Vous êtes sur la page 1sur 3

MOHAMED NASR ZAYED

Mob: +201032892284
Email: m.nasrzayed86@gmail.com
Address: Madinty, Cairo, EGYPT

PROFIOSSIONAL SUMMARY:

Senior Mechanical Engineer, more than 8 years of experience in construction projects including 3 years in GCC
Projects as technical office, project and site engineer , with extensive experience in HVAC, Firefighting, plumbing
and swimming pools systems design development, solid technical expertise, prompt problem-solving with
advanced knowledge of MEP systems, materials, and electromechanical equipment installation, Master the
fundamentals of engineering and apply engineering theories and principles of design, Skilled project
management, passionate leadership in identifying problems and providing solutions.

WORK EXPERIENCE:

SR .Mechanical Engineer (MEP Building Services) at Regency Gate Engineering Service (Aug2021-Present)
Projects: Residential and Commercial Building

 Prepare designs and calculations for plumbing systems such as water supply systems, drainage systems,
storm systems and swimming pools.
 Prepare designs and calculations for firefighting systems such as automatic sprinklers, fire hose
cabinets, fire hydrants, gas systems, and FF pump stations.
 Prepare designs and calculations for heating air conditioning systems such as chilled water, direct
expansion, and ventilation systems.
 Prepare project documents such as design drawings, material submittals, calculation sheets, equipment
selection, data methods, estimates, BOQs, test procedures, shutdown reports, etc.
 supervising on-site labor and arranging it in accordance with the day's activities
 Monitoring site progress and providing input to the planning engineer on a weekly basis
 Scheduling of delivery of materials and shop drawings (approvals, project procurement deliverable
status, and delivery of materials) Follow up with the supplier to ensure delivery on time.
 Coordination with other services, either on site or through the preparation of coordination drawings.
 Attend technical meetings to understand the project status and resolve any technical issues that arise.
Preparation of a response to NCR, raising technical queries.
 Preparation of the monthly progress invoice and following up with the consultant/main contractor till
the payment certificate is released.
 Project-related correspondence with the main contractor, consultant, and subcontractor (if applicable)
in order to update variations as per the new requirements that may arise during project execution.
 Monitoring Services and Mechanical Equipment Installation Works ensure that it is installed according
to the manufacturer's specifications and recommendations and provide it with the necessary hookups.
 preparation of an evaluation of tender or contract documents and a bill of quantities
 preparation of preliminary estimation, budget estimation, and detailed estimates after
 Quantity Take-Off
 Sending inquiries and obtaining prices, analyzing prices, and preparing material and labor cost
estimations.
SR. MEP Engineer (Design) at INFRA-AIR for engineering and contracting (Mar2020-Jul2021)
Project: NN1 Administration Building, New Capital

 Review awarded projects documentation from tender like (design drawing, calculations, BOQ, contract,
project specification, etc.)
 Analyze drawings, specifications and statements of work in the preparation for project resource
planning and scheduling of works.
 Prepare design drawings and calculations for plumbing system (water supply, drainage, booster pump
room, underground tank )
 Prepare design drawings and calculations for Firefighting system (Wet sprinklers, FHC, FH, FF pump
room, Fire Alarm system, underground tank )
 Prepare material submittals and QS.
 Monitoring project budgets and schedules and overseeing performance to ensure on-time , quality, and
project budget execution.
 Coordination with other services, either on site or through the preparation of coordination drawings.
 Monitoring Services and Mechanical Equipment Installation Works ensure that it is installed according
to the manufacturer's specifications and recommendations and provide it with the necessary hookup.

Project Engineer at Tubal leading company for industry & trade (KSA) (Apr2017-Jan2020)
Projects: Rabigh housing Complex, Riyadh Improvement schools, Embassies Compound, Almalqa Private Schools

 Project management, supervision and co-ordination of electromechanical works in high-rise building


and commercial.
 Assistance in the preparation of shop drawing and calculations for HVAC, Plumbing and firefighting
systems services as per site requirements and international codes (ASHRAE, SMACNA, IPC, ASPE, NPC,
and NFPA).
 Preparation and review BOQ, Cost study, Project Specs, Equipment’s selection, Technical submittals and
construction Programs).
 Check installation of electromechanical systems and pump stations in site.
 Enable testing and commissioning of mechanical installation.
 Prepare weekly and monthly progress reports and asses those against the project schedule.
 Ensure the availably of adequate resources (manpower and material) for the execution of assigned job.
 Coordinate with civil/electrical and mechanical works.
 Provide input to quantity surveyor for interim payment applications.
 Conduct safety tool box lecture to ensure safety regulations for individuals on the site.
 Ensure work is executed according to contract specifications, approval design drawings, agreed
procedures, and MOS.

Mechanical Site Engineer at Archirodon Construction (Oct2014-Feb2017)


Project: El shabab power station

 Generally responsible for installation, implementation and monitoring of all mechanical related works
on site (Underground Networks – MEP Systems) as per approved drawings, methods and safety rules.
 Submits site daily reports, inspection requests, estimate and all applicable monitoring reports on
regular basis or as required.
 Checking technical designs drawing to ensure that they are followed correctly.
 Ensuring Projects meet agreed specifications and time schedule.
 Providing technical advice, problem solving.
Mechanical Site Engineer at Egypt air force (Oct2013-June2014)
Project: Cairo waste air force upgrading

 Implementation and supervision of all mechanical works on site.


 Preparing daily reports and any other documents for the site.
 Monitor the work of mechanical subcontractors.
 Advice on payment to subcontractors.
 Receive the materials according to the technical specifications of the project.

EDUCATION:


th
Higher Technological institute 10 of Ramadan
Bachelor of Mechanical Engineering, Mechanical power Department (2012)

SKILLS:

PERSONAL:

 Technical Problem Solving.


 Strong Verbal and Written Communication skills.
 Team Leader.
 Mechanical Equipment installation.
 MEP System Design and Specifications.
 P&ID Design.
 Quantity Survey (QS).
 Cost Estimation and Project Control.
 Experts in Pump Station Installation.

SOFTWARE:

 AutoCAD.
 HVAC Software (HAP, Duct Sizer, Pipe Sizer)
 Firefighting Software (ELITE)

LANAGUGE:

 Arabic: Native.
 English: Excellent Spoken and Written.

Vous aimerez peut-être aussi