Introduction
SQ UARE 42 | BELVAL DISTRICT Introduction Location Building Technical Contact
About ATENOR
ATENOR is an international sustainable urban real estate development
company present in 10 European countries and listed on the Euronext
Brussels market. Its mission is to respond to new requirements of
the evolution of urban and professional life through sustainable urban
planning and architecture.
Edito
For the project called “Square 42”,
the masterplan of this new district is the
result of the transformation of the former
Belval steel factory into a modern, dynamic
site that offers a diverse array of activities
such as housing, retail, business, research
and education.
ATENOR
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
MORE THAN
ROOFTOP
3,000 SQ M with breathtaking views
office floors
RESTAURANT AVAILABLE IN
on the ground floor 2025
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
02
Location
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
ESCH-SUR-ALZETTE
Belval, an urban
quarter for A1
the 21 century
st
BELGIUM
A6
A6
A1
FINDEL
AIRPORT
LUXEMBOURG
E44
A6 CITY A1
JUST 20KM FROM LUXEMBOURG CITY AND E29
A4
A13
A3
A13 GERMANY
Large local talent
pool
270+ Fast connections
to Luxembourg,
ESCH-SUR-ALZETTE
companies, A13
shops and public Esch and Metz
by bus or tramway FRANCE
buildings
FRANCE
Belval, an urban
Roads Completed buildings
Parking
Bus stops Buildings under Luxembourg A4
construction
RN
31
century Sanem
Ponds Esch sur Alzette
Porte de l’université
Differdange
Park
CR18
Belval-Université
MUSIC & BARS & HOTELS Station
FRANCE Porte de la source
CULTURE RESTAURANTS Belval-Lycée
in the direct vicinity
Station
Rockal in the direct vicinity
7 minutes walk
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
The new heart of Belval focal point of Agora’s dynamic urban masterplan. Designed
around the factory’s original subterranean basins, the
square will combine business, retail, housing and leisure
spaces – all wrapped up in a bold architectural vision.
7 connected Fully
zones pedestrianized
Boulevard de la Recherche
03
Building
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
An environmental
approach
The architectural expression is directly linked to the
studies of solar energy intake on the facades of the
building.
THE LOBBY
A very special
welcome
A SPACE CREATED FOR
WELLBEING AND COMFORT
R+1
INTERIOR SPACES
Relax,
you’re at work
SQUARE 42 IS DESIGNED
TO MAKE WORK A PLEASURE
R+6
More than
3M
3,000 SQ M Typical ceiling
per floor height
More than
60/215
1,000 Bicycle/
total workforce car spaces Beautiful spaces for
possible companies of all shapes and
sizes, and at every stage of
their journey.
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
workspace
relaxed and happy. Cool aesthetic, space, sunlight and clean air…
they all have their part to play. And a large rooftop garden,
1st floor terraces, ground floor patio garden and green galleries
enhance that feeling of ease and contentment.
This means greater creativity, more productivity and a better staff
retention.
40 to 65 SQ M 225 SQ M
Galleries Rooftop garden
04
Technical
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
1 floor
st
2 , 3 , 4 and 5 floors
nd rd th th
1 person/10 sq m design density 1 person/10 sq m design density
6 floor
th
7 floor
th
Technical specifications
TARGETED THE BUILDING Clearance heights HVAC Lightning CEILING
CERTIFICATIONS The structural height makes it possible to reach: • LED technology controlled by external light
Functionality and surfaces (based on the BACS
method) •O ffice floors: 280 cm detectors and absence detectors
Heat supply and distribution Metal cassette ceilings - office areas
• 2 1,280 sq m of which 20,460 sq m is office •S tair/lift cores: 260 cm • Use of maximum natural light thanks to the
• Heat energy from the district heating network in • Active reversible for the office areas (levels +1
space over 8 levels orientation and the bay windows
•G round floor lobby: 450 – 500 cm the Belval district to +5)
gold 2018 • 8 40 sq m retail space on the ground floor •S anitary facilities: 260 cm •P ower (including the hot coils of the ventilation • Active chilled for the office areas on the GF
• Approximately 1,000 sq m green terraces •C ar Parks: 231 – 362 cm plants): +- 960 kW as an initial approximation LIFTS
(ground floor, level +1 and level +6). External •B asement technical rooms: 231 – 362 cm •T otal power reserve for the future shops on the
planted loggias (between levels +2 and +7) GF: 100 kW
WALLS
• The machinery of the lifts is integrated in the
• Independent retail and office areas shaft
• Two main pedestrian office entrances on either SUPERSTRUCTURE & SHELL Production and distribution of cooling energy
• Single layer coating sprayed on concrete walls
• Automatic sliding doors with telescopic opening
side of the building and masonry in the corridor areas, entrance
•C ooling energy of the entire building: by • The lifts comply with Luxembourg standards and and offices
• A third pedestrian entrance for public access to Stairs two water-cooled magnetic bearing cooling the European directive 95/16/CE and EN
the car park •P recast in concrete with a smooth finish • Interior walls: plastered and painted (one coat),
machines 81-01/1998
a double coat acrylic paint is applied
• 2 15 private parking spaces on •F itted with non-slip stair nosings and equipped The project provides for a load break on the
2 levels (-1, -2) with painted steel handrails • Stairwells: the walls are painted directly on the
Active reversible ceiling ground floor:
concrete and masonry
•A
ir conditioning of the offices: - Stair/lift core B serving up to level +7 triplex coil
• Tiles in the toilets and changing rooms
Acoustics Facades by an active reversible ceiling (hot and cold) with 3 lifts max. load 1000 kg / 10 persons. One
• Requirements of DIN 4109 and ISO 717-1 •D irectly related to the solar energy studies with a metal cassette distributed uniformly in of the lifts serves the basement levels.
regarding acoustic insulation (exterior facades and interior facades of the each zone - Cores A and D serving up to level +5: a duplex
building’s courtyard) coil with 1 lift max. load 800 kg and 1 lift max.
•R educing of cooling requirements and risk of Ventilation of office and sanitary areas load 1000 kg / 10 persons. One of the lifts in
THE STRUCTURE core D serves level -1.
overheating •4 air handling units with a basic flow rate of
•C omposed of curtain walls with a general approximately - Core C serving up to level +5: 1000 kg simplex
General description modulation of width 1.35 m unit
72,000 m³/h
• Basement structure: features (walls, columns, •B asic modules are divided into - 3 simplex units to serve the basements to
•D esigned, while meeting the ERP, to reach a
beams and slabs) in reinforced concrete cast in 5 cases: case 1 (no oscillation), case 2 (10° ground floor: 2 lifts max. load 800 kg and 1
total flow rate of approximately 100,000 m³/h
situ oscillation), lift max. load 1000 kg / 10 persons (for public
to ensure the necessary night-time cooling
• Structure of the above-ground levels: case 3 (20° oscillation), according to the results of the dynamic thermal access to the car park)
prefabricated elements (walls, columns, beams case 4 (30° oscillation) simulation
and slabs) and case 5 (40° oscillation)
• Division into 4 zones with expansion joints
FITTINGS
•G eneral modulation of 1.35 m corresponds to
the 5.40 m centre-to-centre distance of the ELECTRICITY
structural columns Floor
Modularity
•W indows of 2.80 m (their widths vary according Electricity • False floors in office spaces: raised floors,
• Principle of 1.35 m axes
to the orientation of the facades and the levels) •D ry type transformer with 20% reserve with a total height 15 cm including the thickness of
• Every 2 modules (2.70 m), the subfloor slab and the soft covering (to be
•C urtain walls: assembly of the vision parts secondary voltage of 230/400 V.
the techniques are equipped with: defined by the tenant)
- Activated ceiling panel (triple glazing), shadow-boxes at the level of the •A General Low Voltage Board protects
spandrels and sandwich panels with insulation and distributes the electrical energy to the • Carpet tiles: as the basic flooring in the
- Air supply and return
and finishing sheet metal switchboards through cable ducts (each level entrance airlocks on the ground floor
- Lighting system
has its own distribution switchboard with a 20%
• Partitioning can be carried out every 1.35 m
Exterior joinery reserve)
module taking into account the geometric
stresses of the building •C urtain walls and external doors in aluminium
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
05
Contact
SQ UARE 42 | BELVA L DISTRICT Introduction Location Building Technical Contact
Contact DEVELOPMENT
ATENOR
ARCHITECTURE
A2M
MORENO
ARCHITECTURE
+352 26 27 61 10 +32 2 640 51 81 +352 26 48 27 75
info@atenor.eu info@a2m.be moreno@moreno.lu
CGIs: ARTEFACTO – Floor plans: A2M – All rights reserved – Non-binding document – September 2022 – Brochure designed and produced by SAENTYS | info@saentys.com | saentys.com | 3500