w(t) 0.79363264
K(t) 0.49948082
v(t) 1.19149747
u(t) 0.27356782

BV Côte amont C aval Longueur Pente C A m(t)


BV 1 135.64 135.4 22.95 0.0105 0.9 976.72 1.753
BV 2 135.4 135.3 45.8 0.0022 0.9 1890.09
BV1 + BV2 68.75 0.00325739 0.9 2866.81 1.282
BV3 135.3 135.11 20.58 0.0092 0.8 850.26 1.793
BV3+BV eq 89.33 0.00396432 0.87712553 3717.07 1.191
BV4 135.1 135 15.62 0.0064 0.7 637.49 1.930
104.95 0.00422827 0.85119507 4354.56 1.137
ent
a 2.5
b -0.56 β + δ ε f d c µ
1.1 0.05 -0.287 0.507 -0.41 0.5

Q(t) D VH V(1/10) V(1/100) condition autocurage(1/10) autocurage(1/100)


0.0350 0.244 0.75 0.30 0.08 condition non respecter condition non respecter

0.0437 0.351 0.45 0.18 0.05 condition non respecter condition non respecter

0.0511 0.286 0.80 0.32 0.08 condition non respecter

0.0543 0.312 0.71 0.28 0.07 condition non respecter condition non respecter
autocurage(1/100) solution
condition non respecter

condition non respecter

on va augmenter les valeur de la cote amont


condition non respecter