Vous êtes sur la page 1sur 60

DIgSILENT

Nodes Branches Line Synchronous Machine 2-Winding Transformer Shunt/Filter 3-Winding Transformer General Load Static Var System BANDUNGU_15
Line-Line [kV] parallel Lines [-] Nominal Apparent Power [MVA] Rated Power [MVA] Max. Rated Reactive Power [Mvar] HV-Side [MVA] Total Active Power Load [MW] Q Reactance (>0) [Mvar] 15.00 kV

Name [-] Power Factor [-] Short-Circuit Voltage uk [%] HV-MV [%] Total Reactive Power Load [Mvar] Q per Capacitor Unit (<0) [Mvar] 15.00 MVA
9.80 %
0.60 MW
0.37 Mvar
0.85

T1_BAND_220/15
Length of Line [km] Nominal Voltage [kV] Power Factor [-] Max. Number of Capacitors [-]

L_BAND_15
L_MALUKU_30
15.00 MVA
9.80 %
BANDUNGU_220
220.00 kV

40.00 MW
24.79 Mvar 1 20.00 Mvar
0.85 L_220kV_..
264.0 km
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
30.00 kV
L_FUNA_20 1

1 30.00 kV
Comp_FUNA_20

L_MAL_BAND_220
75.00 MVA 75.00 MVA Comp_BANDUN_220
11.54 % 11.54 %
10.00 MW 75.00 MVA 75.00 MVA
6.20 Mvar 1
11.54 % 11.54 %
0.85 18.00 Mvar
70.00 MW
T_UTEX_20 43.38 Mvar T1_MALUKU T2_MALUKU
0.85 18.00 Mvar
20.00 kV
FUNA_20/B0.0
100.00 MVA 20.00 kV
17.82 % 0 0
T1_UTEX_220/20

100.00 MVA 100.00 MVA


L_LINGW_30 18.05 % 18.05 %
1
6 75.00 MVA 75.00 MVA L_220kV_..

T1_FUNA_220/20

T2_FUNA_220/20
Comp_LINGWALA_30 11.54 % 11.54 % 264.0 km

MALUKU_220/B..
0 0 220.00 kV
100.00 MVA 1
17.82 %
120.00 MW
220.00 kV
UTEXCO_220 74.37 Mvar
18.00 Mvar 0.85
220.00 kV
LINGWALA_30/.. LIMINGA_30/B.. 100.00 MVA 100.00 MVA
1
L_220kV_..
1
L_220kV_..
18.05 % 18.05 % 68.6 km 68.6 km
1 30.00 kV 30.00 kV
L_220kV_..
2.3 km
30.00 kV 30.00 kV

75.00 MVA 75.00 MVA 18.00 Mvar 120.00 MW 75.00 MVA 75.00 MVA 1 1
11.54 % 11.54 % 74.37 Mvar 11.54 % 11.54 % L_220kV_.. L_220kV_..
0.85 4.9 km 4.9 km
75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA
L_LING_UTEX_220

11.54 % 11.54 % 1 11.54 % 11.54 %

L2_LIMIN_FUN_220
L1_LIMIN_FUN_220
Comp_LIMINGA_30

L_LIMIN_30
0 0 0 0
T1_LIMINGA T2_LIMINGA

L1_MAL_KIM_220

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA

1 1 1
L_220kV_.. 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA L_220kV_.. L_220kV_..
2.3 km 11.54 % 11.54 % 11.54 % 11.54 % 4.9 km 4.9 km
LINGWALA_220.. LIMINGA_220/..
220.00 kV 220.00 kV

1 1 1 1 1
L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
14.0 km 18.0 km 18.0 km 11.0 km 11.0 km

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220
L_LIMG_MBOU_220

L2_LING_KIM_220

L1_LING_KIM_220

1 1 1 1 1 1
L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
18.0 km 18.0 km 11.0 km 11.0 km 68.6 km 68.6 km
1
L_220kV_.. GOM_6/B0.1 KIMWENZA/B0...
14.0 km
220.00 kV
MBUONO_220/B.. 6.60 kV

220.00 kV 6.60 kV 220.00 kV


KIMWENZA/B0...
30.00 MVA 30.00 MVA 10.00 MW 15.00 MVA 15.00 MVA 100.00 MVA 50.00 MVA 1 1
10.00 % 10.00 % 6.20 Mvar 10.50 % 10.50 % 6.00 % 6.00 % L_220kV_.. L_220kV_..
0.85 182.0 km 182.0 km
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
T1_GOM_70/6

T2_GOM_70/6

0 0
0 0 0 0
L_KAS_GOM_70
L_GOM_6

1 1
30.00 MVA 30.00 MVA 15.00 MVA 15.00 MVA L_70kV_1.. L_70kV_1.. 100.00 MVA 50.00 MVA
10.00 % 10.00 % 10.50 % 10.50 % 30.0 km 30.0 km 6.00 % 6.00 %

KASAN_70/B1
30.00 kV
GOM_70/B0.1 70.00 kV 70.00 kV
MBOUNO_30
50.00 MW 70.00 kV 1 2.60 MVA 0.00 Mvar 0.00 Mvar
30.99 Mvar L_70kV_1.. 7.80 % L_KAS_15 -30.00 Mvar -40.00 Mvar
0.85 50.0 km 3 1

T_KAS_70/15
L_KAS_ZONG_70

SVS SVS
L_MBUONO_30 1.00 MW TSC1 TSC2
2.60 MVA 0.62 Mvar
7.80 % 0.85
T_KAS_15

1 15.00 kV
L_70kV_1..
50.0 km
70.00 kV
ZONGO/B0.1

70.00 kV
ZONGO/B0.0
62.50 MVA 17.50 MVA 17.50 MVA 17.50 MVA 26.40 MVA 26.40 MVA 1 1
10.00 % 9.40 % 9.40 % 9.40 % 9.90 % 9.90 % L_70kV_1.. L_70kV_1..
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

41.0 km 41.0 km
T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

0 0 0 0 0 0
Voltage Levels

220. kV 1 1
132. kV 62.50 MVA 17.50 MVA 17.50 MVA 17.50 MVA 26.40 MVA 26.40 MVA L_70kV_1.. L_70kV_1..
10.00 % 9.40 % 9.40 % 9.40 % 9.90 % 9.90 % 41.0 km 41.0 km
70. kV INKISI_70
30. kV
20. kV 70.00 kV
16. kV 1 17.50 MVA 17.50 MVA 17.50 MVA 4.86 MVA 4.86 MVA 1 1 5.00 MVA
15. kV L_132kV_.. 0.85 0.85 0.85 0.85 0.85 L_70kV_1.. L_70kV_1.. 9.50 %
58.3 km 6.60 kV 6.60 kV 6.60 kV 6.60 kV 6.60 kV 22.0 km 22.0 km
11. kV
T1_INK_70/15

10.5 kV L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

6.6 kV ~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO 1 1


L_70kV_1.. L_70kV_1..
22.0 km 22.0 km
2.50 MW
MBANZA_70 5.00 MVA
9.50 %
1.55 Mvar
0.85
70.00 kV

1 2.60 MVA 2.60 MVA 1 1 15.00 kV


L_132kV_..
58.3 km
7.80 % 7.80 % L_70kV_1.. L_70kV_1.. T_INK_15
20.0 km 20.0 km
T2_MBAN_70/6.6
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
132.00 kV 0 0

50.00 MVA 1 1
10.75 % L_70kV_1.. L_70kV_1..
20.0 km 20.0 km
T1_BADIA_124/33

1.50 MW 1.50 MW
0.93 Mvar
0.85
2.60 MVA
7.80 %
2.60 MVA
7.80 %
0.93 Mvar
0.85
LUFU-TOTO_70
-1 70.00 kV

6.60 kV 6.60 kV 1 1 5.00 MVA 5.00 MVA


T1_MBAN_6.6 T2_MBAN_6.6 L_70kV_1.. L_70kV_1.. 8.00 % 8.00 %
T2_LUF_70/15

30.0 km 30.0 km
T1_LUF_70/15

50.00 MVA L1_LUFU_15 L2_LUFU_15


10.75 %
L1_LUK_LUF_70 L2_LUK_LUF_70 0 0
T_BADIA_AT
1 1
L_70kV_1.. L_70kV_1..
30.0 km 30.0 km
30.00 kV 4.00 MW 4.00 MW
60.00 MVA
0.90 % LUKALA_70 2.48 Mvar
0.85
5.00 MVA
8.00 %
5.00 MVA
8.00 %
2.48 Mvar
0.85
T2_BADIA_30/30

70.00 kV

10.50 MVA 10.50 MVA 1 1 15.00 kV 15.00 kV


10 10.00 % 10.00 % L_LUKALA_6.6 L_70kV_1.. L_70kV_1..
T1_LUFU_15 T2_LUFU_15
10.0 km 10.0 km
T2_LUK_70/6.6
T1_LUK_70/6.6

L1_KIM_LUK_70 L2_KIM_LUK_70
60.00 MVA
0.90 %
1 1
BADIA_30 L_70kV_1.. L_70kV_1..
10.0 km 10.0 km
10.00 MW
10.50 MVA 10.50 MVA 6.20 Mvar
10.00 % 10.00 % 0.85 KIMPESE_70
30.00 kV
30.00 MW 70.00 kV
18.59 Mvar
0.85
6.60 kV 1 1 7.00 MVA 7.00 MVA
L_SANDA_15 L_70kV_1.. L_70kV_1.. 12.50 % 12.50 %
12.0 km 12.0 km
6.60 kV 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30 LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
4.00 MW 1 1
2.48 Mvar L_70kV_1.. L_70kV_1..
0.85 12.0 km 12.0 km T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.50 MW 0.50 MW
15.00 kV 70.00 kV 0.31 Mvar 7.00 MVA 7.00 MVA 7.00 MVA 7.00 MVA 0.31 Mvar
0.85 12.50 % 12.50 % 12.50 % 12.50 % 0.85
5.00 MVA 10.00 MVA 1 1
6.00 % 8.50 % L_CIN_6.6 L_70kV_1.. L_70kV_1..
T1_KINTATA_132/15

20.0 km 20.0 km
30.00 kV 15.00 kV
T-KIMP_30 T_KIM_15
T_CIN_70/6

L1_KWIL_CIN_70 L2_KWIL_CIN_70
0
1 1
L_132_INGA_KINT L_70kV_1.. L_70kV_1..
20.0 km 20.0 km
1 5.00 MW 70.00 kV
5.00 MVA
6.00 %
L_132kV_..
21.0 km
10.00 MVA
8.50 %
3.10 Mvar
0.85
KWILU_70/B0...

132.00 kV 70.00 kV
KINTATA_132 T_CIN_6.6 KWILU_70/B0...
1 1 1 6.60 kV 50.00 MVA 50.00 MVA
L_132kV_.. L_132kV_.. L_132kV_.. 11.63 % 11.63 % L_KWILU_15 Comp_KWIL_15
74.0 km 30.0 km 21.0 km
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

132.00 kV T2_KWILU 1
L2_ING_KWIL_220
50.00 MVA 50.00 MVA 0.50 MW
9.60 % 9.60 % 0 50.00 MVA 50.00 MVA 0.31 Mvar
11.63 % 11.63 % 0.85 10.00 Mvar
L1_ING_KWIL_220 0
1 1
L_132kV_.. L_132kV_.. 50.00 MVA 50.00 MVA 15.00 kV
74.0 km 30.0 km
9.60 % 9.60 % T_KWILU_15
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
1
L_220kV_..
1
L_220kV_.. 50.00 MVA 50.00 MVA
1
L_220kV_..
1
L_220kV_..
79.6 km 79.6 km 11.63 % 11.63 % 182.0 km 182.0 km
220.00 kV
0 0
132.00 kV 132.00 kV KWILU_220/B0..
10.00 MVA 15.00 MVA 15.00 MVA
10.40 % 9.80 % 9.80 %
T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

220.00 kV
KWILU_220/B0..
1 1
50.00 MVA 50.00 MVA L_220kV_.. L_220kV_..
9.60 % 9.60 % 79.6 km 79.6 km
220.00 kV
INGA1/B0.1
10.00 MVA 15.00 MVA 15.00 MVA
10.40 % 9.80 % 9.80 % INGA1/B0.0
BOMA_15 MATADI_15 220.00 kV

15.00 kV 15.00 kV 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 200.00 MW
10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 123.95 Mvar
0.85
5.00 MVA 20.00 MW
6.00 % 12.39 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

0.85
T1_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

4.00 MW
5.00 MVA 2.48 Mvar 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA
6.00 % 0.85 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 %
LEMBA_A30
30.00 kV

65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA
0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
CONGO - PMEDE Project: 6830P03
11.00 kV 11.00 kV 11.00 kV 11.00 kV 11.00 kV 11.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Documentation des dates de l'equipment Date: 4/19/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Réseau de haute tension (HT) Annex: 2.3.0
Documentation of Device Data Busbar

single busbar

Short- Rated Short- Rated Short-


Circuit Peak Time Thermal Circuit
Name Nom.Volt. Current Current Duration
kV kA kA s
BADIADINGI_132 132 39 14 1
BADIA_30 30 40 16 1
BANDUNGU_15 15 40 16 1
BANDUNGU_220 220 62,5 25 1
BOMA_132 132 39 14 1
BOMA_15 15 40 16 1
CINAT_70 70 36 14,6 1
INGA_132 132 39 14 1
INKISI_70 70 36 14,6 1
KASAN_70 70 36 14,6 1
KIMPESE_70 70 36 14,6 1
KINTATA_132 132 39 14 1
LEMBA_A30 30 63 25 1
LUFU-TOTO_70 70 36 14,6 1
LUKALA_70 70 36 14,6 1
MATADI_132 132 39 14 1
MATADI_15 15 40 16 1
MBANZA_70 70 36 14,6 1
MBOUNO_30 30 40 16 1
MBUONO_220 220 62,5 25 1
SANDA_15 15 40 16 1
T_BADIA_AT 30 40 16 1
T_CIN_6.6 6,6 40 16 1
T_INK_15 15 40 16 1
T_KAS_15 15 40 16 1
T_KIM_15 15 40 16 1
T_KIM_30 30 40 16 1
T_KWILU_15 15 40 16 1
T_UTEX_20 20 40 16 1
T1_LUFU_15 15 40 16 1
T2_LUFU_15 15 40 16 1
T1_MBAN_6.6 6,6 40 16 1
T2_MBAN_6.6 6,6 40 16 1
UTEXCO_220 220 100 40 1

single busbar with bus coppler

Short- Rated Short- Rated Short-


Circuit Peak Time Thermal Circuit
Name Nom. Volt. Current Current Duration
kV kA kA s
FUNA_20 20 64 25 1
LIMINGA_220 220 80 31,5 1
LINGWALA_220 220 100 40 1

6830P03 FICHTNER Annex 2.3.1 page 1 of 2


Documentation of Device Data Busbar

double busbar

Short- Rated Short- Rated Short-


Circuit Peak Time Thermal Circuit
Name Nom. Volt. Current Current Duration
kV kA kA s
GOMBE_6.6 6,6 75 30 1
GOMBE_70 70 36 14,6 1
KIMWENZA 220 62,5 25 1
KWILU_220 220 63 20 3
KWILU_70 70 36 14,6 1
LIMINGA_30 30 100 40 1
LINGWALA_30 30 100 40 1
LUKALA_6.6 6,6 63 25 1
MALUKU_220 220 100 40 1
MALUKU_30 30 100 40 1
ZONGO 70 36 14,6 1

double busbar with bus coupler

Short- Rated Short- Rated Short-


Circuit Peak Time Thermal Circuit
Name Nom. Volt. Current Current Duration
kV kA kA s
INGA1 220 47,5 19 1

6830P03 FICHTNER Annex 2.3.1 page 2 of 2


Documentation of Device Data System Loads

Loads along 70 kV Line Inga - Kinshasa


Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow.
Busbar MW MVA Mvar
L1_LUFU_15 T1_LUFU_15 4,0 0,85 4,2 1,3
L1_MBAN_6.6 T1_MBAN_6.6 1,5 0,85 1,6 0,5
L2_LUFU_15 T2_LUFU_15 4,0 0,85 4,2 1,3
L2_MBAN_6.6 T2_MBAN_6.6 1,5 0,85 1,6 0,5
L_CIN_6.6 T_CIN_6.6 5,0 0,85 5,3 1,6
L_INK_15 T_INK_15 2,5 0,85 2,6 0,8
L_KIMP_15 T_KIM_15 0,5 0,85 0,5 0,2
L_KIMP_30 T-KIMP_30 0,5 0,85 0,5 0,2
L_KWILU_15 T_KWILU_15 0,5 0,85 0,5 0,2
L_LUKALA_6.6 LUKALA_6.6 10,0 0,85 10,5 3,3
Total Load 70 kV Line 30,0

Loads Kinshasa
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow.
Busbar MW MVA Mvar
L_BADIA_30 BADIA_30 30,0 0,85 31,6 9,9
L_BAND_15 BANDUNGU_15 0,6 0,85 0,6 0,2
L_FUNA_20 FUNA_20 70,0 0,85 73,7 23,0
L_GOM_6 GOMBE_6.6 10,0 0,85 10,5 3,3
L_KAS_15 T_KAS_15 1,0 0,85 1,1 0,3
L_LIMIN_30 LIMINGA_30 120,0 0,85 126,3 39,4
L_LINGW_30 LINGWALA_30 120,0 0,85 126,3 39,4
L_MALUKU_30 MALUKU_30 40,0 0,85 42,1 13,1
L_UTEX_20 T_UTEX_20 10,0 0,85 15,8 4,9
Total Kinshasa 401,6

Loads Inga Region


Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow.
Busbar MW MVA Mvar
L_LEMBA_30 LEMBA_A30 4,0 0,85 4,2 1,3
L_MATADI_15 MATADI_15 20,0 0,85 21,1 6,6
L_SANDA_15 SANDA_15 4,0 0,85 4,2 1,3
Total Inga 28,0

Export
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow.
Busbar MW MVA Mvar
L_MBUONO_30 MBOUNO_30 50,0 0,85 31,6 9,9
Export Brazzaville 50,0
L_HVDC INGA1 200,0 0,85 294,7 92,0
Export HVDC 200,0

6830P03 FICHTNER Annex 2.3.2-1 Page 1 of 1


Load Forecast
Loads along 70 kV Line Inga - Kinshasa
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
annual growth 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5%
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow.
Busbar MW MVA Mvar MW MW MW MW MW MW MW MW MW MW MW MW MW MW
L1_LUFU_15 T1_LUFU_15 4,0 0,85 4,2 1,3 4,1 4,2 4,3 4,4 4,5 4,6 4,8 4,9 5,0 5,1 5,2 5,4 5,5 5,7
L1_MBAN_6.6 T1_MBAN_6.6 1,5 0,85 1,6 0,5 1,5 1,6 1,6 1,7 1,7 1,7 1,8 1,8 1,9 1,9 2,0 2,0 2,1 2,1
L2_LUFU_15 T2_LUFU_15 4,0 0,85 4,2 1,3 4,1 4,2 4,3 4,4 4,5 4,6 4,8 4,9 5,0 5,1 5,2 5,4 5,5 5,7
L2_MBAN_6.6 T2_MBAN_6.6 1,5 0,85 1,6 0,5 1,5 1,6 1,6 1,7 1,7 1,7 1,8 1,8 1,9 1,9 2,0 2,0 2,1 2,1
L_CIN_6.6 T_CIN_6.6 5,0 0,85 5,3 1,6 5,1 5,3 5,4 5,5 5,7 5,8 5,9 6,1 6,2 6,4 6,6 6,7 6,9 7,1
L_INK_15 T_INK_15 2,5 0,85 2,6 0,8 2,6 2,6 2,7 2,8 2,8 2,9 3,0 3,0 3,1 3,2 3,3 3,4 3,4 3,5
L_KIMP_15 T_KIM_15 0,5 0,85 0,5 0,2 0,5 0,5 0,5 0,6 0,6 0,6 0,6 0,6 0,6 0,6 0,7 0,7 0,7 0,7
L_KIMP_30 T-KIMP_30 0,5 0,85 0,5 0,2 0,5 0,5 0,5 0,6 0,6 0,6 0,6 0,6 0,6 0,6 0,7 0,7 0,7 0,7
L_KWILU_15 T_KWILU_15 0,5 0,85 0,5 0,2 0,5 0,5 0,5 0,6 0,6 0,6 0,6 0,6 0,6 0,6 0,7 0,7 0,7 0,7
L_LUKALA_6.6 LUKALA_6.6 10,0 0,85 10,5 3,3 10,3 10,5 10,8 11,0 11,3 11,6 11,9 12,2 12,5 12,8 13,1 13,4 13,8 14,1
Total Load 70 kV Line 30,0 30,8 31,5 32,3 33,1 33,9 34,8 35,7 36,6 37,5 38,4 39,4 40,3 41,4 42,4

Loads Kinshasa
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
annual growth 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5%
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow.
Busbar MW MVA Mvar MW MW MW MW MW MW MW MW MW MW MW MW MW MW
L_BADIA_30 BADIA_30 30,0 0,85 31,6 9,9 30,8 31,5 32,3 33,1 33,9 34,8 35,7 36,6 37,5 38,4 39,4 40,3 41,4 42,4
L_BAND_15 BANDUNGU_15 0,6 0,85 0,6 0,2 0,6 0,6 0,6 0,7 0,7 0,7 0,7 0,7 0,7 0,8 0,8 0,8 0,8 0,8
L_FUNA_20 FUNA_20 70,0 0,85 73,7 23,0 71,8 73,5 75,4 77,3 79,2 81,2 83,2 85,3 87,4 89,6 91,8 94,1 96,5 98,9
L2_FUNA_20_ST FUNA_20 20,0 20,5 21,0 21,5 22,1 22,6 23,2 23,8 24,4 25,0 25,6 26,2 26,9
L3_FUNA_20_MT FUNA_20 80,0 82,0 84,1 86,2 88,3 90,5 92,8 95,1
L_GOM_6 GOMBE_6.6 10,0 0,85 10,5 3,3 10,3 10,5 10,8 11,0 11,3 11,6 11,9 12,2 12,5 12,8 13,1 13,4 13,8 14,1
L_KAS_15 T_KAS_15 1,0 0,85 1,1 0,3 1,0 1,1 1,1 1,1 1,1 1,2 1,2 1,2 1,2 1,3 1,3 1,3 1,4 1,4
L_LIMIN_30 LIMINGA_30 120,0 0,85 126,3 39,4 123,0 126,1 129,2 132,5 135,8 139,2 142,6 146,2 149,9 153,6 157,5 161,4 165,4 169,6
L_LINGW_30 LINGWALA_30 120,0 0,85 126,3 39,4 123,0 126,1 129,2 132,5 135,8 139,2 142,6 146,2 149,9 153,6 157,5 161,4 165,4 169,6
L_MALUKU_30 MALUKU_30 40,0 0,85 42,1 13,1 41,0 42,0 43,1 44,2 45,3 46,4 47,5 48,7 50,0 51,2 52,5 53,8 55,1 56,5
L_UTEX_20 T_UTEX_20 10,0 0,85 15,8 4,9 10,3 10,5 10,8 11,0 11,3 11,6 11,9 12,2 12,5 12,8 13,1 13,4 13,8 14,1
L2_UTEX_20_ST T_UTEX_20 20,0 20,5 21,0 21,5 22,1 22,6 23,2 23,8 24,4 25,0 25,6 26,2 26,9
L3_UTEX_20_MT T_UTEX_20 50,0 51,3 52,5 53,8 55,2 56,6 58,0 59,4
L_KIMBANSEKE KIMBANSEKE_20 30,0 30,8 31,5 32,3 33,1 33,9 34,8 35,7 36,6 37,5 38,4
Total Kinshasa 401,6 411,6 461,9 473,5 515,3 528,2 541,4 684,9 702,1 719,6 737,6 756,0 774,9 794,3 814,2

Loads Inga Region


Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
annual growth 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5%
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow.
Busbar MW MVA Mvar MW MW MW MW MW MW MW MW MW MW MW MW MW MW
L_LEMBA_30 LEMBA_A30 4,0 0,85 4,2 1,3 4,1 4,2 4,3 4,4 4,5 4,6 4,8 4,9 5,0 5,1 5,2 5,4 5,5 5,7
L_MATADI_15 MATADI_15 20,0 0,85 21,1 6,6 20,5 21,0 21,5 22,1 22,6 23,2 23,8 24,4 25,0 25,6 26,2 26,9 27,6 28,3
L_SANDA_15 SANDA_15 4,0 0,85 4,2 1,3 4,1 4,2 4,3 4,4 4,5 4,6 4,8 4,9 5,0 5,1 5,2 5,4 5,5 5,7
Total Inga 28,0 28,7 29,4 30,2 30,9 31,7 32,5 33,3 34,1 35,0 35,8 36,7 37,7 38,6 39,6

Export
Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
annual growth 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5%
Name Terminal Act.Pow. Pow.Fact. App.Pow. React.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow. Act.Pow.
Busbar MW MVA Mvar MW MW MW MW MW MW MW MW MW MW MW MW MW MW
L_MBUONO_30 MBOUNO_30 50,0 0,85 31,6 9,9 51,3 52,5 53,8 55,2 56,6 58,0 59,4 60,9 62,4 64,0 65,6 67,2 68,9 70,6
Export Brazzaville 50,0
annual growth 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0%
L_HVDC INGA1 200,0 0,85 294,7 92,0 200,0 200,0 200,0 500,0 500,0 500,0 500,0 500,0 800,0 800,0 800,0 800,0 800,0 800,0
Export HVDC 200,0

6830P03 FICHTNER Annex 2.3.2-2 Page 1 of 1


Documentation of Device Data Line Data

Cable/ Conductor Rtd. Rtd. Derating 1,2 - Sequence Zero Sequence


Name Terminal i Terminal j Type OHL Type Cross Section Voltage Length Par.no. Current Factor R' X' C' R0' X0' C0'
mm2 kV km kA Ohm/km Ohm/km uF/km Ohm/km Ohm/km uF/km
L1_ING_KWIL_220 INGA1 KWILU_220 L_220kV OHL 2x ALAC Oriole 210,3 220 79,6 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_ING_KWIL_220 INGA1 KWILU_220 L_220kV OHL 2x ALAC Oriole 210,3 220 79,6 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L1_KWIL_KIM_220 KWILU_220 KIMWENZA L_220kV OHL 2x ALAC Oriole 210,3 220 182 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_KWIL_KIM_220 KWILU_220 KIMWENZA L_220kV OHL 2x ALAC Oriole 210,3 220 182 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L1_LIMIN_FUN_220 LIMINGA_220 T1_Funa L_220kV OHL 2x ALAC Oriole 210,3 220 4,86 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_LIMIN_FUN_220 LIMINGA_220 T2_Funa L_220kV OHL 2x ALAC Oriole 210,3 220 4,86 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L1_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L1_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 18 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 18 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L1_MAL_KIM_220 KIMWENZA MALUKU_220 L_220kV OHL 2x ALAC Oriole 210,3 220 68,6 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L2_MAL_KIM_220 KIMWENZA MALUKU_220 L_220kV OHL 2x ALAC Oriole 210,3 220 68,6 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L_LIMG_MBOU_220 LINGWALA_220 MBUONO_220 L_220kV-210MVA OHL 1xAlmelec 366 220 14 1 0,551 1 0,1 0,345 0,00863 0,38 0,81 0,00863
L_LING_UTEX_220 UTEXCO_220 LINGWALA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 2,26 1 0,76 1 0,09 0,345 0,00863 0,38 0,81 0,00863
L_MAL_BAND_220 MALUKU_220 BANDUNGU_220 L_220kV-232MVA OHL 2x ALAC Oriole 210,3 220 264 1 0,578 1 0,09 0,345 0,00863 0,38 0,81 0,00863

L_132_INGA_KINT INGA_132 KINTATA_132 L_132kV OHL 1xALAC 150 132 21 1 0,279 1 0,27 0,46 0,00866 0,5 0,95 0,00866
L_132_KINT_BOM KINTATA_132 BOMA_132 L_132kV OHL 1xALAC 150 132 74 1 0,279 1 0,27 0,46 0,00866 0,5 0,95 0,00866
L_132_KINT_MAT KINTATA_132 MATADI_132 L_132kV OHL 1xALAC 150 132 30 1 0,279 1 0,27 0,46 0,00866 0,5 0,95 0,00866
L_ZON_BAI_132 BADIADINGI_132 T_ZON_132 L_132kV OHL 1xALAC 150 132 58,3 1 0,279 1 0,27 0,46 0,00866 0,5 0,95 0,00866

L1_KWIL_CIN_70 KWILU_70 CINAT_70 L_70kV_49MVA OHL 1 x Cu 54 70 20 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_KWIL_CIN_70 KWILU_70 CINAT_70 L_70kV_49MVA OHL 1 x Cu 54 70 20 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_CIN_KIM_70 CINAT_70 KIMPESE_70 L_70kV_49MVA OHL 1 x Cu 54 70 12 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_CIN_KIM_70 CINAT_70 KIMPESE_70 L_70kV_49MVA OHL 1 x Cu 54 70 12 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_KIM_LUK_70 KIMPESE_70 LUKALA_70 L_70kV_49MVA OHL 1 x Cu 54 70 10 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_KIM_LUK_70 KIMPESE_70 LUKALA_70 L_70kV_49MVA OHL 1 x Cu 54 70 10 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_LUK_LUF_70 LUKALA_70 LUFU-TOTO_70 L_70kV_49MVA OHL 1 x Cu 54 70 30 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_LUK_LUF_70 LUKALA_70 LUFU-TOTO_70 L_70kV_49MVA OHL 1 x Cu 54 70 30 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_LUFU_MBAN_70 LUFU-TOTO_70 MBANZA_70 L_70kV_49MVA OHL 1 x Cu 54 70 20 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_LUFU_MBAN_70 LUFU-TOTO_70 MBANZA_70 L_70kV_49MVA OHL 1 x Cu 54 70 20 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_MBAN_INK_70 MBANZA_70 INKISI_70 L_70kV_49MVA OHL 1 x Cu 54 70 22 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_MBAN_INK_70 MBANZA_70 INKISI_70 L_70kV_49MVA OHL 1 x Cu 54 70 22 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L1_INK_ZONG_70 INKISI_70 ZONGO L_70kV_49MVA OHL 1 x Cu 54 70 41 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L2_INK_ZONG_70 INKISI_70 ZONGO L_70kV_49MVA OHL 1 x Cu 54 70 41 1 0,206 1 0,4 0,452 0,00866 0,6 1,15 0,00866
L_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30 1 0,206 1 0,4 0,452 0,00764 0,6 1,15 0,00764
L_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50 1 0,206 1 0,4 0,452 0,00764 0,6 1,15 0,00764

Adatption of line data according to the conductor types

6830P03 FICHTNER Annex 2.3.3 Page 1 of 1


Documentation of Device Data
Two Winding Transformer

HV-rtd. LV-Rtd. Rtd. Shc No Load No Load Vector Earthing Earthing


Name Volt. Volt. Pow. Volt. Cop.Los. Los. Cur. Grp. Add.V./tap Min.Tap Max.Tap HV side LV side
kV kV MVA % kW kW % % Ohm Ohm
T1_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T2_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T3_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T4_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T5_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T6_INGA1 234 11 65 10,5 190 50 0,2 YNd11 0 0 0 solid insolated
T7_INGA2A 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T8_INGA2A 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T9_INGA2A 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T10_INGA2A 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T11_INGA2B 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T12_INGA2B 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T13_INGA2B 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T14_INGA2B 240 16 204 10,5 300 80 0,2 YNd11 1,8 -1 2 solid insolated
T1_BAND_220/15 220 15 15 9,8 65 18 0,2 YNd0 0 0 0 insolated insolated
T1_MBUO_220/30 220 30 30 10 125 35 0,2 YNy11 1,25 -12 8 solid insolated
T2_MBUO_220/30 220 30 30 10 125 35 0,2 YNy11 1,25 -12 8 solid insolated
T1_TSC_220/10.5 220 10,5 100 6 250 50 0,2 YNd0 1,25 -8 8 solid insolated
T2_TSC_220/10.5 220 10,5 50 6 190 40 0,2 YNd0 1,25 -8 8 solid insolated
T1_FUNA_220/20 220 22 100 18,05 250 50 0,2 YNd11 1,25 -12 8 solid insolated
T2_FUNA_220/20 220 22 100 18,05 250 50 0,2 YNd11 1,25 -12 8 solid insolated
T1_UTEX_220/20 214,5 22 100 17,82 250 50 0,2 YNd11 1,25 -12 8 insolated insolated
T1_BOMA_132/15 132 15 10 10,4 100 25 0,3 YNy0 0 0 0 solid insolated
T1_KINTATA_132/15 132 15 5 6 70 18 0,4 YNy0 0 0 0 solid insolated
T1_MATADI_132/15 132 15 15 9,8 130 30 0,2 YNd0 0 0 0 solid insolated
T2_MATADI_132/15 132 15 15 9,8 130 30 0,2 YNd0 0 0 0 solid insolated
T_ZONGO_132/70 132 70 62,5 10 150 40 0,2 YNy0 1,25 -10 10 solid insolated
T1_BADIA_124/33 124 33 50 10,75 190 40 0,2 YNyn0 2,5 -2 2 solid solid

6830P03 FICHTNER Annex 2.3.4-1 Page 1 of 2


Documentation of Device Data
Two Winding Transformer

HV-rtd. LV-Rtd. Rtd. Shc No Load No Load Vector Earthing Earthing


Name Volt. Volt. Pow. Volt. Cop.Los. Los. Cur. Grp. Add.V./tap Min.Tap Max.Tap HV side LV side
kV kV MVA % kW kW % % Ohm Ohm
T1_INK_70/15 70 15 5 9,5 60 18 0,4 YNd0 1,25 -8 8 solid insolated
T1_LUF_70/15 70 15 5 8 60 18 0,4 YNd0 1,25 -8 8 solid insolated
T2_LUF_70/15 70 15 5 8 60 18 0,4 YNd0 1,25 -8 8 solid insolated
T1_LUK_70/6.6 70 6,6 10,5 10 60 18 0,2 YNd0 0 0 0 solid insolated
T2_LUK_70/6.6 70 6,6 10,5 10 60 18 0,2 YNd0 0 0 0 solid insolated
T1_MBAN_70/6.6 70 6,6 2,6 7,8 60 9 0,4 YNd0 1,25 -8 8 solid insolated
T2_MBAN_70/6.6 70 6,6 2,6 7,8 60 9 0,4 YNd0 1,25 -8 8 solid insolated
T1_Zongo 70 6,6 17,5 9,4 80 20 0,2 YNd11 1,8 -1 2 solid insolated
T2_Zongo 70 6,6 17,5 9,4 80 20 0,2 YNd11 1,8 -1 2 solid insolated
T3_Zongo 70 6,6 17,5 9,4 80 20 0,2 YNd11 1,8 -1 2 solid insolated
T4_Zongo 70 6,6 26,4 9,9 90 20 0,2 YNd11 1,8 -1 2 solid insolated
T5_Zongo 70 6,6 26,4 9,9 90 20 0,2 YNd11 1,8 -1 2 solid insolated
T_CIN_70/6 70 6,6 10 8,5 60 18 0,2 YNd0 1,25 -8 8 solid insolated
T_KAS_70/15 70 15 2,6 7,8 60 9 0,4 YNd0 1,25 -8 8 solid insolated
T1_GOM_70/6 64 7,1 15 10,5 80 20 0,2 YNd11 2,5 -3 3 solid insolated
T2_GOM_70/6 64 7,1 15 10,5 80 20 0,2 YNd11 2,5 -3 3 solid insolated
T2_BADIA_30/30 31,5 30 60 0,9 60 18 0,2 YNy0 0,85 -10 10 solid insolated
T1_LEMBA_30/15 30 15 5 6 60 18 0,4 YNy0 0 0 0 solid insolated

Addaption of the transformer losses

6830P03 FICHTNER Annex 2.3.4-1 Page 2 of 2


Documentation of Device Data
Three Winding Transformer

HV-rtd. MV-rtd. LV-rtd. HV-rtd. MV-rtd. LV-rtd. HV-MV- MV-LV- LV-HV- HV-MV MV-LV LV-HV No Load No Ld.
Name Volt. Volt. Volt. Pow. Pow. Pow. Shc.Volt. Shc.Volt. Shc.Volt. Cop.Los. Cop.Los. Cop.Los. Los. Cur.
kV kV kV MVA MVA MVA % % % kW kW kW kW %
T1_INGA_220/132 220 132 15 50 50 6,9 9,6 4,69 21,52 200 80 80 50 0,4
T2_INGA_220/132 220 132 15 50 50 6,9 9,6 4,69 21,52 200 80 80 50 0,4
T1_KWILU 220 73,5 15,75 50 50 30 11,63 12,37 8,03 160 60 60 50 0,4
T2_KWILU 220 73,5 15,75 50 50 30 11,63 12,37 8,03 160 60 60 50 0,4
T1_LIMINGA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T2_LIMINGA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T1_LINGWALA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T2_LINGWALA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T1_MALUKU 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T2_MALUKU 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125 180 80 30 50 0,4
T1_KIM_70/30/15 70 30 15 7 3,5 3,5 12,5 6,25 12,5 120 90 90 20 0,4
T2_KIM_70/30/15 70 30 15 7 3,5 3,5 12,5 6,25 12,5 120 90 90 20 0,4

Addaption of the transformer losses

6830P03 FICHTNER Annex 2.3.4-2 Page 1 of 2


Documentation of Device Data
Three Winding Transformer

HV MV LV
Add.V./ Min. Max. Add.V./ Min. Max. Add.V./ Min. Max. Earthing Earthing Earthing
Name Vector Grp. Tap Tap Tap Tap Tap Tap Tap Tap Tap HV side MV side LV side
% % % Ohm Ohm Ohm
T1_INGA_220/132 YN0yn0d11 0 0 0 2,5 -2 2 0 0 0 solid solid insulated
T2_INGA_220/132 YN0yn0d11 0 0 0 2,5 -2 2 0 0 0 solid solid insulated
T1_KWILU YN0yn0d11 1 -10 10 0 0 0 0 0 0 solid solid insulated
T2_KWILU YN0yn0d11 1 -10 10 0 0 0 0 0 0 solid solid insulated
T1_LIMINGA YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid 22,48 insulated
T2_LIMINGA YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid 22,48 insulated
T1_LINGWALA YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated
T2_LINGWALA YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated
T1_MALUKU YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated
T2_MALUKU YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated
T1_KIM_70/30/15 YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated
T2_KIM_70/30/15 YN0yn0d11 1,25 -10 10 0 0 0 0 0 0 solid solid insulated

6830P03 FICHTNER Annex 2.3.4-2 Page 2 of 2


Documentation of Device Data
Compensation Equipment

Name Terminal Nom.Volt. C Vect.Grp. Max.Step Act.Step


kV Mvar
Comp_FUNA_20 FUNA_20 20 18 Y 1 1
Comp_LIMINGA_30 LIMINGA_30 30 18 Y 1 1
Comp_LINGWALA_30 LINGWALA_30 30 18 Y 1 1
Comp_UTEX T_UTEX_20 20 18 Y 1 1

Static Var System


Name Terminal Nom.Volt. C Vect.Grp. Max.Step Act.Step Operative
kV Mvar
TSC1 T_TSC1_10.5 10,5 30 3 Out of Service
TSC2 T_TSC2_10.5 10,5 40 1 Out of Service

6830P03 FICHTNER Annex 2.3.5 Page 1 of 1


Documentation of Device Data
Generation Units

Name Terminal Operative Nom.Volt. App.Pow. Pow.Fact. xd xd' xd'' xq xq' xq'' xl Td' Tq' Td'' Tq'' Tag[Sgn]
Yes/No kV MVA p.u. p.u. p.u. p.u. p.u. p.u. p.u. s s s s s
G1_INGA1 T_ING1_G1 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G2_INGA1 T_ING1_G2 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G3_INGA1 T_ING1_G3 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G4_INGA1 T_ING1_G4 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G5_INGA1 T_ING1_G5 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G6_INGA1 T_ING1_G6 Yes 11 65 0,845 1,08 0,28 0,17 0,65 0,3 0,26 0,1 1,56 0 0,03 0,03 7
G7_INGA2A T_ING2_G7 Yes 16 205 0,85 1,4 0,34 0,22 0,72 0,3 0,23 0,1 1,5 0 0,03 0,03 6,6
G8_INGA2A T_ING2_G8 Yes 16 205 0,85 1,4 0,34 0,22 0,72 0,3 0,23 0,1 1,5 0 0,03 0,03 6,6
G9_INGA2A T_ING2_G9 Yes 16 205 0,85 1,4 0,34 0,22 0,72 0,3 0,23 0,1 1,5 0 0,03 0,03 6,6
G10_INGA2A T_ING2_G10 Yes 16 205 0,85 1,4 0,34 0,22 0,72 0,3 0,23 0,1 1,5 0 0,03 0,03 6,6
G11_INGA2B T_ING2_G11 Yes 16 205 0,85 1,08 0,22 0,16 0,65 0,3 0,18 0,1 1,56 0 0,04 0,03 6,6
G12_INGA2B T_ING2_G12 Yes 16 205 0,85 1,08 0,22 0,16 0,65 0,3 0,18 0,1 1,56 0 0,04 0,03 6,6
G13_INGA2B T_ING2_G13 Yes 16 205 0,85 1,08 0,22 0,16 0,65 0,3 0,18 0,1 1,56 0 0,04 0,03 6,6
G14_INGA2B T_ING2_G14 Yes 16 205 0,85 1,08 0,22 0,16 0,65 0,3 0,18 0,1 1,56 0 0,04 0,03 6,6

G1_ZONGO T_ZONGO_G1 Yes 6,6 17,5 0,85 1,18 0,34 0,22 0,23 0,3 0,2 0,1 0,53 0 0,03 0,03 4
G2_ZONGO T_ZONGO_G2 No 6,6 17,5 0,85 1,18 0,34 0,22 0,23 0,3 0,2 0,1 0,53 0 0,03 0,03 4
G3_ZONGO T_ZONGO_G3 No 6,6 17,5 0,85 1,18 0,34 0,22 0,23 0,3 0,2 0,1 0,53 0 0,03 0,03 4
G4_ZONGO T_ZONGO_G4 No 6,6 4,855 0,85 0,922 0,3 0,2 0,23 0,3 0,2 0,1 0,53 0 0,03 0,03 4
G5_ZONGO T_ZONGO_G5 No 6,6 4,855 0,85 0,922 0,3 0,2 0,23 0,3 0,2 0,1 0,53 0 0,03 0,03 4

6830P03 FICHTNER Annex 2.3.6 Page 1 of 1


DIgSILENT
Nodes Branches Line Synchronous Machine 2-Winding Transformer Shunt/Filter 3-Winding Transformer General Load Static Var System BANDUNGU_15
Line-Line [kV] parallel Lines [-] Nominal Apparent Power [MVA] Rated Power [MVA] Max. Rated Reactive Power [Mvar] HV-Side [MVA] Total Active Power Load [MW] Q Reactance (>0) [Mvar] 15.00 kV

Name [-] Power Factor [-] Short-Circuit Voltage uk [%] HV-MV [%] Total Reactive Power Load [Mvar] Q per Capacitor Unit (<0) [Mvar] 15.00 MVA
9.80 %
0.60 MW
0.37 Mvar
0.85

T1_BAND_220/15
Length of Line [km] Nominal Voltage [kV] Power Factor [-] Max. Number of Capacitors [-]

L_BAND_15
L_MALUKU_30
15.00 MVA
9.80 %
BANDUNGU_220
220.00 kV

40.00 MW
24.79 Mvar 1 20.00 Mvar
0.85 L_220kV_..
264.0 km
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
30.00 kV
L_FUNA_20 1

1 30.00 kV
Comp_FUNA_20

L_MAL_BAND_220
75.00 MVA 75.00 MVA Comp_BANDUN_220
11.54 % 11.54 %
10.00 MW 75.00 MVA 75.00 MVA
6.20 Mvar 1
11.54 % 11.54 %
0.85 18.00 Mvar
70.00 MW
T_UTEX_20 43.38 Mvar T1_MALUKU T2_MALUKU
0.85 18.00 Mvar
20.00 kV
FUNA_20/B0.0
100.00 MVA 20.00 kV
17.82 % 0 0
T1_UTEX_220/20

100.00 MVA 100.00 MVA


L_LINGW_30 18.05 % 18.05 %
1
8 75.00 MVA 75.00 MVA L_220kV_..

T1_FUNA_220/20

T2_FUNA_220/20
Comp_LINGWALA_30 11.54 % 11.54 % 264.0 km

MALUKU_220/B..
0 0 220.00 kV
100.00 MVA 1
17.82 %
120.00 MW
220.00 kV
UTEXCO_220 74.37 Mvar
72.00 Mvar 0.85
220.00 kV
LINGWALA_30/.. LIMINGA_30/B.. 100.00 MVA 100.00 MVA
1
L_220kV_..
1
L_220kV_..
18.05 % 18.05 % 68.6 km 68.6 km
1 30.00 kV 30.00 kV
L_220kV_..
2.3 km
30.00 kV 30.00 kV

75.00 MVA 75.00 MVA 75.00 MVA 90.00 Mvar 120.00 MW 75.00 MVA 75.00 MVA 75.00 MVA 1 1
11.54 % 11.54 % 11.54 % 74.37 Mvar 11.54 % 11.54 % 11.54 % L_220kV_.. L_220kV_..
0.85 4.9 km 4.9 km
75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA
L_LING_UTEX_220

11.54 % 11.54 % 11.54 % 1 11.54 % 11.54 % 11.54 %

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
Comp_LIMINGA_30

L_LIMIN_30
0 0 0 0 0 0
T1_LIMINGA T2_LIMINGA

L1_MAL_KIM_220

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA T3_LIMINGA

1 1 1
L_220kV_.. 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA 75.00 MVA L_220kV_.. L_220kV_..
2.3 km 11.54 % 11.54 % 11.54 % 11.54 % 11.54 % 11.54 % 4.9 km 4.9 km
LINGWALA_220.. LIMINGA_220/..
220.00 kV 220.00 kV

1 1 1 1 1 1 1
L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
14.0 km 20.0 km 18.0 km 18.0 km 20.0 km 11.0 km 11.0 km
L2_LING_COM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220
L_LIMG_MBOU_220

L2_LING_KIM_220

L1_LING_KIM_220

L1_LING_COM_220
1 1
L_220kV_.. L_220kV_..
20.0 km 20.0 km
1 1 1 1 1 1
L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
18.0 km 18.0 km 11.0 km 11.0 km 68.6 km 68.6 km
1 COM_220/B0.1
L_220kV_.. 220.00 kV GOM_6/B0.1 KIMWENZA/B0...
14.0 km
COM_220/B0.0 220.00 kV
MBUONO_220/B.. 220.00 kV 6.60 kV

220.00 kV 50.00 MVA 50.00 MVA 6.60 kV 220.00 kV


11.63 % 11.63 %
T2_COMBE KIMWENZA/B0...
30.00 MVA 30.00 MVA T1_COMBE 50.00 MVA 50.00 MVA 15.00 MVA 15.00 MVA 10.00 MW 100.00 MVA 50.00 MVA 1 1 1 1
10.00 % 10.00 % 11.63 % 11.63 % 10.50 % 10.50 % 6.20 Mvar 6.00 % 6.00 % L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
0.85 182.0 km 182.0 km 260.0 km 260.0 km
0 0
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L2_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

-3 -3
3 3 3 3
L_KAS_GOM_70
L_GOM_6

1 1 1 1
30.00 MVA 30.00 MVA 50.00 MVA 50.00 MVA 15.00 MVA 15.00 MVA L_70kV_1.. L_70kV_1.. L_70kV_1.. L_70kV_1.. 100.00 MVA 50.00 MVA
10.00 % 10.00 % 11.63 % 11.63 % 10.50 % 10.50 % 30.0 km 30.0 km 30.0 km 30.0 km 6.00 % 6.00 %

KASAN_70/B1
30.00 kV
GOM_70/B0.1 70.00 kV 70.00 kV
MBOUNO_30
50.00 MW 70.00 kV 1 2 2.60 MVA 0.00 Mvar 0.00 Mvar
30.99 Mvar L_70kV_1.. L_70kV_1.. 7.80 % L_KAS_15 -30.00 Mvar -40.00 Mvar
0.85 50.0 km 50.0 km 3 1

T_KAS_70/15
Shunt/Filter
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

SVS SVS
5
L_MBUONO_30 1.00 MW TSC1 TSC2
2.60 MVA 0.62 Mvar
7.80 % 0.85
T_KAS_15

1 2 15.00 kV
L_70kV_1.. L_70kV_1..
60.00 Mvar 50.0 km 50.0 km
70.00 kV
ZONGO/B0.1

70.00 kV
ZONGO/B0.0
62.50 MVA 17.50 MVA 17.50 MVA 17.50 MVA 26.40 MVA 26.40 MVA 1 1
10.00 % 9.40 % 9.40 % 9.40 % 9.90 % 9.90 % L_70kV_1.. L_70kV_1..
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

41.0 km 41.0 km
T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. 1 1
62.50 MVA 17.50 MVA 17.50 MVA 17.50 MVA 26.40 MVA 26.40 MVA L_70kV_1.. L_70kV_1..
U > 1.05 p.u. 10.00 % 9.40 % 9.40 % 9.40 % 9.90 % 9.90 % 41.0 km 41.0 km
Loading > 50. % INKISI_70
70.00 kV

1 17.50 MVA 17.50 MVA 17.50 MVA 4.86 MVA 4.86 MVA 2 1 5.00 MVA
L_132kV_.. 0.85 0.85 0.85 0.85 0.85 L_70kV_1.. L_70kV_1.. 9.50 %
58.3 km 6.60 kV 6.60 kV 6.60 kV 6.60 kV 6.60 kV 22.0 km 22.0 km
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO 2 1


L_70kV_1.. L_70kV_1..
22.0 km 22.0 km
2.50 MW
MBANZA_70 5.00 MVA
9.50 %
1.55 Mvar
0.85
70.00 kV

1 2.60 MVA 2.60 MVA 1 1 15.00 kV


L_132kV_..
58.3 km
7.80 % 7.80 % L_70kV_1.. L_70kV_1.. T_INK_15
20.0 km 20.0 km
T2_MBAN_70/6.6
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
132.00 kV -2 -2

50.00 MVA 1 1

L1_INGA_KIM_220

L2_INGA_KIM_220
10.75 % L_70kV_1.. L_70kV_1..
20.0 km 20.0 km
T1_BADIA_124/33

1.50 MW 1.50 MW
0.93 Mvar
0.85
2.60 MVA
7.80 %
2.60 MVA
7.80 %
0.93 Mvar
0.85
LUFU-TOTO_70
2 70.00 kV

6.60 kV 6.60 kV 1 1 5.00 MVA 5.00 MVA


T1_MBAN_6.6 T2_MBAN_6.6 L_70kV_1.. L_70kV_1.. 8.00 % 8.00 %
T2_LUF_70/15

30.0 km 30.0 km
T1_LUF_70/15

50.00 MVA L1_LUFU_15 L2_LUFU_15


10.75 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2
T_BADIA_AT
1 1
L_70kV_1.. L_70kV_1..
30.0 km 30.0 km
30.00 kV 4.00 MW 4.00 MW
60.00 MVA
0.90 % LUKALA_70 2.48 Mvar
0.85
5.00 MVA
8.00 %
5.00 MVA
8.00 %
2.48 Mvar
0.85
T2_BADIA_30/30

70.00 kV

10.50 MVA 10.50 MVA 1 1 15.00 kV 15.00 kV


-5 10.00 % 10.00 % L_LUKALA_6.6 L_70kV_1.. L_70kV_1..
T1_LUFU_15 T2_LUFU_15
10.0 km 10.0 km
T2_LUK_70/6.6
T1_LUK_70/6.6

L1_KIM_LUK_70 L2_KIM_LUK_70
60.00 MVA
0.90 %
1 1
BADIA_30 L_70kV_1.. L_70kV_1..
10.0 km 10.0 km
10.00 MW
10.50 MVA 10.50 MVA 6.20 Mvar
10.00 % 10.00 % 0.85 KIMPESE_70
30.00 kV
30.00 MW 70.00 kV
18.59 Mvar
0.85
6.60 kV 1 1 7.00 MVA 7.00 MVA
L_SANDA_15 L_70kV_1.. L_70kV_1.. 12.50 % 12.50 %
12.0 km 12.0 km
6.60 kV 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30 LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
4.00 MW 1 1
2.48 Mvar L_70kV_1.. L_70kV_1..
0.85 12.0 km 12.0 km T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.50 MW 0.50 MW
15.00 kV 70.00 kV 0.31 Mvar 7.00 MVA 7.00 MVA 7.00 MVA 7.00 MVA 0.31 Mvar
0.85 12.50 % 12.50 % 12.50 % 12.50 % 0.85
5.00 MVA 10.00 MVA 1 1
6.00 % 8.50 % L_CIN_6.6 L_70kV_1.. L_70kV_1..
T1_KINTATA_132/15

20.0 km 20.0 km
30.00 kV 15.00 kV
T-KIMP_30 T_KIM_15
T_CIN_70/6

L1_KWIL_CIN_70 L2_KWIL_CIN_70
0
1 1
L_132_INGA_KINT L_70kV_1.. L_70kV_1..
20.0 km 20.0 km
1 5.00 MW 70.00 kV
5.00 MVA
6.00 %
L_132kV_..
21.0 km
10.00 MVA
8.50 %
3.10 Mvar
0.85
KWILU_70/B0...

132.00 kV 70.00 kV
KINTATA_132 T_CIN_6.6 KWILU_70/B0...
1 1 1 6.60 kV 50.00 MVA 50.00 MVA
L_132kV_.. L_132kV_.. L_132kV_.. 11.63 % 11.63 % L_KWILU_15 Comp_KWIL_15
74.0 km 30.0 km 21.0 km
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

132.00 kV T2_KWILU 1
L2_ING_KWIL_220
50.00 MVA 50.00 MVA 0.50 MW
9.60 % 9.60 % 3 50.00 MVA 50.00 MVA 0.31 Mvar
11.63 % 11.63 % 0.85 10.00 Mvar
L1_ING_KWIL_220 3
1 1
L_132kV_.. L_132kV_.. 50.00 MVA 50.00 MVA 15.00 kV
74.0 km 30.0 km
9.60 % 9.60 % T_KWILU_15
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
1
L_220kV_..
1
L_220kV_.. 50.00 MVA 50.00 MVA
1
L_220kV_..
1
L_220kV_..
79.6 km 79.6 km 11.63 % 11.63 % 182.0 km 182.0 km
220.00 kV
0 0
132.00 kV 132.00 kV KWILU_220/B0..
10.00 MVA 15.00 MVA 15.00 MVA
10.40 % 9.80 % 9.80 %
T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

220.00 kV
KWILU_220/B0..
1 1 1 1
50.00 MVA 50.00 MVA L_220kV_.. L_220kV_.. L_220kV_.. L_220kV_..
9.60 % 9.60 % 79.6 km 79.6 km 260.0 km 260.0 km
220.00 kV
INGA1/B0.1
10.00 MVA 15.00 MVA 15.00 MVA
10.40 % 9.80 % 9.80 % INGA1/B0.0
BOMA_15 MATADI_15 220.00 kV

15.00 kV 15.00 kV 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 200.00 MW
10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 123.95 Mvar
0.85
5.00 MVA 20.00 MW
6.00 % 12.39 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

0.85
T1_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

4.00 MW
5.00 MVA 2.48 Mvar 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA 204.00 MVA
6.00 % 0.85 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 % 10.50 %
LEMBA_A30
30.00 kV

65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 65.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA 205.00 MVA
0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
CONGO - PMEDE Project: 6830P03
11.00 kV 11.00 kV 11.00 kV 11.00 kV 11.00 kV 11.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV 16.00 kV
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Documentation des dates de I'equibment, élargie Date: 4/20/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2006 Annex: 3.2.1
Additional Equipment for 2006

double busbar

Rated
Rated Short- Short-
Short-Circuit Time Thermal Circuit
Name Nom. Volt. Peak Current Current Duration
kV kA kA s
COM_220 220 62,5 25 1

OHL

Cable/ Conductor Rtd.

Name Terminal i Terminal j Type OHL Type Cross Section Voltage Length
mm2 kV km
L1_INGA_KIM_220 INGA1 KIMWENZA L_220kV OHL 2x ALAC Oriole 210,3 220 260
L2_INGA_KIM_220 INGA1 KIMWENZA L_220kV OHL 2x ALAC Oriole 210,3 220 260
L1_LING_COM_220 LINGWALA_220 COM_220 L_220kV OHL 2x ALAC Oriole 210,3 220 20
L2_LING_COM_220 LINGWALA_220 COM_220 L_220kV OHL 2x ALAC Oriole 210,3 220 20
L2_KAS_GOM_70 KASAN_70 GOMBE_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L2_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50

Rtd. Derating 1,2 - Sequence Zero Sequence


Name Par.no. Current Factor R' X' C' R0' X0' C0'
kA Ohm/km Ohm/km uF/km Ohm/km Ohm/km uF/km
L1_INGA_KIM_220 1 0,76 1 0,090 0,345 0,0086262 0,38000 0,81 0,008626
L2_INGA_KIM_220 1 0,76 1 0,090 0,345 0,0086262 0,38000 0,81 0,008626
L1_LING_COM_220 1 0,76 1 0,090 0,345 0,0086262 0,38000 0,81 0,008626
L2_LING_COM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,008626
L2_KAS_GOM_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,007639
L2_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,007639

Subject of discussion in chapter 3.3

6830P03 FICHTNER Annex 3.2.2 page 1 of 2


Additional Equipment for 2006

Three winding transformer

HV-rtd. MV-rtd. LV-rtd. HV-rtd. MV-rtd. LV-rtd. HV-MV- MV-LV- LV-HV-


Name Volt. Volt. Volt. Pow. Pow. Pow. Shc.Volt. Shc.Volt. Shc.Volt.
kV kV kV MVA MVA MVA % % %
T1_COMBE 220 73,5 6,6 50 50 20 15 16 12
T2_COMBE 220 73,5 6,6 50 50 20 15 16 12
T3_LIMINGA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125
T3_LINGWALA 215,6 30,85 6,6 75 75 1 11,54 17,62 4,125

HV

HV-MV MV-LV LV-HV No Load No Ld. Add.V./ Min. Max.


Name Cop.Los. Cop.Los. Cop.Los. Los. Cur. Vector Grp. Tap Tap Tap
kW kW kW kW % %
T1_COMBE 160 60 60 50 0,4 YN0yn0d11 1 -10 10
T2_COMBE 160 60 60 50 0,4 YN0yn0d11 1 -10 10
T3_LIMINGA 180 80 30 50 0,4 YN0yn0d11 1,25 -10 10
T3_LINGWALA 180 80 30 50 0,4 YN0yn0d11 1,25 -10 10

MV LV

Add.V./ Min. Max. Add.V./ Min. Max. Earthing Earthing Earthing


Name Tap Tap Tap Tap Tap Tap HV side MV side LV side
% % Ohm Ohm Ohm
T1_COMBE 0 0 0 0 0 0 solid solid insulated
T2_COMBE 0 0 0 0 0 0 solid solid insulated
T3_LIMINGA 0 0 0 0 0 0 solid 22,48 insulated
T3_LINGWALA 0 0 0 0 0 0 solid solid insulated

Compensation equipment
Name Terminal Nom.Volt. C Vect.Grp. Max.Step Act.Step
kV Mvar
Comp_ZONGO ZONGO 70 25 Y 2 2

6830P03 FICHTNER Annex 3.2.2 page 2 of 2


Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.18
1.01
-47.76
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.61 MW
-0.38 Mvar
0.61 MW
0.38 Mvar
4.93 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30
0.63 MW
0.41 Mvar
4.93 %
BANDUNGU_220
223.32
1.02
39.26 MW -47.54
24.27 Mvar -0.63 MW
0.85 -0.41 Mvar
11.81 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
29.65
L_FUNA_20 1

1 29.65
Comp_FUNA_20 0.99

L_MAL_BAND_220
-50.35
-19.63 MW -19.63 MW Comp_BANDUN_220
-12.14 Mvar -12.14 Mvar
10.42 MW 0.00 MW 32.30 % 32.30 %
1 -0.00 MW -0.00 MW
6.49 Mvar -18.94 Mvar 0.00 Mvar 0.00 Mvar
0.85 32.30 % 32.30 %
74.74 MW 0.00 MW
T_UTEX_20 46.70 Mvar -19.53 Mvar T1_MALUKU T2_MALUKU
0.85
20.52
1.03 FUNA_20/B0.0
-17.71
-10.42 MW 20.84
12.45 Mvar 1.04 0 0
17.41 %
T1_UTEX_220/20

-20.35
-37.37 MW -37.37 MW
L_LINGW_30 -13.58 Mvar -13.58 Mvar
42.09 % 42.09 % 19.70 MW 19.70 MW 0.78 MW
8 14.23 Mvar 14.23 Mvar -33.61 Mvar

T1_FUNA_220/20

T2_FUNA_220/20
Comp_LINGWALA_30 32.30 % 32.30 % 11.81 %

MALUKU_220/B..
10.47 MW
0 0 216.93
-11.75 Mvar 1
17.41 %
0.00 MW 111.16 MW
216.29
UTEXCO_220 -16.36 Mvar 68.23 Mvar
0.98
0.85
37.46 MW 37.46 MW -46.98
214.63
0.98 LINGWALA_30/.. LIMINGA_30/B.. 16.95 Mvar 16.95 Mvar
-0.00 MW
-0.00 Mvar
-40.18 MW
5.16 Mvar
42.09 % 42.09 % 3.06 % 14.90 %
-46.44
-10.47 MW 28.60 28.67
11.75 Mvar
5.65 %
28.60 28.67
0.95 0.96
-52.93 -52.62
-37.05 MW -37.05 MW -37.05 MW 0.00 MW 111.59 MW -37.20 MW -37.20 MW -37.20 MW -37.46 MW -37.46 MW
-17.29 Mvar -17.29 Mvar -17.29 Mvar -16.44 Mvar 68.53 Mvar -17.37 Mvar -17.37 Mvar -17.37 Mvar -16.95 Mvar -16.95 Mvar
59.08 % 59.08 % 59.08 % 0.85 59.17 % 59.17 % 59.17 % 14.53 % 14.53 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

0.00 Mvar 0.00 Mvar 0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
59.08 % 59.08 % 59.08 % 59.17 % 59.17 % 59.17 %

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
Comp_LIMINGA_30

L_LIMIN_30
0 0 0 0 0 0
T1_LIMINGA T2_LIMINGA

L1_MAL_KIM_220

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA T3_LIMINGA

10.47 MW 37.38 MW 37.38 MW 37.38 MW 37.53 MW 37.53 MW 37.53 MW 37.47 MW 37.47 MW


-12.03 Mvar 23.40 Mvar 23.40 Mvar 23.40 Mvar 23.50 Mvar 23.50 Mvar 23.50 Mvar 16.40 Mvar 16.40 Mvar
5.65 % 59.08 % 59.08 % 59.08 % 59.17 % 59.17 % 59.17 % 14.53 % 14.53 %
LINGWALA_220.. LIMINGA_220/..
214.60 215.11
0.98 0.98
-46.42 -46.12
46.63 MW 13.74 MW -98.37 MW -98.37 MW 13.74 MW -93.77 MW -93.77 MW
32.49 Mvar -6.49 Mvar -38.85 Mvar -38.85 Mvar -6.49 Mvar -51.65 Mvar -51.65 Mvar
28.24 % 5.38 % 37.44 % 37.44 % 5.38 % 37.81 % 37.81 %
L2_LING_COM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220
L_LIMG_MBOU_220

L2_LING_KIM_220

L1_LING_KIM_220

L1_LING_COM_220
-13.73 MW -13.73 MW
4.02 Mvar 4.02 Mvar
5.38 % 5.38 %
98.76 MW 98.76 MW 94.01 MW 94.01 MW 0.00 MW 40.41 MW
38.08 Mvar 38.08 Mvar 51.19 Mvar 51.19 Mvar -8.72 Mvar -13.00 Mvar
37.44 % 37.44 % 37.81 % 37.81 % 3.06 % 14.90 %
-46.53 MW COM_220/B0.1
-33.88 Mvar 214.65 GOM_6/B0.1 KIMWENZA/B0...
28.24 %
COM_220/B0.0 216.45
MBUONO_220/B.. 214.65
0.98
6.36
0.98
-46.55 -45.75
213.55 13.73 MW 13.73 MW 6.36 216.45
0.97 -4.02 Mvar -4.02 Mvar 0.96 0.98
-46.65 29.34 % 29.34 %
T2_COMBE -17.73 -45.75 KIMWENZA/B0...
23.26 MW 23.26 MW T1_COMBE -4.71 MW -4.71 MW 9.41 MW 0.23 MW 0.12 MW -103.78 MW -103.78 MW -109.37 MW -109.37 MW
16.94 Mvar 16.94 Mvar -2.90 Mvar -2.90 Mvar 5.79 Mvar -81.79 Mvar -32.18 Mvar -11.21 Mvar -11.21 Mvar -10.22 Mvar -10.22 Mvar
98.82 % 98.82 % 29.34 % 29.34 % 0.85 86.45 % 67.23 % 36.64 % 36.64 % 38.55 % 38.55 %
0 0
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L2_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

-3 -3
3 3 3 2
L_KAS_GOM_70
L_GOM_6

-23.12 MW -23.12 MW -9.01 MW -9.01 MW 9.01 MW 9.01 MW -8.71 MW -8.71 MW -0.00 MW -0.00 MW
-14.19 Mvar -14.19 Mvar 7.37 Mvar 7.37 Mvar -7.37 Mvar -7.37 Mvar 7.33 Mvar 7.33 Mvar 86.45 Mvar 33.62 Mvar
98.82 % 98.82 % 29.34 % 29.34 % 44.77 % 44.77 % 44.77 % 44.77 % 86.45 % 67.23 %

KASAN_70/B1
28.57
GOM_70/B0.1 72.89 72.80
0.95 MBOUNO_30 1.04
-21.13 -50.09
46.23 MW 72.89 5.45 MW 10.89 MW 1.09 MW 0.00 MW 0.00 MW
28.37 Mvar 1.04 -5.12 Mvar -10.25 Mvar 0.71 Mvar L_KAS_15 -86.45 Mvar -33.62 Mvar
0.85 -47.84 28.79 % 28.79 % 48.01 %

T_KAS_70/15
Shunt/Filter
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

SVS SVS
5
L_MBUONO_30 -1.06 MW 1.06 MW TSC1 TSC2
-0.66 Mvar 0.66 Mvar
48.01 % 0.85
T_KAS_15
15.58
1.04
-0.00 MW -5.25 MW -10.49 MW -51.37
-54.17 Mvar 4.71 Mvar 9.43 Mvar
28.79 % 28.79 %
72.86
1.04
-52.46
ZONGO/B0.1

72.86
1.04 ZONGO/B0.0
-52.46
33.90 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -2.62 MW -2.62 MW
26.44 Mvar -8.53 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 11.06 Mvar 11.06 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

66.08 % 85.19 % 0.20 % 0.20 % 0.20 % 0.20 % 45.64 % 45.64 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -33.79 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW 3.03 MW 3.03 MW
-23.59 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -11.10 Mvar -11.10 Mvar
U > 1.05 p.u. 66.08 % 85.19 % 0.20 % 0.20 % 0.20 % 0.20 % 45.64 % 45.64 %
Loading > 80. % INKISI_70
70.64
1.01
33.79 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -49.85 -5.67 MW -2.83 MW 2.43 MW
23.59 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 13.70 Mvar 6.85 Mvar 1.64 Mvar
64.08 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 30.37 % 30.37 % 58.18 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO 5.87 MW 2.93 MW


-14.00 Mvar -7.00 Mvar
30.37 % 30.37 %
-2.39 MW 2.39 MW
MBANZA_70 -1.48 Mvar
58.18 %
1.48 Mvar
0.85
70.03
1.00
-32.34 MW -48.81
1.50 MW 1.50 MW -5.90 MW -5.90 MW 14.60
-23.99 Mvar
64.08 %
1.00 Mvar 1.00 Mvar 9.50 Mvar 9.50 Mvar 0.97 T_INK_15
69.36 % 69.36 % 45.55 % 45.55 %
T2_MBAN_70/6.6

-52.29
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
130.03 -2 -2
0.99
-57.01 6.11 MW 6.11 MW
32.34 MW

L1_INGA_KIM_220

L2_INGA_KIM_220
23.99 Mvar -9.50 Mvar -9.50 Mvar
45.55 % 45.55 %
T1_BADIA_124/33

80.48 % 1.47 MW -1.47 MW -1.47 MW 1.47 MW


0.91 Mvar
0.85
-0.91 Mvar
69.36 %
-0.91 Mvar
69.36 %
0.91 Mvar
0.85
LUFU-TOTO_70
2 69.48
0.99
-47.28
6.51 6.51 -9.98 MW -9.98 MW 3.87 MW 3.87 MW
0.99 T1_MBAN_6.6 0.99 T2_MBAN_6.6 6.81 Mvar 6.81 Mvar 2.69 Mvar 2.69 Mvar
T2_LUF_70/15

-32.18 MW -50.74 -50.74 49.52 % 49.52 % 94.93 % 94.93 %


T1_LUF_70/15

-20.41 Mvar L1_LUFU_15 L2_LUFU_15


80.48 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2
T_BADIA_AT
10.35 MW 10.35 MW
31.25 -6.74 Mvar -6.74 Mvar
1.04 49.52 % 49.52 %
-61.11 3.80 MW -3.80 MW -3.80 MW 3.80 MW
32.18 MW
20.41 Mvar LUKALA_70 2.34 Mvar
0.85
-2.34 Mvar
94.93 %
-2.34 Mvar
94.93 %
2.34 Mvar
0.85
63.53 %
T2_BADIA_30/30

69.92
1.00
-44.69
4.77 MW 4.77 MW -15.12 MW -15.12 MW 14.53 14.53
-5 3.24 Mvar 3.24 Mvar L_LUKALA_6.6 3.50 Mvar 3.50 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
54.97 % 54.97 % 62.32 % 62.32 % -50.45 -50.45
T2_LUK_70/6.6
T1_LUK_70/6.6

-32.14 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-20.09 Mvar
63.53 %
15.32 MW 15.32 MW
BADIA_30 -3.40 Mvar -3.40 Mvar
-4.73 MW 62.32 % 62.32 %
31.32 -4.73 MW 9.47 MW
-2.91 Mvar -2.91 Mvar 5.83 Mvar
1.04 54.97 % 54.97 % 0.85 KIMPESE_70
-61.34
32.14 MW 70.56
20.09 Mvar 1.01
0.85 -43.73
6.38 -15.83 MW -15.83 MW 0.52 MW 0.52 MW
L_SANDA_15 3.06 Mvar 3.06 Mvar 0.34 Mvar 0.34 Mvar
64.16 % 64.16 % 8.77 % 8.77 %
6.38 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.97
-47.28
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.85 MW 16.09 MW 16.09 MW
2.38 Mvar -2.92 Mvar -2.92 Mvar
0.85 64.16 % 64.16 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.50 MW -0.25 MW -0.25 MW -0.25 MW -0.25 MW 0.50 MW
14.65 71.41 0.31 Mvar -0.15 Mvar -0.15 Mvar -0.15 Mvar -0.15 Mvar 0.31 Mvar
0.98 1.02 0.85 8.77 % 8.77 % 8.77 % 8.77 % 0.85
-38.41 -42.59
-3.85 MW 4.96 MW -18.57 MW -18.57 MW
-2.38 Mvar 3.34 Mvar L_CIN_6.6 1.25 Mvar 1.25 Mvar
T1_KINTATA_132/15

93.07 % 58.64 % 73.09 % 73.09 %


29.85 14.93
T-KIMP_30 T_KIM_15
T_CIN_70/6

0.99 1.00
L2_KWIL_CIN_70 -44.49 -14.52
L1_KWIL_CIN_70
0
19.11 MW 19.11 MW
L_132_INGA_KINT -0.89 Mvar -0.89 Mvar
73.09 % 73.09 %
3.93 MW -26.64 MW -4.92 MW 4.92 MW 73.36
2.64 Mvar
93.07 %
-13.77 Mvar
46.21 %
-3.04 Mvar
58.64 %
3.04 Mvar
0.85
1.05
-40.63
KWILU_70/B0...

134.27 6.54 73.36


1.02
-36.19
KINTATA_132 0.99 T_CIN_6.6 1.05
-40.63
KWILU_70/B0...
3.77 MW 18.94 MW 26.92 MW -44.85 -19.11 MW -19.11 MW
-0.87 Mvar 12.00 Mvar 13.20 Mvar 0.89 Mvar 0.89 Mvar L_KWILU_15 Comp_KWIL_15
7.17 % 35.80 % 46.21 % 38.33 % 38.33 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

136.36 T2_KWILU 1
1.03 L2_ING_KWIL_220
-35.62 -0.27 MW -0.27 MW 0.54 MW
-13.46 MW -13.46 MW
-6.60 Mvar -6.60 Mvar 3 -0.17 Mvar -0.17 Mvar 0.34 Mvar
29.30 % 29.30 % 38.33 % 38.33 % 0.85
L1_ING_KWIL_220 3
-3.75 MW -18.71 MW
-2.71 Mvar -13.05 Mvar -0.00 MW -0.00 MW 15.71
7.17 % 35.80 %
-0.00 Mvar -0.00 Mvar 1.05 T_KWILU_15
29.30 % 29.30 % -8.59
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-127.00 MW
-1.79 Mvar
-127.00 MW
-1.79 Mvar
19.45 MW
0.32 Mvar
19.45 MW
0.32 Mvar
107.55 MW
1.47 Mvar
107.55 MW
1.47 Mvar
42.65 % 42.65 % 38.33 % 38.33 % 36.64 % 36.64 %
226.22
0 0
133.47
1.01
131.83
1.00
KWILU_220/B0.. 1.03
-38.09
-36.54 -36.71
3.75 MW 9.35 MW 9.35 MW
2.71 Mvar 6.52 Mvar 6.52 Mvar
T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

45.75 % 76.12 % 76.12 %


226.22
KWILU_220/B0.. 1.03
13.52 MW 13.52 MW 129.26 MW 129.26 MW -38.09 115.37 MW 115.37 MW
7.24 Mvar 7.24 Mvar -0.79 Mvar -0.79 Mvar -1.99 Mvar -1.99 Mvar
29.30 % 29.30 % 42.65 % 42.65 % 38.55 % 38.55 %
230.31
1.05 INGA1/B0.1
-34.22
-3.70 MW -9.25 MW -9.25 MW
-2.48 Mvar -5.68 Mvar -5.68 Mvar
45.75 % 76.12 % 76.12 % INGA1/B0.0
BOMA_15 MATADI_15 230.31
1.05
-34.22
14.70 14.29 -49.83 MW 0.05 MW -49.83 MW 0.05 MW 0.05 MW 0.05 MW 0.07 MW 0.07 MW 0.07 MW -138.21 MW -164.71 MW -164.71 MW 0.07 MW -164.71 MW 215.21 MW
0.98 0.95 -11.93 Mvar 0.12 Mvar -11.93 Mvar 0.12 Mvar 0.12 Mvar 0.12 Mvar 0.37 Mvar 0.37 Mvar 0.37 Mvar -68.27 Mvar -17.78 Mvar -17.78 Mvar 0.37 Mvar -17.78 Mvar 134.60 Mvar
-38.62 -40.14 80.22 % 0.20 % 80.22 % 0.20 % 0.20 % 0.20 % 0.19 % 0.19 % 0.19 % 78.88 % 84.70 % 84.70 % 0.19 % 84.70 % 0.85
3.70 MW 18.50 MW
2.48 Mvar 11.35 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

90.93 % 0.85
T1_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-3.64 MW 3.64 MW 50.00 MW -0.00 MW 50.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 138.47 MW 165.00 MW 165.00 MW -0.00 MW 165.00 MW
-2.23 Mvar 2.23 Mvar 16.43 Mvar -0.00 Mvar 16.43 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 81.96 Mvar 33.50 Mvar 33.50 Mvar 0.00 Mvar 33.50 Mvar
90.93 % 0.85 80.22 % 0.20 % 80.22 % 0.20 % 0.20 % 0.20 % 0.19 % 0.19 % 0.19 % 78.88 % 84.70 % 84.70 % 0.19 % 84.70 %
LEMBA_A30
28.27
0.94
-40.95
50.00 MW 0.00 MW 50.00 MW 0.00 MW 0.00 MW 0.00 MW 0.00 MW 0.00 MW 0.00 MW 138.47 MW 165.00 MW 165.00 MW 0.00 MW 165.00 MW
16.43 Mvar 0.00 Mvar 16.43 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 81.96 Mvar 33.50 Mvar 33.50 Mvar 0.00 Mvar 33.50 Mvar
CONGO - PMEDE Project: 6830P03
80.97 % 0.00 % 80.97 % 0.00 % 0.00 % 0.00 % 0.00 % 0.00 % 0.00 % 78.49 % 82.13 % 82.13 % 0.00 % 82.13 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis, élargie Date: 4/20/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2006 Annex: 3.2.3
Additional Equipment for 2020 Option 1

double busbar

Rated
Short-
Short-Circuit Rated Short-Time Circuit
Name Nom. Volt. Peak Current Thermal Current Duration
kV kA kA s
KIMBANSEKE_220 220 62,5 25 1
KIMBANSEKE_20 20 64 25 1

OHL

Cable/ Conductor Rtd.

Name Terminal i Terminal j Type OHL Type Cross Section


Voltage Length
2
mm kV km
L1_INGA_KIM_220 INGA1 KIMWENZA L_220kV_2x570 ALAC OHL 2x ALAC 570 220 260
L2_INGA_KIM_220 INGA1 KIMWENZA L_220kV_2x570 ALAC OHL 2x ALAC 570 220 260
L3_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11
L4_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11
L3_LING_KIM_220 KIMWENZA LINGWALA_220L_220kV OHL 2x ALAC Oriole 210,3 220 18
L4_LING_KIM_220 KIMWENZA LINGWALA_220L_220kV OHL 2x ALAC Oriole 210,3 220 18
L3_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L4_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L3_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50
L4_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50

Rtd. Derating 1,2 - Sequence Zero Sequence


Name Par.no. Current Factor R' X' C' R0' X0' C0'
kA Ohm/km Ohm/km uF/km Ohm/kmOhm/km uF/km
L1_INGA_KIM_220 1 1,4 1 0,0426 0,322 0,0086262 0,329 0,783 0,00863
L2_INGA_KIM_220 1 1,4 1 0,0426 0,322 0,0086262 0,329 0,783 0,00863
L3_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L3_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764

6830P03 FICHTNER Annex 3.3.1-1 page 1 of 2


Additional Equipment for 2020 Option 1

Two winding transformer


No
HV-rtd. LV-Rtd. No Load Load
Name Volt. Volt. Rtd. Pow. Shc Volt. Cop.Los. Los. Cur.
kV kV MVA % kW kW %
T1_KIMBANSEKE 220 20 40 10 190 40 0,2
T2_KIMBANSEKE 220 20 40 10 190 40 0,2
T3_FUNA_220/20 220 22 100 18,05 250 50 0,2
T4_FUNA_220/20 220 22 100 18,05 250 50 0,2
T2_KINTATA_132/15 132 15 5 6 70 18 0,4
T2_MATADI_132/15(1) 132 15 15 9,8 130 30 0,2
T3_LUF_70/15 70 15 5 8 60 18 0,4
T4_LUF_70/15 70 15 5 8 60 18 0,4
T2_LEMBA_30/15 30 15 5 6 60 18 0,4

Vector Earthing Earthing


Name Grp. Add.V./tap Min.Tap Max.Tap HV side LV side
% Ohm Ohm
T1_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T2_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T3_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T4_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T2_KINTATA_132/15 YNy0 0 0 0 solid insolated
T2_MATADI_132/15(1) YNd0 0 0 0 solid insolated
T3_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T4_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T2_LEMBA_30/15 YNy0 0 0 0 solid insolated

Compensation equipment
Name Terminal Nom.Volt. C Vect.Grp. Max.Step Act.Step
kV Mvar
Comp_KIMW_1 KIMWENZA 220 18 Y 6 6
Comp_KIMW_2 KIMWENZA 220 18 Y 6 6
Comp_LIMINGA LIMINGA_30 30 18 Y 5 5
Comp_LINGWALA_2 LINGWALA_30 30 18 Y 5 5
Comp_MALUKU MALUKU_30 30 18 Y 5 2
Comp_FUNA_2 FUNA_20 20 18 Y 6 4
Comp_UTEX_2 T_UTEX_20 20 18 Y 5 3

6830P03 FICHTNER Annex 3.3.1-1 page 2 of 2


Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 14.91
0.99
-63.19
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.79 MW
-0.49 Mvar
0.79 MW
0.49 Mvar
6.44 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.81 MW
0.52 Mvar
6.44 %
2 BANDUNGU_220
219.51
1.00
56.98 MW -0.00 MW -62.89
35.35 Mvar -36.38 Mvar -0.81 MW
0.85 -0.52 Mvar
11.57 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
30.16
L_FUNA_20 Comp_FUNA_2 1

1 3 30.16
Comp_FUNA_20 1.01

L_MAL_BAND_220
-67.36
-28.49 MW -28.49 MW Comp_BANDUN_220
4 0.52 Mvar 0.52 Mvar
98.22 MW 0.00 MW 0.00 MW 38.97 % 38.97 %
1 -0.00 MW -0.00 MW
60.71 Mvar -17.51 Mvar -52.54 Mvar 0.00 Mvar 0.00 Mvar
0.85 38.97 % 38.97 %
227.91 MW 0.00 MW 0.00 MW
T_UTEX_20 141.80 Mvar -18.72 Mvar -74.87 Mvar T1_MALUKU T2_MALUKU
0.85
19.73
0.99 FUNA_20/B0.0
-38.20
-98.22 MW 20.39
9.35 Mvar 1.02 0 0
55.02 %
T1_UTEX_220/20

-38.40
-56.98 MW -56.98 MW -56.98 MW -56.98 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -12.05 Mvar -12.05 Mvar -12.05 Mvar -12.05 Mvar
62.91 % 62.91 % 62.91 % 62.91 % 28.73 MW 28.73 MW 0.95 MW
8 2.41 Mvar 2.41 Mvar -32.37 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 38.97 % 38.97 % 11.57 %
5 5
MALUKU_220/B..
98.46 MW
0 0 0 0 212.67
1.76 Mvar 1
55.02 %
0.00 MW 164.56 MW 0.00 MW 0.00 MW
212.67
UTEXCO_220 -17.33 Mvar 101.60 Mvar -86.67 Mvar -86.94 Mvar
0.97
0.85
57.12 MW 57.12 MW 57.12 MW 57.12 MW -62.31
211.05
0.96 LINGWALA_30/.. LIMINGA_30/B.. 19.36 Mvar 19.36 Mvar 19.36 Mvar 19.36 Mvar
-21.12 MW
19.20 Mvar
-37.28 MW
8.34 Mvar
62.91 % 62.91 % 62.91 % 62.91 % 11.40 % 14.57 %
-61.92

L1_MAL_KIM_220_P2
-98.46 MW 29.44 29.49
-1.76 Mvar
35.44 %
29.44 29.49
0.98 0.98
-71.65 -71.36
-54.85 MW -54.85 MW -54.85 MW 0.00 MW 164.97 MW -54.99 MW -54.99 MW -54.99 MW -114.24 MW -114.24 MW
0.80 Mvar 0.80 Mvar 0.80 Mvar -17.39 Mvar 101.89 Mvar 0.81 Mvar 0.81 Mvar 0.81 Mvar -38.72 Mvar -38.72 Mvar
76.79 % 76.79 % 76.79 % 0.85 76.87 % 76.87 % 76.87 % 43.44 % 43.44 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

0.00 Mvar 0.00 Mvar 0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
76.79 % 76.79 % 76.79 % 76.87 % 76.87 % 76.87 % 21.19 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-23.64 Mvar
Comp_LIMINGA_30 11.40 %
KIMBANSEKE_220
L_LIMIN_30
211.67
0 0 0 0 0 0 0.96
-61.86
T1_LIMINGA T2_LIMINGA 18.30 MW 18.30 MW -57.79 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 12.50 Mvar 12.50 Mvar -1.35 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 57.58 % 57.58 % 20.75 %

T1_KIMBANSEKE
98.50 MW 55.63 MW 55.63 MW 55.63 MW 55.77 MW 55.77 MW 55.77 MW 114.38 MW 114.38 MW
1.65 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 38.68 Mvar 38.68 Mvar -3 -3
35.44 % 76.79 % 76.79 % 76.79 % 76.87 % 76.87 % 76.87 % 43.44 % 43.44 %
LINGWALA_220.. LIMINGA_220/..
36.41 MW -18.20 MW -18.20 MW

L1_MAL_KIM_220_P1
211.15 211.47 22.41 Mvar -11.21 Mvar -11.21 Mvar
0.96 0.96 0.85 57.58 % 57.58 %
-61.82 -61.54
65.72 MW 25.86 MW -95.71 MW -95.71 MW -95.71 MW -95.71 MW 25.86 MW -99.02 MW -99.02 MW -99.02 MW -99.02 MW
44.57 Mvar -0.98 Mvar -18.04 Mvar -18.04 Mvar -18.04 Mvar -18.04 Mvar -0.98 Mvar -26.32 Mvar -26.32 Mvar -26.32 Mvar -26.32 Mvar
39.88 % 9.32 % 35.04 % 35.04 % 35.04 % 35.04 % 9.32 % 36.81 % 36.81 % 36.81 % 36.81 % KIMBANSEKE_20 19.34
L4_LING_KIM_220 0.97

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-34.48
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

96.05 MW 96.05 MW 96.05 MW 96.05 MW 99.25 MW 99.25 MW 99.25 MW 99.25 MW 0.00 MW 0.00 MW 57.99 MW 37.49 MW
L1_LING_COM_220 17.17 Mvar 17.17 Mvar 17.17 Mvar 17.17 Mvar 25.87 Mvar 25.87 Mvar 25.87 Mvar 25.87 Mvar -100.67 Mvar -100.67 Mvar -1.53 Mvar -15.93 Mvar
35.04 % 35.04 % 35.04 % 35.04 % 36.81 % 36.81 % 36.81 % 36.81 % 20.75 % 14.57 %
-65.52 MW
-45.56 Mvar GOM_6/B0.1 KIMWENZA/B0...
39.88 %
-25.84 MW -25.84 MW 212.40
MBUONO_220/B.. -1.33 Mvar -1.33 Mvar 6.28
0.97
9.32 % 9.32 % -61.10
209.68 6.28 212.40
0.95 0.95 0.97
-62.15 COM_220/B0.1 -35.03 -61.10 KIMWENZA/B0...
32.76 MW 32.76 MW 210.93 -6.52 MW -6.52 MW 13.04 MW 0.20 MW 0.15 MW -202.84 MW -202.84 MW -235.70 MW -235.70 MW
22.78 Mvar 22.78 Mvar -4.00 Mvar -4.00 Mvar 8.00 Mvar L2_KAS_GOM_70 -73.88 Mvar -36.99 Mvar 51.24 Mvar 51.24 Mvar 27.51 Mvar 27.51 Mvar
69.77 % 69.77 % COM_220/B0.0 210.93
53.97 % 53.97 % 0.85 77.68 % 77.77 % 76.00 % 76.00 % 46.07 % 46.07 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
0.96 L4_KAS_GOM_70
-62.05
25.84 MW 25.84 MW
1.33 Mvar 1.33 Mvar L_KAS_GOM_70
-3 -3 53.97 % 53.97 %
T1_COMBE T2_COMBE 1 1
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-2 -2
-32.58 MW -32.58 MW -9.42 MW -9.42 MW -9.42 MW -9.42 MW -0.00 MW -0.00 MW
-19.99 Mvar -19.99 Mvar 3 3 2.08 Mvar 2.08 Mvar 2.08 Mvar 2.08 Mvar 77.68 Mvar 38.88 Mvar
69.77 % 69.77 % 38.22 % 38.22 % 38.22 % 38.22 % 77.68 % 77.77 %

KASAN_70/B1
28.53 71.29
0.95 MBOUNO_30 1.02
-35.37 -67.44
65.16 MW 9.05 MW 9.05 MW 9.05 MW 9.05 MW 1.45 MW 0.00 MW 0.00 MW
39.98 Mvar -2.32 Mvar -2.32 Mvar -2.32 Mvar -2.32 Mvar 0.96 Mvar L_KAS_15 -77.68 Mvar -38.88 Mvar
0.85 -19.27 MW -19.27 MW 9.64 MW 9.64 MW 9.64 MW 9.64 MW 36.74 % 36.74 % 36.74 % 36.74 % 65.65 %

T_KAS_70/15
4.40 Mvar 4.40 Mvar -2.20 Mvar -2.20 Mvar -2.20 Mvar -2.20 Mvar
53.97 % 53.97 % 38.22 % 38.22 % 38.22 % 38.22 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.48 SVS SVS
4
L_MBUONO_30 -1.41 MW 1.41 MW TSC1 TSC2
72.48 -0.88 Mvar 0.88 Mvar
1.04 65.65 % 0.85
-65.73
T_KAS_15
15.10
1.01
-0.00 MW -8.72 MW -8.72 MW -8.72 MW -8.72 MW -69.24
-39.40 Mvar 2.11 Mvar 2.11 Mvar 2.11 Mvar 2.11 Mvar
36.74 % 36.74 % 36.74 % 36.74 %
69.48
0.99
-70.28
ZONGO/B0.1

69.48
0.99 ZONGO/B0.0
-70.28
40.31 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 3.73 MW 3.73 MW
35.87 Mvar -8.42 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 1.77 Mvar 1.77 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

86.99 % 88.98 % 0.20 % 0.20 % 0.20 % 0.20 % 17.55 % 17.55 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -40.16 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -3.67 MW -3.67 MW
-31.04 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -2.16 Mvar -2.16 Mvar
U > 1.05 p.u. 86.99 % 88.98 % 0.20 % 0.20 % 0.20 % 0.20 % 17.55 % 17.55 %
Loading > 80. % INKISI_70
68.06
0.97
40.16 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -70.72 2.67 MW 1.34 MW 3.34 MW
31.04 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 1.33 Mvar 0.67 Mvar 2.33 Mvar
83.50 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 6.66 % 6.66 % 83.71 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -2.66 MW -1.33 MW


-1.81 Mvar -0.91 Mvar
6.66 % 6.66 %
-3.28 MW 3.28 MW
MBANZA_70 -2.02 Mvar
83.71 %
2.02 Mvar
0.85
67.77
0.97
-37.67 MW -70.80
2.00 MW 2.00 MW -0.00 MW -0.00 MW 14.41
-29.24 Mvar
83.50 %
1.36 Mvar 1.36 Mvar -0.00 Mvar -0.00 Mvar 0.96 T_INK_15
95.90 % 95.90 % 0.86 % 0.86 %
T2_MBAN_70/6.6

-74.10
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
118.17 -3 -3
0.90
-76.30 0.00 MW 0.00 MW
37.67 MW

L1_INGA_KIM_220

L2_INGA_KIM_220
29.24 Mvar -0.20 Mvar -0.20 Mvar
0.86 % 0.86 %
T1_BADIA_124/33

104.94 % 1.94 MW -1.94 MW -1.94 MW 1.94 MW


1.19 Mvar
0.85
-1.19 Mvar
95.90 %
-1.19 Mvar
95.90 %
1.19 Mvar
0.85
LUFU-TOTO_70
2 64.11
0.92
-47.84
6.27 6.27 -4.95 MW -4.95 MW 2.47 MW 2.47 MW 2.47 MW 2.47 MW
0.95 T1_MBAN_6.6 0.95 T2_MBAN_6.6 -3.09 Mvar -3.09 Mvar 1.64 Mvar 1.64 Mvar 1.64 Mvar 1.64 Mvar
T2_LUF_70/15

-37.43 MW -73.50 -73.50 25.50 % 25.50 % 64.84 % 64.84 % 64.84 % 64.84 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-23.24 Mvar L1_LUFU_15 L2_LUFU_15


104.94 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
5.04 MW 5.04 MW
27.71 2.90 Mvar 2.90 Mvar
0.92 25.50 % 25.50 %
-82.22 4.87 MW -2.43 MW -2.43 MW -2.43 MW -2.43 MW 4.87 MW
37.43 MW
23.24 Mvar LUKALA_70 2.96 Mvar
0.85
-1.48 Mvar
64.84 %
-1.48 Mvar
64.84 %
-1.48 Mvar
64.84 %
-1.48 Mvar
64.84 %
2.96 Mvar
0.85
82.90 %
T2_BADIA_30/30

65.66
0.94
-47.40
5.94 MW 5.94 MW -10.99 MW -10.99 MW 13.59 13.59
-5 4.15 Mvar 4.15 Mvar L_LUKALA_6.6 -7.05 Mvar -7.05 Mvar 0.91 T1_LUFU_15 0.91 T2_LUFU_15
73.60 % 73.60 % 55.71 % 55.71 % -50.20 -50.20
T2_LUK_70/6.6
T1_LUK_70/6.6

-37.38 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-22.80 Mvar
82.90 %
11.14 MW 11.14 MW
BADIA_30 7.12 Mvar 7.12 Mvar
-5.90 MW 55.71 % 55.71 %
27.73 -5.90 MW 11.79 MW
-3.57 Mvar -3.57 Mvar 7.15 Mvar
0.92 73.60 % 73.60 % 0.86 KIMPESE_70
-82.57
37.38 MW 66.82
22.80 Mvar 0.95
0.85 -47.12
5.90 -11.80 MW -11.80 MW 0.65 MW 0.65 MW
L_SANDA_15 -7.54 Mvar -7.54 Mvar 0.42 Mvar 0.42 Mvar
58.74 % 58.74 % 11.65 % 11.65 %
5.90 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.89
-51.11
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
5.38 MW 12.01 MW 12.01 MW
3.31 Mvar 7.65 Mvar 7.65 Mvar
0.85 58.74 % 58.74 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.63 MW -0.32 MW -0.32 MW -0.32 MW -0.32 MW 0.63 MW
14.46 68.27 0.39 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar 0.39 Mvar
0.96 0.98 0.85 11.65 % 11.65 % 11.65 % 11.65 % 0.85
-40.79 -46.77
-2.69 MW -2.69 MW 6.42 MW -15.22 MW -15.22 MW
-1.65 Mvar -1.65 Mvar 4.44 Mvar L_CIN_6.6 -9.87 Mvar -9.87 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

65.86 % 65.86 % 80.07 % 74.46 % 74.46 %


28.11 14.06
T-KIM_30 T_KIM_15
T_CIN_70/6

0.94 0.94
L2_KWIL_CIN_70 -48.19 -18.24
L1_KWIL_CIN_70
0
15.78 MW 15.78 MW
L_132_INGA_KINT 10.27 Mvar 10.27 Mvar
74.46 % 74.46 %
2.74 MW 2.74 MW -36.26 MW -6.37 MW 6.37 MW 71.35
1.79 Mvar
65.86 %
1.79 Mvar
65.86 %
-20.71 Mvar
65.94 %
-3.89 Mvar
80.07 %
3.89 Mvar
0.85
1.02
-46.07
KWILU_70/B0...

131.04 6.17 71.35


0.99
-39.18
KINTATA_132 0.93 T_CIN_6.6 1.02
-46.07
KWILU_70/B0...
5.11 MW 25.68 MW 36.83 MW -50.02 -15.78 MW -15.78 MW
0.33 Mvar 16.80 Mvar 20.68 Mvar -10.27 Mvar -10.27 Mvar L_KWILU_15 Comp_KWIL_15
10.01 % 49.68 % 65.94 % 39.98 % 39.98 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

134.11 T2_KWILU 1
1.02 L2_ING_KWIL_220
-38.41 -0.37 MW -0.37 MW 0.75 MW
-18.42 MW -18.42 MW
-10.34 Mvar -10.34 Mvar 0 -0.23 Mvar -0.23 Mvar 0.47 Mvar
41.87 % 41.87 % 39.98 % 39.98 % 0.85
L1_ING_KWIL_220 0
-5.08 MW -25.22 MW
-3.69 Mvar -17.39 Mvar -0.00 MW -0.00 MW 15.61
10.01 % 49.68 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
41.87 % 41.87 % -14.36
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-235.41 MW
-0.02 Mvar
-235.41 MW
-0.02 Mvar
16.23 MW
11.58 Mvar
16.23 MW
11.58 Mvar
219.19 MW
-11.56 Mvar
219.19 MW
-11.56 Mvar
81.52 % 81.52 % 39.98 % 39.98 % 76.00 % 76.00 %
219.39
0 0
129.73
0.98
127.62
0.97
KWILU_220/B0.. 1.00
-43.93
-39.63 -39.91
5.08 MW 8.41 MW 8.41 MW 8.41 MW
T2_MATADI_132/15(1)

3.69 Mvar 5.80 Mvar 5.80 Mvar 5.80 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

63.87 % 70.42 % 70.42 % 70.42 %


219.39
KWILU_220/B0.. 1.00
18.49 MW 18.49 MW 243.66 MW 243.66 MW -43.93 249.80 MW 249.80 MW
11.42 Mvar 11.42 Mvar 20.84 Mvar 20.84 Mvar 44.81 Mvar 44.81 Mvar
41.87 % 41.87 % 81.52 % 81.52 % 46.07 % 46.07 %
228.36
1.04 INGA1/B0.1
-36.47
-5.01 MW -8.32 MW -8.32 MW -8.32 MW
-3.26 Mvar -5.07 Mvar -5.07 Mvar -5.07 Mvar
63.87 % 70.42 % 70.42 % 70.42 % INGA1/B0.0
BOMA_15 MATADI_15 228.36
1.04
-36.47
14.10 13.86 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW -209.26 MW -164.65 MW -164.71 MW -164.71 MW -164.71 MW 636.89 MW
0.94 0.92 -25.55 Mvar -25.55 Mvar -25.55 Mvar -25.55 Mvar -25.55 Mvar -25.55 Mvar -82.56 Mvar -82.56 Mvar -82.56 Mvar -74.96 Mvar -82.56 Mvar -25.19 Mvar 15.93 Mvar 15.93 Mvar 397.67 Mvar
-42.65 -43.20 88.40 % 88.40 % 88.40 % 88.40 % 88.40 % 88.40 % 95.03 % 95.03 % 95.03 % 114.64 % 95.03 % 85.92 % 85.29 % 85.29 % 0.85
2.51 MW 2.51 MW 24.95 MW
1.63 Mvar 1.63 Mvar 15.22 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

63.59 % 63.59 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-2.47 MW -2.47 MW 4.93 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 209.73 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-1.50 Mvar -1.50 Mvar 3.00 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 103.46 Mvar 102.26 Mvar 41.35 Mvar 0.00 Mvar 0.00 Mvar
63.59 % 63.59 % 0.85 88.40 % 88.40 % 88.40 % 88.40 % 88.40 % 88.40 % 95.03 % 95.03 % 95.03 % 114.64 % 95.03 % 85.92 % 85.29 % 85.29 %
LEMBA_A30
27.42
0.91
-44.35
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 209.73 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 103.46 Mvar 102.26 Mvar 41.35 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 114.08 % 94.69 % 82.98 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis Date: 5/11/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2020, Option 1 Annex: 3.3.1-2
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.28
1.02
-45.48
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.49 MW
-0.31 Mvar
0.49 MW
0.31 Mvar
4.00 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.51 MW
0.33 Mvar
4.00 %
2 BANDUNGU_220
224.68
1.02
33.95 MW 0.00 MW -45.30
21.05 Mvar 0.00 Mvar -0.51 MW
0.85 -0.33 Mvar
11.91 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
30.03
L_FUNA_20 Comp_FUNA_2 1

1 3 30.03
Comp_FUNA_20 1.00

L_MAL_BAND_220
-47.65
-16.98 MW -16.98 MW Comp_BANDUN_220
4 -10.52 Mvar -10.52 Mvar
57.07 MW 0.00 MW 0.00 MW 27.64 % 27.64 %
1 -0.00 MW -0.00 MW
35.13 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
0.85 27.64 % 27.64 %
139.09 MW 0.00 MW 0.00 MW
T_UTEX_20 86.72 Mvar 0.00 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
19.34
0.97 FUNA_20/B0.0
-18.11
-57.07 MW 20.61
-35.13 Mvar 1.03 0 0
38.13 %
T1_UTEX_220/20

-18.29
-34.77 MW -34.77 MW -34.77 MW -34.77 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -21.68 Mvar -21.68 Mvar -21.68 Mvar -21.68 Mvar
43.87 % 43.87 % 43.87 % 43.87 % 17.03 MW 17.03 MW 0.66 MW
8 12.15 Mvar 12.15 Mvar -34.09 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 27.64 % 27.64 % 11.91 %
5 5
MALUKU_220/B..
57.22 MW
0 0 0 0 217.56
40.64 Mvar 1
38.13 %
0.00 MW 100.78 MW 0.00 MW 0.00 MW
217.56
UTEXCO_220 -17.78 Mvar 62.38 Mvar -88.92 Mvar 0.00 Mvar
0.99
0.85
34.87 MW 34.87 MW 34.87 MW 34.87 MW -44.75
216.47
0.98 LINGWALA_30/.. LIMINGA_30/B.. 25.32 Mvar 25.32 Mvar 25.32 Mvar 25.32 Mvar
-12.23 MW
8.27 Mvar
-22.49 MW
1.52 Mvar
43.87 % 43.87 % 43.87 % 43.87 % 6.28 % 8.62 %
-44.53

L1_MAL_KIM_220_P2
-57.22 MW 29.82 29.28
-40.64 Mvar
24.63 %
29.82 29.28
0.99 0.98
-61.68 -49.88
-33.59 MW -33.59 MW -33.59 MW 0.00 MW 97.89 MW -32.63 MW -32.63 MW -32.63 MW -69.74 MW -69.74 MW
14.77 Mvar 14.77 Mvar 14.77 Mvar -17.15 Mvar 60.38 Mvar -14.41 Mvar -14.41 Mvar -14.41 Mvar -50.65 Mvar -50.65 Mvar
50.62 % 50.62 % 50.62 % 0.85 50.37 % 50.37 % 50.37 % 30.30 % 30.30 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
50.62 % 50.62 % 50.62 % 50.37 % 50.37 % 50.37 % 12.25 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-13.13 Mvar
Comp_LIMINGA_30 6.28 %
KIMBANSEKE_220
L_LIMIN_30
217.10
3 3 3 0 0 0 0.99
-44.51
T1_LIMINGA T2_LIMINGA 11.68 MW 11.68 MW -35.62 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 7.75 Mvar 7.75 Mvar -2.36 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 35.51 % 35.51 % 12.49 %

T1_KIMBANSEKE
57.24 MW 36.58 MW 36.58 MW 36.58 MW 32.87 MW 32.87 MW 32.87 MW 69.80 MW 69.80 MW
40.44 Mvar -3.77 Mvar -3.77 Mvar -3.77 Mvar 18.98 Mvar 18.98 Mvar 18.98 Mvar 50.30 Mvar 50.30 Mvar -3 -3
24.63 % 50.62 % 50.62 % 50.62 % 50.37 % 50.37 % 50.37 % 30.30 % 30.30 %
LINGWALA_220.. LIMINGA_220/..
23.24 MW -11.62 MW -11.62 MW

L1_MAL_KIM_220_P1
216.67 216.62 14.42 Mvar -7.21 Mvar -7.21 Mvar
0.98 0.98 0.85 35.51 % 35.51 %
-44.48 -44.29
42.33 MW 14.39 MW -59.53 MW -59.53 MW -59.53 MW -59.53 MW 14.39 MW -59.56 MW -59.56 MW -59.56 MW -59.56 MW
26.77 Mvar 6.10 Mvar -17.02 Mvar -17.02 Mvar -17.02 Mvar -17.02 Mvar 6.10 Mvar -39.38 Mvar -39.38 Mvar -39.38 Mvar -39.38 Mvar
24.69 % 5.89 % 21.71 % 21.71 % 21.71 % 21.71 % 5.89 % 25.04 % 25.04 % 25.04 % 25.04 % KIMBANSEKE_20 20.11
L4_LING_KIM_220 1.01

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-16.08
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

59.66 MW 59.66 MW 59.66 MW 59.66 MW 59.66 MW 59.66 MW 59.66 MW 59.66 MW 0.00 MW 0.00 MW 35.69 MW 22.56 MW
L1_LING_COM_220 15.23 Mvar 15.23 Mvar 15.23 Mvar 15.23 Mvar 38.38 Mvar 38.38 Mvar 38.38 Mvar 38.38 Mvar 0.00 Mvar -105.63 Mvar -1.20 Mvar -10.05 Mvar
21.71 % 21.71 % 21.71 % 21.71 % 25.04 % 25.04 % 25.04 % 25.04 % 12.49 % 8.62 %
-42.25 MW
-28.28 Mvar GOM_6/B0.1 KIMWENZA/B0...
24.69 %
-14.38 MW -14.38 MW 217.57
MBUONO_220/B.. -8.60 Mvar -8.60 Mvar 6.42
0.99
5.89 % 5.89 % -44.06
215.78 6.42 217.57
0.98 0.97 0.99
-44.68 COM_220/B0.1 -16.31 -44.06 KIMWENZA/B0...
21.13 MW 21.13 MW 216.31 -4.05 MW -4.05 MW 8.10 MW 0.20 MW 0.15 MW -124.78 MW -124.78 MW -143.16 MW -143.16 MW
14.14 Mvar 14.14 Mvar -2.50 Mvar -2.50 Mvar 5.00 Mvar L2_KAS_GOM_70 -74.38 Mvar -37.24 Mvar 11.49 Mvar 11.49 Mvar -4.46 Mvar -4.46 Mvar
43.20 % 43.20 % COM_220/B0.0 216.31
34.09 % 34.09 % 0.85 78.23 % 78.32 % 44.57 % 44.57 % 27.15 % 27.15 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
0.98 L4_KAS_GOM_70
-44.59
14.38 MW 14.38 MW
8.60 Mvar 8.60 Mvar L_KAS_GOM_70
-3 -3 34.09 % 34.09 %
T1_COMBE T2_COMBE 3 3
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-1 -1
-21.01 MW -21.01 MW -5.07 MW -5.07 MW -5.07 MW -5.07 MW -0.00 MW -0.00 MW
-13.01 Mvar -13.01 Mvar 3 3 -3.00 Mvar -3.00 Mvar -3.00 Mvar -3.00 Mvar 78.23 Mvar 39.16 Mvar
43.20 % 43.20 % 23.56 % 23.56 % 23.56 % 23.56 % 78.23 % 78.32 %

KASAN_70/B1
29.85 70.14
1.00 MBOUNO_30 1.00
-16.61 -46.92
42.02 MW 4.86 MW 4.86 MW 4.86 MW 4.86 MW 0.86 MW 0.00 MW 0.00 MW
26.02 Mvar 2.86 Mvar 2.86 Mvar 2.86 Mvar 2.86 Mvar 0.56 Mvar L_KAS_15 -78.23 Mvar -39.16 Mvar
0.85 -10.31 MW -10.31 MW 5.16 MW 5.16 MW 5.16 MW 5.16 MW 23.79 % 23.79 % 23.79 % 23.79 % 39.52 %

T_KAS_70/15
-5.47 Mvar -5.47 Mvar 2.74 Mvar 2.74 Mvar 2.74 Mvar 2.74 Mvar
34.09 % 34.09 % 23.56 % 23.56 % 23.56 % 23.56 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 71.56 SVS SVS
4
L_MBUONO_30 -0.85 MW 0.85 MW TSC1 TSC2
71.56 -0.53 Mvar 0.53 Mvar
1.02 39.52 % 0.85
-46.52
T_KAS_15
15.07
1.00
0.00 MW -4.72 MW -4.72 MW -4.72 MW -4.72 MW -48.01
0.00 Mvar -3.28 Mvar -3.28 Mvar -3.28 Mvar -3.28 Mvar
23.79 % 23.79 % 23.79 % 23.79 %
67.74
0.97
-47.48
ZONGO/B0.1

67.74
0.97 ZONGO/B0.0
-47.48
27.33 MW -12.91 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.23 MW 2.23 MW
20.12 Mvar -8.36 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.68 Mvar 0.68 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

56.12 % 91.04 % 0.20 % 0.20 % 0.20 % 0.20 % 10.35 % 10.35 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

6 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -27.25 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.21 MW -2.21 MW
-18.05 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.11 Mvar -1.11 Mvar
U > 1.05 p.u. 56.12 % 91.04 % 0.20 % 0.20 % 0.20 % 0.20 % 10.35 % 10.35 %
Loading > 80. % INKISI_70
66.95
0.96
27.25 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -47.82 1.61 MW 0.80 MW 2.01 MW
18.05 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.58 Mvar 0.29 Mvar 1.34 Mvar
53.42 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.02 % 4.02 % 50.51 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.60 MW -0.80 MW


-1.05 Mvar -0.53 Mvar
4.02 % 4.02 %
-1.98 MW 1.98 MW
MBANZA_70 -1.22 Mvar
50.51 %
1.22 Mvar
0.85
66.79
0.95
-26.25 MW -47.87
1.20 MW 1.20 MW -0.00 MW -0.00 MW 14.46
-18.99 Mvar
53.42 %
0.79 Mvar 0.79 Mvar 0.00 Mvar 0.00 Mvar 0.96 T_INK_15
57.99 % 57.99 % 0.91 % 0.91 %
T2_MBAN_70/6.6

-49.89
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
125.50 -3 -3
0.95
-51.67 0.00 MW 0.00 MW
26.25 MW

L1_INGA_KIM_220

L2_INGA_KIM_220
18.99 Mvar -0.22 Mvar -0.22 Mvar
0.91 % 0.91 %
T1_BADIA_124/33

67.06 % 1.18 MW -1.18 MW -1.18 MW 1.18 MW


0.72 Mvar
0.85
-0.72 Mvar
57.99 %
-0.72 Mvar
57.99 %
0.72 Mvar
0.85
LUFU-TOTO_70
2 67.72
0.97
-36.93
6.32 6.32 -3.32 MW -3.32 MW 1.66 MW 1.66 MW 1.66 MW 1.66 MW
0.96 T1_MBAN_6.6 0.96 T2_MBAN_6.6 -1.93 Mvar -1.93 Mvar 1.08 Mvar 1.08 Mvar 1.08 Mvar 1.08 Mvar
T2_LUF_70/15

-26.13 MW -49.53 -49.53 15.89 % 15.89 % 40.88 % 40.88 % 40.88 % 40.88 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-16.48 Mvar L1_LUFU_15 L2_LUFU_15


67.06 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.35 MW 3.35 MW
30.40 1.64 Mvar 1.64 Mvar
1.01 15.89 % 15.89 %
-55.21 3.26 MW -1.63 MW -1.63 MW -1.63 MW -1.63 MW 3.26 MW
26.13 MW
16.48 Mvar LUKALA_70 2.01 Mvar
0.85
-1.01 Mvar
40.88 %
-1.01 Mvar
40.88 %
-1.01 Mvar
40.88 %
-1.01 Mvar
40.88 %
2.01 Mvar
0.85
52.92 %
T2_BADIA_30/30

68.66
0.98
-36.64
3.95 MW 3.95 MW -7.31 MW -7.31 MW 14.57 14.57
-5 2.64 Mvar 2.64 Mvar L_LUKALA_6.6 -4.28 Mvar -4.28 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
46.13 % 46.13 % 34.56 % 34.56 % -38.33 -38.33
T2_LUK_70/6.6
T1_LUK_70/6.6

-26.09 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-16.22 Mvar
52.92 %
7.37 MW 7.37 MW
BADIA_30 4.23 Mvar 4.23 Mvar
-3.92 MW 34.56 % 34.56 %
30.48 -3.92 MW 7.84 MW
-2.41 Mvar -2.41 Mvar 4.81 Mvar
1.02 46.13 % 46.13 % 0.85 KIMPESE_70
-55.41
26.09 MW 69.36
16.22 Mvar 0.99
0.85 -36.44
6.29 -7.79 MW -7.79 MW 0.43 MW 0.43 MW
L_SANDA_15 -4.51 Mvar -4.51 Mvar 0.28 Mvar 0.28 Mvar
36.38 % 36.38 % 7.36 % 7.36 %
6.29 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.95
-38.85
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.37 MW 7.87 MW 7.87 MW
2.09 Mvar 4.46 Mvar 4.46 Mvar
0.85 36.38 % 36.38 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.41 MW -0.20 MW -0.20 MW -0.20 MW -0.20 MW 0.41 MW
14.87 70.25 0.25 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar 0.25 Mvar
0.99 1.00 0.85 7.36 % 7.36 % 7.36 % 7.36 % 0.85
-32.62 -36.20
-1.69 MW -1.69 MW 4.15 MW -9.95 MW -9.95 MW
-1.04 Mvar -1.04 Mvar 2.75 Mvar L_CIN_6.6 -5.84 Mvar -5.84 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

40.40 % 40.40 % 49.60 % 46.01 % 46.01 %


29.40 14.71
T-KIM_30 T_KIM_15
T_CIN_70/6

0.98 0.98
L2_KWIL_CIN_70 -37.09 -7.12
L1_KWIL_CIN_70
0
10.16 MW 10.16 MW
L_132_INGA_KINT 5.84 Mvar 5.84 Mvar
46.01 % 46.01 %
1.72 MW 1.72 MW -23.17 MW -4.11 MW 4.11 MW 72.12
1.10 Mvar
40.40 %
1.10 Mvar
40.40 %
-10.54 Mvar
39.56 %
-2.54 Mvar
49.60 %
2.54 Mvar
0.85
1.03
-35.70
KWILU_70/B0...

133.14 6.46 72.12


1.01
-31.65
KINTATA_132 0.98 T_CIN_6.6 1.03
-35.70
KWILU_70/B0...
3.32 MW 16.42 MW 23.37 MW -38.15 -10.16 MW -10.16 MW
-1.27 Mvar 9.60 Mvar 9.86 Mvar -5.84 Mvar -5.84 Mvar L_KWILU_15 Comp_KWIL_15
6.25 % 30.75 % 39.56 % 24.22 % 24.22 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

134.86 T2_KWILU 1
1.02 L2_ING_KWIL_220
-31.12 -0.22 MW -0.22 MW 0.45 MW
-11.69 MW -11.69 MW
-4.93 Mvar -4.93 Mvar 2 -0.14 Mvar -0.14 Mvar 0.28 Mvar
25.09 % 25.09 % 24.22 % 24.22 % 0.85
L1_ING_KWIL_220 2
-3.30 MW -16.25 MW
-2.26 Mvar -10.74 Mvar -0.00 MW -0.00 MW 15.63
6.25 % 30.75 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
25.09 % 25.09 % -4.61
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-140.79 MW
7.62 Mvar
-140.79 MW
7.62 Mvar
10.44 MW
6.50 Mvar
10.44 MW
6.50 Mvar
130.35 MW
-14.12 Mvar
130.35 MW
-14.12 Mvar
48.12 % 48.12 % 24.22 % 24.22 % 44.57 % 44.57 %
223.49
0 0
132.51
1.00
131.07
0.99
KWILU_220/B0.. 1.02
-34.34
-31.98 -32.12
3.30 MW 5.42 MW 5.42 MW 5.42 MW
T2_MATADI_132/15(1)

2.26 Mvar 3.58 Mvar 3.58 Mvar 3.58 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

39.89 % 43.58 % 43.58 % 43.58 %


223.49
KWILU_220/B0.. 1.02
11.75 MW 11.75 MW 143.66 MW 143.66 MW -34.34 147.99 MW 147.99 MW
5.45 Mvar 5.45 Mvar -7.58 Mvar -7.58 Mvar 6.13 Mvar 6.13 Mvar
25.09 % 25.09 % 48.12 % 48.12 % 27.15 % 27.15 %
227.10
1.03 INGA1/B0.1
-29.86
-3.26 MW -5.36 MW -5.36 MW -5.36 MW
-2.08 Mvar -3.30 Mvar -3.30 Mvar -3.30 Mvar
39.89 % 43.58 % 43.58 % 43.58 % INGA1/B0.0
BOMA_15 MATADI_15 227.10
1.03
-29.86
14.67 14.50 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW 3.03 MW -164.65 MW -164.71 MW -164.71 MW -164.71 MW 841.70 MW
0.98 0.97 -25.49 Mvar -25.49 Mvar -25.49 Mvar -25.49 Mvar -25.49 Mvar -25.49 Mvar -82.37 Mvar -82.37 Mvar -82.37 Mvar -98.85 Mvar -82.37 Mvar 16.11 Mvar 16.11 Mvar 16.11 Mvar 524.97 Mvar
-33.84 -34.10 88.85 % 88.85 % 88.85 % 88.85 % 88.85 % 88.85 % 95.51 % 95.51 % 95.51 % 51.43 % 95.51 % 85.77 % 85.77 % 85.77 % 0.85
1.63 MW 1.63 MW 16.09 MW
1.04 Mvar 1.04 Mvar 9.90 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

39.60 % 39.60 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.61 MW -1.61 MW 3.21 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW -2.88 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-0.99 Mvar -0.99 Mvar 1.97 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 104.88 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
39.60 % 39.60 % 0.85 88.85 % 88.85 % 88.85 % 88.85 % 88.85 % 88.85 % 95.51 % 95.51 % 95.51 % 51.43 % 95.51 % 85.77 % 85.77 % 85.77 %
LEMBA_A30
28.85
0.96
-34.85
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW -2.88 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 104.88 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 51.18 % 94.69 % 80.49 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis Date: 5/11/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de faible charge 2020, Option 1 Annex: 3.3.1-3
Additional Equipment for 2020 Option 1a

double busbar

Rated
Short-
Circuit
Short-Circuit Rated Short-Time Duratio
Name Nom. Volt. Peak Current Thermal Current n
kV kA kA s
KIMBANSEKE_220 220 62,5 25 1
KIMBANSEKE_20 20 64 25 1

OHL
Conduc
Cable/ tor Rtd.

Name Terminal i Terminal j Type OHL Type Cross Section


Voltage Length
mm2 kV km
L1_INGA_KIM_220 INGA1 KIMWENZA L_220kV_2x570 ALAC OHL 2x ALAC 570 220 260
L2_INGA_KIM_220 INGA1 KIMWENZA L_220kV_2x570 ALAC OHL 2x ALAC 570 220 260
L3_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 11
L4_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 11
L3_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 18
L4_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 18
L3_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L4_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L3_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50
L4_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50

Rtd. Derating 1,2 - Sequence Zero Sequence


Name Par.no. Current Factor R' X' C' R0' X0' C0'
kA Ohm/kmOhm/km uF/km Ohm/kmOhm/km uF/km
L1_INGA_KIM_220 1 1,4 1 0,0426 0,322 0,0086262 0,329 0,783 0,00863
L2_INGA_KIM_220 1 1,4 1 0,0426 0,322 0,0086262 0,329 0,783 0,00863
L3_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L3_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764

6830P03 FICHTNER Annex 3.3.2-1 page 1 of 2


Additional Equipment for 2020 Option 1a

Two winding transformer


No
HV-rtd. LV-Rtd. Shc Cop.Lo No Load Load
Name Volt. Volt. Rtd. Pow. Volt. s. Los. Cur.
kV kV MVA % kW kW %
PH_S Tr1 220 220 600 7 600 400 0,094
PH_S Tr2 220 220 600 7 600 400 0,094
T1_KIMBANSEKE 220 20 40 10 190 40 0,2
T2_KIMBANSEKE 220 20 40 10 190 40 0,2
T3_FUNA_220/20 220 22 100 18,05 250 50 0,2
T4_FUNA_220/20 220 22 100 18,05 250 50 0,2
T2_KINTATA_132/15 132 15 5 6 70 18 0,4
T2_MATADI_132/15(1) 132 15 15 9,8 130 30 0,2
T3_LUF_70/15 70 15 5 8 60 18 0,4
T4_LUF_70/15 70 15 5 8 60 18 0,4
T2_LEMBA_30/15 30 15 5 6 60 18 0,4

Earthin
Vector g Earthing
Name Grp. Add.V./tap Min.Tap Max.TapHV side LV side
% Ohm Ohm
PH_S Tr1 YNY0 Phase shift -12.5 degree
PH_S Tr2 YNY0 Phase shift -12.5 degree
T1_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T2_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T3_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T4_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T2_KINTATA_132/15 YNy0 0 0 0 solid insolated
T2_MATADI_132/15(1) YNd0 0 0 0 solid insolated
T3_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T4_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T2_LEMBA_30/15 YNy0 0 0 0 solid insolated

Compensation equipment
Name Terminal Nom.Volt. C Vect.Grp.
Max.StepAct.Step
kV Mvar
Comp_KIMW_1 KIMWENZA 220 18 Y 6 6
Comp_KIMW_2 KIMWENZA 220 18 Y 6 6
Comp_LIMINGA LIMINGA_30 30 18 Y 5 5
Comp_LINGWALA_2 LINGWALA_30 30 18 Y 5 5
Comp_MALUKU MALUKU_30 30 18 Y 5 2
Comp_FUNA_2 FUNA_20 20 18 Y 6 4
Comp_UTEX_2 T_UTEX_20 20 18 Y 5 3

6830P03 FICHTNER Annex 3.3.2-1 page 2 of 2


Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 14.88
0.99
-53.44
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.79 MW
-0.49 Mvar
0.79 MW
0.49 Mvar
6.43 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.81 MW
0.52 Mvar
6.43 %
2 BANDUNGU_220
219.06
1.00
56.79 MW -0.00 MW -53.14
35.22 Mvar -36.23 Mvar -0.81 MW
0.85 -0.52 Mvar
11.54 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
30.10
L_FUNA_20 Comp_FUNA_2 1

1 3 30.10
Comp_FUNA_20 1.00

L_MAL_BAND_220
-57.62
-28.39 MW -28.39 MW Comp_BANDUN_220
3 0.51 Mvar 0.51 Mvar
98.21 MW 0.00 MW 0.00 MW 38.92 % 38.92 %
1 -0.00 MW -0.00 MW
60.70 Mvar -17.51 Mvar -52.53 Mvar 0.00 Mvar 0.00 Mvar
0.85 38.92 % 38.92 %
224.00 MW 0.00 MW 0.00 MW
T_UTEX_20 139.07 Mvar -18.32 Mvar -54.95 Mvar T1_MALUKU T2_MALUKU
0.85
19.73
0.99 FUNA_20/B0.0
-28.21
-98.21 MW 20.18
9.34 Mvar 1.01 0 0
55.01 %
T1_UTEX_220/20

-28.44
-56.00 MW -56.00 MW -56.00 MW -56.00 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -16.45 Mvar -16.45 Mvar -16.45 Mvar -16.45 Mvar
63.74 % 63.74 % 63.74 % 63.74 % 28.63 MW 28.63 MW 0.95 MW
8 2.41 Mvar 2.41 Mvar -32.23 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 38.92 % 38.92 % 11.54 %
5 5
MALUKU_220/B..
98.44 MW
0 0 0 0 212.24
1.76 Mvar 1
55.01 %
0.00 MW 164.54 MW 0.00 MW 0.00 MW
212.24
UTEXCO_220 -17.33 Mvar 101.59 Mvar -86.66 Mvar -86.78 Mvar
0.96
0.85
56.15 MW 56.15 MW 56.15 MW 56.15 MW -52.56
211.03
0.96 LINGWALA_30/.. LIMINGA_30/B.. 23.94 Mvar 23.94 Mvar 23.94 Mvar 23.94 Mvar
-21.22 MW
18.99 Mvar
-36.99 MW
8.41 Mvar
63.74 % 63.74 % 63.74 % 63.74 % 11.38 % 14.51 %
-51.93

L1_MAL_KIM_220_P2
-98.44 MW 29.44 29.46
-1.76 Mvar
35.44 %
29.44 29.46
0.98 0.98
-61.66 -61.47
-54.85 MW -54.85 MW -54.85 MW 0.00 MW 164.74 MW -54.91 MW -54.91 MW -54.91 MW -112.29 MW -112.29 MW
0.80 Mvar 0.80 Mvar 0.80 Mvar -17.36 Mvar 101.72 Mvar 0.81 Mvar 0.81 Mvar 0.81 Mvar -47.89 Mvar -47.89 Mvar
76.79 % 76.79 % 76.79 % 0.85 76.82 % 76.82 % 76.82 % 44.02 % 44.02 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

0.00 Mvar 0.00 Mvar 0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
76.79 % 76.79 % 76.79 % 76.82 % 76.82 % 76.82 % 21.29 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-23.42 Mvar
Comp_LIMINGA_30 11.38 %
KIMBANSEKE_220
L_LIMIN_30
211.25
0 0 0 0 0 0 0.96
-52.11
T1_LIMINGA T2_LIMINGA 17.87 MW 17.87 MW -57.02 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 12.17 Mvar 12.17 Mvar -0.93 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 56.28 % 56.28 % 20.52 %

T1_KIMBANSEKE
98.49 MW 55.63 MW 55.63 MW 55.63 MW 55.69 MW 55.69 MW 55.69 MW 112.44 MW 112.44 MW
1.65 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 9.31 Mvar 47.86 Mvar 47.86 Mvar -2 -2
35.44 % 76.79 % 76.79 % 76.79 % 76.82 % 76.82 % 76.82 % 44.02 % 44.02 %
LINGWALA_220.. LIMINGA_220/..
35.54 MW -17.77 MW -17.77 MW

L1_MAL_KIM_220_P1
211.14 211.29 21.82 Mvar -10.91 Mvar -10.91 Mvar
0.96 0.96 0.85 56.28 % 56.28 %
-51.84 -51.64
65.71 MW 25.86 MW -63.80 MW -127.60 MW -127.60 MW -63.80 MW 25.86 MW -65.33 MW -130.65 MW -130.65 MW -65.33 MW
44.56 Mvar -0.98 Mvar -12.03 Mvar -24.06 Mvar -24.06 Mvar -12.03 Mvar -0.98 Mvar -20.61 Mvar -41.22 Mvar -41.22 Mvar -20.61 Mvar
39.87 % 9.32 % 23.36 % 23.36 % 23.36 % 23.36 % 9.32 % 24.63 % 24.63 % 24.63 % 24.63 % KIMBANSEKE_20 19.06
L4_LING_KIM_220 0.95

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-24.74
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

63.95 MW 127.90 MW 127.90 MW 63.95 MW 65.43 MW 130.86 MW 130.86 MW 65.43 MW 0.00 MW 0.00 MW 57.22 MW 37.20 MW
L1_LING_COM_220 10.43 Mvar 20.86 Mvar 20.86 Mvar 10.43 Mvar 19.67 Mvar 39.34 Mvar 39.34 Mvar 19.67 Mvar -100.25 Mvar -100.25 Mvar -1.96 Mvar -15.97 Mvar
23.36 % 23.36 % 23.36 % 23.36 % 24.63 % 24.63 % 24.63 % 24.63 % 20.52 % 14.51 %
-65.51 MW
-45.55 Mvar GOM_6/B0.1 KIMWENZA/B0...
39.87 %
-25.83 MW -25.83 MW 211.95
MBUONO_220/B.. -1.33 Mvar -1.33 Mvar 6.28
0.96
9.32 % 9.32 % -51.35
209.66 6.28 211.95
0.95 0.95 0.96
-52.16 COM_220/B0.1 -25.05 -51.35 KIMWENZA/B0...
32.75 MW 32.75 MW 210.91 -6.52 MW -6.52 MW 13.04 MW 0.21 MW 0.16 MW -158.59 MW -158.59 MW -276.95 MW -276.95 MW
22.77 Mvar 22.77 Mvar -4.00 Mvar -4.00 Mvar 8.00 Mvar L2_KAS_GOM_70 -76.93 Mvar -38.51 Mvar 17.15 Mvar 17.15 Mvar 59.48 Mvar 59.48 Mvar
69.77 % 69.77 % COM_220/B0.0 210.91
53.96 % 53.96 % 0.85 81.04 % 81.13 % 57.68 % 57.68 % 49.05 % 49.05 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
0.96 L4_KAS_GOM_70
-52.06
25.83 MW 25.83 MW

PH_S Tr1

PH_S Tr2
1.33 Mvar 1.33 Mvar L_KAS_GOM_70
-3 -3 53.96 % 53.96 %
T1_COMBE T2_COMBE 1 1 5 5
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-2 -2
-32.58 MW -32.58 MW -9.41 MW -9.41 MW -9.41 MW -9.41 MW -0.00 MW -0.00 MW 277.47 MW 277.47 MW
-19.99 Mvar -19.99 Mvar 3 3 2.08 Mvar 2.08 Mvar 2.08 Mvar 2.08 Mvar 81.04 Mvar 40.57 Mvar -52.77 Mvar -52.77 Mvar
69.77 % 69.77 % 38.22 % 38.22 % 38.22 % 38.22 % 81.04 % 81.13 % 49.05 % 49.05 %

KASAN_70/B1
28.53 71.29
0.95 MBOUNO_30 1.02
-25.39 -57.46
65.15 MW 9.05 MW 9.05 MW 9.05 MW 9.05 MW 1.45 MW 0.00 MW 0.00 MW -277.47 MW -277.47 MW
39.97 Mvar -2.32 Mvar -2.32 Mvar -2.32 Mvar -2.32 Mvar 0.96 Mvar L_KAS_15 -81.04 Mvar -40.57 Mvar 52.77 Mvar 52.77 Mvar
0.85 -19.27 MW -19.27 MW 9.64 MW 9.64 MW 9.64 MW 9.64 MW 36.74 % 36.74 % 36.74 % 36.74 % 65.65 % 55.17 % 55.17 %

T_KAS_70/15
4.40 Mvar 4.40 Mvar -2.20 Mvar -2.20 Mvar -2.20 Mvar -2.20 Mvar
53.96 % 53.96 % 38.22 % 38.22 % 38.22 % 38.22 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.47 SVS SVS
4
L_MBUONO_30 -1.41 MW 1.41 MW TSC1 TSC2
72.47 -0.88 Mvar 0.88 Mvar
1.04 65.65 % 0.85
-55.74
T_KAS_15
15.09
1.01
-0.00 MW -8.71 MW -8.71 MW -8.71 MW -8.71 MW -59.25
-39.40 Mvar 2.10 Mvar 2.10 Mvar 2.10 Mvar 2.10 Mvar
36.74 % 36.74 % 36.74 % 36.74 %
69.47
0.99
-60.29
ZONGO/B0.1

69.47
0.99 ZONGO/B0.0
-60.29
40.31 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 3.73 MW 3.73 MW
35.86 Mvar -8.42 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 1.77 Mvar 1.77 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

86.98 % 88.98 % 0.20 % 0.20 % 0.20 % 0.20 % 17.55 % 17.55 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -40.16 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -3.67 MW -3.67 MW
-31.04 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -2.16 Mvar -2.16 Mvar
U > 1.05 p.u. 86.98 % 88.98 % 0.20 % 0.20 % 0.20 % 0.20 % 17.55 % 17.55 %
Loading > 80. % INKISI_70
68.06
0.97
40.16 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -60.73 2.67 MW 1.34 MW 3.34 MW
31.04 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 1.33 Mvar 0.67 Mvar 2.33 Mvar
83.50 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 6.65 % 6.65 % 83.71 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -2.66 MW -1.33 MW


-1.81 Mvar -0.90 Mvar
6.65 % 6.65 %
-3.28 MW 3.28 MW
MBANZA_70 -2.02 Mvar
83.71 %
2.02 Mvar
0.85
67.77
0.97
-37.67 MW -60.81
2.00 MW 2.00 MW -0.00 MW -0.00 MW 14.40
-29.23 Mvar
83.50 %
1.36 Mvar 1.36 Mvar -0.00 Mvar -0.00 Mvar 0.96 T_INK_15
95.89 % 95.89 % 0.86 % 0.86 %
T2_MBAN_70/6.6

-64.11
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
118.16 -3 -3
0.90
-66.31 0.00 MW 0.00 MW
37.67 MW
29.23 Mvar -0.20 Mvar -0.20 Mvar
0.86 % 0.86 %
T1_BADIA_124/33

104.93 % 1.94 MW -1.94 MW -1.94 MW 1.94 MW


1.19 Mvar
0.85
-1.19 Mvar
95.89 %
-1.19 Mvar
95.89 %
1.19 Mvar
0.85
LUFU-TOTO_70
2 64.06
0.92
-42.43
6.27 6.27 -4.94 MW -4.94 MW 2.47 MW 2.47 MW 2.47 MW 2.47 MW
0.95 T1_MBAN_6.6 0.95 T2_MBAN_6.6 -3.09 Mvar -3.09 Mvar 1.64 Mvar 1.64 Mvar 1.64 Mvar 1.64 Mvar
T2_LUF_70/15

-37.43 MW -63.51 -63.51 25.48 % 25.48 % 64.81 % 64.81 % 64.81 % 64.81 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

L1_INGA_KIM_220

L2_INGA_KIM_220
-23.24 Mvar L1_LUFU_15 L2_LUFU_15
104.93 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
5.04 MW 5.04 MW
27.71 2.89 Mvar 2.89 Mvar
0.92 25.48 % 25.48 %
-72.24 4.86 MW -2.43 MW -2.43 MW -2.43 MW -2.43 MW 4.86 MW
37.43 MW
23.24 Mvar LUKALA_70 2.95 Mvar
0.85
-1.48 Mvar
64.81 %
-1.48 Mvar
64.81 %
-1.48 Mvar
64.81 %
-1.48 Mvar
64.81 %
2.95 Mvar
0.85
82.90 %
T2_BADIA_30/30

65.61
0.94
-41.99
5.94 MW 5.94 MW -10.97 MW -10.97 MW 13.58 13.58
-5 4.14 Mvar 4.14 Mvar L_LUKALA_6.6 -7.04 Mvar -7.04 Mvar 0.91 T1_LUFU_15 0.91 T2_LUFU_15
73.56 % 73.56 % 55.68 % 55.68 % -44.79 -44.79
T2_LUK_70/6.6
T1_LUK_70/6.6

-37.37 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-22.80 Mvar
82.90 %
11.13 MW 11.13 MW
BADIA_30 7.11 Mvar 7.11 Mvar
-5.89 MW 55.68 % 55.68 %
27.72 -5.89 MW 11.78 MW
-3.57 Mvar -3.57 Mvar 7.14 Mvar
0.92 73.56 % 73.56 % 0.86 KIMPESE_70
-72.59
37.37 MW 66.76
22.80 Mvar 0.95
0.85 -41.71
5.90 -11.78 MW -11.78 MW 0.65 MW 0.65 MW
L_SANDA_15 -7.53 Mvar -7.53 Mvar 0.42 Mvar 0.42 Mvar
58.70 % 58.70 % 11.65 % 11.65 %
5.90 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.89
-45.70
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
5.39 MW 11.99 MW 11.99 MW
3.32 Mvar 7.64 Mvar 7.64 Mvar
0.85 58.70 % 58.70 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.63 MW -0.31 MW -0.31 MW -0.32 MW -0.32 MW 0.63 MW
14.49 68.21 0.39 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar 0.39 Mvar
0.97 0.97 0.85 11.65 % 11.65 % 11.65 % 11.65 % 0.85
-37.12 -41.36
-2.70 MW -2.70 MW 6.41 MW -15.20 MW -15.20 MW
-1.66 Mvar -1.66 Mvar 4.44 Mvar L_CIN_6.6 -9.85 Mvar -9.85 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

65.94 % 65.94 % 80.02 % 74.42 % 74.42 %


28.08 14.05
T-KIM_30 T_KIM_15
T_CIN_70/6

0.94 0.94
L2_KWIL_CIN_70 -42.78 -12.83
L1_KWIL_CIN_70
0
15.76 MW 15.76 MW
L_132_INGA_KINT 10.25 Mvar 10.25 Mvar
74.42 % 74.42 %
2.74 MW 2.74 MW -36.36 MW -6.36 MW 6.36 MW 71.29
1.79 Mvar
65.94 %
1.79 Mvar
65.94 %
-20.77 Mvar
66.02 %
-3.89 Mvar
80.02 %
3.89 Mvar
0.85
1.02
-40.66
KWILU_70/B0...

131.27 6.16 71.29


0.99
-35.51
KINTATA_132 0.93 T_CIN_6.6 1.02
-40.66
KWILU_70/B0...
5.13 MW 25.75 MW 36.93 MW -44.61 -15.76 MW -15.76 MW
0.33 Mvar 16.85 Mvar 20.74 Mvar -10.25 Mvar -10.25 Mvar L_KWILU_15 Comp_KWIL_15
10.02 % 49.73 % 66.02 % 39.56 % 39.56 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

134.34 T2_KWILU 1
1.02 L2_ING_KWIL_220
-34.75 -0.37 MW -0.37 MW 0.75 MW
-18.47 MW -18.47 MW
-10.37 Mvar -10.37 Mvar 1 -0.23 Mvar -0.23 Mvar 0.47 Mvar
41.92 % 41.92 % 39.56 % 39.56 % 0.85
L1_ING_KWIL_220 1
-5.09 MW -25.29 MW
-3.70 Mvar -17.45 Mvar -0.00 MW -0.00 MW 15.60
10.02 % 49.73 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
41.92 % 41.92 % -8.95
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-184.25 MW
-7.50 Mvar
-184.25 MW
-7.50 Mvar
16.20 MW
11.56 Mvar
16.20 MW
11.56 Mvar
168.05 MW
-4.05 Mvar
168.05 MW
-4.05 Mvar
63.28 % 63.28 % 39.56 % 39.56 % 57.68 % 57.68 %
221.37
0 0
129.96
0.98
127.84
0.97
KWILU_220/B0.. 1.01
-38.52
-35.96 -36.24
5.09 MW 8.43 MW 8.43 MW 8.43 MW
T2_MATADI_132/15(1)

3.70 Mvar 5.82 Mvar 5.82 Mvar 5.82 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

63.95 % 70.50 % 70.50 % 70.50 %


221.37
KWILU_220/B0.. 1.01
18.55 MW 18.55 MW 189.21 MW 189.21 MW -38.52 297.77 MW 297.77 MW
11.45 Mvar 11.45 Mvar 15.60 Mvar 15.60 Mvar 66.50 Mvar 66.50 Mvar
41.92 % 41.92 % 63.28 % 63.28 % 55.17 % 55.17 %
228.75
1.04 INGA1/B0.1
-32.80
-5.03 MW -8.34 MW -8.34 MW -8.34 MW
-3.27 Mvar -5.09 Mvar -5.09 Mvar -5.09 Mvar
63.95 % 70.50 % 70.50 % 70.50 % INGA1/B0.0
BOMA_15 MATADI_15 228.75
1.04
-32.80
14.13 13.89 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW -91.69 MW -164.65 MW -164.71 MW -164.71 MW -164.71 MW 532.20 MW
0.94 0.93 -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -82.62 Mvar -82.62 Mvar -82.62 Mvar -83.30 Mvar -82.62 Mvar 15.88 Mvar 15.88 Mvar 15.88 Mvar 332.41 Mvar
-38.98 -39.53 88.27 % 88.27 % 88.27 % 88.27 % 88.27 % 88.27 % 94.88 % 94.88 % 94.88 % 63.88 % 94.88 % 85.14 % 85.14 % 85.14 % 0.85
2.51 MW 2.51 MW 25.02 MW
1.63 Mvar 1.63 Mvar 15.27 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

63.67 % 63.67 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-2.47 MW -2.47 MW 4.95 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 91.89 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-1.51 Mvar -1.51 Mvar 3.01 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 92.40 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
63.67 % 63.67 % 0.85 88.27 % 88.27 % 88.27 % 88.27 % 88.27 % 88.27 % 94.88 % 94.88 % 94.88 % 63.88 % 94.88 % 85.14 % 85.14 % 85.14 %
LEMBA_A30
27.46
0.92
-40.68
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 91.89 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 92.40 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 63.57 % 94.69 % 80.49 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis Date: 5/11/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2020, Option 1a Annex: 3.3.2-2
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.19
1.01
-39.20
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.49 MW
-0.30 Mvar
0.49 MW
0.30 Mvar
3.98 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.51 MW
0.33 Mvar
3.98 %
2 BANDUNGU_220
223.25
1.01
33.60 MW 0.00 MW -39.02
20.80 Mvar 0.00 Mvar -0.51 MW
0.85 -0.33 Mvar
11.83 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
29.84
L_FUNA_20 Comp_FUNA_2 1

1 3 29.84
Comp_FUNA_20 0.99

L_MAL_BAND_220
-41.37
-16.80 MW -16.80 MW Comp_BANDUN_220
3 -10.40 Mvar -10.40 Mvar
56.61 MW 0.00 MW 0.00 MW 27.53 % 27.53 %
1 -0.00 MW -0.00 MW
34.81 Mvar 0.00 Mvar 0.00 Mvar -0.00 Mvar -0.00 Mvar
0.85 27.53 % 27.53 %
137.99 MW 0.00 MW 0.00 MW
T_UTEX_20 85.95 Mvar 0.00 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
19.24
0.96 FUNA_20/B0.0
-11.70
-56.61 MW 20.51
-34.81 Mvar 1.03 0 0
38.00 %
T1_UTEX_220/20

-11.94
-34.50 MW -34.50 MW -34.50 MW -34.50 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -21.49 Mvar -21.49 Mvar -21.49 Mvar -21.49 Mvar
43.73 % 43.73 % 43.73 % 43.73 % 16.86 MW 16.86 MW 0.65 MW
8 12.02 Mvar 12.02 Mvar -33.66 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 27.53 % 27.53 % 11.83 %
5 5
MALUKU_220/B..
56.76 MW
0 0 0 0 216.18
40.29 Mvar 1
38.00 %
0.00 MW 99.91 MW 0.00 MW 0.00 MW
216.18
UTEXCO_220 -17.59 Mvar 61.77 Mvar -87.96 Mvar 0.00 Mvar
0.98
0.85
34.59 MW 34.59 MW 34.59 MW 34.59 MW -38.47
215.39
0.98 LINGWALA_30/.. LIMINGA_30/B.. 25.10 Mvar 25.10 Mvar 25.10 Mvar 25.10 Mvar
-12.21 MW
8.07 Mvar
-22.16 MW
1.55 Mvar
43.73 % 43.73 % 43.73 % 43.73 % 6.25 % 8.56 %
-38.11

L1_MAL_KIM_220_P2
-56.76 MW 29.66 29.14
-40.29 Mvar
24.55 %
29.66 29.14
0.99 0.97
-55.29 -43.54
-33.30 MW -33.30 MW -33.30 MW 0.00 MW 97.11 MW -32.37 MW -32.37 MW -32.37 MW -69.18 MW -69.18 MW
14.59 Mvar 14.59 Mvar 14.59 Mvar -16.98 Mvar 59.83 Mvar -14.28 Mvar -14.28 Mvar -14.28 Mvar -50.21 Mvar -50.21 Mvar
50.43 % 50.43 % 50.43 % 0.85 50.21 % 50.21 % 50.21 % 30.20 % 30.20 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 -0.00 Mvar -0.00 Mvar -0.00 Mvar
50.43 % 50.43 % 50.43 % 50.21 % 50.21 % 50.21 % 12.23 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-12.88 Mvar
Comp_LIMINGA_30 6.25 %
KIMBANSEKE_220
L_LIMIN_30
215.73
3 3 3 0 0 0 0.98
-38.23
T1_LIMINGA T2_LIMINGA 11.33 MW 11.33 MW -34.88 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 7.48 Mvar 7.48 Mvar -2.09 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 34.61 % 34.61 % 12.31 %

T1_KIMBANSEKE
56.79 MW 36.27 MW 36.27 MW 36.27 MW 32.61 MW 32.61 MW 32.61 MW 69.25 MW 69.25 MW
40.08 Mvar -3.68 Mvar -3.68 Mvar -3.68 Mvar 18.82 Mvar 18.82 Mvar 18.82 Mvar 49.86 Mvar 49.86 Mvar -2 -2
24.55 % 50.43 % 50.43 % 50.43 % 50.21 % 50.21 % 50.21 % 30.20 % 30.20 %
LINGWALA_220.. LIMINGA_220/..
22.53 MW -11.27 MW -11.27 MW

L1_MAL_KIM_220_P1
215.59 215.55 13.93 Mvar -6.96 Mvar -6.96 Mvar
0.98 0.98 0.85 34.61 % 34.61 %
-38.07 -37.94
41.99 MW 14.56 MW -39.45 MW -78.90 MW -78.90 MW -39.45 MW 14.56 MW -39.39 MW -78.77 MW -78.77 MW -39.39 MW
26.53 Mvar 6.24 Mvar -11.34 Mvar -22.69 Mvar -22.69 Mvar -11.34 Mvar 6.24 Mvar -26.03 Mvar -52.07 Mvar -52.07 Mvar -26.03 Mvar
24.61 % 5.99 % 14.46 % 14.46 % 14.46 % 14.46 % 5.99 % 16.64 % 16.64 % 16.64 % 16.64 % KIMBANSEKE_20 19.72
L4_LING_KIM_220 0.99

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-9.81
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

39.51 MW 79.01 MW 79.01 MW 39.51 MW 39.43 MW 78.87 MW 78.87 MW 39.43 MW 0.00 MW 0.00 MW 34.95 MW 22.23 MW
L1_LING_COM_220 9.29 Mvar 18.59 Mvar 18.59 Mvar 9.29 Mvar 24.82 Mvar 49.65 Mvar 49.65 Mvar 24.82 Mvar 0.00 Mvar -104.28 Mvar -1.43 Mvar -9.97 Mvar
14.46 % 14.46 % 14.46 % 14.46 % 16.64 % 16.64 % 16.64 % 16.64 % 12.31 % 8.56 %
-41.91 MW
-28.03 Mvar GOM_6/B0.1 KIMWENZA/B0...
24.61 %
-14.55 MW -14.55 MW 216.18
MBUONO_220/B.. -8.71 Mvar -8.71 Mvar 6.46
0.98
5.99 % 5.99 % -37.78
214.70 6.46 216.18
0.98 0.98 0.98
-38.27 COM_220/B0.1 -9.90 -37.78 KIMWENZA/B0...
20.96 MW 20.96 MW 215.23 -4.08 MW -4.08 MW 8.17 MW 0.11 MW 0.09 MW -72.88 MW -72.88 MW -192.63 MW -192.63 MW
14.01 Mvar 14.01 Mvar -2.52 Mvar -2.52 Mvar 5.04 Mvar L2_KAS_GOM_70 -47.73 Mvar -23.90 Mvar -21.19 Mvar -21.19 Mvar 12.51 Mvar 12.51 Mvar
43.05 % 43.05 % COM_220/B0.0 215.23
34.67 % 34.67 % 0.85 49.38 % 49.43 % 26.67 % 26.67 % 32.80 % 32.80 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
0.98 L4_KAS_GOM_70
-38.17
14.55 MW 14.55 MW

PH_S Tr1

PH_S Tr2
8.71 Mvar 8.71 Mvar L_KAS_GOM_70
-3 -3 34.67 % 34.67 %
T1_COMBE T2_COMBE 1 1 5 5
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-2 -2
-20.84 MW -20.84 MW -5.14 MW -5.14 MW -5.14 MW -5.14 MW -0.00 MW -0.00 MW 193.09 MW 193.09 MW
-12.89 Mvar -12.89 Mvar 3 3 -3.04 Mvar -3.04 Mvar -3.04 Mvar -3.04 Mvar 49.38 Mvar 24.72 Mvar -9.29 Mvar -9.29 Mvar
43.05 % 43.05 % 23.75 % 23.75 % 23.75 % 23.75 % 49.38 % 49.43 % 32.80 % 32.80 %

KASAN_70/B1
29.70 70.49
0.99 MBOUNO_30 1.01
-10.20 -40.52
41.69 MW 4.92 MW 4.92 MW 4.92 MW 4.92 MW 0.87 MW 0.00 MW 0.00 MW -193.09 MW -193.09 MW
25.78 Mvar 2.90 Mvar 2.90 Mvar 2.90 Mvar 2.90 Mvar 0.56 Mvar L_KAS_15 -49.38 Mvar -24.72 Mvar 9.29 Mvar 9.29 Mvar
0.85 -10.45 MW -10.45 MW 5.22 MW 5.22 MW 5.22 MW 5.22 MW 23.98 % 23.98 % 23.98 % 23.98 % 39.65 % 36.89 % 36.89 %

T_KAS_70/15
-5.54 Mvar -5.54 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar
34.67 % 34.67 % 23.75 % 23.75 % 23.75 % 23.75 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 71.91 SVS SVS
4
L_MBUONO_30 -0.85 MW 0.85 MW TSC1 TSC2
71.91 -0.53 Mvar 0.53 Mvar
1.03 39.65 % 0.85
-40.12
T_KAS_15
15.15
1.01
0.00 MW -4.78 MW -4.78 MW -4.78 MW -4.78 MW -41.61
0.00 Mvar -3.32 Mvar -3.32 Mvar -3.32 Mvar -3.32 Mvar
23.98 % 23.98 % 23.98 % 23.98 %
68.07
0.97
-41.09
ZONGO/B0.1

68.07
0.97 ZONGO/B0.0
-41.09
27.55 MW -12.91 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.25 MW 2.25 MW
20.28 Mvar -8.37 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.69 Mvar 0.69 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

56.30 % 90.65 % 0.20 % 0.20 % 0.20 % 0.20 % 10.38 % 10.38 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

6 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -27.47 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.23 MW -2.23 MW
-18.20 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.11 Mvar -1.11 Mvar
U > 1.05 p.u. 56.30 % 90.65 % 0.20 % 0.20 % 0.20 % 0.20 % 10.38 % 10.38 %
Loading > 80. % INKISI_70
67.28
0.96
27.47 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -41.42 1.62 MW 0.81 MW 2.03 MW
18.20 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.59 Mvar 0.29 Mvar 1.35 Mvar
53.59 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.04 % 4.04 % 50.68 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.62 MW -0.81 MW


-1.06 Mvar -0.53 Mvar
4.04 % 4.04 %
-2.00 MW 2.00 MW
MBANZA_70 -1.23 Mvar
50.68 %
1.23 Mvar
0.85
67.11
0.96
-26.46 MW -41.48
1.21 MW 1.21 MW -0.00 MW -0.00 MW 14.53
-19.15 Mvar
53.59 %
0.79 Mvar 0.79 Mvar 0.00 Mvar 0.00 Mvar 0.97 T_INK_15
58.18 % 58.18 % 0.91 % 0.91 %
T2_MBAN_70/6.6

-43.48
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
126.12 -3 -3
0.96
-45.26 0.00 MW 0.00 MW
26.46 MW
19.15 Mvar -0.22 Mvar -0.22 Mvar
0.91 % 0.91 %
T1_BADIA_124/33

67.28 % 1.19 MW -1.19 MW -1.19 MW 1.19 MW


0.73 Mvar
0.85
-0.73 Mvar
58.18 %
-0.73 Mvar
58.18 %
0.73 Mvar
0.85
LUFU-TOTO_70
2 67.64
0.97
-35.17
6.35 6.35 -3.31 MW -3.31 MW 1.66 MW 1.66 MW 1.66 MW 1.66 MW
0.96 T1_MBAN_6.6 0.96 T2_MBAN_6.6 -1.93 Mvar -1.93 Mvar 1.07 Mvar 1.07 Mvar 1.07 Mvar 1.07 Mvar
T2_LUF_70/15

-26.34 MW -43.13 -43.13 15.88 % 15.88 % 40.85 % 40.85 % 40.85 % 40.85 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

L1_INGA_KIM_220

L2_INGA_KIM_220
-16.63 Mvar L1_LUFU_15 L2_LUFU_15
67.28 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.35 MW 3.35 MW
30.55 1.64 Mvar 1.64 Mvar
1.02 15.88 % 15.88 %
-48.80 3.26 MW -1.63 MW -1.63 MW -1.63 MW -1.63 MW 3.26 MW
26.34 MW
16.63 Mvar LUKALA_70 2.01 Mvar
0.85
-1.00 Mvar
40.85 %
-1.00 Mvar
40.85 %
-1.00 Mvar
40.85 %
-1.00 Mvar
40.85 %
2.01 Mvar
0.85
53.10 %
T2_BADIA_30/30

68.59
0.98
-34.88
3.94 MW 3.94 MW -7.29 MW -7.29 MW 14.55 14.55
-5 2.63 Mvar 2.63 Mvar L_LUKALA_6.6 -4.27 Mvar -4.27 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
46.10 % 46.10 % 34.54 % 34.54 % -36.57 -36.57
T2_LUK_70/6.6
T1_LUK_70/6.6

-26.30 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-16.37 Mvar
53.10 %
7.35 MW 7.35 MW
BADIA_30 4.22 Mvar 4.22 Mvar
-3.91 MW 34.54 % 34.54 %
30.63 -3.91 MW 7.83 MW
-2.40 Mvar -2.40 Mvar 4.81 Mvar
1.02 46.10 % 46.10 % 0.85 KIMPESE_70
-49.00
26.30 MW 69.29
16.37 Mvar 0.99
0.85 -34.69
6.29 -7.78 MW -7.78 MW 0.43 MW 0.43 MW
L_SANDA_15 -4.50 Mvar -4.50 Mvar 0.28 Mvar 0.28 Mvar
36.36 % 36.36 % 7.35 % 7.35 %
6.29 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.95
-37.09
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.42 MW 7.86 MW 7.86 MW
2.12 Mvar 4.45 Mvar 4.45 Mvar
0.85 36.36 % 36.36 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.41 MW -0.20 MW -0.20 MW -0.20 MW -0.20 MW 0.41 MW
15.00 70.18 0.25 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar 0.25 Mvar
1.00 1.00 0.85 7.35 % 7.35 % 7.35 % 7.35 % 0.85
-32.77 -34.44
-1.71 MW -1.71 MW 4.14 MW -9.93 MW -9.93 MW
-1.06 Mvar -1.06 Mvar 2.75 Mvar L_CIN_6.6 -5.83 Mvar -5.83 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

40.63 % 40.63 % 49.56 % 45.98 % 45.98 %


29.37 14.69
T-KIM_30 T_KIM_15
T_CIN_70/6

0.98 0.98
L2_KWIL_CIN_70 -35.33 -5.36
L1_KWIL_CIN_70
0
10.14 MW 10.14 MW
L_132_INGA_KINT 5.83 Mvar 5.83 Mvar
45.98 % 45.98 %
1.74 MW 1.74 MW -23.49 MW -4.11 MW 4.11 MW 72.05
1.12 Mvar
40.63 %
1.12 Mvar
40.63 %
-10.69 Mvar
39.77 %
-2.53 Mvar
49.56 %
2.53 Mvar
0.85
1.03
-33.94
KWILU_70/B0...

134.28 6.45 72.05


1.02
-31.81
KINTATA_132 0.98 T_CIN_6.6 1.03
-33.94
KWILU_70/B0...
3.36 MW 16.65 MW 23.70 MW -36.39 -10.14 MW -10.14 MW
-1.29 Mvar 9.75 Mvar 9.99 Mvar -5.83 Mvar -5.83 Mvar L_KWILU_15 Comp_KWIL_15
6.29 % 30.92 % 39.77 % 23.97 % 23.97 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

136.01 T2_KWILU 1
1.03 L2_ING_KWIL_220
-31.28 -0.22 MW -0.22 MW 0.45 MW
-11.85 MW -11.85 MW
-5.00 Mvar -5.00 Mvar 3 -0.14 Mvar -0.14 Mvar 0.28 Mvar
25.22 % 25.22 % 23.97 % 23.97 % 0.85
L1_ING_KWIL_220 3
-3.35 MW -16.48 MW
-2.30 Mvar -10.90 Mvar -0.00 MW -0.00 MW 15.62
6.29 % 30.92 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
25.22 % 25.22 % -2.85
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-85.20 MW
-10.89 Mvar
-85.20 MW
-10.89 Mvar
10.43 MW
6.49 Mvar
10.43 MW
6.49 Mvar
74.77 MW
4.40 Mvar
74.77 MW
4.40 Mvar
28.94 % 28.94 % 23.97 % 23.97 % 26.67 % 26.67 %
225.44
0 0
133.65
1.01
132.21
1.00
KWILU_220/B0.. 1.02
-32.58
-32.14 -32.28
3.35 MW 5.49 MW 5.49 MW 5.49 MW
T2_MATADI_132/15(1)

2.30 Mvar 3.63 Mvar 3.63 Mvar 3.63 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

40.12 % 43.83 % 43.83 % 43.83 %


225.44
KWILU_220/B0.. 1.02
11.91 MW 11.91 MW 86.22 MW 86.22 MW -32.58 202.09 MW 202.09 MW
5.53 Mvar 5.53 Mvar 3.68 Mvar 3.68 Mvar 23.82 Mvar 23.82 Mvar
25.22 % 25.22 % 28.94 % 28.94 % 36.89 % 36.89 %
229.03
1.04 INGA1/B0.1
-30.03
-3.31 MW -5.44 MW -5.44 MW -5.44 MW
-2.12 Mvar -3.35 Mvar -3.35 Mvar -3.35 Mvar
40.12 % 43.83 % 43.83 % 43.83 % INGA1/B0.0
BOMA_15 MATADI_15 229.03
1.04
-30.03
14.79 14.63 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW -2.12 MW -164.65 MW -164.68 MW -164.71 MW -164.71 MW 853.21 MW
0.99 0.98 -25.57 Mvar -25.57 Mvar -25.57 Mvar -25.57 Mvar -25.57 Mvar -25.57 Mvar -82.66 Mvar -82.66 Mvar -82.66 Mvar -84.68 Mvar -82.66 Mvar -62.01 Mvar 15.84 Mvar 15.84 Mvar 533.04 Mvar
-34.00 -34.25 88.17 % 88.17 % 88.17 % 88.17 % 88.17 % 88.17 % 94.77 % 94.77 % 94.77 % 43.71 % 94.77 % 90.51 % 85.03 % 85.03 % 0.85
1.65 MW 1.65 MW 16.31 MW
1.06 Mvar 1.06 Mvar 10.06 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

39.83 % 39.83 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.63 MW -1.63 MW 3.26 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 2.25 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-1.00 Mvar -1.00 Mvar 2.01 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 89.14 Mvar 102.26 Mvar 79.91 Mvar 0.00 Mvar 0.00 Mvar
39.83 % 39.83 % 0.85 88.17 % 88.17 % 88.17 % 88.17 % 88.17 % 88.17 % 94.77 % 94.77 % 94.77 % 43.71 % 94.77 % 90.51 % 85.03 % 85.03 %
LEMBA_A30
29.10
0.97
-35.00
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 2.25 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 89.14 Mvar 102.26 Mvar 79.91 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 43.50 % 94.69 % 89.43 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis Date: 5/11/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de faible charge 2020, Option 1a Annex: 3.3.2-3
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.40
1.03
-51.62
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.60 MW
-0.37 Mvar
0.60 MW
0.37 Mvar
4.79 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.62 MW
0.40 Mvar
4.79 %
1 BANDUNGU_220
226.40
1.03
42.52 MW 0.00 MW -51.41
26.50 Mvar -19.02 Mvar -0.62 MW
0.85 -0.40 Mvar
11.98 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
30.84
L_FUNA_20 Comp_FUNA_2 1

0 3 30.84
Comp_FUNA_20 1.03

L_MAL_BAND_220
-54.44
-21.26 MW -21.26 MW Comp_BANDUN_220
0 -3.74 Mvar -3.74 Mvar
74.78 MW 0.00 MW 0.00 MW 28.96 % 28.96 %
1 -0.00 MW -0.00 MW
46.54 Mvar 0.00 Mvar -56.33 Mvar -0.00 Mvar -0.00 Mvar
0.85 28.96 % 28.96 %
165.67 MW 0.00 MW 0.00 MW
T_UTEX_20 103.20 Mvar 0.00 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
20.43
1.02 FUNA_20/B0.0
-25.03
-74.78 MW 20.52
9.79 Mvar 1.03 0 0
40.61 %
T1_UTEX_220/20

-25.03
-41.42 MW -41.42 MW -41.42 MW -41.42 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -25.80 Mvar -25.80 Mvar -25.80 Mvar -25.80 Mvar
52.46 % 52.46 % 52.46 % 52.46 % 21.38 MW 21.38 MW 0.77 MW
8 5.54 Mvar 5.54 Mvar -34.56 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 28.96 % 28.96 % 11.98 %
3 3
MALUKU_220/B..
74.95 MW
0 0 0 0 219.26
-3.58 Mvar 1
40.61 %
0.00 MW 125.68 MW -0.00 MW -0.00 MW
219.26
UTEXCO_220 -18.66 Mvar 78.17 Mvar -55.98 Mvar -55.94 Mvar
1.00
0.85
41.53 MW 41.53 MW 41.53 MW 41.53 MW -50.86
217.85
0.99 LINGWALA_30/.. LIMINGA_30/B.. 30.93 Mvar 30.93 Mvar 30.93 Mvar 30.93 Mvar
-15.57 MW
15.85 Mvar
-27.96 MW
7.64 Mvar
52.46 % 52.46 % 52.46 % 52.46 % 9.02 % 11.24 %
-50.57

L1_MAL_KIM_220_P2
-74.95 MW 30.55 30.53
3.58 Mvar
26.17 %
30.55 30.53
1.02 1.02
-57.53 -57.30
-41.89 MW -41.89 MW -41.89 MW 0.00 MW 125.60 MW -41.87 MW -41.87 MW -41.87 MW -83.06 MW -83.06 MW
-1.18 Mvar -1.18 Mvar -1.18 Mvar -18.65 Mvar 78.12 Mvar -1.18 Mvar -1.18 Mvar -1.18 Mvar -61.86 Mvar -61.86 Mvar
56.58 % 56.58 % 56.58 % 0.85 56.56 % 56.56 % 56.56 % 36.23 % 36.23 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 -0.00 Mvar -0.00 Mvar -0.00 Mvar
56.58 % 56.58 % 56.58 % 56.56 % 56.56 % 56.56 % 15.62 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-20.70 Mvar
Comp_LIMINGA_30 9.02 %
KIMBANSEKE_220
L_LIMIN_30
218.40
0 0 0 0 0 0 0.99
-50.53
T1_LIMINGA T2_LIMINGA 14.06 MW 14.06 MW -43.74 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 9.42 Mvar 9.42 Mvar 1.85 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 42.63 % 42.63 % 15.34 %

T1_KIMBANSEKE
74.97 MW 42.33 MW 42.33 MW 42.33 MW 42.30 MW 42.30 MW 42.30 MW 83.16 MW 83.16 MW
-3.78 Mvar 6.90 Mvar 6.90 Mvar 6.90 Mvar 6.90 Mvar 6.90 Mvar 6.90 Mvar 61.62 Mvar 61.62 Mvar -3 -3
26.17 % 56.58 % 56.58 % 56.58 % 56.56 % 56.56 % 56.56 % 36.23 % 36.23 %
LINGWALA_220.. LIMINGA_220/..
27.98 MW -13.99 MW -13.99 MW

L1_MAL_KIM_220_P1
217.90 217.82 17.37 Mvar -8.68 Mvar -8.68 Mvar
0.99 0.99 0.85 42.63 % 42.63 %
-50.49 -50.27
50.81 MW 18.09 MW -72.23 MW -72.23 MW -72.23 MW -72.23 MW 18.09 MW -73.31 MW -73.31 MW -73.31 MW -73.31 MW
32.98 Mvar -0.19 Mvar -12.38 Mvar -12.38 Mvar -12.38 Mvar -12.38 Mvar -0.19 Mvar -35.99 Mvar -35.99 Mvar -35.99 Mvar -35.99 Mvar
29.61 % 6.36 % 25.55 % 25.55 % 25.55 % 25.55 % 6.36 % 28.48 % 28.48 % 28.48 % 28.48 % KIMBANSEKE_20 20.15
L4_LING_KIM_220 1.01

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-22.40
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

72.42 MW 72.42 MW 72.42 MW 72.42 MW 73.44 MW 73.44 MW 73.44 MW 73.44 MW 0.00 MW 0.00 MW 43.85 MW 28.08 MW
L1_LING_COM_220 10.76 Mvar 10.76 Mvar 10.76 Mvar 10.76 Mvar 35.10 Mvar 35.10 Mvar 35.10 Mvar 35.10 Mvar -106.79 Mvar -106.79 Mvar -5.32 Mvar -16.10 Mvar
25.55 % 25.55 % 25.55 % 25.55 % 28.48 % 28.48 % 28.48 % 28.48 % 15.34 % 11.24 %
-50.70 MW
-34.39 Mvar GOM_6/B0.1 KIMWENZA/B0...
29.61 %
-18.08 MW -18.08 MW 218.77
MBUONO_220/B.. -2.34 Mvar -2.34 Mvar 6.34
0.99
6.36 % 6.36 % -49.98
216.83 6.34 218.77
0.99 0.96 0.99
-50.73 COM_220/B0.1 -22.74 -49.98 KIMWENZA/B0...
25.35 MW 25.35 MW 217.72 -4.76 MW -4.76 MW 9.52 MW 0.07 MW 0.06 MW -146.89 MW -146.89 MW -180.86 MW -180.86 MW
17.20 Mvar 17.20 Mvar -2.93 Mvar -2.93 Mvar 5.85 Mvar L2_KAS_GOM_70 -29.29 Mvar -14.66 Mvar 28.80 Mvar 28.80 Mvar 18.97 Mvar 18.97 Mvar
51.80 % 51.80 % COM_220/B0.0 217.72
36.84 % 36.84 % 0.85 30.01 % 30.05 % 53.36 % 53.36 % 42.46 % 42.46 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
0.99 L4_KAS_GOM_70
-50.64
18.08 MW 18.08 MW
2.34 Mvar 2.34 Mvar L_KAS_GOM_70
-3 -3 36.84 % 36.84 %
T1_COMBE T2_COMBE 1 1
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
1 1
-25.22 MW -25.22 MW -6.52 MW -6.52 MW -6.52 MW -6.52 MW -0.00 MW -0.00 MW
-15.61 Mvar -15.61 Mvar 3 3 0.54 Mvar 0.54 Mvar 0.54 Mvar 0.54 Mvar 30.01 Mvar 15.02 Mvar
51.80 % 51.80 % 25.93 % 25.93 % 25.93 % 25.93 % 30.01 % 30.05 %

KASAN_70/B1
29.85 71.15
1.00 MBOUNO_30 1.02
-23.04 -54.23
50.43 MW 6.26 MW 6.26 MW 6.26 MW 6.26 MW 1.05 MW 0.00 MW 0.00 MW
31.22 Mvar -0.71 Mvar -0.71 Mvar -0.71 Mvar -0.71 Mvar 0.69 Mvar L_KAS_15 -30.01 Mvar -15.02 Mvar
0.85 -13.25 MW -13.25 MW 6.62 MW 6.62 MW 6.62 MW 6.62 MW 24.81 % 24.81 % 24.81 % 24.81 % 47.65 %

T_KAS_70/15
1.59 Mvar 1.59 Mvar -0.80 Mvar -0.80 Mvar -0.80 Mvar -0.80 Mvar
36.84 % 36.84 % 25.93 % 25.93 % 25.93 % 25.93 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.12 SVS SVS
2
L_MBUONO_30 -1.03 MW 1.03 MW TSC1 TSC2
72.12 -0.64 Mvar 0.64 Mvar
1.03 47.65 % 0.85
-53.15
T_KAS_15
15.22
1.01
0.00 MW -6.10 MW -6.10 MW -6.10 MW -6.10 MW -55.53
-19.74 Mvar 0.30 Mvar 0.30 Mvar 0.30 Mvar 0.30 Mvar
24.81 % 24.81 % 24.81 % 24.81 %
69.55
0.99
-55.96
ZONGO/B0.1

69.55
0.99 ZONGO/B0.0
-55.96
31.80 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.76 MW 2.76 MW
24.93 Mvar -8.42 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 1.03 Mvar 1.03 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

65.07 % 88.89 % 0.20 % 0.20 % 0.20 % 0.20 % 12.66 % 12.66 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -31.70 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.73 MW -2.73 MW
-22.18 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.46 Mvar -1.46 Mvar
U > 1.05 p.u. 65.07 % 88.89 % 0.20 % 0.20 % 0.20 % 0.20 % 12.66 % 12.66 %
Loading > 80. % INKISI_70
68.56
0.98
31.70 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -56.33 1.99 MW 0.99 MW 2.48 MW
22.18 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.83 Mvar 0.41 Mvar 1.68 Mvar
63.02 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.88 % 4.88 % 61.25 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.98 MW -0.99 MW


-1.32 Mvar -0.66 Mvar
4.88 % 4.88 %
-2.45 MW 2.45 MW
MBANZA_70 -1.51 Mvar
61.25 %
1.51 Mvar
0.85
68.36
0.98
-30.30 MW -56.39
1.49 MW 1.49 MW -0.00 MW -0.00 MW 14.72
-22.38 Mvar
63.02 %
0.99 Mvar 0.99 Mvar -0.00 Mvar -0.00 Mvar 0.98 T_INK_15
70.28 % 70.28 % 0.90 % 0.90 %
T2_MBAN_70/6.6

-58.78
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
123.69 -3 -3
0.94
-60.66 0.00 MW 0.00 MW
30.30 MW

L1_INGA_KIM_220

L2_INGA_KIM_220
22.38 Mvar -0.22 Mvar -0.22 Mvar
0.90 % 0.90 %
T1_BADIA_124/33

79.15 % 1.45 MW -1.45 MW -1.45 MW 1.45 MW


0.89 Mvar
0.85
-0.89 Mvar
70.28 %
-0.89 Mvar
70.28 %
0.89 Mvar
0.85
LUFU-TOTO_70
2 67.03
0.96
-41.27
6.43 6.43 -3.89 MW -3.89 MW 1.94 MW 1.94 MW 1.94 MW 1.94 MW
0.97 T1_MBAN_6.6 0.97 T2_MBAN_6.6 -2.33 Mvar -2.33 Mvar 1.27 Mvar 1.27 Mvar 1.27 Mvar 1.27 Mvar
T2_LUF_70/15

-30.14 MW -58.35 -58.35 18.94 % 18.94 % 48.51 % 48.51 % 48.51 % 48.51 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-18.93 Mvar L1_LUFU_15 L2_LUFU_15


79.15 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.94 MW 3.94 MW
29.68 2.06 Mvar 2.06 Mvar
0.99 18.94 % 18.94 %
-64.92 3.83 MW -1.91 MW -1.91 MW -1.91 MW -1.91 MW 3.83 MW
30.14 MW
18.93 Mvar LUKALA_70 2.35 Mvar
0.85
-1.18 Mvar
48.51 %
-1.18 Mvar
48.51 %
-1.18 Mvar
48.51 %
-1.18 Mvar
48.51 %
2.35 Mvar
0.85
62.49 %
T2_BADIA_30/30

68.17
0.97
-40.94
4.64 MW 4.64 MW -8.58 MW -8.58 MW 14.36 14.36
-5 3.15 Mvar 3.15 Mvar L_LUKALA_6.6 -5.20 Mvar -5.20 Mvar 0.96 T1_LUFU_15 0.96 T2_LUFU_15
54.86 % 54.86 % 41.27 % 41.27 % -42.95 -42.95
T2_LUK_70/6.6
T1_LUK_70/6.6

-30.10 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-18.62 Mvar
62.49 %
8.67 MW 8.67 MW
BADIA_30 5.19 Mvar 5.19 Mvar
-4.61 MW 41.27 % 41.27 %
29.74 -4.61 MW 9.22 MW
-2.82 Mvar -2.82 Mvar 5.64 Mvar
0.99 54.86 % 54.86 % 0.85 KIMPESE_70
-65.16
30.10 MW 69.01
18.62 Mvar 0.99
0.85 -40.71
6.21 -9.17 MW -9.17 MW 0.50 MW 0.50 MW
L_SANDA_15 -5.52 Mvar -5.52 Mvar 0.33 Mvar 0.33 Mvar
43.47 % 43.47 % 8.71 % 8.71 %
6.21 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.94
-43.58
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
4.10 MW 9.29 MW 9.29 MW
2.54 Mvar 5.51 Mvar 5.51 Mvar
0.85 43.47 % 43.47 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.48 MW -0.24 MW -0.24 MW -0.24 MW -0.24 MW 0.48 MW
15.00 70.08 0.30 Mvar -0.15 Mvar -0.15 Mvar -0.15 Mvar -0.15 Mvar 0.30 Mvar
1.00 1.00 0.85 8.71 % 8.71 % 8.71 % 8.71 % 0.85
-36.59 -40.43
-2.05 MW -2.05 MW 4.91 MW -11.75 MW -11.75 MW
-1.27 Mvar -1.27 Mvar 3.31 Mvar L_CIN_6.6 -7.16 Mvar -7.16 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

48.68 % 48.68 % 59.18 % 55.02 % 55.02 %


29.19 14.60
T-KIM_30 T_KIM_15
T_CIN_70/6

0.97 0.97
L2_KWIL_CIN_70 -41.49 -11.52
L1_KWIL_CIN_70
0
12.05 MW 12.05 MW
L_132_INGA_KINT 7.26 Mvar 7.26 Mvar
55.02 % 55.02 %
2.09 MW 2.09 MW -28.04 MW -4.88 MW 4.88 MW 72.33
1.35 Mvar
48.68 %
1.35 Mvar
48.68 %
-14.02 Mvar
48.13 %
-3.00 Mvar
59.18 %
3.00 Mvar
0.85
1.03
-39.87
KWILU_70/B0...

134.78 6.41 72.33


1.02
-35.45
KINTATA_132 0.97 T_CIN_6.6 1.03
-39.87
KWILU_70/B0...
3.99 MW 19.87 MW 28.34 MW -42.77 -12.05 MW -12.05 MW
-0.82 Mvar 12.14 Mvar 13.48 Mvar -7.26 Mvar -7.26 Mvar L_KWILU_15 Comp_KWIL_15
7.49 % 36.96 % 48.13 % 29.24 % 29.24 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

136.94 T2_KWILU 1
1.04 L2_ING_KWIL_220
-34.84 -0.27 MW -0.27 MW 0.54 MW
-14.17 MW -14.17 MW
-6.74 Mvar -6.74 Mvar 1 -0.17 Mvar -0.17 Mvar 0.34 Mvar
31.28 % 31.28 % 29.24 % 29.24 % 0.85
L1_ING_KWIL_220 1
-3.98 MW -19.62 MW
-2.78 Mvar -13.17 Mvar -0.00 MW -0.00 MW 15.72
7.49 % 36.96 %
-0.00 Mvar -0.00 Mvar 1.05 T_KWILU_15
31.28 % 31.28 % -8.59
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-167.22 MW
14.27 Mvar
-167.22 MW
14.27 Mvar
12.39 MW
8.11 Mvar
12.39 MW
8.11 Mvar
154.84 MW
-22.37 Mvar
154.84 MW
-22.37 Mvar
57.50 % 57.50 % 29.24 % 29.24 % 53.36 % 53.36 %
222.75
1 1
133.94
1.01
132.28
1.00
KWILU_220/B0.. 1.01
-38.27
-35.81 -35.99
3.98 MW 6.54 MW 6.54 MW 6.54 MW
T2_MATADI_132/15(1)

2.78 Mvar 4.39 Mvar 4.39 Mvar 4.39 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

47.81 % 52.40 % 52.40 % 52.40 %


222.75
KWILU_220/B0.. 1.01
14.23 MW 14.23 MW 171.32 MW 171.32 MW -38.27 190.06 MW 190.06 MW
7.56 Mvar 7.56 Mvar -9.47 Mvar -9.47 Mvar 1.47 Mvar 1.47 Mvar
31.28 % 31.28 % 57.50 % 57.50 % 42.46 % 42.46 %
226.70
1.03 INGA1/B0.1
-32.89
-3.93 MW -6.47 MW -6.47 MW -6.47 MW
-2.53 Mvar -3.99 Mvar -3.99 Mvar -3.99 Mvar
47.81 % 52.40 % 52.40 % 52.40 % INGA1/B0.0
BOMA_15 MATADI_15 226.70
1.03
-32.89
14.75 14.56 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.70 MW -93.88 MW -164.71 MW -164.71 MW -164.71 MW 0.07 MW 629.52 MW
0.98 0.97 -25.48 Mvar -25.48 Mvar -25.48 Mvar -25.48 Mvar -25.48 Mvar -25.48 Mvar -82.31 Mvar -82.31 Mvar -24.97 Mvar -98.02 Mvar 16.16 Mvar 16.16 Mvar 16.16 Mvar 0.36 Mvar 392.49 Mvar
-38.01 -38.34 88.99 % 88.99 % 88.99 % 88.99 % 88.99 % 88.99 % 95.66 % 95.66 % 86.53 % 70.61 % 85.92 % 85.92 % 85.92 % 0.19 % 0.85
1.96 MW 1.96 MW 19.42 MW
1.26 Mvar 1.26 Mvar 11.97 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

47.52 % 47.52 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.93 MW -1.93 MW 3.87 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 94.11 MW 165.00 MW 165.00 MW 165.00 MW -0.00 MW
-1.19 Mvar -1.19 Mvar 2.38 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 41.35 Mvar 109.05 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
47.52 % 47.52 % 0.85 88.99 % 88.99 % 88.99 % 88.99 % 88.99 % 88.99 % 95.66 % 95.66 % 86.53 % 70.61 % 85.92 % 85.92 % 85.92 % 0.19 %
LEMBA_A30
28.91
0.96
-39.22
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 94.11 MW 165.00 MW 165.00 MW 165.00 MW 0.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 41.35 Mvar 109.05 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 82.98 % 70.27 % 80.49 % 80.49 % 80.49 % 0.00 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis, Option 2, 2x400mm2 Date: 6/30/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de charge 650 MW vers Kimwenza, Option Annex: 3.3.3-1
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.51
1.03
-49.29
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.54 MW
-0.34 Mvar
0.54 MW
0.34 Mvar
4.30 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.56 MW
0.37 Mvar
4.30 %
1 BANDUNGU_220
228.07
1.04
38.55 MW 0.00 MW -49.11
24.08 Mvar -19.50 Mvar -0.56 MW
0.85 -0.37 Mvar
12.08 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
31.22
L_FUNA_20 Comp_FUNA_2 1

0 3 31.22
Comp_FUNA_20 1.04

L_MAL_BAND_220
-51.78
-19.28 MW -19.28 MW Comp_BANDUN_220
0 -2.29 Mvar -2.29 Mvar
67.80 MW 0.00 MW 0.00 MW 25.71 % 25.71 %
0 -0.00 MW -0.00 MW
42.30 Mvar 0.00 Mvar -57.75 Mvar -0.00 Mvar -0.00 Mvar
0.85 25.71 % 25.71 %
150.34 MW 0.00 MW 0.00 MW
T_UTEX_20 93.89 Mvar 0.00 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
20.68
1.03 FUNA_20/B0.0
-22.24
-67.80 MW 20.78
15.45 Mvar 1.04 0 0
36.98 %
T1_UTEX_220/20

-22.24
-37.59 MW -37.59 MW -37.59 MW -37.59 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA -23.47 Mvar -23.47 Mvar -23.47 Mvar -23.47 Mvar
47.04 % 47.04 % 47.04 % 47.04 % 19.39 MW 19.39 MW 0.71 MW
8 3.80 Mvar 3.80 Mvar -35.11 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 25.71 % 25.71 % 12.08 %
2 2
MALUKU_220/B..
67.95 MW
0 0 0 0 220.85
-10.23 Mvar 1
36.98 %
0.00 MW 111.59 MW -0.00 MW -0.00 MW
220.85
UTEXCO_220 -18.63 Mvar 69.40 Mvar -37.27 Mvar -37.24 Mvar
1.00
0.85
37.69 MW 37.69 MW 37.69 MW 37.69 MW -48.56
219.18
1.00 LINGWALA_30/.. LIMINGA_30/B.. 27.64 Mvar 27.64 Mvar 27.64 Mvar 27.64 Mvar
-14.15 MW
17.44 Mvar
-25.33 MW
10.06 Mvar
47.04 % 47.04 % 47.04 % 47.04 % 9.15 % 10.90 %
-48.26

L1_MAL_KIM_220_P2
-67.95 MW 30.52 30.51
10.23 Mvar
23.83 %
30.52 30.51
1.02 1.02
-54.39 -54.19
-37.20 MW -37.20 MW -37.20 MW 0.00 MW 111.53 MW -37.18 MW -37.18 MW -37.18 MW -75.38 MW -75.38 MW
-4.50 Mvar -4.50 Mvar -4.50 Mvar -18.62 Mvar 69.36 Mvar -4.50 Mvar -4.50 Mvar -4.50 Mvar -55.28 Mvar -55.28 Mvar
50.66 % 50.66 % 50.66 % 0.85 50.65 % 50.65 % 50.65 % 32.49 % 32.49 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 -0.00 Mvar -0.00 Mvar -0.00 Mvar
50.66 % 50.66 % 50.66 % 50.65 % 50.65 % 50.65 % 14.20 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-22.36 Mvar
Comp_LIMINGA_30 9.15 %
KIMBANSEKE_220
L_LIMIN_30
219.87
0 0 0 0 0 0 1.00
-48.25
T1_LIMINGA T2_LIMINGA 12.69 MW 12.69 MW -39.58 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 8.46 Mvar 8.46 Mvar 5.44 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 38.15 % 38.15 % 14.05 %

T1_KIMBANSEKE
67.97 MW 37.53 MW 37.53 MW 37.53 MW 37.50 MW 37.50 MW 37.50 MW 75.46 MW 75.46 MW
-10.45 Mvar 9.17 Mvar 9.17 Mvar 9.17 Mvar 9.17 Mvar 9.17 Mvar 9.17 Mvar 54.95 Mvar 54.95 Mvar -3 -3
23.83 % 50.66 % 50.66 % 50.66 % 50.65 % 50.65 % 50.65 % 32.49 % 32.49 %
LINGWALA_220.. LIMINGA_220/..
25.25 MW -12.62 MW -12.62 MW

L1_MAL_KIM_220_P1
219.21 219.13 15.70 Mvar -7.85 Mvar -7.85 Mvar
1.00 1.00 0.85 38.15 % 38.15 %
-48.20 -48.00
45.87 MW 15.50 MW -64.36 MW -64.36 MW -64.36 MW -64.36 MW 15.50 MW -65.86 MW -65.86 MW -65.86 MW -65.86 MW
29.32 Mvar 2.17 Mvar -12.68 Mvar -12.68 Mvar -12.68 Mvar -12.68 Mvar 2.17 Mvar -34.35 Mvar -34.35 Mvar -34.35 Mvar -34.35 Mvar
26.50 % 5.62 % 22.73 % 22.73 % 22.73 % 22.73 % 5.62 % 25.75 % 25.75 % 25.75 % 25.75 % KIMBANSEKE_20 20.34
L4_LING_KIM_220 1.02

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-19.92
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

64.50 MW 64.50 MW 64.50 MW 64.50 MW 65.97 MW 65.97 MW 65.97 MW 65.97 MW 0.00 MW 0.00 MW 39.67 MW 25.44 MW
L1_LING_COM_220 10.88 Mvar 10.88 Mvar 10.88 Mvar 10.88 Mvar 33.35 Mvar 33.35 Mvar 33.35 Mvar 33.35 Mvar -108.02 Mvar -108.02 Mvar -9.03 Mvar -18.68 Mvar
22.73 % 22.73 % 22.73 % 22.73 % 25.75 % 25.75 % 25.75 % 25.75 % 14.05 % 10.90 %
-45.78 MW
-30.83 Mvar GOM_6/B0.1 KIMWENZA/B0...
26.50 %
-15.49 MW -15.49 MW 220.02
MBUONO_220/B.. -4.74 Mvar -4.74 Mvar 6.38
1.00
5.62 % 5.62 % -47.74
218.25 6.38 220.02
0.99 0.97 1.00
-48.41 COM_220/B0.1 -20.16 -47.74 KIMWENZA/B0...
22.89 MW 22.89 MW 218.97 -4.28 MW -4.28 MW 8.55 MW 0.06 MW 0.05 MW -147.50 MW -147.50 MW -146.04 MW -146.04 MW
15.41 Mvar 15.41 Mvar -2.63 Mvar -2.63 Mvar 5.26 Mvar L2_KAS_GOM_70 -20.23 Mvar -10.13 Mvar 26.00 Mvar 26.00 Mvar 22.59 Mvar 22.59 Mvar
46.36 % 46.36 % COM_220/B0.0 218.97
32.55 % 32.55 % 0.85 20.67 % 20.69 % 52.97 % 52.97 % 52.44 % 52.44 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
1.00 L4_KAS_GOM_70
-48.32
15.49 MW 15.49 MW
4.74 Mvar 4.74 Mvar L_KAS_GOM_70
-3 -3 32.55 % 32.55 %
T1_COMBE T2_COMBE 1 1
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
1 1
-22.77 MW -22.77 MW -5.50 MW -5.50 MW -5.50 MW -5.50 MW -0.00 MW -0.00 MW
-14.12 Mvar -14.12 Mvar 3 3 -0.94 Mvar -0.94 Mvar -0.94 Mvar -0.94 Mvar 20.67 Mvar 10.35 Mvar
46.36 % 46.36 % 22.08 % 22.08 % 22.08 % 22.08 % 20.67 % 20.69 %

KASAN_70/B1
30.15 70.85
1.00 MBOUNO_30 1.01
-20.46 -51.15
45.54 MW 5.27 MW 5.27 MW 5.27 MW 5.27 MW 0.93 MW 0.00 MW 0.00 MW
28.25 Mvar 0.79 Mvar 0.79 Mvar 0.79 Mvar 0.79 Mvar 0.61 Mvar L_KAS_15 -20.67 Mvar -10.35 Mvar
0.85 -11.15 MW -11.15 MW 5.58 MW 5.58 MW 5.58 MW 5.58 MW 21.52 % 21.52 % 21.52 % 21.52 % 42.36 %

T_KAS_70/15
-1.31 Mvar -1.31 Mvar 0.65 Mvar 0.65 Mvar 0.65 Mvar 0.65 Mvar
32.55 % 32.55 % 22.08 % 22.08 % 22.08 % 22.08 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 71.93 SVS SVS
1
L_MBUONO_30 -0.92 MW 0.92 MW TSC1 TSC2
71.93 -0.57 Mvar 0.57 Mvar
1.03 42.36 % 0.85
-50.42
T_KAS_15
15.20
1.01
-0.00 MW -5.15 MW -5.15 MW -5.15 MW -5.15 MW -52.31
-9.72 Mvar -1.24 Mvar -1.24 Mvar -1.24 Mvar -1.24 Mvar
21.52 % 21.52 % 21.52 % 21.52 %
69.03
0.99
-52.29
ZONGO/B0.1

69.03
0.99 ZONGO/B0.0
-52.29
28.64 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.45 MW 2.45 MW
21.49 Mvar -8.41 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.81 Mvar 0.81 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

58.10 % 89.50 % 0.20 % 0.20 % 0.20 % 0.20 % 11.19 % 11.19 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -28.55 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.42 MW -2.42 MW
-19.28 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.24 Mvar -1.24 Mvar
U > 1.05 p.u. 58.10 % 89.50 % 0.20 % 0.20 % 0.20 % 0.20 % 11.19 % 11.19 %
Loading > 80. % INKISI_70
68.17
0.97
28.55 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -52.64 1.76 MW 0.88 MW 2.20 MW
19.28 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.67 Mvar 0.34 Mvar 1.47 Mvar
56.48 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.34 % 4.34 % 54.43 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.76 MW -0.88 MW


-1.16 Mvar -0.58 Mvar
4.34 % 4.34 %
-2.17 MW 2.17 MW
MBANZA_70 -1.34 Mvar
54.43 %
1.34 Mvar
0.85
67.99
0.97
-27.43 MW -52.70
1.32 MW 1.32 MW -0.00 MW -0.00 MW 14.70
-19.96 Mvar
56.48 %
0.87 Mvar 0.87 Mvar -0.00 Mvar -0.00 Mvar 0.98 T_INK_15
62.47 % 62.47 % 0.91 % 0.91 %
T2_MBAN_70/6.6

-54.82
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
124.30 -3 -3
0.94
-56.58 0.00 MW 0.00 MW
27.43 MW

L1_INGA_KIM_220

L2_INGA_KIM_220
19.96 Mvar -0.22 Mvar -0.22 Mvar
0.91 % 0.91 %
T1_BADIA_124/33

70.92 % 1.29 MW -1.29 MW -1.29 MW 1.29 MW


0.79 Mvar
0.85
-0.79 Mvar
62.47 %
-0.79 Mvar
62.47 %
0.79 Mvar
0.85
LUFU-TOTO_70
2 67.71
0.97
-38.94
6.42 6.42 -3.53 MW -3.53 MW 1.76 MW 1.76 MW 1.76 MW 1.76 MW
0.97 T1_MBAN_6.6 0.97 T2_MBAN_6.6 -2.08 Mvar -2.08 Mvar 1.15 Mvar 1.15 Mvar 1.15 Mvar 1.15 Mvar
T2_LUF_70/15

-27.30 MW -54.44 -54.44 16.95 % 16.95 % 43.54 % 43.54 % 43.54 % 43.54 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-17.18 Mvar L1_LUFU_15 L2_LUFU_15


70.92 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.57 MW 3.57 MW
30.01 1.79 Mvar 1.79 Mvar
1.00 16.95 % 16.95 %
-60.37 3.47 MW -1.74 MW -1.74 MW -1.74 MW -1.74 MW 3.47 MW
27.30 MW
17.18 Mvar LUKALA_70 2.14 Mvar
0.85
-1.07 Mvar
43.54 %
-1.07 Mvar
43.54 %
-1.07 Mvar
43.54 %
-1.07 Mvar
43.54 %
2.14 Mvar
0.85
55.97 %
T2_BADIA_30/30

68.72
0.98
-38.63
4.21 MW 4.21 MW -7.78 MW -7.78 MW 14.55 14.55
-5 2.83 Mvar 2.83 Mvar L_LUKALA_6.6 -4.62 Mvar -4.62 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
49.17 % 49.17 % 36.89 % 36.89 % -40.43 -40.43
T2_LUK_70/6.6
T1_LUK_70/6.6

-27.26 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-16.90 Mvar
55.97 %
7.85 MW 7.85 MW
BADIA_30 4.58 Mvar 4.58 Mvar
-4.18 MW 36.89 % 36.89 %
30.09 -4.18 MW 8.35 MW
-2.56 Mvar -2.56 Mvar 5.13 Mvar
1.00 49.17 % 49.17 % 0.85 KIMPESE_70
-60.59
27.26 MW 69.48
16.90 Mvar 0.99
0.85 -38.43
6.29 -8.30 MW -8.30 MW 0.46 MW 0.46 MW
L_SANDA_15 -4.88 Mvar -4.88 Mvar 0.30 Mvar 0.30 Mvar
38.84 % 38.84 % 7.83 % 7.83 %
6.29 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.95
-40.98
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.62 MW 8.40 MW 8.40 MW
2.24 Mvar 4.84 Mvar 4.84 Mvar
0.85 38.84 % 38.84 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.43 MW -0.22 MW -0.22 MW -0.22 MW -0.22 MW 0.43 MW
14.93 70.43 0.27 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar 0.27 Mvar
1.00 1.01 0.85 7.83 % 7.83 % 7.83 % 7.83 % 0.85
-33.87 -38.17
-1.81 MW -1.81 MW 4.43 MW -10.61 MW -10.61 MW
-1.12 Mvar -1.12 Mvar 2.96 Mvar L_CIN_6.6 -6.32 Mvar -6.32 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

43.17 % 43.17 % 52.92 % 49.14 % 49.14 %


29.43 14.72
T-KIM_30 T_KIM_15
T_CIN_70/6

0.98 0.98
L2_KWIL_CIN_70 -39.12 -9.14
L1_KWIL_CIN_70
0
10.85 MW 10.85 MW
L_132_INGA_KINT 6.35 Mvar 6.35 Mvar
49.14 % 49.14 %
1.84 MW 1.84 MW -24.82 MW -4.39 MW 4.39 MW 72.43
1.18 Mvar
43.17 %
1.18 Mvar
43.17 %
-11.69 Mvar
42.43 %
-2.71 Mvar
52.92 %
2.71 Mvar
0.85
1.03
-37.65
KWILU_70/B0...

133.80 6.46 72.43


1.01
-32.84
KINTATA_132 0.98 T_CIN_6.6 1.03
-37.65
KWILU_70/B0...
3.55 MW 17.59 MW 25.05 MW -40.25 -10.85 MW -10.85 MW
-1.12 Mvar 10.45 Mvar 11.06 Mvar -6.35 Mvar -6.35 Mvar L_KWILU_15 Comp_KWIL_15
6.67 % 32.83 % 42.43 % 25.86 % 25.86 %
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

135.66 T2_KWILU 1
1.03 L2_ING_KWIL_220
-32.28 -0.24 MW -0.24 MW 0.48 MW
-12.52 MW -12.52 MW
-5.53 Mvar -5.53 Mvar 2 -0.15 Mvar -0.15 Mvar 0.30 Mvar
26.91 % 26.91 % 25.86 % 25.86 % 0.85
L1_ING_KWIL_220 2
-3.53 MW -17.39 MW
-2.44 Mvar -11.55 Mvar -0.00 MW -0.00 MW 15.72
6.67 % 32.83 %
0.00 Mvar 0.00 Mvar 1.05 T_KWILU_15
26.91 % 26.91 % -6.50
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-166.51 MW
13.23 Mvar
-166.51 MW
13.23 Mvar
11.15 MW
7.07 Mvar
11.15 MW
7.07 Mvar
155.35 MW
-20.30 Mvar
155.35 MW
-20.30 Mvar
56.71 % 56.71 % 25.86 % 25.86 % 52.97 % 52.97 %
224.71
0 0
133.10
1.01
131.58
1.00
KWILU_220/B0.. 1.02
-36.21
-33.18 -33.33
3.53 MW 5.80 MW 5.80 MW 5.80 MW
T2_MATADI_132/15(1)

2.44 Mvar 3.85 Mvar 3.85 Mvar 3.85 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

42.55 % 46.54 % 46.54 % 46.54 %


224.71
KWILU_220/B0.. 1.02
12.59 MW 12.59 MW 170.49 MW 170.49 MW -36.21 157.23 MW 157.23 MW
6.10 Mvar 6.10 Mvar -9.04 Mvar -9.04 Mvar -14.03 Mvar -14.03 Mvar
26.91 % 26.91 % 56.71 % 56.71 % 52.44 % 52.44 %
228.70
1.04 INGA1/B0.1
-30.96
-3.49 MW -5.74 MW -5.74 MW -5.74 MW
-2.23 Mvar -3.53 Mvar -3.53 Mvar -3.53 Mvar
42.55 % 46.54 % 46.54 % 46.54 % INGA1/B0.0
BOMA_15 MATADI_15 228.70
1.04
-30.96
14.70 14.53 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.71 MW -32.13 MW -164.71 MW -164.71 MW -164.71 MW 0.07 MW 638.39 MW
0.98 0.97 -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -25.56 Mvar -82.61 Mvar -82.61 Mvar -7.72 Mvar -86.49 Mvar 15.89 Mvar 15.89 Mvar 15.89 Mvar 0.36 Mvar 398.72 Mvar
-35.16 -35.43 88.28 % 88.28 % 88.28 % 88.28 % 88.28 % 88.28 % 94.90 % 94.90 % 84.89 % 47.66 % 85.16 % 85.16 % 85.16 % 0.19 % 0.85
1.74 MW 1.74 MW 17.22 MW
1.12 Mvar 1.12 Mvar 10.60 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

42.26 % 42.26 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.72 MW -1.72 MW 3.43 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 32.27 MW 165.00 MW 165.00 MW 165.00 MW -0.00 MW
-1.06 Mvar -1.06 Mvar 2.11 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 23.51 Mvar 91.72 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
42.26 % 42.26 % 0.85 88.28 % 88.28 % 88.28 % 88.28 % 88.28 % 88.28 % 94.90 % 94.90 % 84.89 % 47.66 % 85.16 % 85.16 % 85.16 % 0.19 %
LEMBA_A30
28.89
0.96
-36.23
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 32.27 MW 165.00 MW 165.00 MW 165.00 MW 0.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 23.51 Mvar 91.72 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 81.30 % 47.43 % 80.49 % 80.49 % 80.49 % 0.00 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis, Option 2, 2x210mm2 Date: 6/30/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de charge 587 MW vers Kimwenza Annex: 3.3.3-2
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 14.65
0.98
-55.87
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.77 MW
-0.48 Mvar
0.77 MW
0.48 Mvar
6.36 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30
0.79 MW
0.50 Mvar
6.36 %
BANDUNGU_220
215.68
0.98
56.27 MW -55.57
34.85 Mvar -0.79 MW
0.85 -0.50 Mvar
11.36 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
29.92
L_FUNA_20 1

1 29.92
Comp_FUNA_20 1.00

L_MAL_BAND_220
-57.77
-28.13 MW -28.13 MW Comp_BANDUN_220
-17.43 Mvar -17.43 Mvar
102.75 MW 0.00 MW 46.36 % 46.36 %
1 -0.00 MW -0.00 MW
63.87 Mvar -18.53 Mvar 0.00 Mvar 0.00 Mvar
0.85 46.36 % 46.36 %
210.67 MW 0.00 MW
T_UTEX_20 129.79 Mvar -16.96 Mvar T1_MALUKU T2_MALUKU
0.85
20.29
1.01 FUNA_20/B0.0
-30.56
-102.75 MW 19.42
-45.34 Mvar 0.97 -1 -1
61.00 %
T1_UTEX_220/20

-31.01
-52.67 MW -52.67 MW -52.67 MW -52.67 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA_2 -28.21 Mvar -28.21 Mvar -28.21 Mvar -28.21 Mvar
67.82 % 67.82 % 67.82 % 67.82 % 27.56 MW 27.56 MW 0.92 MW
0 19.40 Mvar 19.40 Mvar -31.24 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 46.36 % 46.36 % 11.36 %
5 5
MALUKU_220/B..
103.03 MW
0 0 0 0 208.96
58.92 Mvar 1
61.00 %
0.00 MW 161.79 MW 0.00 MW 0.00 MW
208.96
UTEXCO_220 -16.97 Mvar 99.68 Mvar -84.85 Mvar -85.18 Mvar
0.95
0.85
52.82 MW 52.82 MW 52.82 MW 52.82 MW -54.99
208.68
0.95 LINGWALA_30/.. LIMINGA_30/B.. 36.66 Mvar 36.66 Mvar 36.66 Mvar 36.66 Mvar
-20.15 MW
1.52 Mvar
-35.89 MW
-9.07 Mvar
67.82 % 67.82 % 67.82 % 67.82 % 7.65 % 13.46 %
-54.74

L1_MAL_KIM_220_P2
-103.03 MW 29.13 29.19
-58.92 Mvar
43.21 %
29.13 29.19
0.97 0.97
-64.51 -64.19
-53.93 MW -53.93 MW -53.93 MW 0.00 MW 162.29 MW -54.10 MW -54.10 MW -54.10 MW -105.65 MW -105.65 MW
0.71 Mvar 0.71 Mvar 0.71 Mvar -17.04 Mvar 100.03 Mvar 0.73 Mvar 0.73 Mvar 0.73 Mvar -73.31 Mvar -73.31 Mvar
76.30 % 76.30 % 76.30 % 0.85 76.39 % 76.39 % 76.39 % 46.83 % 46.83 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

0.00 Mvar 0.00 Mvar 0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
76.30 % 76.30 % 76.30 % 76.39 % 76.39 % 76.39 % 20.19 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-5.96 Mvar
Comp_LIMINGA_30 7.65 %
KIMBANSEKE_220
L_LIMIN_30
209.06
0 0 0 0 0 0 0.95
-54.62
T1_LIMINGA T2_LIMINGA 17.94 MW 17.94 MW -56.06 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 12.23 Mvar 12.23 Mvar -18.49 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 57.11 % 57.11 % 21.45 %

T1_KIMBANSEKE
103.09 MW 54.70 MW 54.70 MW 54.70 MW 54.87 MW 54.87 MW 54.87 MW 105.82 MW 105.82 MW
58.90 Mvar 9.26 Mvar 9.26 Mvar 9.26 Mvar 9.27 Mvar 9.27 Mvar 9.27 Mvar 73.37 Mvar 73.37 Mvar -3 -3
43.21 % 76.30 % 76.30 % 76.30 % 76.39 % 76.39 % 76.39 % 46.83 % 46.83 %
LINGWALA_220.. LIMINGA_220/..
35.68 MW -17.84 MW -17.84 MW

L1_MAL_KIM_220_P1
209.00 209.39 21.91 Mvar -10.96 Mvar -10.96 Mvar
0.95 0.95 0.85 57.11 % 57.11 %
-54.65 -54.34
64.64 MW 26.96 MW -96.44 MW -96.44 MW -96.44 MW -96.44 MW 26.96 MW -94.06 MW -94.06 MW -94.06 MW -94.06 MW
43.78 Mvar -5.60 Mvar -29.81 Mvar -29.81 Mvar -29.81 Mvar -29.81 Mvar -5.60 Mvar -43.64 Mvar -43.64 Mvar -43.64 Mvar -43.64 Mvar
39.61 % 10.01 % 36.69 % 36.69 % 36.69 % 36.69 % 10.01 % 37.62 % 37.62 % 37.62 % 37.62 % KIMBANSEKE_20 19.10
L4_LING_KIM_220 0.96

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-27.26
L_LIMG_MBOU_220

L2_LING_KIM_220
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220

96.81 MW 96.81 MW 96.81 MW 96.81 MW 94.30 MW 94.30 MW 94.30 MW 94.30 MW 56.27 MW 36.08 MW
L1_LING_COM_220 29.11 Mvar 29.11 Mvar 29.11 Mvar 29.11 Mvar 43.25 Mvar 43.25 Mvar 43.25 Mvar 43.25 Mvar 15.72 Mvar 1.60 Mvar
36.69 % 36.69 % 36.69 % 36.69 % 37.62 % 37.62 % 37.62 % 37.62 % 21.45 % 13.46 %
-64.44 MW
-44.74 Mvar GOM_6/B0.1 KIMWENZA/B0...
39.61 %
-26.93 MW -26.93 MW 210.62
MBUONO_220/B.. 3.36 Mvar 3.36 Mvar 6.24
0.96
10.01 % 10.01 % -53.93
207.54 6.24 210.62
0.94 0.95 0.96
-54.98 COM_220/B0.1 -27.95 -53.93 KIMWENZA/B0...
32.22 MW 32.22 MW 208.92 -6.45 MW -6.45 MW 12.89 MW 0.25 MW 0.13 MW -159.38 MW -159.38 MW -269.21 MW -269.21 MW
22.37 Mvar 22.37 Mvar -3.95 Mvar -3.95 Mvar 7.90 Mvar L2_KAS_GOM_70 -85.87 Mvar -34.08 Mvar 10.93 Mvar 10.93 Mvar -104.33 Mvar -104.33 Mvar
69.30 % 69.30 % COM_220/B0.0 208.92
57.15 % 57.15 % 0.85 91.01 % 71.37 % 57.81 % 57.81 % 66.19 % 66.19 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L4_KAS_GOM_70

T2_KIM_400/220

T1_KIM_400/220
0.95
-54.90
26.93 MW 26.93 MW
-3.36 Mvar -3.36 Mvar L_KAS_GOM_70
-3 -3 57.15 % 57.15 %
T1_COMBE T2_COMBE 1 0 -7 -7
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-2 -2
-32.04 MW -32.04 MW -9.91 MW -9.91 MW -9.91 MW -9.91 MW -0.00 MW -0.00 MW 269.49 MW 269.49 MW
-19.62 Mvar -19.62 Mvar 3 3 4.71 Mvar 4.71 Mvar 4.71 Mvar 4.71 Mvar 91.01 Mvar 35.69 Mvar 132.03 Mvar 132.03 Mvar
69.30 % 69.30 % 43.24 % 43.24 % 43.24 % 43.24 % 91.01 % 71.37 % 66.19 % 66.19 %

KASAN_70/B1
28.24 72.14
0.94 MBOUNO_30 1.03
-28.21 -60.92
64.09 MW 9.54 MW 9.54 MW 9.54 MW 9.54 MW 1.48 MW 0.00 MW 0.00 MW -269.49 MW -269.49 MW
39.24 Mvar -4.95 Mvar -4.95 Mvar -4.95 Mvar -4.95 Mvar 0.98 Mvar L_KAS_15 -91.01 Mvar -35.69 Mvar -132.03 Mvar -132.03 Mvar
0.85 -20.38 MW -20.38 MW 10.19 MW 10.19 MW 10.19 MW 10.19 MW 41.76 % 41.76 % 41.76 % 41.76 % 66.17 % 62.85 % 62.85 %

T_KAS_70/15
9.53 Mvar 9.53 Mvar -4.77 Mvar -4.77 Mvar -4.77 Mvar -4.77 Mvar
57.15 % 57.15 % 43.24 % 43.24 % 43.24 % 43.24 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.92 SVS SVS
5
L_MBUONO_30 -1.44 MW 1.44 MW TSC1 TSC2
72.92 -0.90 Mvar 0.90 Mvar
1.04 66.17 % 0.85
-58.81
T_KAS_15
15.28
1.02
-0.00 MW -9.11 MW -9.11 MW -9.11 MW -9.11 MW -62.70
-51.55 Mvar 4.83 Mvar 4.83 Mvar 4.83 Mvar 4.83 Mvar
41.76 % 41.76 % 41.76 % 41.76 %
71.08
1.02
-64.37
ZONGO/B0.1

71.08
1.02 ZONGO/B0.0
-64.37
41.90 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 3.73 MW 3.73 MW
37.28 Mvar -8.47 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 1.72 Mvar 1.72 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

88.37 % 87.14 % 0.20 % 0.20 % 0.20 % 0.20 % 17.09 % 17.09 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -41.74 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -3.67 MW -3.67 MW
-32.29 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -2.14 Mvar -2.14 Mvar
U > 1.05 p.u. 88.37 % 87.14 % 0.20 % 0.20 % 0.20 % 0.20 % 17.09 % 17.09 %
Loading > 80. % INKISI_70
69.71
1.00
41.74 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -64.79 2.72 MW 1.36 MW 3.26 MW
32.29 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 1.35 Mvar 0.67 Mvar 2.27 Mvar
84.85 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 6.62 % 6.62 % 79.81 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -2.71 MW -1.35 MW


-1.85 Mvar -0.92 Mvar
6.62 % 6.62 %
-3.21 MW 3.21 MW
MBANZA_70 -1.96 Mvar
79.81 %
1.96 Mvar
0.85
69.42
0.99
-39.17 MW -64.87
2.03 MW 2.03 MW -0.00 MW -0.00 MW 14.20
-30.47 Mvar
84.85 %
1.38 Mvar 1.38 Mvar -0.00 Mvar -0.00 Mvar 0.95 T_INK_15
95.37 % 95.37 % 0.85 % 0.85 %
T2_MBAN_70/6.6

-68.19
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
121.03 -2 -2
0.92

L2_INGA_KIM_400
-70.34 0.00 MW 0.00 MW
39.17 MW

L1_INGA_KIM_400
30.47 Mvar -0.19 Mvar -0.19 Mvar
0.85 % 0.85 %
T1_BADIA_124/33

106.63 % 1.97 MW -1.97 MW -1.97 MW 1.97 MW


1.21 Mvar
0.85
-1.21 Mvar
95.37 %
-1.21 Mvar
95.37 %
1.21 Mvar
0.85
LUFU-TOTO_70
2 62.90
0.90
-45.07
6.35 6.35 -4.80 MW -4.80 MW 2.40 MW 2.40 MW 2.40 MW 2.40 MW
0.96 T1_MBAN_6.6 0.96 T2_MBAN_6.6 -2.99 Mvar -2.99 Mvar 1.59 Mvar 1.59 Mvar 1.59 Mvar 1.59 Mvar
T2_LUF_70/15

-38.92 MW -67.56 -67.56 25.18 % 25.18 % 64.03 % 64.03 % 64.03 % 64.03 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-24.28 Mvar L1_LUFU_15 L2_LUFU_15


106.63 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
4.89 MW 4.89 MW
28.39 2.80 Mvar 2.80 Mvar
0.95 25.18 % 25.18 %
-76.21 4.72 MW -2.36 MW -2.36 MW -2.36 MW -2.36 MW 4.72 MW
38.92 MW
24.28 Mvar LUKALA_70 2.86 Mvar
0.86
-1.43 Mvar
64.03 %
-1.43 Mvar
64.03 %
-1.43 Mvar
64.03 %
-1.43 Mvar
64.03 %
2.86 Mvar
0.86
84.24 %
T2_BADIA_30/30

64.43
0.92
-44.64
5.76 MW 5.76 MW -10.65 MW -10.65 MW 13.33 13.33
-5 4.01 Mvar 4.01 Mvar L_LUKALA_6.6 -6.82 Mvar -6.82 Mvar 0.89 T1_LUFU_15 0.89 T2_LUFU_15
72.68 % 72.68 % 55.02 % 55.02 % -47.45 -47.45
T2_LUK_70/6.6
T1_LUK_70/6.6

-38.86 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-23.83 Mvar
84.24 %
10.81 MW 10.81 MW
BADIA_30 6.89 Mvar 6.89 Mvar
-5.72 MW 55.02 % 55.02 %
28.41 -5.72 MW 11.44 MW
-3.45 Mvar -3.45 Mvar 6.90 Mvar
0.95 72.68 % 72.68 % 0.86 KIMPESE_70
-76.55
38.86 MW 65.57
23.83 Mvar 0.94
0.85 -44.35
5.79 -11.44 MW -11.44 MW 0.63 MW 0.63 MW
L_SANDA_15 -7.30 Mvar -7.30 Mvar 0.41 Mvar 0.41 Mvar
58.01 % 58.01 % 11.51 % 11.51 %
5.79 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.88
-48.37
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
5.45 MW 11.65 MW 11.65 MW
3.36 Mvar 7.40 Mvar 7.40 Mvar
0.85 58.01 % 58.01 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.61 MW -0.31 MW -0.31 MW -0.31 MW -0.31 MW 0.61 MW
14.58 67.00 0.37 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar 0.37 Mvar
0.97 0.96 0.85 11.51 % 11.51 % 11.51 % 11.51 % 0.85
-39.79 -44.00
-2.72 MW -2.72 MW 6.63 MW -14.96 MW -14.96 MW
-1.68 Mvar -1.68 Mvar 4.60 Mvar L_CIN_6.6 -9.70 Mvar -9.70 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

66.21 % 66.21 % 84.27 % 74.58 % 74.58 %


27.58 13.80
T-KIM_30 T_KIM_15
T_CIN_70/6

0.92 0.92
L2_KWIL_CIN_70 -45.43 -15.48
L1_KWIL_CIN_70
-3
15.52 MW 15.52 MW
L_132_INGA_KINT 10.11 Mvar 10.11 Mvar
74.58 % 74.58 %
2.77 MW 2.77 MW -36.74 MW -6.57 MW 6.57 MW 70.09
1.81 Mvar
66.21 %
1.81 Mvar
66.21 %
-20.99 Mvar
66.29 %
-4.03 Mvar
84.27 %
4.03 Mvar
0.85
1.00
-43.28
KWILU_70/B0...

132.10 6.29 70.09


1.00
-38.19
KINTATA_132 0.95 T_CIN_6.6 1.00
-43.28
KWILU_70/B0...
5.18 MW 26.01 MW 37.31 MW -47.22 -15.52 MW -15.52 MW
0.33 Mvar 17.04 Mvar 20.95 Mvar -10.11 Mvar -10.11 Mvar L_KWILU_15 Comp_KWIL_15
10.07 % 49.94 % 66.29 % 38.87 % 38.87 % 283.87 MW 283.87 MW
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

83.80 Mvar 83.80 Mvar


62.85 % 62.85 %
135.19 T2_KWILU 1
1.02 L2_ING_KWIL_220
-37.43 -0.36 MW -0.36 MW 0.73 MW
-18.66 MW -18.66 MW
-10.48 Mvar -10.48 Mvar 3 -0.23 Mvar -0.23 Mvar 0.45 Mvar
42.09 % 42.09 % 38.87 % 38.87 % 0.85
-283.87 MW -283.87 MW
L1_ING_KWIL_220 3 -83.80 Mvar -83.80 Mvar
-5.14 MW -25.55 MW 58.23 % 58.23 %
-3.74 Mvar -17.64 Mvar -0.00 MW -0.00 MW 15.34
10.07 % 49.94 %
-0.00 Mvar -0.00 Mvar 1.02 T_KWILU_15
T2_INGA_400/220

T1_INGA_400/220

42.09 % 42.09 % -11.54


BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-184.90 MW
-14.01 Mvar
-184.90 MW
-14.01 Mvar
15.96 MW
11.40 Mvar
15.96 MW
11.40 Mvar
168.94 MW
2.61 Mvar
168.94 MW
2.61 Mvar
63.45 % 63.45 % 38.87 % 38.87 % 57.81 % 57.81 %
222.02
0 0
130.78
0.99
128.66
0.97
KWILU_220/B0.. 1.01
-41.12
0 0
-38.64 -38.92
5.14 MW 8.52 MW 8.52 MW 8.52 MW
T2_MATADI_132/15(1)

3.74 Mvar 5.88 Mvar 5.88 Mvar 5.88 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

64.22 % 70.80 % 70.80 % 70.80 %


222.02
KWILU_220/B0.. 1.01
18.74 MW 18.74 MW 189.88 MW 189.88 MW -41.12 284.19 MW 284.19 MW
11.57 Mvar 11.57 Mvar 22.06 Mvar 22.06 Mvar 109.62 Mvar 109.62 Mvar
42.09 % 42.09 % 63.45 % 63.45 % 58.23 % 58.23 %
230.17
1.05 INGA1/B0.1
-35.49
-5.08 MW -8.43 MW -8.43 MW -8.43 MW
-3.30 Mvar -5.15 Mvar -5.15 Mvar -5.15 Mvar
64.22 % 70.80 % 70.80 % 70.80 % INGA1/B0.0
BOMA_15 MATADI_15 230.17
1.05
-35.49
14.22 13.98 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.66 MW -164.66 MW -164.66 MW -179.09 MW -164.66 MW -164.66 MW -164.71 MW -164.71 MW 645.01 MW
0.95 0.93 -25.62 Mvar -25.62 Mvar -25.62 Mvar -25.62 Mvar -25.62 Mvar -25.62 Mvar -82.83 Mvar -82.83 Mvar -82.83 Mvar -65.23 Mvar -82.83 Mvar -82.83 Mvar 15.69 Mvar 15.69 Mvar 315.23 Mvar
-41.66 -42.20 87.76 % 87.76 % 87.76 % 87.76 % 87.76 % 87.76 % 94.35 % 94.35 % 94.35 % 97.54 % 94.35 % 94.35 % 84.61 % 84.61 % 0.90
2.54 MW 2.54 MW 25.28 MW
1.65 Mvar 1.65 Mvar 15.45 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

63.94 % 63.94 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-2.50 MW -2.50 MW 5.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 179.45 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-1.52 Mvar -1.52 Mvar 3.05 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 85.97 Mvar 102.26 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar
63.94 % 63.94 % 0.85 87.76 % 87.76 % 87.76 % 87.76 % 87.76 % 87.76 % 94.35 % 94.35 % 94.35 % 97.54 % 94.35 % 94.35 % 84.61 % 84.61 %
LEMBA_A30
27.64
0.92
-43.35
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 179.45 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 85.97 Mvar 102.26 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 97.06 % 94.69 % 94.69 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis Date: 5/12/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2020, Option 3 Annex: 3.3.4-2
Additional Equipment for 2020 Option 3

double busbar

Rated
Short-
Circuit
Short-Circuit Rated Short-Time Duratio
Name Nom. Volt. Peak Current Thermal Current n
kV kA kA s
KIMBANSEKE_220 220 62,5 25 1
KIMBANSEKE_20 20 64 25 1

OHL
Conduc
Cable/ tor Rtd.

Name Terminal i Terminal j Type OHL Type Cross Section


Voltage Length
2
mm kV km
L1_INGA_KIM_400 INGA1 KIMWENZA L_400kV_2x210 ALAC OHL 2x ALAC 210,3 400 260
L2_INGA_KIM_400 INGA1 KIMWENZA L_400kV_2x210 ALAC OHL 2x ALAC 211,3 400 260
L3_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 11
L4_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 11
L3_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 18
L4_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole
210,3 220 18
L3_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L4_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA OHL 1 x Cu 54 70 30
L3_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50
L4_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA OHL 1 x Cu 54 70 50

Rtd. Derating 1,2 - Sequence Zero Sequence


Name Par.no. Current Factor R' X' C' R0' X0' C0'
kA Ohm/kmOhm/km uF/km Ohm/kmOhm/km uF/km
L1_INGA_KIM_400 1 0,76 1 0,091 0,358 0,0086262 0,298 1,037 0,00863
L2_INGA_KIM_400 1 0,76 1 0,091 0,358 0,0086262 0,298 1,037 0,00863
L3_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_GOM_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L3_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764
L4_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,0076394 0,6 1,15 0,00764

6830P03 FICHTNER Annex 3.3.4-1 page 1 of 2


Additional Equipment for 2020 Option 3

Two winding transformer


No
HV-rtd. LV-Rtd. Shc Cop.Lo No Load Load
Name Volt. Volt. Rtd. Pow. Volt. s. Los. Cur.
kV kV MVA % kW kW %
T1_INGA_400/220 400 220 500 15 0,1 300 0,1
T2_INGA_400/220 400 220 500 15 0,1 300 0,1
T1_KIM_400/220 400 220 500 15 0,1 300 0,1
T2_KIM_400/220 400 220 500 15 0,1 300 0,1
T1_KIMBANSEKE 220 20 40 10 190 40 0,2
T2_KIMBANSEKE 220 20 40 10 190 40 0,2
T3_FUNA_220/20 220 22 100 18,05 250 50 0,2
T4_FUNA_220/20 220 22 100 18,05 250 50 0,2
T2_KINTATA_132/15 132 15 5 6 70 18 0,4
T2_MATADI_132/15(1) 132 15 15 9,8 130 30 0,2
T3_LUF_70/15 70 15 5 8 60 18 0,4
T4_LUF_70/15 70 15 5 8 60 18 0,4
T2_LEMBA_30/15 30 15 5 6 60 18 0,4

Earthin
Vector g Earthing
Name Grp. Add.V./tap Min.Tap Max.TapHV side LV side
% Ohm Ohm
T1_INGA_400/220 YNY0 1,25 -12 8 solid insolated
T2_INGA_400/220 YNY0 1,25 -12 8 solid insolated
T1_KIM_400/220 YNY0 1,25 -12 8 solid insolated
T2_KIM_400/220 YNY0 1,25 -12 8 solid insolated
T1_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T2_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T3_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T4_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T2_KINTATA_132/15 YNy0 0 0 0 solid insolated
T2_MATADI_132/15(1)YNd0 0 0 0 solid insolated
T3_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T4_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T2_LEMBA_30/15 YNy0 0 0 0 solid insolated

Compensation equipment
Name Terminal Nom.Volt. C Vect.Grp.
Max.StepAct.Step
kV Mvar
Comp_LIMINGA LIMINGA_30 30 18 Y 5 5
Comp_LINGWALA_2 LINGWALA_30 30 18 Y 5 5

6830P03 FICHTNER Annex 3.3.4-1 page 2 of 2


Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.55
1.04
-43.09
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.51 MW
-0.32 Mvar
0.51 MW
0.32 Mvar
4.05 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30
0.53 MW
0.35 Mvar
4.05 %
BANDUNGU_220
228.60
1.04
34.91 MW -42.92
21.72 Mvar -0.53 MW
0.85 -0.35 Mvar
12.11 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
30.56
L_FUNA_20 1

1 30.56
Comp_FUNA_20 1.02

L_MAL_BAND_220
-45.24
-17.46 MW -17.46 MW Comp_BANDUN_220
-10.86 Mvar -10.86 Mvar
63.25 MW 0.00 MW 27.96 % 27.96 %
1 -0.00 MW -0.00 MW
39.44 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
0.85 27.96 % 27.96 %
140.22 MW 0.00 MW
T_UTEX_20 87.51 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
20.62
1.03 FUNA_20/B0.0
-15.65
-63.25 MW 20.72
-39.44 Mvar 1.04 0 0
39.76 %
T1_UTEX_220/20

-15.89
-35.05 MW -35.05 MW -35.05 MW -35.05 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA_2 -21.88 Mvar -21.88 Mvar -21.88 Mvar -21.88 Mvar
43.88 % 43.88 % 43.88 % 43.88 % 17.51 MW 17.51 MW 0.68 MW
4 12.53 Mvar 12.53 Mvar -35.29 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 27.96 % 27.96 % 12.11 %
5 5
MALUKU_220/B..
63.42 MW
1 1 1 1 221.36
45.45 Mvar 1
39.76 %
0.00 MW 103.86 MW 0.00 MW 0.00 MW
221.36
UTEXCO_220 -18.46 Mvar 64.53 Mvar -92.32 Mvar 0.00 Mvar
1.01
0.85
35.15 MW 35.15 MW 35.15 MW 35.15 MW -42.37
220.20
1.00 LINGWALA_30/.. LIMINGA_30/B.. 25.54 Mvar 25.54 Mvar 25.54 Mvar 25.54 Mvar
-12.58 MW
8.59 Mvar
-23.13 MW
1.63 Mvar
43.88 % 43.88 % 43.88 % 43.88 % 6.38 % 8.73 %
-42.15

L1_MAL_KIM_220_P2
-63.42 MW 30.38 29.80
-45.45 Mvar
26.92 %
30.38 29.80
1.01 0.99
-59.23 -47.46
-34.62 MW -34.62 MW -34.62 MW 0.00 MW 100.70 MW -33.57 MW -33.57 MW -33.57 MW -70.30 MW -70.30 MW
15.42 Mvar 15.42 Mvar 15.42 Mvar -17.77 Mvar 62.33 Mvar -14.85 Mvar -14.85 Mvar -14.85 Mvar -51.09 Mvar -51.09 Mvar
51.30 % 51.30 % 51.30 % 0.85 50.92 % 50.92 % 50.92 % 30.02 % 30.02 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
51.30 % 51.30 % 51.30 % 50.92 % 50.92 % 50.92 % 12.60 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-13.63 Mvar
Comp_LIMINGA_30 6.38 %
KIMBANSEKE_220
L_LIMIN_30
220.89
3 3 3 0 0 0 1.00
-42.13
T1_LIMINGA T2_LIMINGA 12.01 MW 12.01 MW -36.62 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 7.99 Mvar 7.99 Mvar -2.34 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 35.92 % 35.92 % 12.62 %

T1_KIMBANSEKE
63.44 MW 37.69 MW 37.69 MW 37.69 MW 33.81 MW 33.81 MW 33.81 MW 70.37 MW 70.37 MW
45.25 Mvar -4.12 Mvar -4.12 Mvar -4.12 Mvar 19.53 Mvar 19.53 Mvar 19.53 Mvar 50.71 Mvar 50.71 Mvar -3 -3
26.92 % 51.30 % 51.30 % 51.30 % 50.92 % 50.92 % 50.92 % 30.02 % 30.02 %
LINGWALA_220.. LIMINGA_220/..
23.89 MW -11.95 MW -11.95 MW

L1_MAL_KIM_220_P1
220.42 220.41 14.88 Mvar -7.44 Mvar -7.44 Mvar
1.00 1.00 0.85 35.92 % 35.92 %
-42.11 -41.91
43.51 MW 14.52 MW -62.27 MW -62.27 MW -62.27 MW -62.27 MW 14.52 MW -60.54 MW -60.54 MW -60.54 MW -60.54 MW
27.59 Mvar 6.05 Mvar -18.15 Mvar -18.15 Mvar -18.15 Mvar -18.15 Mvar 6.05 Mvar -40.00 Mvar -40.00 Mvar -40.00 Mvar -40.00 Mvar
24.97 % 5.83 % 22.35 % 22.35 % 22.35 % 22.35 % 5.83 % 25.01 % 25.01 % 25.01 % 25.01 % KIMBANSEKE_20 20.46
L4_LING_KIM_220 1.02

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-13.68
L_LIMG_MBOU_220

L2_LING_KIM_220
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220

62.41 MW 62.41 MW 62.41 MW 62.41 MW 60.65 MW 60.65 MW 60.65 MW 60.65 MW 36.70 MW 23.20 MW
L1_LING_COM_220 16.30 Mvar 16.30 Mvar 16.30 Mvar 16.30 Mvar 38.96 Mvar 38.96 Mvar 38.96 Mvar 38.96 Mvar -1.35 Mvar -10.47 Mvar
22.35 % 22.35 % 22.35 % 22.35 % 25.01 % 25.01 % 25.01 % 25.01 % 12.62 % 8.73 %
-43.44 MW
-29.15 Mvar GOM_6/B0.1 KIMWENZA/B0...
24.97 %
-14.51 MW -14.51 MW 221.36
MBUONO_220/B.. -8.65 Mvar -8.65 Mvar 6.54
1.01
5.83 % 5.83 % -41.68
219.52 6.54 221.36
1.00 0.99 1.01
-42.31 COM_220/B0.1 -13.91 -41.68 KIMWENZA/B0...
21.72 MW 21.72 MW 220.07 -4.17 MW -4.17 MW 8.33 MW 0.05 MW 0.04 MW -100.68 MW -100.68 MW -175.43 MW -175.43 MW
14.58 Mvar 14.58 Mvar -2.58 Mvar -2.58 Mvar 5.16 Mvar L2_KAS_GOM_70 -10.36 Mvar 5.18 Mvar 6.06 Mvar 6.06 Mvar -108.07 Mvar -108.07 Mvar
43.69 % 43.69 % COM_220/B0.0 220.07
33.78 % 33.78 % 0.85 10.62 % 10.29 % 35.55 % 35.55 % 44.98 % 44.98 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L4_KAS_GOM_70

T2_KIM_400/220

T1_KIM_400/220
1.00
-42.21
14.51 MW 14.51 MW
8.65 Mvar 8.65 Mvar L_KAS_GOM_70
-3 -3 33.78 % 33.78 %
T1_COMBE T2_COMBE 1 0 -7 -7
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-1 -1
-21.60 MW -21.60 MW -5.06 MW -5.06 MW -5.06 MW -5.06 MW -0.00 MW -0.00 MW 175.74 MW 175.74 MW
-13.42 Mvar -13.42 Mvar 3 3 -2.92 Mvar -2.92 Mvar -2.92 Mvar -2.92 Mvar 10.62 Mvar -5.06 Mvar 121.09 Mvar 121.09 Mvar
43.69 % 43.69 % 22.89 % 22.89 % 22.89 % 22.89 % 10.62 % 10.29 % 44.98 % 44.98 %

KASAN_70/B1
30.37 71.53
1.01 MBOUNO_30 1.02
-14.22 -44.47
43.20 MW 4.84 MW 4.84 MW 4.84 MW 4.84 MW 0.89 MW 0.00 MW 0.00 MW -175.74 MW -175.74 MW
26.84 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar 0.58 Mvar L_KAS_15 -10.62 Mvar 5.06 Mvar -121.09 Mvar -121.09 Mvar
0.85 -10.28 MW -10.28 MW 5.14 MW 5.14 MW 5.14 MW 5.14 MW 23.11 % 23.11 % 23.11 % 23.11 % 40.03 % 42.72 % 42.72 %

T_KAS_70/15
-5.26 Mvar -5.26 Mvar 2.63 Mvar 2.63 Mvar 2.63 Mvar 2.63 Mvar
33.78 % 33.78 % 22.89 % 22.89 % 22.89 % 22.89 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.90 SVS SVS
5
L_MBUONO_30 -0.87 MW 0.87 MW TSC1 TSC2
72.90 -0.54 Mvar 0.54 Mvar
1.04 40.03 % 0.85
-44.08
T_KAS_15
15.37
1.02
0.00 MW -4.71 MW -4.71 MW -4.71 MW -4.71 MW -45.55
0.00 Mvar -3.22 Mvar -3.22 Mvar -3.22 Mvar -3.22 Mvar
23.11 % 23.11 % 23.11 % 23.11 %
69.21
0.99
-45.02
ZONGO/B0.1

69.21
0.99 ZONGO/B0.0
-45.02
27.31 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.22 MW 2.22 MW
20.02 Mvar -8.41 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.64 Mvar 0.64 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

54.80 % 89.29 % 0.20 % 0.20 % 0.20 % 0.20 % 10.06 % 10.06 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -27.23 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.20 MW -2.20 MW
-18.03 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.08 Mvar -1.08 Mvar
U > 1.05 p.u. 54.80 % 89.29 % 0.20 % 0.20 % 0.20 % 0.20 % 10.06 % 10.06 %
Loading > 80. % INKISI_70
68.45
0.98
27.23 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -45.35 1.63 MW 0.82 MW 1.96 MW
18.03 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.58 Mvar 0.29 Mvar 1.30 Mvar
53.40 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.00 % 4.00 % 48.10 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.63 MW -0.81 MW


-1.07 Mvar -0.53 Mvar
4.00 % 4.00 %
-1.93 MW 1.93 MW
MBANZA_70 -1.18 Mvar
48.10 %
1.18 Mvar
0.85
68.28
0.98
-26.23 MW -45.40
1.22 MW 1.22 MW -0.00 MW -0.00 MW 14.23
-18.97 Mvar
53.40 %
0.80 Mvar 0.80 Mvar 0.00 Mvar 0.00 Mvar 0.95 T_INK_15
57.60 % 57.60 % 0.91 % 0.91 %
T2_MBAN_70/6.6

-47.43
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
125.43 -2 -2
0.95

L2_INGA_KIM_400
-49.09 0.00 MW 0.00 MW
26.23 MW

L1_INGA_KIM_400
18.97 Mvar -0.22 Mvar -0.22 Mvar
0.91 % 0.91 %
T1_BADIA_124/33

67.04 % 1.19 MW -1.19 MW -1.19 MW 1.19 MW


0.74 Mvar
0.85
-0.74 Mvar
57.60 %
-0.74 Mvar
57.60 %
0.74 Mvar
0.85
LUFU-TOTO_70
2 67.67
0.97
-36.68
6.38 6.38 -3.31 MW -3.31 MW 1.66 MW 1.66 MW 1.66 MW 1.66 MW
0.97 T1_MBAN_6.6 0.97 T2_MBAN_6.6 -1.93 Mvar -1.93 Mvar 1.07 Mvar 1.07 Mvar 1.07 Mvar 1.07 Mvar
T2_LUF_70/15

-26.10 MW -47.05 -47.05 15.88 % 15.88 % 40.86 % 40.86 % 40.86 % 40.86 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-16.47 Mvar L1_LUFU_15 L2_LUFU_15


67.04 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.35 MW 3.35 MW
30.38 1.64 Mvar 1.64 Mvar
1.01 15.88 % 15.88 %
-52.63 3.26 MW -1.63 MW -1.63 MW -1.63 MW -1.63 MW 3.26 MW
26.10 MW
16.47 Mvar LUKALA_70 2.01 Mvar
0.85
-1.00 Mvar
40.86 %
-1.00 Mvar
40.86 %
-1.00 Mvar
40.86 %
-1.00 Mvar
40.86 %
2.01 Mvar
0.85
52.90 %
T2_BADIA_30/30

68.61
0.98
-36.39
3.95 MW 3.95 MW -7.30 MW -7.30 MW 14.56 14.56
-5 2.64 Mvar 2.64 Mvar L_LUKALA_6.6 -4.27 Mvar -4.27 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
46.11 % 46.11 % 34.54 % 34.54 % -38.08 -38.08
T2_LUK_70/6.6
T1_LUK_70/6.6

-26.07 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-16.21 Mvar
52.90 %
7.36 MW 7.36 MW
BADIA_30 4.23 Mvar 4.23 Mvar
-3.92 MW 34.54 % 34.54 %
30.46 -3.92 MW 7.83 MW
-2.40 Mvar -2.40 Mvar 4.81 Mvar
1.02 46.11 % 46.11 % 0.85 KIMPESE_70
-52.84
26.07 MW 69.31
16.21 Mvar 0.99
0.85 -36.19
6.29 -7.78 MW -7.78 MW 0.43 MW 0.43 MW
L_SANDA_15 -4.50 Mvar -4.50 Mvar 0.28 Mvar 0.28 Mvar
36.37 % 36.37 % 7.35 % 7.35 %
6.29 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.95
-38.60
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.39 MW 7.86 MW 7.86 MW
2.10 Mvar 4.46 Mvar 4.46 Mvar
0.85 36.37 % 36.37 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.41 MW -0.20 MW -0.20 MW -0.20 MW -0.20 MW 0.41 MW
14.91 70.20 0.25 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar 0.25 Mvar
0.99 1.00 0.85 7.35 % 7.35 % 7.35 % 7.35 % 0.85
-33.17 -35.95
-1.69 MW -1.69 MW 4.40 MW -10.07 MW -10.07 MW
-1.05 Mvar -1.05 Mvar 2.94 Mvar L_CIN_6.6 -5.93 Mvar -5.93 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

40.48 % 40.48 % 52.82 % 46.64 % 46.64 %


29.38 14.70
T-KIM_30 T_KIM_15
T_CIN_70/6

0.98 0.98
L2_KWIL_CIN_70 -36.84 -6.86
L1_KWIL_CIN_70
-3
10.29 MW 10.29 MW
L_132_INGA_KINT 5.93 Mvar 5.93 Mvar
46.64 % 46.64 %
1.72 MW 1.72 MW -23.28 MW -4.37 MW 4.37 MW 72.10
1.11 Mvar
40.48 %
1.11 Mvar
40.48 %
-10.59 Mvar
39.63 %
-2.72 Mvar
52.82 %
2.72 Mvar
0.85
1.03
-35.44
KWILU_70/B0...

133.55 6.71 72.10


1.01
-32.21
KINTATA_132 1.02 T_CIN_6.6 1.03
-35.44
KWILU_70/B0...
3.33 MW 16.50 MW 23.49 MW -37.87 -10.29 MW -10.29 MW
-1.28 Mvar 9.66 Mvar 9.91 Mvar -5.93 Mvar -5.93 Mvar L_KWILU_15 Comp_KWIL_15
6.27 % 30.81 % 39.63 % 24.30 % 24.30 % 181.62 MW 181.62 MW
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

34.39 Mvar 34.39 Mvar


42.72 % 42.72 %
135.27 T2_KWILU 1
1.02 L2_ING_KWIL_220
-31.68 -0.22 MW -0.22 MW 0.45 MW
-11.74 MW -11.74 MW
-4.95 Mvar -4.95 Mvar 3 -0.14 Mvar -0.14 Mvar 0.28 Mvar
25.14 % 25.14 % 24.30 % 24.30 % 0.85
-181.62 MW -181.62 MW
L1_ING_KWIL_220 3 -34.39 Mvar -34.39 Mvar
-3.32 MW -16.33 MW 36.19 % 36.19 %
-2.27 Mvar -10.79 Mvar -0.00 MW -0.00 MW 15.63
6.27 % 30.81 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
T2_INGA_400/220

T1_INGA_400/220

25.14 % 25.14 % -4.34


BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-114.74 MW
10.68 Mvar
-114.74 MW
10.68 Mvar
10.57 MW
6.60 Mvar
10.57 MW
6.60 Mvar
104.17 MW
-17.29 Mvar
104.17 MW
-17.29 Mvar
39.20 % 39.20 % 24.30 % 24.30 % 35.55 % 35.55 %
225.65
0 0
132.92
1.01
131.48
1.00
KWILU_220/B0.. 1.03
-34.07
0 0
-32.54 -32.68
3.32 MW 5.44 MW 5.44 MW 5.44 MW
T2_MATADI_132/15(1)

2.27 Mvar 3.60 Mvar 3.60 Mvar 3.60 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

39.98 % 43.67 % 43.67 % 43.67 %


225.65
KWILU_220/B0.. 1.03
11.80 MW 11.80 MW 116.63 MW 116.63 MW -34.07 181.94 MW 181.94 MW
5.48 Mvar 5.48 Mvar -14.53 Mvar -14.53 Mvar 44.62 Mvar 44.62 Mvar
25.14 % 25.14 % 39.20 % 39.20 % 36.19 % 36.19 %
227.79
1.04 INGA1/B0.1
-30.42
-3.28 MW -5.39 MW -5.39 MW -5.39 MW
-2.09 Mvar -3.32 Mvar -3.32 Mvar -3.32 Mvar
39.98 % 43.67 % 43.67 % 43.67 % INGA1/B0.0
BOMA_15 MATADI_15 227.79
1.04
-30.42
14.71 14.55 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW -14.95 MW -164.70 MW -164.71 MW -164.71 MW -164.71 MW 845.78 MW
0.98 0.97 -25.52 Mvar -25.52 Mvar -25.52 Mvar -25.52 Mvar -25.52 Mvar -25.52 Mvar -82.47 Mvar -82.47 Mvar -82.47 Mvar -93.57 Mvar -37.54 Mvar 16.01 Mvar 16.01 Mvar 16.01 Mvar 412.49 Mvar
-34.40 -34.65 88.61 % 88.61 % 88.61 % 88.61 % 88.61 % 88.61 % 95.25 % 95.25 % 95.25 % 49.14 % 87.34 % 85.51 % 85.51 % 85.51 % 0.90
1.64 MW 1.64 MW 16.17 MW
1.05 Mvar 1.05 Mvar 9.96 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

39.68 % 39.68 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.61 MW -1.61 MW 3.23 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 15.10 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-0.99 Mvar -0.99 Mvar 1.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 99.11 Mvar 54.23 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
39.68 % 39.68 % 0.85 88.61 % 88.61 % 88.61 % 88.61 % 88.61 % 88.61 % 95.25 % 95.25 % 95.25 % 49.14 % 87.34 % 85.51 % 85.51 % 85.51 %
LEMBA_A30
28.93
0.96
-35.41
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 15.10 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 99.11 Mvar 54.23 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 48.90 % 84.72 % 80.49 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis Date: 5/12/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de faible charge 2020, Option 3 Annex: 3.3.4-3
Additional Equipment for 2020 Option 3a

double busbar

Rated
Short- Rated
Time Short-
Short-Circuit Thermal Circuit
Name Nom. Volt. Peak Current Current Duration
kV kA kA s
KIMBANSEKE_220 220 62,5 25 1
KIMBANSEKE_20 20 64 25 1

OHL

Cable/ Conductor Rtd.


Name Terminal i Terminal j Type OHL Type Cross Section Voltage Length
mm2 kV km
L1_INGA_KIM_400 INGA1 KIMWENZA L_400kV_2x210
OHL ALAC2x ALAC 400 400 260
L2_INGA_KIM_400 INGA1 KIMWENZA L_400kV_2x210
OHL ALAC2x ALAC 400 400 260
L3_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11
L4_LIMIN_KIM_220 KIMWENZA LIMINGA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 11
L3_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 18
L4_LING_KIM_220 KIMWENZA LINGWALA_220 L_220kV OHL 2x ALAC Oriole 210,3 220 18
L3_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA
OHL 1 x Cu 54 70 30
L4_KAS_GOM_70 GOMBE_70 KASAN_70 L_70kV_25MVA
OHL 1 x Cu 54 70 30
L3_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA
OHL 1 x Cu 54 70 50
L4_KAS_ZONG_70 KASAN_70 ZONGO L_70kV_25MVA
OHL 1 x Cu 54 70 50

Rtd. Derating 1,2 - Sequence Zero Sequence


Name Par.no. Current Factor R' X' C' R0' X0' C0'
kA Ohm/km Ohm/km uF/km Ohm/km Ohm/km uF/km
L1_INGA_KIM_400 1 1,14 1 0,0498 0,3 0,0086262 0,25 0,98 0,00863
L2_INGA_KIM_400 1 1,14 1 0,0498 0,3 0,0086262 0,25 0,98 0,00863
L3_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LIMIN_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L4_LING_KIM_220 1 0,76 1 0,09 0,345 0,0086262 0,38 0,81 0,00863
L3_KAS_GOM_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,00764
L4_KAS_GOM_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,00764
L3_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,00764
L4_KAS_ZONG_70 1 0,206 1 0,4 0,452 0,00763944 0,6 1,15 0,00764

6830P03 FICHTNER Annex 3.3.5-1 page 1 of 2


Additional Equipment for 2020 Option 3a

Two winding transformer

HV-rtd. LV-Rtd. Rtd. No Load


Name Volt. Volt. Pow. Shc Volt. Cop.Los. No Load Los. Cur.
kV kV MVA % kW kW %
T1_INGA_400/220 400 220 500 15 0,1 300 0,1
T2_INGA_400/220 400 220 500 15 0,1 300 0,1
T1_KIM_400/220 400 220 500 15 0,1 300 0,1
T2_KIM_400/220 400 220 500 15 0,1 300 0,1
T1_KIMBANSEKE 220 20 40 10 190 40 0,2
T2_KIMBANSEKE 220 20 40 10 190 40 0,2
T3_FUNA_220/20 220 22 100 18,05 250 50 0,2
T4_FUNA_220/20 220 22 100 18,05 250 50 0,2
T2_KINTATA_132/15 132 15 5 6 70 18 0,4
T2_MATADI_132/15(1) 132 15 15 9,8 130 30 0,2
T3_LUF_70/15 70 15 5 8 60 18 0,4
T4_LUF_70/15 70 15 5 8 60 18 0,4
T2_LEMBA_30/15 30 15 5 6 60 18 0,4

Vector Earthing Earthing


Name Grp. Add.V./tap Min.Tap Max.Tap HV side LV side
% Ohm Ohm
T1_INGA_400/220 YNY0 1,25 -12 8 solid insolated
T2_INGA_400/220 YNY0 1,25 -12 8 solid insolated
T1_KIM_400/220 YNY0 1,25 -12 8 solid insolated
T2_KIM_400/220 YNY0 1,25 -12 8 solid insolated
T1_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T2_KIMBANSEKE YNd11 1,25 -8 8 solid insolated
T3_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T4_FUNA_220/20 YNd11 1,25 -12 8 solid insolated
T2_KINTATA_132/15 YNy0 0 0 0 solid insolated
T2_MATADI_132/15(1)YNd0 0 0 0 solid insolated
T3_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T4_LUF_70/15 YNd0 1,25 -8 8 solid insolated
T2_LEMBA_30/15 YNy0 0 0 0 solid insolated

Compensation equipment
Name Terminal Nom.Volt. C Vect.Grp. Max.Step Act.Step
kV Mvar
Comp_LIMINGA LIMINGA_30 30 18 Y 5 5
Comp_LINGWALA_2 LINGWALA_30 30 18 Y 5 5

6830P03 FICHTNER Annex 3.3.5-1 page 2 of 2


Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 14.85
0.99
-55.08
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.79 MW
-0.49 Mvar
0.79 MW
0.49 Mvar
6.42 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30
0.81 MW
0.52 Mvar
6.42 %
BANDUNGU_220
218.66
0.99
57.52 MW -54.78
35.73 Mvar -0.81 MW
0.85 -0.52 Mvar
11.52 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
30.34
L_FUNA_20 1

1 30.34
Comp_FUNA_20 1.01

L_MAL_BAND_220
-56.96
-28.76 MW -28.76 MW Comp_BANDUN_220
-17.86 Mvar -17.86 Mvar
105.03 MW 0.00 MW 46.79 % 46.79 %
1 -0.00 MW -0.00 MW
65.46 Mvar -19.04 Mvar 0.00 Mvar 0.00 Mvar
0.85 46.79 % 46.79 %
215.45 MW 0.00 MW
T_UTEX_20 133.11 Mvar -17.45 Mvar T1_MALUKU T2_MALUKU
0.85
20.57
1.03 FUNA_20/B0.0
-29.73
-105.03 MW 19.69
-46.41 Mvar 0.98 -1 -1
61.52 %
T1_UTEX_220/20

-30.18
-53.86 MW -53.86 MW -53.86 MW -53.86 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA_2 -28.92 Mvar -28.92 Mvar -28.92 Mvar -28.92 Mvar
68.43 % 68.43 % 68.43 % 68.43 % 28.18 MW 28.18 MW 0.94 MW
0 19.87 Mvar 19.87 Mvar -32.12 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 46.79 % 46.79 % 11.52 %
5 5
MALUKU_220/B..
105.31 MW
0 0 0 0 211.85
60.23 Mvar 1
61.52 %
0.00 MW 165.44 MW 0.00 MW 0.00 MW
211.85
UTEXCO_220 -17.45 Mvar 102.21 Mvar -87.25 Mvar -87.64 Mvar
0.96
0.85
54.02 MW 54.02 MW 54.02 MW 54.02 MW -54.20
211.51
0.96 LINGWALA_30/.. LIMINGA_30/B.. 37.52 Mvar 37.52 Mvar 37.52 Mvar 37.52 Mvar
-20.60 MW
1.61 Mvar
-36.69 MW
-9.24 Mvar
68.43 % 68.43 % 68.43 % 68.43 % 7.72 % 13.57 %
-53.94

L1_MAL_KIM_220_P2
-105.31 MW 29.54 29.60
-60.23 Mvar
43.57 %
29.54 29.60
0.98 0.99
-63.66 -63.36
-55.15 MW -55.15 MW -55.15 MW 0.00 MW 166.03 MW -55.34 MW -55.34 MW -55.34 MW -108.04 MW -108.04 MW
0.83 Mvar 0.83 Mvar 0.83 Mvar -17.53 Mvar 102.62 Mvar 0.85 Mvar 0.85 Mvar 0.85 Mvar -75.04 Mvar -75.04 Mvar
76.95 % 76.95 % 76.95 % 0.85 77.05 % 77.05 % 77.05 % 47.26 % 47.26 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 -0.00 Mvar -0.00 Mvar -0.00 Mvar
76.95 % 76.95 % 76.95 % 77.05 % 77.05 % 77.05 % 20.64 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-6.17 Mvar
Comp_LIMINGA_30 7.72 %
KIMBANSEKE_220
L_LIMIN_30
211.95
0 0 0 0 0 0 0.96
-53.84
T1_LIMINGA T2_LIMINGA 18.34 MW 18.34 MW -57.31 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 12.53 Mvar 12.53 Mvar -18.88 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 57.63 % 57.63 % 21.63 %

T1_KIMBANSEKE
105.37 MW 55.93 MW 55.93 MW 55.93 MW 56.13 MW 56.13 MW 56.13 MW 108.21 MW 108.21 MW
60.22 Mvar 9.32 Mvar 9.32 Mvar 9.32 Mvar 9.33 Mvar 9.33 Mvar 9.33 Mvar 75.09 Mvar 75.09 Mvar -3 -3
43.57 % 76.95 % 76.95 % 76.95 % 77.05 % 77.05 % 77.05 % 47.26 % 47.26 %
LINGWALA_220.. LIMINGA_220/..
36.48 MW -18.24 MW -18.24 MW

L1_MAL_KIM_220_P1
211.83 212.29 22.47 Mvar -11.23 Mvar -11.23 Mvar
0.96 0.96 0.85 57.63 % 57.63 %
-53.85 -53.55
66.06 MW 25.98 MW -97.80 MW -97.80 MW -97.80 MW -97.80 MW 25.98 MW -96.20 MW -96.20 MW -96.20 MW -96.20 MW
44.82 Mvar -0.94 Mvar -32.78 Mvar -32.78 Mvar -32.78 Mvar -32.78 Mvar -0.94 Mvar -44.54 Mvar -44.54 Mvar -44.54 Mvar -44.54 Mvar
39.96 % 9.33 % 36.99 % 36.99 % 36.99 % 36.99 % 9.33 % 37.94 % 37.94 % 37.94 % 37.94 % KIMBANSEKE_20 19.37
L4_LING_KIM_220 0.97

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-26.45
L_LIMG_MBOU_220

L2_LING_KIM_220
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220

98.18 MW 98.18 MW 98.18 MW 98.18 MW 96.45 MW 96.45 MW 96.45 MW 96.45 MW 57.53 MW 36.88 MW
L1_LING_COM_220 32.03 Mvar 32.03 Mvar 32.03 Mvar 32.03 Mvar 44.13 Mvar 44.13 Mvar 44.13 Mvar 44.13 Mvar 16.02 Mvar 1.55 Mvar
36.99 % 36.99 % 36.99 % 36.99 % 37.94 % 37.94 % 37.94 % 37.94 % 21.63 % 13.57 %
-65.86 MW
-45.81 Mvar GOM_6/B0.1 KIMWENZA/B0...
39.96 %
-25.96 MW -25.96 MW 213.52
MBUONO_220/B.. -1.38 Mvar -1.38 Mvar 6.31
0.97
9.33 % 9.33 % -53.14
210.36 6.31 213.52
0.96 0.96 0.97
-54.18 COM_220/B0.1 -27.05 -53.14 KIMWENZA/B0...
32.93 MW 32.93 MW 211.60 -6.55 MW -6.55 MW 13.11 MW 0.24 MW 0.13 MW -153.47 MW -153.47 MW -283.18 MW -283.18 MW
22.91 Mvar 22.91 Mvar -4.02 Mvar -4.02 Mvar 8.05 Mvar L2_KAS_GOM_70 -83.88 Mvar -33.15 Mvar 12.36 Mvar 12.36 Mvar -114.97 Mvar -114.97 Mvar
69.92 % 69.92 % COM_220/B0.0 211.60
54.05 % 54.05 % 0.85 88.78 % 69.36 % 55.15 % 55.15 % 68.17 % 68.17 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L4_KAS_GOM_70

T2_KIM_400/220

T1_KIM_400/220
0.96
-54.08
25.96 MW 25.96 MW
1.38 Mvar 1.38 Mvar L_KAS_GOM_70
-3 -3 54.05 % 54.05 %
T1_COMBE T2_COMBE 2 1 -6 -6
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-2 -2
-32.75 MW -32.75 MW -9.43 MW -9.43 MW -9.43 MW -9.43 MW -0.00 MW -0.00 MW 283.47 MW 283.47 MW
-20.11 Mvar -20.11 Mvar 3 3 2.15 Mvar 2.15 Mvar 2.15 Mvar 2.15 Mvar 88.78 Mvar 34.68 Mvar 145.15 Mvar 145.15 Mvar
69.92 % 69.92 % 38.22 % 38.22 % 38.22 % 38.22 % 88.78 % 69.36 % 68.17 % 68.17 %

KASAN_70/B1
28.63 71.57
0.95 MBOUNO_30 1.02
-27.39 -59.46
65.50 MW 9.07 MW 9.07 MW 9.07 MW 9.07 MW 1.46 MW 0.00 MW 0.00 MW -283.47 MW -283.47 MW
40.21 Mvar -2.39 Mvar -2.39 Mvar -2.39 Mvar -2.39 Mvar 0.97 Mvar L_KAS_15 -88.78 Mvar -34.68 Mvar -145.15 Mvar -145.15 Mvar
0.85 -19.31 MW -19.31 MW 9.66 MW 9.66 MW 9.66 MW 9.66 MW 36.73 % 36.73 % 36.73 % 36.73 % 65.82 % 43.16 % 43.16 %

T_KAS_70/15
4.55 Mvar 4.55 Mvar -2.28 Mvar -2.28 Mvar -2.28 Mvar -2.28 Mvar
54.05 % 54.05 % 38.22 % 38.22 % 38.22 % 38.22 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.74 SVS SVS
4
L_MBUONO_30 -1.42 MW 1.42 MW TSC1 TSC2
72.74 -0.88 Mvar 0.88 Mvar
1.04 65.82 % 0.85
-57.74
T_KAS_15
15.15
1.01
-0.00 MW -8.73 MW -8.73 MW -8.73 MW -8.73 MW -61.24
-39.75 Mvar 2.18 Mvar 2.18 Mvar 2.18 Mvar 2.18 Mvar
36.73 % 36.73 % 36.73 % 36.73 %
69.78
1.00
-62.29
ZONGO/B0.1

69.78
1.00 ZONGO/B0.0
-62.29
40.61 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 3.62 MW 3.62 MW
36.13 Mvar -8.43 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 1.67 Mvar 1.67 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

87.25 % 88.62 % 0.20 % 0.20 % 0.20 % 0.20 % 16.88 % 16.88 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -40.46 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -3.56 MW -3.56 MW
-31.28 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -2.08 Mvar -2.08 Mvar
U > 1.05 p.u. 87.25 % 88.62 % 0.20 % 0.20 % 0.20 % 0.20 % 16.88 % 16.88 %
Loading > 80. % INKISI_70
68.42
0.98
40.46 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -62.72 2.64 MW 1.32 MW 3.16 MW
31.28 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 1.30 Mvar 0.65 Mvar 2.20 Mvar
83.76 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 6.54 % 6.54 % 78.83 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -2.63 MW -1.31 MW


-1.79 Mvar -0.89 Mvar
6.54 % 6.54 %
-3.11 MW 3.11 MW
MBANZA_70 -1.90 Mvar
78.83 %
1.90 Mvar
0.85
68.14
0.97
-37.95 MW -62.79
1.97 MW 1.97 MW -0.00 MW -0.00 MW 13.93
-29.47 Mvar
83.76 %
1.34 Mvar 1.34 Mvar -0.00 Mvar -0.00 Mvar 0.93 T_INK_15
94.20 % 94.20 % 0.85 % 0.85 %
T2_MBAN_70/6.6

-66.14
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
118.71 -2 -2
0.90

L2_INGA_KIM_400
-68.30 0.00 MW 0.00 MW
37.95 MW

L1_INGA_KIM_400
29.47 Mvar -0.19 Mvar -0.19 Mvar
0.85 % 0.85 %
T1_BADIA_124/33

105.26 % 1.91 MW -1.91 MW -1.91 MW 1.91 MW


1.17 Mvar
0.85
-1.17 Mvar
94.20 %
-1.17 Mvar
94.20 %
1.17 Mvar
0.85
LUFU-TOTO_70
2 63.29
0.90
-44.96
6.23 6.23 -4.84 MW -4.84 MW 2.42 MW 2.42 MW 2.42 MW 2.42 MW
0.94 T1_MBAN_6.6 0.94 T2_MBAN_6.6 -3.02 Mvar -3.02 Mvar 1.61 Mvar 1.61 Mvar 1.61 Mvar 1.61 Mvar
T2_LUF_70/15

-37.71 MW -65.50 -65.50 25.28 % 25.28 % 64.29 % 64.29 % 64.29 % 64.29 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-23.44 Mvar L1_LUFU_15 L2_LUFU_15


105.26 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
4.94 MW 4.94 MW
27.84 2.83 Mvar 2.83 Mvar
0.93 25.28 % 25.28 %
-74.21 4.77 MW -2.38 MW -2.38 MW -2.38 MW -2.38 MW 4.77 MW
37.71 MW
23.44 Mvar LUKALA_70 2.89 Mvar
0.86
-1.44 Mvar
64.29 %
-1.44 Mvar
64.29 %
-1.44 Mvar
64.29 %
-1.44 Mvar
64.29 %
2.89 Mvar
0.86
83.16 %
T2_BADIA_30/30

64.83
0.93
-44.52
5.82 MW 5.82 MW -10.76 MW -10.76 MW 13.42 13.42
-5 4.06 Mvar 4.06 Mvar L_LUKALA_6.6 -6.89 Mvar -6.89 Mvar 0.89 T1_LUFU_15 0.89 T2_LUFU_15
72.98 % 72.98 % 55.24 % 55.24 % -47.33 -47.33
T2_LUK_70/6.6
T1_LUK_70/6.6

-37.66 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-22.99 Mvar
83.16 %
10.92 MW 10.92 MW
BADIA_30 6.96 Mvar 6.96 Mvar
-5.78 MW 55.24 % 55.24 %
27.86 -5.78 MW 11.55 MW
-3.49 Mvar -3.49 Mvar 6.98 Mvar
0.93 72.98 % 72.98 % 0.86 KIMPESE_70
-74.56
37.66 MW 65.97
22.99 Mvar 0.94
0.85 -44.23
5.83 -11.56 MW -11.56 MW 0.64 MW 0.64 MW
L_SANDA_15 -7.38 Mvar -7.38 Mvar 0.41 Mvar 0.41 Mvar
58.24 % 58.24 % 11.55 % 11.55 %
5.83 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.88
-48.24
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
5.46 MW 11.76 MW 11.76 MW
3.37 Mvar 7.48 Mvar 7.48 Mvar
0.85 58.24 % 58.24 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.62 MW -0.31 MW -0.31 MW -0.31 MW -0.31 MW 0.62 MW
14.60 67.41 0.38 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar -0.19 Mvar 0.38 Mvar
0.97 0.96 0.85 11.55 % 11.55 % 11.55 % 11.55 % 0.85
-39.89 -43.88
-2.73 MW -2.73 MW 6.69 MW -15.11 MW -15.11 MW
-1.68 Mvar -1.68 Mvar 4.65 Mvar L_CIN_6.6 -9.80 Mvar -9.80 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

66.28 % 66.28 % 84.61 % 74.88 % 74.88 %


27.75 13.89
T-KIM_30 T_KIM_15
T_CIN_70/6

0.93 0.93
L2_KWIL_CIN_70 -45.31 -15.36
L1_KWIL_CIN_70
-3
15.68 MW 15.68 MW
L_132_INGA_KINT 10.22 Mvar 10.22 Mvar
74.88 % 74.88 %
2.78 MW 2.78 MW -36.83 MW -6.64 MW 6.64 MW 70.51
1.82 Mvar
66.28 %
1.82 Mvar
66.28 %
-21.05 Mvar
66.35 %
-4.08 Mvar
84.61 %
4.08 Mvar
0.85
1.01
-43.17
KWILU_70/B0...

132.30 6.33 70.51


1.00
-38.29
KINTATA_132 0.96 T_CIN_6.6 1.01
-43.17
KWILU_70/B0...
5.19 MW 26.08 MW 37.40 MW -47.10 -15.68 MW -15.68 MW
0.33 Mvar 17.08 Mvar 21.01 Mvar -10.22 Mvar -10.22 Mvar L_KWILU_15 Comp_KWIL_15
10.08 % 49.99 % 66.35 % 39.02 % 39.02 % 291.78 MW 291.78 MW
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

87.49 Mvar 87.49 Mvar


43.16 % 43.16 %
135.39 T2_KWILU 1
1.03 L2_ING_KWIL_220
-37.52 -0.37 MW -0.37 MW 0.73 MW
-18.70 MW -18.70 MW
-10.50 Mvar -10.50 Mvar 3 -0.23 Mvar -0.23 Mvar 0.46 Mvar
42.13 % 42.13 % 39.02 % 39.02 % 0.85
-291.78 MW -291.78 MW
L1_ING_KWIL_220 3 -87.49 Mvar -87.49 Mvar
-5.16 MW -25.62 MW 59.90 % 59.90 %
-3.75 Mvar -17.69 Mvar -0.00 MW -0.00 MW 15.43
10.08 % 49.99 %
-0.00 Mvar -0.00 Mvar 1.03 T_KWILU_15
T2_INGA_400/220

T1_INGA_400/220

42.13 % 42.13 % -11.44


BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-178.24 MW
-8.81 Mvar
-178.24 MW
-8.81 Mvar
16.11 MW
11.52 Mvar
16.11 MW
11.52 Mvar
162.13 MW
-2.70 Mvar
162.13 MW
-2.70 Mvar
60.70 % 60.70 % 39.02 % 39.02 % 55.15 % 55.15 %
223.34
0 0
130.98
0.99
128.85
0.98
KWILU_220/B0.. 1.02
-41.01
0 0
-38.73 -39.01
5.16 MW 8.54 MW 8.54 MW 8.54 MW
T2_MATADI_132/15(1)

3.75 Mvar 5.90 Mvar 5.90 Mvar 5.90 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

64.28 % 70.87 % 70.87 % 70.87 %


223.34
KWILU_220/B0.. 1.02
18.78 MW 18.78 MW 182.81 MW 182.81 MW -41.01 292.10 MW 292.10 MW
11.60 Mvar 11.60 Mvar 15.20 Mvar 15.20 Mvar 114.79 Mvar 114.79 Mvar
42.13 % 42.13 % 60.70 % 60.70 % 59.90 % 59.90 %
230.52
1.05 INGA1/B0.1
-35.58
-5.09 MW -8.45 MW -8.45 MW -8.45 MW
-3.31 Mvar -5.16 Mvar -5.16 Mvar -5.16 Mvar
64.28 % 70.87 % 70.87 % 70.87 % INGA1/B0.0
BOMA_15 MATADI_15 230.52
1.05
-35.58
14.24 14.00 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.66 MW -164.66 MW -164.66 MW -182.39 MW -164.66 MW -164.66 MW -164.71 MW -164.71 MW 646.55 MW
0.95 0.93 -25.63 Mvar -25.63 Mvar -25.63 Mvar -25.63 Mvar -25.63 Mvar -25.63 Mvar -82.88 Mvar -82.88 Mvar -82.88 Mvar -62.32 Mvar -82.88 Mvar -82.88 Mvar 15.65 Mvar 15.65 Mvar 316.08 Mvar
-41.75 -42.29 87.64 % 87.64 % 87.64 % 87.64 % 87.64 % 87.64 % 94.22 % 94.22 % 94.22 % 98.49 % 94.22 % 94.22 % 84.48 % 84.48 % 0.90
2.55 MW 2.55 MW 25.34 MW
1.66 Mvar 1.66 Mvar 15.49 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

64.00 % 64.00 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-2.51 MW -2.51 MW 5.01 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 182.76 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-1.53 Mvar -1.53 Mvar 3.06 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 83.46 Mvar 102.26 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar
64.00 % 64.00 % 0.85 87.64 % 87.64 % 87.64 % 87.64 % 87.64 % 87.64 % 94.22 % 94.22 % 94.22 % 98.49 % 94.22 % 94.22 % 84.48 % 84.48 %
LEMBA_A30
27.68
0.92
-43.44
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 182.76 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 83.46 Mvar 102.26 Mvar 102.26 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 98.01 % 94.69 % 94.69 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis Date: 5/12/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de forte charge 2020, Option 3a Annex: 3.3.5-2
Load Flow Balanced

DIgSILENT
Nodes Branches General Load Synchronous Machine BANDUNGU_15
Line-Line Voltage, Magnitude [kV] Active Power [MW] Active Power [MW] Active Power [MW] 15.69
1.05
-42.70
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Reactive Power [Mvar] Reactive Power [Mvar] -0.52 MW
-0.32 Mvar
0.52 MW
0.32 Mvar
4.07 % 0.85

T1_BAND_220/15
Voltage, Angle [deg] Loading [%] Power Factor [-] Loading [%]

L_BAND_15
L_MALUKU_30
0.54 MW
0.35 Mvar
4.07 %
BANDUNGU_220
230.69
1.05
35.43 MW -42.52
22.08 Mvar -0.54 MW
0.85 -0.35 Mvar
12.22 %
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX
30.84
L_FUNA_20 1

1 30.84
Comp_FUNA_20 1.03

L_MAL_BAND_220
-44.84
-17.71 MW -17.71 MW Comp_BANDUN_220
-11.04 Mvar -11.04 Mvar
64.18 MW 0.00 MW 28.13 % 28.13 %
1 -0.00 MW -0.00 MW
40.09 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
0.85 28.13 % 28.13 %
142.29 MW 0.00 MW
T_UTEX_20 88.97 Mvar 0.00 Mvar T1_MALUKU T2_MALUKU
0.85
20.81
1.04 FUNA_20/B0.0
-15.25
-64.18 MW 20.91
-40.09 Mvar 1.05 0 0
40.01 %
T1_UTEX_220/20

-15.49
-35.57 MW -35.57 MW -35.57 MW -35.57 MW
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA_2 -22.24 Mvar -22.24 Mvar -22.24 Mvar -22.24 Mvar
44.15 % 44.15 % 44.15 % 44.15 % 17.77 MW 17.77 MW 0.69 MW
4 12.73 Mvar 12.73 Mvar -35.94 Mvar

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 28.13 % 28.13 % 12.22 %
5 5
MALUKU_220/B..
64.36 MW
1 1 1 1 223.38
46.18 Mvar 1
40.01 %
0.00 MW 105.52 MW 0.00 MW 0.00 MW
223.38
UTEXCO_220 -18.84 Mvar 65.70 Mvar -94.18 Mvar 0.00 Mvar
1.02
0.85
35.67 MW 35.67 MW 35.67 MW 35.67 MW -41.98
222.21
1.01 LINGWALA_30/.. LIMINGA_30/B.. 25.96 Mvar 25.96 Mvar 25.96 Mvar 25.96 Mvar
-12.76 MW
8.77 Mvar
-23.47 MW
1.70 Mvar
44.15 % 44.15 % 44.15 % 44.15 % 6.44 % 8.79 %
-41.76

L1_MAL_KIM_220_P2
-64.36 MW 30.69 30.08
-46.18 Mvar
27.08 %
30.69 30.08
1.02 1.00
-58.79 -47.05
-35.17 MW -35.17 MW -35.17 MW 0.00 MW 102.20 MW -34.07 MW -34.07 MW -34.07 MW -71.34 MW -71.34 MW
15.77 Mvar 15.77 Mvar 15.77 Mvar -18.10 Mvar 63.37 Mvar -15.09 Mvar -15.09 Mvar -15.09 Mvar -51.91 Mvar -51.91 Mvar
51.67 % 51.67 % 51.67 % 0.85 51.22 % 51.22 % 51.22 % 30.21 % 30.21 %
-0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW
L_LING_UTEX_220

-0.00 Mvar -0.00 Mvar -0.00 Mvar 1 0.00 Mvar 0.00 Mvar 0.00 Mvar
51.67 % 51.67 % 51.67 % 51.22 % 51.22 % 51.22 % 12.78 MW

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
-13.90 Mvar
Comp_LIMINGA_30 6.44 %
KIMBANSEKE_220
L_LIMIN_30
222.90
3 3 3 0 0 0 1.01
-41.73
T1_LIMINGA T2_LIMINGA 12.19 MW 12.19 MW -37.16 MW

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 8.12 Mvar 8.12 Mvar -2.33 Mvar

T1_KIMBANSEKE(1)
T3_LIMINGA 36.14 % 36.14 % 12.69 %

T1_KIMBANSEKE
64.38 MW 38.29 MW 38.29 MW 38.29 MW 34.31 MW 34.31 MW 34.31 MW 71.41 MW 71.41 MW
45.97 Mvar -4.31 Mvar -4.31 Mvar -4.31 Mvar 19.82 Mvar 19.82 Mvar 19.82 Mvar 51.52 Mvar 51.52 Mvar -3 -3
27.08 % 51.67 % 51.67 % 51.67 % 51.22 % 51.22 % 51.22 % 30.21 % 30.21 %
LINGWALA_220.. LIMINGA_220/..
24.25 MW -12.12 MW -12.12 MW

L1_MAL_KIM_220_P1
222.43 222.42 15.12 Mvar -7.56 Mvar -7.56 Mvar
1.01 1.01 0.85 36.14 % 36.14 %
-41.71 -41.52
44.16 MW 14.50 MW -63.10 MW -63.10 MW -63.10 MW -63.10 MW 14.50 MW -61.44 MW -61.44 MW -61.44 MW -61.44 MW
28.03 Mvar 5.99 Mvar -18.26 Mvar -18.26 Mvar -18.26 Mvar -18.26 Mvar 5.99 Mvar -40.63 Mvar -40.63 Mvar -40.63 Mvar -40.63 Mvar
25.12 % 5.77 % 22.44 % 22.44 % 22.44 % 22.44 % 5.77 % 25.16 % 25.16 % 25.16 % 25.16 % KIMBANSEKE_20 20.65
L4_LING_KIM_220 1.03

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
-13.29
L_LIMG_MBOU_220

L2_LING_KIM_220
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220

63.24 MW 63.24 MW 63.24 MW 63.24 MW 61.55 MW 61.55 MW 61.55 MW 61.55 MW 37.24 MW 23.54 MW
L1_LING_COM_220 16.38 Mvar 16.38 Mvar 16.38 Mvar 16.38 Mvar 39.56 Mvar 39.56 Mvar 39.56 Mvar 39.56 Mvar -1.43 Mvar -10.69 Mvar
22.44 % 22.44 % 22.44 % 22.44 % 25.16 % 25.16 % 25.16 % 25.16 % 12.69 % 8.79 %
-44.08 MW
-29.63 Mvar GOM_6/B0.1 KIMWENZA/B0...
25.12 %
-14.49 MW -14.49 MW 223.37
MBUONO_220/B.. -8.63 Mvar -8.63 Mvar 6.53
1.02
5.77 % 5.77 % -41.29
221.53 6.53 223.37
1.01 0.99 1.02
-41.91 COM_220/B0.1 -13.51 -41.29 KIMWENZA/B0...
22.04 MW 22.04 MW 222.09 -4.16 MW -4.16 MW 8.32 MW 0.06 MW 0.04 MW -96.61 MW -96.61 MW -183.40 MW -183.40 MW
14.82 Mvar 14.82 Mvar -2.57 Mvar -2.57 Mvar 5.15 Mvar L2_KAS_GOM_70 -15.58 Mvar 2.34 Mvar 9.48 Mvar 9.48 Mvar -108.67 Mvar -108.67 Mvar
43.95 % 43.95 % COM_220/B0.0 222.09
33.40 % 33.40 % 0.85 15.92 % 4.61 % 34.34 % 34.34 % 45.50 % 45.50 %
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
L4_KAS_GOM_70

T2_KIM_400/220

T1_KIM_400/220
1.01
-41.81
14.49 MW 14.49 MW
8.63 Mvar 8.63 Mvar L_KAS_GOM_70
-3 -3 33.40 % 33.40 %
T1_COMBE T2_COMBE 2 1 -6 -6
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
0 0
-21.92 MW -21.92 MW -5.05 MW -5.05 MW -5.05 MW -5.05 MW -0.00 MW -0.00 MW 183.72 MW 183.72 MW
-13.64 Mvar -13.64 Mvar 3 3 -2.91 Mvar -2.91 Mvar -2.91 Mvar -2.91 Mvar 15.92 Mvar -2.24 Mvar 122.35 Mvar 122.35 Mvar
43.95 % 43.95 % 22.86 % 22.86 % 22.86 % 22.86 % 15.92 % 4.61 % 45.50 % 45.50 %

KASAN_70/B1
30.65 71.47
1.02 MBOUNO_30 1.02
-13.82 -44.07
43.84 MW 4.83 MW 4.83 MW 4.83 MW 4.83 MW 0.89 MW 0.00 MW 0.00 MW -183.72 MW -183.72 MW
27.29 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar 2.77 Mvar 0.58 Mvar L_KAS_15 -15.92 Mvar 2.24 Mvar -122.35 Mvar -122.35 Mvar
0.85 -10.26 MW -10.26 MW 5.13 MW 5.13 MW 5.13 MW 5.13 MW 23.08 % 23.08 % 23.08 % 23.08 % 40.01 % 28.80 % 28.80 %

T_KAS_70/15
-5.25 Mvar -5.25 Mvar 2.62 Mvar 2.62 Mvar 2.62 Mvar 2.62 Mvar
33.40 % 33.40 % 22.86 % 22.86 % 22.86 % 22.86 %Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 72.84 SVS SVS
4
L_MBUONO_30 -0.87 MW 0.87 MW TSC1 TSC2
72.84 -0.54 Mvar 0.54 Mvar
1.04 40.01 % 0.85
-43.67
T_KAS_15
15.36
1.02
0.00 MW -4.70 MW -4.70 MW -4.70 MW -4.70 MW -45.15
0.00 Mvar -3.21 Mvar -3.21 Mvar -3.21 Mvar -3.21 Mvar
23.08 % 23.08 % 23.08 % 23.08 %
69.15
0.99
-44.62
ZONGO/B0.1

69.15
0.99 ZONGO/B0.0
-44.62
27.28 MW -12.92 MW -0.00 MW -0.00 MW -0.00 MW -0.00 MW 2.22 MW 2.22 MW
19.99 Mvar -8.41 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar -0.00 Mvar 0.64 Mvar 0.64 Mvar
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

54.77 % 89.35 % 0.20 % 0.20 % 0.20 % 0.20 % 10.05 % 10.05 %


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

4 0 0 0 0 0
Low and High Voltage / Loading
U < 0.95 p.u. -27.19 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -2.20 MW -2.20 MW
-18.01 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar -1.08 Mvar -1.08 Mvar
U > 1.05 p.u. 54.77 % 89.35 % 0.20 % 0.20 % 0.20 % 0.20 % 10.05 % 10.05 %
Loading > 80. % INKISI_70
68.39
0.98
27.19 MW 13.00 MW 0.02 MW 0.02 MW 0.02 MW 0.02 MW -44.94 1.63 MW 0.82 MW 1.96 MW
18.01 Mvar 9.75 Mvar 0.03 Mvar 0.03 Mvar 0.05 Mvar 0.05 Mvar 0.58 Mvar 0.29 Mvar 1.30 Mvar
53.37 % 92.86 % 0.20 % 0.20 % 1.09 % 1.09 % 4.00 % 4.00 % 48.08 %
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ 0

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO -1.63 MW -0.81 MW


-1.07 Mvar -0.53 Mvar
4.00 % 4.00 %
-1.93 MW 1.93 MW
MBANZA_70 -1.18 Mvar
48.08 %
1.18 Mvar
0.85
68.23
0.97
-26.19 MW -45.00
1.22 MW 1.22 MW -0.00 MW -0.00 MW 14.22
-18.94 Mvar
53.37 %
0.80 Mvar 0.80 Mvar 0.00 Mvar 0.00 Mvar 0.95 T_INK_15
57.57 % 57.57 % 0.91 % 0.91 %
T2_MBAN_70/6.6

-47.03
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
125.33 -2 -2
0.95

L2_INGA_KIM_400
-48.68 0.00 MW 0.00 MW
26.19 MW

L1_INGA_KIM_400
18.94 Mvar -0.22 Mvar -0.22 Mvar
0.91 % 0.91 %
T1_BADIA_124/33

67.01 % 1.19 MW -1.19 MW -1.19 MW 1.19 MW


0.73 Mvar
0.85
-0.73 Mvar
57.57 %
-0.73 Mvar
57.57 %
0.73 Mvar
0.85
LUFU-TOTO_70
2 67.83
0.97
-36.60
6.38 6.38 -3.33 MW -3.33 MW 1.66 MW 1.66 MW 1.66 MW 1.66 MW
0.97 T1_MBAN_6.6 0.97 T2_MBAN_6.6 -1.94 Mvar -1.94 Mvar 1.08 Mvar 1.08 Mvar 1.08 Mvar 1.08 Mvar
T2_LUF_70/15

-26.07 MW -46.65 -46.65 15.91 % 15.91 % 40.92 % 40.92 % 40.92 % 40.92 %


T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

-16.44 Mvar L1_LUFU_15 L2_LUFU_15


67.01 %
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
3.36 MW 3.36 MW
30.36 1.64 Mvar 1.64 Mvar
1.01 15.91 % 15.91 %
-52.23 3.27 MW -1.64 MW -1.64 MW -1.64 MW -1.64 MW 3.27 MW
26.07 MW
16.44 Mvar LUKALA_70 2.02 Mvar
0.85
-1.01 Mvar
40.92 %
-1.01 Mvar
40.92 %
-1.01 Mvar
40.92 %
-1.01 Mvar
40.92 %
2.02 Mvar
0.85
52.88 %
T2_BADIA_30/30

68.77
0.98
-36.30
3.96 MW 3.96 MW -7.32 MW -7.32 MW 14.59 14.59
-5 2.65 Mvar 2.65 Mvar L_LUKALA_6.6 -4.29 Mvar -4.29 Mvar 0.97 T1_LUFU_15 0.97 T2_LUFU_15
46.18 % 46.18 % 34.59 % 34.59 % -37.99 -37.99
T2_LUK_70/6.6
T1_LUK_70/6.6

-26.04 MW L1_KIM_LUK_70 L2_KIM_LUK_70


-16.18 Mvar
52.88 %
7.38 MW 7.38 MW
BADIA_30 4.24 Mvar 4.24 Mvar
-3.93 MW 34.59 % 34.59 %
30.44 -3.93 MW 7.86 MW
-2.41 Mvar -2.41 Mvar 4.83 Mvar
1.01 46.18 % 46.18 % 0.85 KIMPESE_70
-52.43
26.04 MW 69.47
16.18 Mvar 0.99
0.85 -36.11
6.30 -7.81 MW -7.81 MW 0.43 MW 0.43 MW
L_SANDA_15 -4.52 Mvar -4.52 Mvar 0.28 Mvar 0.28 Mvar
36.42 % 36.42 % 7.36 % 7.36 %
6.30 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
0.96
-38.51
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
3.38 MW 7.89 MW 7.89 MW
2.09 Mvar 4.47 Mvar 4.47 Mvar
0.85 36.42 % 36.42 % T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
0.41 MW -0.20 MW -0.20 MW -0.20 MW -0.20 MW 0.41 MW
14.90 70.36 0.25 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar -0.13 Mvar 0.25 Mvar
0.99 1.01 0.85 7.36 % 7.36 % 7.36 % 7.36 % 0.85
-33.19 -35.86
-1.69 MW -1.69 MW 4.42 MW -10.10 MW -10.10 MW
-1.05 Mvar -1.05 Mvar 2.96 Mvar L_CIN_6.6 -5.95 Mvar -5.95 Mvar
T1_KINTATA_132/15

T2_KINTATA_132/15

40.45 % 40.45 % 52.90 % 46.71 % 46.71 %


29.45 14.73
T-KIM_30 T_KIM_15
T_CIN_70/6

0.98 0.98
L2_KWIL_CIN_70 -36.76 -6.78
L1_KWIL_CIN_70
-3
10.32 MW 10.32 MW
L_132_INGA_KINT 5.96 Mvar 5.96 Mvar
46.71 % 46.71 %
1.72 MW 1.72 MW -23.25 MW -4.39 MW 4.39 MW 72.26
1.10 Mvar
40.45 %
1.10 Mvar
40.45 %
-10.57 Mvar
39.61 %
-2.73 Mvar
52.90 %
2.73 Mvar
0.85
1.03
-35.36
KWILU_70/B0...

133.41 6.72 72.26


1.01
-32.23
KINTATA_132 1.02 T_CIN_6.6 1.03
-35.36
KWILU_70/B0...
3.33 MW 16.48 MW 23.45 MW -37.78 -10.32 MW -10.32 MW
-1.27 Mvar 9.64 Mvar 9.89 Mvar -5.96 Mvar -5.96 Mvar L_KWILU_15 Comp_KWIL_15
6.26 % 30.79 % 39.61 % 24.34 % 24.34 % 187.03 MW 187.03 MW
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

30.12 Mvar 30.12 Mvar


28.80 % 28.80 %
135.14 T2_KWILU 1
1.02 L2_ING_KWIL_220
-31.70 -0.23 MW -0.23 MW 0.45 MW
-11.73 MW -11.73 MW
-4.94 Mvar -4.94 Mvar 3 -0.14 Mvar -0.14 Mvar 0.28 Mvar
25.12 % 25.12 % 24.34 % 24.34 % 0.85
-187.03 MW -187.03 MW
L1_ING_KWIL_220 3 -30.12 Mvar -30.12 Mvar
-3.32 MW -16.30 MW 37.08 % 37.08 %
-2.27 Mvar -10.77 Mvar -0.00 MW -0.00 MW 15.67
6.26 % 30.79 %
-0.00 Mvar -0.00 Mvar 1.04 T_KWILU_15
T2_INGA_400/220

T1_INGA_400/220

25.12 % 25.12 % -4.26


BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
-110.44 MW
15.43 Mvar
-110.44 MW
15.43 Mvar
10.61 MW
6.63 Mvar
10.61 MW
6.63 Mvar
99.83 MW
-22.06 Mvar
99.83 MW
-22.06 Mvar
38.03 % 38.03 % 24.34 % 24.34 % 34.34 % 34.34 %
226.17
0 0
132.78
1.01
131.34
1.00
KWILU_220/B0.. 1.03
-33.99
0 0
-32.56 -32.70
3.32 MW 5.43 MW 5.43 MW 5.43 MW
T2_MATADI_132/15(1)

2.27 Mvar 3.59 Mvar 3.59 Mvar 3.59 Mvar


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

39.95 % 43.64 % 43.64 % 43.64 %


226.17
KWILU_220/B0.. 1.03
11.79 MW 11.79 MW 112.21 MW 112.21 MW -33.99 187.35 MW 187.35 MW
5.47 Mvar 5.47 Mvar -19.74 Mvar -19.74 Mvar 40.84 Mvar 40.84 Mvar
25.12 % 25.12 % 38.03 % 38.03 % 37.08 % 37.08 %
227.56
1.03 INGA1/B0.1
-30.44
-3.28 MW -5.38 MW -5.38 MW -5.38 MW
-2.09 Mvar -3.31 Mvar -3.31 Mvar -3.31 Mvar
39.95 % 43.64 % 43.64 % 43.64 % INGA1/B0.0
BOMA_15 MATADI_15 227.56
1.03
-30.44
14.70 14.53 -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -49.80 MW -164.65 MW -164.65 MW -164.65 MW -15.54 MW -164.71 MW -164.71 MW -164.71 MW -164.71 MW 844.44 MW
0.98 0.97 -25.51 Mvar -25.51 Mvar -25.51 Mvar -25.51 Mvar -25.51 Mvar -25.51 Mvar -82.44 Mvar -82.44 Mvar -82.44 Mvar -95.20 Mvar -17.42 Mvar 16.04 Mvar 16.04 Mvar 16.04 Mvar 411.76 Mvar
-34.42 -34.67 88.69 % 88.69 % 88.69 % 88.69 % 88.69 % 88.69 % 95.33 % 95.33 % 95.33 % 50.07 % 85.70 % 85.59 % 85.59 % 85.59 % 0.90
1.64 MW 1.64 MW 16.14 MW
1.05 Mvar 1.05 Mvar 9.94 Mvar
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

39.66 % 39.66 % 0.85


T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

-1.61 MW -1.61 MW 3.22 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 15.69 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
-0.99 Mvar -0.99 Mvar 1.98 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 100.93 Mvar 33.50 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
39.66 % 39.66 % 0.85 88.69 % 88.69 % 88.69 % 88.69 % 88.69 % 88.69 % 95.33 % 95.33 % 95.33 % 50.07 % 85.70 % 85.59 % 85.59 % 85.59 %
LEMBA_A30
28.91
0.96
-35.43
50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 50.00 MW 165.00 MW 165.00 MW 165.00 MW 15.69 MW 165.00 MW 165.00 MW 165.00 MW 165.00 MW
30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 30.99 Mvar 102.26 Mvar 102.26 Mvar 102.26 Mvar 100.93 Mvar 33.50 Mvar 0.00 Mvar 0.00 Mvar 0.00 Mvar
CONGO - PMEDE Project: 6830P03
90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 90.50 % 94.69 % 94.69 % 94.69 % 49.82 % 82.13 % 80.49 % 80.49 % 80.49 %
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résultat acquis Date: 5/12/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Répartition de faible charge 2020, Option 3a Annex: 3.3.5-3
Max. 3-Phase Short-Circuit acc. to VDE

DIgSILENT
Short Circuit Nodes Branches BANDUNGU_15
Initial Short-Circuit Current [kA] Initial Short-Circuit Power [MVA] 4.6 kA
4.7 kA
4.6 kA
Thermal equivalent Short-Circuit Current [kA] Initial Short-Circuit Current [kA] 119.43 MVA
4.60 kA
11.33 kA

T1_BAND_220/15
Short-Circuit Breaking Current [kA] Peak Short-Circuit Current [kA]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.00 MVA
0.00 kA
0.00 kA
2 BANDUNGU_220
1.0 kA
1.0 kA
0.00 MVA 1.0 kA
0.00 kA 393.35 MVA
0.00 kA 1.03 kA
2.19 kA
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
12.2 kA
L_FUNA_20 Comp_FUNA_2 1

1 3 12.2 kA
Comp_FUNA_20 12.4 kA

L_MAL_BAND_220
12.2 kA
318.07 MVA 318.07 MVA Comp_BANDUN_220
4 6.12 kA 6.12 kA
0.00 MVA 0.00 MVA 14.99 kA 14.99 kA
1 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.00 MVA 0.00 MVA
T_UTEX_20 0.00 kA 0.00 kA T1_MALUKU T2_MALUKU
0.00 kA 0.00 kA
17.3 kA
17.6 kA FUNA_20/B0.0
17.3 kA
598.18 MVA 24.7 kA
17.27 kA 25.1 kA 0 0
43.89 kA
T1_UTEX_220/20

24.7 kA
213.90 MVA 213.90 MVA 213.90 MVA 213.90 MVA
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA 6.17 kA 6.17 kA 6.17 kA 6.17 kA
15.28 kA 15.28 kA 15.28 kA 15.28 kA 0.00 MVA 0.00 MVA 0.00 MVA
8 0.00 kA 0.00 kA 0.00 kA

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 0.00 kA 0.00 kA 0.00 kA
5 5
MALUKU_220/B..
0.00 MVA
0 0 0 0 3.4 kA
0.00 kA 1
0.00 kA
0.00 MVA 0.00 MVA 0.00 MVA
3.4 kA
UTEXCO_220 0.00 kA 0.00 kA 0.00 kA
3.4 kA
0.00 kA 0.00 kA 0.00 kA
16.92 MVA 16.92 MVA 16.92 MVA 16.92 MVA 3.4 kA
4.4 kA
4.5 kA LINGWALA_30/.. LIMINGA_30/B.. 0.04 kA 0.04 kA 0.04 kA 0.04 kA
644.52 MVA
1.69 kA
644.52 MVA
1.69 kA
0.10 kA 0.10 kA 0.10 kA 0.10 kA 3.80 kA 3.80 kA
4.4 kA

L1_MAL_KIM_220_P2
1695.46 .. 17.3 kA 17.5 kA
4.45 kA
10.29 kA
17.3 kA 17.5 kA
17.6 kA 17.8 kA
17.3 kA 17.5 kA
299.69 MVA 299.69 MVA 299.69 MVA 0.00 MVA 302.50 MVA 302.50 MVA 302.50 MVA 1642.00 .. 1642.00 ..
5.77 kA 5.77 kA 5.77 kA 0.00 kA 5.82 kA 5.82 kA 5.82 kA 4.31 kA 4.31 kA
14.32 kA 14.32 kA 14.32 kA 0.00 kA 14.48 kA 14.48 kA 14.48 kA 9.95 kA 9.95 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
L_LING_UTEX_220

0.00 kA 0.00 kA 0.00 kA 1 0.00 kA 0.00 kA 0.00 kA


0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 310.92 MVA

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
0.82 kA
Comp_LIMINGA_30 1.85 kA
KIMBANSEKE_220
L_LIMIN_30
3.7 kA
3 3 3 0 0 0 3.8 kA
3.7 kA
T1_LIMINGA T2_LIMINGA 0.00 MVA 0.00 MVA 1111.02 ..

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 0.00 kA 0.00 kA 2.92 kA

T1_KIMBANSEKE(1)
T3_LIMINGA 0.00 kA 0.00 kA 6.62 kA

T1_KIMBANSEKE
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA -3 -3
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
LINGWALA_220.. LIMINGA_220/..
274.70 MVA 274.70 MVA

L1_MAL_KIM_220_P1
4.6 kA 4.6 kA 7.93 kA 7.93 kA
4.6 kA 4.7 kA 19.69 kA 19.69 kA
4.6 kA 4.6 kA
0.00 MVA 32.43 MVA 418.85 MVA 418.85 MVA 0.00 MVA 0.00 MVA 0.00 MVA 442.26 MVA 442.26 MVA 442.26 MVA 442.26 MVA
0.00 kA 0.09 kA 1.10 kA 1.10 kA 0.00 kA 0.00 kA 0.00 kA 1.16 kA 1.16 kA 1.16 kA 1.16 kA
0.00 kA 0.20 kA 2.55 kA 2.55 kA 0.00 kA 0.00 kA 0.00 kA 2.70 kA 2.70 kA 2.70 kA 2.70 kA KIMBANSEKE_20 15.9 kA
L4_LING_KIM_220 16.1 kA

L3_LIMIN_KIM_220

L1_LIMIN_KIM_220

L2_LIMIN_KIM_220

L4_LIMIN_KIM_220
15.9 kA
L_LIMG_MBOU_220

L2_LING_KIM_220
Comp_KIMW_1 Comp_KIMW_2
L2_LING_COM_220

L1_LING_KIM_220

L3_LING_KIM_220 6 6

16.18 MVA 16.18 MVA 16.18 MVA 16.18 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
L1_LING_COM_220 0.04 kA 0.04 kA 0.04 kA 0.04 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.10 kA 0.10 kA 0.10 kA 0.10 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
1495.77 ..
3.93 kA GOM_6/B0.1 KIMWENZA/B0...
8.91 kA
753.55 MVA 753.55 MVA 4.8 kA
MBUONO_220/B.. 1.98 kA 1.98 kA 26.8 kA
4.9 kA
4.53 kA 4.53 kA 4.8 kA
3.9 kA 26.8 kA 4.8 kA
4.0 kA 27.7 kA 4.9 kA
3.9 kA COM_220/B0.1 26.8 kA 4.8 kA KIMWENZA/B0...
0.00 MVA 0.00 MVA 4.1 kA 153.13 MVA 153.13 MVA 0.00 MVA 0.00 MVA 419.89 MVA 419.89 MVA 463.76 MVA 463.76 MVA
0.00 kA 0.00 kA 13.40 kA 13.40 kA L2_KAS_GOM_70 0.00 kA 0.00 kA 1.10 kA 1.10 kA 1.22 kA 1.22 kA
0.00 kA 0.00 kA COM_220/B0.0 4.1 kA
35.23 kA 35.23 kA 0.00 kA 0.00 kA 2.57 kA 2.57 kA 2.84 kA 2.84 kA
T1_MBUO_220/30

T2_MBUO_220/30

T1_TSC_220/10.5

T2_TSC_220/10.5
4.2 kA L4_KAS_GOM_70
4.1 kA
32.57 MVA 32.57 MVA
0.09 kA 0.09 kA L_KAS_GOM_70
-3 -3 0.20 kA 0.20 kA
T1_COMBE T2_COMBE 3 3
L3_KAS_GOM_70
T1_GOM_70/6

T2_GOM_70/6

L_GOM_6
-1 -1
354.01 MVA 354.01 MVA 86.82 MVA 86.82 MVA 86.82 MVA 86.82 MVA 0.00 MVA 0.00 MVA
6.81 kA 6.81 kA 3 3 0.72 kA 0.72 kA 0.72 kA 0.72 kA 0.00 kA 0.00 kA
16.76 kA 16.76 kA 1.54 kA 1.54 kA 1.54 kA 1.54 kA 0.00 kA 0.00 kA

KASAN_70/B1
13.6 kA 3.4 kA
13.9 kA MBOUNO_30 3.4 kA
13.6 kA 3.4 kA
16.92 MVA 16.92 MVA 16.92 MVA 16.92 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.14 kA 0.14 kA 0.14 kA 0.14 kA 0.00 kA L_KAS_15 0.00 kA 0.00 kA
230.62 MVA 230.62 MVA 16.10 MVA 16.10 MVA 16.10 MVA 16.10 MVA 0.30 kA 0.30 kA 0.30 kA 0.30 kA 0.00 kA 0.00 kA 0.00 kA

T_KAS_70/15
1.90 kA 1.90 kA 0.13 kA 0.13 kA 0.13 kA 0.13 kA
4.82 kA 4.82 kA 0.34 kA 0.34 kA 0.34 kA 0.34 kA Comp_ZONGO
L_KAS_ZONG_70

-2
L2_KAS_ZONG_70

L3_KAS_ZONG_70

L4_KAS_ZONG_70
GOM_70/B0.1 4.3 kA SVS SVS
4
L_MBUONO_30 33.68 MVA TSC1 TSC2
4.3 kA 1.30 kA
4.4 kA 2.59 kA
4.3 kA
T_KAS_15
1.3 kA
1.3 kA
0.00 MVA 59.91 MVA 59.91 MVA 59.91 MVA 59.91 MVA 1.3 kA
0.00 kA 0.49 kA 0.49 kA 0.49 kA 0.49 kA
0.00 kA 1.00 kA 1.00 kA 1.00 kA 1.00 kA
2.6 kA
2.6 kA
2.5 kA
ZONGO/B0.1

2.6 kA
2.6 kA ZONGO/B0.0
2.5 kA
0.00 MVA 73.84 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.00 kA 0.61 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
L2_INK_ZONG_70

L1_INK_ZONG_70
T_ZONGO_132/70

0.00 kA 1.23 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA


T1_Zongo

T2_Zongo

T3_Zongo

T4_Zongo

T5_Zongo

6 0 0 0 0 0

Loading of Thermal/Peak Short-Circuit Current


0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 92.49 MVA 92.49 MVA
Mech. Loading > 100. % 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.76 kA 0.76 kA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 1.34 kA 1.34 kA
Therm. Loading > 100. %
INKISI_70
1.5 kA
1.5 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 1.5 kA 0.00 MVA 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
T1_INK_70/15

L_INK_15
G G G G G L1_MBAN_INK_70 L2_MBAN_INK_70
L_ZON_BAI_132

~ ~ ~ ~ ~ -3

G1_ZONGO G2_ZONGO G3_ZONGO G4_ZONGO G5_ZONGO 107.34 MVA 53.67 MVA


0.89 kA 0.44 kA
1.53 kA 0.76 kA
45.06 MVA
MBANZA_70 1.73 kA
3.78 kA
1.3 kA
1.3 kA
162.41 MVA 1.3 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 1.7 kA
0.71 kA
1.43 kA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 1.7 kA T_INK_15
0.00 kA 0.00 kA 0.00 kA 0.00 kA
T2_MBAN_70/6.6

1.7 kA
T1_MBAN_70/6.6

BADIADINGI_132

L1_KWIL_KIM_220

L2_KWIL_KIM_220
L1_MBAN_6.6 L2_MBAN_6.6
L1_LUFU_MBAN_70 L2_LUFU_MBAN_70
0.7 kA -3 -3
0.7 kA
0.7 kA 0.00 MVA 0.00 MVA
0.00 MVA

L1_INGA_KIM_220

L2_INGA_KIM_220
0.00 kA 0.00 kA 0.00 kA
0.00 kA 0.00 kA
T1_BADIA_124/33

0.00 kA 29.99 MVA 29.99 MVA


2.62 kA
5.06 kA
2.62 kA
5.06 kA
LUFU-TOTO_70
2 1.5 kA
1.6 kA
1.5 kA
2.6 kA 2.6 kA 93.77 MVA 93.77 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
2.6 kA T1_MBAN_6.6 2.6 kA T2_MBAN_6.6 0.77 kA 0.77 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
T2_LUF_70/15

93.57 MVA 2.6 kA 2.6 kA 1.29 kA 1.29 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
T3_LUF_70/15

T1_LUF_70/15

T4_LUF_70/15

1.80 kA L1_LUFU_15 L2_LUFU_15


3.82 kA
L1_LUK_LUF_70 L2_LUK_LUF_70 -2 -2 -2 -2
T_BADIA_AT
0.00 MVA 0.00 MVA
1.8 kA 0.00 kA 0.00 kA
1.8 kA 0.00 kA 0.00 kA
1.8 kA 40.49 MVA 40.49 MVA 40.49 MVA 40.49 MVA
0.00 MVA
0.00 kA LUKALA_70 1.56 kA
3.05 kA
1.56 kA
3.05 kA
1.56 kA
3.05 kA
1.56 kA
3.05 kA
0.00 kA
T2_BADIA_30/30

2.2 kA
2.2 kA
2.2 kA
0.00 MVA 0.00 MVA 135.44 MVA 135.44 MVA 3.1 kA 3.1 kA
-5 0.00 kA 0.00 kA L_LUKALA_6.6 1.12 kA 1.12 kA 3.1 kA T1_LUFU_15 3.1 kA T2_LUFU_15
0.00 kA 0.00 kA 1.96 kA 1.96 kA 3.1 kA 3.1 kA
T2_LUK_70/6.6
T1_LUK_70/6.6

83.77 MVA L1_KIM_LUK_70 L2_KIM_LUK_70


1.61 kA
3.42 kA
0.00 MVA 0.00 MVA
BADIA_30 0.00 kA 0.00 kA
64.13 MVA 0.00 kA 0.00 kA
1.6 kA 64.13 MVA
5.61 kA 5.61 kA
1.6 kA 11.75 kA 11.75 kA KIMPESE_70
1.6 kA
2.6 kA
2.6 kA
2.6 kA
11.2 kA 158.54 MVA 158.54 MVA 0.00 MVA 0.00 MVA
L_SANDA_15 1.31 kA 1.31 kA 0.00 kA 0.00 kA
2.36 kA 2.36 kA 0.00 kA 0.00 kA
11.2 kA 0 0
L_KIMP_30 L_KIMP_15
L_BADIA_30
11.3 kA
11.2 kA
LUKALA_6.6/B..
L1_CIN_KIM_70 L2_CIN_KIM_70
0.00 MVA 0.00 MVA
0.00 kA 0.00 kA
0.00 kA 0.00 kA T1_KIM_70/30/15 T2_KIM_70/30/15
SANDA_15 CINAT_70
26.38 MVA 26.38 MVA 26.46 MVA 26.46 MVA
5.5 kA 3.3 kA 0.51 kA 0.51 kA 1.02 kA 1.02 kA
5.5 kA 3.3 kA 1.01 kA 1.01 kA 2.14 kA 2.14 kA
5.5 kA 3.3 kA
70.83 MVA 70.83 MVA 0.00 MVA 198.32 MVA 198.32 MVA
2.73 kA 2.73 kA 0.00 kA L_CIN_6.6 1.64 kA 1.64 kA
T1_KINTATA_132/15

T2_KINTATA_132/15

5.79 kA 5.79 kA 0.00 kA 3.15 kA 3.15 kA


1.0 kA 2.0 kA
T-KIM_30 T_KIM_15
T_CIN_70/6

1.0 kA 2.1 kA
L2_KWIL_CIN_70 1.0 kA 2.0 kA
L1_KWIL_CIN_70
0
0.00 MVA 0.00 MVA
L_132_INGA_KINT 0.00 kA 0.00 kA
0.00 kA 0.00 kA
0.00 MVA 0.00 MVA 644.19 MVA 98.65 MVA 5.3 kA
0.00 kA
0.00 kA
0.00 kA
0.00 kA
2.82 kA
6.06 kA
8.63 kA
20.36 kA
5.5 kA
5.3 kA
KWILU_70/B0...

2.8 kA 8.6 kA 5.3 kA


2.8 kA
2.8 kA
KINTATA_132 8.7 kA T_CIN_6.6 5.5 kA
5.3 kA
KWILU_70/B0...
0.00 MVA 0.00 MVA 0.00 MVA 8.6 kA 324.17 MVA 324.17 MVA
0.00 kA 0.00 kA 0.00 kA 2.67 kA 2.67 kA L_KWILU_15 Comp_KWIL_15
0.00 kA 0.00 kA 0.00 kA 6.92 kA 6.92 kA
INGA_132 T1_KWILU
L_132_KINT_BOM

L_132_KINT_MAT

4.3 kA T2_KWILU 1
4.5 kA L2_ING_KWIL_220
4.3 kA 287.22 MVA 287.22 MVA
493.89 MVA 493.89 MVA
2.16 kA 2.16 kA 2 11.05 kA 11.05 kA
5.76 kA 5.76 kA 28.85 kA 28.85 kA
L1_ING_KWIL_220 2
280.23 MVA 423.60 MVA
1.23 kA 1.85 kA 0.00 MVA 0.00 MVA 22.1 kA
2.25 kA 3.60 kA
0.00 kA 0.00 kA 22.8 kA T_KWILU_15
0.00 kA 0.00 kA 22.1 kA
BOMA_132 MATADI_132 T1_INGA_220/132 T2_INGA_220/132
1129.22 ..
2.96 kA
1129.22 ..
2.96 kA
0.00 MVA
0.00 kA
0.00 MVA
0.00 kA
227.87 MVA
0.60 kA
227.87 MVA
0.60 kA
6.78 kA 6.78 kA 0.00 kA 0.00 kA 1.37 kA 1.37 kA
7.1 kA
0 0
1.2 kA
1.2 kA
1.9 kA
1.9 kA
KWILU_220/B0.. 7.2 kA
7.1 kA
1.2 kA 1.9 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
T2_MATADI_132/15(1)

0.00 kA 0.00 kA 0.00 kA 0.00 kA


T1_MATADI_132/15

T2_MATADI_132/15
T1_BOMA_132/15

0.00 kA 0.00 kA 0.00 kA 0.00 kA


7.1 kA
KWILU_220/B0.. 7.2 kA
0.00 MVA 0.00 MVA 15.00 MVA 15.00 MVA 7.1 kA 16.57 MVA 16.57 MVA
0.00 kA 0.00 kA 0.04 kA 0.04 kA 0.04 kA 0.04 kA
0.00 kA 0.00 kA 0.10 kA 0.10 kA 0.12 kA 0.12 kA
17.5 kA
18.2 kA INGA1/B0.1
15.8 kA
78.40 MVA 77.79 MVA 77.79 MVA 77.79 MVA
3.02 kA 2.99 kA 2.99 kA 2.99 kA
6.78 kA 6.44 kA 6.44 kA 6.44 kA INGA1/B0.0
BOMA_15 MATADI_15 17.5 kA
18.2 kA
15.8 kA
3.0 kA 9.0 kA 210.13 MVA 210.13 MVA 210.13 MVA 210.13 MVA 210.13 MVA 210.13 MVA 668.23 MVA 668.23 MVA 668.23 MVA 668.23 MVA 667.78 MVA 667.78 MVA 667.78 MVA 667.78 MVA
3.0 kA 9.1 kA 0.55 kA 0.55 kA 0.55 kA 0.55 kA 0.55 kA 0.55 kA 1.75 kA 1.75 kA 1.75 kA 1.75 kA 1.75 kA 1.75 kA 1.75 kA 1.75 kA
3.0 kA 9.0 kA 1.47 kA 1.47 kA 1.47 kA 1.47 kA 1.47 kA 1.47 kA 4.67 kA 4.67 kA 4.67 kA 4.67 kA 4.67 kA 4.67 kA 4.67 kA 4.67 kA
0.00 MVA 0.00 MVA
0.00 kA 0.00 kA
T10_INGA2A

T11_INGA2B

T12_INGA2B

T13_INGA2B

T14_INGA2B

0.00 kA 0.00 kA
T1_LEMBA_30/15

T2_LEMBA_30/15

T7_INGA2A

T8_INGA2A

T9_INGA2A
T1_INGA1

T2_INGA1

T3_INGA1

T4_INGA1

T5_INGA1

T6_INGA1

L_LEMBA_30 0 0 0 0 0 0 0 0

L_MATADI_.. Export HVDC

27.38 MVA 27.38 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.53 kA 0.53 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
1.18 kA 1.18 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
LEMBA_A30
1.1 kA
1.1 kA
1.1 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
CONGO - PMEDE Project: 6830P03
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
FICHTNER
G G G G G G G G G G G G G G Étude du Réseau Electrique Graphic: Kinshasa_Grid
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Résulttat acquis, Option 1 Date: 5/11/2006
G1_INGA1 G2_INGA1 G3_INGA1 G4_INGA1 G5_INGA1G6_INGA1 G7_INGA2A G8_INGA2A G9_INGA2A G10_INGA2A G11_INGA2B G12_INGA2B G13_INGA2B G14_INGA2B
PowerFactory 13.1.255 Triphasé court-circuit de faible charge 2020 Annex: 4.1.1-1
Max. 3-Phase Short-Circuit acc. to VDE

DIgSILENT
Short Circuit Nodes Branches BANDUNGU_15
Initial Short-Circuit Current [kA] Initial Short-Circuit Power [MVA] 4.6 kA
4.7 kA
4.6 kA
Thermal equivalent Short-Circuit Current [kA] Initial Short-Circuit Current [kA] 119.31 MVA
4.59 kA
11.32 kA

T1_BAND_220/15
Short-Circuit Breaking Current [kA] Peak Short-Circuit Current [kA]

L_BAND_15
L_MALUKU_30 Comp_MALUKU
0.00 MVA
0.00 kA
0.00 kA
2 BANDUNGU_220
1.0 kA
1.0 kA
0.00 MVA 1.0 kA
0.00 kA 392.03 MVA
0.00 kA 1.03 kA
2.19 kA
L_UTEX_20 MALUKU_30/B0..
Comp_UTEX Comp_UTEX_2
12.2 kA
L_FUNA_20 Comp_FUNA_2 1

1 3 12.2 kA
Comp_FUNA_20 12.4 kA

L_MAL_BAND_220
12.2 kA
316.18 MVA 316.18 MVA Comp_BANDUN_220
3 6.08 kA 6.08 kA
0.00 MVA 0.00 MVA 14.90 kA 14.90 kA
1 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.00 kA 0.00 kA 0.00 kA 0.00 kA
0.00 MVA 0.00 MVA
T_UTEX_20 0.00 kA 0.00 kA T1_MALUKU T2_MALUKU
0.00 kA 0.00 kA
17.3 kA
17.7 kA FUNA_20/B0.0
17.3 kA
598.48 MVA 24.6 kA
17.28 kA 25.1 kA 0 0
43.96 kA
T1_UTEX_220/20

24.6 kA
213.36 MVA 213.36 MVA 213.36 MVA 213.36 MVA
L_LINGW_30 Comp_LINGWALA_2 Comp_LIMINGA 6.16 kA 6.16 kA 6.16 kA 6.16 kA
15.26 kA 15.26 kA 15.26 kA 15.26 kA 0.00 MVA 0.00 MVA 0.00 MVA
8 0.00 kA 0.00 kA 0.00 kA

T3_FUNA_220/20

T1_FUNA_220/20

T2_FUNA_220/20

T4_FUNA_220/20
Comp_LINGWALA_30 0.00 kA 0.00 kA 0.00 kA
5 5
MALUKU_220/B..
0.00 MVA
0 0 0 0 3.3 kA
0.00 kA 1
0.00 kA
0.00 MVA 0.00 MVA 0.00 MVA
3.3 kA
UTEXCO_220 0.00 kA 0.00 kA 0.00 kA
3.4 kA
0.00 kA 0.00 kA 0.00 kA
16.86 MVA 16.86 MVA 16.86 MVA 16.86 MVA 3.3 kA
4.5 kA
4.5 kA LINGWALA_30/.. LIMINGA_30/B.. 0.04 kA 0.04 kA 0.04 kA 0.04 kA
637.50 MVA
1.67 kA
637.50 MVA
1.67 kA
0.10 kA 0.10 kA 0.10 kA 0.10 kA 3.77 kA 3.77 kA
4.4 kA

L1_MAL_KIM_220_P2
1697.57 .. 17.3 kA 17.4 kA
4.45 kA
10.32 kA
17.3 kA 17.4 kA
17.6 kA 17.7 kA
17.3 kA 17.4 kA
299.89 MVA 299.89 MVA 299.89 MVA 0.00 MVA 301.76 MVA 301.76 MVA 301.76 MVA 1635.32 .. 1635.32 ..
5.77 kA 5.77 kA 5.77 kA 0.00 kA 5.81 kA 5.81 kA 5.81 kA 4.29 kA 4.29 kA
14.35 kA 14.35 kA 14.35 kA 0.00 kA 14.46 kA 14.46 kA 14.46 kA 9.93 kA 9.93 kA
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
L_LING_UTEX_220

0.00 kA 0.00 kA 0.00 kA 1 0.00 kA 0.00 kA 0.00 kA


0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 307.19 MVA

L2_LIMIN_FUN_220
T3_LINGWALA

L1_LIMIN_FUN_220
0.81 kA
Comp_LIMINGA_30 1.83 kA
KIMBANSEKE_220
L_LIMIN_30
3.7 kA
3 3 3 0 0 0 3.7 kA
3.7 kA
T1_LIMINGA T2_LIMINGA 0.00 MVA 0.00 MVA 1097.69 ..

L2_MAL_KIM_220
T1_LINGWALA T2_LINGWALA L_KIMBANSEKE 0.00 kA 0.00 kA 2.88 kA

T1_KIMBANSEKE(1)
T3_LIMINGA 0.00 kA 0.00 kA 6.54 kA

T1_KIMBANSEKE
0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA 0.00 MVA
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA -2 -2
0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA 0.00 kA
LINGWALA_220.. LIMINGA_220/..
273.41 MVA 273.41 MVA

L1_MAL_KIM_220_P1
4.6 kA 4.6 kA 7.89 kA 7.89 kA
4.6 kA 4.7 kA 19.60 kA 19.60 kA
4.6 kA 4.6 kA
0.00 MVA 32.43 MVA 279.60 MVA 559.20 MVA 0.00 MVA 0.00 MVA 0.00 MVA 293.57 MVA 587.15 MVA 587.15 MVA 293.57 MVA

Vous aimerez peut-être aussi