Vous êtes sur la page 1sur 1

0 1 2 3 4 5 6 7 8

REV.

100 101 102 201 a 203 300


a > 90°

303 a 408 a a 314 a 617 a 800


T15b a < 90° a > 90° a > 90° a < 90°
T15a 950 950 T15a
20Ø5/8"@250-Ai1 20Ø5/8"
20Ø5/8"@250-Ai1
@250-As1
CA_PS_DO_DC_A01

A Ab1 Ab1
A
10Ø3/8"-Ab T13
T12 10Ø3/8"-Ab 5000
T11 0-Ai1 20Ø5/8"
T12 20Ø5/8"@25 20Ø5/8" @250-A T11
20Ø5/8"@250-Ai1
@250-Ai1 i1 20Ø5/8"@250-Ai1

T07
PLANO

21Ø1"@250-Bve
T06
21Ø1"@250-Bvi

T14 T16 T14 B B


Ø1.3/8"-As2 Ø5/8"-As2 Ø1.3/8"-As2
T16
63Ø5/8"@200-As2
2800
P03 P04 P04 P03
P02 P02
Ab2 3Ø1/2" 3Ø1/2" 3Ø1/2" 3Ø1/2"
DET. 1 Ab2
3Ø1/2" @1500-Sp 3Ø1/2" P1-15E DC P2-15W

12600
50
@1500-Sp @1500-Sp @1500-Sp @1500-Sp
2Ø1/2"-Ab @1500-Sp 2Ø1/2"-Ab
Ab2 T10 T09

Ø1/2"-Ab Ø5/8"-Ai1 Ø5/8"-Ai1

25
EXTREMO EXTREMO

11Ø5/8"@200-Bhe

11Ø5/8"@200-Bhe
50 50 DE DOVELA DE DOVELA
T10 T09

25
25

13Ø5/8"@150-Ai1
0-Ai1 10Ø5/8"
T09
15Ø5/8"@200-Ai1 T09 10Ø5/8"@20 @200-A
i1 T09
15Ø5/8"@200-Ai1
B B B
11Ø5/8"@200-Bhe

11Ø5/8"@200-Bhe

11Ø5/8"@200-Bhe

11Ø5/8"@200-Bhe
T04 T03

T08

T08
Ø3/4"-As2 Ø1"-Ai2
50 40 40 50
T08

T08

T08

T08
T04
7Ø3/4" T04 7Ø3/4"
@200-A 2800
s2 s2
T04 @200-A DIRECCION DE AVANCE

21Ø1"@242-Bve
T01 T01
21Ø1"@242-Bve

21Ø1"@242-Bvi
15Ø3/4"@200-As2 DE CONSTRUCION
T01 T01
21Ø1"@242-Bvi

25

Ø1.3/8"-Ai1 Ø1.3/8"-Ai1
Ø1.3/8"-Ai1 SECCIÓN B-B Ø1.3/8"-Ai1 A
50

J02a J02e T01 PLANTA DOVELA DC

T07
T01 J02e J02a

T06
T07

AL AL
J01
T06

4Ø1.3/8"-Ai1 5x17Ø1/2"Tr 7x17Ø1/2"-Tr 5x17Ø1/2"Tr 4Ø1.3/8"-Ai1

T03
29Ø1"@200-Ai2

SECCIÓN A-A
ALTERNAR POSICION
DE GANCHO

T05x
s2
34Ø5/8"@
150-As2 T05x 34Ø5/8"@150-A
T05
21Ø3/4"@250-As1
C
DETALLE DE POSICION
DE TRABAS
T02
21Ø3/4"@250-Ai1
- NOMENCLATURA DE BARRAS
UBICACION
(VER TABLA 1)
P01 3 Ø 5/8" @ 15 - Ai1
T14 POSICION ESPACIAMIENTO
4Ø1.3/8"-As2 CANTIDAD DIAMETRO
J03ba J03bh USAR CONECTOR J03ai J03aa DE BARRAS
AL AL - TABLA 1
8x20Ø1/2"@250Tr 9x20Ø1/2"@250Tr AsN : Armadura superior - Capa "N" Tr : Traba
IZQUIERDO

IZQUIERDO

DERECHO

DERECHO
ESTRIBO
AiN : Armadura inferior - Capa "N" Sp : Separador
PILAR

PILAR

PILAR
LN : Armadura lateral - Capa "N" Bve/i : Barra vertical Ext./Int.
Rs : Refuerzo superior : Barra horizontal Ext./Int.
300.00

70.00 160.00 70.00 Bhe/i


Ri : Refuerzo inferior Abx : Barra adicional Estructura
St : Barra vertical de arranque Ub : Barra en "U"
DC
Es : Estribo Su : Barra suple

15.00
Ho : Habilitar en obra

20.00
35.00

- NOTAS:
50.00

- RECUBRIMIENTOS INDICADOS
DETALLE 1 - ACERO CORRUGADO ASTM A615
D - SE COMPLEMENTA CON LÁMINAS DEL PROYECTO ORIGINAL
UBICACIÓN DE ESTRUCTURAS ISOMÉTRICO ARMADURA - SE COMPLEMENTA CON LÁMINAS ACEDIM: CA_PS_DO_DC_A01

SUPERVISION : CONSORCIO : CONTRATO SUPERVISION:


ESTUDIO DEFINITIVO Ing. De Estructuras: Plano: Escala : LAMINA :
Contrato N° 04-2019-MTC/21
"CONSTRUCCIÓN DEL PUENTE VEHÍCULAR SALVADOR Ing. Jorge Cabanillas Rodriguez
PILAR DERECHO S/E
CONTRATO CONTRATISTA: SOBRE EL RÍO HUALLAGA EN AUCAYACU"
REGIÓN HUÁNUCO.
Residente de Obra: CA_PS_DO_DC_A01 Fecha: CA_PS_DO_DC_A01
N° 04-2019-MTC/21 MARZO-2023
Ing. Manuel Villoslada Trujillano

Vous aimerez peut-être aussi