31 42,480 8,000
Siku 25 x 25 x 3 mm – 6 M 6.72 53,760 8,000
Siku 30 x 30 x 3 mm – 6 M 8.16 65,280 8,000
Siku 40 x 40 x 3 mm – 6 M 11 88,000 8,000
Siku 40 x 40 x 4 mm – 6 M 14.5 116,000 8,000
Siku 40 x 40 x 5 mm – 6 M 18 144,000 8,000
Siku 45 x 45 x 4 mm – 6 M 16.44 131,520 8,000
Siku 45 x 45 x 5 mm – 6 M 20.5 164,000 8,000
Siku 50 x 50 x 4 mm – 6 M 18.4 147,200 8,000
Siku 50 x 50 x 5 mm – 6 M 22.68 181,440 8,000
Siku 50 x 50 x 6 mm – 6 M 27.58 220,640 8,000
Siku 60 x 60 x 5 mm – 6 M 27.42 219,360 8,000
Siku 60 x 60 x 6 mm – 6 M 32.52 260,160 8,000
Siku 65 x 65 x 6 mm – 6 M 35.46 283,680 8,000
Siku 70 x 70 x 6 mm – 6 M 38.28 306,240 8,000
Siku 70 x 70 x 7 mm – 6 M 44.28 354,240 8,000
Siku 75 x 75 x 6 mm – 6 M 41.22 329,760 8,000
Siku 75 x 75 x 7 mm – 6 M 47.64 381,120 8,000
Siku 75 x 75 x 8 mm – 6 M 54.18 433,440 8,000
Siku 75 x 75 x 9 mm – 6 M 60 480,000 8,000
Siku 80 x 80 x 6 mm – 6 M 43.02 344,160 8,000
Siku 80 x 80 x 8 mm – 6 M 57.96 463,680 8,000
Siku 90 x 90 x 8 mm – 6 M 65.4 523,200 8,000
Siku 90 x 90 x 9 mm – 6 M 73.2 585,600 8,000
Siku 90 x 90 x 10 mm – 6 M 79.8 638,400 8,000
Siku 100 x 100 x 8 mm – 6 M 73.2 585,600 8,000
Siku 100 x 100 x 10 mm – 6 90.6 724,800 8,000
Siku 100 x 100 x 11 mm – 6 119.4 955,200 8,000
Siku 120 x 120 x 12 mm – 6 130 1,040,000 8,000
Siku 125 x 125 x 12 mm – 6 140 1,120,000 8,000
Siku 130 x 130 x 9 mm – 6 M 129 1,032,000 8,000
Per 1 M3/
Bata Ringan Hebel
Kubik
750,000
Per 1 M3/
Bata Ringan Voscon Kubik
1,000,000
Bata Ringan 10x20x60cm 1 Biji 10,000
Bata Ringan 7,5x20x60cm 1 Biji 7,800
Bata Ringan 10x20x60cm Per 1 M3 750,000
Per 1 M
Bata Ringan 7,5x20x60cm Kubik
585,000
Ukuran Besi Hollow Berat Kg Harga Per Batang
Besi Hollow 40 x 40 x 2 mm x 6 Meter 14.45 Rp 114,155 114,155 7,900
Besi Hollow 40 x 40 x 2,3 mm x 6 Meter 16.6 Rp 131,140 131,140 7,900
Besi Hollow 50 x 50 x 2 mm x 6 Meter 18.21 Rp 143,859 143,859 7,900
Besi Hollow 50 x 50 x 2,3 mm x 6 Meter 20.94 Rp 165,426 165,426 7,900
Besi Hollow 50 x 50 x 2,5 mm x 6 Meter 22.77 Rp 179,883 179,883 7,900
Besi Hollow 50 x 50 x 2,7 mm x 6 Meter 25 Rp 197,500 197,500 7,900
Besi Hollow 50 x 50 x 2,8 mm x 6 Meter 25.5 Rp 201,450 201,450 7,900
Besi Hollow 50 x 50 x 3 mm x 6 Meter 27.32 Rp 215,828 215,828 7,900
Besi Hollow 60 x 60 x 2 mm x 6 Meter 22 Rp 173,800 173,800 7,900
Besi Hollow 60 x 60 x 2,3 mm x 6 Meter 25.26 Rp 199,554 199,554 7,900
Besi Hollow 60 x 60 x 2,5 mm x 6 Meter 27.5 Rp 217,250 217,250 7,900
Besi Hollow 60 x 60 x 2,8 mm x 6 Meter 30.77 Rp 243,083 243,083 7,900
Besi Hollow 60 x 60 x 3 mm x 6 Meter 33 Rp 260,700 260,700 7,900
Besi Hollow 60 x 60 x 3,2 mm x 6 Meter 35.17 Rp 277,843 277,843 7,900
Besi Hollow 75 x 75 x 2 mm x 6 Meter 27.63 Rp 218,277 218,277 7,900
Besi Hollow 75 x 75 x 2,3 mm x 6 Meter 32 Rp 252,800 252,800 7,900
Besi Hollow 75 x 75 x 2,5 mm x 6 Meter 34.53 Rp 272,787 272,787 7,900
Besi Hollow 75 x 75 x 3,2 mm x 6 Meter 44.19 Rp 349,101 349,101 7,900
Besi Hollow 100 x 100 x 3,2 mm x 6 Meter 59.28 Rp 468,312 468,312 7,900
Besi Hollow 100 x 100 x 4,5 mm x 6 M 83.37 Rp 658,623 658,623 7,900
Besi Hollow 125 x 125 x 3,2 mm x 6 M 74.36 Rp 587,444 587,444 7,900
Besi Hollow 125 x 125 x 4,5 mm x 6 M 104.56 Rp 826,024 826,024 7,900
Besi Hollow 150 x 150 x 4,5 mm x 6 M 125.76 Rp 993,504 993,504 7,900
Besi Hollow 150 x 150 x 5 mm x 6 M 139.73 Rp 1,103,867 1,103,867 7,900
Uraian Ukuran Harga Ket.
Wiremesh M5 2,1 m x 5,4 m 215,000 24,14 kg/lbr 8906.3795
Wiremesh M6 2,1 m x 5,4 m 315,000 34,76 kg/lbr 9062.1404
Wiremesh M7 2,1 m x 5,4 m 425,000 47,31 kg/lbr 8983.30163
Wiremesh M8 2,1 m x 5,4 m 550,000 61,79 kg/lbr 8901.11669
Wiremesh M9 2,1 m x 5,4 m 725,000 78,21 kg/lbr
Wiremesh M10 2,1 m x 5,4 m 880,000 96,55 kg/lbr
MEDIUM SCHEDUL
( inch )
SII E 40
1 360,800 395,800
I. PEKERJAAN ………………………………. Rp -
II. PEKERJAAN ………………………………. Rp -
III. PEKERJAAN ………………………………. Rp -
IV. PEKERJAAN ………………………………. Rp -
V. PEKERJAAN ………………………………. Rp -
VI. PEKERJAAN ………………………………. Rp -
VII. PEKERJAAN ………………………………. Rp -
VIII. PEKERJAAN ………………………………. Rp -
IX. PEKERJAAN ………………………………. Rp -
X. PEKERJAAN ………………………………. Rp -
XI. PEKERJAAN ………………………………. Rp -
Jumlah Rp -
PPN 10% Rp -
Jumlah Total Rp -
Dibulatkan Rp -
Terbilang : ..........................
NIHIL
-
NIHIL - 1 0 0 0 0
0 0 0 0 0 0 0 0
( Rupiah ) ( Rupiah ) ( Rupiah ) ( Rupiah ( Rupiah( Rupi ( Rup
( R ( ( ( ( Rupiah )
Contoh
Kegiatan : ……………………………………………
Pekerjaan : ……………………………………………
Lokasi : ……………………………………………
TA : ……………………………………………
I. PEKERJAAN PERSIAPAN
1 ……………………….. A. 2.2.1.1. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
Rp -
V. PEKERJAAN Dst……………………..
1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
4 ……………………….. ……. …. Rp - Rp -
5 dst………………………. ……. …. Rp - Rp -
Rp -
XII. UPAH DAN BAHAN
HARGA SURVEY
NO. URAIAN SATUAN
RATA-RATA
1 2 3 4
I. TENAGA KERJA
1 Pekerja Oh 120,000
2 Tenaga gali tanah/pondasi Oh 120,000
3 Tukang Oh 160,000
4 Tukang pipa Oh 160,000
5 Tukang batu Oh 160,000
6 Tukang kayu Oh 160,000
7 Tukang cat Oh 160,000
8 Tukang besi Oh 160,000
9 Tukang politur Oh 160,000
10 Tukang Listrik Oh 160,000
11 Tukang Las Konstruksi Oh 160,000
12 Tukang khusus aluminium Oh 160,000
13 Tukang Las biasa Oh 160,000
14 Tukang Pipa ledeng Oh 160,000
15 Tukang Batu/Pipa Oh 160,000
16 Tukang Vibrator Oh 160,000
17 Tukang Erection Oh 160,000
18 Operator crane Oh 180,000
19 Pembantu operator crane Oh 120,000
20 Operator Oh 200,000
21 Kepala Tukang Oh 200,000
22 Kepala tukang batu Oh 200,000
23 Kepala tukang kayu Oh 200,000
24 Kepala tukang cat Oh 200,000
25 Kepala tukang besi Oh 200,000
26 Kepala tukang politur Oh 200,000
27 Mandor Oh 200,000
28 Operator alat berat Oh 180,000
HARGA
HARGA
SATUAN
SATUAN UPAH/
GALIAN C UPAH/
BAHAN/ALAT
BAHAN/ALAT
2021
2020
5 6
120,000 120,000
120,000 120,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
180,000 180,000
120,000 120,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
180,000 180,000
- -
70,484.00 70,484.00
68.75 68.75
462,214.00 462,214.00
482,241.80 482,241.80
487,265.20 487,265.20
455,403.00 455,403.00
436,921.15 436,921.15
481,338.51 481,338.51
470,634.18 470,634.18
270,204.00 270,204.00
232,254.00 232,254.00
67,403.42 67,403.42
5,309.62 5,309.62
78,529.00 78,529.00
132,000.00 132,000.00
17,691.61 17,691.61
17,691.61 17,691.61
15,750.00 15,750.00
68,077.78 68,077.78
73,700.00 73,700.00
42,955.00 42,955.00
47,300.00 47,300.00
51,700.00 51,700.00
58,520.00 58,520.00
55,971.67 55,971.67
60,390.00 60,390.00
64,460.00 64,460.00
70,418.33 70,418.33
72,215.00 72,215.00
72,462.50 72,462.50
80,478.10 80,478.10
81,400.00 81,400.00
81,922.50 81,922.50
90,537.86 90,537.86
86,625.00 86,625.00
100,597.62 100,597.62
96,250.00 96,250.00
13,514.29 13,514.29
6,175.71 6,175.71
4,510.00 4,510.00
10,138.33 10,138.33
35,750.00 35,750.00
42,533.33 42,533.33
56,210.00 56,210.00
85,356.27 85,356.27
14,850.00 14,850.00
39,600.00 39,600.00
168,000.00 168,000.00
67,000.00 67,000.00
1,080,000.00 1,080,000.00
13,557.00 13,557.00
14,494.75 14,494.75
14,941.00 14,941.00
15,844.75 15,844.75
143,000.00 143,000.00
80,300.00 80,300.00
88,000.00 88,000.00
104,500.00 104,500.00
16,500.00 16,500.00
216,700.00 216,700.00
464,592.86 464,592.86
236,500.00 236,500.00
233,750.00 233,750.00 0.1815
385,550.00 385,550.00
4,565,000.00 4,565,000.00
3,630,000.00 3,630,000.00
11,000.00 11,000.00
8,580.00 8,580.00
1,895.21 1,895.21
50,094.00 50,094.00
198,000.00 198,000.00
1,540.00 1,540.00
1,446.92 1,446.92
1,369.50 1,369.50
393,874.14 393,874.14
369,933.33 369,933.33
198,000.00 198,000.00
452,021.50 452,021.50
332,750.00 332,750.00
70,180.00 70,180.00
387,000.00 387,000.00
171,600.00 171,600.00
444,583.33 444,583.33
436,379.17 436,379.17
438,750.00 438,750.00
440,473.29 440,473.29
440,544.71 440,544.71
200,102.00 200,102.00
305.56 305.56
305.56 305.56
305.56 305.56
305.56 305.56
46,200.00 46,200.00
302,500.00 302,500.00
162,500.00 162,500.00
595,430.00 595,430.00
8,690.00 8,690.00
8,140.00 8,140.00
13,105.05 13,105.05
9,938.74 9,938.74
9,859.00 9,859.00
10,018.47 10,018.47
11,632.88 11,632.88
10,557.95 10,557.95
1,235,891.25 1,235,891.25
468,713.75 468,713.75
705,463.75 705,463.75
973,095.75 973,095.75
509,355.00 509,355.00
283,967.67 283,967.67
12,537.25 12,537.25
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
11,251.49 11,251.49
17,966.67 17,966.67
13,105.05 13,105.05
9,938.74 9,938.74
9,859.00 9,859.00
10,018.47 10,018.47
11,632.88 11,632.88
10,557.95 10,557.95
5,225.00 5,225.00
8,456.25 8,456.25
9,625.00 9,625.00
515,143.20 515,143.20
724,485.30 724,485.30
646,188.40 646,188.40
908,626.40 908,626.40
1,092,854.40 1,092,854.40
1,214,253.70 1,214,253.70
125,570.50 125,570.50
144,254.00 144,254.00
158,244.90 158,244.90
181,968.60 181,968.60
197,871.30 197,871.30
217,250.00 217,250.00
221,595.00 221,595.00
237,410.80 237,410.80
191,180.00 191,180.00
219,509.40 219,509.40
238,975.00 238,975.00
267,391.30 267,391.30
286,770.00 286,770.00
240,104.70 240,104.70
278,080.00 278,080.00
300,065.70 300,065.70
384,011.10 384,011.10
22,000.00 22,000.00
149,050.00 149,050.00
11,737.00 11,737.00
15,730.00 15,730.00
9,680.00 9,680.00
9,900.00 9,900.00
### 10,500,000.00
7,875,000.00 7,875,000.00
80,630.00 80,630.00
9,680.00 9,680.00
57,750.00 57,750.00
45,512.50 45,512.50
78,650.00 78,650.00
66,770.00 66,770.00
19,662.50 19,662.50
18,892.50 18,892.50
7,260.00 7,260.00
4,675.00 4,675.00
48,950.00 48,950.00
4,984.38 4,984.38
35,750.00 35,750.00
35,200.00 35,200.00
33,000.00 33,000.00
1,452,000.00 1,452,000.00
484,000.00 484,000.00
484,000.00 484,000.00
1,163,910.00 1,163,910.00
484,000.00 484,000.00
72,600.00 72,600.00
85,000.00 85,000.00
49,000.00 49,000.00
77,293.33 77,293.33
109,725.00 109,725.00
13,750.00 13,750.00
55,963.44 55,963.44
64,088.78 64,088.78
33,366.67 33,366.67
55,556.00 55,556.00
57,191.67 57,191.67
56,684.67 56,684.67
41,372.88 41,372.88
55,086.52 55,086.52
51,244.29 51,244.29
92,862.00 92,862.00
76,692.00 76,692.00
64,773.08 64,773.08
19,700.00 19,700.00
1,667,966.67 1,667,966.67
3,212,000.00 3,212,000.00
559,166.67 559,166.67
217,861.11 217,861.11
211,126.67 211,126.67
1,383,800.00 1,383,800.00
49,316.67 49,316.67
52,708.33 52,708.33
423,361.03 423,361.03
224.39 224.39
37,103.85 37,103.85
1,848.61 1,848.61
215,710.00 215,710.00
129,250.00 129,250.00
53,900.00 53,900.00
40,920.00 40,920.00
60,000.00 60,000.00
70,000.00 70,000.00
1,100,000.00 1,100,000.00
386,760.00 386,760.00
924,000.00 924,000.00
22,173.68 22,173.68
53,263.16 53,263.16
82,500.00 82,500.00
29,590.00 29,590.00
442,200.00 442,200.00
26,042.50 26,042.50
30,250.00 30,250.00
31,460.00 31,460.00
399,300.00 399,300.00
14,520.00 14,520.00
25,850.00 25,850.00
1,815.00 1,815.00
9,854.17 9,854.17
- -
- -
484,000.00 484,000.00
665,500.00 665,500.00
93,500.00 93,500.00
140,000.00 140,000.00
70,583.33 70,583.33
31,350.00 31,350.00
52,341.67 52,341.67
38,293.75 38,293.75
38,500.00 38,500.00
63,250.00 63,250.00
57,415.60 57,415.60
26,498.72 26,498.72
990,000.00 990,000.00
297,366.67 297,366.67
31,900.00 31,900.00
20,044.44 20,044.44
42,405.00 42,405.00
104,192.00 104,192.00
77,600.00 77,600.00
425,388.00 425,388.00
31,812.50 31,812.50
33,235.00 33,235.00
605,000.00 605,000.00
61,187.50 61,187.50
127,200.00 127,200.00
9,735.00 9,735.00
1,100,000.00 1,100,000.00
22,000.00 22,000.00
37,400.00 37,400.00
8,000.00 8,000.00
9,000.00 9,000.00
825,000.00 825,000.00
317,240.00 317,240.00
185,020.00 185,020.00
52,076.25 52,076.25
23,514.69 23,514.69
33,275.00 33,275.00
6,783.33 6,783.33
53,114.29 53,114.29 796.71 ###
8,461.75 8,461.75 126.93
14,806.00 14,806.00 222.09
19,624.00 19,624.00 294.36
34,787.50 34,787.50 521.81
85,000.00 85,000.00
242,000.00 242,000.00
104,500.00 104,500.00
145,750.00 145,750.00
154,000.00 154,000.00
- -
- -
154,000.00 154,000.00
93,500.00 93,500.00
137,500.00 137,500.00
217,800.00 217,800.00
568,700.00 568,700.00
605,000.00 605,000.00
266,200.00 266,200.00
568,700.00 568,700.00
605,000.00 605,000.00
217,800.00 217,800.00
266,200.00 266,200.00
24,200.00 24,200.00
71,500.00 71,500.00
129,800.00 129,800.00
26,400.00 26,400.00
938,300.00 938,300.00
363,000.00 363,000.00
423,500.00 423,500.00
102,850.00 102,850.00
145,200.00 145,200.00
302,500.00 302,500.00
145,200.00 145,200.00
266,200.00 266,200.00
625,900.00 625,900.00
20,680.00 20,680.00
7,739.29 7,739.29
17,600.00 17,600.00
44,000.00 44,000.00
77,924.00 77,924.00
28,664.90 28,664.90
10,894.07 10,894.07
109,346.60 109,346.60
18,783.11 18,783.11
17,270.00 17,270.00
33,586.67 33,586.67
23,964.29 23,964.29
45,540.00 45,540.00
26,125.00 26,125.00
18,374.07 18,374.07
23,393.33 23,393.33
87,560.00 87,560.00
12,048.75 12,048.75
3,569,198.00 3,569,198.00
3,482,456.20 3,482,456.20
2,780,578.17 2,780,578.17
2,991,422.60 2,991,422.60
2,596,383.33 2,596,383.33
2,498,000.00 2,498,000.00
2,374,225.75 2,374,225.75
2,206,250.00 2,206,250.00
3,015,000.00 3,015,000.00
1,707,096.00 1,707,096.00
1,782,215.50 1,782,215.50
290,000.00 290,000.00
5,225.00 5,225.00
37,537.50 37,537.50
33,000.00 33,000.00
49,500.00 49,500.00
61,050.00 61,050.00
65,679.17 65,679.17
56,792.59 56,792.59
65,066.67 65,066.67
60,967.50 60,967.50
63,066.67 63,066.67
58,410.00 58,410.00
69,609.38 69,609.38
54,835.00 54,835.00
99,000.00 99,000.00
176,000.00 176,000.00
99,000.00 99,000.00
165,000.00 165,000.00
372,395.10 372,395.10
64,114.29 64,114.29
199,600.00 199,600.00
140,879.33 140,879.33
296,180.33 296,180.33
304,000.00 304,000.00
18,500.00 18,500.00
5,200.00 5,200.00
3,005.36 3,005.36
3,575.00 3,575.00
81,125.00 81,125.00
41,492.00 41,492.00
72,600.00 72,600.00
39,233.33 39,233.33
27,046.25 27,046.25
27,775.00 27,775.00
16,500.00 16,500.00
9,350.00 9,350.00
- -
28,600.00 28,600.00
- -
207,487.50 207,487.50
188,100.00 188,100.00
198,000.00 198,000.00
19,800.00 19,800.00
137,133.33 137,133.33
180,125.00 180,125.00
90,750.00 90,750.00
90,750.00 90,750.00
66,550.00 66,550.00
102,850.00 102,850.00
102,850.00 102,850.00
90,750.00 90,750.00
88,000.00 88,000.00
104,500.00 104,500.00
88,000.00 88,000.00
132,000.00 132,000.00
259,233.33 259,233.33
215,600.00 215,600.00
63,250.00 63,250.00
111,650.00 111,650.00
126,500.00 126,500.00
70,950.00 70,950.00
92,950.00 92,950.00
133,100.00 133,100.00
119,163.00 119,163.00
152,559.00 152,559.00
171,534.00 171,534.00
346,500.00 346,500.00
132,792.00 132,792.00
247,500.00 247,500.00
177,650.00 177,650.00
43,670.00 43,670.00
52,800.00 52,800.00
59,730.00 59,730.00
67,650.00 67,650.00
31,166.67 31,166.67
25,520.00 25,520.00
16,463.33 16,463.33
24,148.34 24,148.34
24,148.34 24,148.34
39,416.67 39,416.67
- -
- -
19,066.67 19,066.67
507,775.33 507,775.33
507,775.33 507,775.33
507,775.33 507,775.33
496,987.67 496,987.67
275,000.00 275,000.00
233,475.00 233,475.00
11,281.50 11,281.50
12,550.00 12,550.00
31,410.00 31,410.00
3,080,000.00 3,080,000.00
193,050.00 193,050.00
252,083.33 252,083.33
292,285.71 292,285.71
95,800.00 95,800.00
141,991.67 141,991.67
45,100.00 45,100.00
22,912.30 22,912.30
24,967.08 24,967.08
17,032.50 17,032.50
20,160.00 20,160.00
33,000.00 33,000.00
48,400.00 48,400.00
26,033.33 26,033.33
23,335.71 23,335.71
51,833.33 51,833.33
121,000.00 121,000.00
151,250.00 151,250.00
181,500.00 181,500.00
211,750.00 211,750.00
114,950.00 114,950.00
135,093.43 135,093.43
79.47 79.47
103,077.17 103,077.17
93,335.00 93,335.00
87,787.60 87,787.60
80,756.00 80,756.00
102,787.50 102,787.50
64,350.00 64,350.00
51,000.00 51,000.00
838,750.00 838,750.00
1,650,000.00 1,650,000.00
475,200.00 475,200.00
366,666.67 366,666.67
241,816.67 241,816.67
412,500.00 412,500.00
244,750.00 244,750.00
295,166.67 295,166.67
243,833.33 243,833.33
825,000.00 825,000.00
31,278.33 31,278.33
38,052.50 38,052.50
41,955.36 41,955.36
54,488.33 54,488.33
74,392.50 74,392.50
85,633.00 85,633.00
140,590.63 140,590.63
141,810.00 141,810.00
49,156.25 49,156.25
60,000.00 60,000.00
78,281.25 78,281.25
93,750.00 93,750.00
95,468.75 95,468.75
130,643.75 130,643.75
171,362.50 171,362.50
271,000.00 271,000.00
90,427.20 90,427.20
30,083.33 30,083.33
34,532.17 34,532.17
47,201.67 47,201.67
19,217.00 19,217.00
28,941.00 28,941.00
27,957.00 27,957.00
55,745.00 55,745.00
95,297.00 95,297.00
157,920.50 157,920.50
138,050.00 138,050.00
178,750.00 178,750.00
222,750.00 222,750.00
455,400.00 455,400.00
710,050.00 710,050.00
888,800.00 888,800.00
1,813,350.00 1,813,350.00
2,296,800.00 2,296,800.00
2,833,380.00 2,833,380.00
3,549,150.00 3,549,150.00
45,980.00 45,980.00
5,747,500.00 5,747,500.00
8,986,010.00 8,986,010.00
7,239,320.00 7,239,320.00
11,125.32 11,125.32
18,754.38 18,754.38
27,688.06 27,688.06
49,631.20 49,631.20
84,769.60 84,769.60
6,704.49 6,704.49
8,459.04 8,459.04
30,231.50 30,231.50
59,667.38 59,667.38
84,753.75 84,753.75
187,708.75 187,708.75
261,500.00 261,500.00
341,508.75 341,508.75
873,615.50 873,615.50
1,481,333.50 1,481,333.50
2,303,816.00 2,303,816.00
3,731,382.25 3,731,382.25
45,191.67 45,191.67
15,400.00 15,400.00
8,800.00 8,800.00
27,500.00 27,500.00
37,400.00 37,400.00
8,800.00 8,800.00
15,400.00 15,400.00
27,500.00 27,500.00
55,000.00 55,000.00
57,640.00 57,640.00
62,150.00 62,150.00
61,050.00 61,050.00
90,200.00 90,200.00
87,725.00 87,725.00
157,300.00 157,300.00
833,250.00 833,250.00
2,648,937.50 2,648,937.50
647,350.00 647,350.00
1,320.00 1,320.00
6,600.00 6,600.00
1,149,500.00 1,149,500.00
236,500.00 236,500.00
48,400.00 48,400.00
36,080.00 36,080.00
43,780.00 43,780.00
20,790.00 20,790.00
3,972.22 3,972.22
3,483.33 3,483.33
4,888.89 4,888.89
269,500.00 269,500.00
42,900.00 42,900.00
59,510.00 59,510.00
35,723.81 35,723.81
- -
211,750.00 211,750.00
423,500.00 423,500.00
484,000.00 484,000.00
- -
423,500.00 423,500.00
- -
- -
423,500.00 423,500.00
- -
97,350.00 97,350.00
8,030.00 8,030.00
14,850.00 14,850.00
41,250.00 41,250.00
55,550.00 55,550.00
792,000.00 792,000.00
22,000.00 22,000.00
20,075.00 20,075.00
22,000.00 22,000.00
22,000.00 22,000.00
15,693.33 15,693.33
14,300.00 14,300.00
3,080.00 3,080.00
38,225.00 38,225.00
7,348.00 7,348.00
1,487.75 1,487.75
13,074.42 13,074.42
15,583.33 15,583.33
16,500.00 16,500.00
68,200.00 68,200.00
49,500.00 49,500.00
59,400.00 59,400.00
69,300.00 69,300.00
79,200.00 79,200.00
89,100.00 89,100.00
99,000.00 99,000.00
44,000.00 44,000.00
55,000.00 55,000.00
1,980.00 1,980.00
89,375.00 89,375.00
616,000.00 616,000.00
242,000.00 242,000.00
176,275.00 176,275.00
12,466.67 12,466.67
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
148,028.00 148,028.00
2,310.00 2,310.00
27,500.00 27,500.00
23,650.00 23,650.00
4,840.00 4,840.00
4,713.08 4,713.08
2,995.38 2,995.38
4,738.46 4,738.46
19,161.43 19,161.43
9,600.00 9,600.00
67,100.00 67,100.00
21,340.00 21,340.00
55,550.00 55,550.00
27,500.00 27,500.00
50,600.00 50,600.00
27,500.00 27,500.00
363,000.00 363,000.00
13,200.00 13,200.00
22,000.00 22,000.00
77,000.00 77,000.00
170,500.00 170,500.00
1,650,000.00 1,650,000.00
2,750.00 2,750.00
80,631.70 80,631.70
1,683,392.86 1,683,392.86
3,359,277.78 3,359,277.78
4,180,000.00 4,180,000.00
1,036,160.71 1,036,160.71
1,535,600.00 1,535,600.00
2,997,500.00 2,997,500.00
7,590,000.00 7,590,000.00
### 23,100,000.00
1,485,000.00 1,485,000.00
2,997,500.00 2,997,500.00
7,590,000.00 7,590,000.00
### 23,100,000.00
2,832,500.00 2,832,500.00
2,090,000.00 2,090,000.00
264.00 264.00
56,980.00 56,980.00
90,750.00 90,750.00
108,900.00 108,900.00
491,150.00 491,150.00
491,150.00 491,150.00
247,500.00 247,500.00
495,000.00 495,000.00
61,233.33 61,233.33
330,000.00 330,000.00
825,000.00 825,000.00
62,791.67 62,791.67
81,522.22 81,522.22
113,300.00 113,300.00
27,203.14 27,203.14
7,150.00 7,150.00
9,680.00 9,680.00
122,430.00 122,430.00
7,150.00 7,150.00
544,500.00 544,500.00
544,500.00 544,500.00
423,500.00 423,500.00
1,045,000.00 1,045,000.00
845,000.00 845,000.00
88,990.00 88,990.00
69,575.00 69,575.00
48,702.50 48,702.50
41,745.00 41,745.00
907,500.00 907,500.00
327,250.00 327,250.00
385,000.00 385,000.00
22,000.00 22,000.00
550,000.00 550,000.00
145,200.00 145,200.00
47,575.00 47,575.00
42,900.00 42,900.00
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
6,272,848.24 6,272,848.24
718,788.88 718,788.88
67,070.79 67,070.79
603,156.56 603,156.56
139,897.04 139,897.04
111,533.60 111,533.60
297,524.25 297,524.25
233,699.72 233,699.72
329,587.79 329,587.79
450,000.00 450,000.00
300,000.00 300,000.00
750,000.00 750,000.00
283,507.66 283,507.66
296,869.63 296,869.63
541,436.05 541,436.05
347,935.90 347,935.90
474,246.50 474,246.50
290,094.73 290,094.73
237,591.01 237,591.01
448,082.97 448,082.97
341,118.31 341,118.31
64,996.94 64,996.94
635,032.82 635,032.82
62,541.73 62,541.73
230,978.18 230,978.18
80,314.45 80,314.45
64,070.88 64,070.88
62,347.52 62,347.52
506,241.50 506,241.50
242,308.70 242,308.70
313,452.79 313,452.79
149,642.81 149,642.81
435,745.61 435,745.61
74,078.92 74,078.92
778,290.99 778,290.99
### 50,000,000.00
WALIKOTA PANGKALPINANG
MAULAN AKLIL
DAFTAR UPAH BAHAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
PERIODE OKT TAHUN 2022
1 2 3
I. TENAGA KERJA
1 Pekerja Oh 121,800
2 Tenaga gali tanah/pondasi Oh 121,800
3 Tukang Oh 162,400
4 Tukang pipa Oh 162,400
5 Tukang batu Oh 162,400
6 Tukang kayu Oh 162,400
7 Tukang cat Oh 162,400
8 Tukang besi Oh 162,400
9 Tukang politur Oh 162,400
10 Tukang Listrik Oh 162,400
11 Tukang Las Konstruksi Oh 162,400
12 Tukang khusus aluminium Oh 162,400
13 Tukang Las biasa Oh 162,400
14 Tukang Pipa ledeng Oh 162,400
15 Tukang Batu/Pipa Oh 162,400
16 Tukang Vibrator Oh 162,400
17 Tukang Erection Oh 162,400
18 Operator crane Oh 182,700
19 Pembantu operator crane Oh 121,800
20 Operator Oh 203,000
21 Kepala Tukang Oh 203,000
22 Kepala tukang batu Oh 203,000
23 Kepala tukang kayu Oh 203,000
24 Kepala tukang cat Oh 203,000
25 Kepala tukang besi Oh 203,000
26 Kepala tukang politur Oh 203,000
27 Mandor Oh 203,000
28 Operator alat berat Oh 182,700
A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 5,000.00 5,000.00
Kawat berduri kg 25.000 110,986.80 2,774,669.98
Semen Portland kg 2.000 1,627.00 3,254.00
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Paku berbagai ukuran (2"-5") kg 0.030 17,287.99 518.64
JUMLAH HARGA BAHAN 2,790,920.11
C. PERALATAN
Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian
Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian
A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00
JUMLAH HARGA BAHAN 911,404.00
C. PERALATAN
A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 853,201.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,188,151.00
E. Profit 15% * D 178,222.65
F. Harga Satuan Pekerjaan (D+E) 1,366,373.65
A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00
JUMLAH HARGA BAHAN 812,872.00
C. PERALATAN
A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00
JUMLAH HARGA BAHAN 784,509.00
C. PERALATAN
A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00
JUMLAH HARGA BAHAN 745,657.00
C. PERALATAN
A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland Kg 0.170 1,627.00 276.59
Batu kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00
JUMLAH HARGA BAHAN 573,386.15
C. PERALATAN
A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00
JUMLAH HARGA BAHAN 693,518.21
C. PERALATAN
A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00
JUMLAH HARGA BAHAN 664,488.48
C. PERALATAN
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 425,000.00 204,000.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00
JUMLAH HARGA BAHAN 2,633,873.10
C. PERALATAN
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
batu gunung m3 0.480 364,285.71 174,857.14
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00
JUMLAH HARGA BAHAN 2,604,730.24
C. PERALATAN
A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 425,000.00 191,250.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
JUMLAH HARGA BAHAN 903,518.00
C. PERALATAN
A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,054,758.42
C. PERALATAN
A. 4.1.1.1. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN
A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,139,205.54
C. PERALATAN
A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN
A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 384.0000 1,627.00 624,768.00
Pasir beton (Kg) kg 692.0000 83.33 57,666.67
Batu pecah 1 - 2 (Kg) kg 1,039.0000 515.52 535,622.41
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,233,060.05
C. PERALATAN
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 413.0000 1,627.00 671,951.00
Pasir beton (Kg) kg 681.0000 83.33 56,750.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 515.52 526,343.10
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,270,047.07
C. PERALATAN
A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 439.0000 1,627.00 714,253.00
Pasir beton (Kg) kg 670.0000 83.33 55,833.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 515.52 518,610.34
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,303,699.65
C. PERALATAN
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 448.0000 1,627.00 728,896.00
Pasir beton (Kg) kg 667.0000 83.33 55,583.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 515.52 515,517.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,314,999.54
C. PERALATAN
A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 121,800.00 20,097.00
Tukang Batu L.02 OH 0.0280 162,400.00 4,547.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 26,877.20
B. BAHAN
Semen portland kg 32.6000 1,627.00 53,040.20
Pasir beton (Kg) kg 76.0000 83.33 6,333.33
Batu pecah 1 - 2 (Kg) kg 102.9000 515.52 53,046.72
Air ltr 21.5000 69.78 1,500.30
JUMLAH HARGA BAHAN 113,920.55
C. PERALATAN
A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 121,800.00 24,116.40
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 32,114.60
B. BAHAN
Semen portland kg 32.1200 1,627.00 52,259.24
Pasir beton (Kg) kg 91.2000 83.33 7,600.00
Batu pecah 1 - 2 (Kg) kg 123.4800 515.52 63,656.07
Air ltr 25.8000 69.78 1,800.36
JUMLAH HARGA BAHAN 125,315.67
C. PERALATAN
A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 121,800.00 30,206.40
Tukang Batu L.02 OH 0.0410 162,400.00 6,658.40
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 40,315.80
B. BAHAN
Semen portland kg 48.9000 1,627.00 79,560.30
Pasir beton (Kg) kg 114.0000 83.33 9,500.00
Batu pecah 1 - 2 (Kg) kg 154.3500 515.52 79,570.09
Air ltr 32.2500 69.78 2,250.45
JUMLAH HARGA BAHAN 170,880.83
C. PERALATAN
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 120,000.00 126,000.00
Tukang Las biasa L.02 OH 1.0500 160,000.00 168,000.00
Kepala tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L,04 OH 0.0520 200,000.00 10,400.00
JUMLAH TENAGA KERJA 325,400.00
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,680.00 145,200.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 45,540.00 2,277.00
JUMLAH HARGA BAHAN 532,450.60
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 857,850.60
E. Profit 15% *D 128,677.59
F. Harga Satuan Pekerjaan (D+E) 986,528.19
A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Besi L.02 OH 0.2500 162,400.00 40,600.00
Kepala tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L,04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 78,764.00
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A
A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 121,800.00 89,401.20
Tukang Besi L.02 OH 0.734 162,400.00 119,201.60
Kepala tukang L.03 OH 0.073 203,000.00 14,900.20
Mandor L,04 OH 0.037 203,000.00 7,450.10
A. 4.2.1.23. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 121,800.00 92,616.72
Tukang Besi L.02 OH 0.7604 162,400.00 123,488.96
Kepala tukang L.03 OH 0.0760 203,000.00 15,428.00
Mandor L,04 OH 0.0380 203,000.00 7,714.00
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Las biasa L.02 OH 1.0500 162,400.00 170,520.00
Kepala tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L,04 OH 0.0520 203,000.00 10,556.00
JUMLAH TENAGA KERJA 330,281.00
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,825.20 147,378.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 46,223.10 2,311.16
JUMLAH HARGA BAHAN 534,662.76
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 864,943.76
E. Profit 15% *D 129,741.56
F. Harga Satuan Pekerjaan (D+E) 994,685.32
A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
A. 4.2.1.22. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75
A. 4.4.1.1. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
A. 4.4.1.2. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.2.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
A. 4.4.1.3. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.3.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.4. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.4.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
A. 4.4.1.5. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 6PP
A. 4.4.1.5.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
A. 4.4.1.7. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 2PP
A. 4.4.1.7.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
A. 4.4.1.8. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 3PP
A. 4.4.1.8.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
A. 4.4.1.9. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 4PP
A. 4.4.1.9. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
A. 4.4.1.10. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 5PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.10.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
A. 4.4.1.11. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 6PP
A. 4.4.1.11.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
A. 4.4.1.14. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
A. 4.4.1.15. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
%
Peralatan 10.0000 766.81 7,668.08
(bahan)
A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
%
Peralatan 10.0000 942.56 9,425.59
(bahan)
B. BAHAN
Semen portland Kg 15.5040 1,627.00 25,225.01
Pasir pasang m3 0.0160 150,000.00 2,400.00
JUMLAH HARGA BAHAN 27,625.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 94,615.01
E. Profit 15% *D 14,192.25
F. Harga Satuan Pekerjaan (D+E) 108,807.26
A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik Bh 53.0000 #N/A #N/A
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Batu L.02 OH 0.5250 162,400.00 85,260.00
Kepala Tukang L.03 OH 0.0530 203,000.00 10,759.00
Mandor L.04 OH 0.0530 203,000.00 10,759.00
JUMLAH TENAGA KERJA 234,668.00
B. BAHAN
Ubin keramik Bh 33.0000 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 4.3700 22,250.00 97,232.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72
A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39
A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 121,800.00 60,900.00
Tukang Besi L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0250 203,000.00 5,075.00
JUMLAH TENAGA KERJA 157,325.00
B. BAHAN
Profil Allum "T" m 3.6000 #N/A #N/A
Kawat dia 4mm Kg 0.1500 #N/A #N/A
Dina bolt/ ramset Bh 1.0500 1,876.34 1,970.16
Akustik 60 x 120 Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II
A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III
A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III
A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III
- -
- -
A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III
- -
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV
Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 199,000.00 148,653.00
Screw Bh 9.150 1,450.00 13,267.50
JUMLAH HARGA BAHAN 161,920.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,182.50
E. Profit 0.150 *D 28,977.38
F. Harga Satuan Pekerjaan (D+E) 222,159.88
Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 32 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.010 203,000.00 2,030.00
Mandor L.15 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 65,000.00 241,150.00
Screw Bh 16.129 1,450.00 23,387.05
JUMLAH HARGA BAHAN 264,537.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 309,197.05
E. Profit 0.150 *D 46,379.56
F. Harga Satuan Pekerjaan (D+E) 355,576.61
Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10°)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II
A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
JUMLAH HARGA BAHAN 139,368.42
PERALATAN
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,534,693.04 90,488.14
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 198,205.93
C. PERALATAN
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III
A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III
A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III
- -
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV
A. 4.6.2.2.a Pemasangan 1 set Handle + kunci untuk pintu kusen alumunium Alumunium
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Handle + kunci untuk pintu kusen alumunium Alumunium buah 1.0000 614,075.00 614,075.00
A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN
A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Cat dasar kg 0.1200 77,842.38 9,341.09
Cat penutup kg 0.1800 77,842.38 14,011.63
JUMLAH HARGA BAHAN 23,352.71
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49
A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.7000 162,400.00 113,680.00
Kepala Tukang L.03 OH 0.0700 203,000.00 14,210.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 180,670.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat dasar kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 4,241.41
C. PERALATAN
A. 4.7.1.23. 1 M2 1 m2 Pengecatan Waterproofing Emulsion (2 Lapis Cat Penutup) Analisa Permen PU no 28, 2016
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN
A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian
A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP
A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.
A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
A. 4.1.1.1. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
A. 4.4.1.1. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
A. 4.4.1.2. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 3PP
A. 4.4.1.3. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.3.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.4. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 5PP
A. 4.4.1.4.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
A. 4.4.1.5.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
A. 4.4.1.7. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 2PP
A. 4.4.1.8. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 3PP
A. 4.4.1.8.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
A. 4.4.1.9. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 4PP
A. 4.4.1.10. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 5PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 119,802.34
C. PERALATAN
-
A. 4.4.1.10.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
A. 4.4.1.11. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 6PP
A. 4.4.1.11.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
%
Peralatan 10.0000 766.81 7,668.08
(bahan)
A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
%
Peralatan 10.0000 942.56 9,425.59
(bahan)
A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72
A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
JUMLAH HARGA BAHAN 139,368.42
PERALATAN
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III
- -
A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III
- -
- -
- -
- -
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
A. 4.6.2.2.a Pemasangan 1 set Handle + kunci untuk pintu kusen alumunium Alumunium
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Handle + kunci untuk pintu kusen alumunium Alumuniumbuah 1.0000 614,075.00 614,075.00
A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN
A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Cat dasar kg 0.1200 77,842.38 9,341.09
Cat penutup kg 0.1800 77,842.38 14,011.63
JUMLAH HARGA BAHAN 23,352.71
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49
A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
Page 436 of 649
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00
Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 32 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.010 203,000.00 2,030.00
Mandor L.15 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 65,000.00 241,150.00
Screw Bh 16.129 1,450.00 23,387.05
JUMLAH HARGA BAHAN 264,537.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 309,197.05
E. Profit 0.150 *D 46,379.56
F. Harga Satuan Pekerjaan (D+E) 355,576.61
Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10°)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39
KEPALA BIDANG
CIPTA KARYA
A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,054,758.42
C. PERALATAN
A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 299.0000 1,627.00 486,473.00
Pasir beton (Kg) kg 799.0000 83.33 66,583.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 515.52 524,281.03
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,092,340.34
C. PERALATAN
A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN
Semen portland kg 230.0000 1,627.00 374,210.00
Pasir beton (Kg) kg 893.0000 83.33 74,416.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 515.52 529,436.21
Air ltr 200.0000 69.78 13,956.25
JUMLAH HARGA BAHAN 992,019.12
C. PERALATAN
A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,139,205.54
C. PERALATAN
A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN
A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 384.0000 Err:504 Err:504
Pasir beton (Kg) kg 692.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,039.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 413.0000 Err:504 Err:504
Pasir beton (Kg) kg 681.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,021.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 439.0000 Err:504 Err:504
Pasir beton (Kg) kg 670.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,006.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 Err:504 Err:504
Tukang Batu L.02 OH 0.0280 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.6000 Err:504 Err:504
Pasir beton (Kg) kg 76.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 102.9000 Err:504 Err:504
Air ltr 21.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 Err:504 Err:504
Tukang Batu L.02 OH 0.0330 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.1200 Err:504 Err:504
Pasir beton (Kg) kg 91.2000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 123.4800 Err:504 Err:504
Air ltr 25.8000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 Err:504 Err:504
Tukang Batu L.02 OH 0.0410 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 48.9000 Err:504 Err:504
Pasir beton (Kg) kg 114.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 154.3500 Err:504 Err:504
Air ltr 32.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Las biasa L.02 OH 1.0500 Err:504 Err:504
Kepala tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L,04 OH 0.0520 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 Err:504 Err:504
Besi plat baja kg 32.8000 Err:504 Err:504
Kawat Las Listrik kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Besi L.02 OH 0.2500 Err:504 Err:504
Kepala tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L,04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Besi L.02 OH 0.3500 Err:504 Err:504
Kepala tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!
A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 Err:504 Err:504
Tukang Besi L.02 OH 0.734 Err:504 Err:504
Kepala tukang L.03 OH 0.073 Err:504 Err:504
Mandor L,04 OH 0.037 Err:504 Err:504
A. 4.2.1.22. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 Err:504 Err:504
Tukang Besi L.02 OH 0.7604 Err:504 Err:504
Kepala tukang L.03 OH 0.0760 Err:504 Err:504
Mandor L,04 OH 0.0380 Err:504 Err:504
A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 32.9500 Err:504 Err:504
Pasir pasang m3 0.0910 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 26.5500 Err:504 Err:504
Pasir pasang m3 0.0930 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.4. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 22.2200 Err:504 Err:504
Pasir pasang m3 0.1020 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 18.5000 Err:504 Err:504
Pasir pasang m3 0.1220 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 10.0800 Err:504 Err:504
Kapur padam m3 0.0275 Err:504 Err:504
Pasir pasang m3 0.0925 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 18.9500 Err:504 Err:504
Pasir pasang m3 0.0380 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 14.3700 Err:504 Err:504
Pasir pasang m3 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.9. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 11.5000 Err:504 Err:504
Pasir pasang m3 0.0430 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 9.6800 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 8.3200 Err:504 Err:504
Pasir pasang m3 0.0490 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 6.5000 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 4.5000 Err:504 Err:504
Kapur padam m3 0.0150 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.14. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0180 Err:504 Err:504
Kapur padam m3 0.0180 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.15. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0140 Err:504 Err:504
Kapur padam m3 0.0140 Err:504 Err:504
Pasir pasang m3 0.0280 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata berongga ekspose buah 70.0000 Err:504 Err:504
Semen portland kg 14.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
B. BAHAN
Semen portland Kg 15.5040 Err:504 Err:504
Pasir pasang m3 0.0160 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 106.0000 Err:504 Err:504
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 3.2000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Batu L.02 OH 0.5250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0530 Err:504 Err:504
Mandor L.04 OH 0.0530 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 33.0000 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 4.3700 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Tripleks Lembar 0.3750 Err:504 Err:504
Paku tripleks Kg 0.0300 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Besi L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0250 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil Allum "T" m 3.6000 Err:504 Err:504
Kawat dia 4mm Kg 0.1500 Err:504 Err:504
Ramset Bh 1.0500 #REF! #REF!
Akustik 60 x 120 Lembar 1.5000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
List kayu profil m 1.0500 Err:504 Err:504
Paku Kg 0.0100 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II
A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III
A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III
A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III
- -
- -
A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III
- -
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
- -
A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV
A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang cat L.02 OH 0.1050 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat menie kg 0.2000 Err:504 Err:504
Plamir tembok kg 0.1500 Err:504 Err:504
Cat dasar kg 0.1700 #REF! #REF!
Cat penutup kg 0.3500 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 Err:504 Err:504
Ampelas lbr 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup
A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang cat L.02 OH 0.7000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0700 Err:504 Err:504
Mandor L.04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.3000 #REF! #REF!
Cat dasar kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 5,000.00 5,000.00
Kawat berduri kg 25.000 110,986.80 2,774,669.98
Semen Portland kg 2.000 1,627.00 3,254.00
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Paku berbagai ukuran (2"-5") kg 0.030 17,287.99 518.64
Pengurugan kembali 1 m 3 galian dihitung dari 1/3 dari koefisien pekerjaan galian
A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00
A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00
A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland Kg 0.170 1,627.00 276.59
Batu kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00
A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 425,000.00 204,000.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00
A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 425,000.00 191,250.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Page 571 of 649
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN
Semen portland kg 230.0000 1,627.00 374,210.00
Pasir beton (Kg) kg 893.0000 83.33 74,416.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 515.52 529,436.21
Air ltr 200.0000 69.78 13,956.25
A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97
A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 406.0000 1,627.00 660,562.00
Pasir beton (Kg) kg 684.0000 83.33 57,000.00
Batu pecah 1 - 2 (Kg) kg 1,026.0000 515.52 528,920.69
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,261,485.66
C. PERALATAN
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 413.0000 1,627.00 671,951.00
Pasir beton (Kg) kg 681.0000 83.33 56,750.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 515.52 526,343.10
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,270,047.07
C. PERALATAN
A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 439.0000 1,627.00 714,253.00
Pasir beton (Kg) kg 670.0000 83.33 55,833.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 515.52 518,610.34
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,303,699.65
C. PERALATAN
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 448.0000 1,627.00 728,896.00
Pasir beton (Kg) kg 667.0000 83.33 55,583.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 515.52 515,517.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,314,999.54
C. PERALATAN
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Las biasa L.02 OH 1.0500 162,400.00 170,520.00
Kepala tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L,04 OH 0.0520 203,000.00 10,556.00
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Page 590 of 649
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Batu L.02 OH 1.3000 162,400.00 211,120.00
Kepala tukang L.03 OH 0.1300 203,000.00 26,390.00
Mandor L,04 OH 0.0030 203,000.00 609.00
A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72
A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III
- -
- -
A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III
- -
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.0090 162,400.00 1,461.60
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,814.60
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat Dasar kg 0.1700 60,500.00 10,285.00
Cat Penutup kg 0.2600 60,500.00 15,730.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 44,615.05
C. PERALATAN
A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN
A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Residu atau ter liter 0.3500 60,402.65 21,140.93
JUMLAH HARGA BAHAN 21,140.93
C. PERALATAN
A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0063 203,000.00 1,278.90
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 14,555.10
B. BAHAN
Plamir Tembok kg 0.1000 45,869.54 4,586.95
Cat Dasar kg 0.1000 77,842.38 7,784.24
Cat penutup kg 0.2600 77,842.38 20,239.02
JUMLAH HARGA BAHAN 32,610.21
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49
A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00
Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00
Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 199,000.00 148,653.00
Screw Bh 9.150 1,450.00 13,267.50
JUMLAH HARGA BAHAN 161,920.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,182.50
E. Profit 0.150 *D 28,977.38
F. Harga Satuan Pekerjaan (D+E) 222,159.88
Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10 °)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39
KEPALA BIDANG
CIPTA KARYA
Dihitung 6. ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap 5 - 10)
Uk. 195 x 96 x 0.30 cm, Jarak Rangka Gording atau Reng Max. 32 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.878 150,000.00 131,700.00
Screw Bh 13.740 1,200.00 16,488.00
JUMLAH HARGA BAHAN 148,188.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 178,988.00
E. Profit 0.150 *D 26,848.20
F. Harga Satuan Pekerjaan (D+E) 205,836.20
Mengetahui, Menyetujui,
Page 58 of 58
p 18 18 14.5 14.5 65
t depan 1
t samping 1.7
t belakang 1.7
pintu 3
galian 23.4
pondasi 12.1875
sloof 0.75