50 0.51 135.43 47.03 30.00 3.00 135.43 33.86 60.94 6.09 135.43 2.17 1405.44 1.05
17 SEGMEN 56 W: 1100 25.50 0.51 135.10 46.91 30.00 3.00 135.10 33.78 60.80 6.08 135.10 2.16 1941.84 1.46
18 SEGMEN 57 W: 1100 7.35 0.15 47.09 16.35 8.65 0.87 47.09 11.77 21.19 2.12 47.09 0.75 554.50 0.42
19 SEGMEN 58 W: 1100 9.62 0.19 57.86 20.09 11.31 1.13 57.86 14.46 26.04 2.60 57.86 0.93 725.27 0.54
Subtotal Sisi Timur 2.98 425 23.00 305.90 55.06 19.58 12.81
20 SEGMEN 59 W: 1100 7.94 0.16 49.64 17.24 9.34 0.93 49.64 12.41 22.34 2.23 49.64 0.79 596.62 0.45
21 SEGMEN 60 W: 1100 25.50 0.51 132.40 45.97 30.00 3.00 132.40 33.10 59.58 5.96 132.40 2.12 1912.32 1.43
22 SEGMEN 61 W: 1100 25.50 0.51 131.41 45.63 30.00 3.00 131.41 32.85 59.13 5.91 131.41 2.10 1901.52 1.43
23 SEGMEN 62 W: 1100 25.50 0.51 130.42 45.28 30.00 3.00 130.42 32.60 58.69 5.87 130.42 2.09 1890.72 1.42
24 SEGMEN 63 W: 1000 24.00 0.48 115.32 40.04 30.00 3.00 115.32 28.83 51.90 5.19 115.32 1.85 1697.76 1.27
25 SEGMEN 64 W: 1000 24.00 0.48 114.34 39.70 30.00 3.00 114.34 28.59 51.45 5.15 114.34 1.83 1686.96 1.27
26 SEGMEN 65 W: 1000 24.00 0.48 113.42 39.38 30.00 3.00 113.42 28.36 51.04 5.10 113.42 1.81 1676.88 1.26
27 SEGMEN 66 W: 1000 24.00 0.48 112.44 39.04 30.00 3.00 112.44 28.11 50.60 5.06 112.44 1.80 1666.08 1.25
28 SEGMEN 67 W: 1000 24.22 0.48 112.39 39.02 30.27 3.03 112.39 28.10 50.57 5.06 112.39 1.80 1670.40 1.25
29 SEGMEN 68 W: 1000 0.00 0.00 110.54 38.38 30.00 3.00 110.54 27.63 49.74 4.97 110.54 1.77 1141.20 0.86
30 SEGMEN 69 W: 1000 0.00 0.00 109.55 38.04 30.00 3.00 109.55 27.39 49.30 4.93 109.55 1.75 1130.40 0.85
31 SEGMEN 70 W: 1000 24.00 0.48 108.57 37.70 30.00 3.00 108.57 27.14 48.86 4.89 108.57 1.74 1623.60 1.22
32 SEGMEN 71 W: 900 18.00 0.36 63.57 22.07 20.00 2.00 63.57 15.89 28.61 2.86 63.57 1.02 1675.80 1.26
33 SEGMEN 72 W: 900 18.00 0.36 63.57 22.07 20.00 2.00 63.57 15.89 28.61 2.86 63.57 1.02 1675.80 1.26
34 SEGMEN 89 W: 800 19.50 0.39 62.15 21.58 30.00 3.00 62.15 15.54 27.97 2.80 62.15 0.99 777.60 0.58
Subtotal Sisi Selatan 5.68 531 40.96 382.43 68.84 24.48 17.04