PAS. BATU PENGURANG TOTAL LUASAN DINDING PONDASI 30 x 20 DINDING DINDING KERAMIK KERAMIK KERAMIK KERAMIK KERAMIK KOLOM
PAS. BATU PINTU JENDELA JENDELA Ventilasi 40x40 30X30 20X20 25X25 20x25 BETON
W3 BATA J1,J2,J3,J9,J10,15
J4,J5,J6,J7,J11,12,13,14 GYPSUM PAS. BATA Platinum Platinum Platinum Roman 15X20
4.20 2.10 2.19 1.29 0.45 0.06 0.80 0.06
LANTAI 1
X1 6.70 10.05 10.05 17.55 20.10 16.08 45.36 1.85 1.10 3.10
X2 3.28 11.97 1.20 10.77 6.00 21.54 17.24 0.31
X3 3.28 11.64 2.025 1.615 8.42 6.25 16.84 13.47
X4 3.13 11.42 11.42 3.43 22.85 18.28
X5 3.13 11.27 2.43 8.84 1.85 17.68 14.14 0.90
X6 1.20 4.38 2.61 1.77 3.54 2.83
X7 5.06 17.96 2.43 2.89 12.65 25.29 20.23
X8 3.28 3.28 3.28 6.56 5.25
X9 - - - -
X10 - - - -
- - -
- - -
Y1 2.95 4.43 4.43 8.85 7.08
5.16 17.29 17.29 34.57 27.66
5.35 5.35 5.35 10.70 8.56
Y2 0.35 1.28 0.96 0.32 0.63 0.50
Y3 1.85 6.48 1.68 4.80 9.59 7.67
Y4 2.63 9.34 9.34 18.67 14.94
Y5 0.35 1.28 1.28 2.56 2.04
0.80 2.66 2.66 5.33 4.26
Y6 3.45 5.18 5.18 10.35 8.28 4.42
4.81 16.11 16.11 32.23 25.78 5.43 7.38
5.35 5.35 5.35 10.70 8.56
-
Dekat Atap - - -
- - -
- - -
62.11 156.71 105.65 39.50 2.10 278.57 222.85 45.36 9.23 1.41 - 3.10 0.90
PONDASI SETENGAH 43.40 21.70 11.15 2.60 5.21
Full s2 - - - -
FULL 26.08 17.79 8.92 2.61 5.22
ROLLAG 4.26 0.01 0.26 0.03
5.48 0.35 0.04
TIMBUNAN TANAH
5.25
4.28
LANTAI 2
3.78
KOLOM KOLOM PLAT PLAFOND LIST Ring Balk Sopi BALOK BALOK BALOK B BALOK LATEI
BETON BETON 10 CM PLAFOND 15 x 20 15 x 15 20 x 30 20 x 25 BORDES 15X20
15 X 15 30 X 15
3.66
0.165
0.47 1.54 35.38 33.51 35.08 1.12 0.50 2.41 0.45 0.15 0.20
DAFTAR HARGA BAHAN & MATERIAL
KOTA MAKASSAR
II BAHAN PEREKAT
1 Portland Cement (PC) 50 Kg Zak 56,560.00
2 Portland Cement (PC) Kg Kg 1,885.33
3 Cement Putih Zak 49,130.00
4 Cement Putih Kg Kg 1,228.25
5 Semen Warna kg 10,880.00
6 Kapur Ayak M3 68,680.00
7 Kapur Pasangan/Hidrasi M3 4,340.00
8 Kapur Karung (3 Kg) Kg 10,880.00
9 Lem Vinyl / Karet Kg 43,350.00
10 Perekat Kaca Kg 70,470.00
IV BAHAN KAYU
1 Kayu Bayam
Kaso Bayam uk. 5/7 & 5/10 panjang 3,80 m' m3 7,102,180.00
Balok bayam m3 7,113,060.00
Papan Bayam uk. 3/20 & 3/30 panjang 3,80 m' m3 7,206,220.00
2 Kayu Borneo Super -
Kaso Borneo uk. 5/7 & 5/10 panjang 3,80 m' m3 5,698,400.00
Balok Borneo uk. 6/12, 6/15, 8/12 & 8/15 panjang 3,80 m' m3 5,884,380.00
Papan Borneo uk. 3/20 & 3/30 panjang 3,80 m' m3 6,318,310.00
3 Kayu Kamper Samarinda -
Kaso Kamper Samarinda m3 5,009,390.00
Balok Kamper Samarinda m3 5,237,790.00
Papan Kamper Samarinda m3 5,077,560.00
Dolken dia 5 s/d 7 cm p. 4 m btg 15,560.00
Dolken dia 7 s/d 10 cm p. 4 m btg 25,420.00
Bambu dia 5 s/d 7 cm p. 4 m btg 9,350.00
Kayu Mangga/Kemiri m3 3,172,880.00
-
V BATU ALAM -
1 Batu Candi 15/30 m2 57,630.00
2 Batu Candi 20/40 m2 61,200.00
3 Batu Alam Kuning 15/20 m2 59,670.00
-
-
VI BAHAN PELAPIS : -
1 Triplex t. 3 mm Uk 120x240 cm lbr 55,650.00
2 Triplex t. 4 mm Uk 120x240 cm lbr 72,350.00
3 Triplex t. 6 mm lbr 93,450.00
4 Triplex t. 9 mm lbr 123,500.00
5 Triplex t. 12 mm lbr 155,000.00
6 Multiplex t. 6 mm Uk 120x240 cm lbr 95,500.00
7 Multiplex t. 9 mm Uk 120x240 cm lbr 125,500.00
8 Multiplex t. 12 mm Uk 120x240 cm lbr 175,800.00
9 Multiplex t. 18 mm Uk 120x240 cm lbr 215,900.00
-
VII BAHAN LANTAI & DINDING KERAMIK -
18 Keramik Lantai Asia Tile 60/60 4/dos m2 115,300.00
34 Keramik Dinding Asia Tile 33/66 m2 114,920.00
10 Keramik Lantai 33/33 cm Unpolished ex Roman m2 75,910.00
11 Keramik Lantai 40/40 cm Polished ex Roman m2 57,800.00
12 Keramik Lantai 40/40 cm Unpolished ex Roman m2 73,700.00
13 Keramik Lantai 60/60 cm Polished ex Roman m2 101,920.00
16 Keramik Lantai Roman 20/20 25/dos m2 72,250.00
17 Keramik Lantai Roman 30/30 11/dos m2 75,910.00
18 Keramik Lantai Roman 40/40 6/dos m2 80,920.00
19 Keramik Lantai Roman 50/50 4/dos m2 104,810.00
20 Keramik Lantai Roman 60/60 3/dos m2 129,370.00
21 Keramik Lantai Granito 60/60 220 Ivory, 280 Joyce m2 145,950.00
22 Keramik Lantai Granito 60/60 242 Sara m2 166,940.00
23 Keramik Lantai Granito 60/60 White m2 166,940.00
28 Keramik Dinding Roman 20/20 m2 70,130.00
29 Keramik Dinding Roman 20/25 m2 75,140.00
30 Keramik Dinding Roman 25/25 m2 91,040.00
31 Keramik Dinding Roman 30/30 m2 106,930.00
32 Keramik Dinding Roman 20/40 m2 71,570.00
33 Keramik Dinding Roman 20/60 m2 117,050.00
34 Keramik Dinding Roman 33/66 m2 129,370.00
35 Roster 20x20 cm bh 7,990.00
36 Roster 20x40 cm bh 15,900.00
37 Glass Block bh 21,000.00
-
VIII BAHAN PENUTUP ATAP -
1 Steel Sheet Zincalum Econoroof TR 22 t. 0,45 mm ex Hokayu m2 34,340.00
2 Genteng Metal 1x4 Merpati uk. 38,5x80cm ex Sakura Roof lbr 13,010.00
3 Genteng Metal 1x4 uk. 38,5x80cm Elang ex Sakura Roof lbr 14,960.00
4 Genteng Metal 1x4 uk. 38,5x80cm Garuda ex Sakura Roof lbr 15,640.00
5 Nok atas 2,5 bh/m bh 9,860.00
6 Nok Metal Type U 5x110cm ex Sakura roof 6 bh/m2 m' 41,480.00
7 Nok Steel Sheet Zincalum t. 0,45 mm ex Hokayu m' 41,570.00
8 Skrup 12 x 45 HWTG bh 340.00
9 Seng Plat BJLS 30 L. 90 cm m' 10,290.00
10 Seng Gelombang BJLS 25 Uk. 80 x 180 cm lbr 30,600.00
11 Metal deck m2 88,060.00
12 Rangka atap baja ringan ex Mart roof m2 84,580.00
13 Baja Ringan Profil C 0.75 mm Btg 63,580.00
14 Baja Ringan Profil W 0.35 mm Btg 32,300.00
15 Karet Pelapis Atap m2 9,010.00
-
IX KAWAT / MESH -
1 Kawat Beton Hitam kg 23,500.00
-
X BAHAN KACA : -
2 Kaca Polos 5 mm m2 89,340.00
3 Kaca Polos 6 mm m2 111,690.00
4 Kaca Polos 8 mm m2 171,190.00
5 Kaca Polos 10 mm m2 200,770.00
-
XI BAHAN PAKU DAN MUR BAUT : -
1 Paku 1 s/d 3 cm kg 19,600.00
2 Paku 4 s/d 7 cm kg 22,350.00
3 Paku 8 s/d 12 cm kg 24,230.00
4 Paku Payung kg 12,350.00
5 Besi Begel Kuda-kuda kg 10,290.00
6 Duk angker kg 10,290.00
7 Mur Baut HTB dia 16 s/d 19 mm p. 5 cm bh 260.00
8 Mur Baut Biasa dia 16 s/d 19 mm p. 5 cm bh 260.00
9 Wartermur 12 mm bh 7,570.00
10 Klem Alm bh 1,620.00
11 Dynabolt dia.10 / 6 cm bh 770.00
dia.10 / 8 cm bh 850.00
12 Screw 10x16x20 mm bh 170.00
14x14x22 mm bh 260.00
-
-
XII BAHAN FINISHING : -
A. Cat Besi dan Kayu : -
1 Dempul Besi/Kayu Kg 26,440.00
2 Cat Dasar / meni Kg 15,560.00
3 Cat Besi ex SEIV Kg 30,430.00
4 Cat Aviant Ltr 34,680.00
5 Cat Akhir Duco ex Danaglos ICI Kg 21,760.00
6 Cat Synthetic Gloss ex SEIV Kg 18,360.00
7 Thinner Ltr 11,900.00
8 Terpentin Ltr 5,190.00
-
B. Cat Tembok -
1 Mowilex Interior 1 Liter Ltr 50,150.00
2 Mowilex Interior 2.5 Liter Ltr 108,550.00
3 Mowilex Interior 20 Liter Ltr 751,060.00
4 Mowilex Exterior 20 Liter Ltr 1,041,170.00
5 Metrolite Exterior 16 Liter Ltr 230,520.00
6 Cat Dasar Alkali Resistant Primer Kg 6,630.00
7 Plamir Tembok Kg 1,020.00
8 Plamir Kayu Kg 14,620.00
-
C. Bahan Pembantu -
1 Amplas Kayu / Besi Lbr 3,150.00
2 Kuas Cat rata2 Bh 6,290.00
3 Roll Cat Bh 13,520.00
4 Lem Kayu kg 14,540.00
5 Pintu Kamar Mandi PVC Unit 183,260.00
6 Minyak Bekisting Ltr 6,800.00
7 Pintu besi harmonika m2 380,460.00
8 Lockcase Kunci ex SES unt 322,150.00
9 Lockcase Kunci ex Deckson unt 113,820.00
10 Lockcase Kunci bh 62,390.00
11 Door stoper Gracia Art 601 S bh 14,450.00
12 Engsel Pintu Kuningan bh 17,770.00
13 Engsel Jendela bh 12,160.00
14 Door closer ex Dorma bh 165,840.00
15 Handle Pintu ex Wilka bh 176,380.00
16 Handle Pintu ex Bremen Bh 55,340.00
17 Grendel Kodok ( Kunci Slot) bh 13,940.00
18 Kait Angin bh 5,360.00
19 Sealant clear neutral (300 ml) btl 104,040.00
20 Pintu Kaca tempered unt 1,909,700.00
21 Pintu geser unt 1,443,050.00
22 Folding Gate Minim 0,3 mm m2 252,880.00
23 Folding Gate Medium 0,5 mm m2 299,880.00
24 Folding Gate Super 0,8 mm m2 415,480.00
25 Harmonika ( Folding Gate tanpa daun ) m2 303,450.00
26 Sealant Tube 17,850.00
-
XIII BAHAN SANITARI -
1 Kloset Duduk keramik komplit acc CW 821 J ex Toto unt 2,674,840.00
2 Kitchenzink stainless steel 1 lubang Hwaco 1L unt 599,080.00
3 Kitchenzink Stainlees Steel 1 Lubang unt 140,250.00
4 Floordrain TX 1B ex Toto unt 200,860.00
5 Floordrain Stailess Steel 4" unt 15,560.00
6 Toilet Shower TX 403 S PIV ex Toto unt 282,120.00
7 Toilet Shower unt 67,580.00
8 Kran shower Bh 49,810.00
9 Kran Cebok Bh 57,460.00
10 Keran Air 3/4'' Bh 10,630.00
11 Keran Leher Angsa Bh 43,350.00
-
XIV BAHAN PARTISI DINDING /PLAFOND -
3 Gypsum 120x240 tbl. 6 mm Lbr 47,690.00
4 Gypsum 120x240 tbl. 9 mm Lbr 56,870.00
5 Gypsum 120x240 tbl. 12 mm Lbr 74,380.00
6 Kayu Profil 1" m' 5,020.00
7 Kayu Profil 2" m' 9,180.00
8 Kayu Profil 3" m' 13,430.00
9 Kayu Profil 4" m' 16,830.00
-
XV BAHAN SALURAN AIR -
1 Pipa PVC dia 3/4" D (Panjang 4 m) Btg 9,950.00
2 Pipa PVC dia 1" D (Panjang 4 m) Btg 17,170.00
3 Pipa PVC dia 3" D (Panjang 4 m) Btg 36,210.00
4 Pipa PVC dia 4" D (Panjang 4 m) Btg 60,010.00
5 Sambungan Elbow 3/4" Bh 3,230.00
6 Sambungan Tee 3/4" Bh 4,850.00
7 Sambungan Elbow 3' Bh 8,760.00
8 Sambungan Tee 3' Bh 12,750.00
9 Sambungan Elbow 4" Bh 16,750.00
10 Sambungan Tee 4" Bh 21,510.00
11 Lem pipa tb 16,320.00
12 Seal tape roll 7,480.00
A Pengukuran :
Juru Ukur Org/Hari 100,000.00
Pembantu Juru Ukur Org/Hari 85,000.00
B Pembesian :
Tukang Besi Konstruksi Org/Hari 100,000.00
Tukang Besi Tulangan Org/Hari 90,000.00
Kepala Tukang Besi Org/Hari 125,000.00
C Kayu
Tukang Kayu Kasar (Plafond , Kuda/Gording, R.Atap) Org/Hari 90,000.00
Tukang Kayu Halus (Kusen) Org/Hari 100,000.00
Kepala Tukang Kayu Org/Hari 125,000.00
D Tembok / batu
Tukang Batu Kasar Tukang Batu Kasar Org/Hari 90,000.00
Tukang Batu Halus Tukang Batu Halus (Bata,Plester,Acian list2) Org/Hari 100,000.00
Kepala Tukang Batu Org/Hari 125,000.00
E Cat:
Tukang Cat Biasa Org/Hari 90,000.00
Tukang Cat Duco Org/Hari 100,000.00
Kepala Tukang Cat Org/Hari 125,000.00
F Lain-Lain :
Pekerja Org/Hari 65,000.00
Tukang Gali Org/Hari 65,000.00
Tukang Kaca Org/Hari 65,000.00
Tukang Railing Org/Hari 100,000.00
Kepala Tukang Railing Org/Hari 100,000.00
Kepala Tukang Kaca Org/Hari 100,000.00
Mandor Org/Hari 135,000.00
Penjaga Malam Org/Hari 95,000.00
Pengemudi Org/Hari 100,000.00
Operator Org/Hari 125,000.00
Pembantu Operator Org/Hari 85,000.00
Operator Alat Berat Org/Hari 125,000.00
Pembantu operator / Mekanik Org/Hari 100,000.00
ANALISA
BAHAN DAN UPAH KERJA
Bahan
Kayu 5/7 0.009 M3 x Rp 3,172,880 = Rp 28,555.92
Paku biasa 2" - 5" 0.020 Kg x Rp 22,350 = Rp 447.00
Kayu papan 3/20 0.007 M3 x Rp 3,172,880 = Rp 22,210.16
Jumlah (1) = Rp 51,213.08
Tenaga
Pekerja 0.100 Oh x Rp 65,000 = Rp 6,500.00
Tukang kayu 0.010 Oh x Rp 100,000 = Rp 1,000.00
Kepala tukang 0.010 Oh x Rp 125,000 = Rp 1,250.00
Mandor 0.005 Oh x Rp 135,000 = Rp 675.00
Jumlah (2) = Rp 9,425.00
Jumlah (1) + (2) = Rp 60,638.08
Tenaga
Pekerja 0.400 Oh x Rp. 65,000 = Rp. 26,000.00
Mandor 0.040 Oh x Rp. 135,000 = Rp. 5,400.00
Jumlah (1) = Rp. 31,400.00
Tenaga
Pekerja 0.526 Oh x Rp. 65,000 = Rp. 34,190.00
Mandor 0.0526 Oh x Rp. 135,000 = Rp. 7,101.00
Jumlah (1) = Rp. 41,291.00
Tenaga
Pekerja 0.735 Oh x Rp. 65,000 = Rp. 47,775.00
Mandor 0.0735 Oh x Rp. 135,000 = Rp. 9,922.50
Jumlah (1) = Rp. 57,697.50
1 m³ Urugan kembali
Tenaga
Pekerja 0.192 Oh x Rp. 65,000 = Rp. 12,480.00
Mandor 0.019 Oh x Rp. 135,000 = Rp. 2,565.00
Jumlah = Rp. 15,045.00
1 m³ Urugan pasir
Bahan
Pasir urug 1.100 M³ x Rp. 85,000 = Rp. 93,500.00
Jumlah (1) = Rp. 93,500.00
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp. 19,500.00
Mandor 0.015 Oh x Rp. 135,000 = Rp. 2,025.00
Jumlah (2) = Rp. 21,525.00
Jumlah (1) + (2) = Rp. 115,025.00
Bahan
Tanah Urug 1.100 M³ x Rp. 43,350 = Rp. 47,685.00
Jumlah (1) = Rp. 47,685.00
Tenaga
Bahan
Batu Kali 15/20 cm 1.050 M³ x Rp. 108,380.00 = Rp. 113,799.00
Semen porland 136.000 Kg x Rp. 1,885.33 = Rp. 256,405.33
Pasir Pasang 0.544 M³ x Rp. 97,580.00 = Rp. 53,083.52
Jumlah (1) = Rp. 423,287.85
Tenaga
Pekerja 1.500 Oh x Rp. 65,000.00 = Rp. 97,500.00
Tukang batu 0.600 Oh x Rp. 100,000.00 = Rp. 60,000.00
Kepala tukang 0.060 Oh x Rp. 125,000.00 = Rp. 7,500.00
Mandor 0.075 Oh x Rp. 135,000.00 = Rp. 10,125.00
Jumlah (2) 175,125.00
Jumlah (1) +(2) 598,412.85
Bahan
Batu Kali 10/15 cm 1.050 M³ x Rp. 115,600.00 = Rp. 121,380.00
Pasir pasang 0.300 M³ x Rp. 97,580.00 = Rp. 29,274.00
Jumlah (1) = Rp. 150,654.00
Tenaga
Pekerja 0.780 Oh x Rp. 65,000.00 = Rp. 50,700.00
Tukang batu 0.390 Oh x Rp. 100,000.00 = Rp. 39,000.00
Kepala tukang 0.039 Oh x Rp. 125,000.00 = Rp. 4,875.00
Mandor 0.039 Oh x Rp. 135,000.00 = Rp. 5,265.00
Jumlah (2) = Rp. 99,840.00
Jumlah (1) +(2) = Rp. 250,494.00
Bahan
Bata merah 5 x 10 x 20 cm 70.000 Bh x Rp. 550 = Rp 38,500.00
Semen portland 14.370 Kg x Rp. 1,885 = Rp 27,092.24
Pasir pasang 0.040 M³ x Rp. 97,580 = Rp 3,903.20
Jumlah (1) = Rp 69,495.44
Tenaga
Pekerja 0.320 Oh x Rp. 65,000 = Rp 20,800.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp 1,250.00
Mandor 0.015 Oh x Rp. 135,000 = Rp 2,025.00
Jumlah (2) = Rp 34,075.00
Jumlah (1) + (2) = Rp 103,570.44
Bahan
Bata merah 5 x 10 x 20 cm 70.000 Bh x Rp. 550 = Rp 38,500.00
Semen portland 9.680 Kg x Rp. 1,885 = Rp 18,250.03
Pasir pasang 0.045 M³ x Rp. 97,580 = Rp 4,391.10
Jumlah (1) = Rp 61,141.13
Tenaga
Pekerja 0.320 Oh x Rp. 65,000 = Rp 20,800.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tuka 0.010 Oh x Rp. 125,000 = Rp 1,250.00
Mandor 0.015 Oh x Rp. 135,000 = Rp 2,025.00
Jumlah (2) = Rp 34,075.00
Jumlah (1) + (2) = Rp 95,216.13
1 M³ Pasangan Bata merah tebal 1/2 bata, 1PC : 5 Ps
Bahan
Bata merah 5 x 10 x 20 cm 350.000 Bh x Rp. 550 = Rp 192,500.00
Semen portland 69.696 Kg x Rp. 1,885 = Rp 131,400.19
Pasir pasang 0.324 M³ x Rp. 97,580 = Rp 31,615.92
Jumlah (1) = Rp 355,516.11
Tenaga
Pekerja 0.833 Oh x Rp. 65,000 = Rp 54,145.00
Tukang batu 0.0833 Oh x Rp. 100,000 = Rp 8,330.00
Kepala tuka 2.6656 Oh x Rp. 125,000 = Rp 333,200.00
Mandor 0.12495 Oh x Rp. 135,000 = Rp 16,868.25
Jumlah (2) = Rp 412,543.25
Jumlah (1) + (2) = Rp 768,059.36
Bahan
Semen portland 6.480 Kg x Rp. 1,885 = Rp. 12,216.96
Pasir pasang 0.019 M³ x Rp. 97,580 = Rp. 1,854.02
Jumlah (1) = Rp. 14,070.98
Tenaga
Pekerja 0.200 Oh x Rp. 65,000 = Rp. 13,000.00
Tukang batu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.010 Oh x Rp. 135,000 = Rp. 1,350.00
Jumlah (2) = Rp. 31,225.00
Jumlah (1) + (2) = Rp. 45,295.98
Bahan
Semen portland 3.320 Kg x Rp. 1,885 = Rp. 6,259.31
Pasir pasang 0.022 M³ x Rp. 97,580 = Rp. 2,146.76
Jumlah (1) = Rp. 8,406.07
Tenaga
Pekerja 0.100 Oh x Rp. 65,000 = Rp. 6,500.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.010 Oh x Rp. 135,000 = Rp. 1,350.00
Jumlah (2) = Rp. 21,725.00
Jumlah (1) + (2) = Rp. 30,131.07
1 M² Pekerjaan Acian
Bahan
Semen portland 0.030 Zak x Rp. 56,560 = Rp. 1,696.80
Jumlah (1) = Rp. 1,696.80
Tenaga
Pekerja 0.008 Oh x Rp. 65,000 = Rp. 520.00
Tukang batu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.004 Oh x Rp. 125,000 = Rp. 500.00
Mandor 0.010 Oh x Rp. 135,000 = Rp. 1,350.00
Jumlah (2) = Rp. 7,370.00
Jumlah (1) + (2) = Rp. 9,066.80
1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr
6.13.1. Bahan
Semen portland 336.000 Kg x Rp. 1,885 = Rp. 633,472.00
Pasir beton 0.540 M³ x Rp. 115,600 = Rp. 62,424.00
Koral beton/batu pecah 2/3 0.810 M³ x Rp. 173,400 = Rp. 140,454.00
Jumlah (1) = Rp. 836,350.00
Tenaga
Pekerja 2.000 Oh x Rp. 65,000 = Rp. 130,000.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 125,000 = Rp. 4,375.00
Mandor 1.000 Oh x Rp. 135,000 = Rp. 135,000.00
Jumlah (2) = Rp. 304,375.00
Jumlah (1) + (2) = Rp. 1,140,725.00
1 M³ Membuat beton 1 Pc : 2 Ps : 4 Kr
6.14.1. Bahan
Semen portland 291.000 Kg x Rp. 1,885 = Rp. 548,632.00
Pasir beton 0.470 M³ x Rp. 115,600 = Rp. 54,332.00
Koral beton/batu pecah 2/3 0.930 M³ x Rp. 173,400 = Rp. 161,262.00
Jumlah (1) = Rp. 764,226.00
Tenaga
Pekerja 2.000 Oh x Rp. 65,000 = Rp. 130,000.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 125,000 = Rp. 4,375.00
Mandor 1.000 Oh x Rp. 135,000 = Rp. 135,000.00
Jumlah (2) = Rp. 304,375.00
Jumlah (1) + (2) = Rp. 1,068,601.00
Bahan
Besi beton polos 1.050 Kg x Rp. 11,750 = Rp. 12,337.50
Kawat beton 0.015 Kg x Rp. 23,500 = Rp. 352.50
Jumlah (1) = Rp. 12,690.00
Tenaga
Pekerja 0.007 Oh x Rp. 65,000 = Rp. 455.00
Tukang besi 0.007 Oh x Rp. 100,000 = Rp. 700.00
Kepala tukang 0.007 Oh x Rp. 125,000 = Rp. 875.00
Mandor 0.003 Oh x Rp. 135,000 = Rp. 405.00
Jumlah (2) = Rp. 2,435.00
Jumlah (1) + (2) = Rp. 15,125.00
Bahan
Kayu sembarang 0.040 M³ x Rp. 3,172,880 = Rp. 126,915.20
Paku biasa 2" - 5" 0.300 Kg x Rp. 22,350 = Rp. 6,705.00
Minyak bekisting 0.100 Ltr x Rp. 6,800 = Rp. 680.00
Jumlah (1) = Rp. 134,300.20
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp. 19,500.00
Tukang besi 0.260 Oh x Rp. 100,000 = Rp. 26,000.00
Kepala tukang 0.026 Oh x Rp. 125,000 = Rp. 3,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) = Rp. 49,425.00
Jumlah (1) + (2) = Rp. 183,725.20
6.29.1. Bahan
Kayu sembarang 0.045 M³ x Rp. 3,172,880 = Rp. 142,779.60
Paku biasa 2' - 5" 0.300 Kg x Rp. 22,350 = Rp. 6,705.00
Minyak bekisting 0.100 Lt x Rp. 6,800 = Rp. 680.00
Jumlah (1) = Rp. 150,164.60
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp. 19,500.00
Tukang batu 0.260 Oh x Rp. 100,000 = Rp. 26,000.00
Kepala tukang 0.026 Oh x Rp. 125,000 = Rp. 3,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) = Rp. 49,425.00
Jumlah (1) + (2) = Rp. 199,589.60
6.30.1. Bahan
Kayu sembarang 0.040 M³ x Rp. 3,172,880 = Rp. 126,915.20
Paku biasa 2' - 5" 0.400 Kg x Rp. 22,350 = Rp. 8,940.00
Minyak bekisting 0.200 Lt x Rp. 6,800 = Rp. 1,360.00
Balok kayu sembarang 0.015 M³ x Rp. 3,172,880 = Rp. 47,593.20
Plywood tebal 9 mm 0.350 Lbr x Rp. 123,500 = Rp. 43,225.00
Kayu dolken/Laut Ø 3"-4"/4 m 2.000 Btg x Rp. 15,560 = Rp. 31,120.00
Jumlah (1) = Rp. 259,153.40
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp. 19,500.00
Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 125,000 = Rp. 4,125.00
Mandor 0.006 Oh x Rp. 135,000 = Rp. 810.00
Jumlah (2) = Rp. 57,435.00
Jumlah (1) + (2) = Rp. 316,588.40
6.31.1. Bahan
Kayu sembarang 0.040 M³ x Rp. 3,172,880 = Rp. 126,915.20
Paku biasa 2' - 5" 0.400 Kg x Rp. 22,350 = Rp. 8,940.00
Minyak bekisting 0.200 Lt x Rp. 6,800 = Rp. 1,360.00
Balok kayu sembarang 0.018 M³ x Rp. 3,172,880 = Rp. 57,111.84
Plywood tebal 9 mm 0.350 Lbr x Rp. 123,500 = Rp. 43,225.00
Kayu dolken/Laut Ø 3"-4"/4 m 2.000 Btg x Rp. 15,560 = Rp. 31,120.00
Jumlah (1) = Rp. 268,672.04
Tenaga
Pekerja 0.320 Oh x Rp. 65,000 = Rp. 20,800.00
Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 125,000 = Rp. 4,125.00
Mandor 0.006 Oh x Rp. 135,000 = Rp. 810.00
Jumlah (2) = Rp. 58,735.00
Jumlah (1) + (2) = Rp. 327,407.04
6.32.1. Bahan
Kayu sembarang 0.040 M³ x Rp. 3,172,880 = Rp. 126,915.20
Paku biasa 2' - 5" 0.400 Kg x Rp. 22,350 = Rp. 8,940.00
Minyak bekisting 0.200 Lt x Rp. 6,800 = Rp. 1,360.00
Balok kayu sembarang 0.015 M³ x Rp. 3,172,880 = Rp. 47,593.20
Plywood tebal 9 mm 0.350 Lbr x Rp. 123,500 = Rp. 43,225.00
Kayu dolken/Laut Ø 3"-4"/4 m 6.000 Btg x Rp. 15,560 = Rp. 93,360.00
Jumlah (1) = Rp. 321,393.40
Tenaga
Pekerja 0.320 Oh x Rp. 65,000 = Rp. 20,800.00
Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 125,000 = Rp. 4,125.00
Mandor 0.006 Oh x Rp. 135,000 = Rp. 810.00
Jumlah (2) = Rp. 58,735.00
Jumlah (1) + (2) = Rp. 380,128.40
6.34.1. Bahan
Kayu Sembarang 0.030 M³ x Rp. 3,172,880 = Rp. 95,186.40
Paku Biasa 0.400 Kg x Rp. 22,350 = Rp. 8,940.00
Minyak bekisting 0.150 Lt x Rp. 6,800 = Rp. 1,020.00
Minyak Kayu Sembarang 0.015 M³ x Rp. 3,172,880 = Rp. 47,593.20
Plywood tebal 9 mm 0.350 Lbr x Rp. 123,500 = Rp. 43,225.00
Kayu dolken/Laut Ø 3"-4"/4 m 2.000 Btg x Rp. 15,560 = Rp. 31,120.00
Jumlah (1) = Rp. 227,084.60
Tenaga
Pekerja 0.320 Oh x Rp. 65,000 = Rp. 20,800.00
Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 125,000 = Rp. 4,125.00
Mandor 0.006 Oh x Rp. 135,000 = Rp. 810.00
Jumlah (2) = Rp. 58,735.00
Jumlah (1) + (2) = Rp. 285,819.60
Bahan
Kayu Bayam, balok 1.100 M³ x Rp. 7,113,060.00 = Rp. 7,824,366.00
Jumlah (1) = Rp. 7,824,366.00
Tenaga
Pekerja 6.000 Oh x Rp. 65,000.00 = Rp. 390,000.00
Tukang kayu 20.000 Oh x Rp. 100,000.00 = Rp. 2,000,000.00
Kepala tukang 2.000 Oh x Rp. 125,000.00 = Rp. 250,000.00
Mandor 0.300 Oh x Rp. 135,000.00 = Rp. 40,500.00
Jumlah (2) = Rp. 2,680,500.00
Jumlah (1) +(2) = Rp. 10,504,866.00
Rp. 83,371.95
Bahan
Kayu Kelas I, Papan 0.045 M3 x Rp. 7,206,220.00 = Rp. 324,279.90
Jumlah (1) = Rp. 324,279.90
Tenaga
Bahan
Pintu Kamar mandi PVC 1.000 Buah x Rp. 183,260.00 = Rp. 183,260.00
Jumlah (1) = Rp. 183,260.00
Tenaga
Bahan
Ubin 60 x 60 cm 2.770 Bh x Rp. 59,621 = Rp. 165,151.36
Semen portland 9.800 Kg x Rp. 1,885 = Rp. 18,476.27
Pasir pasang 0.0215 M³ x Rp. 97,580 = Rp. 2,097.97
Semen warna 1.300 Kg x Rp. 10,880 = Rp. 14,144.00
Jumlah (1) = Rp. 199,869.59
Tenaga
Pekerja 0.250 Oh x Rp. 65,000 = Rp. 16,250.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 125,000 = Rp. 1,500.00
Mandor 0.0125 Oh x Rp. 135,000 = Rp. 1,687.50
Jumlah (2) = Rp. 31,437.50
Jumlah (1) + (2) = Rp. 231,307.09
Bahan
Ubin 40 x 40 cm 6.250 Bh x Rp. 18,448 = Rp. 115,300.00
Semen portland 9.800 Kg x Rp. 1,885 = Rp. 18,476.27
Pasir pasang 0.0215 M³ x Rp. 97,580 = Rp. 2,097.97
Semen warna 1.300 Kg x Rp. 10,880 = Rp. 14,144.00
Jumlah (1) = Rp. 150,018.24
Tenaga
Pekerja 0.250 Oh x Rp. 65,000 = Rp. 16,250.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 125,000 = Rp. 1,500.00
Mandor 0.0125 Oh x Rp. 135,000 = Rp. 1,687.50
Jumlah (2) = Rp. 31,437.50
Jumlah (1) + (2) = Rp. 181,455.74
1 M² Pasang lantai ubin ukuran 33 x 33 cm
Bahan
Ubin 33 x 33 cm 9.200 Bh x Rp. 8,434 = Rp. 77,596.89
Semen portland 10.000 Kg x Rp. 1,885 = Rp. 18,853.33
Pasir pasang 0.0215 M³ x Rp. 97,580 = Rp. 2,097.97
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 114,868.19
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 147,585.69
Bahan
Ubin keramik 20 x 20 cm 25.000 Bh x Rp. 2,890 = Rp. 72,250.00
Semen portland 11.380 Kg x Rp. 1,885 = Rp. 21,455.09
Pasir pasang 0.042 M³ x Rp. 97,580 = Rp. 4,098.36
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 114,123.45
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 146,840.95
Bahan
Keramik 20 x 25 cm 20.000 Bh x Rp. 3,757 = Rp. 75,140.00
Semen Portland 9.300 Kg x Rp. 1,885 = Rp. 17,533.60
Pasir pasang 0.018 M³ x Rp. 97,580 = Rp. 1,756.44
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 110,750.04
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 143,467.54
Bahan
Keramik 25 x 25 cm 16.200 Bh x Rp. 5,690 = Rp. 92,178.00
Semen Portland 11.380 Kg x Rp. 1,885 = Rp. 21,455.09
Pasir pasang 0.042 M³ x Rp. 97,580 = Rp. 4,098.36
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 134,051.45
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 166,768.95
Bahan
Keramik 33 x 33 cm 9.200 Bh x Rp. 11,881 = Rp. 109,306.22
Semen Portland 10.000 Kg x Rp. 1,885 = Rp. 18,853.33
Pasir pasang 0.0215 M³ x Rp. 97,580 = Rp. 2,097.97
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 146,577.53
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 179,295.03
Bahan
Keramik 30 x 60 cm 5.556 Bh x Rp. 19,153 = Rp. 106,407.41
Semen Portland 10.000 Kg x Rp. 1,885 = Rp. 18,853.33
Pasir pasang 0.0215 M³ x Rp. 97,580 = Rp. 2,097.97
Semen warna 1.500 Kg x Rp. 10,880 = Rp. 16,320.00
Jumlah (1) = Rp. 143,678.71
Tenaga
Pekerja 0.260 Oh x Rp. 65,000 = Rp. 16,900.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.0125 Oh x Rp. 125,000 = Rp. 1,562.50
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 32,717.50
Jumlah (1) + (2) = Rp. 176,396.21
Bahan
Kunci tanam biasa 1.000 Bh x Rp. 13,940 = Rp. 13,940.00
Jumlah (1) = Rp. 13,940.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) = Rp. 52,575.00
Jumlah (1) + (2) = Rp. 66,515.00
Bahan
engsel pintu 1.000 Bh x Rp. 17,770 = Rp. 17,770.00
Jumlah (1) = Rp. 17,770.00
Tenaga
Pekerja 0.015 Oh x Rp. 65,000 = Rp. 975.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.00075 Oh x Rp. 135,000 = Rp. 101.25
Jumlah (2) = Rp. 17,951.25
Jumlah (1) + (2) = Rp. 35,721.25
Bahan
Engsel jendela 1.000 Bh x Rp. 17,770 = Rp. 17,770.00
Jumlah (1) = Rp. 17,770.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.0005 Oh x Rp. 135,000 = Rp. 67.50
Jumlah (2) = Rp. 11,967.50
Jumlah (1) + (2) = Rp. 29,737.50
Bahan
Pegangan pintu / door holder 1.000 Bh x Rp. 55,340 = Rp. 55,340.00
Jumlah (1) = Rp. 55,340.00
Tenaga
Pekerja 0.050 Oh x Rp. 65,000 = Rp. 3,250.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.050 Oh x Rp. 125,000 = Rp. 6,250.00
Mandor 0.0025 Oh x Rp. 135,000 = Rp. 337.50
Jumlah (2) = Rp. 59,837.50
Jumlah (1) + (2) 115,177.50
1 buah pasang kait angin
Bahan
Kait angin 1.000 Bh x Rp. 5,360 = Rp. 5,360.00
Jumlah (1) = Rp. 5,360.00
Tenaga
Pekerja 0.015 Oh x Rp. 65,000 = Rp. 975.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.00075 Oh x Rp. 135,000 = Rp. 101.25
Jumlah (2) = Rp. 17,951.25
Jumlah (1) + (2) = Rp. 23,311.25
1 buah pasang Grendel
Bahan
Grendel Kodok 1.000 Bh x Rp. 13,940 = Rp. 13,940.00
Jumlah (1) = Rp. 13,940.00
Tenaga
Pekerja 0.015 Oh x Rp. 65,000 = Rp. 975.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.00075 Oh x Rp. 135,000 = Rp. 101.25
Jumlah (2) = Rp. 17,951.25
Jumlah (1) + (2) = Rp. 31,891.25
Bahan
Kaca 1.100 M² x Rp. 89,340 = Rp. 98,274.00
Jumlah (1) = Rp. 98,274.00
Tenaga
Pekerja 0.0155 Oh x Rp. 65,000 = Rp. 1,007.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 125,000 = Rp. 1,937.50
Mandor 0.00075 Oh x Rp. 135,000 = Rp. 101.25
Jumlah (2) = Rp. 18,546.25
Jumlah (1) + (2) = Rp. 116,820.25
1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) Luar
Bahan
Plamir 0.120 Kg x Rp. 1,020 = Rp. 122.40
Cat dasar 0.120 Kg x Rp. 28,815 = Rp. 3,457.80
Cat tembok 2 x 0.130 Kg x Rp. 28,815 = Rp. 3,745.95
Jumlah (1) = Rp. 7,326.15
Tenaga
Pekerja 0.040 Oh x Rp. 65,000 = Rp. 2,600.00
Tukang cat 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.0120 Oh x Rp. 125,000 = Rp. 1,500.00
Mandor 0.002 Oh x Rp. 135,000 = Rp. 270.00
Jumlah (2) = Rp. 16,370.00
Jumlah (1) + (2) = Rp. 23,696.15
1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir 0.120 Kg x Rp. 1,020 = Rp. 122.40
Cat dasar 0.120 Kg x Rp. 6,630 = Rp. 795.60
Cat tembok 2 x 0.130 Kg x Rp. 50,150 = Rp. 6,519.50
Jumlah (1) = Rp. 7,437.50
Tenaga
Pekerja 0.040 Oh x Rp. 65,000 = Rp. 2,600.00
Tukang cat 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.0120 Oh x Rp. 125,000 = Rp. 1,500.00
Mandor 0.002 Oh x Rp. 135,000 = Rp. 270.00
Jumlah (2) = Rp. 16,370.00
Jumlah (1) + (2) = Rp. 23,807.50
1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 2 lps cat minyak
Bahan
Cat menie kayu 0.200 Kg x Rp. 15,560 = Rp. 3,112.00
Plamir 0.150 Kg x Rp. 14,620 = Rp. 2,193.00
Minyak Cat 0.170 Kg x Rp. 11,900 = Rp. 2,023.00
Cat Minyak 0.130 Kg x Rp. 34,680 = Rp. 4,508.40
Jumlah (1) = Rp. 11,836.40
Tenaga
Pekerja 0.070 Oh x Rp. 65,000 = Rp. 4,550.00
Tukang cat 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.0090 Oh x Rp. 125,000 = Rp. 1,125.00
Mandor 0.0025 Oh x Rp. 135,000 = Rp. 337.50
Jumlah (2) = Rp. 15,012.50
Jumlah (1) + (2) = Rp. 26,848.90
Bahan
Klosed duduk/monoblok 1.000 Bh x Rp. 2,674,840 = Rp. 2,674,840.00
Perlengkapan 6% harga klosed x Rp. 2,674,840 = Rp. 160,490.40
Jumlah (1) = Rp. 2,835,330.40
Tenaga
Pekerja 3.300 Oh x Rp. 100,000 = Rp. 330,000.00
Tukang batu 1.100 Oh x Rp. 125,000 = Rp. 137,500.00
Kepala tukang 0.001 Oh x Rp. 135,000 = Rp. 135.00
Mandor 0.160 Oh x Rp. 0 = Rp. 0.00
Jumlah (2) = Rp. 467,635.00
Jumlah (1) +(2) = Rp. 3,302,965.40
Bahan
Pipa galvanis 1.200 M´ x Rp. 2,488 = Rp. 2,985.00
Perlengkapan 35% Harga Pipa x Rp. 2,488 = Rp. 870.63
Jumlah (1) = Rp. 3,855.63
Tenaga
Pekerja 0.054 Oh x Rp. 65,000 = Rp. 3,510.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 125,000 = Rp. 1,125.00
Mandor 0.027 Oh x Rp. 135,000 = Rp. 3,645.00
Jumlah (2) = Rp. 17,280.00
Jumlah (1) +(2) = Rp. 21,135.63
Bahan
Pipa PVC 1.200 M´ x Rp. 9,053 = Rp. 10,863.00
Perlengkapan 35% harga pipa x Rp. 9,053 = Rp. 3,168.38
Jumlah (1) = Rp. 14,031.38
Tenaga
Pekerja 0.081 Oh x Rp. 65,000 = Rp. 5,265.00
Tukang batu 0.135 Oh x Rp. 100,000 = Rp. 13,500.00
Kepala tukang 0.0135 Oh x Rp. 125,000 = Rp. 1,687.50
Mandor 0.0041 Oh x Rp. 135,000 = Rp. 553.50
Jumlah (2) = Rp. 21,006.00
Jumlah (1) +(2) = Rp. 35,037.38
Bahan
Bak cuci teraso 1.000 Bh x Rp. 140,250 = Rp. 140,250.00
Water drain + asesories 1.000 Bh x Rp. 9,053 = Rp. 9,052.50
Semen portland 20.000 Kg x Rp. 1,885 = Rp. 37,706.67
Pasir 0.050 M³ x Rp. 115,600 = Rp. 5,780.00
Jumlah (1) = Rp. 192,789.17
Tenaga
Pekerja 0.050 Oh x Rp. 65,000 = Rp. 3,250.00
Tukang batu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala tukang 0.050 Oh x Rp. 125,000 = Rp. 6,250.00
Mandor 0.0025 Oh x Rp. 135,000 = Rp. 337.50
Jumlah (2) = Rp. 59,837.50
Jumlah (1) +(2) = Rp. 252,626.67
Bahan
Kran air 1.000 Bh x Rp. 10,630 = Rp. 10,630.00
Seal tape 0.025 Bh x Rp. 7,480 = Rp. 187.00
Jumlah (1) = Rp. 10,817.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) 12,575.00
Jumlah (1) +(2) 23,392.00
Bahan
Kran air 1.000 Bh x Rp. 43,350 = Rp. 43,350.00
Seal tape 0.025 Bh x Rp. 7,480 = Rp. 187.00
Jumlah (1) = Rp. 43,537.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) 12,575.00
Jumlah (1) +(2) 56,112.00
Bahan
Floor drain 1.000 Bh x Rp. 15,560 = Rp. 15,560.00
Jumlah (1) = Rp. 15,560.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) 12,575.00
Jumlah (1) +(2) 28,135.00
Bahan
Shower 1.000 Bh x Rp. 67,580 = Rp. 67,580.00
Perlengkapan 20.000 % x Rp. 67,580 = Rp. 13,516.00
Jumlah (1) = Rp. 81,096.00
Tenaga
Pekerja 0.010 Oh x Rp. 65,000 = Rp. 650.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.005 Oh x Rp. 135,000 = Rp. 675.00
Jumlah (2) 12,575.00
Jumlah (1) +(2) 93,671.00
Bahan
Gypsum board (120 x 240 x 6) mm 0.364 Lbr x Rp. 47,690 = Rp. 17,359.16
Paku sekrup 0.110 Kg x Rp. 24,230 = Rp. 2,665.30
Hollow 0.857 Btg x Rp. 32,640 = Rp. 27,975.74
Jumlah (1) = Rp. 48,000.20
Tenaga
Pekerja 0.070 Oh x Rp. 65,000 = Rp. 4,550.00
Tukang kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.0035 Oh x Rp. 135,000 = Rp. 472.50
Jumlah (2) = Rp. 16,272.50
Jumlah (1) +(2) = Rp. 64,272.70
Bahan
List Profil Gypsum 1.100 M' x Rp. 13,430 = Rp. 14,773.00
Paku 0.010 Kg x Rp. 12,100 = Rp. 121.00
Jumlah (1) = Rp. 14,894.00
Tenaga
Pekerja 0.050 Oh x Rp. 65,000 = Rp. 3,250.00
Tukang kayu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.005 Oh x Rp. 125,000 = Rp. 625.00
Mandor 0.003 Oh x Rp. 135,000 = Rp. 405.00
Jumlah (2) = Rp. 9,280.00
Jumlah (1) +(2) = Rp. 24,174.00
Bahan
Atap genteng metal 1.020 Bh x Rp. 14,960 = Rp. 15,259.20
Paku 0.200 Kg x Rp. 12,100 = Rp. 2,420.00
Jumlah (1) = Rp. 17,679.20
Tenaga
Pekerja 0.200 Oh x Rp. 65,000 = Rp. 13,000.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 125,000 = Rp. 1,250.00
Mandor 0.010 Oh x Rp. 135,000 = Rp. 1,350.00
Jumlah (2) = Rp. 25,600.00
Jumlah (1) + (2) = Rp. 43,279.20
Bahan
Nok genteng decra bond 1.100 Bh x Rp. 9,860 = Rp. 10,846.00
Paku biasa ½" - 1" 0.050 Kg x Rp. 24,230 = Rp. 1,211.50
Jumlah (1) = Rp. 12,057.50
Tenaga
Pekerja 0.250 Oh x Rp. 65,000 = Rp. 16,250.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 125,000 = Rp. 1,875.00
Mandor 0.013 Oh x Rp. 135,000 = Rp. 1,755.00
Jumlah (2) = Rp. 34,880.00
Jumlah (1) + (2) = Rp. 46,937.50
1 M2 Pasang rangka atap baja
Bahan
Main Truss C 2.800 m' x Rp. 10,597 = Rp. 29,670.67
Roof Bottom/ Reng 5.100 m' x Rp. 5,383 = Rp. 27,455.00
Self Driling Screw Truss Screw 6x20 mm 25.000 Bh x Rp. 375 = Rp. 9,375.00
Self Driling Screw Roof Bottom 4x16 mm 35.000 Bh x Rp. 300 = Rp. 10,500.00
Dynabold 12x120 mm 1.000 Bh x Rp. 1,500 = Rp. 1,500.00
Jumlah (1) = Rp. 78,500.67
Tenaga
Tukang besi 0.006 Oh x Rp. 65,000 = Rp. 390.00
Pekerja 0.240 Oh x Rp. 100,000 = Rp. 24,000.00
Kepala tukang 0.006 Oh x Rp. 125,000 = Rp. 750.00
Mandor 0.0003 Oh x Rp. 135,000 = Rp. 40.50
Jumlah (2) = Rp. 25,180.50
Jumlah (1) +(2) = Rp. 103,681.17
Bahan
Karet Pelapis Atap 1.050 m x Rp. 9,010 = Rp. 9,460.50
Jumlah (1) = Rp. 9,460.50
Tenaga
Pekerja 0.150 Oh x Rp. 65,000 = Rp. 9,750.00
Tukang 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala Tukang 0.005 Oh x Rp. 125,000 = Rp. 625.00
Mandor 0.008 Oh x Rp. 135,000 = Rp. 1,080.00
Jumlah (2) = Rp. 16,455.00
Jumlah (1) + (2) = Rp. 25,915.50
Bahan
Kayu meranti,papan 0.0086 M³ x Rp. 7,113,060.00 = Rp. 61,172.32
Paku biasa 2" - 5" 0.060 Kg x Rp. 22,350.00 = Rp. 1,341.00
Jumlah (1) = Rp. 62,513.32
Tenaga
Pekerja 0.100 Oh x Rp. 65,000.00 = Rp. 6,500.00
Tukang kayu 0.100 Oh x Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000.00 = Rp. 1,250.00
Mandor 0.050 Oh x Rp. 135,000.00 = Rp. 6,750.00
Jumlah (2) = Rp. 24,500.00
Jumlah (1) +(2) = Rp. 87,013.32
Bahan
Stop Kontak 1.0000 Bh x Rp. 10,540.00 = Rp. 10,540.00
Jumlah (1) = Rp. 10,540.00
Tenaga
Pekerja 0.200 Oh x Rp. 65,000.00 = Rp. 13,000.00
Tukang Listrik 0.020 Oh x Rp. 100,000.00 = Rp. 2,000.00
Kepala tukang Listrik 0.010 Oh x Rp. 125,000.00 = Rp. 1,250.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 17,600.00
Jumlah (1) +(2) = Rp. 28,140.00
Bahan
Saklar Ganda 1.0000 Bh x Rp. 11,560.00 = Rp. 11,560.00
Jumlah (1) = Rp. 11,560.00
Tenaga
Pekerja 0.400 Oh x Rp. 65,000.00 = Rp. 26,000.00
Tukang Listrik 0.040 Oh x Rp. 100,000.00 = Rp. 4,000.00
Kepala tukang Listrik 0.010 Oh x Rp. 125,000.00 = Rp. 1,250.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 32,600.00
Jumlah (1) +(2) = Rp. 44,160.00
1 Bh Pasangan Saklar Tunggal
Bahan
Saklar Tunggal 1.0000 Bh x Rp. 11,050.00 = Rp. 11,050.00
Jumlah (1) = Rp. 11,050.00
Tenaga
Pekerja 0.400 Oh x Rp. 65,000.00 = Rp. 26,000.00
Tukang Listrik 0.040 Oh x Rp. 100,000.00 = Rp. 4,000.00
Kepala tukang Listrik 0.010 Oh x Rp. 125,000.00 = Rp. 1,250.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 32,600.00
Jumlah (1) +(2) = Rp. 43,650.00
1 Bh Pasangan Mcb
Bahan
MCB 1.0000 Bh x Rp. 121,810.00 = Rp. 121,810.00
Jumlah (1) = Rp. 121,810.00
Tenaga
Pekerja 0.400 Oh x Rp. 65,000.00 = Rp. 26,000.00
Tukang Listrik 0.040 Oh x Rp. 100,000.00 = Rp. 4,000.00
Kepala tukang Listrik 0.040 Oh x Rp. 125,000.00 = Rp. 5,000.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 36,350.00
Jumlah (1) +(2) = Rp. 158,160.00
Bahan
Fitting TL 1.0000 Bh x Rp. 19,890.00 = Rp. 19,890.00
Pipa pvc 2.2000 m' x Rp. 25,641.03 = Rp. 56,410.26
Kabel NYA 3 X 2.5 11.1000 M' x Rp. 6,628.40 = Rp. 73,575.24
Jumlah (1) = Rp. 149,875.50
Tenaga
Pekerja 0.200 Oh x Rp. 65,000.00 = Rp. 13,000.00
Tukang Listrik 0.020 Oh x Rp. 100,000.00 = Rp. 2,000.00
Kepala tukang Listrik 0.020 Oh x Rp. 125,000.00 = Rp. 2,500.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 18,850.00
Jumlah (1) +(2) = Rp. 168,725.50
Bahan
Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 2.0000 Btg x Rp. 14,500.00 = Rp. 29,000.00
Keni Pipa PVC 1/2" (Putih) 2.0000 Bh x Rp. 3,230.00 = Rp. 6,460.00
Kabel 10 mm 2.2000 m' x Rp. 6,628.40 = Rp. 14,582.48
Jumlah (1) = Rp. 50,042.48
Tenaga
Pekerja 0.300 Oh x Rp. 65,000.00 = Rp. 19,500.00
Tukang Listrik 0.036 Oh x Rp. 100,000.00 = Rp. 3,600.00
Kepala tukang Listrik 0.030 Oh x Rp. 125,000.00 = Rp. 3,750.00
Mandor 0.010 Oh x Rp. 135,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 28,200.00
Jumlah (1) +(2) = Rp. 78,242.48
Bahan
Batu Alam Kuning 10 x 20 1.050 M² x Rp. 59,670 = Rp. 62,653.50
Semen Portland 11.750 Kg x Rp. 1,885 = Rp. 22,152.67
Pasir pasang 0.035 M³ x Rp. 97,580 = Rp. 3,415.30
Jumlah (1) = Rp. 88,221.47
Tenaga
Pekerja 0.420 Oh x Rp. 65,000 = Rp. 27,300.00
Tukang batu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala tukang 0.025 Oh x Rp. 125,000 = Rp. 3,125.00
Mandor 0.030 Oh x Rp. 135,000 = Rp. 4,050.00
Jumlah (2) = Rp. 59,475.00
Jumlah (1) + (2) = Rp. 147,696.47
1 m² Pasang dinding roster / terawang 20x40
Bahan
Roster/terawang 12.500 Bh x Rp. 15,900 = Rp 198,750.00
Semen portland 12.800 Kg x Rp. 1,885 = Rp 24,132.27
Pasir pasang 0.035 M³ x Rp. 97,580 = Rp 3,415.30
Jumlah (1) = Rp 226,297.57
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp 19,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp 1,250.00
Mandor 0.015 Oh x Rp. 135,000 = Rp 2,025.00
Jumlah (2) = Rp 32,775.00
Jumlah (1) + (2) = Rp 259,072.57
Bahan
Glass Block 25.000 Bh x Rp. 21,000 = Rp 525,000.00
Semen portland 8.800 Kg x Rp. 1,885 = Rp 16,590.93
Pasir pasang 0.025 M³ x Rp. 97,580 = Rp 2,439.50
Jumlah (1) = Rp 544,030.43
Tenaga
Pekerja 0.300 Oh x Rp. 65,000 = Rp 19,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 125,000 = Rp 1,250.00
Mandor 0.015 Oh x Rp. 135,000 = Rp 2,025.00
Jumlah (2) = Rp 32,775.00
Jumlah (1) + (2) = Rp 576,805.43
RENCANA ANGGARAN BIAYA ( RAB )
TYPE 41/78
I PEKERJAAN PERSIAPAN
1 Pembersihan & Pengukuran kav. m2 150.00 250,000.00 37,500,000.00 6.017
2 Pas. Bouwplank m' 58.00 72,831.00 4,224,198.00 0.678
3 Alat Bantu Ls 1.00 150,000.00 150,000.00 0.024
41,874,198.00 6.719
II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Garis m3 56.72 71,830.00 4,073,864.31 0.654
2 Pek. Galian Tanah Pondasi Poerflat m3 6.26 71,830.00 449,296.65 0.072
3 Pek. Urugan Tanah Kembali m3 20.34 294,956.20 5,998,966.67 0.963
4 Pek. Urugan Pasir Bawah Lantai m3 2.28 250,426.00 571,910.38 0.092
5 Pek. Urugan Pasir Bawah Pondasi m3 5.46 250,426.00 1,367,911.96 0.219
12,461,949.97 2.000
III PEKERJAAN PONDASI
1 Pek. Pondasi Batu Kosong m3 11.00 643,589.10 7,079,480.10 1.136
2 Pek. Pondasi Batu Kali / Gunung 1 pc : 4 ps m3 33.12 1,087,707.00 36,024,855.84 5.780
43,104,335.94 6.916
IV PEKERJAAN BETON & BEKISTING
1 Pek. Pembesian Sloef 25/30 m3 4.36 15,125.00 65,945.00 0.011
2 Pek, Pembesian Kolom 1 25/30 Kg 1,465.20 15,125.00 22,161,150.00 3.556
3 Pek. Pembesian Kolom 2 L 20/20 Kg 390.72 15,125.00 5,909,640.00 0.948
4 Pek. Pembesian Kolom 3 15/20 Kg 849.60 15,125.00 12,850,200.00 2.062
5 Pek. Pembesian Kolom 4 20/40 Kg 153.60 15,125.00 2,323,200.00 0.373
6 Pek. Pembesian Ringbalk 25/30 Kg 1,138.50 15,125.00 17,219,812.50 2.763
7 Pek. Pembesian RingBalk 15/20 Kg 117.00 15,125.00 1,769,625.00 0.284
8 Pek. Bekisting Sloef 25/30 1:2:3 m2 34.87 199,589.60 6,958,890.99 1.117
9 Pek. Bekisting Kolom 25/30 1:2:3 m2 89.54 316,588.40 28,347,325.34 4.549
10 Pek. Bekisting Kolom L 20/20 1:2:3 m2 19.24 316,588.40 6,091,160.82 0.977
11 Pek. Bekisting Kolom 15/20 1:2:3 m2 82.60 316,588.40 26,150,201.84 4.196
12 Pek. Bekisting Kolom 20/40 1:2:3 m2 9.60 316,588.40 3,039,248.64 0.488
13 Pek. Bekisting RingBalk 25/30 1:2:3 m2 37.95 380,128.40 14,425,872.78 2.315
14 Pek. Bekisting RingBalk 15/20 1:2:3 m2 6.50 380,128.40 2,472,355.11 0.397
15 Pek. Beton Sloef 25/30 1:2:3 m3 4.36 1,140,725.00 4,971,564.73 0.798
16 Pek. Beton Kolom 25/30 1:2:3 m3 6.11 1,140,725.00 6,964,126.13 1.117
17 Pek. Beton Kolom L 20/20 1:2:3 m3 1.63 1,140,725.00 1,857,100.30 0.298
18 Pek. Beton Kolom 15/20 1:2:3 m3 3.54 1,140,725.00 4,038,166.50 0.648
19 Pek. Beton Kolom 20/40 1:2:3 m3 0.64 1,140,725.00 730,064.00 0.117
20 Pek. Beton RingBalk 25/30 1:2:3 m3 4.74 1,140,725.00 5,411,314.22 0.868
21 Pek. Beton RingBalk 15/20 1:2:3 m3 0.49 1,140,725.00 556,103.44 0.089
22 Pek. Beton Plat Teras 15 Cm 1:2:3 m3 1.02 1,068,601.00 1,085,965.77 0.174
23 Pek. Beton Lantai Septictank 10 cm 1:2:4 m3 0.11 1,068,601.00 112,875.90 0.018
24 Pek. Beton Penutup Septictank 10 cm 1:2:3 m3 0.11 1,068,601.00 112,875.90 0.018
175,624,784.89 28.180
V PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Batu Bata Dinding Rumah 1:3 m2 29.63 164,836.10 4,883,269.46 0.784
2 Pek. Pas. Batu Bata Dindi ding rumah 1:4 m2 315.74 161,474.50 50,983,474.21 8.181
55,866,743.67 8.964
VI PEK. LANTAI & DINDING KERAMIK
1 Pek. Lantai Granit 60 x 60 m2 127.23 395,439.90 50,311,818.48 8.073
2 Pek. Lantai Keramik putih 20 x 20 (kasar) m2 10.37 298,005.70 3,088,829.08 0.496
3 Pek. Lantai Keramik Roman 20/20 m2 6.56 298,005.70 1,954,023.37 0.314
4 Pek. Dinding Keramik 20/40 (halus) m2 32.69 323,763.00 10,582,193.66 1.698
65,936,864.59 10.580
VII PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding Rumah 1:3 m2 59.25 80,537.62 4,771,853.99 0.766
2 Pek. Plesteran Dinding Rumah 1:5 m2 631.47 80,846.70 51,052,589.04 8.192
4 Pek. Acian m2 690.72 48,636.50 33,594,397.83 5.390
89,418,840.85 14.348
VIII PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen & Pintu Type P1 Unit 3.00 1,388,400.00 4,165,200.00 0.668
2 Pek. Kusen & Pintu Type P2 Unit 3.00 1,388,400.00 4,165,200.00 0.668
3 Pek. Kusen & Pintu Type PJ1 Unit 1.00 1,062,750.00 1,062,750.00 0.171
4 Pek. Kusen & Pintu Type PJ2 Unit 2.00 2,115,750.00 4,231,500.00 0.679
5 Pek. Kusen & Pintu Type PJ3 Unit 1.00 1,033,500.00 1,033,500.00 0.166
4 Pek. Kusen & Jendela Type J1 Unit 1.00 565,710.00 565,710.00 0.091
5 Pek. Kusen & Jendela Type J2 Unit 2.00 1,071,440.00 2,142,880.00 0.344
6 Pek. Kusen & Jendela Type J3 Unit 3.00 1,208,000.00 3,624,000.00 0.581
7 Pek. Kusen & Jendela Type J4 Unit 2.00 935,240.00 1,870,480.00 0.300
8 Pek. Kusen & Jendela Type J5 Unit 1.00 472,160.00 472,160.00 0.076
9 Pek. Kusen & Jendela Type J6 Unit 2.00 944,320.00 1,888,640.00 0.303
10 Pek. Kusen & Jendela Type J7 Unit 2.00 930,700.00 1,861,400.00 0.299
27,083,420.00 4.346
IX PEKERJAAN PLAFOND
1 Pek. Plafond Calsiboard 4 mm + Rangka Hollow m2 180.45 252,683.19 45,596,681.64 7.316
45,596,681.64 7.316
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu TL Titik 6.00 168,725.50 1,012,352.98 0.162
2 Pas. Stop Kontak Bh 4.00 28,140.00 112,560.00 0.018
3 Pas. Saklar Ganda Bh 9.00 44,160.00 397,440.00 0.064
4 Pas. Saklar Tunggal Bh 5.00 43,650.00 218,250.00 0.035
5 Pas. Mcb Bh 1.00 158,160.00 158,160.00 0.025
6 Pas. Kotak Mcb Bh 1.00 30,600.00 30,600.00 0.005
7 Pas. Arde Bh 1.00 78,242.48 78,242.48 0.013
2,007,605.46 0.322
XI PEKERJAAN SANITASI
1 Pas. Kloset Duduk American Standar/Setara Bh 3.00 3,302,965.40 9,908,896.20 1.590
2 Pas. Wastafel Bh 3.00 1,320,000.00 3,960,000.00 0.635
3 Pas. Keran Air Bh 4.00 23,392.00 93,568.00 0.015
4 Pas. Floor Drain Bh 1.00 28,135.00 28,135.00 0.005
5 Pas. Keran Leher Angsa Bh 1.00 56,112.00 56,112.00 0.009
6 Pas. Kitchen Zink Bh 1.00 252,626.67 252,626.67 0.041
7 Pas. Shower Kamar Mandi Bh 1.00 93,671.00 93,671.00 0.015
8 Pas. Pipa Galvanis 3/4'' m' 25.64 21,135.63 541,917.43 0.087
9 Pas. Pipa PVC dia. 3” (Mandi/Cuci) m' 9.00 35,037.38 315,336.38 0.051
10 Pas. Pipa PVC dia. 3” (Air Kotor) m' 6.00 35,037.38 210,224.25 0.034
11 Pas. Samb. Pipa PVC dia. 3/4'' Elbow Bh 5.00 3,230.00 16,150.00 0.003
12 Pas. Samb. Pipa PVC dia. 3/4'' Tee Bh 3.00 4,850.00 14,550.00 0.002
13 Pas. Samb. Pipa PVC dia. 3” Elbow Bh 2.00 8,760.00 17,520.00 0.003
14 Pas. Samb. Pipa PVC dia. 3” Tee Bh 2.00 12,750.00 25,500.00 0.004
15 Lem Pipa Bh/Klng 1.00 16,320.00 16,320.00 0.003
15,550,526.92 2.495
XII PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Luar m2 347.31 23,696.15 8,229,926.44 1.321
2 Pek. Cat Tembok Dalam m2 284.16 23,807.50 6,765,217.76 1.086
3 Pek. Cat Plafond m2 180.45 23,807.50 4,296,063.38 0.689
4 Pek. Cat Kusen & Pintu m2 11.72 26,848.90 4,296,063.38 0.689
5 Pek. Cat Lisplank m2 7.96 16,370.00 4,296,063.38 0.689
6 Pek. Cat Atap m2 81.05 23,696.15 1,920,595.35 0.308
29,803,929.68 4.782
XIII PEKERJAAN SECONDARY SKIN, ACCESSORY
1 Pas. Batu Alam m2 4.77 147,696.47 704,984.77 0.113
2 Pek. Profil m' 7.00 100,000.00 700,000.00 0.112
1,404,984.77 0.225
XIV PEKERJAAN ATAP
1 Pek. Rangka atap m2 81.05 103,681.17 8,403,456.54 1.348
2 Pas. Atap Seng Spandek m2 27.69 45,108.35 1,248,948.22 0.200
3 Pas. Atap Genteng Flat Beton m2 53.36 90,216.70 4,814,252.35 0.772
4 Pek. Lisplank Kayu m' 21.99 87,013.32 1,913,422.82 0.307
5 Pek. Lisplank Beton m' 6.30 100,000.00 630,000.00 0.101
17,010,079.93 2.729
XV PEKERJAAN PEMBERSIHAN
1 Pembersihan Sisa Bahan Bangunan Ls 1 300,000.00 300,000.00 0.048
2 Pembersihan Kaca Jendela/Kaca Mati Ls 1 175,000.00 175,000.00 0.028
475,000.00 0.076
JUMLAH TOTAL BIAYA 623,219,946.30 100.0
JUMLAH TOTAL LANTAI 623,219,946.30 100.0
###
REKAPITULASI ( RAB )
Terbilang : Seratus Tiga Puluh Delapan Juta Tujuh Puluh Satu Ribu Rupiah
###
###
0
0
#REF!
I PEKERJAAN PERSIAPAN
1 Pembersihan & Pengukuran kav. Ls 150.00 37,500,000.00 0.00 5,625,000,000.00
2 Pas. Bouwplank m' 58.00 #REF! #REF! #REF! #REF!
3 Alat Bantu Ls 1.00 150,000.00 150,000.00 0.00
#REF! #REF!
II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Garis m3 56.72 #REF! 0.00 #REF!
2 Pek. Galian Tanah Pondasi Poer m3 #REF! #REF! #REF! #REF!
3 Pek. Urugan Kembali Galian m3 20.34 #REF! 0.00 #REF!
4 Pek. Urugan Tanah Bawah Lantai m3 #REF! #REF! #REF! #REF! #REF!
5 Pek. Galian Tanah Septitank m3 #REF! #REF! #REF! #REF!
6 Pek. Urugan Pasir Bawah Pondasi m3 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
III PEKERJAAN PONDASI
1 Pek. Pondasi Batu Kosong m3 11.00 #REF! #REF! #REF! #REF!
2 Pek. Pondasi Batu Kali / Gunung 1:5 m3 33.12 #REF! #REF! #REF! #REF!
3 Pek. Pondasi Rollag Batu Bata 1:5 m3 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
IV PEKERJAAN BETON & BEKISTING
1 Pek. Pembesian Pondasi Poer 80/80/25 Kg #REF! #REF! #REF! #REF! #REF!
2 Pek. Pembesian Pondasi Poer 60/60/25 Kg #REF! #REF! #REF! #REF! #REF!
3 Pek. Pembesian Sloef 20/30 Kg #REF! #REF! #REF! #REF! #REF!
4 Pek. Pembesian Sloef 15/20 Kg 4.36 #REF! #REF! #REF! #REF!
5 Pek. Pembesian Kolom 15/30 Kg 1,465.20 #REF! #REF! #REF! #REF!
6 Pek. Pembesian Kolom 15/20 Kg #REF! #REF! #REF! #REF! #REF!
7 Pek. Pembesian Kolom 15/15 Kg 390.72 #REF! #REF! #REF! #REF!
8 Pek. Pembesian Kolom 15/25 Kg #REF! #REF! #REF! #REF! #REF!
9 Pek. Pembesian Tangga 10 Cm Kg #REF! #REF! #REF! #REF! #REF!
10 Pek. Pembesian Balok Bordes Tangga 15/25 Kg #REF! #REF! #REF! #REF! #REF!
11 Pek. Pembesian Balok Latei 15/20 Kg #REF! #REF! #REF! #REF! #REF!
12 Pek. Pembesian Plat Teras 15 Cm Kg #REF! #REF! #REF! #REF! #REF!
13 Pek. Pembesian Plat Dapur 10 Cm Kg 849.60 #REF! #REF! #REF! #REF!
14 Pek. Pembesian Penutup Septictank 10 cm Kg 117.00 #REF! #REF! #REF! #REF!
15 Pek. Bekisting Pondasi Poer 80/80/25 m2 #REF! #REF! #REF! #REF! #REF!
16 Pek. Bekisting Pondasi Poer 60/60/25 m2 #REF! #REF! #REF! #REF! #REF!
17 Pek. Bekisting Sloef 20/30 m2 #REF! #REF! #REF! #REF! #REF!
18 Pek. Bekisting Sloef 15/20 m2 34.87 #REF! #REF! #REF! #REF!
19 Pek. Bekisting Kolom 15/30 m2 89.54 #REF! #REF! #REF! #REF!
20 Pek. Bekisting Kolom 15/20 m2 #REF! #REF! #REF! #REF! #REF!
21 Pek. Bekisting Kolom 15/15 m2 19.24 #REF! #REF! #REF! #REF!
22 Pek. Bekisting Kolom 15/25 m2 #REF! #REF! #REF! #REF! #REF!
23 Pek. Bekisting Tangga 10 Cm m2 #REF! #REF! #REF! #REF! #REF!
24 Pek. Bekisting Balok Bordes Tangga 15/25 m2 #REF! #REF! #REF! #REF! #REF!
25 Pek. Bekisting Balok Latei 15/20 m2 #REF! #REF! #REF! #REF! #REF!
26 Pek. Bekisting Plat Teras 15 Cm m2 #REF! #REF! #REF! #REF! #REF!
27 Pek. Bekisting Plat Dapur 10 Cm m2 6.50 #REF! #REF! #REF! #REF!
28 Pek. Bekisting Penutup Septictank 10 cm m2 #REF! #REF! #REF! #REF! #REF!
29 Pek. Bekisting Car Port m3 #REF! #REF! #REF! #REF! #REF!
30 Pek. Beton Pondasi Poer 80/80/25 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
31 Pek. Beton Pondasi Poer 60/60/25 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
32 Pek. Beton Sloef 20/30 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
33 Pek. Beton Sloef 15/20 1:2:3 m3 4.36 #REF! #REF! #REF! #REF!
34 Pek. Beton Kolom 15/30 1:2:3 m3 6.11 #REF! #REF! #REF! #REF!
35 Pek. Beton Kolom 15/20 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
36 Pek. Beton Kolom 15/15 1:2:3 m3 1.63 #REF! #REF! #REF! #REF!
37 Pek. Beton Kolom 15/25 1:2:4 m2 #REF! #REF! #REF! #REF! #REF!
38 Pek. Beton Tangga 10 Cm 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
39 Pek. Beton Balok Bordes Tangga 15/25 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
40 Pek. Beton Balok Latei 15/20 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
41 Pek. Beton Plat Teras 15 Cm 1:2:3 m3 1.02 #REF! #REF! #REF! #REF!
42 Pek. Beton Plat Dapur 10 Cm 1:2:3 m3 #REF! #REF! #REF! #REF! #REF!
43 Pek. Beton Lantai Septictank 10 cm 1:2:4 m3 0.11 #REF! #REF! #REF! #REF!
44 Pek. Beton Penutup Septictank 10 cm 1:2:3 m3 0.11 #REF! #REF! #REF! #REF!
45 Pek. Beton Car Port 1:2:4 m3 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
V PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Batu Bata Dinding Rumah 1:3 m2 29.63 #REF! #REF! #REF! #REF!
2 Pek. Pas. Batu Bata Dinding Rumah 1:5 m2 315.74 #REF! #REF! #REF! #REF!
3 Pek. Pas. Batu Bata Dinding Septictank 1:5 #REF! #REF! #REF! #REF! #REF!
4 Pek. Pas. Batu Bata Pagar 1:5 m2 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
VI PEK. LANTAI & DINDING KERAMIK
1 Pek. Urugan Pasir Bawah Lantai m3 #REF! 93,500.00 21,525.00 #REF! #REF!
2 Pek. Lantai Keramik 40/40 Platinum m2 #REF! #REF! #REF! #REF! #REF!
3 Pek. Lantai Keramik 30/30 KM Platinum m2 32.69 #REF! #REF! #REF! #REF!
4 Pek. Dinding Keramik 30/30 KM Platinum m2 #REF! 146,577.53 32,717.50 #REF! #REF!
5 Pek. Keramik Meja Dapur 20/20 Platinum m2 #REF! #REF! #REF! #REF! #REF!
6 Pek. Dinding Keramik Meja Dapur 20/25 Platinum m2 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
VII PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding Rumah 1:3 m2 631.47 #REF! #REF! #REF! #REF!
2 Pek. Plesteran Dinding Rumah 1:5 m2 59.25 #REF! #REF! #REF! #REF!
3 Pek. Plesteran Dinding Septictank 1:5 m2 #REF! #REF! #REF! #REF! #REF!
4 Pek. Plesteran Dinding Pagar 1:5 m2 #REF! #REF! #REF! #REF! #REF!
5 Pek. Acian m2 690.72 #REF! #REF! #REF! #REF!
#REF! #REF!
VIII PEKERJAAN PINTU DAN JENDELA
2 Pek. Kusen & Pintu Type P1 Unit 3.00 1,388,400.00 4,165,200.00 0.00
3 Pek. Kusen & Pintu Type P2 Unit 3.00 1,388,400.00 4,165,200.00 0.00
4 Pek. Kusen & Pintu Type P3 Unit 1.00 #REF! #REF! #REF! #REF!
5 Pek. Kusen & Jendela Type J Unit #REF! #REF! #REF! #REF!
6 Pek. Kusen & Jendela Type J1 Unit 1.00 565,710.00 565,710.00 0.00
7 Pek. Kusen & Jendela Type J2 Unit 2.00 1,071,440.00 2,142,880.00 0.00
8 Pek. Kusen & Jendela Type J5 Unit #REF! #REF! #REF! #REF!
9 Pek. Kusen & Jendela Type J6 Unit #REF! #REF! #REF! #REF!
#REF! #REF!
IX PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum+ Rangka Hollow m2 180.45 #REF! #REF! #REF! #REF!
2 Pek. List plafond m’ #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
IX PEKERJAAN GANTUNGAN & KUNCI
1 Pas. Engsel Pintu Biasa Set #REF! #REF! #REF! #REF! #REF!
2 Pas. Kunci Tanam Set #REF! #REF! #REF! #REF! #REF!
3 Pas. Handle Pintu Set #REF! #REF! #REF! #REF! #REF!
4 Pas. Engsel Jendela Set #REF! #REF! #REF! #REF! #REF!
5 Pas. Kait Angin Set #REF! #REF! #REF! #REF! #REF!
6 Pas. Kunci Selot Jendela Set #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu E 24 Titik #REF! #REF! #REF! #REF! #REF!
2 Instalasi Titik Lampu TL Titik 6.00 149,875.50 18,850.00 899,252.98 113,100.00
3 Instalasi Titik Lampu Taman Titik #REF! #REF! #REF! #REF! #REF!
4 Pas. Stop Kontak Panasonic Bh 4.00 #REF! #REF! #REF! #REF!
5 Pas. Saklar Ganda Panasonic Bh 9.00 #REF! #REF! #REF! #REF!
6 Pas. Saklar Tunggal Panasonic Bh 5.00 #REF! #REF! #REF! #REF!
7 Pas. Mcb Bh 1.00 #REF! #REF! #REF! #REF!
8 Pas. Kotak Mcb Bh 1.00 30,600.00 30,600.00 0.00
9 Pas. Arde Bh 1.00 #REF! #REF! #REF! #REF!
#REF! #REF!
XI PEKERJAAN SANITASI
1 Pas. Kloset Duduk American Standar/Setara Bh 3.00 #REF! #REF! #REF! #REF!
2 Pas. Keran Air Bh 4.00 #REF! #REF! #REF! #REF!
3 Pas. Floor Drain Bh 1.00 #REF! #REF! #REF! #REF!
4 Pas. Keran Leher Angsa Bh 1.00 #REF! #REF! #REF! #REF!
5 Pas. Kitchen Zink Bh 1.00 #REF! #REF! #REF! #REF!
6 Pas. Shower Kamar Mandi Bh 1.00 #REF! #REF! #REF! #REF!
7 Pas. Pipa Galvanis 3/4'' m' 25.64 #REF! #REF! #REF! #REF!
8 Pas. Pipa PVC dia. 3” (Mandi/Cuci) m' 9.00 #REF! #REF! #REF! #REF!
9 Pas. Pipa PVC dia. 3” (Air Kotor) m' 6.00 #REF! #REF! #REF! #REF!
10 Pas. Samb. Pipa PVC dia. 3/4'' Elbow Bh 5.00 3,230.00 16,150.00 0.00
11 Pas. Samb. Pipa PVC dia. 3/4'' Tee Bh 3.00 4,850.00 14,550.00 0.00
12 Pas. Samb. Pipa PVC dia. 3” Elbow Bh 2.00 8,760.00 17,520.00 0.00
13 Pas. Samb. Pipa PVC dia. 3” Tee Bh 2.00 12,750.00 25,500.00 0.00
14 Lem Pipa Bh/Klng 1.00 16,320.00 16,320.00 0.00
#REF! #REF!
XII PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Luar m2 347.31 #REF! #REF! #REF! #REF!
2 Pek. Cat Tembok Dalam m2 284.16 #REF! #REF! #REF! #REF!
3 Pek. Cat Plafond m2 180.45 #REF! #REF! #REF! #REF!
4 Pek. Cat Kusen & Pintu m2 11.72 #REF! #REF! #REF! #REF!
5 Pek. Cat Lisplank m2 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
XIV PEKERJAAN ATAP
1 Pek. Rangka atap m2 #REF! #REF! #REF! #REF! #REF!
2 Pas. Atap Seng Motif Genteng m2 #REF! #REF! #REF! #REF! #REF!
3 Pek. Lapis Karet Atap m2 #REF! #REF! #REF! #REF! #REF!
4 Pek. Lisplank m' #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
XV PEKERJAAN SECONDARY SKIN, ACCESSORY
1 Pas. Batu Alam m2 4.77 88,221.47 59,475.00 421,098.70 283,886.07
421,098.70 283,886.07
XIII PEKERJAAN PEMBERSIHAN
1 Pembersihan Sisa Bahan Bangunan Ls #REF! #REF! #REF! #REF!
2 Pembersihan Kaca Jendela/Kaca Mati Ls #REF! #REF! #REF! #REF!
#REF! #REF!
JUMLAH LANTAI 1 #REF! #REF!
LANTAI 2
1 2 3 4 5 6 7 8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PT. AKAR MAS DEVELOPMENT
PROYEK : PEMBANGUNAN PERUMAHAN BASNAPAL RESIDENCE
SUBJECT : RENCANA PEMBAYARAN TAHAPAN
PEKERJAAN : PEMBANGUNAN TYPE 84 / 105
LOKASI : BLOK
I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 58.00
Kayu 5/7 0.010 M³ 0.58
Paku biasa 2" - 5" 0.020 Kg 1.160
Kayu papan 3/20 0.007 M³ 0.406
II PEKERJAAN TANAH
1 Pek. Urugan Tanah Bawah Lantai M³ #REF!
Tanah Urug 1.200 M³ #REF!
2 Pek. Urugan Pasir Bawah Pondasi M³ #REF!
Pasir urug 1.200 M³ #REF!
IX PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum+ Rangka Hollow M² 180.45
Gypsum board (120 x 240 x 6) mm 0.364 Lbr 65.68
Paku sekrup 0.110 Kg 19.85
Hollow 0.857 Btg 154.66
2 Pek. List plafond M' #REF!
List Profil Gypsum 1.100 M' #REF!
Paku 0.010 Kg #REF!
LANTAI 2
1 2 3 4
IX PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum+ Rangka Hollow M² #REF!
Gypsum board (120 x 240 x 6) mm 0.364 Lbr #REF!
Paku sekrup 0.110 Kg #REF!
Hollow 0.857 Btg #REF!
2 Pek. List plafond M' #REF!
List Profil Gypsum 1.100 M' #REF!
Paku 0.010 Kg #REF!
IV PEKERJAAN BETON & BEKISTING #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
V PEKERJAAN PASANGAN DINDING #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VIII PEKERJAAN PINTU & JENDELA #REF! #REF! #REF! #REF! #REF!
XIV PEKERJAAN SECONDARY SKIN, ACCESSORY #REF! #REF! #REF! #REF! #REF!
TOTAL BOBOT #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W A K T U P E L A K S A N A A N ( BULAN)
NO JENIS PEKERJAAN JUMLAH HARGA (Rp) BOBOT (%) DURASI
1 2 3 4 5 6 7 8
4 PEKERJAAN BETON & BEKISTING 175,624,784.89 28.180225285 2 7.0450563 7.0450563 7.0450563 7.0450563 80
5 PEKERJAAN PASANGAN DINDING 55,866,743.67 8.9642098269 2 2.241052 2.241052 2.241052 2.241052 73.33
6 PEKERJAAN LANTAI & DINDING KERAMIK 65,936,864.59 10.580031172 2 2.6450078 2.6450078 2.6450078 2.6450078 66.667
BOBOT PROGRESS / 2 MINGGU 3.359504 3.359504 2.7289016 2.7289016 8.7741544 8.7741544 9.2861088 9.2861088 4.4139146 4.4139146 5.7184789 5.7184789 15.680829 15.680829 0.0381085 0.0381085 0
JUMLAH KOMULATIF 623,219,946.30 100 3.359504 6.719008 9.4479096 12.176811 20.950966 29.72512 39.011229 48.297337 52.711252 57.125167 62.843645 68.562124 84.242954 99.923783 99.961891 100