Vous êtes sur la page 1sur 8

SEDA HUANUCO S.A.

Gerencia Operacional

FECHA

Sunday, April 08, 2012

R-2

R-3

(m)

(m)

(m)

01:00

4.26

02:00

HORA

R-1

RIO 01.02.03 GO.CP.

Caudal de Salida de Planta


HUANUCO

AMARILIS

Movimiento de Vlvulas

PILLCO
MARCA

PARCIALES DE PRODUCCION DE AGUA POR CADA FILTRO Y PLANTA

N de Vueltas Abiertas

PLANTA ANTIGUA

14"

24"

16"

10"

16"

(L/seg)

(L/seg)

(L/seg)

Cayhuayna

Hunuco

San Luis

Moras

A.P.

4.25

192

110

30

20

10

4.78

4.80

199

19

30

20

10

03:00

5.18

5.05

219

226

30

20

04:00

5.48

5.30

251

210

30

05:00

5.80

5.70

222

575

30

06:00

6.00

5.98

368

822

07:00

5.84

5.85

354

08:00

5.73

5.95

461

09:00

5.13

5.48

10:00

4.63

11:00

by-pass

F-1

F-2

PLANTA NUEVA

F-3

F-4

F-1

F-2

F-3

F-4

L/s

P.C.

L/s

P.C.

L/s

P.C

L/s

P.C.

L/s

P.C.

L/s

P.C.

L/s

P.C.

L/s

P.C.

20

48

46

33

36

63

51

46

27

52

43

30

48

53

181

176

20

43

46

65

51

86

48

46

35

50

32

40

34

188

168

10

20

43

46

69

50

106

50

46

50

43

47

42

37

35

189

173

20

10

20

39

46

49

41

89

50

46

56

44

39

24

37

48

176

166

16

20

23

20

42

46

56

50

110

51

46

36

40

39

25

36

46

189

161

30

16

20

23

20

38

46

45

48

100

58

46

20

43

42

25

40

46

190

171

65

30

16

20

23

20

38

46

45

49

100

57

46

20

47

50

25

39

45

190

182

30

30

16

20

23

20

38

46

45

48

100

56

46

20

50

51

28

38

46

188

185

458

62

30

16

20

23

20

54

12

54

40

53

132

55

48

27

47

42

28

37

40

216

174

4.88

467

68

30

16

20

23

20

51

15

54

35

50

138

56

48

32

51

43

28

38

35

211

180

4.30

4.47

498

72

30

16

20

23

20

55

20

54

30

56

140

57

48

35

49

41

29

36

30

222

174

12:00

3.81

3.68

446

70

30

16

20

23

20

57

23

54

25

54

144

56

48

40

47

40

25

37

25

221

172

13:00

3.48

3.27

467

67

30

16

20

23

20

56

24

54

20

55

146

58

48

45

50

39

30

38

20

223

175

14:00

3.21

3.25

458

63

30

16

20

23

20

54

27

54

15

56

148

56

48

50

49

40

32

36

15

220

173

15:00

3.02

3.10

432

64

30

16

20

23

20

53

27

54

13

54

150

57

48

54

48

41

34

38

10

218

175

16:00

2.85

2.91

390

57

30

16

20

23

20

55

28

54

10

55

150

55

48

57

47

40

36

37

219

172

17:00

2.80

2.83

389

35

30

16

20

23

20

48

10

51

10

53

150

68

44

58

46

48

38

36

220

174

18:00

2.76

2.44

329

14

30

16

20

23

20

47

11

51

11

52

150

67

44

60

45

47

40

35

217

171

19:00

2.78

2.79

339

33

30

16

20

23

20

45

51

18

59

150

66

44

60

44

45

56

38

221

171

20:00

2.90

2.57

352

14

30

16

20

23

20

42

10

51

45

49

150

67

44

62

38

44

65

39

209

165

21:00

3.04

2.72

323

499

30

16

20

23

20

42

20

51

45

49

150

66

44

62

47

46

66

39

208

176

22:00

3.20

2.92

171

216

30

20

10

20

45

31

51

46

51

150

58

44

64

44

45

69

36

205

169

23:00

3.83

3.54

194

17

30

20

10

20

44

34

51

64

49

150

46

44

70

44

47

73

39

190

174

24:00

4.30

4.06

178

30

20

10

20

45

36

51

65

50

150

47

44

70

45

47

74

40

193

176

4904

4153

17654.4
107.5438596
204.3333333

14950.8
75.23550725
173.0416667

1122

1208

1218

1356

4039.2

4348.8

4384.8

4881.6

0
329
147
435
175.25
358
167.38

PROMEDIO PRODUCCIN HORARIA (PRIMER TURNO)


PROMEDIO PRODUCCIN HORARIA (SEGUNDO TURNO)
PROMEDIO PRODUCCIN HORARIA (TERCER TURNO)
PROMEDIO DIARIO
FILTROS :

Planta
P1

F1
150

P2

M3 USADOS EN FILTROS:
F2
F3
150
150
150

150

204.33
minimo
38
maximo
57
promedio 46.75

53
57
84
83

0
36
14.042

84
0
0
0
0
0
0

M3
500

PLANTA
P1
P2

PRODUCC. NETA M3
17154.4
14450.8

150

500

TOTAL M3

31605.2

TOTAL m3

1000

F4
0

Planta antigua:
373
421
433

10
69
37.458

36
59
50.75

46
68
56.5

3974.4

3996

368
141
384
174.38
352
172

485

63
150
129.25

1110

450

412

1104

0
0
0

173.04
44
48
46

1025

914

3690

3290.4

Planta nueva:
330

369

61
288

388

326

297
349.625

353

369

302
0

20
70
46.25

38
52
46.25

0
43
1.7917

30
51
42.708

0
74
37.167

35
48
38.083

0
53
22.208

357
356
362
342
350
361
372
373
390
391
396
393
398
393
393
391
394
388
392
374
384
374
364
369
9057

32605.2
31,905.20
377.375

87.92217813

CONTROL DE GASTO DE INSUMOS POR TURNO


Planta de Tratamiento SEDA HUANUCO S.A.

Fecha:

PLANTA N 1
TURNO

ALTURA
OPERADOR INICIAL

PLANTA N 2

TURBIDEZ
NTU

OBSERVACIONES

TURNO

OPERADOR

ALTURA
INICIAL

TURBIDEZ
NTU

0:00

0:00

1:00

1:00

2:00

2:00

0:00

3:00

0:00

3:00

4:00

4:00

8:00

5:00

8:00

5:00

6:00

6:00

7:00

7:00

8:00

8:00

9:00

9:00

10:00

10:00

11:00

11:00

8:00

12:00

8:00

12:00

a
16:00

13:00

13:00

14:00

16:00

14:00

15:00

15:00

16:00

16:00

17:00

17:00

18:00

18:00

19:00

19:00

16:00

20:00

16:00

20:00

21:00

21:00

0:00

22:00

0:00

22:00

23:00

23:00

0:00

0:00

Nota: Antes de realizar una preparacin de insumo en tanque, se debe anotar la hora de preparacin

OBSERVACIONES

CONTROL DE PARAMETROS DIARIOS


SEDA HUANUCO S.A.
FECHA
MES
PLANTA 1
HORA:
Agua Cruda

Agua Sedimentada
(filtro 3)

PLANTA 2
Agua Cruda

Agua Sedimentada
(filtro 2)

Turbidez (NTU)
pH

CLORO=

Color (UC)

_______________________ _______________________
Responsable
Responsable

PLANTA 1
HORA:
Agua Cruda

Agua Sedimentada
(filtro 3)

PLANTA 2
Agua Cruda

Agua Sedimentada
(filtro 2)

Turbidez (NTU)
pH
Color (UC)

_______________________ _______________________
Responsable
Responsable

PLANTA 1
HORA:
Agua Cruda

Agua Sedimentada
(filtro 3)

PLANTA 2
Agua Cruda

Agua Sedimentada
(filtro 2)

Turbidez (NTU)
pH

CLORO=

Color (UC)

_______________________ _______________________
Responsable
Responsable

Vous aimerez peut-être aussi