Casablanca Le13/12/2023

DEVIS N°DE085/23 MR. MAMOUN RAHMOUNI


IMMEUBLE PLATEAU BUREAU
SIDI MAAROUF

Désignations Unité Quantité P.H.T Total TTC


FOURNITURE ET POSE
GAINES EP 4CM LA POSE DES
SUPPORTS EN BAS
1er S/SOL
5*3,56 M² 17.80 208.33 3,708.27
5,90*3,26 M² 19.23 208.33 4,007.02
11,50*3,06 M² 35.19 208.33 7,331.13
15,45*2,86 M² 44.19 208.33 9,205.48
15,30*2,76 M² 42.23 208.33 8,797.36
10,72*1,66 M² 17.80 208.33 3,707.27
2émé S/SOL
5,07*3,54 M² 17.95 208.33 3,739.07
4,90*3,86 M² 18.91 208.33 3,940.35
8,6*3,66 M² 31.48 208.33 6,557.40
10,10*3,40 M² 34.34 208.33 7,154.05
5,3*3,06 M² 16.22 208.33 3,378.70
12,5*2,6 M² 32.50 208.33 6,770.73
10,7*1,76 M² 18.83 208.33 3,923.27
GAINE EP 2,5 CM FIXATION
VERTICALE
1er S/SOL & R+6
36,53*1,90 M² 69.41 100.00 6,940.70
TALOCHE
36,53*1,30 M² 47.49 33.33 1,582.81
TOTAL HT 80,743.60
TVA 20% 16,148.72
TOTAL TTC 96,892.32
Casablanca Le13/12/2023

DEVIS N°DE085B/23 MR. MAMOUN RAHMOUNI


IMMEUBLE PLATEAU BUREAU
SIDI MAAROUF
TRAVAUX SUPPLÉMENTAIRE

Désignations Unité Quantité P.H.T Total TTC


GAINE HORIZONTALE EP 2,5 CM AVEC
STRUCTURE MI-PRO
2émé S/SOL
23,80*1,90 M² 45.22 175.00 7,913.50
24,70*1,25 M² 30.88 175.00 5,403.13

TOTAL HT 13,316.63
TVA 20% 2,663.33
TOTAL TTC 15,979.95
5 3.56 17.80 5.07 3.54
5.9 3.26 19.23 4.9 3.86
11.5 3.06 35.19 8.6 3.66
15.45 2.86 44.19 10.1 3.4
15.3 2.76 42.23 5.3 3.06
10.72 1.66 17.80 12.5 2.6
10.7 1.76
17.95
18.91
31.48
34.34
16.22
32.50
18.83

36.53 1.9 69.407


36.53 1.3 47.489

23.8 1.9 45.22

24.7 1.25 30.875