TOTAL TRR 1-2 TRR 3-4 (1-2) TRR 5-6 TRR 7

ITEM DESCRIPCION UNIDAD CANT. VR. UNITARIO VR. TOTAL CANT. VR. TOTAL CANT. VR. TOTAL CANT. VR. TOTAL CANT. VR. TOTAL
1 PRELIMINARES 163,951,076
1.01 DESMONTE Y LIMPIEZA M2 7,582.07 4,452 33,751,893 2,456.71 10,936,140.05 2,456.71 10,936,140.05 1,779.10 7,919,741.70 889.55 3,959,870.85
1.02 LOCALIZACION Y REPLANTEO M2 36,578.81 2,671 97,699,183 10,784.97 28,805,819.86 10,784.97 28,805,819.86 10,416.94 27,822,847.96 4,591.93 12,264,695.59
1.03 CERRAMIENTO PROVISIONAL EN LAMINA ML - 34,638 - - - - -
1.04 CAMPAMENTO GL 1.00 15,000,000 15,000,000 0.29 4,285,714.29 0.29 4,285,714.29 0.29 4,285,714.29 0.14 2,142,857.14
1.05 CASINO GL 1.00 12,000,000 12,000,000 0.29 3,428,571.43 0.29 3,428,571.43 0.29 3,428,571.43 0.14 1,714,285.71
1.06 INSTALACIONES PROVISIONALES ENERGIA GL 1.00 3,000,000 3,000,000 0.29 857,142.86 0.29 857,142.86 0.29 857,142.86 0.14 428,571.43
1.07 INSTALACION PROVISIONAL HIDROSANIT GL 1.00 2,500,000 2,500,000 0.29 714,285.71 0.29 714,285.71 0.29 714,285.71 0.14 357,142.86
2 MOVIMIENTO DE TIERRAS 1,618,393,321
2.01 EXCAVACIÓN MECANICA CON RETIRO M3 28,482.95 52,980 1,509,032,541 8,844.17 468,565,910.20 8,844.17 468,565,910.20 7,196.41 381,267,147.14 3,598.20 190,633,573.57
2.02 EXCAVACION MANUAL CON RETIRO M3 1,971.33 44,686 88,090,145 638.74 28,542,487.27 638.74 28,542,487.27 462.57 20,670,113.59 231.28 10,335,056.80
2.03 RELLENO EN RECEBO M3 758.21 28,054 21,270,635 245.67 6,892,017.61 245.67 6,892,017.61 177.91 4,991,066.23 88.96 2,495,533.11
3 CIMENTACIÓN 2,241,697,366
3.01 ZAPATAS M3 530.75 550,118 291,974,810 171.97 94,603,669.89 171.97 94,603,669.89 124.54 68,511,646.79 62.27 34,255,823.40
3.02 VIGAS DE CIMENTACION M3 682.38 519,775 354,682,460 221.10 114,922,237.79 221.10 114,922,237.79 160.12 83,225,322.79 80.06 41,612,661.40
3.03 PLACA DE CONTRAPISO M2 7,582.08 198,930 1,508,299,529 2,456.71 488,712,800.47 2,456.71 488,712,800.47 1,779.10 353,915,952.23 889.55 176,957,976.11
3.04 ESMALTADO PLACA M2 4,086.93 21,224 86,740,567 1,238.47 26,285,089.71 1,238.47 26,285,089.71 1,073.33 22,780,258.27 536.67 11,390,129.13
4 ESTRUCTURA EN CONCRETO 6,214,130,666
4.01 COLUMNAS M3 2,016.32 772,027 1,556,654,980 608.03 469,415,377.23 608.03 469,415,377.23 545.76 421,338,805.90 254.51 196,485,420.12
4.02 LOSAS ALIGERADAS M2 36,578.81 112,909 4,130,064,414 10,784.97 1,217,716,336.24 10,784.97 1,217,716,336.24 10,416.94 1,176,162,895.22 4,591.93 518,468,845.90
4.03 ESCALERAS EN CONCRETO M3 365.79 158,173 57,858,096 107.85 17,058,956.40 107.85 17,058,956.40 104.17 16,476,879.82 45.92 7,263,303.46
4.04 FOSO DE ASCENSOR M3 583.28 623,440 363,637,115 212.10 132,231,678.29 212.10 132,231,678.29 106.05 66,115,839.15 53.03 33,057,919.57
4.05 TANQUE DE AGUA M3 182.88 579,156 105,916,061 53.92 31,228,094.94 53.92 31,228,094.94 52.08 30,162,447.78 22.96 13,297,423.22
5 ACERO DE REFUERZO 2,735,157,606
5.01 ACERO DE REFUERZO KG 706,027.85 2,166 1,529,592,600 227,796.66 493,516,065.14 227,796.66 493,516,065.14 159,971.90 346,575,327.00 90,462.63 195,985,142.22
5.02 MALLA ELECTROSOLDADA KG 365,788.05 3,296 1,205,565,007 107,849.67 355,451,163.94 107,849.67 355,451,163.94 104,169.40 343,321,722.52 45,919.31 151,340,956.23
6 MAMPOSTERIA 3,603,911,962
6.01 MURO EN BLOQUE No. 4 M2 35,395.41 36,808 1,302,817,588 12,942.93 476,397,409.61 12,942.93 476,397,409.61 6,233.50 229,439,748.99 3,276.04 120,583,019.84
6.02 MURO EN LADRILLO TOLETE GRAN FORMATO A LA VISTA M2 15,169.46 74,330 1,127,544,094 5,546.97 412,305,675.46 5,546.97 412,305,675.46 2,671.50 198,572,260.84 1,404.02 104,360,482.32
6.03 COLUMNETAS EN CONCRETO E= 12CM ML 11,798.47 39,392 464,770,843 4,314.31 169,951,363.71 4,314.31 169,951,363.71 2,077.83 81,850,987.10 1,092.01 43,017,128.66
6.04 MORTERO GROUTING DE LLENO ML 5,056.49 15,439 78,067,187 1,848.99 28,546,594.78 1,848.99 28,546,594.78 890.50 13,748,444.91 468.01 7,225,552.73
6.05 VIGAS DE CONFINAMIENTO E= 12CM ML 12,205.31 40,669 496,371,870 4,463.08 181,506,816.47 4,463.08 181,506,816.47 2,149.48 87,416,257.04 1,129.67 45,941,979.55
6.06 ANCLAJES MAMPOSTERIA UN 8,136.88 13,839 112,604,913 2,975.39 41,175,901.49 2,975.39 41,175,901.49 1,432.99 19,830,898.14 753.11 10,422,211.47
6.07 POYOS COCINAS Y BAÑOS ML 538.20 40,385 21,735,468 147.20 5,944,743.28 147.20 5,944,743.28 159.20 6,429,369.09 84.60 3,416,611.97
7 PAÑETES 1,223,917,371
7.01 PAÑETE LISO INTERIOR M2 70,790.82 14,595 1,033,209,772 25,885.87 377,810,726.31 25,885.87 377,810,726.31 12,467.00 181,959,004.10 6,552.08 95,629,315.75
7.02 PAÑETE LISO IMPERMEABILIZADO BAÑOS - ROPAS M2 3,072.34 28,824 88,557,284 854.88 24,641,136.43 854.88 24,641,136.43 891.00 25,682,262.49 471.58 13,592,748.17
7.03 PAÑETE BAJO PLACA ESCALERAS M2 360.90 18,680 6,741,437 91.20 1,703,571.82 91.20 1,703,571.82 119.00 2,222,862.35 59.50 1,111,431.18
7.04 PAÑETE BAJO PLACA ESCALERAS - GUALDERAS ML 420.00 9,619 4,039,823 120.00 1,154,235.06 120.00 1,154,235.06 120.00 1,154,235.06 60.00 577,117.53
7.05 PAÑETE CONTRAHUELLAS ESCALERAS ML 770.00 9,619 7,406,342 220.00 2,116,097.61 220.00 2,116,097.61 220.00 2,116,097.61 110.00 1,058,048.81
7.06 PAÑETE FOSO ASCENSOR M2 1,744.05 12,470 21,748,617 634.20 7,908,587.90 634.20 7,908,587.90 317.10 3,954,293.95 158.55 1,977,146.97
7.07 PAÑETE IMPERMEABILIZADO TANQUE DE AGUA M2 731.52 17,626 12,894,022 215.68 3,801,649.55 215.68 3,801,649.55 208.32 3,671,919.67 91.84 1,618,803.30
7.08 FILOS Y DILATACIONES ML 10,618.62 4,645 49,320,074 3,882.88 18,034,724.07 3,882.88 18,034,724.07 1,870.05 8,685,778.89 982.81 4,564,847.43
8 PISOS BASES 640,038,527
8.01 MORTERO AFINADO PLACA M2 18,503.45 20,940 387,469,600 6,071.69 127,143,588.27 6,071.69 127,143,588.27 4,165.99 87,237,463.95 2,194.08 45,944,959.36
8.02 MORTERO IMPERMEABILIZADO BAÑOS - ROPAS M2 715.80 24,873 17,803,746 197.73 4,917,977.27 197.73 4,917,977.27 209.48 5,210,430.35 110.86 2,757,361.41
8.03 MORTERO IMPERMEABILIZADO TERRAZAS M2 3,306.77 26,694 88,271,970 1,306.16 34,866,986.01 1,306.16 34,866,986.01 456.75 12,192,644.57 237.70 6,345,353.88
8.04 MORTERO IMPERMEABILIZADO CUBIERTAS M2 5,141.76 26,694 137,255,863 1,665.87 44,469,397.67 1,665.87 44,469,397.67 1,206.67 32,211,378.64 603.34 16,105,689.32
8.05 MORTERO AFINADO ESCALERAS ML 770.00 9,617 7,404,862 220.00 2,115,674.81 220.00 2,115,674.81 220.00 2,115,674.81 110.00 1,057,837.41
8.06 MORTERO AFINADO DESCANSOS ESCALERAS M2 117.60 15,582 1,832,485 33.60 523,567.20 33.60 523,567.20 33.60 523,567.20 16.80 261,783.60
9 ENCHAPES 246,498,220
9.01 ENCHAPE COCINA PORCELANATO BLANCO MATE 30X60 M2 1,259.25 80,956 101,944,279 353.28 28,600,258.00 353.28 28,600,258.00 372.21 30,132,761.63 180.48 14,611,001.37
9.02 ENCHAPE BAÑOS ALCOBAS CERAMICA BLANCA MATE 30X60 M2 836.16 49,727 41,579,440 190.56 9,475,911.36 190.56 9,475,911.36 297.60 14,798,652.50 157.44 7,828,964.55
9.03 ENCHAPE BAÑOS PPALES MARMOL CREMA MARFIL JP M2 592.32 148,610 88,024,577 195.36 29,032,417.34 195.36 29,032,417.34 134.40 19,973,161.81 67.20 9,986,580.90
9.04 ENCHAPE ROPAS Y BAÑO SERVICIO CERAMICA BLANCA MATE 40X4 M2 415.20 36,007 14,949,924 117.12 4,217,088.25 117.12 4,217,088.25 118.32 4,260,296.13 62.64 2,255,450.89
10 PISOS ACABADOS 4,186,623,254
10.01 MARMOL CREMA MARFIL JUNTA PERDIDA M2 18,503.45 148,610 2,749,794,055 6,071.69 902,312,551.16 6,071.69 902,312,551.16 4,165.99 619,106,788.82 2,194.08 326,062,163.75
10.02 MARMOL CREMA MARFIL JUNTA PERDIDA ANTIKADO M2 4,022.56 152,491 613,406,099 1,503.88 229,329,124.33 1,503.88 229,329,124.33 666.23 101,594,978.74 348.56 53,152,872.08
10.03 PORCELANATO GRIS CLARO 40X40 - ROPAS Y SERVICIO M2 1,224.63 68,361 83,716,899 370.19 25,306,602.72 370.19 25,306,602.72 316.63 21,644,722.44 167.63 11,458,970.70
10.04 GUARDAESCOBA MARMOL CREMA MARFIL ML 12,428.53 47,396 589,060,842 3,640.16 172,528,668.11 3,640.16 172,528,668.11 3,432.14 162,669,004.15 1,716.07 81,334,502.08
10.05 GUARDAESCOBA PORCELANATO GRIS CLARO ML 1,827.40 21,267 38,863,212 517.48 11,005,326.93 517.48 11,005,326.93 518.13 11,018,980.34 274.30 5,833,577.83
10.06 PASOS ESCALERAS MARMOL CREMA MARFIL ML 1,093.40 102,234 111,782,147 312.40 31,937,756.25 312.40 31,937,756.25 312.40 31,937,756.25 156.20 15,968,878.13
11 INSTALACIONES HIDROSANITARIAS 2,553,200,589
11.01 INSTALACION HIDRAULICA Y SANITARIAS M2 36,578.81 61,200 2,238,622,866 10,784.97 660,039,980.40 10,784.97 660,039,980.40 10,416.94 637,516,728.00 4,591.93 281,026,177.20
11.02 INSTALACION RED CONTRAINCENDIO M2 36,578.81 8,600 314,577,723 10,784.97 92,750,716.20 10,784.97 92,750,716.20 10,416.94 89,585,684.00 4,591.93 39,490,606.60
12 INST. ELECT,TEL,CITOF,TV,SONID 2,669,521,189
12.01 INSTALACION ELECTRICA, TEL, CITO, TV M2 36,578.81 72,980 2,669,521,189 10,784.97 787,086,891.66 10,784.97 787,086,891.66 10,416.94 760,228,281.20 4,591.93 335,119,124.38
13 INSTALACION INTERIOR DE GAS 562,808,921
13.01 RED INTERNA DE GAS M2 36,578.81 15,336 560,972,553 10,784.97 165,398,253.91 10,784.97 165,398,253.91 10,416.94 159,754,191.84 4,591.93 70,421,853.82
13.02 REJILLA VENTILACION GAS 40X25CM UN 90.00 20,404 1,836,367 16.00 326,465.29 16.00 326,465.29 38.00 775,355.07 20.00 408,081.62
14 INSTALACIONES AIRE ACONDICIONADO 1,865,165,592
14.01 INSTALACION DE AIRE ACONDICIONADO M2 36,578.81 46,204 1,690,098,201 10,784.97 498,311,886.59 10,784.97 498,311,886.59 10,416.94 481,307,455.46 4,591.93 212,166,972.76
14.02 VENTILACION MECANICA M2 36,578.81 4,786 175,067,391 10,784.97 51,617,214.76 10,784.97 51,617,214.76 10,416.94 49,855,825.17 4,591.93 21,977,136.19
15 IMPERMEABILIZACIONES 153,777,110
15.01 IMPERMEABILIZACIÓN CUBIERTA MANTO TIPO 1 M2 5,141.76 26,939 138,512,414 1,665.87 44,876,506.33 1,665.87 44,876,506.33 1,206.67 32,506,267.52 603.34 16,253,133.76
15.02 IMPERMEABILIZACIÓN TANQUE DE AGUA M2 731.52 20,867 15,264,696 215.68 4,500,614.74 215.68 4,500,614.74 208.32 4,347,032.93 91.84 1,916,433.87
16 CIELORASOS 723,453,759
16.01 CIELORASO EN DRYWALL M2 18,503.45 37,456 693,057,031 6,071.69 227,418,506.73 6,071.69 227,418,506.73 4,165.99 156,039,435.83 2,194.08 82,180,581.76
16.02 CIELORASO RH BAÑOS M2 715.80 42,466 30,396,728 197.73 8,396,570.84 197.73 8,396,570.84 209.48 8,895,882.41 110.86 4,707,703.82
17 VENTANERIA 2,471,434,355
17.01 VENTANERIA ALUMINIO ANONIZADO M2 4,402.54 325,000 1,430,823,875 1,218.34 395,960,500.00 1,218.34 395,960,500.00 1,407.32 457,379,000.00 558.54 181,523,875.00
17.02 PUERTAS VENTANAS TERRAZAS M2 1,598.48 651,000 1,040,610,480 663.00 431,613,000.00 663.00 431,613,000.00 178.36 116,112,360.00 94.12 61,272,120.00
18 CARPINTERIA METALICA 329,416,589
18.01 DIVISION EN VIDRIO PARA LA DUCHA M2
18.02 ESTRUCTURA METALICA ESCALERAS UN 14.00 10,500,000 147,000,000 4.00 42,000,000.00 4.00 42,000,000.00 4.00 42,000,000.00 2.00 21,000,000.00
18.03 PASAMANOS ESCALERAS ML 420.00 250,000 105,000,000 120.00 30,000,000.00 120.00 30,000,000.00 120.00 30,000,000.00 60.00 15,000,000.00
18.04 TAPA SHUTS DE BASURAS UN 35.00 165,763 5,801,700 10.00 1,657,628.49 10.00 1,657,628.49 10.00 1,657,628.49 5.00 828,814.24
18.05 PUERTA SUBESTACIÓN ELECTRICA UN 1.00 2,605,237 2,597,794 0.29 744,353.44 0.29 744,353.44 0.29 744,353.44 0.14 364,733.19
18.06 PUERTAS CUARTOS TECNICOS UN 35.00 898,771 31,456,987 10.00 8,987,710.59 10.00 8,987,710.59 10.00 8,987,710.59 5.00 4,493,855.29
18.07 PUERTAS CUARTOS DE BASURA UN 7.00 955,472 6,688,305 2.00 1,910,944.18 2.00 1,910,944.18 2.00 1,910,944.18 1.00 955,472.09
18.08 PUERTAS DEPOSITOS UN 24.00 852,379 20,457,103 4.00 3,409,517.22 4.00 3,409,517.22 8.00 6,819,034.45 8.00 6,819,034.45
18.09 REJILLAS DE MEDIDORES UN 7.00 1,487,814 10,414,701 2.00 2,975,628.72 2.00 2,975,628.72 2.00 2,975,628.72 1.00 1,487,814.36
19 CARPINTERIA EN MADERA 3,384,556,877
19.01 PUERTAS PRINCIPALES UN 90.00 1,187,061 106,835,501 16.00 18,992,977.92 16.00 18,992,977.92 38.00 45,108,322.56 20.00 23,741,222.40
19.02 PUERTAS ALCOBAS UN 182.00 847,357 154,218,984 52.00 44,062,566.91 52.00 44,062,566.91 51.00 43,215,209.86 27.00 22,878,640.51
19.03 PUERTAS BAÑOS Y VESTIERES UN 246.00 738,500 181,670,879 68.00 50,217,966.49 68.00 50,217,966.49 72.00 53,171,964.52 38.00 28,062,981.27
19.04 PUERTAS ALCOBAS SERVICIO UN 74.00 862,344 63,813,456 24.00 20,696,256.00 24.00 20,696,256.00 17.00 14,659,848.00 9.00 7,761,096.00
19.05 PUERTAS BAÑOS SERVICIO UN 58.00 862,344 50,015,952 16.00 13,797,504.00 16.00 13,797,504.00 17.00 14,659,848.00 9.00 7,761,096.00
19.06 PUERTAS COCINA UN 82.00 939,658 77,051,923 28.00 26,310,412.80 28.00 26,310,412.80 17.00 15,974,179.20 9.00 8,456,918.40
19.07 CLOSETS ML 890.66 1,095,943 976,112,325 281.36 308,354,438.13 281.36 308,354,438.13 214.65 235,244,100.60 113.29 124,159,348.51
19.08 CLOSETS SERVICIOS ML 56.60 1,095,943 62,030,357 19.20 21,042,099.84 19.20 21,042,099.84 11.90 13,041,718.13 6.30 6,904,439.01
19.09 MUEBLES DE BAÑO BAJO ML 616.30 472,124 290,969,750 195.00 92,064,094.17 195.00 92,064,094.17 148.10 69,921,499.21 78.20 36,920,062.38
19.10 GABINETES DE BAÑO CON ESPEJO ML 616.30 472,124 290,969,750 195.00 92,064,094.17 195.00 92,064,094.17 148.10 69,921,499.21 78.20 36,920,062.38
19.11 PERGOLA TERRAZAS Y BALCONES ML 676.80 550,000 372,240,000 174.00 95,700,000.00 174.00 95,700,000.00 184.75 101,612,500.00 144.05 79,227,500.00
19.12 BARANDAS BALCONES ML 1,167.12 650,000 758,628,000 458.76 298,194,000.00 458.76 298,194,000.00 166.40 108,160,000.00 83.20 54,080,000.00
20 EQUIPOS DE BANOS 650,526,947
20.01 SANITARIO MONTECARLO UN 246.00 371,634 91,422,036 68.00 25,271,131.85 68.00 25,271,131.85 72.00 26,757,669.01 38.00 14,122,103.09
20.02 JUEGO INCRUSTACIONES METALICAS UN 246.00 167,492 41,203,052 68.00 11,389,461.65 68.00 11,389,461.65 72.00 12,059,429.98 38.00 6,364,699.16
20.03 GRIFERIA LAVAMANOS ALTA VERA UN 312.00 414,704 129,387,559 88.00 36,493,926.97 88.00 36,493,926.97 89.00 36,908,630.68 47.00 19,491,074.63
20.04 GRIFERIA DUCHA MONOCONTROL UN 246.00 73,986 18,200,442 68.00 5,031,016.39 68.00 5,031,016.39 72.00 5,326,958.53 38.00 2,811,450.34
20.05 COMBO ACUACER SERVICIO UN 58.00 94,604 5,487,037 16.00 1,513,665.47 16.00 1,513,665.47 17.00 1,608,269.56 9.00 851,436.83
20.06 ESPEJO ML 616.30 150,000 92,445,000 195.00 29,250,000.00 195.00 29,250,000.00 148.10 22,215,000.00 78.20 11,730,000.00
20.07 REJILLAS DE PISO UN 374.00 8,348 3,122,179 100.00 834,807.23 100.00 834,807.23 114.00 951,680.24 60.00 500,884.34
20.08 TAPA REGISTROS UN 374.00 11,711 4,379,954 100.00 1,171,110.77 100.00 1,171,110.77 114.00 1,335,066.27 60.00 702,666.46
20.09 MESON EN QUARTZTONE BLANCO CON LAVAMANOS ML 616.30 429,790 264,879,687 195.00 83,809,084.76 195.00 83,809,084.76 148.10 63,651,925.40 78.20 33,609,591.94
21 MUEBLES Y EQUIPOS DE COCINAS 1,280,397,610
21.01 MESON EN QUARTZTONE BLANCO ML 538.20 429,790 231,313,074 147.20 63,265,114.24 147.20 63,265,114.24 159.20 68,422,596.38 84.60 36,360,249.08
21.02 MUEBLES COCINA ACABADO EN POLIURETANO BLANCO UN 58.00 15,448,547 896,015,726 16.00 247,176,752.00 16.00 247,176,752.00 17.00 262,625,299.00 9.00 139,036,923.00
21.03 CUBIERTA A GAS 5 PUESTOS CHALLENGER UN 58.00 591,131 34,285,589 16.00 9,458,093.46 16.00 9,458,093.46 17.00 10,049,224.30 9.00 5,320,177.57
21.04 HORNO ELECTRICO CHALLENGER UN 58.00 672,749 39,019,465 16.00 10,763,990.37 16.00 10,763,990.37 17.00 11,436,739.77 9.00 6,054,744.58
21.05 CAMPANA EXTRACTORA CHALLENGER UN 58.00 725,488 42,078,277 16.00 11,607,800.68 16.00 11,607,800.68 17.00 12,333,288.22 9.00 6,529,387.88
21.06 LAVADERO PREFABRICADO UN 58.00 324,930 18,845,966 16.00 5,198,887.19 16.00 5,198,887.19 17.00 5,523,817.64 9.00 2,924,374.04
21.07 POCETA LAVAPLATOS EN ACERO INOXIDABLE UN 58.00 78,471 4,551,310 16.00 1,255,533.80 16.00 1,255,533.80 17.00 1,334,004.66 9.00 706,237.76
21.08 GRIFERIA MONOCONTROL PARA LAVAPLATOS UN 58.00 156,987 9,105,230 16.00 2,511,787.54 16.00 2,511,787.54 17.00 2,668,774.27 9.00 1,412,880.49
21.09 LLAVE LAVADORA UN 58.00 29,546 1,713,689 16.00 472,741.88 16.00 472,741.88 17.00 502,288.25 9.00 265,917.31
21.10 LLAVE LAVADERO UN 58.00 22,730 1,318,333 16.00 363,677.96 16.00 363,677.96 17.00 386,407.83 9.00 204,568.85
21.11 CAJILLA LAVADORA UN 58.00 16,330 947,169 16.00 261,287.91 16.00 261,287.91 17.00 277,618.40 9.00 146,974.45
21.12 REJILLAS DE PISO UN 58.00 8,348 484,188 16.00 133,569.16 16.00 133,569.16 17.00 141,917.23 9.00 75,132.65
21.13 CAJILLA REGISTRO DE GAS UN 58.00 12,407 719,594 16.00 198,508.61 16.00 198,508.61 17.00 210,915.40 9.00 111,661.09
22 PINTURA 1,461,972,973
22.01 ESTUCO + VINILO SOBRE PANETE M2 70,790.82 14,042 994,051,724 25,885.87 363,491,919.88 25,885.87 363,491,919.88 12,467.00 175,062,863.85 6,552.08 92,005,020.39
22.02 VINILO SOBRE CIELORASOS M2 19,219.24 22,936 440,805,125 6,269.41 143,792,870.00 6,269.41 143,792,870.00 4,375.47 100,354,144.18 2,304.94 52,865,240.93
22.03 ESTUCO Y VINILO SOBRE PLACA ESCALERAS M2 360.90 15,690 5,662,580 91.20 1,430,942.92 91.20 1,430,942.92 119.00 1,867,129.47 59.50 933,564.74
22.04 ESTUCO Y VINILO GUALDERAS ESCALERAS ML 420.00 10,870 4,565,367 120.00 1,304,390.44 120.00 1,304,390.44 120.00 1,304,390.44 60.00 652,195.22
22.05 ESTUCO Y VINILO CONTRAHUELLAS ESCALERAS ESCALERAS ML 770.00 9,406 7,242,920 220.00 2,069,405.80 220.00 2,069,405.80 220.00 2,069,405.80 110.00 1,034,702.90
22.06 LINEA DEMARCACIÓN ML 640.50 9,681 6,200,682 210.00 2,033,010.47 210.00 2,033,010.47 143.50 1,389,223.82 77.00 745,437.17
22.07 DEMARCACION PARQUEADEROS NUMEROS UN 183.00 12,338 2,257,832 60.00 740,272.66 60.00 740,272.66 41.00 505,852.98 22.00 271,433.31
22.08 PINTURA COLUMNAS PARQUEADEROS UN 90.00 13,186 1,186,744 30.00 395,581.25 30.00 395,581.25 20.00 263,720.83 10.00 131,860.42
23 CERRADURAS 61,934,477
23.01 CERRADURA PRINCIPAL UN 90.00 222,081 19,987,328 16.00 3,553,302.79 16.00 3,553,302.79 38.00 8,439,094.13 20.00 4,441,628.49
23.02 CERRADURAS ALCOBAS UN 256.00 76,185 19,503,236 76.00 5,790,023.31 76.00 5,790,023.31 68.00 5,180,547.17 36.00 2,742,642.62
23.03 CERRADURAS BAÑOS UN 304.00 70,683 21,487,780 84.00 5,937,412.85 84.00 5,937,412.85 89.00 6,290,830.28 47.00 3,322,123.86
23.04 TOPE PUERTAS UN 90.00 10,624 956,133 16.00 169,979.20 16.00 169,979.20 38.00 403,700.60 20.00 212,474.00
24 ILUMINACIÓN 166,523,015
24.01 BALAS HALOGENAS APARTAMENTOS UN 5,764.00 24,179 139,369,825 1,880.00 45,457,194.67 1,880.00 45,457,194.67 1,312.00 31,723,318.83 692.00 16,732,116.34
24.02 BALAS HALOGENAS ZONAS COMUNES UN 1,155.00 23,509 27,153,190 420.00 9,873,887.42 420.00 9,873,887.42 210.00 4,936,943.71 105.00 2,468,471.86
25 EQUIPOS ESPECIALES 2,855,116,508
25.01 ASCENSOR PASAJEROS UN 7.00 120,000,000 840,000,000 2.00 240,000,000.00 2.00 240,000,000.00 2.00 240,000,000.00 1.00 120,000,000.00
25.02 ASCENSOR DE SERVICIOS UN 4.00 100,000,000 400,000,000 2.00 200,000,000.00 2.00 200,000,000.00 - -
25.03 DUCTO BASURAS EN FIBRA DE VIDRIO ML 66.70 226,190 15,086,905 17.40 3,935,714.29 17.40 3,935,714.29 17.40 3,935,714.29 14.50 3,279,761.90
25.04 CALDERA UN 4.00 60,000,000 240,000,000 1.00 60,000,000.00 1.00 60,000,000.00 1.00 60,000,000.00 1.00 60,000,000.00
25.05 PLANTA ELECTRICA DE SUPLENCIA UN 1.00 80,000,000 79,771,429 0.29 22,857,142.86 0.29 22,857,142.86 0.29 22,857,142.86 0.14 11,200,000.00
25.06 SISTEMA DE CCTV M2 36,578.81 35,000 1,280,258,175 10,784.97 377,473,845.00 10,784.97 377,473,845.00 10,416.94 364,592,900.00 4,591.93 160,717,585.00
26 ASEO Y SEÑALIZACIÓN 184,937,346
26.01 NOMENCLATURA CONJUNTO UN 1.00 750,000 750,000 0.29 214,285.71 0.29 214,285.71 0.29 214,285.71 0.14 107,142.86
26.02 NOMENCLATURA EDIFICIO UN 7.00 365,400 2,557,800 2.00 730,800.00 2.00 730,800.00 2.00 730,800.00 1.00 365,400.00
26.03 NOMENCLATURA APARTAMENTOS UN 58.00 69,136 4,009,888 16.00 1,106,176.00 16.00 1,106,176.00 17.00 1,175,312.00 9.00 622,224.00
26.04 NOMENCLATURA ZONAS COMUNES UN 64.00 31,900 2,041,600 19.00 606,100.00 19.00 606,100.00 15.00 478,500.00 11.00 350,900.00
26.05 ASEO APARTAMENTO PARA ENTREGAS M2 36,578.81 4,800 175,578,058 10,784.97 51,767,780.73 10,784.97 51,767,780.73 10,416.94 50,001,253.20 4,591.93 22,041,242.88
PRABYC INGENIEROS S.A.S.
Fecha 15-Jan-14

LISTADO DE PRECIOS BASICOS

1 Arena peña M3 SIN 38,587.50


2 Gravilla de rio M3 SIN 81,382.88
3 Arena Lavada de rio M3 SIN 81,382.88
4 Arena lavada pozo M3 SIN 54,316.50
5 Arena semilavada M3 SIN 64,750.00
Arena lavada de peña M3 SIN 38,482.50
Piedra Media Zonga M3 SIN 44,100.00
Recebo Comun M3 SIN 44,100.00 25000.00
Recebo B-200 M3 SIN 44,100.00
Recebo B-400 M3 SIN 48,510.00
Tierra negra M3 SIN 28,333.33
Volqueta VJ SIN 140,000.00
Concreto 1500 p.s.i M3 CON 272,269.67
Concreto 2000 p.s.i M3 CON 292,889.97
Concreto 2500 p.s.i M3 CON 315,072.26
Concreto 3000 p.s.i. M3 CON 338,934.18
Concreto 3000 p.s.i. - fina M3 CON 344,216.82
Concreto 4000 p.s.i. M3 CON 352,563.39
Concreto 4000 p.s.i - fina M3 CON 357,846.03
Concreto 3500 p.s.i. M3 CON 366,826.52
Concreto 5000 p.s.i M3 CON 372,320.47
Mortero grouting 210 kg/cm² M3 CON 347,174.08
Cemento Gris KG CON 547.04
Cemento Blanco Kg CON 1,104.99
Acero 37.000 p.s.i. 1/4 " KG CON 1,972.00
Acero 37.000 p.s.i. 3/8" KG CON 1,972.00
Acero 60.000 p.s.i. 1/2 " KG CON 1,972.00
Acero 60.000 p.s.i. 5/8 " KG CON 1,972.00
Acero 60.000 p.s.i. 3/4 " KG CON 1,972.00
Acero 60.000 p.s.i. 7/8 " KG CON 1,972.00
Acero 60.000 p.s.i. 1" KG CON 1,972.00
Alambre Negro No. 18 Kg CON 2,610.00
Malla gallinero Hueco 2" 1.6 * M2 CON 2,479.17
Grafil 4mm KG CON 2,784.00
Malla Electrosoldada Kg CON 2,900.00
Mortero 1:3 LT CON 345.53
Mortero 1:3 A. pozo Lt CON 358.54
Mortero 1:3 A. lavada de Rio Lt CON 389.99
Mortero 1:4. A.Semilavada LT CON 319.11
Mortero 1:4 LT CON 295.16
Mortero 1:5 A. Lavada de rio LT CON 324.61
Mortero 1:5 LT CON 264.57
Mortero 1:5 A. S/lavada LT CON 303.00
Mortero 1:6 LT CON 304.74
Mortero 1:5 Cemento blanco LT CON 507.01
Distanciadores verticales UN CON 336.40
Distanciadores horizontales UN CON 464.00
Equipo de concretos M3 40,400.00
Formaleta M2 CON 5,200.00
Jornal basico JOR 41,123.74
Polietileno negro KG CON 3,335.00
Sikafloor 3 Quartz top Kg CON 1,008.04
Separol KG CON 11,741.75
Epoxico G5 Cartucho CON 55,419.00
Antisol Kg CON 3,608.76
Sikaflex 3WF Cartucho CON 60,354.80
Piedra muñeca M2 CON 100,100.00 91000.00
Bloque No. 4 Un SIN 1,310.00
Ladrillo gran formato Un SIN 1,100.00
Tela pàra cerramiento ML Con 2,204.00
Igol denso KG Con 12,695.74
Puntilla 2" Lb CON 1,600.80
Yeso BT 16,756.20 23000.00
Caolin BT 7,018.00
Sika 1 Kg CON 6,519.43
Sika 101 Kg CON 3,323.63
Sika flex 1a Cartucho CON 22,244.16
Cativo ML 14,288.00
Lamina de zinc .70 UN CON 13,500.00
Pegacor constructor kg CON 1,047.50
Boquilla concolor kg CON 1,860.00
Porcelanato blanco mate 30x60 M2 CON 45,589.16
Piso-pared Egeo M2 CON 17,300.00
Pared macedonia blanco 25x43 M2 CON 22,500.00
Porcelanato gris 40x40 M2 CON 34,319.76
Pegacor porcelanato Kg CON 1,672.50
Piso oceano beige 33x33 M2 CON 17,900.00
Grano blanco huila Bulto CON 14,368.00
Masterseal 485 Kg CON 14,616.00
Lamina dry wall UN CON 17,980.00
Lamina dry wall RH UN CON 31,204.00
Angulo perimetral 2,44m UN CON 3,480.00
Viguetas 2,44m UN CON 4,988.00
Omegas 2,44m UN CON 5,800.00
Desagüe integral sin rebose p UN CON 4,384.80
Griflex para sanitario UN CON 1,340.96
Grilex para lavamano UN CON 1,251.56
Silicona transparente TUBO CON 6,799.92
Sifon botella lavamanos UN CON 4,052.66
Desague lavamanos Un CON 18,270.00
Rejilla de piso UN CON 1,970.00
Viniltex Pintuco GLN CON 48,659.91
Koraza Pintuco GLN CON 61,920.00
Acualux Pintuco GLN CON 62,895.00
Esmalte Super sintetico Pintulu GLN CON 62,895.00
Anticorrosivo Pintuco GLN CON 40,368.00
Pintura trafico GLN CON 72,450.00
Thinner Gln CON 12,789.00
Estuco M2 CON 2,605.17

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:3 A. Pozo UNIDAD: LT

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Arena lavada pozo M3 0.00109 5% 54,316.50 62.17
Cemento Gris KG 0.454 5% 547.04 260.77

SUBTOTAL 322.94
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.0007 2,056.19 1.44
0.00
SUBTOTAL 1.44
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0007 41,123.74 28.79
Trasiego Jr 0.50 10.76 5.38

SUBTOTAL 34.16
TOTAL COSTO DIRECTO 358.54

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:5 A Semilavada UNIDAD: LT

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Arena semilavada M3 0.0012 5% 64,750.00 81.59
Cemento Gris KG 0.3020 5% 547.04 173.47

SUBTOTAL 255.05
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.0009 2,056.19 1.85
0.00

SUBTOTAL 1.85
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0009 41,123.74 37.01
Trasiego Jr 1.00 9.09 9.09
SUBTOTAL 46.10
TOTAL COSTO DIRECTO 303.00

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:3 Análisis Básico UNIDAD: LT

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Arena peña M3 0.00109 5% 38,587.50 44.16
Cemento Gris KG 0.454 5% 547.04 260.77

SUBTOTAL 304.94
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.0007 2,056.19 1.44
0.00

SUBTOTAL 1.44
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0007 41,123.74 28.79
Trasiego Jr 1.00 10.37 10.37

SUBTOTAL 39.15
TOTAL COSTO DIRECTO 345.53

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:5 A. lavada de rio UNIDAD: LT

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Arena Lavada de rio M3 0.0012 5% 81,382.88 102.54
Cemento Gris KG 0.3020 5% 547.04 173.47

SUBTOTAL 276.01
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.0009 2,056.19 1.85
0.00

SUBTOTAL 1.85
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0009 41,123.74 37.01
Trasiego Jr 1.00 9.74 9.74

SUBTOTAL 46.75
TOTAL COSTO DIRECTO 324.61

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:6 UNIDAD: LT

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Arena Lavada de rio M3 0.0013 5% 81,382.88 106.82
Cemento Gris KG 0.2610 5% 547.04 149.92
SUBTOTAL 256.73
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.0009 2,056.19 1.85
0.00

SUBTOTAL 1.85
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0009 41,123.74 37.01
Trasiego Jr 1.00 9.14 9.14

SUBTOTAL 46.15
TOTAL COSTO DIRECTO 304.74

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: DESMONTE Y LIMPIEZA UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
0.00
0.00

SUBTOTAL 0.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.1000 2,056.19 205.62
0.00

SUBTOTAL 205.62
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.1000 41,123.74 4,112.37
Trasiego Jr 1.00 133.55 133.55

SUBTOTAL 4,245.92
TOTAL COSTO DIRECTO 4,451.54

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CERRAMIENTO PROVISIONAL EN LAMINA UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Lamina de zinc .70 UN 1.5000 5% 13,500.00 21,262.50
Cativo ML 0.2500 5% 14,288.00 3,750.60
Puntillas - varios GLB 1.00000 5% 774.80 813.54

SUBTOTAL 25,826.64
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.1800 2,056.19 370.11
0.00

SUBTOTAL 370.11
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.1800 41,123.74 7,402.27
Trasiego Jr 1.00 1,039.15 1,039.15

SUBTOTAL 8,441.42
TOTAL COSTO DIRECTO 34,638.17
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: RELLENO EN RECEBO UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Recebo B-200 M3 0.25 5% 44,100.00 11,576.25
0.00
0.00
0.00

SUBTOTAL 11,576.25
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.20 2,056.19 411.24
Rana eléctrica dia 0.35 20,000.00 7,000.00
0.00

SUBTOTAL 7,411.24
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.20 41,123.74 8,224.75
Trasiego Jr 1.00 841.62 841.62

SUBTOTAL 9,066.36
TOTAL COSTO DIRECTO 28,053.85

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: FOSO DE ASCENSOR UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Concreto 3000 p.s.i. M3 1.00 5% 338,934.18 355,880.89
Formaleta M2 6.67 5,200.00 34,684.00
ACPM - varios Glb 1.00 5% 20,654.66 21,687.40
Distanciadores verticales UN 2.50 336.40 841.00

SUBTOTAL 413,093.29
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 3.30 2,056.19 6,785.42
Equipo de concretos M3 1.00 40,400.00 40,400.00
Motobomba Hr 0.25 35,000.00 8,750.00

SUBTOTAL 55,935.42
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 3.30 41,123.74 135,708.34
Trasiego Jr 1.00 18,703.21 18,703.21

SUBTOTAL 154,411.55
TOTAL COSTO DIRECTO 623,440.26

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: VIGAS DE CIMENTACION UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Distanciadores horizontales UN 1.40 464.00 649.60
Concreto 3000 p.s.i. M3 1.00 5% 338,934.18 355,880.89
Puntillas - varios GLB 1.00 5% 11,043.79 11,595.98
0.00

SUBTOTAL 368,126.48
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 2.45 2,056.19 5,037.66
Equipo de concretos M3 1.00 40,400.00 40,400.00

SUBTOTAL 45,437.66
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 2.45 41,123.74 100,753.16
Trasiego Jr 0.35 15,593.25 5,457.64

SUBTOTAL 106,210.80
TOTAL COSTO DIRECTO 519,774.93

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: ACERO DE REFUERZO UNIDAD: KG

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Acero 37.000 p.s.i. 1/4 " KG 0.15 1% 1,972.00 298.76
Acero 37.000 p.s.i. 3/8" KG 0.20 1% 1,972.00 398.34
Acero 60.000 p.s.i. 1/2 " KG 0.08 1% 1,972.00 159.34
Acero 60.000 p.s.i. 5/8 " KG 0.20 1% 1,972.00 398.34
Acero 60.000 p.s.i. 3/4 " KG 0.12 1% 1,972.00 239.01
Acero 60.000 p.s.i. 7/8 " KG 0.10 1% 1,972.00 199.17
Acero 60.000 p.s.i. 1" KG 0.15 1% 1,972.00 298.76
Alambre Negro No. 18 Kg 0.04 1% 2,610.00 105.44

SUBTOTAL 2,097.16
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.000 2,056.19 0.21
0.00

SUBTOTAL 0.21
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.0001 41,123.74 4.11
Trasiego Jr 1.00 64.99 64.99
SUBTOTAL 69.11
TOTAL COSTO DIRECTO 2,166.48

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PLACA DE CONTRAPISO UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Distanciadores horizontales UN 1.50 464.00 696.00
Concreto 3000 p.s.i. M3 0.33 5% 338,934.18 117,440.69
Formaleta de borde ML 0.12 5% 3,400.00 428.40
Puntillas - varias GLB 1.00 5% 1,844.80 1,937.04
Separol KG 0.01 5% 11,741.75 133.15
Polietileno negro KG 1.20 5% 3,335.00 4,202.10
Sikaflex 3WF Cartucho 0.18 5% 60,354.80 11,407.06
0.00
SUBTOTAL 136,244.45
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.90 2,056.19 1,850.57
Equipo de concretos M3 0.33 40,400.00 13,332.00
Equipo de corte hr 0.25 10,000.00 2,500.00
0.00
SUBTOTAL 17,682.57
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.90 41,123.74 37,011.37
Trasiego Jr 1.35 1,350.08 1,822.60
corte Jr 0.15 41,123.74 6,168.56
SUBTOTAL 45,002.53
TOTAL COSTO DIRECTO 198,929.55

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14
ITEM: DESC: ESMALTADO PLACA UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Sikafloor 3 Quartz top Kg 5.00 5% 1,008.04 5,292.21
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 5,292.21
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.25 2,056.19 514.05
Allanadora Hr 0.50 9,000.00 4,500.00

SUBTOTAL 5,014.05
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.25 41,123.74 10,280.94
Trasiego Jr 1.00 636.72 636.72

SUBTOTAL 10,917.65
TOTAL COSTO DIRECTO 21,223.91

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: COLUMNETAS EN CONCRETO E= 12CM UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Formaleta de borde ML 2.00 3,400.00 6,800.00
Concreto 3000 p.s.i. M3 0.01 5% 338,934.18 5,124.68
Puntillas - varios GB 1.00 5% 675.48 709.25
Separol KG 0.60 5% 11,741.75 7,397.30
Acero 60.000 p.s.i. 1/2 " KG 1.20 5% 1,972.00 2,484.72
0.00

SUBTOTAL 22,515.96
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.35 2,056.19 719.67
Equipo de concretos M3 0.01 40,400.00 581.76

SUBTOTAL 1,301.43
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.35 41,123.74 14,393.31
Trasiego Jr 1.00 1,181.77 1,181.77

SUBTOTAL 15,575.08
TOTAL COSTO DIRECTO 39,392.47

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: VIGAS DE CONFINAMIENTO E= 12CM UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Formaleta de borde ML 2.00 3,400.00 6,800.00
Concreto 3000 p.s.i. M3 0.01 5% 338,934.18 5,124.68
Separol KG 0.60 5% 11,741.75 7,397.30
Puntillas - varios GLB 1.00 5% 1,144.51 1,201.73
Acero 60.000 p.s.i. 1/2 " KG 1.20 1,972.00 2,366.40
0.00

SUBTOTAL 22,890.12
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.37 2,056.19 760.79
Equipo de concretos M3 0.01 40,400.00 581.76

SUBTOTAL 1,342.55
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.37 41,123.74 15,215.78
Trasiego Jr 1.00 1,220.06 1,220.06

SUBTOTAL 16,435.84
TOTAL COSTO DIRECTO 40,668.51

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: MURO EN BLOQUE No. 4 UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Bloque No. 4 Un 13.00 5% 1,310.00 17,881.50
Mortero 1:4. A.Semilavada LT 10.00 5% 319.11 3,350.63
Grafil 4mm KG 0.56 5% 2,784.00 1,636.99
Andamios - varios GLB 1.00 5% 708.39 743.81

SUBTOTAL 23,612.93
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.28 2,056.19 575.73
0.00

SUBTOTAL 575.73
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.28 41,123.74 11,514.65
Trasiego Jr 1.00 1,104.23 1,104.23

SUBTOTAL 12,618.87
TOTAL COSTO DIRECTO 36,807.53
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PAÑETE LISO INTERIOR UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 LT 18.00 5% 345.53 6,530.50
Andamios - varios Gb 1.00 5% 272.67 286.31
0.00
0.00
0.00

SUBTOTAL 6,816.81
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.17 2,056.19 349.55
0.00
0.00

SUBTOTAL 349.55
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.17 41,123.74 6,991.04
Trasiego Jr 1.00 437.86 437.86

SUBTOTAL 7,428.89
TOTAL COSTO DIRECTO 14,595.25

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: PAÑETE BAJO PLACA ESCALERAS UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 LT 18.00 5% 345.53 6,530.50
Andamios - varios Gb 1.00 5% 344.62 361.85
0.00
0.00

SUBTOTAL 6,892.35
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.26 2,056.19 534.61
0.00

SUBTOTAL 534.61
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.26 41,123.74 10,692.17
Trasiego Jr 1.00 560.39 560.39

SUBTOTAL 11,252.56
TOTAL COSTO DIRECTO 18,679.52

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PAÑETE BAJO PLACA ESCALERAS - GUAL UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 LT 7.00 5% 345.53 2,539.64
Andamios - varios Gb 1.00 5% 134.02 140.72
0.00
0.00

SUBTOTAL 2,680.36
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.15 2,056.19 316.65
0.00

SUBTOTAL 316.65
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.15 41,123.74 6,333.06
Trasiego Jr 1.00 288.56 288.56

SUBTOTAL 6,621.61
TOTAL COSTO DIRECTO 9,618.63

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: FILOS Y DILATACIONES UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 LT 5.00 5% 345.53 1,814.03
Andamios - varios Gb 1.00 5% 95.73 100.51
0.00
0.00

SUBTOTAL 1,914.54
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.06 2,056.19 123.37
0.00

SUBTOTAL 123.37
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.06 41,123.74 2,467.42
Trasiego Jr 1.00 139.34 139.34

SUBTOTAL 2,606.76
TOTAL COSTO DIRECTO 4,644.68

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

MORTERO IMPERMEABILIZADO BAÑOS -


ITEM: DESC: UNIDAD: M2
ROPAS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 A. pozo Lt 25.00 5% 358.54 9,411.76
Sika 1 Kg 1.00 5% 6,519.43 6,845.40
Llana - varios Gb 1.00 5% 503.58 528.76
0.00

SUBTOTAL 16,785.92
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.17 2,056.19 349.55
0.00

SUBTOTAL 349.55
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.17 41,123.74 6,991.04
Trasiego Jr 1.00 746.18 746.18

SUBTOTAL 7,737.22
TOTAL COSTO DIRECTO 24,872.69

OBRA: 0 PRABYC INGENIEROS S.A.S.


ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: MORTERO AFINADO ESCALERAS UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Mortero 1:3 A. pozo Lt 14.00 5% 358.54 5,270.59
Llana - varios Gb 1.00 5% 163.26 171.42
0.00
0.00

SUBTOTAL 5,442.01
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.09 2,056.19 185.06
0.00

SUBTOTAL 185.06
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.09 41,123.74 3,701.14
Trasiego Jr 1.00 288.50 288.50

SUBTOTAL 3,989.64
TOTAL COSTO DIRECTO 9,616.70

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: ANCLAJES MAMPOSTERIA UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Acero 37.000 p.s.i. 3/8" KG 1.34 5% 1,972.00 2,782.89
Epoxico G5 Cartucho 0.02 5% 55,419.00 1,163.80
0.00
0.00

SUBTOTAL 3,946.69
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.15 2,056.19 308.43
Taladro hr 0.20 15,000.00 3,000.00

SUBTOTAL 3,308.43
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.15 41,123.74 6,168.56
Trasiego Jr 1.00 415.17 415.17

SUBTOTAL 6,583.73
TOTAL COSTO DIRECTO 13,838.84

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ENCHAPE BAÑOS ALCOBAS CERAMICA
ITEM: DESC: UNIDAD: M2
BLANCA MATE 30X60

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Pared macedonia blanco 25x43 M2 1.00 5% 22,500.00 23,625.00
Pegacor constructor kg 6.00 5% 1,047.50 6,599.25
Boquilla concolor kg 0.20 5% 1,860.00 390.60
Llana - varios Gb 1.00 5% 948.32 995.73

SUBTOTAL 31,610.58
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.39 2,056.19 791.63
0.00

SUBTOTAL 791.63
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.39 41,123.74 15,832.64
Trasiego Jr 1.00 1,491.80 1,491.80

SUBTOTAL 17,324.44
TOTAL COSTO DIRECTO 49,726.65

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ENCHAPE ROPAS Y BAÑO SERVICIO
ITEM: DESC: UNIDAD: M2
CERAMICA BLANCA MATE 40X40

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Piso-pared Egeo M2 0.70 5% 17,300.00 12,715.50
Pegacor constructor kg 4.20 5% 1,047.50 4,619.48
Boquilla concolor kg 0.20 5% 1,860.00 390.60
Llana - varios Gb 1.00 5% 549.06 576.52
0.00

SUBTOTAL 18,302.09
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.39 2,056.19 791.63
0.00

SUBTOTAL 791.63
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.39 41,123.74 15,832.64
Trasiego Jr 1.00 1,080.20 1,080.20
SUBTOTAL 16,912.84
TOTAL COSTO DIRECTO 36,006.56

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
MARMOL CREMA MARFIL JUNTA PERDIDA
ITEM: DESC: UNIDAD: M2
ANTIKADO

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Enchape crema marfil 60JP M2 1.00 5% 140,873.04 147,916.69
0.00
0.00
0.00

SUBTOTAL 147,916.69
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.00 2,056.19 0.00
0.00

SUBTOTAL 0.00
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 41,123.74 0.00
Trasiego Jr 1.00 4,574.74 4,574.74

SUBTOTAL 4,574.74
TOTAL COSTO DIRECTO 152,491.44

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14
GUARDAESCOBA MARMOL CREMA
ITEM: DESC: UNIDAD: ML
MARFIL

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Guardaescoba crema marfil ML 1.00 5% 43,784.74 45,973.97
0.00
0.00
0.00

SUBTOTAL 45,973.97
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.00 2,056.19 0.00
0.00

SUBTOTAL 0.00
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 41,123.74 0.00
Trasiego Jr 1.00 1,421.88 1,421.88

SUBTOTAL 1,421.88
TOTAL COSTO DIRECTO 47,395.85

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
PASOS ESCALERAS MARMOL CREMA
ITEM: DESC: UNIDAD: ML
MARFIL

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Enchape pasos escaleras marmol crema ML 1.00 5% 94,444.31 99,166.53
marfil nariz toriada 0.00
0.00
0.00

SUBTOTAL 99,166.53
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.00 2,056.19 0.00
0.00

SUBTOTAL 0.00
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 41,123.74 0.00
Trasiego Jr 1.00 3,067.01 3,067.01

SUBTOTAL 3,067.01
TOTAL COSTO DIRECTO 102,233.53

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
IMPERMEABILIZACIÓN CUBIERTA MANTO
ITEM: DESC: UNIDAD: M2
TIPO 1

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Manto Real At V30C 3 mm NO REQUIERE M2 1.00 5% 24,063.78 25,266.97
PINTURA DE ALUMINIO VIENE CON FOIL DE ALUMINIO 5% 0.00
5% 0.00
5% 0.00

SUBTOTAL 25,266.97
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.02 2,056.19 41.12
0.00

SUBTOTAL 41.12
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.02 41,123.74 822.47
Trasiego Jr 1.00 808.16 808.16

SUBTOTAL 1,630.64
TOTAL COSTO DIRECTO 26,938.73

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CIELORASO RH BAÑOS UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Lamina dry wall RH UN 0.35 5% 31,204.00 11,467.47
Angulo perimetral 2,44m UN 0.84 5% 3,480.00 3,069.36
Viguetas 2,44m UN 0.51 5% 4,988.00 2,671.07
Omegas 2,44m UN 0.70 5% 5,800.00 4,263.00
Masilla - cinta - varios GLB 1.00 5% 931.77 978.36
Tiros - clavos - tornillos GLB 1.00 5% 3,412.84 3,583.48
Pintura GLB 1.00 5% 2,100.00 2,205.00

SUBTOTAL 28,237.74
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.30 2,056.19 616.86
0.00

SUBTOTAL 616.86
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.30 41,123.74 12,337.12
Trasiego Jr 1.00 1,273.97 1,273.97

SUBTOTAL 13,611.09
TOTAL COSTO DIRECTO 42,465.69

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PUERTA SUBESTACIÓN ELECTRICA UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Puerta dobles para subestación cortafuego de 0.00
2,40 x 1,20, acabado en pintura electrostatica UN 1.00 1,300,000.00 1,300,000.00
Barra antipanico y cortafuego empaque 0.00
intumicenta de acuerdo a Norma RETIE UN 1.00 1,183,900.00 1,183,900.00

SUBTOTAL 2,483,900.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 1.00 2,056.19 2,056.19
0.00

SUBTOTAL 2,056.19
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 1.00 41,123.74 41,123.74
Trasiego Jr 1.00 78,157.11 78,157.11

SUBTOTAL 119,280.85
TOTAL COSTO DIRECTO 2,605,237.04

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PUERTAS CUARTOS DE BASURA UNIDAD: UN
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Puerta metalica 2,40 x 2,00 UN 1.00 750,000.00 750,000.00
Pintura UN 1.00 95,000.00 95,000.00
Cerradura Schlage UN 1.00 38,628.00 38,628.00
0.00

SUBTOTAL 883,628.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 1.00 2,056.19 2,056.19
0.00

SUBTOTAL 2,056.19
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 1.00 41,123.74 41,123.74
Trasiego Jr 1.00 28,664.16 28,664.16

SUBTOTAL 69,787.90
TOTAL COSTO DIRECTO 955,472.09

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: REJILLAS DE MEDIDORES UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Rejillas para medidores UN 1.00 1,250,000.00 1,250,000.00
Pintura UN 1.00 150,000.00 150,000.00
0.00
0.00
SUBTOTAL 1,400,000.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 1.00 2,056.19 2,056.19
0.00

SUBTOTAL 2,056.19
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 1.00 41,123.74 41,123.74
Trasiego Jr 1.00 44,634.43 44,634.43

SUBTOTAL 85,758.17
TOTAL COSTO DIRECTO 1,487,814.36

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Lavamanos spazia UNIDAD 1.00 115,900.00 115,900.00
Desagüe integral sin rebose para lavamanos UN 1.00 4,384.80 4,384.80
Grilex para lavamano UN 1.00 1,251.56 1,251.56
Cemento Blanco Kg 1.50 5% 1,104.99 1,740.35

SUBTOTAL 123,276.71
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.50 2,056.19 1,028.09
0.00

SUBTOTAL 1,028.09
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.50 41,123.74 20,561.87
Trasiego Jr 1.00 4,480.41 4,480.41

SUBTOTAL 25,042.28
TOTAL COSTO DIRECTO 149,347.09

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: JUEGO INCRUSTACIONES METALICAS UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Juego de incrustaciones spazio JGO 1.00 144,900.00 144,900.00
Cemento Blanco Kg 1.50 5% 1,104.99 1,740.35
Silicona transparente TUBO 0.10 5% 6,799.92 713.99
0.00

SUBTOTAL 147,354.35
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.35 2,056.19 719.67
0.00

SUBTOTAL 719.67
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.35 41,123.74 14,393.31
Trasiego Jr 1.00 5,024.76 5,024.76

SUBTOTAL 19,418.07
TOTAL COSTO DIRECTO 167,492.08

OBRA: 0 PRABYC INGENIEROS S.A.S.


ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: GRIFERIA DUCHA MONOCONTROL UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Conjunto duchas piscis UN 1.00 59,900.00 59,900.00
Silicona transparente TUBO 0.15 5% 6,799.92 1,070.99
0.00
0.00

SUBTOTAL 60,970.99
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.25 2,056.19 514.05
0.00

SUBTOTAL 514.05
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.25 41,123.74 10,280.94
Trasiego Jr 1.00 2,219.57 2,219.57

SUBTOTAL 12,500.50
TOTAL COSTO DIRECTO 73,985.54

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: REJILLAS DE PISO UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Rejilla de piso UN 1.00 1,970.00 1,970.00
Cemento Blanco Kg 0.20 5% 1,104.99 232.05
Silicona transparente TUBO 0.10 5% 6,799.92 713.99
5% 0.00

SUBTOTAL 2,916.04
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.12 2,056.19 246.74
0.00

SUBTOTAL 246.74
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.12 41,123.74 4,934.85
Trasiego Jr 1.00 250.44 250.44

SUBTOTAL 5,185.29
TOTAL COSTO DIRECTO 8,348.07

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
MESON EN QUARTZTONE BLANCO CON
ITEM: DESC: UNIDAD: ML
LAVAMANOS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Meson quarztone blanco ML 1.00 5% 397,044.26 416,896.47
0.00
0.00
0.00

SUBTOTAL 416,896.47
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.00 2,056.19 0.00
0.00

SUBTOTAL 0.00
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 41,123.74 0.00
Trasiego Jr 1.00 12,893.71 12,893.71

SUBTOTAL 12,893.71
TOTAL COSTO DIRECTO 429,790.18

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: LAVADERO PREFABRICADO UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Lavadero prefabricado UN 1.00 191,400.00 191,400.00
Desague lavamanos Un 1.00 18,270.00 18,270.00
soporte lavadero un 1.00 85,000.00 85,000.00
Cemento Blanco Kg 2.50 5% 1,104.99 2,900.59
Silicona transparente TUBO 0.35 5% 6,799.92 2,498.97

SUBTOTAL 300,069.56
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.35 2,056.19 719.67
0.00

SUBTOTAL 719.67
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.35 41,123.74 14,393.31
Trasiego Jr 1.00 9,747.91 9,747.91
SUBTOTAL 24,141.22
TOTAL COSTO DIRECTO 324,930.45

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: LLAVE LAVADORA UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Llave cromada para lavadora UN 1.00 21,112.00 21,112.00
Silicona transparente TUBO 0.15 5% 6,799.92 1,070.99
0.00
0.00

SUBTOTAL 22,182.99
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.15 2,056.19 308.43
0.00

SUBTOTAL 308.43
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.15 41,123.74 6,168.56
Trasiego Jr 1.00 886.39 886.39

SUBTOTAL 7,054.95
TOTAL COSTO DIRECTO 29,546.37

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
CUBIERTA A GAS 5 PUESTOS
ITEM: DESC: UNIDAD: UN
CHALLENGER

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Cocina a gas 4 puestos a gas challenger UN 1.00 523,740.00 523,740.00
0.00
0.00
0.00

SUBTOTAL 523,740.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 1.15 2,056.19 2,364.62
0.00

SUBTOTAL 2,364.62
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 1.15 41,123.74 47,292.30
Trasiego Jr 1.00 17,733.93 17,733.93

SUBTOTAL 65,026.23
TOTAL COSTO DIRECTO 591,130.84

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
POCETA LAVAPLATOS EN ACERO
ITEM: DESC: UNIDAD: UN
INOXIDABLE

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Poceta lavaplatos en acero UN 1.00 68,568.76 68,568.76
Silicona transparente TUBO 0.15 5% 6,799.92 1,070.99
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 69,639.75
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.15 2,056.19 308.43
0.00
0.00

SUBTOTAL 308.43
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.15 41,123.74 6,168.56
Trasiego Jr 1.00 2,354.13 2,354.13
0.00
SUBTOTAL 8,522.69
TOTAL COSTO DIRECTO 78,470.86

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CAJILLA LAVADORA UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Cajilla lavadora UN 1.00 6,704.80 6,704.80
Silicona transparente TUBO 0.07 5% 6,799.92 499.79
0.00
0.00

SUBTOTAL 7,204.59
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.20 2,056.19 411.24
0.00
SUBTOTAL 411.24
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.20 41,123.74 8,224.75
Trasiego Jr 1.00 489.91 489.91

SUBTOTAL 8,714.66
TOTAL COSTO DIRECTO 16,330.49

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: ESTUCO + VINILO SOBRE PANETE UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Estuco M2 1.00 5% 2,605.17 2,735.43
Viniltex Pintuco GLN 0.03 5% 48,659.91 1,532.79
Lija - brocha - varios Gb 1.00 5% 476.90 500.74
0.00

SUBTOTAL 4,768.95
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.21 2,056.19 421.52
0.00

SUBTOTAL 421.52
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.21 41,123.74 8,430.37
Trasiego Jr 1.00 421.26 421.26

SUBTOTAL 8,851.63
TOTAL COSTO DIRECTO 14,042.10
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: VINILO SOBRE CIELORASOS UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Estuco M2 1.00 5% 2,605.17 2,735.43
Koraza Pintuco GLN 0.15 5% 61,920.00 9,752.40
andamios - varios GLB 1.00 5% 658.99 691.94
0.00

SUBTOTAL 13,179.76
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.21 2,056.19 431.80
0.00

SUBTOTAL 431.80
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.21 41,123.74 8,635.99
Trasiego Jr 1.00 688.07 688.07

SUBTOTAL 9,324.05
TOTAL COSTO DIRECTO 22,935.62

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ESTUCO Y VINILO CONTRAHUELLAS
ITEM: DESC: UNIDAD: ML
ESCALERAS ESCALERAS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Estuco M2 0.70 8% 2,605.17 1,969.51
Viniltex Pintuco GLN 0.01 5% 48,659.91 510.93
Lija - brocha - varios Gb 1.00 5% 158.83 166.77
0.00

SUBTOTAL 2,647.21
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.15 2,056.19 308.43
0.00

SUBTOTAL 308.43
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.15 41,123.74 6,168.56
Trasiego Jr 1.00 282.19 282.19

SUBTOTAL 6,450.75
TOTAL COSTO DIRECTO 9,406.39

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: LINEA DEMARCACIÓN UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Pintura trafico GLN 0.08 5% 72,450.00 6,085.80
Thiner - brocha Gb 1.00 5% 679.98 713.98
0.00
0.00
SUBTOTAL 6,799.78
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.06 2,056.19 123.37
0.00

SUBTOTAL 123.37
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.06 41,123.74 2,467.42
Trasiego Jr 1.00 290.43 290.43

SUBTOTAL 2,757.85
TOTAL COSTO DIRECTO 9,681.00

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PINTURA COLUMNAS PARQUEADEROS UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Pintura trafico GLN 0.12 5% 72,450.00 9,128.70
Thiner - brocha Gb 1.00 5% 1,019.97 1,070.96
0.00
0.00

SUBTOTAL 10,199.66
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.06 2,056.19 123.37
0.00

SUBTOTAL 123.37
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.06 41,123.74 2,467.42
Trasiego Jr 1.00 395.58 395.58

SUBTOTAL 2,863.01
TOTAL COSTO DIRECTO 13,186.04

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: ASEO APARTAMENTO PARA ENTREGAS UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Materiales M2 1.00 5% 1,350.00 1,417.50
0.00
0.00
0.00

SUBTOTAL 1,417.50
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.08 2,056.19 154.21
0.00

SUBTOTAL 154.21
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.08 41,123.74 3,084.28
Trasiego Jr 1.00 144.00 144.00

SUBTOTAL 3,228.28
TOTAL COSTO DIRECTO 4,799.99
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CERRADURAS BAÑOS UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Cerradura Schlage acent cromado mate baño UN 1.00 57,768.00 57,768.00
0.00
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 57,768.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.25 2,056.19 514.05
0.00

SUBTOTAL 514.05
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.25 41,123.74 10,280.94
Trasiego Jr 1.00 2,120.50 2,120.50

SUBTOTAL 12,401.44
TOTAL COSTO DIRECTO 70,683.49

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: BALAS HALOGENAS APARTAMENTOS UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Balas halogenas interiores UN 1.00 10,500.00 10,500.00
0.00
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 10,500.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.30 2,056.19 616.86
0.00

SUBTOTAL 616.86
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.30 41,123.74 12,337.12
Trasiego Jr 1.00 725.38 725.38
0.00
SUBTOTAL 13,062.50
TOTAL COSTO DIRECTO 24,179.36

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Formaleta M2 3.50 5,200.00 18,200.00
Concreto 3500 p.s.i. M3 1.00 5% 366,826.52 385,167.85
Separol KG 1.05 5% 11,741.75 12,945.28
Distanciadores verticales UN 1.50 336.40 504.60
puntillas - varios Gb 1.00 5% 12,911.24 13,556.80

SUBTOTAL 430,374.53
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 3.25 2,056.19 6,682.61
Equipo de concretos M3 1.00 40,400.00 40,400.00

SUBTOTAL 47,082.61
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 3.25 41,123.74 133,652.16
Trasiego Jr 1.00 18,900.29 18,900.29

SUBTOTAL 152,552.44
TOTAL COSTO DIRECTO 630,009.58

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Puerta metalica UN 1.00 15,800,000.00 15,800,000.00
Motor UNIDAD 1.00 6,500,000.00 6,500,000.00
0.00
0.00

SUBTOTAL 22,300,000.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.00 2,056.19 0.00
0.00

SUBTOTAL 0.00
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 41,123.74 0.00
Trasiego Jr 1.00 689,690.72 689,690.72

SUBTOTAL 689,690.72
TOTAL COSTO DIRECTO 22,989,690.72

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD: M2

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
#REF! #REF! 13.00 5% #REF! #REF!
Mortero 1:4 LT 18.00 5% 295.16 5,578.50
Sika 1 Kg 0.75 5% 6,519.43 5,134.05
0.00

SUBTOTAL #REF!
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.13 2,056.19 257.02
0.00

SUBTOTAL 257.02
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.13 41,123.74 5,140.47
Trasiego Jr 1.00 Err:522 Err:522

SUBTOTAL Err:522
TOTAL COSTO DIRECTO Err:522

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Meson en granito pulido ML 1.00 5% 174,000.00 182,700.00
0.00
0.00
0.00

SUBTOTAL 182,700.00
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.25 2,056.19 514.05
0.00

SUBTOTAL 514.05
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.25 41,123.74 10,280.94
Trasiego Jr 1.00 5,984.38 5,984.38

SUBTOTAL 16,265.32
TOTAL COSTO DIRECTO 199,479.36

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD: M3

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Formaleta M2 0.50 5% 5,200.00 2,730.00
Concreto 3500 p.s.i. M3 1.00 5% 366,826.52 385,167.85
Formaleta de borde ML 1.20 5% 3,400.00 4,284.00
Separol KG 0.36 5% 11,741.75 4,438.38
puntillas - varios GB 1.00 5% 12,285.60 12,899.88

SUBTOTAL 409,520.11
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 2.50 2,056.19 5,140.47
0.00

SUBTOTAL 5,140.47
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 2.50 41,123.74 102,809.35
Trasiego Jr 1.00 16,004.22 16,004.22

SUBTOTAL 118,813.57
TOTAL COSTO DIRECTO 533,474.16

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD: ML

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
0.00 0.00 7.00 5% 0.00 0.00
0.00 UNIDAD 0.80 5% DESP. #VALUE!
0.00
0.00

SUBTOTAL #VALUE!
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.11 2,056.19 226.18
0.00
SUBTOTAL 226.18
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.11 41,123.74 4,523.61
Trasiego Jr 1.00 Err:522 Err:522

SUBTOTAL Err:522
TOTAL COSTO DIRECTO Err:522

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD: UN

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
Combo sanitario ganamax UN 1.00 389,900.00 389,900.00
Cemento Blanco Kg 2.50 5% 1,104.99 2,900.59
0.00
0.00

SUBTOTAL 392,800.59
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.25 2,056.19 514.05
0.00

SUBTOTAL 514.05
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.25 41,123.74 10,280.94
Trasiego Jr 1.00 12,482.34 12,482.34

SUBTOTAL 22,763.27
TOTAL COSTO DIRECTO 416,077.91
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
Fundida de escalones para escalera metalica
ITEM: 10.01.06 DESC: UNIDAD: ML
de penthouse

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO VR. TOTAL
0.00 0.00 0.04 5% 0.00 0.00
0.00 0.00 1.00 5% 0.00 0.00
Formaleta de borde ML 1.20 5% 3,400.00 4,284.00
Puntillas - varios GLB 1.00 5% Err:522 Err:522

SUBTOTAL Err:522
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Herramienta Menor 0.40 2,056.19 822.47
0.00

SUBTOTAL 822.47
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL
Mano de Obra Jr 0.40 41,123.74 16,449.50
Trasiego Jr 1.00 Err:522 Err:522

SUBTOTAL Err:522
TOTAL COSTO DIRECTO Err:522
212000
478000
478000
378000
370000
260000
230000
200000
200000
270000 160000 VJ 6
170000
23333.333333

NUESTRO CARTAGENA
203,278.40 252,810.40 228,044.40 242404.96

-
223,840.56 290,377.00 257,108.78

18199.936 400398.592
400400
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:3 A. Rio UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Arena Lavada de rio M3 0.00109 5% 81,382.88
Cemento Gris KG 0.454 5% 547.04

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0007 2,056.19
SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0007 41,123.74
Trasiego Jr 0.50 11.70

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:4. A.Semilavada UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Arena semilavada M3 0.00116 5% 64,750.00
Cemento Gris KG 0.364 5% 547.04

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0005 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0005 41,123.74
Trasiego Jr 1.00 9.57
SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:4 Análisis Básico UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Arena peña M3 0.00116 5% 38,587.50
Cemento Gris 547.04 0.3640 5% 547.04

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0007 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0007 41,123.74
Trasiego Jr 1.00 8.85

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:5 Análisis Básico UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Arena peña M3 0.0012 5% 38,587.50
Cemento Gris KG 0.3020 5% 547.04

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0008 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0008 41,123.74
Trasiego Jr 1.00 7.94

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO 1:5 - Cemento blanco UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Arena Lavada de rio M3 0.0012 5% 81,382.88
Cemento Blanco Kg 0.3020 5% 1,104.99
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0009 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0009 41,123.74
Trasiego Jr 1.00 15.21

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: LOCALIZACION Y REPLANTEO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0600 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0600 41,123.74
Trasiego Jr 1.00 80.13

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: EXCAVACIÓN MECANICA CON RETIRO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.0600 2,056.19
Volqueta VJ 0.17 140,000.00
Retroexcavadora M3 1.00 25,000.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.0600 41,123.74
Trasiego Jr 1.00 1,589.41

SUBTOTAL
TOTAL COSTO DIRECTO
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: EXCAVACION MANUAL CON RETIRO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
5%
5%
5%

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.25 2,056.19
Motobomba Hr 0.25 35,000.00
Volqueta VJ 0.17 140,000.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.25 41,123.74
Trasiego Jr 1.00 1,340.57

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: TANQUE DE AGUA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Concreto 3000 p.s.i. M3 1.00 5% 338,934.18
Formaleta M2 8.50 5,200.00
Distanciadores verticales UN 3.50 336.40
ACPM - varios Gl 1.00 5% 21,174.58

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 3.00 2,056.19
Motobomba Hr 0.25 35,000.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 3.00 41,123.74
Trasiego Jr 1.00 17,374.68

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: ZAPATAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Distanciadores horizontales UN 2.10 464.00
Concreto 3000 p.s.i. M3 1.00 5% 338,934.18
Puntillas - varios GB 1.00 5% 18,831.41

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 2.70 2,056.19
Equipo de concretos M3 1.00 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 2.70 41,123.74
Trasiego Jr 1.00 16,503.53

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO GROUTING DE LLENO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero grouting 210 kg/cm² M3 0.00008 5% 347,174.08
Acero 60.000 p.s.i. 1/2 " KG 1.00 1% 1,972.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor 0.300 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.3000 41,123.74
Trasiego Jr 1.00 463.17
SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: LOSAS ALIGERADAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Distanciadores horizontales UN 1.50 464.00
Concreto 3500 p.s.i. M3 0.12 5% 366,826.52
Formaleta de borde ML 0.40 5% 3,400.00
Puntillas - varias GLB 1.00 5% 1,844.80
Separol KG 0.38 5% 11,741.75
Formaleta M2 1.26 5,200.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.00 2,056.19
Equipo de concretos M3 0.12 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.00 41,123.74
Trasiego Jr 1.00 3,387.26

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14
ITEM: DESC: ESCALERAS EN CONCRETO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Formaleta M2 2.00 5,200.00
Concreto 4000 p.s.i. M3 0.20 5% 352,563.39
Distanciadores verticales UN 2.50 336.40
Separol KG 0.60 5% 11,741.75
Puntillas - varios GLB 1.00 5% 2,870.73

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.15 2,056.19
Equipo de concretos M3 0.20 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.15 41,123.74
Trasiego Jr 1.00 4,745.19

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: COLUMNAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Formaleta M2 5.00 5,200.00
Formaleta borde ML 17.00 3,400.00
Concreto 3500 p.s.i. M3 1.00 5% 366,826.52
Separol KG 3.03 5% 11,741.75
Puntillas - varios GLB 1.00 5% 15,683.77
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 4.30 2,056.19
Equipo de concretos M3 1.00 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 4.30 41,123.74
Trasiego Jr 1.00 23,160.80

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: POYOS COCINAS Y BAÑOS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Bloque No. 4 Un 10.00 5% 1,310.00
Mortero 1:4. A.Semilavada LT 26.00 5% 319.11
Andamios - varios GLB 1.00 5% 695.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.37 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.37 41,123.74
Trasiego Jr 1.00 1,211.56

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
MURO EN LADRILLO TOLETE GRAN
ITEM: DESC: UNIDAD:
FORMATO A LA VISTA

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Ladrillo gran formato Un 41.00 5% 1,100.00
Mortero 1:4. A.Semilavada LT 21.00 5% 319.11
Grafil 4mm KG 0.56 5% 2,784.00
Andamios - Varios GLB 1.00 5% 1,735.52

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.33 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.33 41,123.74
Trasiego Jr 1.00 2,229.90

SUBTOTAL
TOTAL COSTO DIRECTO
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MALLA ELECTROSOLDADA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Malla Electrosoldada Kg 1.00 1% 2,900.00
Alambre Negro No. 18 Kg 0.10 1% 2,610.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.00 41,123.74
Trasiego Jr 1.00 98.87

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
PAÑETE LISO IMPERMEABILIZADO BAÑOS -
ITEM: DESC: UNIDAD:
ROPAS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 LT 15.00 5% 345.53
Sika 1 Kg 2.00 5% 6,519.43
Andamios - varios Glb 1.00 5% 592.66

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.19 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.19 41,123.74
Trasiego Jr 1.00 864.72

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PAÑETE FOSO ASCENSOR UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 LT 15.00 5% 345.53

andamios - varios Gb 1.00 5% 168.57

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.15 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.15 41,123.74
Trasiego Jr 1.00 374.11

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: MORTERO AFINADO PLACA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 LT 20.00 5% 345.53

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.17 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.17 41,123.74
Trasiego Jr 1.00 451.44

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: MORTERO IMPERMEABILIZADO TERRAZAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 A. pozo Lt 25.00 5% 358.54
Sika 1 Kg 1.25 5% 6,519.43
Llana - varios Gb 1.00 5% 556.59

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.17 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.17 41,123.74
Trasiego Jr 1.00 800.83

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.


ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
MORTERO AFINADO DESCANSOS
ITEM: DESC: UNIDAD:
ESCALERAS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 A. pozo Lt 20.00 5% 358.54
Llana - varios Gb 1.00 5% 233.23

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.17 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.17 41,123.74
Trasiego Jr 1.00 467.47

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ENCHAPE COCINA PORCELANATO BLANCO
ITEM: DESC: UNIDAD:
MATE 30X60

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Porcelanato blanco mate 30x60 M2 1.00 5% 45,589.16
Pegacor porcelanato Kg 5.00 5% 1,672.50
Boquilla concolor kg 0.30 5% 1,860.00
Llana - varios Gb 1.00 5% 1,772.90

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.45 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.45 41,123.74
Trasiego Jr 1.00 2,428.69

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ENCHAPE BAÑOS PPALES MARMOL CREMA
ITEM: DESC: UNIDAD:
MARFIL JP

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Enchape crema marfil 60JP M2 1.00 5% 137,287.18

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 41,123.74
Trasiego Jr 1.00 4,458.30

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: MARMOL CREMA MARFIL JUNTA PERDIDA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Enchape crema marfil 60JP 0.00 1.00 5% 137,287.18

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 41,123.74
Trasiego Jr 1.00 4,458.30
SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
PORCELANATO GRIS CLARO 40X40 - ROPAS
ITEM: DESC: UNIDAD:
Y SERVICIO

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Porcelanato gris 40x40 M2 1.00 5% 34,319.76
Pegacor porcelanato Kg 5.00 5% 1,672.50
Boquilla concolor kg 0.30 5% 1,860.00
Llana - varios Gb 1.00 5% 1,406.37

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.45 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.45 41,123.74
Trasiego Jr 1.00 2,050.82

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14
GUARDAESCOBA PORCELANATO GRIS
ITEM: DESC: UNIDAD:
CLARO

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 M2 0.15 5% 34,319.76
Pegacor porcelanato Kg 1.25 5% 1,672.50
Llana - varios Glb 1.00 5% 235.43

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.30 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.30 41,123.74
Trasiego Jr 1.00 638.01

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
PAÑETE IMPERMEABILIZADO TANQUE DE
ITEM: DESC: UNIDAD:
AGUA

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Mortero 1:3 A. pozo Lt 0.15 5% 358.54
Sika 1 Kg 1.25 5% 6,519.43
Llana - varios GLB 1.00 5% 266.80

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.19 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.19 41,123.74
Trasiego Jr 1.00 528.79

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: CIELORASO EN DRYWALL UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Lamina dry wall UN 0.35 5% 17,980.00
Angulo perimetral 2,44m UN 0.84 5% 3,480.00
Viguetas 2,44m UN 0.51 5% 4,988.00
Omegas 2,44m UN 0.70 5% 5,800.00
Tiros - clavos - tornillos GLB 1.00 5% 931.77
Pasta - cinta GLB 1.00 5% 3,412.84
Pintura GLB 1.00 5% 2,100.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.30 2,056.19
SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.30 41,123.74
Trasiego Jr 1.00 1,123.67

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: IMPERMEABILIZACIÓN TANQUE DE AGUA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Igol denso KG 1.00 5% 12,695.74
Llana - varios GLB 1.00 5% 412.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.15 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.15 41,123.74
Trasiego Jr 1.00 626.01

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PUERTAS CUARTOS TECNICOS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Puerta metalica 2,40 x 1,50 UN 1.00 700,000.00
Pintura UN 1.00 90,000.00
Cerradura Schlage UN 1.00 38,628.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.00 41,123.74
Trasiego Jr 1.00 26,963.13

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: PUERTAS DEPOSITOS UNIDAD:
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Puerta metalica 0,80 x 2,10 UN 1.00 650,000.00
Pintura UN 1.00 95,000.00
Cerradura Schlage UN 1.00 38,628.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.00 41,123.74
Trasiego Jr 1.00 25,571.38

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: TAPA SHUTS DE BASURAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Tapa shut socoda 45x45 UNIDAD 1.00 139,200.00
5%
5%
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.50 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.50 41,123.74
Trasiego Jr 1.00 4,972.89

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: SANITARIO MONTECARLO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Sanitario Montecarlo UN 1.00 335,813.99
Griflex para sanitario UN 1.00 1,340.96
Cemento Blanco Kg 1.50 5% 1,104.99

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.50 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.50 41,123.74
Trasiego Jr 1.00 11,149.03

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: GRIFERIA LAVAMANOS ALTA VERA UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Griferia lavamanos Vera alta UN 1.00 349,000.00
Sifon botella lavamanos UN 1.00 4,052.66
Desague lavamanos Un 1.00 18,270.00
Silicona transparente TUBO 0.10 5% 6,799.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.70 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.70 41,123.74
Trasiego Jr 1.00 12,441.11

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.


ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: COMBO ACUACER SERVICIO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Ducha cedro cromado UN 1.00 79,900.00
Silicona transparente TUBO 0.15 5% 6,799.92
5%

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.25 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.25 41,123.74
Trasiego Jr 1.00 2,838.12

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: TAPA REGISTROS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Tapa registro 20X20 linea europea Un 1.00 4,750.20
Silicona transparente TUBO 0.20 5% 6,799.92
5%

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.12 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.12 41,123.74
Trasiego Jr 1.00 351.33

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: MESON EN QUARTZTONE BLANCO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Meson quarztone blanco ML 1.00 5% 397,044.26

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 41,123.74
Trasiego Jr 1.00 12,893.71

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: LLAVE LAVADERO UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Llavecromada para lavadero UN 1.00 14,500.00
Silicona transparente TUBO 0.15 5% 6,799.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.15 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.15 41,123.74
Trasiego Jr 1.00 681.90
SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CAMPANA EXTRACTORA CHALLENGER UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Campana horizontal tipo peninsula challenger UNIDAD 1.00 654,066.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.15 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.15 41,123.74
Trasiego Jr 1.00 21,764.63

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: HORNO ELECTRICO CHALLENGER UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Horno a gas con resistencia dorada challenger UN 1.00 602,910.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 1.15 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 1.15 41,123.74
Trasiego Jr 1.00 20,182.48

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
GRIFERIA MONOCONTROL PARA
ITEM: DESC: UNIDAD:
LAVAPLATOS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Grifería para lavaplatos monaco grival UN 1.00 58,257.52
Sifon botella lavamanos UN 1.00 4,052.66
Desague lavamanos UN 1.00 18,270.00
Silicona transparente TUBO 0.15 5% 6,799.92
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.70 2,056.19
Equipo de concretos M3 1.00 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.70 41,123.74
Trasiego Jr 1.00 4,709.60

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: CAJILLA REGISTRO DE GAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Caja para registro corte de gas UN 1.00 2,923.20
Silicona transparente TUBO 0.01 5% 6,799.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.20 2,056.19
Equipo de concretos M3 0.01 40,400.00
SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.20 41,123.74
Trasiego Jr 1.00 372.20

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ESTUCO Y VINILO SOBRE PLACA
ITEM: DESC: UNIDAD:
ESCALERAS

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Estuco M2 1.00 8% 2,605.17
Viniltex Pintuco GLN 0.03 5% 48,659.91
Lija - brocha - varios Gb 1.00 5% 485.63

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.24 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.24 41,123.74
Trasiego Jr 1.00 470.70

SUBTOTAL
TOTAL COSTO DIRECTO
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: ESTUCO Y VINILO GUALDERAS ESCALERAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Estuco M2 0.70 8% 2,605.17
Viniltex Pintuco GLN 0.01 5% 48,659.91
Lija - brocha - varios Gb 1.00 5% 277.14

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.18 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.18 41,123.74
Trasiego Jr 1.00 326.10

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: CERRADURA PRINCIPAL UNIDAD:


1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Cerradura Schlage prestige acent UN 1.00 204,624.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.25 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.25 41,123.74
Trasiego Jr 1.00 6,662.44

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: DEMARCACION PARQUEADEROS NUMEROS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Pintura trafico GLN 0.09 5% 72,450.00
Thiner - varios Gb 1.00 5% 764.97
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.10 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.10 41,123.74
Trasiego Jr 1.00 370.14

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: REJILLA VENTILACION GAS 40X25CM UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Rejilla de ventilación 45 x25 UNIDAD 1.00 12,006.00
Cemento Blanco Kg 1.20 5% 1,104.99
Silicona transparente TUBO 0.20 5% 6,799.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.12 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.12 41,123.74
Trasiego Jr 1.00 612.12

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: CERRADURAS ALCOBAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Cerradura Schlage acent cromado mate alcoba UN 1.00 63,104.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.25 2,056.19
Equipo de concretos M3 0.00 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.25 41,123.74
Trasiego Jr 1.00 2,285.54

SUBTOTAL
TOTAL COSTO DIRECTO
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: TOPE PUERTAS UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Tope puertas tipo cazuela UN 1.00 3,828.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.15 2,056.19
Equipo de concretos M3 0.00 40,400.00

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.15 41,123.74
Trasiego Jr 1.00 318.71

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: BALAS HALOGENAS ZONAS COMUNES UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Balas halogenas UN 1.00 9,850.00
SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.30 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.30 41,123.74
Trasiego Jr 1.00 705.28

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Marco metalico 0,9*2,1 UN 1.00 157,760.00
Pintura marco UN 1.00 5% 70,000.00
5%

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.85 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.85 41,123.74
Trasiego Jr 1.00 8,287.51

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Pintura trafico GLN 0.08 5% 72,450.00
Thiner - brocah - varios Gb 1.00 5% 679.98

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.06 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.06 41,123.74
Trasiego Jr 1.00 290.43

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Lavaplatos en acero inoxidable UNIDAD 1.00 50,000.00
Silicona transparente TUBO 0.25 5% 6,799.92

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.18 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.18 41,123.74
Trasiego Jr 1.00 1,835.30

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS


Fecha 15-Jan-14

ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Materiales M2 1.00 5% 1,200.00
0.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.05 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.05 41,123.74
Trasiego Jr 1.00 105.74

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Concreto 3000 p.s.i. M3 0.04 5% 338,934.18
Formaleta de borde ML 3.00 3,400.00
Separol KG 0.90 5% 11,741.75
Acero 60.000 p.s.i. 1/2 " KG 1.20 5% 1,972.00
Andamios - varios Gb 1.00 5% 1,177.57

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.45 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.45 41,123.74
Trasiego Jr 1.00 1,814.95

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Orinal medio UN 1.00 148,900.00
Cemento Blanco Kg 1.50 5% 1,104.99

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.20 2,056.19
SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.20 41,123.74
Trasiego Jr 1.00 4,926.07

SUBTOTAL
TOTAL COSTO DIRECTO

OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14
ITEM: DESC: Err:509 UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Angulo perimetral 2,44m UN 0.84 5% 3,480.00
Viguetas 2,44m UN 0.51 5% 4,988.00
Omegas 2,44m UN 0.70 5% 5,800.00
Tiros - clavos - tornillos GLB 1.00 5% 887.40
Pasta - cinta GLB 1.00 5% 3,250.32
Pintura GLB 1.00 5% 2,100.00
Lamina superboard M2 1.00 5% 25,000.00

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 0.30 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 0.30 41,123.74
Trasiego Jr 1.00 1,724.44

SUBTOTAL
TOTAL COSTO DIRECTO
OBRA: 0 PRABYC INGENIEROS S.A.S.

ANALISIS DE PRECIOS UNITARIOS

Fecha 15-Jan-14

ITEM: 18.01.01 DESC: Aseo permanente de obra UNIDAD:

1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DESP. VR. UNITARIO
Materiales GLB 1.00 5% 320,000.00
5% #REF!
5%

SUBTOTAL
2. EQUIPOS Y HERRAMIENTAS
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Herramienta Menor Jr 5.00 2,056.19

SUBTOTAL
3. MANO DE OBRA
DESCRIPCION UNIDAD CANTIDAD VR. UNITARIO
Mano de Obra Jr 5.00 41,123.74
Trasiego Jr 1.00 Err:522

SUBTOTAL
TOTAL COSTO DIRECTO
NIEROS S.A.S.

LT

VR. TOTAL
93.14
260.77

353.92

VR. TOTAL
1.44
0.00
1.44

VR. TOTAL
28.79
5.85

34.64
389.99

NIEROS S.A.S.

LT

VR. TOTAL
78.87
209.08

287.94

VR. TOTAL
1.03
0.00

1.03

VR. TOTAL
20.56
9.57
30.14
319.11

NIEROS S.A.S.

LT

VR. TOTAL
47.00
209.08

256.08

VR. TOTAL
1.44
0.00

1.44

VR. TOTAL
28.79
8.85

37.64
295.16

NIEROS S.A.S.
LT

VR. TOTAL
48.62
173.47

222.09

VR. TOTAL
1.64
0.00

1.64

VR. TOTAL
32.90
7.94

40.84
264.57

NIEROS S.A.S.

LT

VR. TOTAL
102.54
350.39
452.93

VR. TOTAL
1.85
0.00

1.85

VR. TOTAL
37.01
15.21

52.22
507.01

NIEROS S.A.S.

M2

VR. TOTAL
0.00
0.00

0.00

VR. TOTAL
123.37
0.00

123.37
VR. TOTAL
2,467.42
80.13

2,547.55
2,670.92

NIEROS S.A.S.

M3

VR. TOTAL
0.00
0.00

0.00

VR. TOTAL
123.37
23,800.00
25,000.00

48,923.37

VR. TOTAL
2,467.42
1,589.41

4,056.83
52,980.20
NIEROS S.A.S.

M3

VR. TOTAL
0.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
0.00

VR. TOTAL
514.05
8,750.00
23,800.00

33,064.05

VR. TOTAL
10,280.94
1,340.57

11,621.50
44,685.55

NIEROS S.A.S.

M3

VR. TOTAL
355,880.89
44,200.00
1,177.40
22,233.31
2.9768 100
0.55

24711.4351
423,491.60

VR. TOTAL
6,168.56
8,750.00
0.00

14,918.56

VR. TOTAL
123,371.22
17,374.68

140,745.90
579,156.06

NIEROS S.A.S.

M3

VR. TOTAL
974.40
355,880.89
19,772.98
0.00
0.00 2.9768 100
0.00 0.55
0.00
24711.4351
376,628.28

VR. TOTAL
5,551.70
40,400.00
2308

45,951.70

VR. TOTAL
111,034.10
16,503.53

127,537.63
550,117.61

NIEROS S.A.S.

ML

VR. TOTAL
30.15
1,991.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,021.87

VR. TOTAL
616.86
0.00
0.00
0.00
616.86

VR. TOTAL
12,337.12
463.17
12,800.29
15,439.02

NIEROS S.A.S.

M2

VR. TOTAL
696.00
46,220.14
1,428.00
1,937.04
4,660.30
6,552.00

61,493.49

VR. TOTAL
2,056.19
4,848.00
0.00
0.00
6,904.19

VR. TOTAL
41,123.74 414000
3,387.26

44,511.00
112,908.68

NIEROS S.A.S.
M2

VR. TOTAL
10,400.00 0.2
74,038.31 5
841.00
7,397.30 0.55
3,014.26

#REF!
95,690.88

VR. TOTAL
2,364.62
8,080.00

10,444.62

VR. TOTAL
47,292.30
4,745.19

52,037.49
158,172.98

NIEROS S.A.S.

M3

VR. TOTAL 3.571428571


26,000.00 0.0144 69.44444444
57,800.00
385,167.85
37,356.38 238656
16,467.95 2.9768 100
0.55

24711.4351
522,792.19

VR. TOTAL
8,841.60
40,400.00

49,241.60

VR. TOTAL
176,832.08
23,160.80 6955.2

199,992.88
772,026.67

NIEROS S.A.S.

ML

VR. TOTAL
13,755.00
8,711.63
730.72
0.00 0.55
0.00

#REF!
23,197.35

VR. TOTAL
760.79
0.00

760.79
VR. TOTAL
15,215.78
1,211.56

16,427.35
40,385.48

NIEROS S.A.S.

M2

VR. TOTAL 13.17523057


47,355.00
7,036.32
1,636.99
1,822.29 6375.6
2.9768 100
0.55

24711.4351
57,850.60

VR. TOTAL
678.54 3187.296
0.00

678.54

VR. TOTAL
13,570.83
2,229.90

15,800.73
74,329.87 7534.8
NIEROS S.A.S.

KG

VR. TOTAL
2,929.00
263.61
0.00
0.00

3,192.61

VR. TOTAL
0.21
0.00

0.21

VR. TOTAL
4.11
98.87

102.99
3,295.80

NIEROS S.A.S.

M2
VR. TOTAL
5,442.08 13.17523057
13,690.81
622.29
0.00
2.9768 100
0.55
3767.904
24711.4351
19,755.18

VR. TOTAL
390.68
0.00

390.68

VR. TOTAL
7,813.51
864.72

8,678.23
28,824.09

NIEROS S.A.S.

M2

VR. TOTAL
5,442.08
0.00
177.00
0.00
2.9768 100
0.55

24711.4351
5,619.09
VR. TOTAL
308.43
0.00

308.43

VR. TOTAL
6,168.56
374.11

6,542.67
12,470.18

NIEROS S.A.S.

6552

M2

VR. TOTAL
7,256.11
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
7,256.11

VR. TOTAL
349.55
0.00

2016
349.55
3528
VR. TOTAL
6,991.04
451.44

7,442.48
15,048.14

NIEROS S.A.S.

6552

M2

VR. TOTAL
9,411.76
8,556.75
584.42
0.00
2.9768 100
0.55

24711.4351
18,552.93

VR. TOTAL
349.55
0.00

2016
349.55
3528
VR. TOTAL
6,991.04
800.83

7,791.87
26,694.35

NIEROS S.A.S.
6552

M2

VR. TOTAL
7,529.41
244.89
0.00
0.00
2.9768 100
0.55

24711.4351
7,774.30

VR. TOTAL
349.55
0.00

2016
349.55
3528
VR. TOTAL
6,991.04
467.47

7,458.51
15,582.36

NIEROS S.A.S.

M2

VR. TOTAL
47,868.62
8,780.63
585.90
1,861.55
2.9768 100
0.55

24711.4351
59,096.69

VR. TOTAL
925.28
0.00

925.28 8064

VR. TOTAL
18,505.68
2,428.69

20,934.37
80,956.35

NIEROS S.A.S.

M2

VR. TOTAL
144,151.54
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
144,151.54
VR. TOTAL
0.00
0.00

0.00

VR. TOTAL
0.00
4,458.30

4,458.30
148,609.83

NIEROS S.A.S.

M2

VR. TOTAL
144,151.54
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
144,151.54

VR. TOTAL
0.00
0.00

2016
0.00

VR. TOTAL
0.00
4,458.30
4,458.30
148,609.83

NIEROS S.A.S.

M2

VR. TOTAL
36,035.75
8,780.63
585.90
1,476.69

46,878.96

VR. TOTAL
925.28
0.00

925.28

VR. TOTAL
18,505.68
2,050.82

20,556.51
68,360.75

NIEROS S.A.S.
ML

VR. TOTAL
5,405.36
2,195.16
247.20
0.00
2.9768 100
0.55

24711.4351
7,847.72

VR. TOTAL
608.63
0.00

608.63

VR. TOTAL
12,172.63 2772 12171.6
638.01

12,810.64
21,266.99

NIEROS S.A.S.

6552

M2

VR. TOTAL
56.47
8,556.75
280.14
0.00
2.9768 100
0.55

24711.4351
8,893.37

VR. TOTAL
390.68
0.00

2016
390.68
3528
VR. TOTAL
7,813.51
528.79

8,342.30 10500
17,626.34

NIEROS S.A.S.

6552

M2

VR. TOTAL
6,607.65 0.33557047
3,069.36
2,671.07
4,263.00
978.36 2.9768 100
3,583.48 0.55
2,205.00
24711.4351
23,377.92

VR. TOTAL
616.86
0.00

2016
616.86
3528
VR. TOTAL
12,337.12
1,123.67

13,460.79
37,455.57

NIEROS S.A.S.

M2

VR. TOTAL
13,330.52
433.57
0.00
0.00
2.9768 100
0.55

24711.4351
13,764.09
7056
VR. TOTAL
308.43
0.00

308.43

VR. TOTAL
6,168.56 2772
626.01

6,794.57
20,867.09

NIEROS S.A.S.

UN

VR. TOTAL
700,000.00
90,000.00
38,628.00
0.00
2.9768 100
0.55

24711.4351
828,628.00
7056
VR. TOTAL 10080
2,056.19
0.00

2,056.19

VR. TOTAL
41,123.74 2772
26,963.13

68,086.87
898,771.06

NIEROS S.A.S.

6552

UN
VR. TOTAL
650,000.00
95,000.00
38,628.00
0.00
2.9768 100
0.55

24711.4351
783,628.00

VR. TOTAL
2,056.19
0.00

2016
2,056.19
3528
VR. TOTAL
41,123.74
25,571.38

66,695.12
852,379.31

NIEROS S.A.S.

6552

UN

VR. TOTAL
139,200.00
0.00
0.00
0.00
2.9768 100
0.55
24711.4351
139,200.00

VR. TOTAL
1,028.09
0.00

2016
1,028.09
3528
VR. TOTAL
20,561.87
4,972.89

25,534.76
165,762.85

NIEROS S.A.S.

UN

VR. TOTAL
335,813.99
1,340.96
1,740.35
0.00
2.9768 100
0.55

24711.4351
338,895.30
7056
VR. TOTAL
1,028.09
0.00

1,028.09
VR. TOTAL
20,561.87 2772
11,149.03

31,710.90
371,634.29

NIEROS S.A.S.

UN

VR. TOTAL
349,000.00
4,052.66
18,270.00
713.99
2.9768 100
0.55

24711.4351
372,036.66
7056
VR. TOTAL 10080
1,439.33
0.00

1,439.33

VR. TOTAL
28,786.62 2772
12,441.11

41,227.73
414,703.72

NIEROS S.A.S.
6552

UN

VR. TOTAL
79,900.00
1,070.99
0.00
0.00
2.9768 100
0.55

24711.4351
80,970.99

VR. TOTAL
514.05
0.00

2016
514.05
3528
VR. TOTAL
10,280.94
2,838.12

13,119.06
94,604.09

NIEROS S.A.S.

6552

UN

VR. TOTAL
4,750.20
1,427.98
0.00
0.00
2.9768 100
0.55

24711.4351
6,178.18

VR. TOTAL
246.74
0.00

2016
246.74
3528
VR. TOTAL
4,934.85
351.33

5,286.18
11,711.11

NIEROS S.A.S.

ML

VR. TOTAL
416,896.47
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
416,896.47
7056
VR. TOTAL
0.00
0.00

0.00

VR. TOTAL
0.00 2772
12,893.71

12,893.71
429,790.18

NIEROS S.A.S.

UN

VR. TOTAL
14,500.00
1,070.99
0.00
0.00
2.9768 100
0.55

24711.4351
15,570.99
7056
VR. TOTAL 10080
308.43
0.00

308.43

VR. TOTAL
6,168.56 2772
681.90
6,850.46
22,729.87

NIEROS S.A.S.

6552

UN

VR. TOTAL
654,066.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
654,066.00

VR. TOTAL
2,364.62
0.00

2016
2,364.62
3528
VR. TOTAL
47,292.30
21,764.63

69,056.93
725,487.54

NIEROS S.A.S.

6552
UN

VR. TOTAL
602,910.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
602,910.00

VR. TOTAL
2,364.62
0.00

2016
2,364.62
3528
VR. TOTAL
47,292.30
20,182.48

67,474.78
672,749.40

NIEROS S.A.S.

UN

VR. TOTAL
58,257.52
4,052.66
18,270.00
1,070.99
2.9768 100
0.55

24711.4351
81,651.17
7056
VR. TOTAL 10080
1,439.33
40,400.00

41,839.33

VR. TOTAL
28,786.62 2772
4,709.60

33,496.22
156,986.72

NIEROS S.A.S.

6552

UN

VR. TOTAL
2,923.20
71.40
0.00
0.00
2.9768 100
0.55

24711.4351
2,994.60

VR. TOTAL
411.24
404.00

2016
815.24
3528
VR. TOTAL
8,224.75
372.20

8,596.95
12,406.79

NIEROS S.A.S.

M2

VR. TOTAL
2,813.58
1,532.79
509.91
0.00
2.9768 100
0.55

24711.4351
4,856.28
7056
VR. TOTAL
493.48
0.00

493.48

VR. TOTAL
9,869.70 2772
470.70

10,340.40
15,690.16
NIEROS S.A.S.

ML

VR. TOTAL
1,969.51
510.93
291.00
0.00
2.9768 100
0.55

24711.4351
2,771.44
7056
VR. TOTAL 10080
370.11
0.00

370.11

VR. TOTAL
7,402.27 2772
326.10

7,728.37
10,869.92

NIEROS S.A.S.

6552

UN
VR. TOTAL
204,624.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
204,624.00

VR. TOTAL
514.05
0.00

2016
514.05
3528
VR. TOTAL
10,280.94
6,662.44

16,943.38
222,081.42

NIEROS S.A.S.

UN

VR. TOTAL
6,846.53
803.22
0.00
0.00
2.9768 100
0.55
24711.4351
7,649.75
7056
VR. TOTAL 10080
205.62
0.00

205.62

VR. TOTAL
4,112.37 2772
370.14

4,482.51
12,337.88

NIEROS S.A.S.

6552

UN

VR. TOTAL
12,006.00
1,392.28
1,427.98
0.00
2.9768 100
0.55

24711.4351
14,826.27

VR. TOTAL
236.46
0.00

2016
236.46
3528
VR. TOTAL
4,729.23
612.12

5,341.35
20,404.08

NIEROS S.A.S.

UN

VR. TOTAL
63,104.00
0.00
0.00
0.00
0.00 2.9768 100
0.55

24711.4351
63,104.00
7056
VR. TOTAL
514.05
0.00

514.05

VR. TOTAL
10,280.94 2772
2,285.54

12,566.47
76,184.52
NIEROS S.A.S.

UN

VR. TOTAL
3,828.00
0.00
0.00
0.00
0.00 2.9768 100
0.55

24711.4351
3,828.00
7056
VR. TOTAL
308.43
0.00

308.43

VR. TOTAL
6,168.56 2772
318.71

6,487.27
10,623.70

NIEROS S.A.S.

ML

VR. TOTAL
9,850.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
9,850.00
7056
VR. TOTAL 10080
616.86
0.00

616.86

VR. TOTAL
12,337.12 2772
705.28

13,042.40
23,509.26

NIEROS S.A.S.

6552

UN

VR. TOTAL
157,760.00
73,500.00
0.00
0.00
2.9768 100
0.55

24711.4351
231,260.00
VR. TOTAL
1,747.76
0.00

2016
1,747.76
3528
VR. TOTAL
34,955.18
8,287.51

43,242.69
276,250.45

NIEROS S.A.S.

ML

VR. TOTAL
6,085.80
713.98
0.00
0.00
2.9768 100
0.55

24711.4351
6,799.78
7056
VR. TOTAL
123.37
0.00

123.37

VR. TOTAL
2,467.42 2772
290.43

2,757.85
9,681.00

NIEROS S.A.S.

UN

VR. TOTAL
50,000.00
1,784.98
0.00
0.00
2.9768 100
0.55

24711.4351
51,784.98
7056
VR. TOTAL
359.83
0.00

359.83

VR. TOTAL
7,196.65 2772
1,835.30

9,031.96
61,176.77

NIEROS S.A.S.
M2

VR. TOTAL
1,260.00
0.00
0.00
0.00
2.9768 100
0.55

24711.4351
1,260.00
7056
VR. TOTAL 10080
102.81
0.00

102.81

VR. TOTAL
2,056.19 2772
105.74

2,161.93
3,524.74

NIEROS S.A.S.

6552

ML

VR. TOTAL
14,235.24
10,200.00
11,095.96
2,484.72
1,236.45 2.9768 100
0.55

24711.4351
39,252.36

VR. TOTAL
925.28
0.00

2016
925.28
3528
VR. TOTAL
18,505.68
1,814.95

20,320.63
60,498.28

NIEROS S.A.S.

UN

VR. TOTAL
148,900.00
1,740.35
0.00
0.00
2.9768 100
0.55

24711.4351
150,640.35
7056
VR. TOTAL
411.24
0.00
411.24

VR. TOTAL
8,224.75 2772
4,926.07

13,150.82
164,202.41

NIEROS S.A.S.

M2

VR. TOTAL
3,069.36
2,671.07
4,263.00
931.77
3,412.84 2.9768 100
2,205.00 0.55
26,250.00
24711.4351
42,803.04
7056
VR. TOTAL 10080
616.86
0.00

616.86

VR. TOTAL
12,337.12 2772
1,724.44

14,061.57
57,481.46
NIEROS S.A.S.

6552

MES

VR. TOTAL
336,000.00
#REF!
0.00
0.00
2.9768 100
0.55

24711.4351
#REF!

VR. TOTAL
10,280.94
0.00

2016
10,280.94
3528
VR. TOTAL
205,618.70
Err:522

Err:522
Err:522
TRR 1-2 TRR 3-4 TRR 5-6 TRR 7 TOTAL
ITEM DESCRIPCION UNIDAD CANT. CANT. CANT. CANT. CANT. VR. UNITARIO VR. TOTAL
ZONAS COMUNES - -
PISCINA - -
LOCALIZACIÓN Y REPLANTEO - -
PLACA BASE PISCINA CONCRETO - -
MUROS EN CONCRETO PISCINA - -
IMPERMEABILIZACIÓN MUROS PLACA PISCINA - -
PAÑETE MUROS PISCINA - -
MORTERO AFINADO PLACA - -
ENCHAPE MUROS PISCINA - -
ENCHAPE PLACA PISCINA - -
ESTRUCTURA METALICA BBQ - -
DECK EN MADERA NATURAL - -
PISO EN ADOQUIN CIRCULACIONES - -
GIMNASIO Y TEATRO - -
LOCALIZACIÓN Y REPLANTEO - -
ZAPATAS - -
VIGAS DE CIMENTACIÓN - -
PLACA DE CONTRAPISO - -
COLUMNAS - -
PLACAS AEREAS - -
MAMPOSTERIA BLOQUE No. 5 - -
MAMPOSTERIA GRAN FORMATO - -
PAÑETE LISO INTERIOR - -
PAÑETE LISO IMPERMEABILIZADO BAÑOS - -
AFINADO PLACA - -
AFINADO IMPERMEABILIZADO PLACA - -
ENCHAPE BAÑOS CERAMICA BLANCA 40X40 - -
ENCHAPE PISOS CERAMICA - -
PISO EN VINILO - -
DIVISIONES DE BAÑO - -
JACUZZI - -
PISCINA DE HIDROMASAJES - -
ESTUCO + VINILO - -
DECK EN MADERA NATURAL - -
PORTERIA Y CUARTO CONDUCTORES - -
LOCALIZACIÓN Y REPLANTEO - -
ZAPATAS - -
VIGAS DE CIMENTACIÓN - -
PLACA DE CONTRAPISO - -
COLUMNAS - -
PLACAS AEREAS - -
MAMPOSTERIA BLOQUE No. 5 - -
MAMPOSTERIA GRAN FORMATO - -
PAÑETE LISO INTERIOR - -
PAÑETE LISO IMPERMEABILIZADO BAÑOS - -
AFINADO PLACA - -
AFINADO IMPERMEABILIZADO PLACA - -
ENCHAPE BAÑOS CERAMICA BLANCA 40X40 - -
ENCHAPE PISOS CERAMICA - -

URBANISMO
CERRAMIENTO
VIAS
REDES DE SUMINISTRO
REDES SANITARIAS
TANQUES DE AGUA
PLANTA DE TRATAMIENTO DE AGUAS SERVIDAS
TANQUE DE AGUAS TRATADAS PARA RIEGO
CANALIZACIONES
#REF!
TOTAL TORRE 1 #REF!
TORRE 1 Y 2
TOTAL
UNIDAD CANT.
3 CIMENTACIÓN
3.01 ZAPATAS M3 144.98
3.02 VIGAS DE CIMENTACION M3 214.15
3.03 PLACA DE CONTRAPISO M2 1,611.93
3.04 ESMALTADO PLACA M2 1,611.93
MURO DE CONTENCION M3 132.50
4 ESTRUCTURA EN CONCRETO
4.01 COLUMNAS M3 180.40
4.02 LOSAS ALIGERADAS M2 12,132.00
4.03 ESCALERAS EN CONCRETO M3 42.00
4.04 FOSO DE ASCENSOR M3 106.05
4.05 TANQUE DE AGUA M3 52.08
5 ACERO DE REFUERZO
5.01 ACERO DE REFUERZO KG 233,812.82
5.02 MALLA ELECTROSOLDADA KG 178,895.00

115.98
552.37 43.12
1383.3 1,367.64
1383.3 1,367.64
1322.34 90.21
1223.41
1264.94 144.32
715.16 4,538.00
7844.82 21.00
53.03
22.96

12.14 123,331.00
16.68 86,625.00
16.68
16.68
21.21 PLACA 1ER
0.00 PLACA 2DO
PLACA 3RO
PLACA 4TO
PLACA 5TO
placa 6to
CUB

113.5
TORRE 1 Y 2

VR.
VR. TOTAL
UNITARIO
545,937,811
550,118 79,756,051
519,775 111,309,802
198,930 320,660,502
21,224 34,211,456

1,612,003,212
772,027 139,273,612
112,909 1,369,808,048
158,173 6,643,265
623,440 66,115,839
579,156 30,162,448
1,096,152,437
2,166 506,549,929
3,296 589,602,509

32 40 144.98
1,367.64 121 2420.48 214.15
144.32 32

32 40 180.4

13,743.93
178895.275581842

menos vacios
1285.47 13.93 1271.54
2316.47 169.04 2147.43
1900.86 14.38 1886.48
1900.86 14.38 1886.48
1900.86 14.38 1886.48
1462.05 120.93 1341.12
1900.86 187.83 1713.03
12132.56

Vous aimerez peut-être aussi