Vous êtes sur la page 1sur 649

Siku 20 x 20 x 3 mm – 6 M 5.

31 42,480 8,000
Siku 25 x 25 x 3 mm – 6 M 6.72 53,760 8,000
Siku 30 x 30 x 3 mm – 6 M 8.16 65,280 8,000
Siku 40 x 40 x 3 mm – 6 M 11 88,000 8,000
Siku 40 x 40 x 4 mm – 6 M 14.5 116,000 8,000
Siku 40 x 40 x 5 mm – 6 M 18 144,000 8,000
Siku 45 x 45 x 4 mm – 6 M 16.44 131,520 8,000
Siku 45 x 45 x 5 mm – 6 M 20.5 164,000 8,000
Siku 50 x 50 x 4 mm – 6 M 18.4 147,200 8,000
Siku 50 x 50 x 5 mm – 6 M 22.68 181,440 8,000
Siku 50 x 50 x 6 mm – 6 M 27.58 220,640 8,000
Siku 60 x 60 x 5 mm – 6 M 27.42 219,360 8,000
Siku 60 x 60 x 6 mm – 6 M 32.52 260,160 8,000
Siku 65 x 65 x 6 mm – 6 M 35.46 283,680 8,000
Siku 70 x 70 x 6 mm – 6 M 38.28 306,240 8,000
Siku 70 x 70 x 7 mm – 6 M 44.28 354,240 8,000
Siku 75 x 75 x 6 mm – 6 M 41.22 329,760 8,000
Siku 75 x 75 x 7 mm – 6 M 47.64 381,120 8,000
Siku 75 x 75 x 8 mm – 6 M 54.18 433,440 8,000
Siku 75 x 75 x 9 mm – 6 M 60 480,000 8,000
Siku 80 x 80 x 6 mm – 6 M 43.02 344,160 8,000
Siku 80 x 80 x 8 mm – 6 M 57.96 463,680 8,000
Siku 90 x 90 x 8 mm – 6 M 65.4 523,200 8,000
Siku 90 x 90 x 9 mm – 6 M 73.2 585,600 8,000
Siku 90 x 90 x 10 mm – 6 M 79.8 638,400 8,000
Siku 100 x 100 x 8 mm – 6 M 73.2 585,600 8,000
Siku 100 x 100 x 10 mm – 6 90.6 724,800 8,000
Siku 100 x 100 x 11 mm – 6 119.4 955,200 8,000
Siku 120 x 120 x 12 mm – 6 130 1,040,000 8,000
Siku 125 x 125 x 12 mm – 6 140 1,120,000 8,000
Siku 130 x 130 x 9 mm – 6 M 129 1,032,000 8,000

Siku 130 x 130 x 12 mm – 6 140 1,120,000 8,000

Siku 150 x 150 x 12 mm – 6 164 1,312,000 8,000


Siku 150 x 150 x 15 mm – 6 202 1,616,000 8,000
Siku 200 x 200 x 15 mm – 6 272 2,176,000 8,000
Siku 200 x 200 x 16 mm – 6 301 2,408,000 8,000
Siku 200 x 200 x 20 mm – 6 358 2,864,000 8,000
Siku 200 x 200 x 25 mm – 6 442 3,536,000 8,000
Siku 250 x 250 x 25 mm – 6 562 4,496,000 8,000
Besi Baja I WF 100 x 50 x 5 x 7 mm – 12 M 112 896,000 8,000
Besi Baja I WF 125 x 60 x 6 x 8 mm – 12 M 158.4 1,267,200 8000
Besi Baja I WF 148 x 100 x 6 x 9 mm – 12 M 253.2 2,025,600 8000
Besi Baja I WF 150 x 75 x 5 x 7 mm – 12 M 168 1,344,000 8000
Besi Baja I WF 175 x 90 x 5 x 8 mm – 12 M 217.2 1,737,600 8000
Besi Baja I WF 194 x 150 x 6 x 9 mm – 12 M 367 2,936,000 8000
Besi Baja I WF 198 x 99 x 4,7 x 7 mm – 12 M 218.4 1,747,200 8000
Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 12 M 256 2,048,000 8000
Besi Baja I WF 244 x 175 x 7 x 11 mm – 12 M 529 4,232,000 8000
Besi Baja I WF 248 x 124 x 5 x 8 mm – 12 M 308.4 2,467,200 8000
Besi Baja I WF 250 x 125 x 6 x 9 mm – 12 M 355.2 2,841,600 8000
Besi Baja I WF 294 x 200 x 8 x 12 mm – 12 M 681 5,448,000 8000
Besi Baja I WF 298 x 149 x 6 x 8 mm – 12 M 384 3,072,000 8000
Besi Baja I WF 200 x 150 x 6,7 x 9 mm – 12 M 440.4 3,523,200 8000
Besi Baja I WF 346 x 174 x 6 x 9 mm – 12 M 497 3,976,000 8000
Besi Baja I WF 350 x 175 x 7 x 11 mm – 12 M 595.2 4,761,600 8000
Besi Baja I WF 396 x 199 x 7 x 11 mm – 12 M 679.5 5,436,000 8000
Besi Baja I WF 400 x 200 x 8 x 13 mm – 12 M 792 6,336,000 8000
Besi Baja I WF 446 x 199 x 8 x 12 mm – 12 M 794.4 6,355,200 8000
Besi Baja I WF 450 x 200 x 9 x 14 mm – 12 M 912 7,296,000 8000
Besi Baja I WF 500 x 200 x 10 x 16 mm – 12 M 1075 8,600,000 8000
Besi Baja I WF 588 x 300 x 12 x 20 mm – 12 M 1812 14,496,000 8000
Besi Baja I WF 600 x 200 x 11 x 17 mm – 12 M 1272 10,176,000 8000
Besi Baja I WF 700 x 300 x 13 x 24 mm – 12 M 2220 17,760,000 8000
Besi Baja I WF 800 x 300 x 14 x 26 mm – 12 M 2520 20,160,000 8000
Besi Baja I WF 900 x 300 x 16 x 28 x 12 M 2916 23,328,000 8000

Jenis Batu Bata Satuan

Per 1 M3/
Bata Ringan Hebel
Kubik
750,000
Per 1 M3/
Bata Ringan Voscon Kubik
1,000,000
Bata Ringan 10x20x60cm 1 Biji 10,000
Bata Ringan 7,5x20x60cm 1 Biji 7,800
Bata Ringan 10x20x60cm Per 1 M3 750,000
Per 1 M
Bata Ringan 7,5x20x60cm Kubik
585,000
Ukuran Besi Hollow Berat Kg Harga Per Batang
Besi Hollow 40 x 40 x 2 mm x 6 Meter 14.45 Rp 114,155 114,155 7,900
Besi Hollow 40 x 40 x 2,3 mm x 6 Meter 16.6 Rp 131,140 131,140 7,900
Besi Hollow 50 x 50 x 2 mm x 6 Meter 18.21 Rp 143,859 143,859 7,900
Besi Hollow 50 x 50 x 2,3 mm x 6 Meter 20.94 Rp 165,426 165,426 7,900
Besi Hollow 50 x 50 x 2,5 mm x 6 Meter 22.77 Rp 179,883 179,883 7,900
Besi Hollow 50 x 50 x 2,7 mm x 6 Meter 25 Rp 197,500 197,500 7,900
Besi Hollow 50 x 50 x 2,8 mm x 6 Meter 25.5 Rp 201,450 201,450 7,900
Besi Hollow 50 x 50 x 3 mm x 6 Meter 27.32 Rp 215,828 215,828 7,900
Besi Hollow 60 x 60 x 2 mm x 6 Meter 22 Rp 173,800 173,800 7,900
Besi Hollow 60 x 60 x 2,3 mm x 6 Meter 25.26 Rp 199,554 199,554 7,900
Besi Hollow 60 x 60 x 2,5 mm x 6 Meter 27.5 Rp 217,250 217,250 7,900
Besi Hollow 60 x 60 x 2,8 mm x 6 Meter 30.77 Rp 243,083 243,083 7,900
Besi Hollow 60 x 60 x 3 mm x 6 Meter 33 Rp 260,700 260,700 7,900
Besi Hollow 60 x 60 x 3,2 mm x 6 Meter 35.17 Rp 277,843 277,843 7,900
Besi Hollow 75 x 75 x 2 mm x 6 Meter 27.63 Rp 218,277 218,277 7,900
Besi Hollow 75 x 75 x 2,3 mm x 6 Meter 32 Rp 252,800 252,800 7,900
Besi Hollow 75 x 75 x 2,5 mm x 6 Meter 34.53 Rp 272,787 272,787 7,900
Besi Hollow 75 x 75 x 3,2 mm x 6 Meter 44.19 Rp 349,101 349,101 7,900
Besi Hollow 100 x 100 x 3,2 mm x 6 Meter 59.28 Rp 468,312 468,312 7,900
Besi Hollow 100 x 100 x 4,5 mm x 6 M 83.37 Rp 658,623 658,623 7,900
Besi Hollow 125 x 125 x 3,2 mm x 6 M 74.36 Rp 587,444 587,444 7,900
Besi Hollow 125 x 125 x 4,5 mm x 6 M 104.56 Rp 826,024 826,024 7,900
Besi Hollow 150 x 150 x 4,5 mm x 6 M 125.76 Rp 993,504 993,504 7,900
Besi Hollow 150 x 150 x 5 mm x 6 M 139.73 Rp 1,103,867 1,103,867 7,900
Uraian Ukuran Harga Ket.
Wiremesh M5 2,1 m x 5,4 m 215,000 24,14 kg/lbr 8906.3795
Wiremesh M6 2,1 m x 5,4 m 315,000 34,76 kg/lbr 9062.1404
Wiremesh M7 2,1 m x 5,4 m 425,000 47,31 kg/lbr 8983.30163
Wiremesh M8 2,1 m x 5,4 m 550,000 61,79 kg/lbr 8901.11669
Wiremesh M9 2,1 m x 5,4 m 725,000 78,21 kg/lbr
Wiremesh M10 2,1 m x 5,4 m 880,000 96,55 kg/lbr

NO. MERK UKURAN WARNA HARGA AKSESORIS


—————————————————————————————————————-
1. ALEXINDO 3inch Silver, Putih, Coklat 95.000/m1 Pasang
2. ALEXINDO 3inch Urat Kayu Ready Stock 155.000/m1 Pasang
—————————————————————————————————————
1. ALEXINDO 4inch Silver, Putih, Coklat 120.000/m1 Pasang
2. ALEXINDO 4inch Urat Kayu Ready Stock 180.000/m1 Pasang
—————————————————————————————————————
1. YKK 3inch Silver, Putih, Coklat 170.000/m1 Pasang
2. YKK 3inch Urat Kayu Ready Stock 235.000/m1 Pasang
—————————————————————————————————————
1. YKK 4inch Silver, Putih, Coklat 280.000/m1 Pasang
2. YKK 4inch Urat Kayu Ready Stock 320.000/m1 Pasang

Harga Kusen Aluminium Alexindo:


3 inch Rp 55.000/m” (silver), Rp 75.000/m” (hitam), Rp 75.000/m” (coklat)

4 inch Rp 75.000/m” (silver), Rp 85.000/m” (hitam), Rp 85.000/m” (coklat)

Harga Kusen Aluminium Superex:


3 inch Rp 90.000/m” (silver), Rp 100.000/m” (hitam), Rp 100.000/m” (coklat)
4 inch Rp 100.000/m” (silver), Rp 110.000/m” (hitam), Rp 110.000/m” (coklat)
Harga Kusen Aluminium YKK:
3 inch Rp 100.000/m” (silver), Rp 120.000/m” (hitam), Rp 120.000/m” (coklat)
4 inch Rp 120.000/m” (silver), Rp 150.000/m” (hitam), Rp 150.000/m” (coklat)
Harga Folding Gate:
Ukuran 0,5 mm Rp 400.000/m2
Ukuran 0,8 mm Rp 550.000/m2
Surabaya 1 mm Rp 1.200.000/m2
Surabaya 1,2 mm Rp 1.400.000/m2
Harga Rolling Door:
Ukuran 0,8 mm (aluminium) Rp 350.000/m2
Ukuran 1 mm (aluminium) Rp 400.000/m2
Ukuran 0,4 mm (besi) Rp 175.000/m2
Harga Rupa-Rupa Kaca:
Ukuran 5 mm (kaca polos) Rp 85.000/m2
Ukuran 5 mm (kaca rayban) Rp 120.000/m2
Ukuran 5 mm (kaca dark blue) Rp 180.000/m2
Ukuran 5 mm (kaca dark green) Rp 180.000/m2
Ukuran 6 mm (kaca polos) Rp 120.000/m2
Ukuran 6 mm (kaca rayban) Rp 220.000/m2
Ukuran 6 mm (kaca dark blue) Rp 220.000/m2
Ukuran 6 mm (kaca dark green) Rp 220.000/m2
Ukuran 8 mm (kaca polos) Rp 250.000/m2
Ukuran 8 mm (kaca rayban) Rp 350.000/m2
Ukuran 8 mm (kaca dark blue) Rp 450.000/m2
Ukuran 8 mm (kaca dark green) Rp 450.000/m2
Ukuran 10 mm (kaca polos) Rp 300.000/m2
Ukuran 10 mm (kaca dark blue) Rp 470.000/m2
Ukuran 10 mm (kaca dark green) Rp 470.000/m2
Ukuran 12 mm (kaca polos) Rp 350.000/m2
Ukuran 12 mm (kaca dark blue) Rp 500.000/m2
Ukuran 12 mm (kaca dark green) Rp 500.000/m2
Harga Aneka Pintu Jendela Aluminium Berikut Kaca:
Jendela casement silver (60 x 120) + kaca polos 5 mm @ Rp 425.000.
Jendela casement coklat (60 x 120) + kaca polos 5 mm @ Rp 475.000.
Jendela sliding silver (60 x 120) + kaca polos 5 mm @ Rp 450.000.
Jendela sliding coklat (60 x 120) + kaca polos 5 mm @ Rp 500.000.
Pintu swing + kaca polos 5 mm @ Rp 1.000.000.
Pintu swing silver + kaca polos 5 mm, floor hinge dorma BTS 84 @ Rp 1.800.000.
Pintu swing coklat + kaca polos 5 mm, floor hinge dorma BTS 84 @ Rp 2.000.000.
Pintu frameless (tempered 12 mm polos) floor hinge dorma BTS 84 @ Rp 3.000.000.
Pintu frameless (tempered 12 mm rayban) floor hinge dorma BTS 84 @ Rp 3.500.000.
Pintu fitting (tempered 12 mm polos) floor hinge dorma BTS 84 @ Rp 3.750.000.
Pintu fitting (tempered 12 mm rayban) floor hinge dorma BTS 84 @ Rp 4.500.000.
Powder coating aluminium berbagai warna Rp 20.000/m”
HARGA / HARGA /
JENIS
BTG (Rp.) BTG (Rp.)

Diameter Pipa GIP Pipa GIP

MEDIUM SCHEDUL
( inch )
SII E 40

0.5 182,800 200,800


0.75 234,800 267,800

1 360,800 395,800

1 1/4 475,800 539,800


1 1/5 546,800 676,800
2 745,800 857,800
2 1/2 951,800 1,365,800
3 1,228,800 1,796,800
4 1,779,800 2,555,800
5 2,394,800 3,487,800
6 2,851,800 4,507,800
8 7,115,800
8“ 4,095,800
Rp 2.000.000.
Contoh
REKAPITULASI KUANTITAS DAN HARGA
Kegiatan : ……………………………………………………
Pekerjaan : ……………………………………………………
Lokasi : ……………………………………………………
TA : ……………………………………………………

NO. URAIAN PEKERJAAN HARGA

I. PEKERJAAN ………………………………. Rp -
II. PEKERJAAN ………………………………. Rp -
III. PEKERJAAN ………………………………. Rp -
IV. PEKERJAAN ………………………………. Rp -
V. PEKERJAAN ………………………………. Rp -
VI. PEKERJAAN ………………………………. Rp -
VII. PEKERJAAN ………………………………. Rp -
VIII. PEKERJAAN ………………………………. Rp -
IX. PEKERJAAN ………………………………. Rp -
X. PEKERJAAN ………………………………. Rp -
XI. PEKERJAAN ………………………………. Rp -

Jumlah Rp -
PPN 10% Rp -
Jumlah Total Rp -
Dibulatkan Rp -

Terbilang : ..........................
NIHIL

-
NIHIL - 1 0 0 0 0
0 0 0 0 0 0 0 0
( Rupiah ) ( Rupiah ) ( Rupiah ) ( Rupiah ( Rupiah( Rupi ( Rup
( R ( ( ( ( Rupiah )
Contoh

DAFTAR KUANTITAS DAN HARGA

Kegiatan : ……………………………………………
Pekerjaan : ……………………………………………
Lokasi : ……………………………………………
TA : ……………………………………………

NO. URAIAN PEKERJAAN KODE VOLUME HARGA SATUAN HARGA

I. PEKERJAAN PERSIAPAN
1 ……………………….. A. 2.2.1.1. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
Rp -

II. PEKERJAAN GALIAN DAN URUGAN


1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
Rp -

III. PEKERJAAN PASANGAN DAN PLESTERAN


1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
4 ……………………….. ……. …. Rp - Rp -
5 dst………………………. ……. …. Rp - Rp -
Rp -

IV. PEKERJAAN BETON BERTULANG


1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
4 ……………………….. ……. …. Rp - Rp -
5 ……………………….. ……. …. Rp - Rp -
6 ……………………….. ……. …. Rp - Rp -
7 ……………………….. ……. …. Rp - Rp -
8 ……………………….. ……. …. Rp - Rp -
9 dst………………………. ……. …. Rp - Rp -
Rp -

V. PEKERJAAN Dst……………………..
1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
4 ……………………….. ……. …. Rp - Rp -
5 dst………………………. ……. …. Rp - Rp -
Rp -
XII. UPAH DAN BAHAN

HARGA SURVEY
NO. URAIAN SATUAN
RATA-RATA

1 2 3 4
I. TENAGA KERJA
1 Pekerja Oh 120,000
2 Tenaga gali tanah/pondasi Oh 120,000
3 Tukang Oh 160,000
4 Tukang pipa Oh 160,000
5 Tukang batu Oh 160,000
6 Tukang kayu Oh 160,000
7 Tukang cat Oh 160,000
8 Tukang besi Oh 160,000
9 Tukang politur Oh 160,000
10 Tukang Listrik Oh 160,000
11 Tukang Las Konstruksi Oh 160,000
12 Tukang khusus aluminium Oh 160,000
13 Tukang Las biasa Oh 160,000
14 Tukang Pipa ledeng Oh 160,000
15 Tukang Batu/Pipa Oh 160,000
16 Tukang Vibrator Oh 160,000
17 Tukang Erection Oh 160,000
18 Operator crane Oh 180,000
19 Pembantu operator crane Oh 120,000
20 Operator Oh 200,000
21 Kepala Tukang Oh 200,000
22 Kepala tukang batu Oh 200,000
23 Kepala tukang kayu Oh 200,000
24 Kepala tukang cat Oh 200,000
25 Kepala tukang besi Oh 200,000
26 Kepala tukang politur Oh 200,000
27 Mandor Oh 200,000
28 Operator alat berat Oh 180,000

II. BAHAN MATERIAL


1 Aditive anti pengelupasan Liter 70,484.00
2 Air Ltr 68.75
3 Agregat Pecah Kasar M3 462,214.00
4 Agg. Halus LP A M3 482,241.80
5 Agregat Lolos # 1 " M3 487,265.20
6 Agr.Base Kelas A M3 455,403.00
7 Agr.Base Kelas B M3 436,921.15
8 Agregat Pecah Mesin 5-10 & 10-20 mm M3 481,338.51
9 Agregat Pecah Mesin 20-30 mm M3 470,634.18
10 All socket reducer PVC Ø 100 x 80 (mm) Unit 270,204.00
11 All socket reducer PVC Ø 80 x 50 (mm) unit 232,254.00
12 Aluminium foil air cell bubble M² 67,403.42
13 Ampelas Lembar 5,309.62
14 Anti stripping agent Liter 78,529.00
15 Asesoris bak cuci piring Set 132,000.00
16 Aspal curah Kg 17,691.61
17 Aspal drum Kg 17,691.61
18 Aspal emulsi Kg 15,750.00
19 Atap alumunium Gelombang tebal 0,55 (Galvalum) M² 68,077.78
Atap alumunium super sheet uk. 1,8 x 6 (m), t= 0,2
20 M² 73,700.00
mm (berwarna)
Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4
21 Lembar 42,955.00
mm
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4
22 Lembar 47,300.00
mm
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6
23 Lembar 51,700.00
mm
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5
24 Lembar 58,520.00
mm
Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4
25 Lembar 55,971.67
mm
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6
26 Lembar 60,390.00
mm
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5
27 Lembar 64,460.00
mm
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4
28 Lembar 70,418.33
mm
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6
29 Lembar 72,215.00
mm
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5
30 Lembar 72,462.50
mm
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4
31 Lembar 80,478.10
mm
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6
32 Lembar 81,400.00
mm
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5
33 Lembar 81,922.50
mm
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4
34 Lembar 90,537.86
mm
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6
35 Lembar 86,625.00
mm
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4
36 Lembar 100,597.62
mm
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6
37 Lembar 96,250.00
mm
38 Atap genteng (standar KIA) Buah 13,514.29
39 Atap genteng beton (jenis press) Buah 6,175.71
40 Atap genteng kodok Buah 4,510.00
41 Atap genteng soka Buah 10,138.33
42 Atap metal (biasa/ polos) Lembar 35,750.00
43 Atap metal (standar Rainbow) Lembar 42,533.33
44 Atap metal berpasir Lembar 56,210.00
45 Atap polycarbonat M² 85,356.27
46 Atap seng fiberglass Ft 14,850.00
47 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 39,600.00
48 Atap Selulosa Bitumen (Ukuran 0,95 x 2 m) Lembar 168,000.00
49 Atap Selulosa Bitumen (Ukuran 106 x 40 cm) Lembar 67,000.00
50 As (1,5' x 6m) Batang 1,080,000.00
51 Baja Tulangan (Polos) U24 Kg 13,557.00
52 Baja Tulangan (Ulir) D32 Kg 14,494.75
53 Baja Tulangan (Ulir) D39 Kg 14,941.00
54 Baja Tulangan (Ulir) D48 Kg 15,844.75
55 Baja ringan Taso 75.100 Btg 143,000.00
56 Baja ringan Taso 75.65 Btg 80,300.00
57 Baja ringan Taso 75.75 Btg 88,000.00
58 Baja ringan Taso 75.80 Btg 104,500.00
59 Bak cat bh 16,500.00
60 Bak cuci piring (sink) stainless steel 1 lobang Buah 216,700.00
61 Bak cuci piring (sink) stainless steel 2 lobang Buah 464,592.86
62 Bak mandi fibreglass volume 0,15 m³ Buah 236,500.00
63 Bak mandi fibreglass volume 0,30 m³ Buah 233,750.00
64 Bak mandi fibreglass volume 1,00 m³ Buah 385,550.00
65 Bak mandi jenis bathtub buah 4,565,000.00
Bak mandi jenis bathtub (acrilic P: 1,3 M L: 0,7 M
66 Buah 3,630,000.00
T: 0,4M)
67 Bata Ringan 10x20x60cm Buah 11,000.00
68 Bata Ringan 7,5x20x60cm Buah 8,580.00
69 Bataco Buah 1,895.21
70 Batacote M² 50,094.00
71 Batu alam M² 198,000.00
72 Batu bata berongga uk. 5x11x24 (cm) Buah 1,540.00
73 Batu bata merah besar Buah 1,446.92
74 Batu bata merah kecil Buah 1,369.50
75 Batu belah 10-15 (cm) M³ 393,874.14
76 Batu belah 15-20 (cm) M³ 369,933.33
77 Batu candi M² 198,000.00
78 Batu gunung M³ 452,021.50
79 Batu kali bulat M³ 332,750.00
80 Batu kapur M³ 70,180.00
81 Batu kerikil M³ 387,000.00
82 Batu paras M² 171,600.00
83 Batu pecah 0,5 - 1 M³ 444,583.33
84 Batu pecah 1-2 M³ 436,379.17
85 Batu pecah 2-3 M³ 438,750.00
86 Batu pecah 3-5 M³ 440,473.29
87 Batu pecah 5-7 M³ 440,544.71
88 Batu pecah 0,5 - 1 (kg) Kg 200,102.00
89 Batu pecah 1-2 (kg) Kg 305.56
90 Batu pecah 2-3 (kg) Kg 305.56
91 Batu pecah 3-5 (kg) Kg 305.56
92 Batu pecah 5-7 (kg) Kg 305.56

93 Batu sikat M² 46,200.00

94 Batu teraso M³ 302,500.00

95 Batu Alam Andersit 20/40cm M2 162,500.00

96 Baut Dinabold 3" Buah 595,430.00

97 Baut klem Buah 8,690.00

98 Bensin Pertalite Ltr 8,140.00

99 Besi beton Kg 13,105.05

100 Besi beton Ø10mm Kg 9,938.74

101 Besi beton Ø12mm Kg 9,859.00

102 Besi beton Ø16mm Kg 10,018.47

103 Besi beton Ø6mm Kg 11,632.88

104 Besi beton Ø8mm Kg 10,557.95

105 Buis beton bertulang Ø 100 cm Buah 1,235,891.25

106 Buis beton bertulang Ø 45 cm Buah 468,713.75

107 Buis beton bertulang Ø 60 cm Buah 705,463.75

108 Buis beton bertulang Ø 80 cm Buah 973,095.75

109 Buis beton bertulang Ø< 45 cm Buah 509,355.00

110 Buis beton tak bertulang Ø 60 cm Buah 283,967.67

111 Besi baja CNP kg 12,537.25


112 Besi Baja I WF 100 x 50 x 5 x 7 mm – 12 M Kg 9,680.00

113 Besi Baja I WF 125 x 60 x 6 x 8 mm – 12 M Kg 9,680.00

114 Besi Baja I WF 148 x 100 x 6 x 9 mm – 12 M Kg 9,680.00

115 Besi Baja I WF 150 x 75 x 5 x 7 mm – 12 M Kg 9,680.00

116 Besi Baja I WF 175 x 90 x 5 x 8 mm – 12 M Kg 9,680.00

117 Besi Baja I WF 194 x 150 x 6 x 9 mm – 12 M Kg 9,680.00

118 Besi Baja I WF 198 x 99 x 4,7 x 7 mm – 12 M Kg 9,680.00

119 Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 12 M Kg 9,680.00


120 Besi Baja I WF 200 x 150 x 6,7 x 9 mm – 12 M Kg 9,680.00
121 Besi Baja I WF 244 x 175 x 7 x 11 mm – 12 M Kg 9,680.00
122 Besi Baja I WF 248 x 124 x 5 x 8 mm – 12 M Kg 9,680.00
123 Besi Baja I WF 250 x 125 x 6 x 9 mm – 12 M Kg 9,680.00
124 Besi Baja I WF 294 x 200 x 8 x 12 mm – 12 M Kg 9,680.00
125 Besi Baja I WF 298 x 149 x 6 x 8 mm – 12 M Kg 9,680.00
126 Besi Baja I WF 346 x 174 x 6 x 9 mm – 12 M Kg 9,680.00
127 Besi Baja I WF 350 x 175 x 7 x 11 mm – 12 M Kg 9,680.00
128 Besi Baja I WF 396 x 199 x 7 x 11 mm – 12 M Kg 9,680.00
129 Besi Baja I WF 400 x 200 x 8 x 13 mm – 12 M Kg 9,680.00
130 Besi Baja I WF 446 x 199 x 8 x 12 mm – 12 M Kg 9,680.00
131 Besi Baja I WF 450 x 200 x 9 x 14 mm – 12 M Kg 9,680.00
132 Besi Baja I WF 500 x 200 x 10 x 16 mm – 12 M Kg 9,680.00
133 Besi Baja I WF 588 x 300 x 12 x 20 mm – 12 M Kg 9,680.00
134 Besi Baja I WF 600 x 200 x 11 x 17 mm – 12 M Kg 9,680.00
135 Besi Baja I WF 700 x 300 x 13 x 24 mm – 12 M Kg 9,680.00
136 Besi Baja I WF 800 x 300 x 14 x 26 mm – 12 M Kg 9,680.00
137 Besi Baja I WF 900 x 300 x 16 x 28 x 12 M Kg 9,680.00
138 Besi baja IWF kg 11,251.49
139 Besi baut kuda-kuda Kg 17,966.67
140 Besi beton Kg 13,105.05
141 Besi beton Ø10mm Kg 9,938.74
142 Besi beton Ø12mm Kg 9,859.00
143 Besi beton Ø16mm Kg 10,018.47
144 Besi beton Ø6mm Kg 11,632.88
145 Besi beton Ø8mm Kg 10,557.95
146 Besi Hollow 20x40 mm t: 0,4mm m 5,225.00
147 Besi Hollow 20x40 mm t: 1,8mm m 8,456.25
148 Besi Hollow 40x40 mm t : 1,8mm m 9,625.00
149 Besi Hollow 100 x 100 x 3,2 mm x 6 Meter Btg 515,143.20
150 Besi Hollow 100 x 100 x 4,5 mm x 6 M Btg 724,485.30
151 Besi Hollow 125 x 125 x 3,2 mm x 6 M Btg 646,188.40
152 Besi Hollow 125 x 125 x 4,5 mm x 6 M Btg 908,626.40
153 Besi Hollow 150 x 150 x 4,5 mm x 6 M Btg 1,092,854.40
154 Besi Hollow 150 x 150 x 5 mm x 6 M Btg 1,214,253.70
155 Besi Hollow 40 x 40 x 2 mm x 6 Meter Btg 125,570.50
156 Besi Hollow 40 x 40 x 2,3 mm x 6 Meter Btg 144,254.00
157 Besi Hollow 50 x 50 x 2 mm x 6 Meter Btg 158,244.90
158 Besi Hollow 50 x 50 x 2,3 mm x 6 Meter Btg 181,968.60
159 Besi Hollow 50 x 50 x 2,5 mm x 6 Meter Btg 197,871.30
160 Besi Hollow 50 x 50 x 2,7 mm x 6 Meter Btg 217,250.00
161 Besi Hollow 50 x 50 x 2,8 mm x 6 Meter Btg 221,595.00
162 Besi Hollow 50 x 50 x 3 mm x 6 Meter Btg 237,410.80
163 Besi Hollow 60 x 60 x 2 mm x 6 Meter Btg 191,180.00
164 Besi Hollow 60 x 60 x 2,3 mm x 6 Meter Btg 219,509.40
165 Besi Hollow 60 x 60 x 2,5 mm x 6 Meter Btg 238,975.00
166 Besi Hollow 60 x 60 x 2,8 mm x 6 Meter Btg 267,391.30
167 Besi Hollow 60 x 60 x 3 mm x 6 Meter Btg 286,770.00
168 Besi Hollow 75 x 75 x 2 mm x 6 Meter Btg 240,104.70
169 Besi Hollow 75 x 75 x 2,3 mm x 6 Meter Btg 278,080.00
170 Besi Hollow 75 x 75 x 2,5 mm x 6 Meter Btg 300,065.70
171 Besi Hollow 75 x 75 x 3,2 mm x 6 Meter Btg 384,011.10
172 Besi jaring kawat baja Kg 22,000.00
173 Besi plat aluminium t=1mm m2 149,050.00
174 Besi plat baja Kg 11,737.00
175 Besi prestressed polos Kg 15,730.00
176 Besi profil kg 9,680.00
177 Besi strip 2 x 3 cm kg 9,900.00
178 Besi plat Baja (8mm x 6' x 20') Keping 10,500,000.00
179 Besi plat Baja (6mm x 6' x 20') Keping 7,875,000.00
180 Bilksem spit penangkal petir Buah 80,630.00
181 Bondbeam uk. 40 x 20 x20 (cm) Buah 9,680.00
182 Box sekering, 1 phase Buah 57,750.00
183 Box sekering, 2 phase Buah 45,512.50
184 Box sekering, 3 phase Buah 78,650.00
Bubungan atap (nok) alumunium standar 40 cm,
185 M' 66,770.00
swg.22
186 Bubungan atap (nok) asbes sepasang Lembar 19,662.50
187 Bubungan atap (nok) genteng (standar KIA) Buah 18,892.50
188 Bubungan atap (nok) genteng beton Buah 7,260.00
189 Bubungan atap (nok) genteng kodok Buah 4,675.00
190 Bubungan atap (nok) genteng metal berpasir M 48,950.00
191 Bubungan atap (nok) genteng soka Buah 4,984.38
192 Bubungan atap (nok) metal (biasa/ polos) M 35,750.00
193 Bubungan atap (nok) metal (standar Rainbow) M 35,200.00
Bubungan atap (nok) zincalume setara "Union
194 M 33,000.00
Deck" T= 0,4 mm
195 Buis beton bertulang Ø 100 cm Buah 1,452,000.00
196 Buis beton bertulang Ø 45 cm Buah 484,000.00
197 Buis beton bertulang Ø 60 cm Buah 484,000.00
198 Buis beton bertulang Ø 80 cm Buah 1,163,910.00
199 Buis beton bertulang Ø< 45 cm Buah 484,000.00
200 Buis beton tak bertulang Ø 60 cm Buah 72,600.00
201 Bubungan Atap Selulosa Bitumen (Ukuran 1060x 50Lembar 85,000.00
202 Bracket Kaca Axrilix Set 49,000.00
203 Calsiboard "IRC/ GRC" uk, 1,22 x 2,44 m Lembar 77,293.33
204 Calsiboard "IRC/GRC" uk, 30 cm, t = 9 mm Lembar 109,725.00
205 Cashing + inbow setara panasonic Set 13,750.00
206 Cat genteng KW I Kg 55,963.44
207 Cat genteng KW II Kg 64,088.78
208 Cat jalan (road line) Kg 33,366.67
209 Cat jembatan Kg 55,556.00
210 Cat Kayu Kg 57,191.67
211 Cat marka Kg 56,684.67
212 Cat menie Kg 41,372.88
213 Cat minyak Kg 55,086.52
214 Cat tembok (ex platon) Kg 51,244.29
215 Cat tembok ext (ex mowilex) Kg 92,862.00
216 Cat tembok in (ex mowilex) Kg 76,692.00
217 Cat vernis Kg 64,773.08
218 Cerucuk Batang 19,700.00
219 Closed duduk standar (Ex. America Standart) Buah 1,667,966.67
220 Closed Jongkok (Top inlet dan Flush 6L) Buah 3,212,000.00
221 Closed jongkok keramik (ex. America Standar) Buah 559,166.67
222 Closed jongkok porcelaint (lokal) Buah 217,861.11
223 Closed jongkok terraso Buah 211,126.67
224 Closet Duduk / Monoblock unit 1,383,800.00
225 Conblock tebal 6 cm (polos) M² 49,316.67
226 Conblock tebal 6 cm (warna) M² 52,708.33
227 Chipping M3 423,361.03
228 Chipping (Kg) Kg 224.39
229 Dempul kayu Kg 37,103.85
230 Dina bolt/ ramset Unit 1,848.61
231 Door closer Unit 215,710.00
232 Door holder Unit 129,250.00
233 Door stop Unit 53,900.00
234 Dop PVC Ø 50 mm Unit 40,920.00
235 Downlight ukuran 4" Buah 60,000.00
236 Downlight ukuran 5" Buah 70,000.00
237 Elastromer bearing pad Buah 1,100,000.00
238 Elektroda penghantar bumi untuk penangkal petir Buah 386,760.00
239 Engsel pintu kaca (pivot) stainless steel Buah 924,000.00
240 Engsel pintu/ jendela 3" (ex.Dexon) Buah 22,173.68
241 Engsel pintu/ jendela 4" (ex.Dexon) Buah 53,263.16
242 Engsel pintu/ jendela 5" (Ex.Dexon) Buah 82,500.00
243 Engsel putar jendela/ ventilasi Buah 29,590.00
244 Engsel Sliding door (ex.dexon) M' 442,200.00
245 Eternit asbes uk. 1x1 (m), tebal 4 mm M² 26,042.50
246 Eternit asbes uk. 1x1 (m), tebal 5 mm M² 30,250.00
247 Eternit asbes uk. 1x1 (m), tebal 6 mm M² 31,460.00
248 Exhaust Fan 10 inch (lengkap) Unit 399,300.00
249 Fibre Plat 0,60 x 1,20 (m) tebal 4 mm M² 14,520.00
250 Fibre Plat 1,20 x 2,40 (m) tebal 4 mm M² 25,850.00
251 Filler Kg 1,815.00
252 Floor drain (PVC) Buah 9,854.17
253 Folding door/ pintu lipat M² -
254 Folding gate standar 0,4 mm m2 -
255 Folding gate Ukuran 0,5 mm m² 484,000.00
256 Folding gate Ukuran 0,8 mm m² 665,500.00
257 Formika lbr 93,500.00
258 Floor Deck M2 140,000.00
259 Gate valve/ stop kran Ø 1 ½ (inch) kuningan Buah 70,583.33
260 Gate valve/ stop kran Ø 1" Besi Buah 31,350.00
261 Gate valve/ stop kran Ø 1/2 (inch) kuningan Buah 52,341.67
262 Gate valve/ stop kran Ø 3/4(inch) kuningan Buah 38,293.75
263 Gergaji besi 38,500.00
264 Gergaji kayu 63,250.00
265 Glass bit Kg 57,415.60
266 Glass block 20/20 Buah 26,498.72
267 GRC panel dinding + rangka pipa besi M² 990,000.00
268 GRC rooster M² 297,366.67
269 Grease (minyak gemuk) Kg 31,900.00
270 Grendel (biasa) Buah 20,044.44
271 Grendel (istimewa) Buah 42,405.00
Gypsum board motif uk. 1,22 x 2,44 (m), tebal 9
272 Lembar 104,192.00
mm
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9
273 Lembar 77,600.00
mm
274 Gravel M3 425,388.00
275 Glass Bit Kg 31,812.50
276 Geotextile M2 33,235.00
Handle + kunci untuk pintu kusen alumunium
277 Set 605,000.00
Alumunium
278 Handle jendela Buah 61,187.50
279 Handle pintu Buah 127,200.00
280 Handle untuk meubeulair (furniture) + kunci Buah 9,735.00
281 Handle untuk pintu kaca lebar Buah 1,100,000.00
282 Hollow semi galvanis M' 22,000.00
283 Hook Buah 37,400.00
284 Huruf Stailis (ukuran t < 50 cm) cm 8,000.00
285 Huruf Stailis (ukuran 50 < t < 100 cm) cm 9,000.00
286 Jendela alumunium lengkap (80x120) cm Buah 825,000.00
287 Jendela besi M² 317,240.00
288 Jendela nako (kerangka + kaca 5 mm) M² 185,020.00
289 Kanstin UK. 0,14 x 0,20 x 0,6 m Buah 52,076.25
290 Kawat Beton Kg 23,514.69
291 Kabel biasa M' 33,275.00
292 Kabel bulat M' 6,783.33
293 Kabel listrik NYY 4 x 2,5 mm² M' 53,114.29
294 Kabel listrik NYY 4 x 4 mm² M' 8,461.75
295 Kabel NYM 3x2,5 mm M' 14,806.00
296 Kabel NYM 4x2,5 mm M' 19,624.00
297 Kabel slink M' 34,787.50
298 Kabel Duct (Ukuran 100 x 100 mm) M 85,000.00
299 Kaca bening tebal 10 mm M² 242,000.00
300 Kaca bening tebal 3 mm M² 104,500.00
301 Kaca bening tebal 5 mm M² 145,750.00
302 Kaca bening tebal 8 mm M² 154,000.00
303 Kaca buram 5 mm m2 -
304 Kaca Buram tebal = 12mm m2 -
305 Kaca cermin 8 mm m2 154,000.00
306 Kaca cermin tebal 3 mm M² 93,500.00
307 Kaca cermin tebal 5 mm M² 137,500.00
308 Kaca dark blue Ukuran 5 mm m² 217,800.00
309 Kaca dark blue Ukuran 10 mm m² 568,700.00
310 Kaca dark blue Ukuran 12 mm m² 605,000.00
311 Kaca dark blue Ukuran 6 mm m² 266,200.00
312 Kaca dark green Ukuran 10 mm m² 568,700.00
313 Kaca dark green Ukuran 12 mm m² 605,000.00
314 Kaca dark green Ukuran 5 mm m² 217,800.00
315 Kaca dark green Ukuran 6 mm m² 266,200.00
316 Kaca gelap (ray band) tebal 10 mm M² 24,200.00
317 Kaca gelap (ray band) tebal 3 mm M² 71,500.00
318 Kaca gelap (ray band) tebal 5 mm M² 129,800.00
319 Kaca gelap (ray band) tebal 8 mm M² 26,400.00
320 Kaca patri m2 938,300.00
321 Kaca polos Ukuran 10 mm m² 363,000.00
322 Kaca polos Ukuran 12 mm m² 423,500.00
323 Kaca polos Ukuran 5 mm m² 102,850.00
324 Kaca polos Ukuran 6 mm m² 145,200.00
325 Kaca polos Ukuran 8 mm m² 302,500.00
326 kaca rayban Ukuran 5 mm m² 145,200.00
327 Kaca rayban Ukuran 6 mm m² 266,200.00
328 Kaca Wireglassed tebal = 5mm m2 625,900.00
329 Kain kassa Kg 20,680.00
330 Kait angin biasa Buah 7,739.29
331 Kait angin istimewa Buah 17,600.00
332 Kanstin Uk. 0,14x0,20x0,6 m Bh 44,000.00
333 Kapur bakar M³ 77,924.00
334 Kapur sirih Kg 28,664.90
335 Karpet talang, lebar 0,60 m' M' 10,894.07
336 Kawat berduri Kg 109,346.60
337 Kawat beton Kg 18,783.11
338 Kawat bronjong Kg 17,270.00
339 Kawat harmonika M² 33,586.67
340 Kawat kassa/ kawat loket M² 23,964.29
341 Kawat Las Listrik Kg 45,540.00
342 Kawat nyamuk logam M² 26,125.00
343 Kawat nyamuk plastik M² 18,374.07
344 Kawat seng Kg 23,393.33
345 Kayu bakar M³ 87,560.00
346 Kayu dolken Ø8-10 (cm) panjang 4 m Batang 12,048.75
347 Kayu gergajian kelas I, balok M³ 3,569,198.00
348 Kayu gergajian kelas I, papan M³ 3,482,456.20
349 Kayu gergajian kelas II, balok M³ 2,780,578.17
350 Kayu gergajian kelas II, papan M³ 2,991,422.60
351 Kayu gergajian kelas III, balok M³ 2,596,383.33
352 Kayu gergajian kelas III, papan M³ 2,498,000.00
353 Kayu gergajian kelas IV, balok M³ 2,374,225.75
354 Kayu gergajian kelas IV, papan M³ 2,206,250.00
355 Kayu untuk konstruksi jembatan M³ 3,015,000.00
356 Kayu untuk perancah M³ 1,707,096.00
357 Kayu Acuan M3 1,782,215.50
358 Kaca Axrilix Cutting Biasa M2 290,000.00
359 Kepek Buah 5,225.00
360 Keramik 10x20 (cm) gelap M² 37,537.50
361 Keramik 10x20 (cm) polos M² 33,000.00
362 Keramik 10x20 (cm) terang M² 49,500.00
363 Keramik 20 x 20 cm (Polos) m' 61,050.00
364 Keramik 20x20 (cm) corak M² 65,679.17
365 Keramik 20x20 (cm) polos M² 56,792.59
366 Keramik 20x25 (cm) corak M² 65,066.67
367 Keramik 20x25 (cm) polos M² 60,967.50
368 Keramik 30x30 (cm) corak M² 63,066.67
369 Keramik 30x30 (cm) polos M² 58,410.00
370 Keramik 40x40 (cm) corak M² 69,609.38
371 Keramik 40x40 (cm) polos M² 54,835.00
372 Keramik 50x50 (cm) polos M² 99,000.00
373 Keramik 60x60 (cm) anti slip M² 176,000.00
374 Keramik 60x60 (cm) putih/ berwarna M² 99,000.00
375 Keramik 60x60 (cm) putih/ berwarna granit M² 165,000.00
376 Keramik 80x80 (cm) polos granit M² 372,395.10
377 Keramik KM/WC antislip 20x20 (cm) M² 64,114.29
378 Keramik Granit 60x60 (cm) putih/berwarna M2 199,600.00
379 Keramik Granit 60x60 (cm) Polos M2 140,879.33
380 Keramik Granit 80x80 (cm) putih/berwarna M2 296,180.33
381 Keramik Granit 80x80 (cm) Polos M2 304,000.00
382 Keramik Diffabel 30/30cm Buah 18,500.00
383 Knee/ elbow PVC 1 (inch) Buah 5,200.00
384 Knee/ elbow PVC 1/2 (inch) Buah 3,005.36
385 Knee/ elbow PVC 3/4(inch) Buah 3,575.00
386 Kompon sak 81,125.00
387 Kompon gypsum Kg 41,492.00
388 Kran air Ø 0,5 (inch) steel Buah 72,600.00
389 Kran air Ø 0,75 (inch) Steel Buah 39,233.33
390 Kran air Ø 1,5 (inch) Steel Buah 27,046.25
391 Kuas Buah 27,775.00
392 Kuku keramik 2,5 x 10 cm m' 16,500.00
393 Kuku keramik 2,5 x 8 cm m' 9,350.00
394 Kunci antik set -
395 Kunci jendela (ex.dexon) Set 28,600.00
396 Kunci KM set -
397 Kunci pintu tanam (ex.dexon) Set 207,487.50
398 Kunci pintu tanam (istimewa) (ex.dexon) Set 188,100.00
Kunci pintu untuk meubeulair (furniture)
399 Set 198,000.00
(ex.dexon)
400 Kunci Selot Buah 19,800.00
401 Kunci silinder Buah 137,133.33
402 Kunci tanam Buah 180,125.00
403 Kusen Alumunium 3 inch Coklat m' 90,750.00
404 Kusen Alumunium 3 inch hitam m' 90,750.00
405 Kusen Alumunium 3 inch silver m' 66,550.00
406 Kusen Alumunium 4 inch Coklat m' 102,850.00
407 Kusen Alumunium 4 inch hitam m' 102,850.00
408 Kusen Alumunium 4 inch silver m' 90,750.00
409 Kusen pintu/ jendela alumunium 3" M' 88,000.00
410 Kusen pintu/ jendela alumunium 3" (warna gelap) M' 104,500.00
411 Kusen pintu/ jendela alumunium 4" M' 88,000.00
412 Kusen pintu/ jendela alumunium 4" (warna gelap) M' 132,000.00
413 Kusen, pintu fiber Unit 259,233.33
414 Lampu Baret 32 Watt (Lengkap) Pcs 215,600.00
415 Lampu Downlight 18 Watt (Lengkap) Pcs 63,250.00
416 Lampu LED Philips 10 watt Pcs 111,650.00
417 Lampu LED Philips 13 watt (Yellow) Pcs 126,500.00
418 Lampu LED Philips 7 watt Pcs 70,950.00
419 Lampu LED Philips 9 watt Pcs 92,950.00
420 Lampu LED Philips12 watt Pcs 133,100.00
421 Lampu SL bulat 10 W + aksesories Titik 119,163.00
422 Lampu SL bulat 20 W + aksesories Titik 152,559.00
423 Lampu taman 20 W + aksesories Titik 171,534.00
424 Lampu taman triple 20 W + aksesories Titik 346,500.00
425 Lampu TL 20 W + aksesories Titik 132,792.00
426 Lampu TL 2x18 W + aksesories type RM Titik 247,500.00
427 Lampu TL 40 W + aksesories Titik 177,650.00
Langit-langit accoustic board/ tile uk. 0,30x0,30
428 M² 43,670.00
(m)
Langit-langit accoustic board/ tile uk. 0,30x0,60
429 M² 52,800.00
(m)
Langit-langit accoustic board/ tile uk.
430 M² 59,730.00
0,60x1,20x0,14 (m)
Langit-langit accoustic board/ tile uk.
431 M² 67,650.00
0,60x1,20x0,15 (m)
432 Lem (standar aica aibond) Kg 31,166.67
433 Lem (standar Fox)/ perekat Kg 25,520.00
434 Lem kayu Kg 16,463.33
435 List gypsum m' 24,148.34
436 List gypsum sedang M' 24,148.34
437 List kayu profil m' 39,416.67
438 List lebar 10 - 12 cm m' -
439 List lebar 13- 15 cm m' -
440 Listplank GRC m' 19,066.67
441 Lolos screen1 ukuran ( 0 - 5) M3 507,775.33
442 Lolos screen2 ukuran ( 0 - 5) M3 507,775.33
443 Lolos screen2 ukuran ( 5 - 9,5) M3 507,775.33
444 Lolos screen2 ukuran ( 9.5 - 19,0) M3 496,987.67
445 Marmer 100 x 100 cm m2 275,000.00
446 Meter box (terpasang) Titik 233,475.00
447 Minyak bekisting Liter 11,281.50
448 Minyak pelarut/ pengencer cat (solvent) Liter 12,550.00
449 Minyak pelumas (oli) Liter 31,410.00
450 Multiplek + Fin. Deco sheet Lembar 3,080,000.00
451 Multiplek tebal 12 mm 4x8 (inch) Lembar 193,050.00
452 Multiplek tebal 15 mm 4x8 (inch) Lembar 252,083.33
453 Multiplek tebal 18 mm 4x8 (inch) Lembar 292,285.71
454 Multiplek tebal 6 mm 1,22 x 2,44 (m) Lembar 95,800.00
455 Multiplek tebal 9 mm 4x8 (inch) Lembar 141,991.67
456 Paku anti karat Kg 45,100.00
457 Paku asbes Kg 22,912.30
458 Paku berbagai ukuran (1/2"-1") Kg 24,967.08
459 Paku berbagai ukuran (2"-5") Kg 17,032.50
460 Paku jembatan Kg 20,160.00
461 Paku kait Kg 33,000.00
462 Paku sekrup (kg) Kg 48,400.00
463 Paku sekrup 1 cm -2,5 cm Kg 26,033.33
464 Paku seng Kg 23,335.71
465 Paku tembok Kg 51,833.33
466 Panel listrik/ MCB, 1 fase Buah 121,000.00
467 Panel listrik/ MCB, 2 fase Buah 151,250.00
468 Panel listrik/ MCB, 3fase Buah 181,500.00
469 Panel listrik/ MCB, 4 fase Buah 211,750.00
470 Parquette lantai M² 114,950.00
471 Pasir beton M³ 135,093.43
472 Pasir beton (Kg) Kg 79.47
473 Pasir pasang M³ 103,077.17
474 Pasir urug/ timbun M³ 93,335.00
475 Pasir urug (ada unsur lempung) M³ 87,787.60
476 Pasir urug/timbun M3 80,756.00
477 Pasir halus (untuk HRS) M3 102,787.50
478 Pelitur Jadi Ltr 64,350.00
479 Plafon PVC t = 0,8 mm Keping 51,000.00
480 Pintu alumunium corak untuk WC (80x200)cm Buah 838,750.00
481 Pintu alumunium full kaca untuk WC (80x200)cm 1,650,000.00
482 Pintu alumunium polos untuk WC (80x200)cm Buah 475,200.00
483 Pintu fiber PVC (70x200) wc corak Buah 366,666.67
484 Pintu fiber PVC (70x200) wc polos Buah 241,816.67
485 Pintu fiber PVC (75x200) wc corak Buah 412,500.00
486 Pintu fiber PVC (75x200) wc polos Buah 244,750.00
487 Pintu fiber PVC (80x200) wc corak Buah 295,166.67
488 Pintu fiber PVC (80x200) wc polos Buah 243,833.33
489 Pintu fiber PVC RRC (80x200) wc kaca import 825,000.00
490 Pipa besi galvanis Ø 0,5 (inch)/1,8mm M' 31,278.33
491 Pipa besi galvanis Ø 0,75 (inch)/1,8mm M' 38,052.50
492 Pipa besi galvanis Ø 1 (inch)/1,8mm M' 41,955.36
493 Pipa besi galvanis Ø 1,25 (inch)/1,8mm M' 54,488.33
494 Pipa besi galvanis Ø 1,5 (inch)/1,8mm M' 74,392.50
495 Pipa besi galvanis Ø 2 (inch)/1,8mm M' 85,633.00
496 Pipa besi galvanis Ø 3 (inch) t=4 mm M' 140,590.63
497 Pipa besi galvanis Ø 4 (inch)/1,8mm M' 141,810.00
498 Pipa besi galvanis Ø 0,5 (inch)/2,6mm M' 49,156.25
499 Pipa besi galvanis Ø 0,75 (inch)/2,3mm M' 60,000.00
500 Pipa besi galvanis Ø 1 (inch)/2,7mm M' 78,281.25
501 Pipa besi galvanis Ø 1,25 (inch)/3,1mm M' 93,750.00
502 Pipa besi galvanis Ø 1,5 (inch)/3,1mm M' 95,468.75
503 Pipa besi galvanis Ø 2 (inch)/3,6mm M' 130,643.75
504 Pipa besi galvanis Ø 3 (inch) t=4 /3,8mm M' 171,362.50
505 Pipa besi galvanis Ø 4 (inch)/4mm M' 271,000.00
506 Pipa besi Ø 1 (inch)/1,7mm M' 90,427.20
507 Pipa besi Ø 1,25 (inch)1,7mm M' 30,083.33
508 Pipa besi Ø 1,5 (inch)1,7mm M' 34,532.17
509 Pipa besi Ø 2 (inch)1,7mm M' 47,201.67
510 Pipa besi Ø 1 (inch) M' 19,217.00
511 Pipa besi Ø 1,25 (inch) M' 28,941.00
512 Pipa besi Ø 1,5 (inch) M' 27,957.00
513 Pipa besi Ø 2 (inch) M' 55,745.00
514 Pipa beton Ø 20 cm, panjang 1m' Buah 95,297.00
515 Pipa beton Ø 60 cm, panjang 1m' Buah 157,920.50
516 Pipa HDPE dia. 110 mm m' 138,050.00
517 Pipa HDPE dia. 125mm m' 178,750.00
518 Pipa HDPE dia. 140 mm m' 222,750.00
519 Pipa HDPE dia. 200 mm m' 455,400.00
520 Pipa HDPE dia. 250 mm m' 710,050.00
521 Pipa HDPE dia. 280 mm m' 888,800.00
522 Pipa HDPE dia. 400 mm m' 1,813,350.00
523 Pipa HDPE dia. 450 mm m' 2,296,800.00
524 Pipa HDPE dia. 500 mm m' 2,833,380.00
525 Pipa HDPE dia. 560 mm m' 3,549,150.00
526 Pipa HDPE dia. 63 mm m' 45,980.00
527 Pipa HDPE dia. 800 mm m' 5,747,500.00
528 Pipa HDPE dia.1000 mm m' 8,986,010.00
529 Pipa HDPE dia.900 mm m' 7,239,320.00
530 Pipa PVC Ø 1 (inch) AW, panjang 4 m M' 11,125.32
531 Pipa PVC Ø 1,5(inch) AW, panjang 4 m M' 18,754.38
532 Pipa PVC Ø 2 (inch) AW, panjang 4 m M' 27,688.06
533 Pipa PVC Ø 3 (inch) AW, panjang 4 m M' 49,631.20
534 Pipa PVC Ø 4-6 (inch) AW, panjang 4 m M' 84,769.60
535 Pipa PVC Ø1/2 (inch) AW, panjang 4 m M' 6,704.49
536 Pipa PVC Ø3/4 (inch) AW, panjang 4 m M' 8,459.04
537 Pipa PVC RRJ Ø 63 M' 30,231.50
538 Pipa PVC RRJ Ø 90 M' 59,667.38
539 Pipa PVC RRJ Ø 110 M' 84,753.75
540 Pipa PVC RRJ Ø 160 M' 187,708.75
541 Pipa PVC RRJ Ø 200 M' 261,500.00
542 Pipa PVC RRJ Ø 250 M' 341,508.75
543 Pipa PVC RRJ Ø 315 M' 873,615.50
544 Pipa PVC RRJ Ø 400 M' 1,481,333.50
545 Pipa PVC RRJ Ø 500 M' 2,303,816.00
546 Pipa PVC RRJ Ø 630 M' 3,731,382.25
547 Plamir tembok Kg 45,191.67
548 Plint Keramik 10 x 30 cm (Motif) Bh 15,400.00
549 Plint Keramik 10 x 30 cm (Polos) Bh 8,800.00
550 Plint Keramik 10 x 60 cm biasa Bh 27,500.00
551 Plint Keramik 10 x 60 cm Step Nose Bh 37,400.00
552 Plint keramik 10x40 Cm ( polos) Bh 8,800.00
553 Plint keramik 10x40 Cm (motif) Bh 15,400.00
554 Plint keramik 10x60 (granit) Bh 27,500.00
555 Plint Keramik 60 x 30 cm Step nose Bh 55,000.00
556 Plywood uk. 0,30 x 0,60 (m), tebal 4 mm Lembar 57,640.00
557 Plywood uk. 0,30 x 0,60 (m), tebal 6 mm Lembar 62,150.00
558 Plywood uk. 0,30 x 1,20 (m), tebal 4 mm Lembar 61,050.00
559 Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar 90,200.00
560 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm Lembar 87,725.00
561 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 157,300.00
562 Pompa air (dengan otomatis) Buah 833,250.00
563 Pompa air (jet pump) Buah 2,648,937.50
564 Pompa air (non otomatis) Buah 647,350.00
565 Porcelaint uk. 11x 11 cm Buah 1,320.00
566 Profil kaca M' 6,600.00
567 Railing tangga stainless steel pipa dia. 2" dan 1" M' 1,149,500.00
Rangka atap baja ringan (kuda-kuda, gording,
568 M² 236,500.00
assesories) galvanize + genteng metal
569 Rangka/ Frame accoustic board- wall angle M' 48,400.00
570 Rangka/ Frame accoustic board-cross tee M' 36,080.00
571 Rangka/ Frame accoustic board-main tee M' 43,780.00
Rangka/ Frame accoustic board-rod/ adjustable
572 M' 20,790.00
dia. 4mm
573 Reducer PVC dari 1/2 (inch) ke 1 (inch) Buah 3,972.22
574 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) Buah 3,483.33
575 Reducer PVC dari 3/4 (inch) ke 1 (inch) Buah 4,888.89
576 Rell pintu dorong set 269,500.00
577 Reng Taso 32.45 Btg 42,900.00
578 Residu atau ter Liter 59,510.00
579 Roll cat Buah 35,723.81
580 Rolling door tebal 0,4 mm (PVC) M² -
581 Rolling door Ukuran 0,4 mm (besi) m² 211,750.00
582 Rolling door Ukuran 0,8 mm (aluminium) m² 423,500.00
583 Rolling door Ukuran 1 mm (aluminium) m² 484,000.00
584 Rolling door-alumunium tebal 0,6 mm M² -
585 Rolling door-alumunium tebal 0,8 mm m² 423,500.00
586 Rolling door-Galvalum tebal 0,4 mm M² -
587 Rolling door-alumunium tebal 0,6 mm M² -
588 Rolling door-alumunium tebal 0,8 mm m² 423,500.00
589 Rolling door-Galvalum tebal 0,4 mm M² -
590 Rooflight fibreglass uk. 1,8 x 0,9 (m) Buah 97,350.00
591 Rooster block uk. 12x11x24 (cm) Buah 8,030.00
592 Rooster block uk. 20x20 (cm) Buah 14,850.00
593 Rooster keramik 20x20 (cm) Buah 41,250.00
594 Rooster keramik 30x30 (cm) Buah 55,550.00
595 Rubber bearing (60x30x4) cm Buah 792,000.00
596 Sabun Kg 22,000.00
597 Saklar double Buah 20,075.00
598 Saklar Double (broco) Buah 22,000.00
599 Saklar engkel Buah 22,000.00
600 Saklar tunggal Buah 15,693.33
601 Saklar tunggal (broco) Buah 14,300.00
602 Seal tape bh 3,080.00
603 Sealant Tube 38,225.00
604 Semen Mortar Kg 7,348.00
605 Semen Portland Kg 1,487.75
606 Semen putih Kg 13,074.42
607 Semen warna (sika graut) Kg 15,583.33
608 Seng BJLS 30 lebar 45 cm M' 16,500.00
609 Seng fibreglass Lembar 68,200.00
610 Seng gelombang uk. 1,50 x 0,90 (m) Lembar 49,500.00
611 Seng gelombang uk. 1,80 x 0,90 (m) Lembar 59,400.00
612 Seng gelombang uk. 2,10 x 0,90 (m) Lembar 69,300.00
613 Seng gelombang uk. 2,40 x 0,90 (m) Lembar 79,200.00
614 Seng gelombang uk. 2,70 x 0,90 (m) Lembar 89,100.00
615 Seng gelombang uk. 3,00 x 0,90 (m) Lembar 99,000.00
616 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 44,000.00
617 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) Lembar 55,000.00
618 Sherra block Buah 1,980.00
619 Shower + Stop kran Set 89,375.00
620 Shower bad Hot and cool Set 616,000.00
621 Shower bidet Buah 242,000.00
622 Shower mandi Buah 176,275.00
623 Sikat baja Buah 12,466.67
624 Siku 100 x 100 x 10 mm – 6 M Kg 9,680.00
625 Siku 100 x 100 x 11 mm – 6 M Kg 9,680.00
626 Siku 100 x 100 x 8 mm – 6 M Kg 9,680.00
627 Siku 120 x 120 x 12 mm – 6 M Kg 9,680.00
628 Siku 125 x 125 x 12 mm – 6 M Kg 9,680.00
629 Siku 130 x 130 x 12 mm – 6 M Kg 9,680.00
630 Siku 130 x 130 x 9 mm – 6 M Kg 9,680.00
631 Siku 150 x 150 x 12 mm – 6 M Kg 9,680.00
632 Siku 150 x 150 x 15 mm – 6 M Kg 9,680.00
633 Siku 20 x 20 x 3 mm – 6 M kg 9,680.00
634 Siku 20 x 20 x 3 mm – 6 M Kg 9,680.00
635 Siku 200 x 200 x 15 mm – 6 M Kg 9,680.00
636 Siku 200 x 200 x 16 mm – 6 M Kg 9,680.00
637 Siku 200 x 200 x 20 mm – 6 M Kg 9,680.00
638 Siku 200 x 200 x 25 mm – 6 M Kg 9,680.00
639 Siku 25 x 25 x 3 mm – 6 M kg 9,680.00
640 Siku 25 x 25 x 3 mm – 6 M Kg 9,680.00
641 Siku 250 x 250 x 25 mm – 6 M Kg 9,680.00
642 Siku 30 x 30 x 3 mm – 6 M kg 9,680.00
643 Siku 30 x 30 x 3 mm – 6 M Kg 9,680.00
644 Siku 40 x 40 x 3 mm – 6 M kg 9,680.00
645 Siku 40 x 40 x 3 mm – 6 M Kg 9,680.00
646 Siku 40 x 40 x 4 mm – 6 M kg 9,680.00
647 Siku 40 x 40 x 4 mm – 6 M Kg 9,680.00
648 Siku 40 x 40 x 5 mm – 6 M kg 9,680.00
649 Siku 40 x 40 x 5 mm – 6 M Kg 9,680.00
650 Siku 45 x 45 x 4 mm – 6 M kg 9,680.00
651 Siku 45 x 45 x 4 mm – 6 M Kg 9,680.00
652 Siku 45 x 45 x 5 mm – 6 M kg 9,680.00
653 Siku 45 x 45 x 5 mm – 6 M Kg 9,680.00
654 Siku 50 x 50 x 4 mm – 6 M kg 9,680.00
655 Siku 50 x 50 x 4 mm – 6 M Kg 9,680.00
656 Siku 50 x 50 x 5 mm – 6 M kg 9,680.00
657 Siku 50 x 50 x 5 mm – 6 M Kg 9,680.00
658 Siku 50 x 50 x 6 mm – 6 M kg 9,680.00
659 Siku 50 x 50 x 6 mm – 6 M Kg 9,680.00
660 Siku 60 x 60 x 5 mm – 6 M kg 9,680.00
661 Siku 60 x 60 x 5 mm – 6 M Kg 9,680.00
662 Siku 60 x 60 x 6 mm – 6 M kg 9,680.00
663 Siku 60 x 60 x 6 mm – 6 M Kg 9,680.00
664 Siku 65 x 65 x 6 mm – 6 M kg 9,680.00
665 Siku 65 x 65 x 6 mm – 6 M Kg 9,680.00
666 Siku 70 x 70 x 6 mm – 6 M kg 9,680.00
667 Siku 70 x 70 x 6 mm – 6 M Kg 9,680.00
668 Siku 70 x 70 x 7 mm – 6 M kg 9,680.00
669 Siku 70 x 70 x 7 mm – 6 M Kg 9,680.00
670 Siku 75 x 75 x 6 mm – 6 M kg 9,680.00
671 Siku 75 x 75 x 6 mm – 6 M Kg 9,680.00
672 Siku 75 x 75 x 7 mm – 6 M kg 9,680.00
673 Siku 75 x 75 x 7 mm – 6 M Kg 9,680.00
674 Siku 75 x 75 x 8 mm – 6 M kg 9,680.00
675 Siku 75 x 75 x 8 mm – 6 M Kg 9,680.00
676 Siku 75 x 75 x 9 mm – 6 M kg 9,680.00
677 Siku 75 x 75 x 9 mm – 6 M Kg 9,680.00
678 Siku 80 x 80 x 6 mm – 6 M Kg 9,680.00
679 Siku 80 x 80 x 8 mm – 6 M Kg 9,680.00
680 Siku 90 x 90 x 10 mm – 6 M Kg 9,680.00
681 Siku 90 x 90 x 8 mm – 6 M Kg 9,680.00
682 Siku 90 x 90 x 9 mm – 6 M Kg 9,680.00
683 Sirtu M³ 148,028.00
684 Skrup fixer Buah 2,310.00
685 Slot jendela Buah 27,500.00
686 Slot pintu Buah 23,650.00
687 Slot ventilasi/ bouwvenlight Buah 4,840.00
688 Socket PVC Ø 1 (inch) Buah 4,713.08
689 Socket PVC Ø 1/2 (inch) Buah 2,995.38
690 Socket PVC Ø 3/4 (inch) Buah 4,738.46
691 Soda api Kg 19,161.43
692 Solar Ltr 9,600.00
Spandeck zincalum setara " Union Deck", T=0,4
693 M' 67,100.00
mm
694 Spring knip Buah 21,340.00
695 Stone Coating Kg 55,550.00
696 Stop Kontak + Saklar (broco) Buah 27,500.00
697 Stop Kontak AC (broco) Buah 50,600.00
698 Stop kontak ganda/ tiga Buah 27,500.00
699 Stop kontak lantai Buah 363,000.00
700 Stop kontak saklar Buah 13,200.00
701 Stop kontak tunggal Buah 22,000.00
702 Stop kontak untuk AC Buah 77,000.00
703 Stop kontak+ instalasi Titik 170,500.00
704 sunscreen alumunium M² 1,650,000.00
705 T Dus (listrik) Buah 2,750.00
706 Tanah puru M3 80,631.70
707 Tangki air fiberglass (oranye) 1000 liter Buah 1,683,392.86
708 Tangki air fiberglass (oranye) 2000 liter Buah 3,359,277.78
709 Tangki air fiberglass (oranye) 3000 liter Buah 4,180,000.00
710 Tangki air fiberglass (oranye) 500 liter Buah 1,036,160.71
711 Tangki air/ hydrant umum fiberglass 1000 liter Buah 1,535,600.00
712 Tangki air/ hydrant umum fiberglass 2000 liter Buah 2,997,500.00
713 Tangki air/ hydrant umum fiberglass 3000 liter Buah 7,590,000.00
Tangki air/ hydrant umum fiberglass 6000 liter
714 Buah 23,100,000.00
(horizontal)
715 Tangki air/ hydrant umum polyethylene 1000 liter Buah 1,485,000.00
716 Tangki air/ hydrant umum polyethylene 2000 liter Buah 2,997,500.00
717 Tangki air/ hydrant umum polyethylene 3000 liter Buah 7,590,000.00
718 Tangki air/ hydrant umum polyethylene 4000 liter Buah 23,100,000.00
719 Tangki air/ hydrant umum polyethylene 500 liter Buah 2,832,500.00
720 Tangki air/ hydrant umum polyethylene 5000 liter Liter 2,090,000.00
721 Teak oil Lembar 264.00
722 Teak wood 0,30 x 0,60 (m), tebal 4 mm Lembar 56,980.00
723 Teakwood 0,90 x 2,10 (m), tebal 4 mm Lembar 90,750.00
724 Teakwood 1,20 x 2,40 (m), tebal 4 mm Unit 108,900.00
725 Tee all socket PVC Ø 100 x 50 (mm) Unit 491,150.00
726 Tee all socket PVC Ø 225 x 100 (mm) Unit 491,150.00
727 Tee all socket PVC Ø 50 x 50 (mm) Unit 247,500.00
728 Tee all socket PVC Ø 80 x 50 (mm) Kg 495,000.00
729 Ter lubang 61,233.33
730 Teralis jendela (60x120) cm lubang 330,000.00
731 Teralis pintu (90x200) cm M³ 825,000.00
732 Triplek tebal 2,5 mm uk. 1,22 x 2,44 (m) Lembar 62,791.67
733 Triplek tebal 4 mm uk. 1,22 x 2,44 (m) Lembar 81,522.22
734 Triplek tebal 6 mm uk. 1,22 x 2,44 (m) lbr 113,300.00
735 Thinner Liter 27,203.14
736 Ubin abu-abu 20 x 20 (cm) Buah 7,150.00
737 Ubin berwarna 20 x 20 (cm) Buah 9,680.00
738 Ubin motif (mozaik) M² 122,430.00
739 Ubin wafel Buah 7,150.00
740 Kaca dark blue Ukuran 8 mm m² 544,500.00
741 Kaca dark green Ukuran 8 mm m² 544,500.00
742 Kaca rayban Ukuran 8 mm m² 423,500.00
743 Urinoir Unit 1,045,000.00
744 UNP (100 mm x 6 m) Batang 845,000.00
745 Venetion blinds M² 88,990.00
746 Vertical blinds M² 69,575.00
747 Wallpapaer bermotif M² 48,702.50
748 Wallpaper polos M² 41,745.00
749 wastafel Set 907,500.00
750 Wastafel Ex.American standart (Kecil) Unit 327,250.00
751 Wastafel Ex.American standart (Sedang) Unit 385,000.00
752 Water drain + Assesories Set 22,000.00
753 Water meter dia 1" + pipa gip Unit 550,000.00
754 Water Profing Aquatex Kg 145,200.00
755 Water Profing Nodrop Kg 47,575.00
756 Water Profing ultraprof Kg 42,900.00
757 Wiremesh M5 Kg 10,776.72
758 Wiremesh M6 Kg 10,776.72
759 Wiremesh M7 Kg 10,776.72
760 Wiremesh M8 Kg 10,776.72
761 Wiremesh M9 Kg 10,776.72
762 Wiremesh M10 Kg 10,776.72
763 Wiremesh Kg 10,776.72
III. ALAT BERAT
1 ASPHALT MIXING PLANT Jam 6,272,848.24
2 ASPHALT FINISHER Jam 718,788.88
3 POWER BROOM Jam 67,070.79
4 BULLDOZER 100-150 HP Jam 603,156.56
5 COMPRESSOR 4000-6500 L\M Jam 139,897.04
6 CONCRETE MIXER 0.3-0.6 M3 Jam 111,533.60
7 CRANE 10-15 TON Jam 297,524.25
8 DUMP TRUCK 3 - 4 M3 Jam 233,699.72
9 DUMP TRUCK 6-8 M3 Jam 329,587.79
10 EXCAVATOR 80-140 HP Jam 450,000.00
11 EXCAVATOR MINI Jam 300,000.00
12 EXCAVATOR LONG ARM Jam 750,000.00
13 FLAT BED TRUCK 3-4 TON Jam 283,507.66
14 GENERATOR SET Jam 296,869.63
15 MOTOR GRADER >100 HP Jam 541,436.05
16 TRACK LOADER 75-100 HP Jam 347,935.90
17 WHEEL LOADER 1.0-1.6 M3 Jam 474,246.50
18 THREE WHEEL ROLLER 6-8 T Jam 290,094.73
19 TANDEM ROLLER 6-8 T. Jam 237,591.01
20 TIRE ROLLER 8-10 T. Jam 448,082.97
21 VIBRATORY ROLLER 5-8 T. Jam 341,118.31
22 CONCRETE VIBRATOR Jam 64,996.94
23 STONE CRUSHER Jam 635,032.82
24 WATER PUMP 70-100 mm Jam 62,541.73
25 WATER TANKER 3000-4500 L. Jam 230,978.18
26 PEDESTRIAN ROLLER Jam 80,314.45
27 TAMPER Jam 64,070.88
28 JACK HAMMER Jam 62,347.52
29 FULVI MIXER Jam 506,241.50
30 CONCRETE PUMP Jam 242,308.70
31 TRAILER 20 TON Jam 313,452.79
32 PILE DRIVER + HAMMER Jam 149,642.81

33 CRANE ON TRACK 35 TON Jam 435,745.61

34 WELDING SET Jam 74,078.92


35 BORE PILE MACHINE Jam 778,290.99
36 PONTON Bulan 50,000,000.00
LAMPIRAN XII
PERATURAN WALIKOTA PANGKALPINANG
NOMOR : TAHUN 2020
TANGGAL : DESEMBER 2020

HARGA
HARGA
SATUAN
SATUAN UPAH/
GALIAN C UPAH/
BAHAN/ALAT
BAHAN/ALAT
2021
2020
5 6

120,000 120,000
120,000 120,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
160,000 160,000
180,000 180,000
120,000 120,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200,000
180,000 180,000

- -

70,484.00 70,484.00
68.75 68.75
462,214.00 462,214.00
482,241.80 482,241.80
487,265.20 487,265.20
455,403.00 455,403.00
436,921.15 436,921.15
481,338.51 481,338.51
470,634.18 470,634.18
270,204.00 270,204.00
232,254.00 232,254.00
67,403.42 67,403.42
5,309.62 5,309.62
78,529.00 78,529.00
132,000.00 132,000.00
17,691.61 17,691.61
17,691.61 17,691.61
15,750.00 15,750.00
68,077.78 68,077.78

73,700.00 73,700.00

42,955.00 42,955.00

47,300.00 47,300.00

51,700.00 51,700.00

58,520.00 58,520.00

55,971.67 55,971.67

60,390.00 60,390.00

64,460.00 64,460.00

70,418.33 70,418.33

72,215.00 72,215.00

72,462.50 72,462.50

80,478.10 80,478.10

81,400.00 81,400.00

81,922.50 81,922.50

90,537.86 90,537.86

86,625.00 86,625.00

100,597.62 100,597.62
96,250.00 96,250.00

13,514.29 13,514.29
6,175.71 6,175.71
4,510.00 4,510.00
10,138.33 10,138.33
35,750.00 35,750.00
42,533.33 42,533.33
56,210.00 56,210.00
85,356.27 85,356.27
14,850.00 14,850.00
39,600.00 39,600.00
168,000.00 168,000.00
67,000.00 67,000.00
1,080,000.00 1,080,000.00
13,557.00 13,557.00
14,494.75 14,494.75
14,941.00 14,941.00
15,844.75 15,844.75
143,000.00 143,000.00
80,300.00 80,300.00
88,000.00 88,000.00
104,500.00 104,500.00
16,500.00 16,500.00
216,700.00 216,700.00
464,592.86 464,592.86
236,500.00 236,500.00
233,750.00 233,750.00 0.1815
385,550.00 385,550.00
4,565,000.00 4,565,000.00

3,630,000.00 3,630,000.00

11,000.00 11,000.00
8,580.00 8,580.00
1,895.21 1,895.21
50,094.00 50,094.00
198,000.00 198,000.00
1,540.00 1,540.00
1,446.92 1,446.92
1,369.50 1,369.50
393,874.14 393,874.14
369,933.33 369,933.33
198,000.00 198,000.00
452,021.50 452,021.50
332,750.00 332,750.00
70,180.00 70,180.00
387,000.00 387,000.00
171,600.00 171,600.00
444,583.33 444,583.33
436,379.17 436,379.17
438,750.00 438,750.00
440,473.29 440,473.29
440,544.71 440,544.71
200,102.00 200,102.00
305.56 305.56
305.56 305.56
305.56 305.56
305.56 305.56

46,200.00 46,200.00

302,500.00 302,500.00

162,500.00 162,500.00

595,430.00 595,430.00

8,690.00 8,690.00

8,140.00 8,140.00

13,105.05 13,105.05

9,938.74 9,938.74

9,859.00 9,859.00

10,018.47 10,018.47

11,632.88 11,632.88

10,557.95 10,557.95

1,235,891.25 1,235,891.25

468,713.75 468,713.75

705,463.75 705,463.75

973,095.75 973,095.75

509,355.00 509,355.00

283,967.67 283,967.67

12,537.25 12,537.25
9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00

9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
11,251.49 11,251.49
17,966.67 17,966.67
13,105.05 13,105.05
9,938.74 9,938.74
9,859.00 9,859.00
10,018.47 10,018.47
11,632.88 11,632.88
10,557.95 10,557.95
5,225.00 5,225.00
8,456.25 8,456.25
9,625.00 9,625.00
515,143.20 515,143.20
724,485.30 724,485.30
646,188.40 646,188.40
908,626.40 908,626.40
1,092,854.40 1,092,854.40
1,214,253.70 1,214,253.70
125,570.50 125,570.50
144,254.00 144,254.00
158,244.90 158,244.90
181,968.60 181,968.60
197,871.30 197,871.30
217,250.00 217,250.00
221,595.00 221,595.00
237,410.80 237,410.80
191,180.00 191,180.00
219,509.40 219,509.40
238,975.00 238,975.00
267,391.30 267,391.30
286,770.00 286,770.00
240,104.70 240,104.70
278,080.00 278,080.00
300,065.70 300,065.70
384,011.10 384,011.10
22,000.00 22,000.00
149,050.00 149,050.00
11,737.00 11,737.00
15,730.00 15,730.00
9,680.00 9,680.00
9,900.00 9,900.00
### 10,500,000.00
7,875,000.00 7,875,000.00
80,630.00 80,630.00
9,680.00 9,680.00
57,750.00 57,750.00
45,512.50 45,512.50
78,650.00 78,650.00

66,770.00 66,770.00

19,662.50 19,662.50
18,892.50 18,892.50
7,260.00 7,260.00
4,675.00 4,675.00
48,950.00 48,950.00
4,984.38 4,984.38
35,750.00 35,750.00
35,200.00 35,200.00

33,000.00 33,000.00

1,452,000.00 1,452,000.00
484,000.00 484,000.00
484,000.00 484,000.00
1,163,910.00 1,163,910.00
484,000.00 484,000.00
72,600.00 72,600.00
85,000.00 85,000.00
49,000.00 49,000.00
77,293.33 77,293.33
109,725.00 109,725.00
13,750.00 13,750.00
55,963.44 55,963.44
64,088.78 64,088.78
33,366.67 33,366.67
55,556.00 55,556.00
57,191.67 57,191.67
56,684.67 56,684.67
41,372.88 41,372.88
55,086.52 55,086.52
51,244.29 51,244.29
92,862.00 92,862.00
76,692.00 76,692.00
64,773.08 64,773.08
19,700.00 19,700.00
1,667,966.67 1,667,966.67
3,212,000.00 3,212,000.00
559,166.67 559,166.67
217,861.11 217,861.11
211,126.67 211,126.67
1,383,800.00 1,383,800.00
49,316.67 49,316.67
52,708.33 52,708.33
423,361.03 423,361.03
224.39 224.39
37,103.85 37,103.85
1,848.61 1,848.61
215,710.00 215,710.00
129,250.00 129,250.00
53,900.00 53,900.00
40,920.00 40,920.00
60,000.00 60,000.00
70,000.00 70,000.00
1,100,000.00 1,100,000.00
386,760.00 386,760.00
924,000.00 924,000.00
22,173.68 22,173.68
53,263.16 53,263.16
82,500.00 82,500.00
29,590.00 29,590.00
442,200.00 442,200.00
26,042.50 26,042.50
30,250.00 30,250.00
31,460.00 31,460.00
399,300.00 399,300.00
14,520.00 14,520.00
25,850.00 25,850.00
1,815.00 1,815.00
9,854.17 9,854.17
- -
- -
484,000.00 484,000.00
665,500.00 665,500.00
93,500.00 93,500.00
140,000.00 140,000.00
70,583.33 70,583.33
31,350.00 31,350.00
52,341.67 52,341.67
38,293.75 38,293.75
38,500.00 38,500.00
63,250.00 63,250.00
57,415.60 57,415.60
26,498.72 26,498.72
990,000.00 990,000.00
297,366.67 297,366.67
31,900.00 31,900.00
20,044.44 20,044.44
42,405.00 42,405.00
104,192.00 104,192.00
77,600.00 77,600.00
425,388.00 425,388.00
31,812.50 31,812.50
33,235.00 33,235.00

605,000.00 605,000.00

61,187.50 61,187.50
127,200.00 127,200.00
9,735.00 9,735.00
1,100,000.00 1,100,000.00
22,000.00 22,000.00
37,400.00 37,400.00
8,000.00 8,000.00
9,000.00 9,000.00
825,000.00 825,000.00
317,240.00 317,240.00
185,020.00 185,020.00
52,076.25 52,076.25
23,514.69 23,514.69
33,275.00 33,275.00
6,783.33 6,783.33
53,114.29 53,114.29 796.71 ###
8,461.75 8,461.75 126.93
14,806.00 14,806.00 222.09
19,624.00 19,624.00 294.36
34,787.50 34,787.50 521.81
85,000.00 85,000.00
242,000.00 242,000.00
104,500.00 104,500.00
145,750.00 145,750.00
154,000.00 154,000.00
- -
- -
154,000.00 154,000.00
93,500.00 93,500.00
137,500.00 137,500.00
217,800.00 217,800.00
568,700.00 568,700.00
605,000.00 605,000.00
266,200.00 266,200.00
568,700.00 568,700.00
605,000.00 605,000.00
217,800.00 217,800.00
266,200.00 266,200.00
24,200.00 24,200.00
71,500.00 71,500.00
129,800.00 129,800.00
26,400.00 26,400.00
938,300.00 938,300.00
363,000.00 363,000.00
423,500.00 423,500.00
102,850.00 102,850.00
145,200.00 145,200.00
302,500.00 302,500.00
145,200.00 145,200.00
266,200.00 266,200.00
625,900.00 625,900.00
20,680.00 20,680.00
7,739.29 7,739.29
17,600.00 17,600.00
44,000.00 44,000.00
77,924.00 77,924.00
28,664.90 28,664.90
10,894.07 10,894.07
109,346.60 109,346.60
18,783.11 18,783.11
17,270.00 17,270.00
33,586.67 33,586.67
23,964.29 23,964.29
45,540.00 45,540.00
26,125.00 26,125.00
18,374.07 18,374.07
23,393.33 23,393.33
87,560.00 87,560.00
12,048.75 12,048.75
3,569,198.00 3,569,198.00
3,482,456.20 3,482,456.20
2,780,578.17 2,780,578.17
2,991,422.60 2,991,422.60
2,596,383.33 2,596,383.33
2,498,000.00 2,498,000.00
2,374,225.75 2,374,225.75
2,206,250.00 2,206,250.00
3,015,000.00 3,015,000.00
1,707,096.00 1,707,096.00
1,782,215.50 1,782,215.50
290,000.00 290,000.00
5,225.00 5,225.00
37,537.50 37,537.50
33,000.00 33,000.00
49,500.00 49,500.00
61,050.00 61,050.00
65,679.17 65,679.17
56,792.59 56,792.59
65,066.67 65,066.67
60,967.50 60,967.50
63,066.67 63,066.67
58,410.00 58,410.00
69,609.38 69,609.38
54,835.00 54,835.00
99,000.00 99,000.00
176,000.00 176,000.00
99,000.00 99,000.00
165,000.00 165,000.00
372,395.10 372,395.10
64,114.29 64,114.29
199,600.00 199,600.00
140,879.33 140,879.33
296,180.33 296,180.33
304,000.00 304,000.00
18,500.00 18,500.00
5,200.00 5,200.00
3,005.36 3,005.36
3,575.00 3,575.00
81,125.00 81,125.00
41,492.00 41,492.00
72,600.00 72,600.00
39,233.33 39,233.33
27,046.25 27,046.25
27,775.00 27,775.00
16,500.00 16,500.00
9,350.00 9,350.00
- -
28,600.00 28,600.00
- -
207,487.50 207,487.50
188,100.00 188,100.00

198,000.00 198,000.00

19,800.00 19,800.00
137,133.33 137,133.33
180,125.00 180,125.00
90,750.00 90,750.00
90,750.00 90,750.00
66,550.00 66,550.00
102,850.00 102,850.00
102,850.00 102,850.00
90,750.00 90,750.00
88,000.00 88,000.00
104,500.00 104,500.00
88,000.00 88,000.00
132,000.00 132,000.00
259,233.33 259,233.33
215,600.00 215,600.00
63,250.00 63,250.00
111,650.00 111,650.00
126,500.00 126,500.00
70,950.00 70,950.00
92,950.00 92,950.00
133,100.00 133,100.00
119,163.00 119,163.00
152,559.00 152,559.00
171,534.00 171,534.00
346,500.00 346,500.00
132,792.00 132,792.00
247,500.00 247,500.00
177,650.00 177,650.00

43,670.00 43,670.00

52,800.00 52,800.00

59,730.00 59,730.00

67,650.00 67,650.00

31,166.67 31,166.67
25,520.00 25,520.00
16,463.33 16,463.33
24,148.34 24,148.34
24,148.34 24,148.34
39,416.67 39,416.67
- -
- -
19,066.67 19,066.67
507,775.33 507,775.33
507,775.33 507,775.33
507,775.33 507,775.33
496,987.67 496,987.67
275,000.00 275,000.00
233,475.00 233,475.00
11,281.50 11,281.50
12,550.00 12,550.00
31,410.00 31,410.00
3,080,000.00 3,080,000.00
193,050.00 193,050.00
252,083.33 252,083.33
292,285.71 292,285.71
95,800.00 95,800.00
141,991.67 141,991.67
45,100.00 45,100.00
22,912.30 22,912.30
24,967.08 24,967.08
17,032.50 17,032.50
20,160.00 20,160.00
33,000.00 33,000.00
48,400.00 48,400.00
26,033.33 26,033.33
23,335.71 23,335.71
51,833.33 51,833.33
121,000.00 121,000.00
151,250.00 151,250.00
181,500.00 181,500.00
211,750.00 211,750.00
114,950.00 114,950.00
135,093.43 135,093.43
79.47 79.47
103,077.17 103,077.17
93,335.00 93,335.00
87,787.60 87,787.60
80,756.00 80,756.00
102,787.50 102,787.50
64,350.00 64,350.00
51,000.00 51,000.00
838,750.00 838,750.00
1,650,000.00 1,650,000.00
475,200.00 475,200.00
366,666.67 366,666.67
241,816.67 241,816.67
412,500.00 412,500.00
244,750.00 244,750.00
295,166.67 295,166.67
243,833.33 243,833.33
825,000.00 825,000.00
31,278.33 31,278.33
38,052.50 38,052.50
41,955.36 41,955.36
54,488.33 54,488.33
74,392.50 74,392.50
85,633.00 85,633.00
140,590.63 140,590.63
141,810.00 141,810.00
49,156.25 49,156.25
60,000.00 60,000.00
78,281.25 78,281.25
93,750.00 93,750.00
95,468.75 95,468.75
130,643.75 130,643.75
171,362.50 171,362.50
271,000.00 271,000.00
90,427.20 90,427.20
30,083.33 30,083.33
34,532.17 34,532.17
47,201.67 47,201.67
19,217.00 19,217.00
28,941.00 28,941.00
27,957.00 27,957.00
55,745.00 55,745.00
95,297.00 95,297.00
157,920.50 157,920.50
138,050.00 138,050.00
178,750.00 178,750.00
222,750.00 222,750.00
455,400.00 455,400.00
710,050.00 710,050.00
888,800.00 888,800.00
1,813,350.00 1,813,350.00
2,296,800.00 2,296,800.00
2,833,380.00 2,833,380.00
3,549,150.00 3,549,150.00
45,980.00 45,980.00
5,747,500.00 5,747,500.00
8,986,010.00 8,986,010.00
7,239,320.00 7,239,320.00
11,125.32 11,125.32
18,754.38 18,754.38
27,688.06 27,688.06
49,631.20 49,631.20
84,769.60 84,769.60
6,704.49 6,704.49
8,459.04 8,459.04
30,231.50 30,231.50
59,667.38 59,667.38
84,753.75 84,753.75
187,708.75 187,708.75
261,500.00 261,500.00
341,508.75 341,508.75
873,615.50 873,615.50
1,481,333.50 1,481,333.50
2,303,816.00 2,303,816.00
3,731,382.25 3,731,382.25
45,191.67 45,191.67
15,400.00 15,400.00
8,800.00 8,800.00
27,500.00 27,500.00
37,400.00 37,400.00
8,800.00 8,800.00
15,400.00 15,400.00
27,500.00 27,500.00
55,000.00 55,000.00
57,640.00 57,640.00
62,150.00 62,150.00
61,050.00 61,050.00
90,200.00 90,200.00
87,725.00 87,725.00
157,300.00 157,300.00
833,250.00 833,250.00
2,648,937.50 2,648,937.50
647,350.00 647,350.00
1,320.00 1,320.00
6,600.00 6,600.00
1,149,500.00 1,149,500.00

236,500.00 236,500.00

48,400.00 48,400.00
36,080.00 36,080.00
43,780.00 43,780.00

20,790.00 20,790.00

3,972.22 3,972.22
3,483.33 3,483.33
4,888.89 4,888.89
269,500.00 269,500.00
42,900.00 42,900.00
59,510.00 59,510.00
35,723.81 35,723.81
- -
211,750.00 211,750.00
423,500.00 423,500.00
484,000.00 484,000.00
- -
423,500.00 423,500.00
- -
- -
423,500.00 423,500.00
- -
97,350.00 97,350.00
8,030.00 8,030.00
14,850.00 14,850.00
41,250.00 41,250.00
55,550.00 55,550.00
792,000.00 792,000.00
22,000.00 22,000.00
20,075.00 20,075.00
22,000.00 22,000.00
22,000.00 22,000.00
15,693.33 15,693.33
14,300.00 14,300.00
3,080.00 3,080.00
38,225.00 38,225.00
7,348.00 7,348.00
1,487.75 1,487.75
13,074.42 13,074.42
15,583.33 15,583.33
16,500.00 16,500.00
68,200.00 68,200.00
49,500.00 49,500.00
59,400.00 59,400.00
69,300.00 69,300.00
79,200.00 79,200.00
89,100.00 89,100.00
99,000.00 99,000.00
44,000.00 44,000.00
55,000.00 55,000.00
1,980.00 1,980.00
89,375.00 89,375.00
616,000.00 616,000.00
242,000.00 242,000.00
176,275.00 176,275.00
12,466.67 12,466.67
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
9,680.00 9,680.00
148,028.00 148,028.00
2,310.00 2,310.00
27,500.00 27,500.00
23,650.00 23,650.00
4,840.00 4,840.00
4,713.08 4,713.08
2,995.38 2,995.38
4,738.46 4,738.46
19,161.43 19,161.43
9,600.00 9,600.00

67,100.00 67,100.00

21,340.00 21,340.00
55,550.00 55,550.00
27,500.00 27,500.00
50,600.00 50,600.00
27,500.00 27,500.00
363,000.00 363,000.00
13,200.00 13,200.00
22,000.00 22,000.00
77,000.00 77,000.00
170,500.00 170,500.00
1,650,000.00 1,650,000.00
2,750.00 2,750.00
80,631.70 80,631.70
1,683,392.86 1,683,392.86
3,359,277.78 3,359,277.78
4,180,000.00 4,180,000.00
1,036,160.71 1,036,160.71
1,535,600.00 1,535,600.00
2,997,500.00 2,997,500.00
7,590,000.00 7,590,000.00

### 23,100,000.00

1,485,000.00 1,485,000.00
2,997,500.00 2,997,500.00
7,590,000.00 7,590,000.00
### 23,100,000.00
2,832,500.00 2,832,500.00
2,090,000.00 2,090,000.00
264.00 264.00
56,980.00 56,980.00
90,750.00 90,750.00
108,900.00 108,900.00
491,150.00 491,150.00
491,150.00 491,150.00
247,500.00 247,500.00
495,000.00 495,000.00
61,233.33 61,233.33
330,000.00 330,000.00
825,000.00 825,000.00
62,791.67 62,791.67
81,522.22 81,522.22
113,300.00 113,300.00
27,203.14 27,203.14
7,150.00 7,150.00
9,680.00 9,680.00
122,430.00 122,430.00
7,150.00 7,150.00
544,500.00 544,500.00
544,500.00 544,500.00
423,500.00 423,500.00
1,045,000.00 1,045,000.00
845,000.00 845,000.00
88,990.00 88,990.00
69,575.00 69,575.00
48,702.50 48,702.50
41,745.00 41,745.00
907,500.00 907,500.00
327,250.00 327,250.00
385,000.00 385,000.00
22,000.00 22,000.00
550,000.00 550,000.00
145,200.00 145,200.00
47,575.00 47,575.00
42,900.00 42,900.00
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
10,776.72 10,776.72
6,272,848.24 6,272,848.24
718,788.88 718,788.88
67,070.79 67,070.79
603,156.56 603,156.56
139,897.04 139,897.04
111,533.60 111,533.60
297,524.25 297,524.25
233,699.72 233,699.72
329,587.79 329,587.79
450,000.00 450,000.00
300,000.00 300,000.00
750,000.00 750,000.00
283,507.66 283,507.66
296,869.63 296,869.63
541,436.05 541,436.05
347,935.90 347,935.90
474,246.50 474,246.50
290,094.73 290,094.73
237,591.01 237,591.01
448,082.97 448,082.97
341,118.31 341,118.31
64,996.94 64,996.94
635,032.82 635,032.82
62,541.73 62,541.73
230,978.18 230,978.18
80,314.45 80,314.45
64,070.88 64,070.88
62,347.52 62,347.52
506,241.50 506,241.50
242,308.70 242,308.70
313,452.79 313,452.79
149,642.81 149,642.81

435,745.61 435,745.61

74,078.92 74,078.92
778,290.99 778,290.99
### 50,000,000.00

WALIKOTA PANGKALPINANG

MAULAN AKLIL
DAFTAR UPAH BAHAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
PERIODE OKT TAHUN 2022

HARGA SATUAN UPAH/


NO. URAIAN SATUAN
BAHAN/ALAT 2022

1 2 3
I. TENAGA KERJA
1 Pekerja Oh 121,800
2 Tenaga gali tanah/pondasi Oh 121,800
3 Tukang Oh 162,400
4 Tukang pipa Oh 162,400
5 Tukang batu Oh 162,400
6 Tukang kayu Oh 162,400
7 Tukang cat Oh 162,400
8 Tukang besi Oh 162,400
9 Tukang politur Oh 162,400
10 Tukang Listrik Oh 162,400
11 Tukang Las Konstruksi Oh 162,400
12 Tukang khusus aluminium Oh 162,400
13 Tukang Las biasa Oh 162,400
14 Tukang Pipa ledeng Oh 162,400
15 Tukang Batu/Pipa Oh 162,400
16 Tukang Vibrator Oh 162,400
17 Tukang Erection Oh 162,400
18 Operator crane Oh 182,700
19 Pembantu operator crane Oh 121,800
20 Operator Oh 203,000
21 Kepala Tukang Oh 203,000
22 Kepala tukang batu Oh 203,000
23 Kepala tukang kayu Oh 203,000
24 Kepala tukang cat Oh 203,000
25 Kepala tukang besi Oh 203,000
26 Kepala tukang politur Oh 203,000
27 Mandor Oh 203,000
28 Operator alat berat Oh 182,700

II. BAHAN MATERIAL -

1 Aditive anti pengelupasan Liter 71,541


2 Air Ltr 70
3 Agregat Pecah Kasar M3 469,147
4 Agg. Halus LP A M3 489,475
5 Agregat Lolos # 1 " M3 494,574
6 Aspal curah Kg 19,500
7 Aspal drum Kg 19,500
8 Aspal emulsi Kg 22,500
9 Agr.Base Kelas A M3 462,234
10 Agr.Base Kelas B M3 443,475
11 Agregat Pecah Mesin 5-10 & 10-20 mm M3 488,559
12 Agregat Pecah Mesin 20-30 mm M3 477,694
13 All socket reducer PVC Ø 100 x 80 (mm) Unit 274,257
14 All socket reducer PVC Ø 80 x 50 (mm) unit 235,738
15 Aluminium foil air cell bubble M² 68,414
16 Ampelas Lembar 6,778
17 Anti stripping agent Liter 79,707
18 Asesoris bak cuci piring Set 133,980
19 As (1,5' x 6m) Batang 1,096,200
20 Atap alumunium Gelombang tebal 0,55 (Galvalum) M² 69,099
21 Atap alumunium super sheet uk. 1,8 x 6 (m), t= 0,2 mm (berwarna) M² 74,806
22 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm Lembar 43,599
23 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 48,010
24 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm Lembar 52,476
25 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 59,398
26 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm Lembar 56,811
27 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 61,296
28 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 65,427
29 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 71,475
30 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 73,298
31 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 73,549
32 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 81,685
33 Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 82,621
34 Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 83,151
35 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 91,896
36 Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 87,924
37 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 102,107
38 Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 97,694
39 Atap genteng (standar KIA) Buah 13,717
40 Atap genteng beton (jenis press) Buah 6,268
41 Atap genteng kodok Buah 4,578
42 Atap genteng soka Buah 10,290
43 Atap metal (biasa/ polos) Lembar 47,500
44 Atap metal (standar Rainbow) Lembar 43,171
45 Atap metal berpasir Lembar 57,053
46 Atap polycarbonat M² 86,637
47 Atap seng fiberglass Ft 15,073
48 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 40,194
49 Atap Selulosa Bitumen (Ukuran 0,95 x 2 m) Lembar 170,520
50 Atap Selulosa Bitumen (Ukuran 106 x 40 cm) Lembar 68,005
51 Baja Tulangan (Polos) U24 Kg 13,760
52 Baja Tulangan (Ulir) D32 Kg 14,712
53 Baja ringan Taso 75.100 Btg 145,145
54 Baja ringan Taso 75.65 Btg 81,505
55 Baja ringan Taso 75.75 Btg 133,500
56 Baja ringan Taso 75.80 Btg 106,068
57 Bak Air Fiberglass Uk. 55x55x60 cm bh 250,000
58 Bak cat bh 16,748
59 Bak cuci piring (sink) stainless steel 1 lobang Buah 343,750
60 Bak cuci piring (sink) stainless steel 2 lobang Buah 471,562
61 Bak mandi fibreglass volume 0,15 m³ Buah 240,048
62 Bak mandi fibreglass volume 0,30 m³ Buah 237,256
63 Bak mandi fibreglass volume 1,00 m³ Buah 391,333
64 Bak mandi jenis bathtub buah 4,633,475
65 Bak mandi jenis bathtub (acrilic P: 1,3 M L: 0,7 M T: 0,4M) Buah 3,684,450
66 Bata Ringan 10x20x60cm Buah 11,165
67 Bata Ringan 7,5x20x60cm Buah 8,709
68 Batu Alam Andersit 20/40cm M2 164,938
69 Besi plat Baja (8mm x 6' x 20') Keping 10,657,500
70 Besi plat Baja (6mm x 6' x 20') Keping 7,993,125
71 Bubungan Atap Selulosa Bitumen (Ukuran 1060x 50 cm) Lembar 86,275
72 Bracket Kaca Axrilix Set 49,735
73 Bataco Buah 2,243
74 Batacote M² 50,845
75 Batu alam M² 200,970
76 Batu bata berongga uk. 5x11x24 (cm) Buah 1,563
77 Batu bata merah besar Buah 2,300
78 Batu bata merah kecil Buah 1,390
79 Batu belah 10-15 (cm) M³ 425,000
80 Batu belah 15-20 (cm) M³ 425,000
81 Batu candi M² 200,970
82 Batu gunung M³ 364,286
83 Bahan Tanah Timbunan M3 105,119
84 Bahan Pilihan M3 75,227
85 Batu kali bulat M³ 458,802
86 Batu kapur M³ 71,233
87 Batu kerikil M³ 400,000
88 Batu paras M² 174,174
89 Batu pecah 0,5 - 1 M³ 747,500
90 Batu pecah 1 - 2 M³ 747,500
91 Batu pecah 2 - 3 M³ 747,500
92 Batu pecah 3 - 5 M³ 850,000
93 Batu pecah 5 - 7 M³ 850,000
94 Batu pecah 0,5 - 1 (kg) Kg 516
95 Batu pecah 1 - 2 (kg) Kg 516
96 Batu pecah 2 - 3 (kg) Kg 516
97 Batu pecah 3 - 5 (kg) Kg 586
98 Batu pecah 5 - 7 (kg) Kg 586
99 Batu sikat M² 46,893
100 Batu teraso M³ 307,038
101 Baut Dinabold 3" Buah 604,361
102 Baut klem Buah 8,820
103 Bensin Pertalite Ltr 8,262
104 Baja Tulangan (Polos) U32 Kg 13,815
105 Baja Tulangan (Ulir) D39 Kg 15,165
106 Baja Tulangan (Ulir) D48 Kg 16,082
107 Baja Struktur Lantai Ortotropik Kg 22,381
108 Besi beton Kg 13,302
109 Besi beton Ø10mm Kg 11,761
110 Besi beton Ø12mm Kg 12,289
111 Besi beton Ø16mm Kg 13,274
112 Besi beton Ø6mm Kg 13,636
113 Besi beton Ø8mm Kg 12,821
114 Buis beton bertulang Ø 100 cm Buah 1,254,430
115 Buis beton bertulang Ø 45 cm Buah 475,744
116 Buis beton bertulang Ø 60 cm Buah 716,046
117 Buis beton bertulang Ø 80 cm Buah 987,692
118 Buis beton bertulang Ø< 45 cm Buah 516,995
119 Buis beton tak bertulang Ø 60 cm Buah 288,227
120 Besi baja CNP kg 12,725
121 Besi Baja I WF 100 x 50 x 5 x 7 mm – 6 M Kg 15,000
122 Besi Baja I WF 125 x 60 x 6 x 8 mm – 12 M Kg 9,825
123 Besi Baja I WF 148 x 100 x 6 x 9 mm – 12 M Kg 9,825
124 Besi Baja I WF 150 x 75 x 5 x 7 mm – 6 M Kg 19,405
125 Besi Baja I WF 175 x 90 x 5 x 8 mm – 12 M Kg 9,825
126 Besi Baja I WF 194 x 150 x 6 x 9 mm – 12 M Kg 9,825
127 Besi Baja I WF 198 x 99 x 4,7 x 7 mm – 12 M Kg 9,825
128 Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 6 M Kg 19,375
129 Besi Baja I WF 200 x 150 x 6,7 x 9 mm – 12 M Kg 9,825
130 Besi Baja I WF 244 x 175 x 7 x 11 mm – 12 M Kg 9,825
131 Besi Baja I WF 248 x 124 x 5 x 8 mm – 12 M Kg 9,825
132 Besi Baja I WF 250 x 125 x 6 x 9 mm – 6 M Kg 19,380
133 Besi Baja I WF 294 x 200 x 8 x 12 mm – 12 M Kg 9,825
134 Besi Baja I WF 298 x 149 x 6 x 8 mm – 12 M Kg 9,825
135 Besi Baja I WF 346 x 174 x 6 x 9 mm – 12 M Kg 9,825
136 Besi Baja I WF 350 x 175 x 7 x 11 mm – 6 M Kg 20,504
137 Besi Baja I WF 396 x 199 x 7 x 11 mm – 12 M Kg 9,825
138 Besi Baja I WF 400 x 200 x 8 x 13 mm – 12 M Kg 27,778
139 Besi Baja I WF 446 x 199 x 8 x 12 mm – 12 M Kg 9,825
140 Besi Baja I WF 450 x 200 x 9 x 14 mm – 12 M Kg 9,825
141 Besi Baja I WF 500 x 200 x 10 x 16 mm – 12 M Kg 9,825
142 Besi Baja I WF 588 x 300 x 12 x 20 mm – 12 M Kg 9,825
143 Besi Baja I WF 600 x 200 x 11 x 17 mm – 12 M Kg 9,825
144 Besi Baja I WF 700 x 300 x 13 x 24 mm – 12 M Kg 9,825
145 Besi Baja I WF 800 x 300 x 14 x 26 mm – 12 M Kg 9,825
146 Besi Baja I WF 900 x 300 x 16 x 28 x 12 M Kg 9,825
147 Besi baja IWF kg 11,420
148 Besi baut kuda-kuda Kg 18,236
149 Besi Hollow 20x40 mm t: 0,4mm m 5,303
150 Besi Hollow 20x40 mm t: 1,8mm m 8,583
151 Besi Hollow 40x40 mm t : 1,8mm m 9,769
152 Besi Hollow 100 x 100 x 3,2 mm x 6 Meter Btg 522,870
153 Besi Hollow 100 x 100 x 4,5 mm x 6 M Btg 735,353
154 Besi Hollow 125 x 125 x 3,2 mm x 6 M Btg 655,881
155 Besi Hollow 125 x 125 x 4,5 mm x 6 M Btg 922,256
156 Besi Hollow 150 x 150 x 4,5 mm x 6 M Btg 1,109,247
157 Besi Hollow 150 x 150 x 5 mm x 6 M Btg 1,232,468
158 Besi Hollow 40 x 40 x 2 mm x 6 Meter Btg 127,454
159 Besi Hollow 40 x 40 x 2,3 mm x 6 Meter Btg 146,418
160 Besi Hollow 50 x 50 x 2 mm x 6 Meter Btg 160,619
161 Besi Hollow 50 x 50 x 2,3 mm x 6 Meter Btg 184,698
162 Besi Hollow 50 x 50 x 2,5 mm x 6 Meter Btg 200,839
163 Besi Hollow 50 x 50 x 2,7 mm x 6 Meter Btg 220,509
164 Besi Hollow 50 x 50 x 2,8 mm x 6 Meter Btg 224,919
165 Besi Hollow 50 x 50 x 3 mm x 6 Meter Btg 240,972
166 Besi Hollow 60 x 60 x 2 mm x 6 Meter Btg 194,048
167 Besi Hollow 60 x 60 x 2,3 mm x 6 Meter Btg 222,802
168 Besi Hollow 60 x 60 x 2,5 mm x 6 Meter Btg 242,560
169 Besi Hollow 60 x 60 x 2,8 mm x 6 Meter Btg 271,402
170 Besi Hollow 60 x 60 x 3 mm x 6 Meter Btg 291,072
171 Besi Hollow 75 x 75 x 2 mm x 6 Meter Btg 243,706
172 Besi Hollow 75 x 75 x 2,3 mm x 6 Meter Btg 282,251
173 Besi Hollow 75 x 75 x 2,5 mm x 6 Meter Btg 304,567
174 Besi Hollow 75 x 75 x 3,2 mm x 6 Meter Btg 389,771
175 Besi jaring kawat baja Kg 22,330
176 Besi plat aluminium t=1mm m2 151,286
177 Besi plat baja Kg 11,737
178 Besi prestressed polos Kg 15,966
179 Besi profil kg 9,825
180 Besi strip 2 x 3 cm kg 10,049
181 Bilksem spit penangkal petir Buah 81,839
182 Bondbeam uk. 40 x 20 x20 (cm) Buah 9,825
183 Box sekering, 1 phase Buah 58,616
184 Box sekering, 2 phase Buah 46,195
185 Box sekering, 3 phase Buah 79,830
186 Box Panel PVC isi 4 MCB, merk Legran bh 75,000
187 Bubungan atap (nok) alumunium standar 40 cm, swg.22 M' 67,772
188 Bubungan atap (nok) asbes sepasang Lembar 19,957
189 Bubungan atap (nok) genteng (standar KIA) Buah 27,500
190 Bubungan atap (nok) genteng beton Buah 7,369
191 Bubungan atap (nok) genteng kodok Buah 4,745
192 Bubungan atap (nok) genteng metal berpasir M 49,684
193 Bubungan atap (nok) genteng soka Buah 5,059
194 Bubungan atap (nok) metal (biasa/ polos) M 36,286
195 Bubungan atap (nok) metal (standar Rainbow) M 35,728
196 Bubungan atap (nok) zincalume setara "Union Deck" T= 0,4 mm M 33,495
197 Chipping M3 429,711
198 Chipping (Kg) Kg 228
199 Calsiboard "IRC/ GRC" uk, 1,22 x 2,44 m Lembar 78,453
200 Calsiboard "IRC/GRC" uk, 30 cm, t = 9 mm Lembar 111,371
201 Cashing + inbow setara panasonic Set 13,956
202 Cat genteng KW I Kg 56,803
203 Cat genteng KW II Kg 65,050
204 Cat jalan (road line) Kg 33,867
205 Cat jembatan Kg 56,389
206 Cat Kayu Kg 72,471
207 Cat marka Kg 57,535
208 Cat menie Kg 48,500
209 Cat minyak Kg 55,913
210 Cat tembok (ex platon) Kg 52,013
211 Cat tembok ext (ex mowilex) Kg 94,255
212 Cat tembok in (ex mowilex) Kg 77,842
213 Cat vernis Kg 65,745
214 Closed duduk standar (Ex. America Standart) Buah 1,692,986
215 Closed Jongkok (Top inlet dan Flush 6L) Buah 3,260,180
216 Closed jongkok keramik (ex. America Standar) Buah 567,554
217 Closed jongkok porcelaint (lokal) Buah 221,129
218 Closed jongkok terraso Buah 244,222
219 Closet Duduk / Monoblock unit 1,404,557
220 Conblock tebal 6 cm (polos) M² 61,267
221 Conblock tebal 6 cm (warna) M² 53,499
222 Dempul kayu Kg 37,660
223 Dina bolt/ ramset Unit 1,876
224 Door closer Unit 275,000
225 Door holder Unit 131,189
226 Door stop Unit 50,000
227 Dop PVC Ø 50 mm Unit 41,534
228 Downlight ukuran 4" Buah 60,900
229 Downlight ukuran 5" Buah 71,050
230 Down Light / PLC 13 W Buah 70,500
231 Elastromer bearing pad Buah 1,116,500
232 Elektroda penghantar bumi untuk penangkal petir Buah 392,561
233 Engsel pintu kaca (pivot) stainless steel Buah 937,860
234 Engsel pintu/ jendela 3" (ex.Dexon) Buah 22,506
235 Engsel pintu/ jendela 4" (ex.Dexon) Buah 54,062
236 Engsel pintu/ jendela 5" (Ex.Dexon) Buah 83,738
237 Engsel putar jendela/ ventilasi Buah 30,034
238 Engsel Sliding door (ex.dexon) M' 448,833
239 Eternit asbes uk. 1x1 (m), tebal 4 mm M² 26,433
240 Eternit asbes uk. 1x1 (m), tebal 5 mm M² 30,704
241 Eternit asbes uk. 1x1 (m), tebal 6 mm M² 31,932
242 Exhaust Fan 10 inch (lengkap) Unit 405,290
243 Fibre Plat 0,60 x 1,20 (m) tebal 4 mm M² 14,738
244 Fibre Plat 1,20 x 2,40 (m) tebal 4 mm M² 26,238
245 Filler Kg 1,842
246 Fitting Plafond + Lampu SL, Merk Panasonic Buah 32,500
247 Floor drain (PVC) Buah 10,002
248 Floor Drain (TX 1B Ex. Toto) bh 466,000
249 Folding door/ pintu lipat M² -
250 Folding gate standar 0,4 mm m2 460,333
251 Folding gate Ukuran 0,5 mm m² 491,260
252 Folding gate Ukuran 0,8 mm m² 675,483
253 Formika lbr 94,903
254 Floor Deck M2 142,100
255 Gate valve/ stop kran Ø 1 ½ (inch) kuningan Buah 71,642
256 Gate valve/ stop kran Ø 1" Besi Buah 31,820
257 Gate valve/ stop kran Ø 1/2 (inch) kuningan Buah 53,127
258 Gate valve/ stop kran Ø 3/4(inch) kuningan Buah 38,868
259 Gergaji besi 39,078
260 Gergaji kayu 64,199
261 Glass bit Kg 58,277
262 Glass block 20/20 Buah 26,896
263 GRC panel dinding + rangka pipa besi M² 1,004,850
264 GRC rooster M² 301,827
265 Grease (minyak gemuk) Kg 32,379
266 Grendel (biasa) Buah 20,000
267 Grendel (istimewa) Buah 43,041
268 Gypsum board motif uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 105,755
269 Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 58,250
270 Gravel M3 431,769
271 Glass Bit Kg 32,290
272 Geotextile M2 33,734
273 Handle + kunci untuk pintu kusen alumunium Alumunium Set 614,075
274 Handle jendela Buah 62,105
275 Handle pintu Buah 163,889
276 Handle untuk meubeulair (furniture) + kunci Buah 9,881
277 Handle untuk pintu kaca lebar Buah 1,116,500
278 Hollow semi galvanis M' 22,330
279 Hook Buah 37,961
280 Huruf Stailis (ukuran t < 50 cm) cm 8,120
281 Huruf Stailis (ukuran 50 < t < 100 cm) cm 9,135
282 Isolasi bh 10,167
283 Jendela alumunium lengkap (80x120) cm Buah 837,375
284 Jendela besi M² 321,999
285 Jendela nako (kerangka + kaca 5 mm) M² 187,795
286 Kanstin UK. 0,14 x 0,20 x 0,6 m Buah 52,857
287 Kawat beton Kg 23,111
288 Kabel biasa M' 33,774
289 Kabel bulat M' 6,885
290 Kabel listrik NYY 4 x 2,5 mm² M' 53,911
291 Kabel listrik NYY 4 x 4 mm² M' 8,589
292 Kabel NYM 3x2,5 mm M' 19,290
293 Kabel NYM 4x2,5 mm M' 19,918
294 Kabel NYM 2 x 2,5 mm2 M' 19,837
295 Kabel Telephone 4 x 0,5 mm M' 313,100
296 Kabel slink M' 35,309
297 Kabel Duct (Ukuran 100 x 100 mm) M 86,275
298 Kaca bening tebal 10 mm M² 245,630
299 Kaca bening tebal 3 mm M² 106,068
300 Kaca bening tebal 5 mm M² 147,936
301 Kaca bening tebal 8 mm M² 156,310
302 Kaca buram 5 mm m2 159,863
303 Kaca Buram tebal = 12mm m2 490,245
304 Kaca cermin 8 mm m2 156,310
305 Kaca cermin tebal 3 mm M² 94,903
306 Kaca cermin tebal 5 mm M² 139,563
307 Kaca dark blue Ukuran 5 mm m² 221,067
308 Kaca dark blue Ukuran 10 mm m² 577,231
309 Kaca dark blue Ukuran 12 mm m² 614,075
310 Kaca dark blue Ukuran 6 mm m² 270,193
311 Kaca dark green Ukuran 10 mm m² 577,231
312 Kaca dark green Ukuran 12 mm m² 614,075
313 Kaca dark green Ukuran 5 mm m² 221,067
314 Kaca dark green Ukuran 6 mm m² 270,193
315 Kaca gelap (ray band) tebal 10 mm M² 24,563
316 Kaca gelap (ray band) tebal 3 mm M² 72,573
317 Kaca gelap (ray band) tebal 5 mm M² 131,747
318 Kaca gelap (ray band) tebal 8 mm M² 26,796
319 Kaca patri m2 952,375
320 Kaca polos Ukuran 10 mm m² 368,445
321 Kaca polos Ukuran 12 mm m² 429,853
322 Kaca polos Ukuran 5 mm m² 104,393
323 Kaca polos Ukuran 6 mm m² 147,378
324 Kaca polos Ukuran 8 mm m² 307,038
325 kaca rayban Ukuran 5 mm m² 147,378
326 Kaca rayban Ukuran 6 mm m² 270,193
327 Kaca Wireglassed tebal = 5mm m2 635,289
328 Kain kassa Kg 20,990
329 Kait angin biasa Buah 13,625
330 Kait angin istimewa Buah 17,864
331 Kanstin Uk. 0,14x0,20x0,6 m Bh 44,660
332 Kapur bakar M³ 79,093
333 Kapur sirih Kg 29,095
334 Karpet talang, lebar 0,60 m' M' 11,057
335 Kawat berduri Kg 110,987
336 Kawat bronjong Kg 17,529
337 Kawat harmonika M² 34,090
338 Kawat kassa/ kawat loket M² 24,324
339 Kawat Las Listrik Kg 46,223
340 Kawat nyamuk logam M² 26,517
341 Kawat nyamuk plastik M² 18,650
342 Kawat seng Kg 23,744
343 Kayu bakar M³ 88,873
344 Kayu dolken Ø8-10 (cm) panjang 4 m Batang 5,000
345 Kayu cerucuk Batang 19,700
346 Kayu gergajian kelas I, balok M³ 3,622,736
347 Kayu gergajian kelas I, papan M³ 3,534,693
348 Kayu gergajian kelas II, balok M³ 2,822,287
349 Kayu gergajian kelas II, papan M³ 3,036,294
350 Kayu gergajian kelas III, balok M³ 2,635,329
351 Kayu gergajian kelas III, papan M³ 2,535,470
352 Kayu gergajian kelas IV, balok M³ 2,409,839
353 Kayu gergajian kelas IV, papan M³ 2,239,344
354 Kayu untuk konstruksi jembatan M³ 3,060,225
355 Kayu untuk perancah M³ 1,732,702
356 Kayu Acuan M3 1,808,949
357 Kaca Axrilix Cutting Biasa M2 294,350
358 Kabel Duct (Ukuran 100 x 100 mm) M 86,275
359 Kepek Buah 5,303
360 Keramik 10x20 (cm) gelap M² 38,101
361 Keramik 10x20 (cm) polos M² 33,495
362 Keramik 10x20 (cm) terang M² 50,243
363 Keramik 20 x 20 cm (Polos) m' 61,966
364 Keramik 20x20 (cm) corak M² 66,664
365 Keramik 20x20 (cm) polos M² 57,644
366 Keramik 20x25 (cm) corak M² 66,043
367 Keramik 20x25 (cm) polos M² 64,000
368 Keramik 30x30 (cm) corak M² 64,013
369 Keramik 30x30 (cm) polos M² 59,286
370 Keramik 40x40 (cm) corak M² 70,654
371 Keramik 40x40 (cm) polos M² 58,333
372 Keramik 50x50 (cm) polos M² 100,485
373 Keramik 60x60 (cm) anti slip M² 200,000
374 Keramik 60x60 (cm) putih/ berwarna M² 100,485
375 Keramik KM/WC antislip 20x20 (cm) M² 65,076
376 Keramik Granit 60x60 (cm) putih/berwarna M2 202,594
377 Keramik 60x60 (cm) Polos M2 157,500
378 Keramik Granit 80x80 (cm) putih/berwarna M2 300,632
379 Keramik Granit 80x80 (cm) Polos M2 266,501
380 Keramik Diffabel 30/30cm Buah 18,778
381 Kitchen Zink (Hwaco 1L) Unit 216,700
382 Kloset Duduk (CW 600 J/SW 660 J Komplit Acc Unit 4,370,000
383 Kloset Jongkok type CE 6 Ex. Toto Unit 646,500
384 Knee/ elbow PVC 1 (inch) Buah 5,278
385 Knee/ elbow PVC 1/2 (inch) Buah 3,050
386 Knee/ elbow PVC 3/4(inch) Buah 3,629
387 Kompon sak 82,342
388 Kompon gypsum Kg 42,114
389 Kran air Ø 0,5 (inch) steel Buah 73,689
390 Kran air Ø 0,75 (inch) Steel Buah 39,822
391 Kran air Ø 1,5 (inch) Steel Buah 27,452
392 Kran Zink (T 30 AR13NV7N Ex. Toto) Buah 542,000
393 Kran Dinding Type T 23 B13V7N Ex. Toto Buah 344,000
394 Kuas Buah 28,192
395 Kuku keramik 2,5 x 10 cm m' 16,748
396 Kuku keramik 2,5 x 8 cm m' 9,490
397 Kunci antik set 489,230
398 Kunci jendela (ex.dexon) Set 29,029
399 Kunci KM set 104,799
400 Kunci pintu tanam (ex.dexon) Set 210,600
401 Kunci pintu tanam (istimewa) (ex.dexon) Set 190,922
402 Kunci pintu untuk meubeulair (furniture) (ex.dexon) Set 200,970
403 Kunci Selot Buah 19,800
404 Kunci silinder Buah 62,169
405 Kunci tanam Buah 182,827
406 Kusen Alumunium 3 inch Coklat m' 92,111
407 Kusen Alumunium 3 inch hitam m' 92,111
408 Kusen Alumunium 3 inch silver m' 67,548
409 Kusen Alumunium 4 inch Coklat m' 104,393
410 Kusen Alumunium 4 inch hitam m' 104,393
411 Kusen Alumunium 4 inch silver m' 92,111
412 Kusen pintu/ jendela alumunium 3" M' 89,320
413 Kusen pintu/ jendela alumunium 3" (warna gelap) M' 106,068
414 Kusen pintu/ jendela alumunium 4" M' 89,320
415 Kusen pintu/ jendela alumunium 4" (warna gelap) M' 133,980
416 Kusen, pintu fiber Unit 263,122
417 Lampu Baret 32 Watt (Lengkap) Pcs 218,834
418 Lampu Downlight 18 Watt (Lengkap) Pcs 64,199
419 Lampu LED Philips 10 watt Pcs 113,325
420 Lampu LED Philips 13 watt (Yellow) Pcs 128,398
421 Lampu LED Philips 7 watt Pcs 72,014
422 Lampu LED Philips 9 watt Pcs 94,344
423 Lampu LED Philips12 watt Pcs 135,097
424 Lampu SL bulat 10 W + aksesories Titik 120,950
425 Lampu SL bulat 20 W + aksesories Titik 154,847
426 Lampu taman 20 W + aksesories Titik 174,107
427 Lampu taman triple 20 W + aksesories Titik 351,698
428 Lampu TL 20 W + aksesories Titik 134,784
429 Lampu TL 2x18 W + aksesories type RM Titik 251,213
430 Lampu TL 40 W + aksesories Titik 180,315
431 Lampu TL 2 x 18 Watt Grille, Merk Panasonic bh 250,000
432 Lampu TL 2 x 36 Watt Grille, Merk Panasonic bh 325,000
433 Langit-langit accoustic board/ tile uk. 0,30x0,30 (m) M² 44,325
434 Langit-langit accoustic board/ tile uk. 0,30x0,60 (m) M² 53,592
435 Langit-langit accoustic board/ tile uk. 0,60x1,20x0,14 (m) M² 60,626
436 Langit-langit accoustic board/ tile uk. 0,60x1,20x0,15 (m) M² 68,665
437 Lem (standar aica aibond) Kg 31,634
438 Lem (standar Fox)/ perekat Kg 25,903
439 Lem kayu Kg 35,833
440 List gypsum m' 24,511
441 List gypsum sedang M' 24,511
442 List kayu profil m' 40,008
443 List lebar 10 - 12 cm m' -
444 List lebar 13- 15 cm m' -
445 Listplank GRC m' 19,353
446 Lolos screen1 ukuran ( 0 - 5) M3 515,392
447 Lolos screen2 ukuran ( 0 - 5) M3 515,392
448 Lolos screen2 ukuran ( 5 - 9,5) M3 515,392
449 Lolos screen2 ukuran ( 9.5 - 19,0) M3 504,442
450 Marmer 100 x 100 cm m2 279,125
451 MCB 6 A, Merk Legran bh 65,000
452 MCB 4 A, Merk Legran bh 71,667
453 Meter box (terpasang) Titik 236,977
454 Minyak bekisting Liter 10,000
455 Minyak pelarut/ pengencer cat (solvent) Liter 12,738
456 Kerosen / Minyak Tanah Liter 12,137
457 Minyak pelumas (oli) Liter 31,881
458 Multiplek + Fin. Deco sheet Lembar 3,126,200
459 Multiplek tebal 12 mm 4x8 (inch) Lembar 195,946
460 Multiplek tebal 15 mm 4x8 (inch) Lembar 255,865
461 Multiplek tebal 18 mm 4x8 (inch) Lembar 296,670
462 Multiplek tebal 6 mm 1,22 x 2,44 (m) Lembar 97,237
463 Multiplek tebal 9 mm 4x8 (inch) Lembar 144,122
464 Outlet TV, Merk Broco bh 57,000
465 Outlet Telephone, Merk Broco bh 55,000
466 Paku anti karat Kg 45,777
467 Paku asbes Kg 23,256
468 Paku berbagai ukuran (1/2"-1") Kg 25,342
469 Paku berbagai ukuran (2"-5") Kg 17,288
470 Paku jembatan Kg 20,462
471 Paku kait Kg 33,495
472 Paku sekrup (kg) Kg 49,126
473 Paku sekrup 1 cm -2,5 cm Kg 26,424
474 Paku seng Kg 23,686
475 Paku tembok Kg 52,611
476 Panel listrik/ MCB, 1 fase Buah 122,815
477 Panel listrik/ MCB, 2 fase Buah 153,519
478 Panel listrik/ MCB, 3fase Buah 184,223
479 Panel listrik/ MCB, 4 fase Buah 214,926
480 Parquette lantai M² 116,674
481 Pasir beton M³ 150,000
482 Pasir beton (Kg) Kg 83
483 Pasir pasang M³ 150,000
484 Pasir urug (ada unsur lempung) M³ 89,104
485 Pasir urug/timbun M3 102,500
486 Pasir halus (untuk HRS) M3 104,329
487 Pelitur Jadi Ltr 65,315
488 Pintu alumunium corak untuk WC (80x200)cm Buah 851,331
489 Pintu alumunium full kaca untuk WC (80x200)cm 1,674,750
490 Pintu alumunium polos untuk WC (80x200)cm Buah 482,328
491 Pintu fiber PVC (70x200) wc corak Buah 372,167
492 Pintu fiber PVC (70x200) wc polos Buah 245,444
493 Pintu fiber PVC (75x200) wc corak Buah 418,688
494 Pintu fiber PVC (75x200) wc polos Buah 248,421
495 Pintu fiber PVC (80x200) wc corak Buah 299,594
496 Pintu fiber PVC (80x200) wc polos Buah 247,491
497 Pintu fiber PVC RRC (80x200) wc kaca import 837,375
498 Pipa besi galvanis Ø 0,5 (inch)/1,8mm M' 31,748
499 Pipa besi galvanis Ø 0,75 (inch)/1,8mm M' 38,623
500 Pipa besi galvanis Ø 1 (inch)/1,8mm M' 42,585
501 Pipa besi galvanis Ø 1,25 (inch)/1,8mm M' 55,306
502 Pipa besi galvanis Ø 1,5 (inch)/1,8mm M' 75,508
503 Pipa besi galvanis Ø 2 (inch)/1,8mm M' 86,917
504 Pipa besi galvanis Ø 3 (inch) t=4 mm M' 142,699
505 Pipa besi galvanis Ø 4 (inch)/1,8mm M' 143,937
506 Pipa besi galvanis Ø 0,5 (inch)/2,6mm M' 49,894
507 Pipa besi galvanis Ø 0,75 (inch)/2,3mm M' 60,900
508 Pipa besi galvanis Ø 1 (inch)/2,7mm M' 79,455
509 Pipa besi galvanis Ø 1,25 (inch)/3,1mm M' 95,156
510 Pipa besi galvanis Ø 1,5 (inch)/3,1mm M' 96,901
511 Pipa besi galvanis Ø 2 (inch)/3,6mm M' 132,603
512 Pipa besi galvanis Ø 3 (inch) t=4 /3,8mm M' 173,933
513 Pipa besi galvanis Ø 4 (inch)/4mm M' 275,065
514 Pipa besi Ø 1 (inch)/1,7mm M' 91,784
515 Pipa besi Ø 1,25 (inch)1,7mm M' 30,535
516 Pipa besi Ø 1,5 (inch)1,7mm M' 35,050
517 Pipa besi Ø 2 (inch)1,7mm M' 47,910
518 Pipa besi Ø 1 (inch) M' 19,505
519 Pipa besi Ø 1,25 (inch) M' 29,375
520 Pipa besi Ø 1,5 (inch) M' 28,376
521 Pipa besi Ø 2 (inch) M' 56,581
522 Pipa beton Ø 20 cm, panjang 1m' Buah 96,726
523 Pipa beton Ø 60 cm, panjang 1m' Buah 160,289
524 Pipa HDPE dia. 110 mm m' 140,121
525 Pipa HDPE dia. 125mm m' 181,431
526 Pipa HDPE dia. 140 mm m' 226,091
527 Pipa HDPE dia. 200 mm m' 462,231
528 Pipa HDPE dia. 250 mm m' 720,701
529 Pipa HDPE dia. 280 mm m' 902,132
530 Pipa HDPE dia. 400 mm m' 1,840,550
531 Pipa HDPE dia. 450 mm m' 2,331,252
532 Pipa HDPE dia. 500 mm m' 2,875,881
533 Pipa HDPE dia. 560 mm m' 3,602,387
534 Pipa HDPE dia. 63 mm m' 46,670
535 Pipa HDPE dia. 800 mm m' 5,833,713
536 Pipa HDPE dia.1000 mm m' 9,120,800
537 Pipa HDPE dia.900 mm m' 7,347,910
538 Pipa PVC Ø 1 (inch) AW, panjang 4 m M' 12,938
539 Pipa PVC Ø 1,5(inch) AW, panjang 4 m M' 19,036
540 Pipa PVC Ø 2 (inch) AW, panjang 4 m M' 25,000
541 Pipa PVC Ø 3 (inch) AW, panjang 4 m M' 48,125
542 Pipa PVC Ø 4-6 (inch) AW, panjang 4 m M' 75,906
543 Pipa PVC Ø1/2 (inch) AW, panjang 4 m M' 6,792
544 Pipa PVC Ø3/4 (inch) AW, panjang 4 m M' 9,969
545 Pipa PVC RRJ Ø 63 M' 30,685
546 Pipa PVC RRJ Ø 90 M' 60,562
547 Pipa PVC RRJ Ø 110 M' 86,025
548 Pipa PVC RRJ Ø 160 M' 190,524
549 Pipa PVC RRJ Ø 200 M' 265,423
550 Pipa PVC RRJ Ø 250 M' 346,631
551 Pipa PVC RRJ Ø 315 M' 886,720
552 Pipa PVC RRJ Ø 400 M' 1,503,554
553 Pipa PVC RRJ Ø 500 M' 2,338,373
554 Pipa PVC RRJ Ø 630 M' 3,787,353
555 Plafon PVC t = 0,8 mm Keping 51,765
556 Plamir tembok Kg 45,870
557 Plamir kayu Kg 48,333
558 Plint Keramik 10 x 30 cm (Motif) Bh 15,631
559 Plint Keramik 10 x 30 cm (Polos) Bh 8,932
560 Plint Keramik 10 x 60 cm biasa Bh 27,913
561 Plint Keramik 10 x 60 cm Step Nose Bh 37,961
562 Plint keramik 10x40 Cm ( polos) Bh 3,646
563 Plint keramik 10x40 Cm (motif) Bh 15,631
564 Plint keramik 10x60 (granit) Bh 27,913
565 Plint keramik 10x60 Bh 13,125
566 Plint Keramik 60 x 30 cm Step nose Bh 55,825
567 Plywood uk. 0,30 x 0,60 (m), tebal 4 mm Lembar 58,505
568 Plywood uk. 0,30 x 0,60 (m), tebal 6 mm Lembar 63,082
569 Plywood uk. 0,30 x 1,20 (m), tebal 4 mm Lembar 61,966
570 Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar 91,553
571 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm Lembar 89,041
572 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 159,660
573 Pompa air (dengan otomatis) Buah 845,749
574 Pompa air (jet pump) Buah 3,000,000
575 Pompa air (non otomatis) Buah 657,060
576 Porcelaint uk. 11x 11 cm Buah 1,340
577 Profil kaca M' 6,699
578 Railing tangga stainless steel pipa dia. 2" dan 1" M' 1,166,743
Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize
579 M² 240,048
+ genteng metal
580 Rangka/ Frame accoustic board- wall angle M' 49,126
581 Rangka/ Frame accoustic board-cross tee M' 36,621
582 Rangka/ Frame accoustic board-main tee M' 44,437
583 Rangka/ Frame accoustic board-rod/ adjustable dia. 4mm M' 21,102
584 Reducer PVC dari 1/2 (inch) ke 1 (inch) Buah 4,032
585 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) Buah 3,536
586 Reducer PVC dari 3/4 (inch) ke 1 (inch) Buah 4,962
587 Rell pintu dorong set 273,543
588 Reng Taso 32.45 Btg 65,000
589 Residu atau ter Liter 60,403
590 Roll cat Buah 36,260
591 Rolling door tebal 0,4 mm (PVC) M² 279,125
592 Rolling door Ukuran 0,4 mm (besi) m² 214,926
593 Rolling door Ukuran 0,8 mm (aluminium) m² 429,853
594 Rolling door Ukuran 1 mm (aluminium) m² 491,260
595 Rolling door-alumunium tebal 0,6 mm M² 413,719
596 Rolling door-Galvalum tebal 0,4 mm M² 401,940
597 Rolling door-alumunium tebal 0,8 mm m² 429,853
598 Rooflight fibreglass uk. 1,8 x 0,9 (m) Buah 98,810
599 Rooster block uk. 12x11x24 (cm) Buah 8,150
600 Rooster block uk. 20x20 (cm) Buah 15,073
601 Rooster keramik 20x20 (cm) Buah 41,869
602 Rooster keramik 30x30 (cm) Buah 56,383
603 Rubber bearing (60x30x4) cm Buah 803,880
604 Sabun Kg 22,330
605 Saklar double Buah 25,000
606 Saklar Double (broco) Buah 22,330
607 Saklar engkel Buah 22,330
608 Saklar tunggal Buah 19,625
609 Saklar tunggal (broco) Buah 18,750
610 Saklar Ganda, Merk Broco Buah 26,500
611 Seal tape bh 4,333
612 Sealant Tube 38,798
613 Semen Mortar Kg 7,458
614 Semen Portland Kg 1,627
615 Semen putih Kg 13,271
616 Semen warna (sika graut) Kg 22,250
617 Seng BJLS 30 lebar 45 cm M' 16,748
618 Seng fibreglass Lembar 69,223
619 Seng gelombang uk. 1,50 x 0,90 (m) Lembar 50,243
620 Seng gelombang uk. 1,80 x 0,90 (m) Lembar 60,291
621 Seng gelombang uk. 2,10 x 0,90 (m) Lembar 70,340
622 Seng gelombang uk. 2,40 x 0,90 (m) Lembar 80,388
623 Seng gelombang uk. 2,70 x 0,90 (m) Lembar 90,437
624 Seng gelombang uk. 3,00 x 0,90 (m) Lembar 100,485
625 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 44,660
626 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) Lembar 55,825
627 Seng Plat BJLS 30 Lembar 65,000
628 Sherra block Buah 2,010
629 Shower + Stop kran Set 90,716
630 Shower bad Hot and cool Set 625,240
631 Shower bidet Buah 245,630
632 Shower mandi Buah 178,919
633 Shower Spray type THX 20 NBPIV Ex. Toto Unit 312,000
634 Shower Set Type TX 423 SZ Ex. Toto Unit 1,030,000
635 Sikat baja Buah 12,654
636 Siku 100 x 100 x 10 mm – 6 M Kg 9,825
637 Siku 100 x 100 x 11 mm – 6 M Kg 9,825
638 Siku 100 x 100 x 8 mm – 6 M Kg 9,825
639 Siku 120 x 120 x 12 mm – 6 M Kg 9,825
640 Siku 125 x 125 x 12 mm – 6 M Kg 9,825
641 Siku 130 x 130 x 12 mm – 6 M Kg 9,825
642 Siku 130 x 130 x 9 mm – 6 M Kg 9,825
643 Siku 150 x 150 x 12 mm – 6 M Kg 9,825
644 Siku 150 x 150 x 15 mm – 6 M Kg 9,825
645 Siku 20 x 20 x 3 mm – 6 M kg 9,825
646 Siku 20 x 20 x 3 mm – 6 M Kg 9,825
647 Siku 200 x 200 x 15 mm – 6 M Kg 9,825
648 Siku 200 x 200 x 16 mm – 6 M Kg 9,825
649 Siku 200 x 200 x 20 mm – 6 M Kg 9,825
650 Siku 200 x 200 x 25 mm – 6 M Kg 9,825
651 Siku 25 x 25 x 3 mm – 6 M kg 9,825
652 Siku 25 x 25 x 3 mm – 6 M Kg 9,825
653 Siku 250 x 250 x 25 mm – 6 M Kg 9,825
654 Siku 30 x 30 x 3 mm – 6 M kg 9,825
655 Siku 30 x 30 x 3 mm – 6 M Kg 9,825
656 Siku 40 x 40 x 3 mm – 6 M kg 9,825
657 Siku 40 x 40 x 3 mm – 6 M Kg 9,825
658 Siku 40 x 40 x 4 mm – 6 M kg 9,825
659 Siku 40 x 40 x 4 mm – 6 M Kg 9,825
660 Siku 40 x 40 x 5 mm – 6 M kg 9,825
661 Siku 40 x 40 x 5 mm – 6 M Kg 9,825
662 Siku 45 x 45 x 4 mm – 6 M kg 9,825
663 Siku 45 x 45 x 4 mm – 6 M Kg 9,825
664 Siku 45 x 45 x 5 mm – 6 M kg 9,825
665 Siku 45 x 45 x 5 mm – 6 M Kg 9,825
666 Siku 50 x 50 x 4 mm – 6 M kg 9,825
667 Siku 50 x 50 x 4 mm – 6 M Kg 9,825
668 Siku 50 x 50 x 5 mm – 6 M kg 9,825
669 Siku 50 x 50 x 5 mm – 6 M Kg 9,825
670 Siku 50 x 50 x 6 mm – 6 M kg 9,825
671 Siku 50 x 50 x 6 mm – 6 M Kg 9,825
672 Siku 60 x 60 x 5 mm – 6 M kg 9,825
673 Siku 60 x 60 x 5 mm – 6 M Kg 9,825
674 Siku 60 x 60 x 6 mm – 6 M kg 9,825
675 Siku 60 x 60 x 6 mm – 6 M Kg 9,825
676 Siku 65 x 65 x 6 mm – 6 M kg 9,825
677 Siku 65 x 65 x 6 mm – 6 M Kg 9,825
678 Siku 70 x 70 x 6 mm – 6 M kg 9,825
679 Siku 70 x 70 x 6 mm – 6 M Kg 9,825
680 Siku 70 x 70 x 7 mm – 6 M kg 9,825
681 Siku 70 x 70 x 7 mm – 6 M Kg 9,825
682 Siku 75 x 75 x 6 mm – 6 M kg 9,825
683 Siku 75 x 75 x 6 mm – 6 M Kg 9,825
684 Siku 75 x 75 x 7 mm – 6 M kg 9,825
685 Siku 75 x 75 x 7 mm – 6 M Kg 9,825
686 Siku 75 x 75 x 8 mm – 6 M kg 9,825
687 Siku 75 x 75 x 8 mm – 6 M Kg 9,825
688 Siku 75 x 75 x 9 mm – 6 M kg 9,825
689 Siku 75 x 75 x 9 mm – 6 M Kg 9,825
690 Siku 80 x 80 x 6 mm – 6 M Kg 9,825
691 Siku 80 x 80 x 8 mm – 6 M Kg 9,825
692 Siku 90 x 90 x 10 mm – 6 M Kg 9,825
693 Siku 90 x 90 x 8 mm – 6 M Kg 9,825
694 Siku 90 x 90 x 9 mm – 6 M Kg 9,825
695 Sirtu M³ 150,248
696 Skrup fixer Buah 2,345
697 Slot jendela Buah 27,913
698 Slot pintu Buah 24,005
699 Slot Tanam Buah 85,000
700 Slot ventilasi/ bouwvenlight Buah 4,913
701 Socket PVC Ø 1 (inch) Buah 4,784
702 Socket PVC Ø 1/2 (inch) Buah 3,040
703 Socket PVC Ø 3/4 (inch) Buah 4,810
704 Soda api Kg 19,449
705 Solar Ltr 18,100
706 Petralite Ltr 10,000
707 Spandeck zincalum setara " Union Deck", T=0,4 mm M' 68,107
708 Spring knip Buah 21,660
709 Stone Coating Kg 56,383
710 Stop Kontak + Saklar (broco) Buah 27,913
711 Stop Kontak AC (broco) Buah 51,359
712 Stop kontak ganda/ tiga Buah 27,913
713 Stop kontak lantai Buah 368,445
714 Stop kontak saklar Buah 13,398
715 Stop kontak tunggal Buah 22,330
716 Stop kontak untuk AC Buah 78,155
717 Stop kontak+ instalasi Titik 173,058
718 Stop kontak, Merk Broco bh 17,333
719 Stop Kran dia. 1” Ex. Onda bh 36,000
720 sunscreen alumunium M² 1,674,750
721 T Dus (listrik) Buah 2,791
722 Tanah puru M3 75,000
723 Tangki air fiberglass (oranye) 1000 liter Buah 1,617,250
724 Tangki air fiberglass (oranye) 2000 liter Buah 3,409,667
725 Tangki air fiberglass (oranye) 3000 liter Buah 4,242,700
726 Tangki air fiberglass (oranye) 500 liter Buah 1,079,250
727 Tangki air/ hydrant umum fiberglass 1000 liter Buah 1,558,634
728 Tangki air/ hydrant umum fiberglass 2000 liter Buah 3,042,463
729 Tangki air/ hydrant umum fiberglass 3000 liter Buah 7,703,850
730 Tangki air/ hydrant umum fiberglass 6000 liter (horizontal) Buah 23,446,500
731 Tangki air/ hydrant umum polyethylene 1000 liter Buah 1,507,275
732 Tangki air/ hydrant umum polyethylene 2000 liter Buah 3,042,463
733 Tangki air/ hydrant umum polyethylene 3000 liter Buah 7,703,850
734 Tangki air/ hydrant umum polyethylene 4000 liter Buah 23,446,500
735 Tangki air/ hydrant umum polyethylene 500 liter Buah 2,874,988
736 Tangki air/ hydrant umum polyethylene 5000 liter Liter 2,121,350
737 Teak oil Lembar 268
738 Teak wood 0,30 x 0,60 (m), tebal 4 mm Lembar 57,835
739 Teakwood 0,90 x 2,10 (m), tebal 4 mm Lembar 92,111
740 Teakwood 1,20 x 2,40 (m), tebal 4 mm Unit 110,534
741 Tee all socket PVC Ø 100 x 50 (mm) Unit 498,517
742 Tee all socket PVC Ø 225 x 100 (mm) Unit 498,517
743 Tee all socket PVC Ø 50 x 50 (mm) Unit 251,213
744 Tee all socket PVC Ø 80 x 50 (mm) Kg 502,425
745 Tempat Sabun (S 11 N Ex. Toto) bh 107,000
746 Ter lubang 62,152
747 Teralis jendela (60x120) cm lubang 334,950
748 Teralis pintu (90x200) cm M³ 837,375
749 Triplek tebal 2,5 mm uk. 1,22 x 2,44 (m) Lembar 58,333
750 Triplek tebal 4 mm uk. 1,22 x 2,44 (m) Lembar 76,333
751 Triplek tebal 6 mm uk. 1,22 x 2,44 (m) lbr 115,000
752 Triplek tebal 9 mm (uk. 120x240) cm lbr 123,833
753 Thinner Liter 35,556
754 Ubin abu-abu 20 x 20 (cm) Buah 7,257
755 Ubin berwarna 20 x 20 (cm) Buah 9,825
756 Ubin motif (mozaik) M² 124,266
757 Ubin wafel Buah 7,257
758 Kaca dark blue Ukuran 8 mm m² 552,668
759 Kaca dark green Ukuran 8 mm m² 552,668
760 Kaca rayban Ukuran 8 mm m² 429,853
761 Urinoir Unit 1,060,675
762 Urinoir Type U 57 M ex. Toto Unit 3,620,000
763 UNP (100 mm x 6 m) Batang 857,675
764 Venetion blinds M² 90,325
765 Vertical blinds M² 70,619
766 Wallpapaer bermotif M² 49,433
767 Wallpaper polos M² 42,371
768 wastafel Set 921,113
769 Wastafel Ex.American standart (Kecil) Unit 332,159
770 Wastafel Ex.American standart (Sedang) Unit 390,775
771 Wastafel (LW 240 CJ, Ex. Toto, Komplit Kran & Acc) Unit 2,505,000
772 Water drain + Assesories Set 22,330
773 Water meter dia 1" + pipa gip Unit 558,250
774 Water Profing Aquatex Kg 147,378
775 Water Profing Nodrop Kg 48,289
776 Water Profing ultraprof Kg 43,544
777 Wiremesh M5 Kg 10,938
778 Wiremesh M6 Kg 10,938
779 Wiremesh M7 Kg 10,938
780 Wiremesh M8 Kg 10,938
781 Wiremesh M9 Kg 10,938
782 Wiremesh M10 Kg 10,938
783 Wiremesh Kg 10,938
784 Wood Filler Kg 55,000
785 Grassblok bh 26,625
786 Pavingblok 6 cm M2 90,000
787 Pavingblok 8 cm M2 100,000
788 Conblok 8 cm M2 81,000
789 Baja ringan 75.75 Btg 115,429
790 Reng 32.45 Btg 46,107
791 Besi Plat Galvanis Tebal 1 mm (1,2 m x 2,4 m) Keping 540,000
792 Besi Plat Hitam Tebal 1 mm (1,2 m x 2,4 m) Keping 500,000
793 Besi Plat Hitam Tebal 2 mm (1,2 m x 2,4 m) Keping 960,000
794 Besi Plat Hitam Tebal 3 mm (1,2 m x 2,4 m) Keping 1,442,500
795 Besi Plat Hitam Tebal 6 mm (1,2 m x 2,4 m) Keping 2,677,500
796 Besi Plat Hitam Tebal 8 mm (1,2 m x 2,4 m) Keping 3,645,000
797 Bordes Tebal 1 mm (1,2 m x 2,4 m) keping 520,000
798 Bordes Tebal 2 mm (1,2 m x 2,4 m) keping 1,070,000
799 Bordes Tebal 3 mm (1,2 m x 2,4 m) keping 1,580,000
800 Bordes Tebal 6 mm (1,2 m x 2,4 m) keping 3,090,000
801 CNP Tebal 2 mm (100 mm x 50 mm x 20 mm) Btg 405,000
802 CNP Tebal 3 mm (100 mm x 50 mm x 20 mm) Btg 540,000
803 CNP Tebal 2 mm (125 mm x 50 mm x 20 mm) Btg 410,000
804 CNP Tebal 3 mm (125 mm x 50 mm x 20 mm) Btg 690,000
805 CNP Tebal 2 mm (150 mm x 50 mm x 20 mm) Btg 557,500
806 CNP Tebal 3 mm (150 mm x 50 mm x 20 mm) Btg 800,000
807 UNP Kanal U 50 (50 mm x 38 mm x 5 mm) Btg 255,000
808 UNP Kanal U 65 (65 mm x 42 mm x 5 mm) Btg 392,500
809 UNP Kanal U 80 (80 mm x 45 mm x 5 mm) Btg 447,500
810 UNP Kanal U 100 (100 mm x 50 mm x 5 mm) Btg 595,000
811 UNP Kanal U 120 (120 mm x 55 mm x 5 mm) Btg 1,100,000
812 Keramik 40/40 Anti Slip m2 67,250
813 Spandek Bening m 140,500
814 Klep dia. ¾ “, bh 21,000
815 Plampung Otomatis bh 71,429
816 Mesin Pompa Tekan Kap. 150 watt, Merk Groundfos unit 600,000
817 Box Panel PVC isi 4 MCB, bh 45,000
III. ALAT BERAT -
1 ASPHALT MIXING PLANT Jam 8,417,440
2 ASPHALT FINISHER Jam 784,368
3 POWER BROOM Jam 74,314
4 BULLDOZER 100-150 HP Jam 631,209
5 COMPRESSOR 4000-6500 L\M Jam 160,566
6 CONCRETE MIXER 0.3-0.6 M3 Jam 123,801
7 CRANE 10-15 TON Jam 331,692
8 DUMP TRUCK 3 - 4 M3 Jam 258,566
9 DUMP TRUCK 6-10 M3 Jam 378,533
10 EXCAVATOR 80-140 HP Jam 499,375
11 EXCAVATOR MINI Jam 300,000
12 EXCAVATOR LONG ARM Jam 750,000
13 FLAT BED TRUCK 3-4 TON Jam 306,527
14 GENERATOR SET Jam 420,458
15 MOTOR GRADER >100 HP Jam 623,011
16 TRACK LOADER 75-100 HP Jam 389,104
17 WHEEL LOADER 1.0-1.6 M3 Jam 529,763
18 THREE WHEEL ROLLER 6-8 T Jam 322,427
19 TANDEM ROLLER 6-8 T. Jam 285,992
20 TIRE ROLLER 8-10 T. Jam 533,120
21 VIBRATORY ROLLER 5-8 T. Jam 391,324
22 CONCRETE VIBRATOR Jam 71,733
23 STONE CRUSHER Jam 776,701
24 WATER PUMP 70-100 mm Jam 67,460
25 WATER TANKER 3000-4500 L. Jam 324,068
26 PEDESTRIAN ROLLER Jam 86,768
27 TAMPER PLATE Jam 66,740
28 JACK HAMMER Jam 62,863
29 FULVI MIXER Jam 870,789
30 CONCRETE PUMP Jam 345,858
31 TRAILER 20 TON Jam 432,506
32 PILE DRIVER + HAMMER Jam 165,222
33 CRANE ON TRACK 35 TON Jam 513,034
34 WELDING SET Jam 82,212
35 BORE PILE MACHINE Jam 860,048
36 PONTON SUPPORT Bulan 50,000,000
37 PONTON Bulan 50,000,000

PANGKALPINANG, OKTOBER 2022

KEPALA DINAS PEKERJAAN UMUM


DAN PENATAAN RUANG
KOTA PANGKALPINANG

MIE GO, S.T. ,M.Si.


PEMBINA UTAMA MUDA/IVC
NIP. 19730107 200003 1 005
A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.1. Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Semen Portland kg 2.500 1,627.00 4,067.50
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Kayu gergajian kelas III, balok m3 0.072 2,635,329.08 189,743.69
Paku berbagai ukuran (2"-5") kg 0.060 17,287.99 1,037.28
Residu atau ter ltr 0.400 60,402.65 24,161.06
JUMLAH HARGA BAHAN 232,737.03
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 330,177.03
E. Profit 15% * D 49,526.55
F. Harga Satuan Pekerjaan (D+E) 379,703.59

A. 2.2.1.2. Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Seng gelombang uk. 1,80 x 0,90 (m) lbr 1.200 60,291.00 72,349.20
Semen Portland kg 2.500 1,627.00 4,067.50
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Kayu gergajian kelas III, balok m3 0.072 2,635,329.08 189,743.69
Paku berbagai ukuran (2"-5") kg 0.060 17,287.99 1,037.28
Cat menie ltr 0.450 48,500.00 21,825.00
JUMLAH HARGA BAHAN 302,750.17
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 400,190.17
E. Profit 15% * D 60,028.53
F. Harga Satuan Pekerjaan (D+E) 460,218.70

A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 5,000.00 5,000.00
Kawat berduri kg 25.000 110,986.80 2,774,669.98
Semen Portland kg 2.000 1,627.00 3,254.00
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Paku berbagai ukuran (2"-5") kg 0.030 17,287.99 518.64
JUMLAH HARGA BAHAN 2,790,920.11
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,888,360.11
E. Profit 15% * D 433,254.02
F. Harga Satuan Pekerjaan (D+E) 3,321,614.13

A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.012 2,635,329.08 31,623.95
Paku berbagai ukuran (2"-5") Kg 0.020 17,287.99 345.76
Kayu gergajian kelas III, papan m3 0.007 2,535,470.00 17,748.29
JUMLAH HARGA BAHAN 49,718.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 81,183.00
E. Profit 15% * D 12,177.45
F. Harga Satuan Pekerjaan (D+E) 93,360.45

A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 121,800.00 243,600.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Tukang Batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 801,850.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.180 2,635,329.08 474,359.24
Paku berbagai ukuran (2"-5") kg 0.080 17,287.99 1,383.04
Besi strip 2 x 3 cm kg 1.100 10,048.50 11,053.35
Semen portland kg 35.000 1,627.00 56,945.00
Pasir pasang m3 0.150 150,000.00 22,500.00
Pasir beton m3 0.100 150,000.00 15,000.00
Batu pecah 1 - 2 m3 0.150 747,500.00 112,125.00
Batu bata merah besar bh 30.000 2,300.00 69,000.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 0.250 60,291.00 15,072.75
Jendela nako (kerangka + kaca 5 mm) bh 0.200 187,795.30 37,559.06
Kaca bening tebal 5 mm m2 0.080 147,936.25 11,834.90
Kunci pintu tanam (ex.dexon) bh 0.150 210,599.81 31,589.97
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 0.060 97,237.00 5,834.22
JUMLAH HARGA BAHAN 870,506.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,672,356.53
E. Profit 15% * D 250,853.48
F. Harga Satuan Pekerjaan (D+E) 1,923,210.00

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 3.000 5,000.00 15,000.00
Kayu gergajian kelas III, balok m3 0.276 2,635,329.08 727,350.83
Paku berbagai ukuran (2"-5") kg 0.700 17,287.99 12,101.59
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
JUMLAH HARGA BAHAN 844,888.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,250,888.92
E. Profit 15% * D 187,633.34
F. Harga Satuan Pekerjaan (D+E) 1,438,522.26

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.700 5,000.00 8,500.00
Kayu gergajian kelas III, balok m3 0.210 2,635,329.08 553,419.11
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 10.500 1,627.00 17,083.50
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Seng BJLS 30 lebar 45 cm Lbr 0.250 16,747.50 4,186.88
JUMLAH HARGA BAHAN 720,687.38
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,218,037.38
E. Profit 15% * D 182,705.61
F. Harga Satuan Pekerjaan (D+E) 1,400,742.99

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.186 2,635,329.08 490,171.21
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 18.000 1,627.00 29,286.00
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 1.350 97,237.00 131,269.95
JUMLAH HARGA BAHAN 794,475.06
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,291,825.06
E. Profit 15% * D 193,773.76
F. Harga Satuan Pekerjaan (D+E) 1,485,598.81
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 22,330.00
E. Profit 15% * D 3,349.50
F. Harga Satuan Pekerjaan (D+E) 25,679.50

A.1.1.1.11. Pembuatan 1 m2 steger/perancah dari bambu


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Bambu Ø 6 - 8/600 cm btg 1.250 #N/A #N/A
Tali ijuk m3 0.186 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 54,810.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.036 2,535,470.00 91,276.92
Kayu gergajian kelas III, balok m3 0.014 2,635,329.08 36,894.61
Paku berbagai ukuran (2"-5") m3 0.080 17,287.99 1,383.04
JUMLAH HARGA BAHAN 129,554.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,364.57
E. Profit 15% * D 27,654.68
F. Harga Satuan Pekerjaan (D+E) 212,019.25

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 122,815.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.150 425,000.00 63,750.00
Batu pecah 1 - 2 m3 0.090 747,500.00 67,275.00
Pasir pasang m3 0.010 150,000.00 1,500.00
JUMLAH HARGA BAHAN 132,525.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 255,340.00
E. Profit 15% * D 38,301.00
F. Harga Satuan Pekerjaan (D+E) 293,641.00

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 121,800.00 1,624,081.20
Mandor L.04 OH 0.666 203,000.00 135,198.00
JUMLAH TENAGA KERJA 1,759,279.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,759,279.20
E. Profit 15% * D 263,891.88
F. Harga Satuan Pekerjaan (D+E) 2,023,171.08
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 121,800.00 812,040.60
Mandor L.04 OH 0.333 203,000.00 67,599.00
JUMLAH TENAGA KERJA 879,639.60
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 879,639.60
E. Profit 15% * D 131,945.94
F. Harga Satuan Pekerjaan (D+E) 1,011,585.54

A. 1.1.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.042 121,800.00 5,115.60
Tukang L.02 OH 0.004 162,400.00 649.60
Kepala Tukang L.03 OH 0.002 203,000.00 406.00
Mandor L.04 OH 0.042 203,000.00 8,526.00
JUMLAH TENAGA KERJA 14,697.20
B. BAHAN
Kawat jaring Lbr 0.1434 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 1.1.1.16. Pembuatan 1 m2 Pagar panel beton pracetak 5x50x240 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 121,800.00 45,675.00
Tukang L.02 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.012 203,000.00 2,436.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 72,268.00
B. BAHAN
Panel beton pracetak Lbr 0.986 #N/A #N/A
Kolom beton pracetak btg 0.525 #N/A #N/A
Semen Portland kg 45.000 1,627.00 73,215.00
Pasir beton m3 0.074 150,000.00 11,100.00
Koral beton m3 0.146 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 121,800.00 91,350.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 96,425.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 96,425.00
E. Profit 15% * D 14,463.75
F. Harga Satuan Pekerjaan (D+E) 110,888.75

A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 121,800.00 109,620.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 118,755.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,755.00
E. Profit 15% * D 17,813.25
F. Harga Satuan Pekerjaan (D+E) 136,568.25

A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 121,800.00 127,890.00
Mandor L.04 OH 0.067 203,000.00 13,601.00
JUMLAH TENAGA KERJA 141,491.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 141,491.00
E. Profit 15% * D 21,223.65
F. Harga Satuan Pekerjaan (D+E) 162,714.65

A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.032 203,000.00 6,496.00
JUMLAH TENAGA KERJA 128,296.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 128,296.00
E. Profit 15% * D 19,244.40
F. Harga Satuan Pekerjaan (D+E) 147,540.40

A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,880.00
E. Profit 15% * D 29,232.00
F. Harga Satuan Pekerjaan (D+E) 224,112.00

A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 155,295.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 155,295.00
E. Profit 15% * D 23,294.25
F. Harga Satuan Pekerjaan (D+E) 178,589.25

A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 7,105.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,105.00
E. Profit 15% * D 1,065.75
F. Harga Satuan Pekerjaan (D+E) 8,170.75

A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 121,800.00 40,194.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 42,224.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 42,224.00
E. Profit 15% * D 6,333.60
F. Harga Satuan Pekerjaan (D+E) 48,557.60

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,962.92


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 45,522.75
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 54,238.22
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 49,180.13
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 74,704.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 59,529.75

A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 38,570.00
B. BAHAN
Pasir urug/timbun m3 1.200 80,756.00 96,907.20
JUMLAH HARGA BAHAN 96,907.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 135,477.20
E. Profit 15% * D 20,321.58
F. Harga Satuan Pekerjaan (D+E) 155,798.78
A. 2.3.1.12. Pemasangan 1 m3 lapisan pudel 1KP : 3PP : 7TL
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.080 203,000.00 16,240.00
JUMLAH TENAGA KERJA 186,760.00
B. BAHAN
Kapur padam m3 0.135 #N/A #N/A
Pasir pasang m3 0.400 150,000.00 60,000.00
Tanah liat m3 0.948 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 121,800.00 18,270.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 21,315.00
B. BAHAN
Ijuk m3 6.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.3.1.14. Pemasangan 1 m3 sirtu padat


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 121,800.00 30,450.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 35,525.00
B. BAHAN
Sirtu m3 1.200 150,248.42 180,298.10
JUMLAH HARGA BAHAN 180,298.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 215,823.10
E. Profit 15% * D 32,373.47
F. Harga Satuan Pekerjaan (D+E) 248,196.57
A.1.5.1 HARGA SATUAN PEKERJAAN TANAH

A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 121,800.00 91,350.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 96,425.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 96,425.00
E. Profit 15% * D 14,463.75
F. Harga Satuan Pekerjaan (D+E) 110,888.75

A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 121,800.00 109,620.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 118,755.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,755.00
E. Profit 15% * D 17,813.25
F. Harga Satuan Pekerjaan (D+E) 136,568.25

A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 121,800.00 127,890.00
Mandor L.04 OH 0.067 203,000.00 13,601.00
JUMLAH TENAGA KERJA 141,491.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 141,491.00
E. Profit 15% * D 21,223.65
F. Harga Satuan Pekerjaan (D+E) 162,714.65

A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.032 203,000.00 6,496.00
JUMLAH TENAGA KERJA 128,296.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 128,296.00
E. Profit 15% * D 19,244.40
F. Harga Satuan Pekerjaan (D+E) 147,540.40

A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,880.00
E. Profit 15% * D 29,232.00
F. Harga Satuan Pekerjaan (D+E) 224,112.00

A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 155,295.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 155,295.00
E. Profit 15% * D 23,294.25
F. Harga Satuan Pekerjaan (D+E) 178,589.25

A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 7,105.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,105.00
E. Profit 15% * D 1,065.75
F. Harga Satuan Pekerjaan (D+E) 8,170.75

A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 121,800.00 40,194.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 42,224.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 42,224.00
E. Profit 15% * D 6,333.60
F. Harga Satuan Pekerjaan (D+E) 48,557.60

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,962.92


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 45,522.75
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 54,238.22
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 49,180.13
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 74,704.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 59,529.75

A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 38,570.00
B. BAHAN
Pasir urug/Timbun ` 1.200 102,500.00 123,000.00
JUMLAH HARGA BAHAN 123,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 161,570.00
E. Profit 15% * D 24,235.50
F. Harga Satuan Pekerjaan (D+E) 185,805.50
A. 2.3.1.12. Pemasangan 1 m3 lapisan pudel 1KP : 3PP : 7TL
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.080 203,000.00 16,240.00
JUMLAH TENAGA KERJA 186,760.00
B. BAHAN
Kapur padam m3 0.135 #N/A #N/A
Pasir pasang m3 0.400 150,000.00 60,000.00
Tanah liat m3 0.948 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 1.5.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 121,800.00 18,270.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 21,315.00
B. BAHAN
Ijuk kg 6.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.3.1.14. Pemasangan 1 m3 sirtu padat


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 121,800.00 30,450.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 35,525.00
B. BAHAN
Sirtu m3 1.200 150,248.42 180,298.10
JUMLAH HARGA BAHAN 180,298.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 215,823.10
E. Profit 15% * D 32,373.47
F. Harga Satuan Pekerjaan (D+E) 248,196.57
A.3.1.1 HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00
JUMLAH HARGA BAHAN 911,404.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,246,354.00
E. Profit 15% * D 186,953.10
F. Harga Satuan Pekerjaan (D+E) 1,433,307.10

A. 3.2.1.1.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00
JUMLAH HARGA BAHAN 838,546.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,173,496.86
E. Profit 15% * D 176,024.53
F. Harga Satuan Pekerjaan (D+E) 1,349,521.39

A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 853,201.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,188,151.00
E. Profit 15% * D 178,222.65
F. Harga Satuan Pekerjaan (D+E) 1,366,373.65

A. 3.2.1.2.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 351,327.27 421,592.72
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 764,793.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,099,743.72
E. Profit 15% * D 164,961.56
F. Harga Satuan Pekerjaan (D+E) 1,264,705.28

A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00
JUMLAH HARGA BAHAN 812,872.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,147,822.00
E. Profit 15% * D 172,173.30
F. Harga Satuan Pekerjaan (D+E) 1,319,995.30

A. 3.2.1.3.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 5PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00
JUMLAH HARGA BAHAN 740,014.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,074,964.86
E. Profit 15% * D 161,244.73
F. Harga Satuan Pekerjaan (D+E) 1,236,209.59

A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00
JUMLAH HARGA BAHAN 784,509.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,119,459.00
E. Profit 15% * D 167,918.85
F. Harga Satuan Pekerjaan (D+E) 1,287,377.85

A. 3.2.1.4.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 6PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00
JUMLAH HARGA BAHAN 711,651.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,601.86
E. Profit 15% * D 156,990.28
F. Harga Satuan Pekerjaan (D+E) 1,203,592.14

A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00
JUMLAH HARGA BAHAN 745,657.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,080,607.00
E. Profit 15% * D 162,091.05
F. Harga Satuan Pekerjaan (D+E) 1,242,698.05

A. 3.2.1.5.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 8PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00
JUMLAH HARGA BAHAN 672,799.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,007,749.86
E. Profit 15% * D 151,162.48
F. Harga Satuan Pekerjaan (D+E) 1,158,912.34

A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland Kg 0.170 1,627.00 276.59
Batu kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00
JUMLAH HARGA BAHAN 573,386.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 908,336.15
E. Profit 15% * D 136,250.42
F. Harga Satuan Pekerjaan (D+E) 1,044,586.57

A. 3.2.1.6.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 1KP : 2PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 0.170 1,627.00 276.59
Batu Kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00
JUMLAH HARGA BAHAN 500,529.01
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 835,479.01
E. Profit 15% * D 125,321.85
F. Harga Satuan Pekerjaan (D+E) 960,800.86

A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00
JUMLAH HARGA BAHAN 693,518.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,028,468.21
E. Profit 15% * D 154,270.23
F. Harga Satuan Pekerjaan (D+E) 1,182,738.44

A. 3.2.1.7.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3KP : 10PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00
JUMLAH HARGA BAHAN 620,661.06
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 955,611.06
E. Profit 15% * D 143,341.66
F. Harga Satuan Pekerjaan (D+E) 1,098,952.72

A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00
JUMLAH HARGA BAHAN 664,488.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 999,438.48
E. Profit 15% * D 149,915.77
F. Harga Satuan Pekerjaan (D+E) 1,149,354.26

A. 3.2.1.8.a Pemasangan 1 m3 Pondasi batu gunung campuran 1/4SP : 1KP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00
JUMLAH HARGA BAHAN 591,631.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 926,581.34
E. Profit 15% * D 138,987.20
F. Harga Satuan Pekerjaan (D+E) 1,065,568.54

A. 3.2.1.9. Pemasangan 1 m3 batu hitam kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Pasir urug/timbun m3 0.432 102,500.00 44,280.00
JUMLAH HARGA BAHAN 554,280.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 728,454.00
E. Profit 15% * D 109,268.10
F. Harga Satuan Pekerjaan (D+E) 837,722.10

A. 3.2.1.9.a Pemasangan 1 m3 batu putih kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Pasir urug/timbun m3 0.432 102,500.00 44,280.00
JUMLAH HARGA BAHAN 481,422.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 655,596.86
E. Profit 15% * D 98,339.53
F. Harga Satuan Pekerjaan (D+E) 753,936.39

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 425,000.00 204,000.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00
JUMLAH HARGA BAHAN 2,633,873.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,237,798.10
E. Profit 15% * D 485,669.71
F. Harga Satuan Pekerjaan (D+E) 3,723,467.81

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
batu gunung m3 0.480 364,285.71 174,857.14
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00
JUMLAH HARGA BAHAN 2,604,730.24
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,208,655.24
E. Profit 15% * D 481,298.29
F. Harga Satuan Pekerjaan (D+E) 3,689,953.53

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 425,000.00 191,250.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
JUMLAH HARGA BAHAN 903,518.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,366,155.00
E. Profit 15% * D 204,923.25
F. Harga Satuan Pekerjaan (D+E) 1,571,078.25

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu gunung, diameter 100 cm.


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
batu gunung m3 0.450 364,285.71 163,928.57
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
JUMLAH HARGA BAHAN 876,196.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,338,833.57
E. Profit 15% * D 200,825.04
F. Harga Satuan Pekerjaan (D+E) 1,539,658.61
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,054,758.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,322,921.42
E. Profit 15% *D 198,438.21
F. Harga Satuan Pekerjaan (D+E) 1,521,359.63
A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 299.0000 1,627.00 486,473.00
Pasir beton (Kg) kg 799.0000 83.33 66,583.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 515.52 524,281.03
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,092,340.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,360,503.34
E. Profit 15% *D 204,075.50
F. Harga Satuan Pekerjaan (D+E) 1,564,578.84

A. 4.1.1.1. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,139,205.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,407,368.54
E. Profit 15% *D 211,105.28
F. Harga Satuan Pekerjaan (D+E) 1,618,473.82

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,448,284.91
E. Profit 15% *D 217,242.74
F. Harga Satuan Pekerjaan (D+E) 1,665,527.65

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,484,696.19
E. Profit 15% *D 222,704.43
F. Harga Satuan Pekerjaan (D+E) 1,707,400.62

A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 384.0000 1,627.00 624,768.00
Pasir beton (Kg) kg 692.0000 83.33 57,666.67
Batu pecah 1 - 2 (Kg) kg 1,039.0000 515.52 535,622.41
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,233,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,501,223.05
E. Profit 15% *D 225,183.46
F. Harga Satuan Pekerjaan (D+E) 1,726,406.51
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 406.0000 1,627.00 660,562.00
Pasir beton (Kg) kg 684.0000 83.33 57,000.00
Batu pecah 1 - 2 (Kg) kg 1,026.0000 515.52 528,920.69
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,261,485.66
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,648.66
E. Profit 15% *D 229,447.30
F. Harga Satuan Pekerjaan (D+E) 1,759,095.96

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 413.0000 1,627.00 671,951.00
Pasir beton (Kg) kg 681.0000 83.33 56,750.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 515.52 526,343.10
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,270,047.07
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,538,210.07
E. Profit 15% *D 230,731.51
F. Harga Satuan Pekerjaan (D+E) 1,768,941.58

A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 439.0000 1,627.00 714,253.00
Pasir beton (Kg) kg 670.0000 83.33 55,833.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 515.52 518,610.34
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,303,699.65
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,644,739.65
E. Profit 15% *D 246,710.95
F. Harga Satuan Pekerjaan (D+E) 1,891,450.59

A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 448.0000 1,627.00 728,896.00
Pasir beton (Kg) kg 667.0000 83.33 55,583.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 515.52 515,517.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,314,999.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,656,039.54
E. Profit 15% *D 248,405.93
F. Harga Satuan Pekerjaan (D+E) 1,904,445.47

A. 4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 400.0000 1,627.00 650,800.00
Pasir beton m3 0.4800 150,000.00 72,000.00
Batu pecah 1 - 2 (Kg) m3 0.8000 515.52 412.41
Storox - 100 kg 1.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.1.1.14. Membuat 1 m' PVC waterstop lebar 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Batu L.02 OH 0.0300 162,400.00 4,872.00
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Waterstop lebar 150 mm m3 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.15. Membuat 1 m' PVC waterstop lebar 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Batu L.02 OH 0.0350 162,400.00 5,684.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 16,443.00
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.16. Membuat 1 m' PVC waterstop lebar 230 mm - 320 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu/Pipa L.02 OH 0.0400 162,400.00 6,496.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 17,864.00
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Besi L.02 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.0070 203,000.00 1,421.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 22,127.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1500 23,111.11 3,466.67
JUMLAH HARGA BAHAN 143,133.76
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 165,260.76
E. Profit 15% *D 24,789.11
F. Harga Satuan Pekerjaan (D+E) 190,049.87

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Besi L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1000 23,111.11 2,311.11
JUMLAH HARGA BAHAN 141,978.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,812.20
E. Profit 15% *D 23,671.83
F. Harga Satuan Pekerjaan (D+E) 181,484.03

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang Besi L.02 OH 0.0250 162,400.00 4,060.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 12,383.00
B. BAHAN
Besi jaring kawat baja kg 10.2000 22,330.00 227,766.00
Kawat beton kg 0.0500 23,111.11 1,155.56
JUMLAH HARGA BAHAN 228,921.56
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 241,304.56
E. Profit 15% *D 36,195.68
F. Harga Satuan Pekerjaan (D+E) 277,500.24

A. 4.1.1.18. Membuat 1 m2 bekisting untuk pondasi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 111,599.56
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 227,715.56
E. Profit 15% *D 34,157.33
F. Harga Satuan Pekerjaan (D+E) 261,872.89

A. 4.1.1.20. ck Membuat 1 m2 bekisting untuk pondasi (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
JUMLAH HARGA BAHAN 94,760.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,876.15
E. Profit 15% *D 31,631.42
F. Harga Satuan Pekerjaan (D+E) 242,507.57

A. 4.1.1.19. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 2,635,329.08 118,589.81
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 124,776.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 240,892.21
E. Profit 15% *D 36,133.83
F. Harga Satuan Pekerjaan (D+E) 277,026.04

A. 4.1.1.21. ck Membuat 1 m2 bekisting untuk sloof (kls IV)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0450 2,239,343.75 100,770.47
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter - - -
JUMLAH HARGA BAHAN 105,956.87
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 222,072.87
E. Profit 15% *D 33,310.93
F. Harga Satuan Pekerjaan (D+E) 255,383.79

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 217,105.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 364,483.20
E. Profit 15% *D 54,672.48
F. Harga Satuan Pekerjaan (D+E) 419,155.68

A. 4.1.1.22. ck Membuat 1 m2 bekisting untuk kolom (kls IV)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 142,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,014.53
E. Profit 15% *D 43,502.18
F. Harga Satuan Pekerjaan (D+E) 333,516.71

A. 4.1.1.21. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0180 2,822,286.84 50,801.16
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 225,572.06
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 372,950.06
E. Profit 15% *D 55,942.51
F. Harga Satuan Pekerjaan (D+E) 428,892.57

A. 4.1.1.23. ck Membuat 1 m2 bekisting untuk balok (kls IV)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0180 2,409,839.14 43,377.10
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 149,866.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 297,244.05
E. Profit 15% *D 44,586.61
F. Harga Satuan Pekerjaan (D+E) 341,830.66

A. 4.1.1.22. Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 237,105.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 384,483.20
E. Profit 15% *D 57,672.48
F. Harga Satuan Pekerjaan (D+E) 442,155.68

A. 4.1.1.24.ck Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 162,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 310,014.53
E. Profit 15% *D 46,502.18
F. Harga Satuan Pekerjaan (D+E) 356,516.71

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0200 2,822,286.84 56,445.74
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
Penjaga jarak bekisting/spacer buah - - -
JUMLAH HARGA BAHAN 209,863.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 357,241.34
E. Profit 15% *D 53,586.20
F. Harga Satuan Pekerjaan (D+E) 410,827.55

A. 4.1.1.25. ck Membuat 1 m2 bekisting untuk dinding (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0200 2,409,839.14 48,196.78
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
JUMLAH HARGA BAHAN 137,292.29
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 284,670.29
E. Profit 15% *D 42,700.54
F. Harga Satuan Pekerjaan (D+E) 327,370.83

A. 4.1.1.25. Membuat 1 m2 bekisting untuk tangga


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.1500 10,000.00 1,500.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 190,251.91
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 337,629.91
E. Profit 15% *D 50,644.49
F. Harga Satuan Pekerjaan (D+E) 388,274.40

A. 4.1.1.26. ck Membuat 1 m2 bekisting untuk tangga (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 120,243.09
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 267,621.09
E. Profit 15% *D 40,143.16
F. Harga Satuan Pekerjaan (D+E) 307,764.26

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 2,635,329.08 69,572.69
Paku berbagai ukuran (2"-5") kg 0.6000 17,287.99 10,372.79
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 5,000.00 2,500.00
JUMLAH HARGA BAHAN 82,445.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 111,474.48
E. Profit 15% *D 16,721.17
F. Harga Satuan Pekerjaan (D+E) 128,195.65

A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 121,800.00 21,924.00
Tukang Batu L.02 OH 0.0200 162,400.00 3,248.00
Tukang Kayu L.02 OH 0.0200 162,400.00 3,248.00
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,713.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 2,635,329.08 5,270.66
Paku berbagai ukuran (2"-5") kg 0.0100 17,287.99 172.88
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.0000 13,301.63 39,904.88
Kawat beton kg 0.4500 23,111.11 10,400.00
Semen portland kg 4.0000 1,627.00 6,508.00
Pasir beton m3 0.0060 150,000.00 900.00
Batu pecah 1 - 2 m3 0.0090 747,500.00 6,727.50
JUMLAH HARGA BAHAN 69,883.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 104,596.92
E. Profit 15% *D 15,689.54
F. Harga Satuan Pekerjaan (D+E) 120,286.46
A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 121,800.00 36,174.60
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Kayu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Besi L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,327.20
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 2,635,329.08 7,905.99
Paku berbagai ukuran (2"-5") kg 0.0200 17,287.99 345.76
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.6000 13,301.63 47,885.86
Kawat beton kg 0.0500 23,111.11 1,155.56
Semen portland kg 5.5000 1,627.00 8,948.50
Pasir beton m3 0.0090 150,000.00 1,350.00
Batu pecah 1 - 2 m3 0.0150 747,500.00 11,212.50
JUMLAH HARGA BAHAN 78,804.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 136,131.36
E. Profit 15% *D 20,419.70
F. Harga Satuan Pekerjaan (D+E) 156,551.07
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1320 121,800.00 16,077.60
Tukang Batu L.02 OH 0.0220 162,400.00 3,572.80
Kepala Tukang L.03 OH 0.0020 203,000.00 406.00
Mandor L.04 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 21,477.40
B. BAHAN
Semen portland kg 26.0800 1,627.00 42,432.16
Pasir beton (Kg) kg 60.8000 83.33 5,066.67
Batu pecah 1 - 2 (Kg) kg 82.3200 515.52 42,437.38
Air ltr 17.2000 69.78 1,200.24
JUMLAH HARGA BAHAN 91,136.44
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 112,613.84
E. Profit 15% *D 16,892.08
F. Harga Satuan Pekerjaan (D+E) 129,505.92

A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 121,800.00 20,097.00
Tukang Batu L.02 OH 0.0280 162,400.00 4,547.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 26,877.20
B. BAHAN
Semen portland kg 32.6000 1,627.00 53,040.20
Pasir beton (Kg) kg 76.0000 83.33 6,333.33
Batu pecah 1 - 2 (Kg) kg 102.9000 515.52 53,046.72
Air ltr 21.5000 69.78 1,500.30
JUMLAH HARGA BAHAN 113,920.55
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 140,797.75
E. Profit 15% *D 21,119.66
F. Harga Satuan Pekerjaan (D+E) 161,917.42

A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 121,800.00 24,116.40
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 32,114.60
B. BAHAN
Semen portland kg 32.1200 1,627.00 52,259.24
Pasir beton (Kg) kg 91.2000 83.33 7,600.00
Batu pecah 1 - 2 (Kg) kg 123.4800 515.52 63,656.07
Air ltr 25.8000 69.78 1,800.36
JUMLAH HARGA BAHAN 125,315.67
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,430.27
E. Profit 15% *D 23,614.54
F. Harga Satuan Pekerjaan (D+E) 181,044.80

A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 121,800.00 30,206.40
Tukang Batu L.02 OH 0.0410 162,400.00 6,658.40
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 40,315.80
B. BAHAN
Semen portland kg 48.9000 1,627.00 79,560.30
Pasir beton (Kg) kg 114.0000 83.33 9,500.00
Batu pecah 1 - 2 (Kg) kg 154.3500 515.52 79,570.09
Air ltr 32.2500 69.78 2,250.45
JUMLAH HARGA BAHAN 170,880.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 211,196.63
E. Profit 15% *D 31,679.49
F. Harga Satuan Pekerjaan (D+E) 242,876.13

A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0070 121,800.00 852.60
Tukang Batu L.02 OH 0.0760 162,400.00 12,342.40
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 15,022.00
B. BAHAN
Lantai kerja tebal 10 cm m3 0.0800 #N/A #N/A
Besi Hollow 50 x 50 x 3 mm x 6 Meter kg 9.3940 240,971.96 2,263,690.61
Kayu gergajian kelas III, balok m3 0.0050 2,635,329.08 13,176.65
Phenol film 12 mm lbr 0.0800 #N/A #N/A
Minyak bekisting liter 0.0200 10,000.00 200.00
Dinabolt dia 12 mm ( 10-15 cm) bh 3.8820 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 121,800.00 487.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 7,673.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0050 2,635,329.08 13,176.65
Phenol film 12 mm lbr 0.0430 #N/A #N/A
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Paku 5-7 cm Kg 0.0460 #N/A #N/A
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 121,800.00 487.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 7,673.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0040 2,635,329.08 10,541.32
Phenol film 12 mm lbr 0.0480 #N/A #N/A
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Paku 5-7 cm kg 0.0460 #N/A #N/A
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0530 121,800.00 6,455.40
Tukang Kayu L.02 OH 0.0180 162,400.00 2,923.20
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 10,393.60
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 10,393.60
E. Profit 15% *D 1,559.04
F. Harga Satuan Pekerjaan (D+E) 11,952.64

A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0890 121,800.00 10,840.20
Tukang Kayu L.02 OH 0.0300 162,400.00 4,872.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 16,727.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 16,727.20
E. Profit 15% *D 2,509.08
F. Harga Satuan Pekerjaan (D+E) 19,236.28

A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0710 121,800.00 8,647.80
Tukang Kayu L.02 OH 0.0240 162,400.00 3,897.60
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 13,560.40
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 13,560.40
E. Profit 15% *D 2,034.06
F. Harga Satuan Pekerjaan (D+E) 15,594.46

A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0640 121,800.00 7,795.20
Tukang Batu L.02 OH 0.2440 162,400.00 39,625.60
Tukang vibrator L.02 OH 0.1280 162,400.00 20,787.20
Kepala Tukang L.03 OH 0.0340 203,000.00 6,902.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 89,929.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,929.00
E. Profit 15% *D 13,489.35
F. Harga Satuan Pekerjaan (D+E) 103,418.35

A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0690 121,800.00 8,404.20
Tukang Batu L.02 OH 0.2420 162,400.00 39,300.80
Tukang vibrator L.02 OH 0.1380 162,400.00 22,411.20
Kepala Tukang L.03 OH 0.0370 203,000.00 7,511.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 92,446.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,446.20
E. Profit 15% *D 13,866.93
F. Harga Satuan Pekerjaan (D+E) 106,313.13

A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0610 121,800.00 7,429.80
Tukang Batu L.02 OH 0.2130 162,400.00 34,591.20
Tukang vibrator L.02 OH 0.1220 162,400.00 19,812.80
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 83,351.80
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,351.80
E. Profit 15% *D 12,502.77
F. Harga Satuan Pekerjaan (D+E) 95,854.57

A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0670 182,700.00 12,240.90
Pembantu operator crane L.09 OH 0.0670 121,800.00 8,160.60
Pekerja L.01 OH 0.0670 121,800.00 8,160.60
Tukang Batu L.02 OH 0.0670 162,400.00 10,880.80
Tukang erection L.02 OH 0.1340 162,400.00 21,761.60
Kepala Tukang L.03 OH 0.0670 203,000.00 13,601.00
Mandor L.04 OH 0.0670 203,000.00 13,601.00
JUMLAH TENAGA KERJA 88,406.50
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa Crane UH 0.0670 280,491.24 18,792.91
Sewa Pipe Support buah hari 1.1000
JUMLAH HARGA ALAT 18,792.91
D. Jumlah (A+B+C) 107,199.41
E. Profit 15% *D 16,079.91
F. Harga Satuan Pekerjaan (D+E) 123,279.33

A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0610 182,700.00 11,144.70
Pembantu operator crane L.09 OH 0.0610 121,800.00 7,429.80
Pekerja L.01 OH 0.0610 121,800.00 7,429.80
Tukang Batu L.02 OH 0.0610 162,400.00 9,906.40
Tukang erection L.02 OH 0.1220 162,400.00 19,812.80
Kepala Tukang L.03 OH 0.0610 203,000.00 12,383.00
Mandor L.04 OH 0.0610 203,000.00 12,383.00
JUMLAH TENAGA KERJA 80,489.50
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
Sewa Scafolding UH 1.1000
JUMLAH HARGA ALAT 5,329.33
D. Jumlah (A+B+C) 85,818.83
E. Profit 15% *D 12,872.83
F. Harga Satuan Pekerjaan (D+E) 98,691.66

A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0830 182,700.00 15,164.10
Pembantu operator crane L.09 OH 0.0830 121,800.00 10,109.40
Pekerja L.01 OH 0.0830 121,800.00 10,109.40
Tukang Batu L.02 OH 0.0830 162,400.00 13,479.20
Tukang erection L.02 OH 0.1660 162,400.00 26,958.40
Kepala Tukang L.03 OH 0.0830 203,000.00 16,849.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 109,518.50
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
Sewa Scafolding UH 1.1000
JUMLAH HARGA ALAT 5,329.33
D. Jumlah (A+B+C) 114,847.83
E. Profit 15% *D 17,227.18
F. Harga Satuan Pekerjaan (D+E) 132,075.01

A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
JUMLAH HARGA ALAT 5,329.33
D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
JUMLAH HARGA ALAT 5,329.33
D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
JUMLAH HARGA ALAT 5,329.33
D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

A. 4.1.2.20. Bahan 1 m3 grouting campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,200.0000 #N/A #N/A
Screening kg 650.0000 #N/A #N/A
Air liter 350.0000 69.78 24,423.44
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,850.0000 #N/A #N/A
Air liter 400.0000 69.78 27,912.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Batu L.02 OH 0.3670 162,400.00 59,600.80
Kepala Tukang L.03 OH 0.0740 203,000.00 15,022.00
Mandor L.04 OH 0.0370 203,000.00 7,511.00
JUMLAH TENAGA KERJA 82,133.80
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 82,133.80
E. Profit 15% *D 12,320.07
F. Harga Satuan Pekerjaan (D+E) 94,453.87

A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1470 121,800.00 17,904.60
Tukang kayu L.02 OH 0.1470 162,400.00 23,872.80
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 45,837.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0120 2,635,329.08 31,623.95
Kayu gergajian kelas III, papan m3 0.0040 2,535,470.00 10,141.88
Paku berbagai ukuran (2"-5") kg 0.2640 17,287.99 4,564.03
JUMLAH HARGA BAHAN 46,329.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,167.26
E. Profit 15% *D 13,825.09
F. Harga Satuan Pekerjaan (D+E) 105,992.35

A. 4.1.2.24. Upah 1 titik join dengan sling


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2200 121,800.00 26,796.00
Tukang kayu L.02 OH 0.2200 162,400.00 35,728.00
Tukang Besi L.02 OH 0.2200 162,400.00 35,728.00
Mandor L.04 OH 0.0110 203,000.00 2,233.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 100,485.00
E. Profit 15% *D 15,072.75
F. Harga Satuan Pekerjaan (D+E) 115,557.75

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 18,708.00
B. BAHAN
Besi profil kg 1.1500 9,825.20 11,298.98
JUMLAH HARGA BAHAN 11,298.98
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 30,006.98
E. Profit 15% *D 4,501.05
F. Harga Satuan Pekerjaan (D+E) 34,508.03

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang Las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 18,600.00
B. BAHAN
Besi baja IWF kg 1.1500 11,251.49 12,939.21
JUMLAH HARGA BAHAN 12,939.21
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 31,539.21
E. Profit 15% *D 4,730.88
F. Harga Satuan Pekerjaan (D+E) 36,270.09

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Las konstruksi L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0010 200,000.00 200.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 29,200.00
B. BAHAN
Solar liter 1.0000 9,600.00 9,600.00
Minyak pelumas (oli) liter 0.1000 31,410.00 3,141.00
JUMLAH HARGA BAHAN 12,741.00
C. PERALATAN
Sewa alat jam 0.8000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 120,000.00 126,000.00
Tukang Las biasa L.02 OH 1.0500 160,000.00 168,000.00
Kepala tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L,04 OH 0.0520 200,000.00 10,400.00
JUMLAH TENAGA KERJA 325,400.00
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,680.00 145,200.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 45,540.00 2,277.00
JUMLAH HARGA BAHAN 532,450.60
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 857,850.60
E. Profit 15% *D 128,677.59
F. Harga Satuan Pekerjaan (D+E) 986,528.19

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 120,000.00 4,800.00
Tukang Besi L.02 OH 0.0200 160,000.00 3,200.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 16,000.00
B. BAHAN
Kawat Las Listrik kg 0.4000 45,540.00 18,216.00
Solar kg 0.3000 9,600.00 2,880.00
Minyak pelumas (oli) kg 0.0400 31,410.00 1,256.40
JUMLAH HARGA BAHAN 22,352.40
C. PERALATAN
Sewa alat jam 0.1700 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 121,800.00 79,170.00
Tukang Las biasa L.02 OH 0.6500 162,400.00 105,560.00
Kepala tukang L.03 OH 0.0650 203,000.00 13,195.00
Mandor L,04 OH 0.0320 203,000.00 6,496.00
JUMLAH TENAGA KERJA 204,421.00
B. BAHAN
Besi scuare tube m 4.7600 #N/A #N/A
Besi lis kaca (1 x 1) cm m 4.5220 #N/A #N/A
Pengelasan cm 20.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Las biasa L.02 OH 1.2000 162,400.00 194,880.00
Kepala tukang L.03 OH 0.1200 203,000.00 24,360.00
Mandor L,04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 377,580.00
B. BAHAN
Pintu gulung besi' m2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 121,800.00 53,592.00
Tukang L.02 OH 0.4400 162,400.00 71,456.00
Kepala tukang L.03 OH 0.0440 203,000.00 8,932.00
Mandor L,04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 138,446.00
B. BAHAN
Folding door/ pintu lipat m2 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang L.02 OH 0.8000 162,400.00 129,920.00
Kepala tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L,04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 164,024.00
B. BAHAN
Sunscreen alumunium m2 1.0000 1,674,750.00 1,674,750.00
JUMLAH HARGA BAHAN 1,674,750.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,838,774.00
E. Profit 15% *D 275,816.10
F. Harga Satuan Pekerjaan (D+E) 2,114,590.10

A. 4.2.1.9. Pemasangan 1 m2 rolling door aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang L.02 OH 1.0000 162,400.00 162,400.00
Kepala tukang L.03 OH 0.1000 203,000.00 20,300.00
Mandor L,04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 314,650.00
B. BAHAN
Rolling door-alumunium tebal 0,8 mm m2 1.0000 429,852.50 429,852.50
JUMLAH HARGA BAHAN 429,852.50
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 744,502.50
E. Profit 15% *D 111,675.38
F. Harga Satuan Pekerjaan (D+E) 856,177.88

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 121,800.00 5,237.40
Tukang khusus aluminium L.02 OH 0.0430 162,400.00 6,983.20
Kepala tukang L.03 OH 0.0043 203,000.00 872.90
Mandor L,04 OH 0.0021 203,000.00 426.30
JUMLAH TENAGA KERJA 13,519.80
B. BAHAN
Profil aluminium m 1.1000 #N/A #N/A
Skrup fixer buah 2.0000 2,344.65 4,689.30
Sealant tube 0.0600 38,798.38 2,327.90
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0085 203,000.00 1,725.50
Mandor L,04 OH 0.0042 203,000.00 852.60
JUMLAH TENAGA KERJA 26,735.10
B. BAHAN
Profil aluminium m 4.4000 #N/A #N/A
Aluminium strip m 14.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Profil aluminium m 4.4000 #N/A #N/A
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang khusus aluminium L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Venetions blinds & vertical blinds m2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 121,800.00 203,406.00
Tukang las Konstruksi L.02 OH 1.6700 162,400.00 271,208.00
Kepala tukang L.03 OH 0.1670 203,000.00 33,901.00
Mandor L,04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 525,364.00
B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 10,048.50 62,069.58
Pengelasan cm 27.0800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kawat nyamuk logam m2 1.1000 26,516.88 29,168.56
Pengelasan cm 11.1100 #N/A #N/A
Baja strip (0,2 x 2) cm kg 1.7160 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 61,103.00
B. BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 #N/A #N/A
Paku sekrup 1 cm -2,5 cm buah 10.0000 26,423.83 264,238.33
Baja strip m 7.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 61,103.00
B. BAHAN
Seng plat m 1.0500 #N/A #N/A
Paku sekrup 1 cm -2,5 cm kg 0.0150 26,423.83 396.36
Kayu gergajian kelas III, papan m3 0.0190 2,535,470.00 48,173.93
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang besi L.02 OH 0.3000 162,400.00 48,720.00
Kepala tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L,04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 74,704.00
B. BAHAN
Seng plat m 1.0500 #N/A #N/A
Paku sekrup 1 cm -2,5 cm kg 0.0100 26,423.83 264.24
Besi strip m3 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Besi L.02 OH 0.2500 162,400.00 40,600.00
Kepala tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L,04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 78,764.00
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 121,800.00 89,401.20
Tukang Besi L.02 OH 0.734 162,400.00 119,201.60
Kepala tukang L.03 OH 0.073 203,000.00 14,900.20
Mandor L,04 OH 0.037 203,000.00 7,450.10

JUMLAH TENAGA KERJA 230,953.10


B. BAHAN
Baja ringan canai dingin C75 btg 0.8730 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.23. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 121,800.00 92,616.72
Tukang Besi L.02 OH 0.7604 162,400.00 123,488.96
Kepala tukang L.03 OH 0.0760 203,000.00 15,428.00
Mandor L,04 OH 0.0380 203,000.00 7,714.00

JUMLAH TENAGA KERJA 239,247.68


B. BAHAN
Baja ringan canai dingin C75 btg 0.8730 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las Konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 18,879.00
B. BAHAN
Besi profil kg 1.1500 9,825.20 11,298.98
JUMLAH HARGA BAHAN 11,298.98
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 30,177.98
E. Profit 15% *D 4,526.70
F. Harga Satuan Pekerjaan (D+E) 34,704.68

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 18,879.00
B. BAHAN
Besi Baja IWF kg 1.1500 11,420.26 13,133.30
JUMLAH HARGA BAHAN 13,133.30
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 32,012.30
E. Profit 15% *D 4,801.84
F. Harga Satuan Pekerjaan (D+E) 36,814.14

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Las Konstruksi L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0010 203,000.00 203.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 29,638.00
B. BAHAN
Solar liter 1.0000 18,100.00 18,100.00
Minyak pelumas (oli) liter 0.1000 31,881.15 3,188.12
JUMLAH HARGA BAHAN 21,288.12
C. PERALATAN
Sewa alat jam 0.8000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Las biasa L.02 OH 1.0500 162,400.00 170,520.00
Kepala tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L,04 OH 0.0520 203,000.00 10,556.00
JUMLAH TENAGA KERJA 330,281.00
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,825.20 147,378.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 46,223.10 2,311.16
JUMLAH HARGA BAHAN 534,662.76
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 864,943.76
E. Profit 15% *D 129,741.56
F. Harga Satuan Pekerjaan (D+E) 994,685.32

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 16,240.00
B. BAHAN
Kawat Las Listrik kg 0.4000 46,223.10 18,489.24
Solar kg 0.3000 18,100.00 5,430.00
Minyak pelumas (oli) kg 0.0400 31,881.15 1,275.25
JUMLAH HARGA BAHAN 25,194.49
C. PERALATAN
Sewa alat jam 0.1700 72,706.21 12,360.06
JUMLAH HARGA ALAT 12,360.06
D. Jumlah (A+B+C) 53,794.54
E. Profit 15% *D 8,069.18
F. Harga Satuan Pekerjaan (D+E) 61,863.72

A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 121,800.00 79,170.00
Tukang Las biasa L.02 OH 0.6500 162,400.00 105,560.00
Kepala tukang L.03 OH 0.0650 203,000.00 13,195.00
Mandor L,04 OH 0.0320 203,000.00 6,496.00
JUMLAH TENAGA KERJA 204,421.00
B. BAHAN
Besi scuare tube m 4.7600 #N/A #N/A
Besi lis kaca (1 x 1) cm m 4.5220 #N/A #N/A
Pengelasan cm 20.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Las biasa L.02 OH 1.2000 162,400.00 194,880.00
Kepala tukang L.03 OH 0.1200 203,000.00 24,360.00
Mandor L,04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 377,580.00
B. BAHAN
Rolling door-Galvalum tebal 0,4 mm m2 1.0000 401,940.00 401,940.00
JUMLAH HARGA BAHAN 401,940.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 779,520.00
E. Profit 15% *D 116,928.00
F. Harga Satuan Pekerjaan (D+E) 896,448.00

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 121,800.00 53,592.00
Tukang L.02 OH 0.4400 162,400.00 71,456.00
Kepala tukang L.03 OH 0.0440 203,000.00 8,932.00
Mandor L,04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 138,446.00
B. BAHAN
Rolling door tebal 0,4 mm (PVC) m2 1.0000 279,125.00 279,125.00
JUMLAH HARGA BAHAN 279,125.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 417,571.00
E. Profit 15% *D 62,635.65
F. Harga Satuan Pekerjaan (D+E) 480,206.65

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang L.02 OH 0.8000 162,400.00 129,920.00
Kepala tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L,04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 164,024.00
B. BAHAN
Sunscreen alumunium m2 1.0000 1,674,750.00 1,674,750.00
JUMLAH HARGA BAHAN 1,674,750.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,838,774.00
E. Profit 15% *D 275,816.10
F. Harga Satuan Pekerjaan (D+E) 2,114,590.10

A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang L.02 OH 1.0000 162,400.00 162,400.00
Kepala tukang L.03 OH 0.1000 203,000.00 20,300.00
Mandor L,04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 314,650.00
B. BAHAN
Rolling door-alumunium tebal 0,6 mm m2 1.0000 413,719.08 413,719.08
JUMLAH HARGA BAHAN 413,719.08
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 728,369.08
E. Profit 15% *D 109,255.36
F. Harga Satuan Pekerjaan (D+E) 837,624.44

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 121,800.00 5,237.40
Tukang khusus aluminium L.02 OH 0.0430 162,400.00 6,983.20
Kepala tukang L.03 OH 0.0043 203,000.00 872.90
Mandor L,04 OH 0.0021 203,000.00 426.30
JUMLAH TENAGA KERJA 13,519.80
B. BAHAN
Kusen Alumunium 3 inch Coklat m 1.1000 92,111.25 101,322.38
Skrup fixer buah 2.0000 2,344.65 4,689.30
Sealant tube 0.0600 38,798.38 2,327.90
JUMLAH HARGA BAHAN 108,339.58
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 121,859.38
E. Profit 15% *D 18,278.91
F. Harga Satuan Pekerjaan (D+E) 140,138.28

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0085 203,000.00 1,725.50
Mandor L,04 OH 0.0042 203,000.00 852.60
JUMLAH TENAGA KERJA 26,735.10
B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Alumunium strip m 14.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56
JUMLAH HARGA BAHAN 507,318.06
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 534,317.06
E. Profit 15% *D 80,147.56
F. Harga Satuan Pekerjaan (D+E) 614,464.62

A. 4.2.1.13. ck Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56
Kaca bening tebal 5 mm m2 1.1000 147,936.25 162,729.88
JUMLAH HARGA BAHAN 670,047.94
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,046.94
E. Profit 15% *D 104,557.04
F. Harga Satuan Pekerjaan (D+E) 801,603.98

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang khusus aluminium L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Venetion blinds m2 1.0000 90,324.85 90,324.85
JUMLAH HARGA BAHAN 90,324.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 200,553.85
E. Profit 15% *D 30,083.08
F. Harga Satuan Pekerjaan (D+E) 230,636.93

A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 121,800.00 203,406.00
Tukang las konstruksi L.02 OH 1.6700 162,400.00 271,208.00
Kepala tukang L.03 OH 0.1670 203,000.00 33,901.00
Mandor L,04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 525,364.00
B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 10,048.50 62,069.58
Pengelasan cm 27.0800 206.25 5,585.25

JUMLAH HARGA BAHAN 67,654.83


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 593,018.83
E. Profit 15% *D 88,952.83
F. Harga Satuan Pekerjaan (D+E) 681,971.66

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 31,465.00


B. BAHAN
Kawat nyamuk logam m2 1.1000 26,516.88 29,168.56
Pengelasan cm 11.1100 206.25 2,291.44
Besi strip 2 x 3 cm kg 1.7160 10,048.50 17,243.23

JUMLAH HARGA BAHAN 48,703.23


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 80,168.23
E. Profit 15% *D 12,025.23
F. Harga Satuan Pekerjaan (D+E) 92,193.46

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Jendela nako (kerangka + kaca 5 mm) m2 1.1000 187,795.30 206,574.83
Paku sekrup 1 cm -2,5 cm buah 10.0000 26,423.83 264,238.33
Besi strip 2 x 3 cm m 7.0000 10,048.50 70,339.50

JUMLAH HARGA BAHAN 541,152.66


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 602,255.66
E. Profit 15% *D 90,338.35
F. Harga Satuan Pekerjaan (D+E) 692,594.01

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Seng plat BJLS 27 uk. 0.9 x 1.83 (m) m 1.0500 55,825.00 58,616.25
Paku sekrup 1 cm -2,5 cm kg 0.0150 26,423.83 396.36
Kayu gergajian kelas III, papan m3 0.0190 2,535,470.00 48,173.93
JUMLAH HARGA BAHAN 107,186.54
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 168,289.54
E. Profit 15% *D 25,243.43
F. Harga Satuan Pekerjaan (D+E) 193,532.97

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang besi L.02 OH 0.3000 162,400.00 48,720.00
Kepala tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L,04 OH 0.0080 203,000.00 1,624.00

JUMLAH TENAGA KERJA 74,704.00


B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) m 1.0500 44,660.00 46,893.00
Paku sekrup 1 cm -2,5 cm kg 0.0100 26,423.83 264.24
Besi strip 2 x 3 cm m3 0.5000 10,048.50 5,024.25

JUMLAH HARGA BAHAN 52,181.49


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 126,885.49
E. Profit 15% *D 19,032.82
F. Harga Satuan Pekerjaan (D+E) 145,918.31

A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Besi L.02 OH 0.2500 162,400.00 40,600.00
Kepala tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L,04 OH 0.0130 203,000.00 2,639.00

JUMLAH TENAGA KERJA 78,764.00


B. BAHAN
Besi Hollow 40x40 mm t : 1,8mm m 3.5000 9,769.38 34,192.81
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,769.38 9,769.38

JUMLAH HARGA BAHAN 43,962.19


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 122,726.19
E. Profit 15% *D 18,408.93
F. Harga Satuan Pekerjaan (D+E) 141,135.12

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Besi Hollow 40 x 40 x 1.8 mm x 6 Meter m 4.0000 9,625.00 38,500.00
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,625.00 9,625.00

JUMLAH HARGA BAHAN 48,125.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 158,354.00
E. Profit 15% *D 23,753.10
F. Harga Satuan Pekerjaan (D+E) 182,107.10

A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien (Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 121,800.00 89,401.20
Tukang Besi L.02 OH 0.734 162,400.00 119,201.60
Kepala tukang L.03 OH 0.073 203,000.00 14,900.20
Mandor L,04 OH 0.037 203,000.00 7,450.10

JUMLAH TENAGA KERJA 230,953.10


B. BAHAN
Baja ringan canai dingin C75 Kg 3.0650 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.22. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 121,800.00 92,616.72
Tukang Besi L.02 OH 0.7604 162,400.00 123,488.96
Kepala tukang L.03 OH 0.0760 203,000.00 15,428.00
Mandor L,04 OH 0.0380 203,000.00 7,714.00

JUMLAH TENAGA KERJA 239,247.68


B. BAHAN
Baja ringan canai dingin C75 Kg 4.0500 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.1. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 115,710.00
B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 43.5000 1,627.00 70,774.50
Pasir pasang m3 0.0800 150,000.00 12,000.00
JUMLAH HARGA BAHAN 277,380.45
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 393,090.45
E. Profit 15% *D 58,963.57
F. Harga Satuan Pekerjaan (D+E) 452,054.02

A. 4.4.1.1. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 43.5000 1,627.00 70,774.50
Pasir pasang m3 0.0800 150,000.00 12,000.00

JUMLAH HARGA BAHAN 280,574.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 396,284.50
E. Profit 15% *D 59,442.67
F. Harga Satuan Pekerjaan (D+E) 455,727.18

A. 4.4.1.2. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 32.9500 1,627.00 53,609.65
Pasir pasang m3 0.0910 150,000.00 13,650.00

C. PERALATAN JUMLAH HARGA BAHAN 261,865.60


- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 377,575.60
E. Profit 15% *D 56,636.34
F. Harga Satuan Pekerjaan (D+E) 434,211.94

A. 4.4.1.2.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 32.9500 1,627.00 53,609.65
Pasir pasang m3 0.0910 150,000.00 13,650.00

JUMLAH HARGA BAHAN 265,059.65


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 380,769.65
E. Profit 15% *D 57,115.45
F. Harga Satuan Pekerjaan (D+E) 437,885.10

A. 4.4.1.3. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 4PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 26.5500 1,627.00 43,196.85
Pasir pasang m3 0.0930 150,000.00 13,950.00

C. PERALATAN JUMLAH HARGA BAHAN 251,752.80


- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 367,462.80
E. Profit 15% *D 55,119.42
F. Harga Satuan Pekerjaan (D+E) 422,582.22

A. 4.4.1.3.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 26.5500 1,627.00 43,196.85
Pasir pasang m3 0.0930 150,000.00 13,950.00

JUMLAH HARGA BAHAN 254,946.85


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 370,656.85
E. Profit 15% *D 55,598.53
F. Harga Satuan Pekerjaan (D+E) 426,255.38

A. 4.4.1.4. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 22.2200 1,627.00 36,151.94
Pasir pasang m3 0.1020 150,000.00 15,300.00

JUMLAH HARGA BAHAN 246,057.89


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 361,767.89
E. Profit 15% *D 54,265.18
F. Harga Satuan Pekerjaan (D+E) 416,033.07

A. 4.4.1.4.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 22.2200 1,627.00 36,151.94
Pasir pasang m3 0.1020 150,000.00 15,300.00

JUMLAH HARGA BAHAN 249,251.94


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 364,961.94
E. Profit 15% *D 54,744.29
F. Harga Satuan Pekerjaan (D+E) 419,706.23

A. 4.4.1.5. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 18.5000 1,627.00 30,099.50
Pasir pasang m3 0.1220 150,000.00 18,300.00

JUMLAH HARGA BAHAN 243,005.45


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 358,715.45
E. Profit 15% *D 53,807.32
F. Harga Satuan Pekerjaan (D+E) 412,522.77

A. 4.4.1.5.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 18.5000 1,627.00 30,099.50
Pasir pasang m3 0.1220 150,000.00 18,300.00

JUMLAH HARGA BAHAN 246,199.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 361,909.50
E. Profit 15% *D 54,286.42
F. Harga Satuan Pekerjaan (D+E) 416,195.93

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 10.0800 1,627.00 16,400.16
Kapur padam m3 0.0275 79,092.86 2,175.05
Pasir pasang m3 0.0925 150,000.00 13,875.00

JUMLAH HARGA BAHAN 230,250.21


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 345,960.21
E. Profit 15% *D 51,894.03
F. Harga Satuan Pekerjaan (D+E) 397,854.25

A. 4.4.1.7. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 18.9500 1,627.00 30,831.65
Pasir pasang m3 0.0380 150,000.00 5,700.00

JUMLAH HARGA BAHAN 133,834.63


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 191,689.63
E. Profit 15% *D 28,753.44
F. Harga Satuan Pekerjaan (D+E) 220,443.07

A. 4.4.1.7.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 18.9500 1,627.00 30,831.65
Pasir pasang m3 0.0380 150,000.00 5,700.00

JUMLAH HARGA BAHAN 135,431.65


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 193,286.65
E. Profit 15% *D 28,993.00
F. Harga Satuan Pekerjaan (D+E) 222,279.65

A. 4.4.1.8. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien (Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 14.3700 1,627.00 23,379.99
Pasir pasang m3 0.0400 150,000.00 6,000.00

JUMLAH HARGA BAHAN 126,682.97


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,537.97
E. Profit 15% *D 27,680.69
F. Harga Satuan Pekerjaan (D+E) 212,218.66

A. 4.4.1.8.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 14.3700 1,627.00 23,379.99
Pasir pasang m3 0.0400 150,000.00 6,000.00

JUMLAH HARGA BAHAN 128,279.99


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,134.99
E. Profit 15% *D 27,920.25
F. Harga Satuan Pekerjaan (D+E) 214,055.24

A. 4.4.1.9. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 11.5000 1,627.00 18,710.50
Pasir pasang m3 0.0430 150,000.00 6,450.00

JUMLAH HARGA BAHAN 122,463.48


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 180,318.48
E. Profit 15% *D 27,047.77
F. Harga Satuan Pekerjaan (D+E) 207,366.25

A. 4.4.1.9. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 11.5000 1,627.00 18,710.50
Pasir pasang m3 0.0430 150,000.00 6,450.00

JUMLAH HARGA BAHAN 124,060.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 181,915.50
E. Profit 15% *D 27,287.33
F. Harga Satuan Pekerjaan (D+E) 209,202.83

A. 4.4.1.10. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 5PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00

JUMLAH HARGA BAHAN 119,802.34


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 177,657.34
E. Profit 15% *D 26,648.60
F. Harga Satuan Pekerjaan (D+E) 204,305.94

A. 4.4.1.10.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00

JUMLAH HARGA BAHAN 121,399.36


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 179,254.36
E. Profit 15% *D 26,888.15
F. Harga Satuan Pekerjaan (D+E) 206,142.51

A. 4.4.1.11. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0490 150,000.00 7,350.00

JUMLAH HARGA BAHAN 118,189.62


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 176,044.62
E. Profit 15% *D 26,406.69
F. Harga Satuan Pekerjaan (D+E) 202,451.31

A. 4.4.1.11.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0490 150,000.00 7,350.00

JUMLAH HARGA BAHAN 119,786.64


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 177,641.64
E. Profit 15% *D 26,646.25
F. Harga Satuan Pekerjaan (D+E) 204,287.89

A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 6.5000 1,627.00 10,575.50
Pasir pasang m3 0.0500 150,000.00 7,500.00

JUMLAH HARGA BAHAN 116,975.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 174,830.50
E. Profit 15% *D 26,224.58
F. Harga Satuan Pekerjaan (D+E) 201,055.08

A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 4.5000 1,627.00 7,321.50
Kapur padam m3 0.0150 #N/A #N/A
Pasir pasang m3 0.0500 150,000.00 7,500.00

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.14. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 1PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen merah m3 0.0180 #N/A #N/A
Kapur padam m3 0.0180 #N/A #N/A
Pasir pasang m3 0.0180 150,000.00 2,700.00

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.15. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen merah m3 0.0140 #N/A #N/A
Kapur padam m3 0.0140 #N/A #N/A
Pasir pasang m3 0.0280 150,000.00 4,200.00

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.16. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 73,689.00


B. BAHAN
HB - 20 buah 12.5000 #N/A #N/A
Semen portland kg 30.3200 1,627.00 49,330.64
Pasir pasang m3 0.7280 150,000.00 109,200.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.17. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00

Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00

Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 73,689.00


B. BAHAN
HB - 20 buah 12.5000 #N/A #N/A
Semen portland kg 24.2600 1,627.00 39,471.02
Pasir pasang m3 0.7720 150,000.00 115,800.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.18. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

Pekerja L.01 OH 0.3200 121,800.00 38,976.00

Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00


Kepala tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L,04 OH 0.0160 203,000.00 3,248.00

JUMLAH TENAGA KERJA 64,148.00


B. BAHAN
HB - 15 buah 12.5000 #N/A #N/A
Semen portland kg 22.7400 1,627.00 36,997.98
Pasir pasang m3 0.5500 150,000.00 82,500.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.19. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 121,800.00 38,976.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L,04 OH 0.0160 203,000.00 3,248.00

JUMLAH TENAGA KERJA 64,148.00


B. BAHAN
HB - 15 buah 12.5000 #N/A #N/A
Semen portland kg 18.2000 1,627.00 29,611.40
Pasir pasang m3 0.5820 150,000.00 87,300.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.20. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
HB - 10 buah 12.5000 #N/A #N/A
Semen portland kg 15.1600 1,627.00 24,665.32
Pasir pasang m3 0.3640 150,000.00 54,600.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.21. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
HB - 10 buah 12.5000 #N/A #N/A
Semen portland kg 12.1300 1,627.00 19,735.51
Pasir pasang m3 0.3880 150,000.00 58,200.00
Besi angker 8 mm kg 0.2800 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23.ck Pemasangan 1 m2 dinding terawang (rooster) 20x20 cm, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 20x20 (cm) buah 25.0000 15,072.75 376,818.75
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 399,965.75


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 457,820.75
E. Profit 15% *D 68,673.11
F. Harga Satuan Pekerjaan (D+E) 526,493.86

A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 66,990.00


B. BAHAN
Batu bata berongga uk. 5x11x24 (cm) buah 70.0000 1,563.10 109,417.00
Semen portland kg 14.0000 1,627.00 22,778.00
Pasir pasang m3 0.0320 150,000.00 4,800.00

JUMLAH HARGA BAHAN 136,995.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 203,985.00
E. Profit 15% *D 30,597.75
F. Harga Satuan Pekerjaan (D+E) 234,582.75

A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 105,966.00


B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 8,708.70 73,153.08
Semen Mortar kg 0.4730 7,458.22 3,527.74

JUMLAH HARGA BAHAN 76,680.82


C. PERALATAN

%
Peralatan 10.0000 766.81 7,668.08
(bahan)

JUMLAH HARGA ALAT 7,668.08


D. Jumlah (A+B+C) 190,314.90
E. Profit 15% *D 28,547.23
F. Harga Satuan Pekerjaan (D+E) 218,862.13

A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 121,800.00 81,727.80
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 106,087.80


B. BAHAN
Bata Ringan 10x20x60cm m3 8.4000 11,165.00 93,786.00
Semen Mortar kg 0.0630 7,458.22 469.87

JUMLAH HARGA BAHAN 94,255.87


C. PERALATAN

%
Peralatan 10.0000 942.56 9,425.59
(bahan)

JUMLAH HARGA ALAT 9,425.59


D. Jumlah (A+B+C) 209,769.25
E. Profit 15% *D 31,465.39
F. Harga Satuan Pekerjaan (D+E) 241,234.64
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00

B. BAHAN
Semen portland Kg 15.5040 1,627.00 25,225.01
Pasir pasang m3 0.0160 150,000.00 2,400.00
JUMLAH HARGA BAHAN 27,625.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 94,615.01
E. Profit 15% *D 14,192.25
F. Harga Satuan Pekerjaan (D+E) 108,807.26

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 10.2240 1,627.00 16,634.45
Pasir pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 19,634.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,624.45
E. Profit 15% *D 12,993.67
F. Harga Satuan Pekerjaan (D+E) 99,618.12

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 7.7760 1,627.00 12,651.55
Pasir pasang m3 0.0230 150,000.00 3,450.00
JUMLAH HARGA BAHAN 16,101.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,091.55
E. Profit 15% *D 12,463.73
F. Harga Satuan Pekerjaan (D+E) 95,555.28

A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.2400 1,627.00 10,152.48
Pasir pasang m3 0.0240 150,000.00 3,600.00
JUMLAH HARGA BAHAN 13,752.48
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 80,742.48
E. Profit 15% *D 12,111.37
F. Harga Satuan Pekerjaan (D+E) 92,853.85

A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,324.37
E. Profit 15% *D 11,898.66
F. Harga Satuan Pekerjaan (D+E) 91,223.02

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 4.4160 1,627.00 7,184.83
Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 11,234.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,224.83
E. Profit 15% *D 11,733.72
F. Harga Satuan Pekerjaan (D+E) 89,958.56

A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.9360 1,627.00 6,403.87
Pasir pasang m3 0.0280 150,000.00 4,200.00
JUMLAH HARGA BAHAN 10,603.87
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 77,593.87
E. Profit 15% *D 11,639.08
F. Harga Satuan Pekerjaan (D+E) 89,232.95

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.4560 1,627.00 5,622.91
Pasir pasang m3 0.0290 150,000.00 4,350.00
JUMLAH HARGA BAHAN 9,972.91
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,962.91
E. Profit 15% *D 11,544.44
F. Harga Satuan Pekerjaan (D+E) 88,507.35

A. 4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP :3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 5.7600 1,627.00 9,371.52
2. KP m3 0.0030 #N/A #N/A
Pasir pasang m3 0.0130 150,000.00 1,950.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP :8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 3.0000 1,627.00 4,881.00
2. KP m3 0.0050 #N/A #N/A
Pasir pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP :1PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland m3 0.0090 1,627.00 14.64
2. KP m3 0.0090 #N/A #N/A
Pasir pasang m3 0.0090 150,000.00 1,350.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 0.0070 1,627.00 11.39
2. KP m3 0.0070 #N/A #N/A
Pasir pasang m3 0.0150 150,000.00 2,250.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 13.6320 1,627.00 22,179.26
Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 26,229.26
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 115,955.26
E. Profit 15% *D 17,393.29
F. Harga Satuan Pekerjaan (D+E) 133,348.55

A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 70,847.00
B. BAHAN
Semen portland Kg 10.3680 1,627.00 16,868.74
Pasir pasang m3 0.0310 150,000.00 4,650.00
JUMLAH HARGA BAHAN 21,518.74
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 92,365.74
E. Profit 15% *D 13,854.86
F. Harga Satuan Pekerjaan (D+E) 106,220.60

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 18,336.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 108,062.64
E. Profit 15% *D 16,209.40
F. Harga Satuan Pekerjaan (D+E) 124,272.04

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 6.9120 1,627.00 11,245.82
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 16,495.82
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 106,221.82
E. Profit 15% *D 15,933.27
F. Harga Satuan Pekerjaan (D+E) 122,155.10

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 5.8880 1,627.00 9,579.78
Pasir pasang m3 0.0360 150,000.00 5,400.00
JUMLAH HARGA BAHAN 14,979.78
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 104,705.78
E. Profit 15% *D 15,705.87
F. Harga Satuan Pekerjaan (D+E) 120,411.64

A. 4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4400 121,800.00 53,592.00
Tukang Batu L.03 OH 0.2200 162,400.00 35,728.00
Kepala Tukang L.03 OH 0.0220 203,000.00 4,466.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 98,252.00
B. BAHAN
Semen portland m3 0.0090 1,627.00 14.64
2. KP m3 0.0090 #N/A #N/A
Pasir pasang m3 0.0180 150,000.00 2,700.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 46,032.37
E. Profit 15% *D 6,904.86
F. Harga Satuan Pekerjaan (D+E) 52,937.22

A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu L.03 OH 0.4000 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.0400 203,000.00 8,120.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 83,636.00
B. BAHAN
Semen portland Kg 0.5000 1,627.00 813.50
Pasir pasang m3 0.0130 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,763.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,399.50
E. Profit 15% *D 12,959.93
F. Harga Satuan Pekerjaan (D+E) 99,359.43

A. 4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 121,800.00 54,810.00
Tukang Batu L.03 OH 0.2250 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.0230 203,000.00 4,669.00
Mandor L.04 OH 0.0230 203,000.00 4,669.00
JUMLAH TENAGA KERJA 100,688.00
B. BAHAN
Semen portland Kg 10.0000 1,627.00 16,270.00
Batu granit Kg 15.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 121,800.00 54,810.00
Tukang Batu L.03 OH 0.2250 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.0230 203,000.00 4,669.00
Mandor L.04 OH 0.0230 203,000.00 4,669.00
JUMLAH TENAGA KERJA 100,688.00
B. BAHAN
Semen portland Kg 10.0000 1,627.00 16,270.00
Serbuk Batu Traso Kg 15.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Semen portland Kg 4.3200 1,627.00 7,028.64
Pasir pasang Kg 0.0060 150,000.00 900.00
JUMLAH HARGA BAHAN 7,928.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,783.64
E. Profit 15% *D 9,867.55
F. Harga Satuan Pekerjaan (D+E) 75,651.19

A. 4.4.2.24. Pemasangan 1 m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 3.1080 1,627.00 5,056.72
JUMLAH HARGA BAHAN 5,056.72
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 38,754.72
E. Profit 15% *D 5,813.21
F. Harga Satuan Pekerjaan (D+E) 44,567.92

A. 4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Batu L.03 OH 0.0350 162,400.00 5,684.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Semen portland Kg 1.6000 1,627.00 2,603.20
JUMLAH HARGA BAHAN 2,603.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 18,437.20
E. Profit 15% *D 2,765.58
F. Harga Satuan Pekerjaan (D+E) 21,202.78

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.3400 1,627.00 10,315.18
Pasir pasang m3 0.0120 150,000.00 1,800.00
JUMLAH HARGA BAHAN 12,115.18
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,105.18
E. Profit 15% *D 11,865.78
F. Harga Satuan Pekerjaan (D+E) 90,970.96

A. 4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Semen portland Kg 3.2500 1,627.00 5,287.75
JUMLAH HARGA BAHAN 5,287.75
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 49,947.75
E. Profit 15% *D 7,492.16
F. Harga Satuan Pekerjaan (D+E) 57,439.91

A. 4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - 121,800.00 -
Tukang Batu L.03 OH - 162,400.00 -
Kepala Tukang L.03 OH - 203,000.00 -
Mandor L.04 OH - 203,000.00 -
JUMLAH TENAGA KERJA -
B. BAHAN
Semen Mortar Kg - 7,458.22 -
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) -
E. Profit 15% *D -
F. Harga Satuan Pekerjaan (D+E) -

A. 4.4.2.29. Pemasangan 1 m2 plesteran acian dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - 121,800.00 -
Tukang Batu L.03 OH - 162,400.00 -
Kepala Tukang L.03 OH - 203,000.00 -
Mandor L.04 OH - 203,000.00 -
JUMLAH TENAGA KERJA -
B. BAHAN
Mortar Kg - #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A. 4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin abu-abu Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin abu-abu Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 121,800.00 32,886.00
Tukang Batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0140 203,000.00 2,842.00
Mandor L.04 OH 0.0140 203,000.00 2,842.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Ubin abu-abu 20 x 20 (cm) Bh 26.5000 7,257.25 192,317.13
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 215,987.93
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 276,481.93
E. Profit 15% *D 41,472.29
F. Harga Satuan Pekerjaan (D+E) 317,954.21

A. 4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin warna Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Semen warna (sika graut) Kg 1.3000 22,250.00 28,925.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 58,058.00
B. BAHAN
Ubin warna Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 121,800.00 32,886.00
Tukang Batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0140 203,000.00 2,842.00
Mandor L.04 OH 0.0140 203,000.00 2,842.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Ubin berwarna 20 x 20 (cm) Bh 26.5000 9,825.20 260,367.80
Semen portland Kg 10.4000 1,627.00 16,920.80
Semen warna (sika graut) Kg 1.0000 22,250.00 22,250.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 306,288.60
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 366,782.60
E. Profit 15% *D 55,017.39
F. Harga Satuan Pekerjaan (D+E) 421,799.99

A. 4.4.3.7. Pemasangan 1 m2 lantai ubin traso ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin traso Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Semen warna (sika graut) Kg 1.3000 22,250.00 28,925.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.8. Pemasangan 1 m2 lantai ubin traso ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 58,058.00
B. BAHAN
Ubin traso Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin granit Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Semen warna (sika graut) Kg 1.3000 22,250.00 28,925.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 58,058.00
B. BAHAN
Ubin granit Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.11. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin teralux Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Semen warna (sika graut) Kg 1.3000 22,250.00 28,925.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.12. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 58,058.00
B. BAHAN
Ubin teralux Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.13. Pemasangan 1 m2 lantai ubin Keramik ukuran 60cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 60x60 (cm) putih/ berwarna granit Bh 3.1000 #N/A #N/A
Semen portland Kg 9.6000 1,627.00 15,619.20
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 56,028.00
B. BAHAN
Ubin teralux marmer Bh 6.6300 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Semen warna (sika graut) Kg 1.3000 22,250.00 28,925.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala Tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 58,058.00
B. BAHAN
Ubin teralux marmer Bh 11.8700 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.16. Pemasangan 1 m1plint ubin PC abu-abu ukuran 15cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin PC Bh 5.3000 #N/A #N/A
Semen portland Kg 1.6500 1,627.00 2,684.55
Pasir pasang m3 0.0040 150,000.00 600.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.17. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin PC Bh 3.5300 #N/A #N/A
Semen portland Kg 1.2400 1,627.00 2,017.48
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.18. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin PC Bh 2.6500 #N/A #N/A
Semen portland Kg 1.2400 1,627.00 2,017.48
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.19. Pemasangan 1 m1 plint ubin warna ukuran 10cm x20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin warna Bh 5.3000 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1500 22,250.00 3,337.50
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.20. Pemasangan 1 m1 plint ubin warna ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin warna Bh 3.5300 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.21. Pemasangan 1 m1 plint ubin warna ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin warna Bh 2.6500 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.22. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin teraso Bh 3.5300 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.23. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin teraso Bh 2.6500 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.24. Pemasangan 1 m1 plint ubin granit ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin granit Bh 3.5300 #N/A #N/A
Semen Portlan Kg 1.1400 #N/A #N/A
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.25. Pemasangan 1 m1 plint ubin granit ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint ubin granit Bh 2.6500 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.26. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint teralux kerang Bh 3.5300 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.27. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint teralux kerang Bh 2.6300 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.28. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint teralux marmer Bh 3.5300 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.29. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint teralux marmer Bh 2.6500 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.30. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Plint teralux marmer Bh 1.7000 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
Pasir pasang m3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.02 OH 0.1800 162,400.00 29,232.00
Kepala Tukang L.03 OH 0.0180 203,000.00 3,654.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 80,388.00
B. BAHAN
Teraso cor m3 0.0360 #N/A #N/A
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik Bh 106.0000 #N/A #N/A
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik Bh 53.0000 #N/A #N/A
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 33cm x 33cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik doos 1.0500 #N/A #N/A
Semen Portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.5000 22,250.00 11,125.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.35.ck Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 40x40 (cm) polos doos 1.0500 58,333.33 61,250.00
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 117,645.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 171,237.00
E. Profit 15% *D 25,685.55
F. Harga Satuan Pekerjaan (D+E) 196,922.55
A. 4.4.3.35. ck Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 30x30 (cm) polos doos 1.0500 59,286.15 62,250.46
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 118,645.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 172,237.46
E. Profit 15% *D 25,835.62
F. Harga Satuan Pekerjaan (D+E) 198,073.08
A. 4.4.3.36. ck Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik KM/WC antislip 20x20 (cm) doos 1.0500 65,076.00 68,329.80
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.5000 22,250.00 11,125.00
JUMLAH HARGA BAHAN 103,125.60
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 156,717.60
E. Profit 15% *D 23,507.64
F. Harga Satuan Pekerjaan (D+E) 180,225.24

A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Batu L.02 OH 0.5250 162,400.00 85,260.00
Kepala Tukang L.03 OH 0.0530 203,000.00 10,759.00
Mandor L.04 OH 0.0530 203,000.00 10,759.00
JUMLAH TENAGA KERJA 234,668.00
B. BAHAN
Ubin keramik Bh 33.0000 #N/A #N/A
Semen portland Kg 9.8000 1,627.00 15,944.60
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 4.3700 22,250.00 97,232.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik Bh 11.8700 #N/A #N/A
Semen portland Kg 14.1500 1,627.00 23,022.05
Pasir pasang m3 0.0390 150,000.00 5,850.00
Semen warna (sika graut) Kg 2.0000 22,250.00 44,500.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint Keramik 10 x 30 cm (Polos) Bh 10.6000 8,932.00 94,679.20
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0500 22,250.00 1,112.50
JUMLAH HARGA BAHAN 98,096.48
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 131,794.48
E. Profit 15% *D 19,769.17
F. Harga Satuan Pekerjaan (D+E) 151,563.65

A. 4.4.3.39.ck Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint keramik 10x40 Cm ( polos) Bh 5.3000 3,645.83 19,322.92
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0250 22,250.00 556.25
JUMLAH HARGA BAHAN 22,183.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,881.95
E. Profit 15% *D 8,382.29
F. Harga Satuan Pekerjaan (D+E) 64,264.24

A. 4.4.3.40. Pemasangan 1 m1 plint keramik ukuran 10cm x 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint keramik Bh 5.3000 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0250 22,250.00 556.25
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.41. Pemasangan 1 m1 plint keramik ukuran 5cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint keramik Bh 5.3000 #N/A #N/A
Semen portland Kg 0.5700 1,627.00 927.39
Pasir pasang m3 0.0015 150,000.00 225.00
Semen warna (sika graut) Kg 0.0130 22,250.00 289.25
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.41. Pemasangan 1 m1 plint internal cove artistik 5cm x 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7500 121,800.00 91,350.00
Tukang Batu L.02 OH 0.7500 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.0750 203,000.00 15,225.00
Mandor L.04 OH 0.0380 203,000.00 7,714.00
JUMLAH TENAGA KERJA 236,089.00
B. BAHAN
Plint keramik Bh 5.3000 #N/A #N/A
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.1000 22,250.00 2,225.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.42. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Marmer 100 x 100 cm Bh 1.0600 279,125.00 295,872.50
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.1340 22,250.00 2,981.50
JUMLAH HARGA BAHAN 318,929.13
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 475,239.13
E. Profit 15% *D 71,285.87
F. Harga Satuan Pekerjaan (D+E) 546,525.00

A. 4.4.3.43. Pemasangan 1 m2 lantai karpet


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1700 121,800.00 20,706.00
Tukang Batu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Karpet m2 1.0500 #N/A #N/A
Lem (standar aica aibond) Kg 0.3500 31,634.17 11,071.96
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.44. Pemasangan 1 m2 underlayer ( pelapis bawah karpet )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Underlayer m2 1.0500 #N/A #N/A
Lem (standar aica aibond) Kg 0.3500 31,634.17 11,071.96
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.45. Pemasangan 1 m2 lantai parquet kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Parquette lantai m2 1.0500 116,674.25 122,507.96
Lem (standar aica aibond) Kg 0.6000 31,634.17 18,980.50
JUMLAH HARGA BAHAN 141,488.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,798.46
E. Profit 15% *D 44,669.77
F. Harga Satuan Pekerjaan (D+E) 342,468.23

A. 4.4.3.46. Pemasangan 1 m2 lantai kayu gymfloor


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Parquette lantai m2 1.0500 116,674.25 122,507.96
Lem (standar aica aibond) Kg 0.6000 31,634.17 18,980.50
JUMLAH HARGA BAHAN 141,488.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,798.46
E. Profit 15% *D 44,669.77
F. Harga Satuan Pekerjaan (D+E) 342,468.23

A. 4.4.3.47. Pemasangan 1 m2 dinding porslen 11cmx 11cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 223,300.00
B. BAHAN
Poerslen doos 1.0500 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Kg 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.48. Pemasangan 1 m2 dinding porslen 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Poerslen Bh 53.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.49. Pemasangan 1 m2 dinding porslen 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Poerslen Bh 26.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 1.9400 22,250.00 43,165.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.50. Pemasangan 1 m2 dinding keramik artistik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik artistik Bh 53.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik artistik Bh 104.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 2.9000 22,250.00 64,525.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.52. Pemasangan 1 m2 dinding keramik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik artistik Bh 52.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.53. Pemasangan 1 m2 dinding keramik 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik Bh 26.0000 #N/A #N/A
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 1.9400 22,250.00 43,165.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.54. ck Pemasangan 1 m2 dinding keramik 20cmx 25cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik 20x25 (cm) polos Bh 20.0000 3,200.00 64,000.00
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 1.9400 22,250.00 43,165.00
JUMLAH HARGA BAHAN 124,996.10
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 325,966.10
E. Profit 15% *D 48,894.91
F. Harga Satuan Pekerjaan (D+E) 374,861.01

A. 4.4.3.55. Pemasangan 1 m2 dinding marmer 100cmx 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.3000 121,800.00 158,340.00
Tukang Batu L.02 OH 0.6500 162,400.00 105,560.00
Kepala Tukang L.03 OH 0.0650 203,000.00 13,195.00
Mandor L.04 OH 0.0650 203,000.00 13,195.00
JUMLAH TENAGA KERJA 290,290.00
B. BAHAN
Marmer Bh 1.0600 #N/A #N/A
Semen portland Kg 12.4400 1,627.00 20,239.88
Pasir pasang m3 0.0250 150,000.00 3,750.00
Semen warna (sika graut) Kg 0.6500 22,250.00 14,462.50
Paku 12cm Bh 3.0300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.55. Pemasangan 1 m2 dinding bata pelapis 3cmx 7cmx 24cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 223,300.00
B. BAHAN
Bata pelapis Bh 63.0000 #N/A #N/A
Semen portland Kg 12.4400 1,627.00 20,239.88
Pasir pasang m3 0.0250 150,000.00 3,750.00
Semen warna (sika graut) Kg 2.7500 22,250.00 61,187.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.56. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu paras Bh 1.1000 174,174.00 191,591.40
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 215,958.65
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 372,268.65
E. Profit 15% *D 55,840.30
F. Harga Satuan Pekerjaan (D+E) 428,108.95

A. 4.4.3.57. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu alam m2 1.1000 200,970.00 221,067.00
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 245,434.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 401,744.25
E. Profit 15% *D 60,261.64
F. Harga Satuan Pekerjaan (D+E) 462,005.89

A. 4.4.3.58. Pemasangan 1 m2 lantai vynil ukuran 30cmx 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 47,299.00
B. BAHAN
Vynil Bh 11.8700 #N/A #N/A
Lem Kg 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.59. Pemasangan 1 m2 wallpaper lebar 50cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Batu L.02 OH 0.1750 162,400.00 28,420.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 74,907.00
B. BAHAN
Wallpaper polos m 2.2000 42,371.18 93,216.59
Lem (standar Fox)/ perekat Kg 0.2500 25,902.80 6,475.70
JUMLAH HARGA BAHAN 99,692.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 174,599.29
E. Profit 15% *D 26,189.89
F. Harga Satuan Pekerjaan (D+E) 200,789.18

A. 4.4.3.60. Pemasangan 1 m2 floor harderner


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Floor harderner Kg 5.0000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.61. Pemasangan 1 m1 plint vynil 15cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu L.02 OH 0.0800 162,400.00 12,992.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 25,172.00
B. BAHAN
Vynil Bh 3.1000 #N/A #N/A
Lem Kg 0.0800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.62. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0030 3,534,693.04 10,604.08
Paku sekrup (kg) Kg 0.0500 49,126.00 2,456.30
JUMLAH HARGA BAHAN 13,060.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 50,818.38
E. Profit 15% *D 7,622.76
F. Harga Satuan Pekerjaan (D+E) 58,441.14

A. 4.4.3.63. Pemasangan 1 m² paving block natural tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 122,063.90
B. BAHAN
Paving block 6 cm m² 1.0100 90,000.00 90,900.00
Pasir beton m3 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 98,400.00
C. PERALATAN
Peralatan % Bahan 10.0000 -
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 220,463.90
E. Profit 15% *D 33,069.59
F. Harga Satuan Pekerjaan (D+E) 253,533.49

A. 4.4.3.64. Pemasangan 1 m² paving block natural tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 121,800.00 60,900.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 152,513.90
B. BAHAN
Paving block 6 cm m² 1.0100 #N/A #N/A
Pasir beton m3 0.0800 150,000.00 12,000.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan % Bahan 10.0000 -
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.65. Pemasangan 1 m² paving block berwarna tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 122,063.90
B. BAHAN
Conblock tebal 6 cm (polos) m² 1.0100 61,266.67 61,879.33
Pasir beton m3 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 69,379.33
C. PERALATAN
Peralatan % 10.0000 -
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 191,443.23
E. Profit 15% *D 28,716.49
F. Harga Satuan Pekerjaan (D+E) 220,159.72

A. 4.4.3.66. Pemasangan 1 m² paving block berwarna tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 121,800.00 60,900.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 152,513.90
B. BAHAN
Paving block warna 8 cm m² 1.0100 75,000.00 75,750.00
Pasir beton m3 0.0800 150,000.00 12,000.00
JUMLAH HARGA BAHAN 87,750.00
C. PERALATAN
Peralatan % Bahan 10.0000 -
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 240,263.90
E. Profit 15% *D 36,039.59
F. Harga Satuan Pekerjaan (D+E) 276,303.49
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 121,800.00 3,654.00
Tukang Kayu L.02 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.0070 203,000.00 1,421.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 17,255.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 5 mm m2 1.1000 30,703.75 33,774.13
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
%
peralatan 10.0000 #N/A #N/A
Bahan
JUMLAH HARGA ALAT #N/A
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x 30 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Kayu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Akustik Lembar 12.0000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x60 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Kayu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Akustik Lembar 5.8000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran ( 60 x 120 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Akustik Lembar 1.5000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72

A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 251,720.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0150 3,036,293.94 45,544.41
Paku berbagai ukuran (2"-5") Kg 0.0100 17,287.99 172.88
JUMLAH HARGA BAHAN 45,717.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,437.29
E. Profit 15% *D 44,615.59
F. Harga Satuan Pekerjaan (D+E) 342,052.88

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39
A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 121,800.00 60,900.00
Tukang Besi L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0250 203,000.00 5,075.00
JUMLAH TENAGA KERJA 157,325.00
B. BAHAN
Profil Allum "T" m 3.6000 #N/A #N/A
Kawat dia 4mm Kg 0.1500 #N/A #N/A
Dina bolt/ ramset Bh 1.0500 1,876.34 1,970.16
Akustik 60 x 120 Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.9.a Pemasangan 1 m list gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List gypsum m 1.0500 24,510.57 25,736.10
Paku sekrup (kg) Kg 0.0100 49,126.00 491.26
JUMLAH HARGA BAHAN 26,227.36
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 42,061.36
E. Profit 15% *D 6,309.20
F. Harga Satuan Pekerjaan (D+E) 48,370.56

A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List kayu profil m 1.0500 40,007.92 42,008.31
Paku sekrup 1 cm -2,5 cm Kg 0.0100 26,423.83 264.24
JUMLAH HARGA BAHAN 42,272.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 58,106.55
E. Profit 15% *D 8,715.98
F. Harga Satuan Pekerjaan (D+E) 66,822.53

A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40.2mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m1 4.0000 9,625.00 38,500.00
Assesoris (perkuatan, las dll) Ls 100%*rangka 9,625.00 9,625.00
JUMLAH HARGA BAHAN 48,125.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 158,354.00
E. Profit 15% *D 23,753.10
F. Harga Satuan Pekerjaan (D+E) 182,107.10

A. 4.5.1.4.a Pemasangan 1 m2 langit-langit eternit ukuran( 1 x 1 m) tebal 4 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 4 mm Lembar 1.5000 26,433.14 39,649.71
Paku berbagai ukuran (2"-5") Kg 0.0500 17,287.99 864.40
JUMLAH HARGA BAHAN 40,514.11
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,979.11
E. Profit 15% *D 10,796.87
F. Harga Satuan Pekerjaan (D+E) 82,775.97

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0075 203,000.00 1,522.50
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,596.50
B. BAHAN
Genteng palentong Bh 25.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Atap Genteng kodok Bh 25.0000 4,577.65 114,441.25
JUMLAH HARGA BAHAN 114,441.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 148,139.25
E. Profit 15% *D 22,220.89
F. Harga Satuan Pekerjaan (D+E) 170,360.14
A. 4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/ super
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Genteng palentong Bh 12.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.4. Pemasangan 1 m1 bubung genteng palentong


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 85,666.00
B. BAHAN
Genteng bubung Bh 5.0000 #N/A #N/A
Semen portland Kg 8.0000 1,627.00 13,016.00
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 85,666.00
B. BAHAN
Bubungan atap (nok) genteng kodok Bh 5.0000 4,745.13 23,725.63
Semen portland Kg 8.0000 1,627.00 13,016.00
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 41,541.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 127,207.63
E. Profit 15% *D 19,081.14
F. Harga Satuan Pekerjaan (D+E) 146,288.77

A. 4.5.2.6. Pemasangan 1 m1 bubung genteng palentong besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 85,666.00
B. BAHAN
Genteng bubung Bh 4.0000 #N/A #N/A
Semen portland Kg 8.0000 1,627.00 13,016.00
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0670 162,400.00 10,880.80
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 30,774.80
B. BAHAN
Rooflight fibreglass uk. 1,8 x 0,9 (m) Lembar 0.6000 98,810.25 59,286.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 60,553.23
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 91,328.03
E. Profit 15% *D 13,699.20
F. Harga Satuan Pekerjaan (D+E) 105,027.23

A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 0.5000 83,151.34 41,575.67
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 44,366.39
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,846.39
E. Profit 15% *D 11,526.96
F. Harga Satuan Pekerjaan (D+E) 88,373.35

A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 0.6000 73,549.44 44,129.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 46,920.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,400.38
E. Profit 15% *D 11,910.06
F. Harga Satuan Pekerjaan (D+E) 91,310.44

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 0.6000 65,426.90 39,256.14
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 42,046.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 73,308.86
E. Profit 15% *D 10,996.33
F. Harga Satuan Pekerjaan (D+E) 84,305.19

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 0.7500 59,397.80 44,548.35
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 47,339.07
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,601.07
E. Profit 15% *D 11,790.16
F. Harga Satuan Pekerjaan (D+E) 90,391.23

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 102,106.58 35,737.30
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,528.02
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,790.02
E. Profit 15% *D 10,468.50
F. Harga Satuan Pekerjaan (D+E) 80,258.53

A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 91,895.93 38,596.29
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,387.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,649.01
E. Profit 15% *D 10,897.35
F. Harga Satuan Pekerjaan (D+E) 83,546.36

A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 81,685.27 35,941.52
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,732.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,994.24
E. Profit 15% *D 10,499.14
F. Harga Satuan Pekerjaan (D+E) 80,493.37

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 71,474.61 36,452.05
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 39,242.77
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,504.77
E. Profit 15% *D 10,575.72
F. Harga Satuan Pekerjaan (D+E) 81,080.48

A. 4.5.2.15. a Pemasangan 1 m2 atap zincalum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0,4
m 1.0000 68,106.50 68,106.50
mm
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 48,009.50 38,407.60
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,198.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,460.32
E. Profit 15% *D 10,869.05
F. Harga Satuan Pekerjaan (D+E) 83,329.37

A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 0.3700 97,693.75 36,146.69
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,937.41
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,199.41
E. Profit 15% *D 10,529.91
F. Harga Satuan Pekerjaan (D+E) 80,729.32

A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 0.3800 87,924.38 33,411.26
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 36,201.98
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,463.98
E. Profit 15% *D 10,119.60
F. Harga Satuan Pekerjaan (D+E) 77,583.58

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 0.4600 82,621.00 38,005.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 40,796.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,058.38
E. Profit 15% *D 10,808.76
F. Harga Satuan Pekerjaan (D+E) 82,867.14

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 0.4900 73,298.23 35,916.13
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,706.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,968.85
E. Profit 15% *D 10,495.33
F. Harga Satuan Pekerjaan (D+E) 80,464.18

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 0.5700 61,295.85 34,938.63
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 37,729.35
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 68,991.35
E. Profit 15% *D 10,348.70
F. Harga Satuan Pekerjaan (D+E) 79,340.06

A. 4.5.2.22. Pemasangan 1 m1 bubung stel gelombang 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubung stel gelombang Lembar 2.4000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.23. Pemasangan 1 m1 bubung stel gelombang 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubung stel gelombang Lembar 2.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.24. Pemasangan 1 m1 bubung stel gelombang 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubung stel gelombang Lembar 2.0500 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.25. Pemasangan 1 m1 nok paten 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.26. Pemasangan 1 m1 nok paten 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.27. Pemasangan 1 m1 nok paten 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.28. Pemasangan 1 m1 nok stel rata 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 39,991.00
B. BAHAN
Nok paten 92cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.29. Pemasangan 1 m1 nok stel rata 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.1250 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.0130 203,000.00 2,639.00
Mandor L.15 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Nok paten 92cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 6,268.35 68,951.85
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 69,470.49
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 114,130.49
E. Profit 15% *D 17,119.57
F. Harga Satuan Pekerjaan (D+E) 131,250.06

A. 4.5.2.31. Pemasangan 1 m2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.11 OH 0.0030 203,000.00 609.00
Mandor L.15 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 75,719.00
B. BAHAN
Genteng aspal Bh 6.9000 #N/A #N/A
Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar 0.3500 91,553.00 32,043.55
Paku berbagai ukuran (1/2"-1") Kg 0.0300 25,341.59 760.25
Plastic aerator Bh 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 47,500.00 61,750.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 66,818.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 109,651.32
E. Profit 15% *D 16,447.70
F. Harga Satuan Pekerjaan (D+E) 126,099.01

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 47,500.00 95,000.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 100,068.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 142,901.32
E. Profit 15% *D 21,435.20
F. Harga Satuan Pekerjaan (D+E) 164,336.51

A. 4.5.2.34. Pemasangan 1 m2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1660 121,800.00 20,218.80
Tukang Kayu L.03 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.11 OH 0.0250 203,000.00 5,075.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 67,517.80
B. BAHAN
Sirap kayu Bh 30.0000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 89,320.00
B. BAHAN
Bubungan atap (nok) genteng beton Bh 3.5000 7,368.90 25,791.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
Semen portland Kg 10.8000 1,627.00 17,571.60
Pasir pasang m3 0.0320 150,000.00 4,800.00
Semen warna (sika graut) Kg 1.0000 22,250.00 22,250.00
JUMLAH HARGA BAHAN 71,679.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 160,999.83
E. Profit 15% *D 24,149.97
F. Harga Satuan Pekerjaan (D+E) 185,149.80

A. 4.5.2.36. Pemasangan 1 m1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 121,800.00 15,225.00
Tukang Kayu L.03 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.11 OH 0.0250 203,000.00 5,075.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 62,118.00
B. BAHAN
Nok genteng aspal Bh 2.0000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
Kayu balok borneo m3 0.0035 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Kayu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.11 OH 0.0150 203,000.00 3,045.00
Mandor L.15 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Bubungan atap (nok) metal (biasa/ polos) Bh 1.1000 36,286.25 39,914.88
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 41,181.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 101,675.95
E. Profit 15% *D 15,251.39
F. Harga Satuan Pekerjaan (D+E) 116,927.35

A. 4.5.2.38. Pemasangan 1 m1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 121,800.00 15,225.00
Tukang Kayu L.03 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.11 OH 0.0250 203,000.00 5,075.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 62,118.00
B. BAHAN
Seng plat 3 x 6" Lembar 0.4000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
#REF! Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Kayu L.03 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.11 OH 0.0060 203,000.00 1,218.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 26,796.00
B. BAHAN
Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 0.7000 40,194.00 28,135.80
Paku berbagai ukuran (1/2"-1") Kg 0.0200 25,341.59 506.83
JUMLAH HARGA BAHAN 28,642.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,438.63
E. Profit 15% *D 8,315.79
F. Harga Satuan Pekerjaan (D+E) 63,754.43

A. 4.5.2.40. Pemasangan 1 m1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 32,277.00
B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 0.3000 44,660.00 13,398.00
Paku berbagai ukuran (1/2"-1") Kg 0.0400 25,341.59 1,013.66
JUMLAH HARGA BAHAN 14,411.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 46,688.66
E. Profit 15% *D 7,003.30
F. Harga Satuan Pekerjaan (D+E) 53,691.96

A. 4.5.2.41. Pemasangan 1 m2 atap alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.7500 162,400.00 121,800.00
Kepala Tukang L.11 OH 0.0800 203,000.00 16,240.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 157,528.00
B. BAHAN
Atap alumunium Gelombang tebal 0,55 (Galvalum) Lembar 1.0500 69,098.94 72,553.89
Paku hak panj. 15cm Kg 0.0200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.42. Pemasangan 1 m1 nok alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.03 OH 1.0000 162,400.00 162,400.00
Kepala Tukang L.11 OH 0.1000 203,000.00 20,300.00
Mandor L.15 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 205,030.00
B. BAHAN
Bubungan atap (nok) alumunium standar 40 cm, swg.22 Bh 1.2000 67,771.55 81,325.86
Paku hak panj. 15cm Kg 0.0400 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.11 OH 0.0050 203,000.00 1,015.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Aluminium foil air cell bubble m2 1.0500 68,414.47 71,835.19
JUMLAH HARGA BAHAN 71,835.19
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 100,864.19
E. Profit 15% *D 15,129.63
F. Harga Satuan Pekerjaan (D+E) 115,993.82

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 121,800.00 852,600.00
Tukang kayu L.03 OH 21.0000 162,400.00 3,410,400.00
Kepala tukang L.03 OH 2.1000 203,000.00 426,300.00
Mandor L.04 OH 0.3500 203,000.00 71,050.00
JUMLAH TENAGA KERJA 4,760,350.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,622,735.97 3,985,009.57
paku 8 s/d 12 cm Kg 1.2500 #N/A #N/A
Lem kayu Kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 121,800.00 730,800.00
Tukang kayu L.03 OH 18.0000 162,400.00 2,923,200.00
Kepala Tukang L.03 OH 1.8000 203,000.00 365,400.00
Mandor L.04 OH 0.3000 203,000.00 60,900.00
JUMLAH TENAGA KERJA 4,080,300.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,822,286.84 3,386,744.21
paku 8 s/d 12 cm kg 1.2500 #N/A #N/A
Lem kayu kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-
JUMLAH HARGA BAHAN 122,316.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 360,435.16
E. Profit 15% *D 54,065.27
F. Harga Satuan Pekerjaan (D+E) 414,500.43

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,535,470.00 101,418.80
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-
JUMLAH HARGA BAHAN 102,283.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 340,402.20
E. Profit 15% *D 51,060.33
F. Harga Satuan Pekerjaan (D+E) 391,462.53

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
- -
JUMLAH HARGA BAHAN 139,368.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 819,418.42
E. Profit 15% *D 122,912.76
F. Harga Satuan Pekerjaan (D+E) 942,331.19

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 3,036,293.94 72,871.05
Lem kayu kg 0.3000 35,833.33 10,750.00
- -
JUMLAH HARGA BAHAN 83,621.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 627,661.05
E. Profit 15% *D 94,149.16
F. Harga Satuan Pekerjaan (D+E) 721,810.21

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Kayu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 3,036,293.94 194,322.81
Lem kayu kg 0.5000 35,833.33 17,916.67
- -
JUMLAH HARGA BAHAN 212,239.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 892,289.48
E. Profit 15% *D 133,843.42
F. Harga Satuan Pekerjaan (D+E) 1,026,132.90

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Kayu L.03 OH 2.1000 162,400.00 341,040.00
Kepala Tukang L.03 OH 0.2100 203,000.00 42,630.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 476,035.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 183,625.14
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,660.14
E. Profit 15% *D 98,949.02
F. Harga Satuan Pekerjaan (D+E) 758,609.16

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,534,693.04 90,488.14
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 198,205.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 742,245.93
E. Profit 15% *D 111,336.89
F. Harga Satuan Pekerjaan (D+E) 853,582.82

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Kayu L.03 OH 2.0000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.2000 203,000.00 40,600.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 515,011.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,534,693.04 212,081.58
Paku berbagai ukuran (1/2"-1") kg 0.1500 25,341.59 3,801.24
-
JUMLAH HARGA BAHAN 215,882.82
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 730,893.82
E. Profit 15% *D 109,634.07
F. Harga Satuan Pekerjaan (D+E) 840,527.89

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,534,693.04 88,367.33
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.3000 35,833.33 10,750.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
JUMLAH HARGA BAHAN 191,988.82
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 736,028.82
E. Profit 15% *D 110,404.32
F. Harga Satuan Pekerjaan (D+E) 846,433.15

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 121,800.00 103,530.00
Tukang Kayu L.03 OH 2.5500 162,400.00 414,120.00
Kepala Tukang L.03 OH 0.2550 203,000.00 51,765.00
Mandor L.04 OH 0.0430 203,000.00 8,729.00
JUMLAH TENAGA KERJA 578,144.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.8000 35,833.33 28,666.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
Formika lembar 0.5000 94,902.50 47,451.25

JUMLAH HARGA BAHAN 244,896.76


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 823,040.76
E. Profit 15% *D 123,456.11
F. Harga Satuan Pekerjaan (D+E) 946,496.88

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 121,800.00 487,200.00
Tukang Kayu L.03 12.0000 162,400.00 1,948,800.00
Kepala Tukang L.03 OH 1.2000 203,000.00 243,600.00
Mandor L.04 OH 0.2000 203,000.00 40,600.00
JUMLAH TENAGA KERJA 2,720,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.0000 162,400.00 3,248,000.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,540,095.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,622,735.97 4,347,283.16
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.1000 162,400.00 3,264,240.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,556,335.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 3.0000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0360 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0570 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang kayu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,822,286.84 39,512.02
Paku berbagai ukuran (2"-5") kg 0.0570 17,287.99 985.42
- -
JUMLAH HARGA BAHAN 40,497.43
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,255.43
E. Profit 15% *D 11,738.31
F. Harga Satuan Pekerjaan (D+E) 89,993.75

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0750 203,000.00 15,225.00
JUMLAH TENAGA KERJA 88,305.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2000 17,287.99 3,457.60
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 81,200.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00

- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80

- -

JUMLAH HARGA BAHAN 39,903.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,638.48
E. Profit 15% *D 13,445.77
F. Harga Satuan Pekerjaan (D+E) 103,084.26

A. 4.6.1.21. ck Pemasangan 1m' lisplank ukuran lebar 20cm, kalsiplank/GRC 6mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Listplank GRC m1 1.0000 19,352.67 19,352.67
Paku sekrup (kg) kg 0.1000 49,126.00 4,912.60
JUMLAH HARGA BAHAN 24,265.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 74,000.27
E. Profit 15% *D 11,100.04
F. Harga Satuan Pekerjaan (D+E) 85,100.31

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40

JUMLAH HARGA BAHAN 39,039.08


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,774.08
E. Profit 15% *D 13,316.11
F. Harga Satuan Pekerjaan (D+E) 102,090.20

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.4500 203,000.00 91,350.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 184,324.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,635,329.08 73,789.21
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20

- -

JUMLAH HARGA BAHAN 76,382.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 260,706.41
E. Profit 15% *D 39,105.96
F. Harga Satuan Pekerjaan (D+E) 299,812.37

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 102,109.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 110,533.50 95,058.81
Lem kayu kg 0.5600 35,833.33 20,066.67
JUMLAH HARGA BAHAN 196,742.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 298,851.71
E. Profit 15% *D 44,827.76
F. Harga Satuan Pekerjaan (D+E) 343,679.46

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 136,010.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 89,040.88 76,575.15
Lem kayu kg 0.5600 35,833.33 20,066.67
JUMLAH HARGA BAHAN 178,259.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 314,269.05
E. Profit 15% *D 47,140.36
F. Harga Satuan Pekerjaan (D+E) 361,409.41

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang kayu L.03 OH 1.8000 162,400.00 292,320.00
Kepala Tukang L.03 OH 0.1800 203,000.00 36,540.00
Mandor L.04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 408,030.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,534,693.04 24,742.85
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80
Paku sekrup (kg) kg 0.1500 49,126.00 7,368.90

JUMLAH HARGA BAHAN 33,840.55


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 441,870.55
E. Profit 15% *D 66,280.58
F. Harga Satuan Pekerjaan (D+E) 508,151.13

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 17,052.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 89,040.88 35,616.35
Paku berbagai ukuran (1/2"-1") kg 0.0500 25,341.59 1,267.08

JUMLAH HARGA BAHAN 36,883.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,935.43
E. Profit 15% *D 8,090.31
F. Harga Satuan Pekerjaan (D+E) 62,025.74

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Bilik bambu m2 1.5000 #N/A #N/A
Kaso-kaso 5 x 7 cm m3 0.0140 #N/A #N/A
Paku kg 0.0120 #N/A #N/A
List kayu 2/4 m3 0.0030 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Kunci antik buah 1.0000 489,230.00 489,230.00

JUMLAH HARGA BAHAN 489,230.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 606,767.00
E. Profit 15% *D 91,015.05
F. Harga Satuan Pekerjaan (D+E) 697,782.05

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Kunci tanam buah 1.0000 182,826.88 182,826.88

JUMLAH HARGA BAHAN 182,826.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 276,409.88
E. Profit 15% *D 41,461.48
F. Harga Satuan Pekerjaan (D+E) 317,871.36

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci KM buah 1.0000 104,798.75 104,798.75
JUMLAH HARGA BAHAN 104,798.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 197,366.75
E. Profit 15% *D 29,605.01
F. Harga Satuan Pekerjaan (D+E) 226,971.76

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci silinder buah 1.0000 62,168.75 62,168.75
JUMLAH HARGA BAHAN 62,168.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,736.75
E. Profit 15% *D 23,210.51
F. Harga Satuan Pekerjaan (D+E) 177,947.26

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 22,506.29 22,506.29
JUMLAH HARGA BAHAN 22,506.29
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 51,900.69
E. Profit 15% *D 7,785.10
F. Harga Satuan Pekerjaan (D+E) 59,685.79

A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0005 203,000.00 101.50
JUMLAH TENAGA KERJA 19,589.50
B. BAHAN
Engsel kupu-kupu buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.7. Pemasangan 1 buah engsel angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0005 203,000.00 101.50
JUMLAH TENAGA KERJA 48,821.50
B. BAHAN
Engsel angin buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Spring knip buah 1.0000 21,660.10 21,660.10
JUMLAH HARGA BAHAN 21,660.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 52,516.10
E. Profit 15% *D 7,877.41
F. Harga Satuan Pekerjaan (D+E) 60,393.52

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kait angin biasa buah 1.0000 13,625.00 13,625.00
JUMLAH HARGA BAHAN 13,625.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,481.00
E. Profit 15% *D 6,672.15
F. Harga Satuan Pekerjaan (D+E) 51,153.15

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door closer set 1.0000 275,000.00 275,000.00
JUMLAH HARGA BAHAN 275,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 373,049.00
E. Profit 15% *D 55,957.35
F. Harga Satuan Pekerjaan (D+E) 429,006.35

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 39,179.00
B. BAHAN
Kunci Selot bh 1.0000 19,800.00 19,800.00
JUMLAH HARGA BAHAN 19,800.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 58,979.00
E. Profit 15% *D 8,846.85
F. Harga Satuan Pekerjaan (D+E) 67,825.85

A. 4.6.2.12. Pemasangan 1 buah Door holder


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door holder bh 1.0000 131,188.75 131,188.75
JUMLAH HARGA BAHAN 131,188.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 229,237.75
E. Profit 15% *D 34,385.66
F. Harga Satuan Pekerjaan (D+E) 263,623.41

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Door stop bh 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,503.00
E. Profit 15% *D 10,575.45
F. Harga Satuan Pekerjaan (D+E) 81,078.45

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Rell pintu dorong set 1.0000 273,542.50 273,542.50
JUMLAH HARGA BAHAN 273,542.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 391,079.50
E. Profit 15% *D 58,661.92
F. Harga Satuan Pekerjaan (D+E) 449,741.43

A. 4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 48,983.90
B. BAHAN
Kunci lemari set 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 106,067.50 116,674.25
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 118,614.17
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 148,008.57
E. Profit 15% *D 22,201.29
F. Harga Satuan Pekerjaan (D+E) 170,209.85

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 5 mm m2 1.1000 147,936.25 162,729.88
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 164,669.79
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,064.19
E. Profit 15% *D 29,109.63
F. Harga Satuan Pekerjaan (D+E) 223,173.82

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0009 203,000.00 182.70
JUMLAH TENAGA KERJA 33,312.30
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 156,310.00 171,941.00
Sealant kg 0.0700 38,798.38 2,715.89
JUMLAH HARGA BAHAN 174,656.89
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,969.19
E. Profit 15% *D 31,195.38
F. Harga Satuan Pekerjaan (D+E) 239,164.56

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 48,983.90
B. BAHAN
Kaca Buram tebal = 12mm m2 1.1000 490,245.00 539,269.50
Sealant kg 0.0700 38,798.38 2,715.89
JUMLAH HARGA BAHAN 541,985.39
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 590,969.29
E. Profit 15% *D 88,645.39
F. Harga Satuan Pekerjaan (D+E) 679,614.68

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 139,562.50 153,518.75
JUMLAH HARGA BAHAN 153,518.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,374.75
E. Profit 15% *D 27,656.21
F. Harga Satuan Pekerjaan (D+E) 212,030.96

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,956.60
B. BAHAN
Kaca cermin 8 mm m2 1.1000 156,310.00 171,941.00
JUMLAH HARGA BAHAN 171,941.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 206,897.60
E. Profit 15% *D 31,034.64
F. Harga Satuan Pekerjaan (D+E) 237,932.24

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 635,288.50 698,817.35
JUMLAH HARGA BAHAN 698,817.35
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 729,673.35
E. Profit 15% *D 109,451.00
F. Harga Satuan Pekerjaan (D+E) 839,124.35

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 121,800.00 9,135.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 37,352.00
B. BAHAN
Kaca patri m2 1.1000 952,374.50 1,047,611.95
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 1,049,551.87
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,086,903.87
E. Profit 15% *D 163,035.58
F. Harga Satuan Pekerjaan (D+E) 1,249,939.45
Page 209 of 649

Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 199,000.00 148,653.00
Screw Bh 9.150 1,450.00 13,267.50
JUMLAH HARGA BAHAN 161,920.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,182.50
E. Profit 0.150 *D 28,977.38
F. Harga Satuan Pekerjaan (D+E) 222,159.88

Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 32 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.010 203,000.00 2,030.00
Mandor L.15 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 65,000.00 241,150.00
Screw Bh 16.129 1,450.00 23,387.05
JUMLAH HARGA BAHAN 264,537.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 309,197.05
E. Profit 0.150 *D 46,379.56
F. Harga Satuan Pekerjaan (D+E) 355,576.61

Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10°)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39

Dihitung 7.ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.013 203,000.00 2,639.00
Mandor L.15 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubungan Atap Selulosa Bitumen
108,000.00
(Ukuran 1060x 50 cm) Lbr 1.474 159,192.00
Sekrup / Paku Bh 10.256 1,450.00 14,871.20
JUMLAH HARGA BAHAN 174,063.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 208,045.40
E. Profit 0.150 *D 31,206.81
F. Harga Satuan Pekerjaan (D+E) 239,252.21
Page 210 of 649

DAFTAR ANALISA PEKERJAAN


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
TAHUN ANGGARAN 2021
Dihitung 1. ck Pemasangan 1 m2 Rangka atap baja ringan C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize


m2 1.0000 183,093.75 183,093.75

JUMLAH HARGA ALAT 183,093.75


D. Jumlah (A+B+C) 183,093.75
E. Profit 15% *D 27,464.06
F. Harga Satuan Pekerjaan (D+E) 210,557.81

Dihitung 2. ck Pemasangan 1 m2 Plafond PVC (ex. Shunda Plafond)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00

JUMLAH HARGA ALAT 260,000.00


D. Jumlah (A+B+C) 260,000.00
E. Profit 15% *D 39,000.00
F. Harga Satuan Pekerjaan (D+E) 299,000.00

Dihitung 3. ck Pemasangan 1 m2 Plafond PVC (ex. Wifon)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00

JUMLAH HARGA ALAT 185,000.00


D. Jumlah (A+B+C) 185,000.00
E. Profit 15% *D 27,750.00
F. Harga Satuan Pekerjaan (D+E) 212,750.00

A. 4.5.2.15. ck Pemasangan 1 m2 atap Spandek zincalum, t=0.4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck m2 1.0000 68,106.50 68,106.50
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 121,800.00 852,600.00
Tukang kayu L.03 OH 21.0000 162,400.00 3,410,400.00
Kepala tukang L.03 OH 2.1000 203,000.00 426,300.00
Mandor L.04 OH 0.3500 203,000.00 71,050.00
JUMLAH TENAGA KERJA 4,760,350.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,622,735.97 3,985,009.57
Paku berbagai ukuran (2"-5") Kg 1.2500 17,287.99 21,609.98
Lem kayu Kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN 4,042,452.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,802,802.88
E. Profit 15% *D 1,320,420.43
F. Harga Satuan Pekerjaan (D+E) 10,123,223.32

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 121,800.00 730,800.00
Tukang kayu L.03 OH 18.0000 162,400.00 2,923,200.00
Kepala Tukang L.03 OH 1.8000 203,000.00 365,400.00
Mandor L.04 OH 0.3000 203,000.00 60,900.00
JUMLAH TENAGA KERJA 4,080,300.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,822,286.84 3,386,744.21
paku 8 s/d 12 cm kg 1.2500 17,287.99 21,609.98
Lem kayu kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN 3,444,187.52
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,524,487.52
E. Profit 15% *D 1,128,673.13
F. Harga Satuan Pekerjaan (D+E) 8,653,160.65

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-
JUMLAH HARGA BAHAN 122,316.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 360,435.16
E. Profit 15% *D 54,065.27
F. Harga Satuan Pekerjaan (D+E) 414,500.43

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,535,470.00 101,418.80
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-
JUMLAH HARGA BAHAN 102,283.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 340,402.20
E. Profit 15% *D 51,060.33
F. Harga Satuan Pekerjaan (D+E) 391,462.53
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
JUMLAH HARGA BAHAN 139,368.42
PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 819,418.42
E. Profit 15% *D 122,912.76
F. Harga Satuan Pekerjaan (D+E) 942,331.19

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 3,036,293.94 72,871.05
Lem kayu kg 0.3000 35,833.33 10,750.00
- -
JUMLAH HARGA BAHAN 83,621.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 627,661.05
E. Profit 15% *D 94,149.16
F. Harga Satuan Pekerjaan (D+E) 721,810.21

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Kayu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 3,036,293.94 194,322.81
Lem kayu kg 0.5000 35,833.33 17,916.67
-
JUMLAH HARGA BAHAN 212,239.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 892,289.48
E. Profit 15% *D 133,843.42
F. Harga Satuan Pekerjaan (D+E) 1,026,132.90

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Kayu L.03 OH 2.1000 162,400.00 341,040.00
Kepala Tukang L.03 OH 0.2100 203,000.00 42,630.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 476,035.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 183,625.14
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,660.14
E. Profit 15% *D 98,949.02
F. Harga Satuan Pekerjaan (D+E) 758,609.16

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,534,693.04 90,488.14
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 198,205.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 742,245.93
E. Profit 15% *D 111,336.89
F. Harga Satuan Pekerjaan (D+E) 853,582.82

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Kayu L.03 OH 2.0000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.2000 203,000.00 40,600.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 515,011.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,534,693.04 212,081.58
Paku berbagai ukuran (1/2"-1") kg 0.1500 25,341.59 3,801.24
-
JUMLAH HARGA BAHAN 215,882.82
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 730,893.82
E. Profit 15% *D 109,634.07
F. Harga Satuan Pekerjaan (D+E) 840,527.89

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,534,693.04 88,367.33
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.3000 35,833.33 10,750.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
JUMLAH HARGA BAHAN 191,988.82
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 736,028.82
E. Profit 15% *D 110,404.32
F. Harga Satuan Pekerjaan (D+E) 846,433.15

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 121,800.00 103,530.00
Tukang Kayu L.03 OH 2.5500 162,400.00 414,120.00
Kepala Tukang L.03 OH 0.2550 203,000.00 51,765.00
Mandor L.04 OH 0.0430 203,000.00 8,729.00
JUMLAH TENAGA KERJA 578,144.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.8000 35,833.33 28,666.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
Formika lembar 0.5000 94,902.50 47,451.25

JUMLAH HARGA BAHAN 244,896.76


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 823,040.76
E. Profit 15% *D 123,456.11
F. Harga Satuan Pekerjaan (D+E) 946,496.88

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 121,800.00 487,200.00
Tukang Kayu L.03 OH 12.0000 162,400.00 1,948,800.00
Kepala Tukang L.03 OH 1.2000 203,000.00 243,600.00
Mandor L.04 OH 0.2000 203,000.00 40,600.00
JUMLAH TENAGA KERJA 2,720,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.0000 162,400.00 3,248,000.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,540,095.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,622,735.97 4,347,283.16
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.15. Pemasangan 1m3 konstruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.1000 162,400.00 3,264,240.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,556,335.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
paku 8 s/d 12 cm kg 3.0000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0360 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0570 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang kayu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,822,286.84 39,512.02
Paku berbagai ukuran (2"-5") kg 0.0570 17,287.99 985.42

JUMLAH HARGA BAHAN 40,497.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,255.43
E. Profit 15% *D 11,738.31
F. Harga Satuan Pekerjaan (D+E) 89,993.75

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0750 203,000.00 15,225.00
JUMLAH TENAGA KERJA 88,305.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2000 17,287.99 3,457.60
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 81,200.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00

- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80

- -

JUMLAH HARGA BAHAN 39,903.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,638.48
E. Profit 15% *D 13,445.77
F. Harga Satuan Pekerjaan (D+E) 103,084.26

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
- -
JUMLAH HARGA BAHAN 39,039.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,774.08
E. Profit 15% *D 13,316.11
F. Harga Satuan Pekerjaan (D+E) 102,090.20

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.4500 203,000.00 91,350.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 184,324.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,635,329.08 73,789.21
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20

- -

JUMLAH HARGA BAHAN 76,382.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 260,706.41
E. Profit 15% *D 39,105.96
F. Harga Satuan Pekerjaan (D+E) 299,812.37

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 102,109.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 110,533.50 95,058.81
Lem kayu kg 0.5600 35,833.33 20,066.67
JUMLAH HARGA BAHAN 196,742.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 298,851.71
E. Profit 15% *D 44,827.76
F. Harga Satuan Pekerjaan (D+E) 343,679.46

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 136,010.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 89,040.88 76,575.15
Lem kayu kg 0.5600 35,833.33 20,066.67
JUMLAH HARGA BAHAN 178,259.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 314,269.05
E. Profit 15% *D 47,140.36
F. Harga Satuan Pekerjaan (D+E) 361,409.41

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang kayu L.03 OH 1.8000 162,400.00 292,320.00
Kepala Tukang L.03 OH 0.1800 203,000.00 36,540.00
Mandor L.04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 408,030.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,534,693.04 24,742.85
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80
Paku sekrup (kg) kg 0.1500 49,126.00 7,368.90

JUMLAH HARGA BAHAN 33,840.55


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 441,870.55
E. Profit 15% *D 66,280.58
F. Harga Satuan Pekerjaan (D+E) 508,151.13

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 17,052.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 89,040.88 35,616.35
Paku berbagai ukuran (1/2"-1") kg 0.0500 25,341.59 1,267.08

JUMLAH HARGA BAHAN 36,883.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,935.43
E. Profit 15% *D 8,090.31
F. Harga Satuan Pekerjaan (D+E) 62,025.74

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Bilik bambu m2 1.5000 #N/A #N/A
Kaso-kaso 5 x 7 cm m3 0.0140 #N/A #N/A
Paku kg 0.0120 #N/A #N/A
List kayu 2/4 m3 0.0030 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Kunci antik buah 1.0000 489,230.00 489,230.00

JUMLAH HARGA BAHAN 489,230.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 606,767.00
E. Profit 15% *D 91,015.05
F. Harga Satuan Pekerjaan (D+E) 697,782.05

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Kunci tanam buah 1.0000 182,826.88 182,826.88

JUMLAH HARGA BAHAN 182,826.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 276,409.88
E. Profit 15% *D 41,461.48
F. Harga Satuan Pekerjaan (D+E) 317,871.36

A. 4.6.2.2.a Pemasangan 1 set Handle + kunci untuk pintu kusen alumunium Alumunium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Handle + kunci untuk pintu kusen alumunium Alumunium buah 1.0000 614,075.00 614,075.00

JUMLAH HARGA BAHAN 614,075.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 707,658.00
E. Profit 15% *D 106,148.70
F. Harga Satuan Pekerjaan (D+E) 813,806.70

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci KM buah 1.0000 104,798.75 104,798.75
JUMLAH HARGA BAHAN 104,798.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 197,366.75
E. Profit 15% *D 29,605.01
F. Harga Satuan Pekerjaan (D+E) 226,971.76

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci silinder buah 1.0000 62,168.75 62,168.75
JUMLAH HARGA BAHAN 62,168.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,736.75
E. Profit 15% *D 23,210.51
F. Harga Satuan Pekerjaan (D+E) 177,947.26

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 22,506.29 22,506.29
JUMLAH HARGA BAHAN 22,506.29
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 51,900.69
E. Profit 15% *D 7,785.10
F. Harga Satuan Pekerjaan (D+E) 59,685.79

A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0005 203,000.00 101.50
JUMLAH TENAGA KERJA 19,589.50
B. BAHAN
Engsel kupu-kupu buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.7. Pemasangan 1 buah engsel jendela

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0005 203,000.00 101.50
JUMLAH TENAGA KERJA 48,821.50
B. BAHAN
Engsel Jendela buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Spring knip buah 1.0000 21,660.10 21,660.10
JUMLAH HARGA BAHAN 21,660.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 52,516.10
E. Profit 15% *D 7,877.41
F. Harga Satuan Pekerjaan (D+E) 60,393.52

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kait angin biasa buah 1.0000 13,625.00 13,625.00
JUMLAH HARGA BAHAN 13,625.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,481.00
E. Profit 15% *D 6,672.15
F. Harga Satuan Pekerjaan (D+E) 51,153.15

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door closer set 1.0000 275,000.00 275,000.00
JUMLAH HARGA BAHAN 275,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 373,049.00
E. Profit 15% *D 55,957.35
F. Harga Satuan Pekerjaan (D+E) 429,006.35

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 39,179.00
B. BAHAN
Kunci Selot bh 1.0000 19,800.00 19,800.00
JUMLAH HARGA BAHAN 19,800.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 58,979.00
E. Profit 15% *D 8,846.85
F. Harga Satuan Pekerjaan (D+E) 67,825.85

A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door holder bh 1.0000 131,188.75 131,188.75
JUMLAH HARGA BAHAN 131,188.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 229,237.75
E. Profit 15% *D 34,385.66
F. Harga Satuan Pekerjaan (D+E) 263,623.41

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Door stop bh 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,503.00
E. Profit 15% *D 10,575.45
F. Harga Satuan Pekerjaan (D+E) 81,078.45

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Rell pintu dorong set 1.0000 273,542.50 273,542.50
JUMLAH HARGA BAHAN 273,542.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 391,079.50
E. Profit 15% *D 58,661.92
F. Harga Satuan Pekerjaan (D+E) 449,741.43

A. 4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 48,983.90
B. BAHAN
Kunci lemari set 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 106,067.50 116,674.25
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 118,614.17
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 148,008.57
E. Profit 15% *D 22,201.29
F. Harga Satuan Pekerjaan (D+E) 170,209.85

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca gelap (ray band) tebal 5 mm m2 1.1000 131,747.00 144,921.70
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 146,861.62
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 176,256.02
E. Profit 15% *D 26,438.40
F. Harga Satuan Pekerjaan (D+E) 202,694.42

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0009 203,000.00 182.70
JUMLAH TENAGA KERJA 33,312.30
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 156,310.00 171,941.00
Sealant kg 0.0700 38,798.38 2,715.89
JUMLAH HARGA BAHAN 174,656.89
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,969.19
E. Profit 15% *D 31,195.38
F. Harga Satuan Pekerjaan (D+E) 239,164.56

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 48,983.90
B. BAHAN
Kaca Buram tebal = 12mm m2 1.1000 490,245.00 539,269.50
Sealant kg 0.0700 38,798.38 2,715.89
JUMLAH HARGA BAHAN 541,985.39
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 590,969.29
E. Profit 15% *D 88,645.39
F. Harga Satuan Pekerjaan (D+E) 679,614.68

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 139,562.50 153,518.75
JUMLAH HARGA BAHAN 153,518.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,374.75
E. Profit 15% *D 27,656.21
F. Harga Satuan Pekerjaan (D+E) 212,030.96

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,956.60
B. BAHAN
Kaca cermin 8 mm m2 1.1000 156,310.00 171,941.00
JUMLAH HARGA BAHAN 171,941.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 206,897.60
E. Profit 15% *D 31,034.64
F. Harga Satuan Pekerjaan (D+E) 237,932.24

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 635,288.50 698,817.35
JUMLAH HARGA BAHAN 698,817.35
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 729,673.35
E. Profit 15% *D 109,451.00
F. Harga Satuan Pekerjaan (D+E) 839,124.35

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 121,800.00 9,135.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 37,352.00
B. BAHAN
Kaca patri m2 1.1000 952,374.50 1,047,611.95
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 1,049,551.87
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,086,903.87
E. Profit 15% *D 163,035.58
F. Harga Satuan Pekerjaan (D+E) 1,249,939.45
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Soda api kg 0.0500 19,448.85 972.44

JUMLAH HARGA BAHAN 972.44


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,408.44
E. Profit 15% *D 511.27
F. Harga Satuan Pekerjaan (D+E) 3,919.71

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50
JUMLAH HARGA BAHAN 1,116.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,552.50
E. Profit 15% *D 532.88
F. Harga Satuan Pekerjaan (D+E) 4,085.38

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 3,451.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50

JUMLAH HARGA BAHAN 1,116.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,567.50
E. Profit 15% *D 685.13
F. Harga Satuan Pekerjaan (D+E) 5,252.63

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.0090 162,400.00 1,461.60
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,814.60
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat Dasar kg 0.1700 60,500.00 10,285.00
Cat Penutup kg 0.2600 60,500.00 15,730.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 44,615.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 56,429.65
E. Profit 15% *D 8,464.45
F. Harga Satuan Pekerjaan (D+E) 64,894.10

A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,059.05
E. Profit 15% *D 11,558.86
F. Harga Satuan Pekerjaan (D+E) 88,617.91

A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0630 203,000.00 12,789.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Teak Oil liter 0.3600 267.96 96.47
JUMLAH HARGA BAHAN 96.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 28,597.67
E. Profit 15% *D 4,289.65
F. Harga Satuan Pekerjaan (D+E) 32,887.32

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 18,473.00
B. BAHAN
Pelitur liter 0.1500 65,315.25 9,797.29
Pelitur Jadi liter 0.3720 65,315.25 24,297.27
Ampelas lb 2.0000 6,777.78 13,555.56
JUMLAH HARGA BAHAN 47,650.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 66,123.12
E. Profit 15% *D 9,918.47
F. Harga Satuan Pekerjaan (D+E) 76,041.58

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Residu atau ter liter 0.3500 60,402.65 21,140.93
JUMLAH HARGA BAHAN 21,140.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 34,538.93
E. Profit 15% *D 5,180.84
F. Harga Satuan Pekerjaan (D+E) 39,719.77

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 121,800.00 19,488.00
Tukang cat L.02 OH 0.1600 162,400.00 25,984.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 49,329.00
B. BAHAN
cat Vernis liter 0.1500 65,744.67 9,861.70
Dempul kayu kg 0.0500 37,660.40 1,883.02
Ampelas lb 0.1000 6,777.78 677.78
JUMLAH HARGA BAHAN 12,422.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 61,751.50
E. Profit 15% *D 9,262.72
F. Harga Satuan Pekerjaan (D+E) 71,014.22

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0063 203,000.00 1,278.90
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 14,555.10
B. BAHAN
Plamir tembok kg 0.1000 45,869.54 4,586.95
Cat Dasar kg 0.1000 77,842.38 7,784.24
Cat penutup kg 0.2600 77,842.38 20,239.02
JUMLAH HARGA BAHAN 32,610.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 47,165.31
E. Profit 15% *D 7,074.80
F. Harga Satuan Pekerjaan (D+E) 54,240.11
A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Cat dasar kg 0.1200 77,842.38 9,341.09
Cat penutup kg 0.1800 77,842.38 14,011.63
JUMLAH HARGA BAHAN 23,352.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,045.51
E. Profit 15% *D 5,256.83
F. Harga Satuan Pekerjaan (D+E) 40,302.34

Dihitung-1 1 M2 Pengecatan Genteng dengan Cat Spesial

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49

A. 4.7.1.12. 1 M2 Pelaburan tembok dengan kalkarim

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Kalkarim kg 0.1000 #N/A #N/A

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 11,692.80
E. Profit 15% *D 1,753.92
F. Harga Satuan Pekerjaan (D+E) 13,446.72

A. 4.7.1.13. 1 M2 Pelaburan tembok dengan kapur sirih

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang cat L.02 OH 0.0010 162,400.00 162.40
Kepala Tukang L.03 OH 0.0001 203,000.00 20.30
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 18,960.20
B. BAHAN
Kapur sirih kg 0.1500 29,094.87 4,364.23
Ampelas lembar 0.1000 6,777.78 677.78
Alang-alang ikat 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.7.1.14. 1 M2 Pelaburan tembok lama dengan kapur sirih ( pemeliharaan )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0050 162,400.00 812.00
Kepala Tukang L.03 OH 0.0005 203,000.00 101.50
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 6,293.00
B. BAHAN
Kapur sirih kg 0.3000 29,094.87 8,728.46
Ampelas lembar 0.2000 6,777.78 1,355.56
Alang-alang ikat 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Wallpaper polos m2 1.2000 42,371.18 50,845.41
Lem (standar Fox)/ perekat kg 0.2000 25,902.80 5,180.56
JUMLAH HARGA BAHAN 56,025.97
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,509.47
E. Profit 15% *D 14,326.42
F. Harga Satuan Pekerjaan (D+E) 109,835.89

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA BAHAN 5,131.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,615.42
E. Profit 15% *D 6,692.31
F. Harga Satuan Pekerjaan (D+E) 51,307.73

A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2250 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.0225 203,000.00 4,567.50
Mandor L.04 OH 0.0075 203,000.00 1,522.50
JUMLAH TENAGA KERJA 73,080.00
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
Minyak pelarut/ pengencer cat (solvent) liter 0.0100 12,738.25 127.38
Kayu dolken Ø8-10 (cm) panjang 4 m m3 0.0100 5,000.00 50.00
Kuas bh 0.0020 28,191.63 56.38

JUMLAH HARGA BAHAN 5,083.77


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,163.77
E. Profit 15% *D 11,724.56
F. Harga Satuan Pekerjaan (D+E) 89,888.33

A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 76,388.90
B. BAHAN
Menie A kg 0.1000 41,993.47 4,199.35
Menie B kg 0.1000 41,993.47 4,199.35
Minyak pelarut/ pengencer cat (solvent) liter 0.0800 12,738.25 1,019.06
Cat kg 0.0100 41,993.47 419.93
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 76,388.90
E. Profit 15% *D 11,458.34
F. Harga Satuan Pekerjaan (D+E) 87,847.23

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 20,097.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat kg 0.0100 41,993.47 419.93
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN 4,523.33


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 24,620.33
E. Profit 15% *D 3,693.05
F. Harga Satuan Pekerjaan (D+E) 28,313.37

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 198,940.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.1100 12,738.25 1,401.21
Cat dasar kg 0.1700 41,993.47 7,138.89
Kuas bh 0.0800 28,191.63 2,255.33
Cat antara kg 0.0100 41,993.47 419.93
Cat penutup kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 11,635.30
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,575.30
E. Profit 15% *D 31,586.29
F. Harga Satuan Pekerjaan (D+E) 242,161.59

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.7000 162,400.00 113,680.00
Kepala Tukang L.03 OH 0.0700 203,000.00 14,210.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 180,670.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat dasar kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 4,241.41
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,911.41
E. Profit 15% *D 27,736.71
F. Harga Satuan Pekerjaan (D+E) 212,648.12

A. 4.7.1.22. 1 M2 Pelituran 10 m² dengan plitur melamic

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 121,800.00 243,600.00
Tukang cat L.02 OH 12.0000 162,400.00 1,948,800.00
Kepala Tukang L.03 OH 1.2000 203,000.00 243,600.00
Mandor L.04 OH 0.1000 203,000.00 20,300.00
JUMLAH TENAGA KERJA 2,456,300.00
B. BAHAN
Wood filler kg 1.5000 #N/A #N/A
woodstain kg 1.5000 #N/A #N/A
sanding kg 1.5000 #N/A #N/A
melamic kg 2.4000 #N/A #N/A
thinner Ltr 2.0000 35,555.56 71,111.11
Ampelas Lmbr 6.0000 6,777.78 40,666.67

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.7.1.23. 1 M2 1 m2 Pengecatan Waterproofing Emulsion (2 Lapis Cat Penutup) Analisa Permen PU no 28, 2016

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 41,006.00
B. BAHAN
Waterproofing Emulsion kg 0.5000 42,900.00 21,450.00
Ampelas lmbr 1.5000 5,389.26 8,083.89

JUMLAH HARGA BAHAN 29,533.89


C. PERALATAN
Kuas 3" bh 0.5000 28,191.63 14,095.81
JUMLAH HARGA ALAT 14,095.81
D. Jumlah (A+B+C) 84,635.70
E. Profit 15% *D 12,695.36
F. Harga Satuan Pekerjaan (D+E) 97,331.06
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 121,800.00 401,940.00
Tukang batu L.02 OH 1.100 162,400.00 178,640.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 615,090.00
B. BAHAN
Closet Duduk / Monoblock unit 1.000 1,404,557.00 1,404,557.00
Perlengkapan Ls 6% x clooset 84,273.42 84,273.42
JUMLAH HARGA BAHAN 1,488,830.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,103,920.42
E. Profit 15% * D 315,588.06
F. Harga Satuan Pekerjaan (D+E) 2,419,508.48

A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 428,330.00
B. BAHAN
Closed jongkok porcelaint (lokal) unit 1.000 221,129.03 221,129.03
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00
JUMLAH HARGA BAHAN 230,891.03
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,221.03
E. Profit 15% * D 98,883.15
F. Harga Satuan Pekerjaan (D+E) 758,104.18

A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Closed jongkok terraso unit 1.000 244,222.22 244,222.22
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Batu bata merah besar bh 7.000 2,300.00 16,100.00
JUMLAH HARGA BAHAN 271,584.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 677,584.22
E. Profit 15% * D 101,637.63
F. Harga Satuan Pekerjaan (D+E) 779,221.86

A. 5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.100 203,000.00 20,300.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 314,650.00
B. BAHAN
Urinoir unit 1.000 1,060,675.00 1,060,675.00
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 30.000 318,202.50 318,202.50
JUMLAH HARGA BAHAN 1,390,139.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,704,789.50
E. Profit 15% * D 255,718.43
F. Harga Satuan Pekerjaan (D+E) 1,960,507.93

A. 5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Tukang batu L.02 OH 1.450 162,400.00 235,480.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 424,270.00
B. BAHAN
Wastafel unit 1.000 921,112.50 921,112.50
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 12.000 110,533.50 110,533.50
JUMLAH HARGA BAHAN 1,042,908.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,467,178.00
E. Profit 15% * D 220,076.70
F. Harga Satuan Pekerjaan (D+E) 1,687,254.70

A. 5.1.1.6. Pemasangan 1 buah bathcuip porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 121,800.00 9,135.00
Tukang batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 146,769.00
B. BAHAN
Bathcuip unit 1.000 #N/A #N/A
Perlengkapan % 20.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12%x bak 46,959.99 46,959.99
JUMLAH HARGA BAHAN 438,293.24
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,727,343.24
E. Profit 15% * D 259,101.49
F. Harga Satuan Pekerjaan (D+E) 1,986,444.73

A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 121,800.00 730,800.00
Tukang batu L.02 OH 3.000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 1,284,990.00
B. BAHAN
Batu bata merah besar bh 150.000 2,300.00 345,000.00
Semen portland kg 120.000 1,627.00 195,240.00
Pasir pasang m3 0.300 150,000.00 45,000.00
Porcelaint uk. 11x 11 cm bh 360.000 1,339.80 482,328.00
Semen warna (sika graut) kg 6.000 22,250.00 133,500.00
JUMLAH HARGA BAHAN 1,201,068.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,486,058.00
E. Profit 15% * D 372,908.70
F. Harga Satuan Pekerjaan (D+E) 2,858,966.70

A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 0,30 m³ unit 1.000 237,256.25 237,256.25
Perlengkapan Ls 12%x bak 28,470.75 3,416.49
JUMLAH HARGA BAHAN 240,672.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,722.74
E. Profit 15% * D 229,458.41
F. Harga Satuan Pekerjaan (D+E) 1,759,181.15

A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Tukang batu L.02 OH 0.450 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.045 203,000.00 9,135.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 121,800.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12.000 46,959.99 5,635.20
JUMLAH HARGA BAHAN 396,968.45
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 518,768.45
E. Profit 15% * D 77,815.27
F. Harga Satuan Pekerjaan (D+E) 596,583.72

A. 5.1.1.11. Pemasangan 1 buah bak beton volume 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.500 121,800.00 426,300.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.018 203,000.00 3,654.00
JUMLAH TENAGA KERJA 1,170,904.00
B. BAHAN
Beton 1:2:3 m3 0.900 #N/A #N/A
Baja tulangan kg 180.000 #N/A #N/A
Kayu bekisting m2 8.000 #N/A #N/A
Ubin porselin bh 500.000 #N/A #N/A
Perlengkapan % 10.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 121,800.00 3,654.00
Tukang batu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 61,509.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
JUMLAH HARGA BAHAN 493,891.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 555,400.75
E. Profit 15% * D 83,310.11
F. Harga Satuan Pekerjaan (D+E) 638,710.86

A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Tukang batu L.02 OH 0.500 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 102,515.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
Semen portland kg 20.000 1,627.00 32,540.00
Pasir pasang m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 533,931.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 636,446.75
E. Profit 15% * D 95,467.01
F. Harga Satuan Pekerjaan (D+E) 731,913.76

A. 5.1.1.14. Pemasangan 1 buah floor drain

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Floor drain (PVC) Unit 1.000 10,001.98 10,001.98
JUMLAH HARGA BAHAN 10,001.98
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,504.98
E. Profit 15% * D 4,575.75
F. Harga Satuan Pekerjaan (D+E) 35,080.73

A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.160 121,800.00 263,088.00
Tukang batu L.02 OH 0.720 162,400.00 116,928.00
Kepala Tukang L.03 OH 0.072 203,000.00 14,616.00
Mandor L.04 OH 0.011 203,000.00 2,233.00
JUMLAH TENAGA KERJA 396,865.00
B. BAHAN
Batu bata merah besar bh 40.000 2,300.00 92,000.00
Semen portland kg 44.000 1,627.00 71,588.00
Pasir pasang m3 0.070 150,000.00 10,500.00
Pasir beton m3 0.060 150,000.00 9,000.00
Batu kerikil m3 0.070 400,000.00 28,000.00
Baja Tulangan (Polos) U24 kg 1.600 13,760.36 22,016.57
JUMLAH HARGA BAHAN 233,104.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 629,969.57
E. Profit 15% * D 94,495.44
F. Harga Satuan Pekerjaan (D+E) 724,465.00

A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 70.000 2,300.00 161,000.00
Semen portland kg 77.000 1,627.00 125,279.00
Pasir pasang m3 0.130 150,000.00 19,500.00
Pasir beton m3 0.090 150,000.00 13,500.00
Batu kerikil m3 0.020 400,000.00 8,000.00
Baja Tulangan (Polos) U24 kg 2.600 13,760.36 35,776.92
JUMLAH HARGA BAHAN 363,055.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 945,056.92
E. Profit 15% * D 141,758.54
F. Harga Satuan Pekerjaan (D+E) 1,086,815.46

A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,175,916.72
E. Profit 15% * D 176,387.51
F. Harga Satuan Pekerjaan (D+E) 1,352,304.23

A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 0,5 (inch)/1,8mm m 1.200 31,747.51 38,097.01
Perlengkapan ls 35%x pipa 11,111.63 11,111.63
JUMLAH HARGA BAHAN 49,208.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,709.84
E. Profit 15% * D 11,656.48
F. Harga Satuan Pekerjaan (D+E) 89,366.31

A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,110.33
E. Profit 15% * D 22,366.55
F. Harga Satuan Pekerjaan (D+E) 171,476.88

A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 0,75 (inch)/1,8mm m 1.200 38,623.29 46,347.95
Perlengkapan % 35%x pipa 13,518.15 13,518.15
JUMLAH HARGA BAHAN 59,866.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,367.30
E. Profit 15% * D 13,255.09
F. Harga Satuan Pekerjaan (D+E) 101,622.39

A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 1 (inch)/1,8mm m 1.200 42,584.69 51,101.63
Perlengkapan % 35%x pipa 14,904.64 14,904.64
JUMLAH HARGA BAHAN 66,006.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 94,507.47
E. Profit 15% * D 14,176.12
F. Harga Satuan Pekerjaan (D+E) 108,683.59

A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.108 121,800.00 13,154.40
Tukang batu L.02 OH 0.180 162,400.00 29,232.00
Kepala Tukang L.03 OH 0.018 203,000.00 3,654.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 47,055.40
B. BAHAN
Pipa besi galvanis Ø 1,5 (inch)/1,8mm m 1.200 75,508.39 90,610.06
Perlengkapan % 35%x pipa 26,427.94 26,427.94
JUMLAH HARGA BAHAN 117,038.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 164,093.40
E. Profit 15% * D 24,614.01
F. Harga Satuan Pekerjaan (D+E) 188,707.41

A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 3 (inch) t=4 mm m 1.200 142,699.48 171,239.38
Perlengkapan % 35%x pipa 49,944.82 49,944.82
JUMLAH HARGA BAHAN 221,184.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 280,257.20
E. Profit 15% * D 42,038.58
F. Harga Satuan Pekerjaan (D+E) 322,295.78

A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 4 (inch)/1,8mm m 1.200 143,937.15 172,724.58
Perlengkapan % 35%x pipa 50,378.00 50,378.00
JUMLAH HARGA BAHAN 223,102.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 282,175.58
E. Profit 15% * D 42,326.34
F. Harga Satuan Pekerjaan (D+E) 324,501.92

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø1/2 (inch) AW, panjang 4 m m 1.200 6,791.67 8,150.00
Perlengkapan % 35%x pipa 2,377.08 2,377.08
JUMLAH HARGA BAHAN 10,527.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 26,279.88
E. Profit 15% * D 3,941.98
F. Harga Satuan Pekerjaan (D+E) 30,221.87
A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø3/4 (inch) AW, panjang 4 m m 1.200 9,968.75 11,962.50
Perlengkapan % 35%x pipa 3,489.06 3,489.06
JUMLAH HARGA BAHAN 15,451.56
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 31,204.36
E. Profit 15% * D 4,680.65
F. Harga Satuan Pekerjaan (D+E) 35,885.02

A. 5.1.1.26.SWK Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC 3/4" m 1.200 #N/A #N/A
Perlengkapan % 35%x pipa #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø 1 (inch) AW, panjang 4 m m 1.200 12,937.50 15,525.00
Perlengkapan % 35%x pipa 4,528.13 4,528.13
JUMLAH HARGA BAHAN 20,053.13
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,805.93
E. Profit 15% * D 5,370.89
F. Harga Satuan Pekerjaan (D+E) 41,176.81

A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 1,5(inch) AW, panjang 4 m m 1.200 19,035.70 22,842.84
Perlengkapan % 35%x pipa 6,662.49 6,662.49
JUMLAH HARGA BAHAN 29,505.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,134.53
E. Profit 15% * D 7,970.18
F. Harga Satuan Pekerjaan (D+E) 61,104.71

A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 2 (inch) AW, panjang 4 m m 1.200 25,000.00 30,000.00
Perlengkapan % 35%x pipa 8,750.00 8,750.00
JUMLAH HARGA BAHAN 38,750.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 62,379.20
E. Profit 15% * D 9,356.88
F. Harga Satuan Pekerjaan (D+E) 71,736.08

A. 5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0810 121,800.00 9,865.80
Tukang batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0135 203,000.00 2,740.50
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC 2 1/2" m 1.200 #N/A #N/A
Perlengkapan % 35%x pipa #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 3 (inch) AW, panjang 4 m m 1.200 48,125.00 57,750.00
Perlengkapan % 35%x pipa 16,843.75 16,843.75
JUMLAH HARGA BAHAN 74,593.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 109,936.05
E. Profit 15% * D 16,490.41
F. Harga Satuan Pekerjaan (D+E) 126,426.46

A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 4-6 (inch) AW, panjang 4 m m 1.200 75,906.25 91,087.50
Perlengkapan % 35%x pipa 26,567.19 26,567.19
JUMLAH HARGA BAHAN 117,654.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 152,996.99
E. Profit 15% * D 22,949.55
F. Harga Satuan Pekerjaan (D+E) 175,946.54
A. 5.1.1.33. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 121,800.00 9,744.00
Tukang batu L.02 OH 0.040 162,400.00 6,496.00
Kepala Tukang L.03 OH 0.004 203,000.00 812.00
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 17,864.00
B. BAHAN
Pipa tanah bh 1.600 #N/A #N/A
Semen portland kg 35.000 1,627.00 56,945.00
Pasir pasang m3 0.014 150,000.00 2,100.00

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 5.1.1.34. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 15 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 121,800.00 7,308.00
Tukang batu L.02 OH 0.030 162,400.00 4,872.00
Kepala Tukang L.03 OH 0.003 203,000.00 609.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Pipa tanah bh 1.600 #N/A #N/A
Semen portland kg 0.680 1,627.00 1,106.36
Pasir pasang m3 0.013 150,000.00 1,950.00
Pasir urug/timbun m3 0.011 102,500.00 1,127.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang batu L.02 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.007 203,000.00 1,421.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Pipa beton Ø 20 cm, panjang 1m' bh 1.100 96,726.46 106,399.10
Batu bata merah kecil m3 0.027 1,390.04 37.53
Semen portland kg 3.920 1,627.00 6,377.84
Pasir pasang m3 0.056 150,000.00 8,400.00
Pasir urug/timbun m3 0.024 102,500.00 2,460.00
JUMLAH HARGA BAHAN 123,674.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,936.47
E. Profit 15% * D 23,240.47
F. Harga Satuan Pekerjaan (D+E) 178,176.94

A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 121,800.00 46,284.00
Tukang batu L.02 OH 0.190 162,400.00 30,856.00
Kepala Tukang L.03 OH 0.019 203,000.00 3,857.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 84,854.00
B. BAHAN
Pipa beton Ø 60 cm, panjang 1m' bh 1.100 160,289.31 176,318.24
Batu bata merah kecil m3 0.550 1,390.04 764.52
Semen portland kg 10.300 1,627.00 16,758.10
Pasir pasang m3 0.061 150,000.00 9,150.00
Pasir urug/timbun m3 0.069 102,500.00 7,072.50
JUMLAH HARGA BAHAN 210,063.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 294,917.36
E. Profit 15% * D 44,237.60
F. Harga Satuan Pekerjaan (D+E) 339,154.97
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A. 8.4.1.1. Pemasangan 1 m pipa PVC Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang pipa L.02 OH 0.041 162,400.00 6,658.40
Mandor L.04 OH 0.008 203,000.00 1,624.00
JUMLAH TENAGA KERJA 18,148.20
B. BAHAN
Pipa PVC Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.006 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.2. Pemasangan 1 m Pipa PVC Æ 90 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.094 121,800.00 11,449.20
Tukang Pipa L.02 OH 0.047 162,400.00 7,632.80
Mandor L.04 OH 0.009 203,000.00 1,827.00
JUMLAH TENAGA KERJA 20,909.00
B. BAHAN
Pipa PVC Æ 90 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.008 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.3. Pemasangan 1 m pipa PVC Ø 110 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.105 121,800.00 12,789.00
Tukang pipa L.02 OH 0.053 162,400.00 8,607.20
Mandor L.04 OH 0.011 203,000.00 2,233.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 110 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.01 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.4. Pemasangan 1 m pipa PVC Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.118 121,800.00 14,372.40
Tukang pipa L.02 OH 0.059 162,400.00 9,581.60
Mandor L.04 OH 0.012 203,000.00 2,436.00
JUMLAH TENAGA KERJA 26,390.00
B. BAHAN
Pipa PVC Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.012 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.5. Pemasangan 1 m pipa PVC Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.189 121,800.00 23,020.20
Tukang pipa L.02 OH 0.095 162,400.00 15,428.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 42,305.20
B. BAHAN
Pipa PVC Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.024 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.6. Pemasangan 1 m pipa PVC Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.256 121,800.00 31,180.80
Tukang pipa L.02 OH 0.128 162,400.00 20,787.20
Mandor L.04 OH 0.026 203,000.00 5,278.00
JUMLAH TENAGA KERJA 57,246.00
B. BAHAN
Pipa PVC Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.034 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.7. Pemasangan 1 m pipa PVC Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.294 121,800.00 35,809.20
Tukang pipa L.02 OH 0.147 162,400.00 23,872.80
Mandor L.04 OH 0.029 203,000.00 5,887.00
JUMLAH TENAGA KERJA 65,569.00
B. BAHAN
Pipa PVC Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.04 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.8. Pemasangan 1 m pipa PVC Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.544 121,800.00 66,259.20
Tukang pipa L.02 OH 0.272 162,400.00 44,172.80
Mandor L.04 OH 0.054 203,000.00 10,962.00
JUMLAH TENAGA KERJA 121,394.00
B. BAHAN
Pipa PVC Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.08 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.9. Pemasangan 1 m pipa PVC Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.669 121,800.00 81,484.20
Tukang pipa L.02 OH 0.335 162,400.00 54,404.00
Mandor L.04 OH 0.067 203,000.00 13,601.00
JUMLAH TENAGA KERJA 149,489.20
B. BAHAN
Pipa PVC Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.1 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.809 121,800.00 98,536.20
Tukang pipa L.02 OH 0.405 162,400.00 65,772.00
Mandor L.04 OH 0.081 203,000.00 16,443.00
JUMLAH TENAGA KERJA 180,751.20
B. BAHAN
Pipa PVC Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.122 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.957 121,800.00 116,562.60
Tukang pipa L.02 OH 0.479 162,400.00 77,789.60
Mandor L.04 OH 0.096 203,000.00 19,488.00
JUMLAH TENAGA KERJA 213,840.20
B. BAHAN
Pipa PVC Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.145 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.618 121,800.00 197,072.40
Tukang pipa L.02 OH 0.809 162,400.00 131,381.60
Mandor L.04 OH 0.162 203,000.00 32,886.00
JUMLAH TENAGA KERJA 361,340.00
B. BAHAN
Pipa PVC Ø 800 mm m 1.000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Sewa Tripot/Tackel & hari 0.25 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.691 121,800.00 205,963.80
Tukang pipa L.02 OH 0.846 162,400.00 137,390.40
Mandor L.04 OH 0.169 203,000.00 34,307.00
JUMLAH TENAGA KERJA 377,661.20
B. BAHAN
Pipa PVC Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.262 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.895 121,800.00 230,811.00
Tukang pipa L.02 OH 0.948 162,400.00 153,955.20
Mandor L.04 OH 0.190 203,000.00 38,570.00
JUMLAH TENAGA KERJA 423,336.20
B. BAHAN
Pipa PVC Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.294 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.099 121,800.00 255,658.20
Tukang pipa L.02 OH 1.050 162,400.00 170,520.00
Mandor L.04 OH 0.210 203,000.00 42,630.00
JUMLAH TENAGA KERJA 468,808.20
B. BAHAN
Pipa PVC Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.327 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.303 121,800.00 280,505.40
Tukang pipa L.02 OH 1.152 162,400.00 187,084.80
Mandor L.04 OH 0.230 203,000.00 46,690.00
JUMLAH TENAGA KERJA 514,280.20
B. BAHAN
Pipa PVC Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.359 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.035 121,800.00 4,263.00
Tukang pipa L.02 OH 0.017 162,400.00 2,760.80
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 7,632.80
B. BAHAN
Pipa HDPE Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 121,800.00 4,872.00
Tukang pipa L.02 OH 0.020 162,400.00 3,248.00
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 8,932.00
B. BAHAN
Pipa HDPE Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.045 121,800.00 5,481.00
Tukang pipa L.02 OH 0.023 162,400.00 3,735.20
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 10,231.20
B. BAHAN
Pipa HDPE Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.062 121,800.00 7,551.60
Tukang pipa L.02 OH 0.031 162,400.00 5,034.40
Mandor L.04 OH 0.006 203,000.00 1,218.00
JUMLAH TENAGA KERJA 13,804.00
B. BAHAN
Pipa HDPE Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.102 121,800.00 12,423.60
Tukang pipa L.02 OH 0.051 162,400.00 8,282.40
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 22,736.00
B. BAHAN
Pipa HDPE Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.133 121,800.00 16,199.40
Tukang pipa L.02 OH 0.067 162,400.00 10,880.80
Mandor L.04 OH 0.013 203,000.00 2,639.00
JUMLAH TENAGA KERJA 29,719.20
B. BAHAN
Pipa HDPE Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.042 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 121,800.00 20,706.00
Tukang pipa L.02 OH 0.085 162,400.00 13,804.00
Mandor L.04 OH 0.017 203,000.00 3,451.00
JUMLAH TENAGA KERJA 37,961.00
B. BAHAN
Pipa HDPE Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.065 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.290 121,800.00 35,322.00
Tukang pipa L.02 OH 0.145 162,400.00 23,548.00
Mandor L.04 OH 0.029 203,000.00 5,887.00
JUMLAH TENAGA KERJA 64,757.00
B. BAHAN
Pipa HDPE Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.152 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.359 121,800.00 43,726.20
Tukang pipa L.02 OH 0.180 162,400.00 29,232.00
Mandor L.04 OH 0.036 203,000.00 7,308.00
JUMLAH TENAGA KERJA 80,266.20
B. BAHAN
Pipa HDPE Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.2 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.433 121,800.00 52,739.40
Tukang pipa L.02 OH 0.216 162,400.00 35,078.40
Mandor L.04 OH 0.043 203,000.00 8,729.00
JUMLAH TENAGA KERJA 96,546.80
B. BAHAN
Pipa HDPE Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.251 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.512 121,800.00 62,361.60
Tukang pipa L.02 OH 0.256 162,400.00 41,574.40
Mandor L.04 OH 0.051 203,000.00 10,353.00
JUMLAH TENAGA KERJA 114,289.00
B. BAHAN
Pipa HDPE Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.307 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.893 121,800.00 108,767.40
Tukang pipa L.02 OH 0.446 162,400.00 72,430.40
Mandor L.04 OH 0.089 203,000.00 18,067.00
JUMLAH TENAGA KERJA 199,264.80
B. BAHAN
Pipa HDPE Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.573 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.353 121,800.00 164,795.40
Tukang pipa L.02 OH 0.677 162,400.00 109,944.80
Mandor L.04 OH 0.135 203,000.00 27,405.00
JUMLAH TENAGA KERJA 302,145.20
B. BAHAN
Pipa HDPE Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.883 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.659 121,800.00 202,066.20
Tukang pipa L.02 OH 0.830 162,400.00 134,792.00
Mandor L.04 OH 0.116 203,000.00 23,548.00
JUMLAH TENAGA KERJA 360,406.20
B. BAHAN
Pipa HDPE Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.093 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.818 121,800.00 221,432.40
Tukang pipa L.02 OH 0.909 162,400.00 147,621.60
Mandor L.04 OH 0.182 203,000.00 36,946.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Pipa HDPE Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.205 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.370 121,800.00 288,666.00
Tukang pipa L.02 OH 1.185 162,400.00 192,444.00
Mandor L.04 OH 0.237 203,000.00 48,111.00
JUMLAH TENAGA KERJA 529,221.00
B. BAHAN
Pipa HDPE Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.584 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.345 121,800.00 42,021.00
Tukang pipa L.02 OH 0.172 162,400.00 27,932.80
Mandor L.04 OH 0.034 203,000.00 6,902.00
JUMLAH TENAGA KERJA 76,855.80
B. BAHAN
Pipa GIP Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 121,800.00 48,720.00
Tukang pipa L.02 OH 0.200 162,400.00 32,480.00
Mandor L.04 OH 0.040 203,000.00 8,120.00
JUMLAH TENAGA KERJA 89,320.00
B. BAHAN
Pipa GIP Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.448 121,800.00 54,566.40
Tukang pipa L.02 OH 0.224 162,400.00 36,377.60
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 100,079.00
B. BAHAN
Pipa GIP Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.506 121,800.00 61,630.80
Tukang pipa L.02 OH 0.253 162,400.00 41,087.20
Mandor L.04 OH 0.051 203,000.00 10,353.00
JUMLAH TENAGA KERJA 113,071.00
B. BAHAN
Pipa GIP Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.796 121,800.00 96,952.80
Tukang pipa L.02 OH 0.398 162,400.00 64,635.20
Mandor L.04 OH 0.080 203,000.00 16,240.00
JUMLAH TENAGA KERJA 177,828.00
B. BAHAN
Pipa GIP Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.949 121,800.00 115,588.20
Tukang pipa L.02 OH 0.475 162,400.00 77,140.00
Mandor L.04 OH 0.095 203,000.00 19,285.00
JUMLAH TENAGA KERJA 212,013.20
B. BAHAN
Pipa GIP Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.958 121,800.00 116,684.40
Tukang pipa L.02 OH 0.479 162,400.00 77,789.60
Mandor L.04 OH 0.096 203,000.00 19,488.00
JUMLAH TENAGA KERJA 213,962.00
B. BAHAN
Pipa GIP Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.212 121,800.00 147,621.60
Tukang pipa L.02 OH 0.606 162,400.00 98,414.40
Mandor L.04 OH 0.121 203,000.00 24,563.00
JUMLAH TENAGA KERJA 270,599.00
B. BAHAN
Pipa GIP Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.353 121,800.00 164,795.40
Tukang pipa L.02 OH 0.676 162,400.00 109,782.40
Mandor L.04 OH 0.135 203,000.00 27,405.00
JUMLAH TENAGA KERJA 301,982.80
B. BAHAN
Pipa GIP Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.469 121,800.00 178,924.20
Tukang pipa L.02 OH 0.735 162,400.00 119,364.00
Mandor L.04 OH 0.147 203,000.00 29,841.00
JUMLAH TENAGA KERJA 328,129.20
B. BAHAN
Pipa GIP Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.327 121,800.00 161,628.60
Tukang pipa L.02 OH 0.664 162,400.00 107,833.60
Mandor L.04 OH 0.133 203,000.00 26,999.00
JUMLAH TENAGA KERJA 296,461.20
B. BAHAN
Pipa GIP Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.327 121,800.00 283,428.60
Tukang pipa L.02 OH 1.163 162,400.00 188,871.20
Mandor L.04 OH 0.233 203,000.00 47,299.00
JUMLAH TENAGA KERJA 519,598.80
B. BAHAN
Pipa GIP Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.623 121,800.00 319,481.40
Tukang pipa L.02 OH 1.312 162,400.00 213,068.80
Mandor L.04 OH 0.262 203,000.00 53,186.00
JUMLAH TENAGA KERJA 585,736.20
B. BAHAN
Pipa GIP Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang pipa L.02 OH 1.600 162,400.00 259,840.00
Mandor L.04 OH 0.320 203,000.00 64,960.00
JUMLAH TENAGA KERJA 714,560.00
B. BAHAN
Pipa GIP Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.488 121,800.00 424,838.40
Tukang pipa L.02 OH 1.744 162,400.00 283,225.60
Mandor L.04 OH 0.349 203,000.00 70,847.00
JUMLAH TENAGA KERJA 778,911.00
B. BAHAN
Pipa GIP Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.489 121,800.00 59,560.20
Tukang pipa L.02 OH 0.098 162,400.00 15,915.20
Mandor L.04 OH 0.049 203,000.00 9,947.00
JUMLAH TENAGA KERJA 85,422.40
B. BAHAN
Pipa DCI Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.547 121,800.00 66,624.60
Tukang pipa L.02 OH 0.109 162,400.00 17,701.60
Mandor L.04 OH 0.055 203,000.00 11,165.00
JUMLAH TENAGA KERJA 95,491.20
B. BAHAN
Pipa DCI Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.613 121,800.00 74,663.40
Tukang pipa L.02 OH 0.123 162,400.00 19,975.20
Mandor L.04 OH 0.061 203,000.00 12,383.00
JUMLAH TENAGA KERJA 107,021.60
B. BAHAN
Pipa DCI Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.855 121,800.00 104,139.00
Tukang pipa L.02 OH 0.171 162,400.00 27,770.40
Mandor L.04 OH 0.085 203,000.00 17,255.00
JUMLAH TENAGA KERJA 149,164.40
B. BAHAN
Pipa DCI Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.951 121,800.00 115,831.80
Tukang pipa L.02 OH 0.190 162,400.00 30,856.00
Mandor L.04 OH 0.095 203,000.00 19,285.00
JUMLAH TENAGA KERJA 165,972.80
B. BAHAN
Pipa DCI Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.05 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.973 121,800.00 118,511.40
Tukang pipa L.02 OH 0.195 162,400.00 31,668.00
Mandor L.04 OH 0.097 203,000.00 19,691.00
JUMLAH TENAGA KERJA 169,870.40
B. BAHAN
Pipa DCI Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.071 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.545 121,800.00 188,181.00
Tukang pipa L.02 OH 0.309 162,400.00 50,181.60
Operator alat berat L.08 OH 0.093 182,700.00 16,991.10
Mandor L.04 OH 0.154 203,000.00 31,262.00
JUMLAH TENAGA KERJA 286,615.70
B. BAHAN
Pipa DCI Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.023 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.031 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.813 121,800.00 220,823.40
Tukang pipa L.02 OH 0.363 162,400.00 58,951.20
Operator alat berat L.08 OH 0.143 182,700.00
Mandor L.04 OH 0.181 203,000.00 36,743.00
JUMLAH TENAGA KERJA 316,517.60
B. BAHAN
Pipa DCI Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.029 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.047 121,800.00 249,324.60
Tukang pipa L.02 OH 0.409 162,400.00 66,421.60
Operator alat berat L.08 OH 0.193 182,700.00
Mandor L.04 OH 0.205 203,000.00 41,615.00
JUMLAH TENAGA KERJA 357,361.20
B. BAHAN
Pipa DCI Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.034 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.045 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.58. Pemasangan 1 m pipa DCI Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.011 121,800.00 244,939.80
Tukang pipa L.02 OH 0.402 162,400.00 65,284.80
Operator alat berat L.08 OH 0.293 182,700.00
Mandor L.04 OH 0.201 203,000.00 40,803.00
JUMLAH TENAGA KERJA 351,027.60
B. BAHAN
Pipa DCI Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.058 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.077 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.59. Pemasangan 1 m pipa DCI Ø 800 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.859 121,800.00 470,026.20
Tukang pipa L.02 OH 0.772 162,400.00 125,372.80
Operator alat berat L.08 OH 0.493 182,700.00
Mandor L.04 OH 0.386 203,000.00 78,358.00
JUMLAH TENAGA KERJA 673,757.00
B. BAHAN
Pipa DCI Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.034 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.225 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.60. Pemasangan 1 m pipa DCI Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.995 121,800.00 608,391.00
Tukang pipa L.02 OH 0.999 162,400.00 162,237.60
Operator alat berat L.08 OH 0.593 182,700.00
Mandor L.04 OH 0.154 203,000.00 31,262.00
JUMLAH TENAGA KERJA 801,890.60
B. BAHAN
Pipa DCI Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.093 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.248 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.61. Pemasangan 1 m pipa DCI Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.931 121,800.00 722,395.80
Tukang pipa L.02 OH 1.186 162,400.00 192,606.40
Operator alat berat L.08 OH 0.793 182,700.00
Mandor L.04 OH 0.693 203,000.00 140,679.00
JUMLAH TENAGA KERJA 1,055,681.20
B. BAHAN
Pipa DCI Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.112 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.298 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.62. Pemasangan 1 m pipa DCI Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.949 121,800.00 846,388.20
Tukang pipa L.02 OH 1.390 162,400.00 225,736.00
Operator alat berat L.08 OH 0.793 182,700.00
Mandor L.04 OH 0.695 203,000.00 141,085.00
JUMLAH TENAGA KERJA 1,213,209.20
B. BAHAN
Pipa DCI Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.152 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.304 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.63. Pemasangan 1 m pipa DCI Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 8.056 121,800.00 981,220.80
Tukang pipa L.02 OH 1.611 162,400.00 261,626.40
Operator alat berat L.08 OH 0.893 182,700.00
Mandor L.04 OH 0.806 203,000.00 163,618.00
JUMLAH TENAGA KERJA 1,406,465.20
B. BAHAN
Pipa DCI Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.18 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.36 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.499 121,800.00 60,778.20
Tukang pipa L.02 OH 0.100 162,400.00 16,240.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 87,168.20
B. BAHAN
Pipa baja Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.031 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.579 121,800.00 70,522.20
Tukang pipa L.02 OH 0.116 162,400.00 18,838.40
Mandor L.04 OH 0.058 203,000.00 11,774.00
JUMLAH TENAGA KERJA 101,134.60
B. BAHAN
Pipa baja Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.648 121,800.00 78,926.40
Tukang pipa L.02 OH 0.130 162,400.00 21,112.00
Mandor L.04 OH 0.065 203,000.00 13,195.00
JUMLAH TENAGA KERJA 113,233.40
B. BAHAN
Pipa baja Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.708 121,800.00 86,234.40
Tukang pipa L.02 OH 0.142 162,400.00 23,060.80
Mandor L.04 OH 0.071 203,000.00 14,413.00
JUMLAH TENAGA KERJA 123,708.20
B. BAHAN
Pipa baja Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.113 121,800.00 135,563.40
Tukang pipa L.02 OH 0.223 162,400.00 36,215.20
Mandor L.04 OH 0.111 203,000.00 22,533.00
JUMLAH TENAGA KERJA 194,311.60
B. BAHAN
Pipa baja Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.69. Pemasangan 1 m pipa baja Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.325 121,800.00 161,385.00
Tukang pipa L.02 OH 0.265 162,400.00 43,036.00
Mandor L.04 OH 0.133 203,000.00 26,999.00
JUMLAH TENAGA KERJA 231,420.00
B. BAHAN
Pipa baja Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.415 121,800.00 172,347.00
Tukang pipa L.02 OH 0.283 162,400.00 45,959.20
Mandor L.04 OH 0.141 203,000.00 28,623.00
JUMLAH TENAGA KERJA 246,929.20
B. BAHAN
Pipa baja Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.366 121,800.00 288,178.80
Tukang pipa L.02 OH 0.473 162,400.00 76,815.20
Mandor L.04 OH 0.237 203,000.00 48,111.00
JUMLAH TENAGA KERJA 413,105.00
B. BAHAN
Pipa baja Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.027 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.231 121,800.00 271,735.80
Tukang pipa L.02 OH 0.446 162,400.00 72,430.40
Mandor L.04 OH 0.223 203,000.00 45,269.00
JUMLAH TENAGA KERJA 389,435.20
B. BAHAN
Pipa baja Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.026 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.037 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.432 121,800.00 296,217.60
Tukang pipa L.02 OH 0.486 162,400.00 78,926.40
Mandor L.04 OH 0.243 203,000.00 49,329.00
JUMLAH TENAGA KERJA 424,473.00
B. BAHAN
Pipa baja Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.029 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.045 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.208 121,800.00 268,934.40
Tukang pipa L.02 OH 0.442 162,400.00 71,780.80
Mandor L.04 OH 0.221 203,000.00 44,863.00
JUMLAH TENAGA KERJA 385,578.20
B. BAHAN
Pipa baja Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.027 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.897 121,800.00 474,654.60
Tukang pipa L.02 OH 0.779 162,400.00 126,509.60
Mandor L.04 OH 0.390 203,000.00 79,170.00
JUMLAH TENAGA KERJA 680,334.20
B. BAHAN
Pipa baja Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.046 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.098 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.403 121,800.00 536,285.40
Tukang pipa L.02 OH 0.081 162,400.00 13,154.40
Mandor L.04 OH 0.440 203,000.00 89,320.00
JUMLAH TENAGA KERJA 638,759.80
B. BAHAN
Pipa baja Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.052 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.115 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.895 121,800.00 596,211.00
Tukang pipa L.02 OH 0.979 162,400.00 158,989.60
Mandor L.04 OH 0.489 203,000.00 99,267.00
JUMLAH TENAGA KERJA 854,467.60
B. BAHAN
Pipa baja Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.058 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.133 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.387 121,800.00 656,136.60
Tukang pipa L.02 OH 1.077 162,400.00 174,904.80
Mandor L.04 OH 0.539 203,000.00 109,417.00
JUMLAH TENAGA KERJA 940,458.40
B. BAHAN
Pipa baja Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.064 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.15 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.897 121,800.00 718,254.60
Tukang pipa L.02 OH 1.176 162,400.00 190,982.40
Mandor L.04 OH 0.588 203,000.00 119,364.00
JUMLAH TENAGA KERJA 1,028,601.00
B. BAHAN
Pipa baja Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.07 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.167 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA

A. 8.4.2.1. Pemotongan 1 buah pipa PVC Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 121,800.00 609.00
Tukang pipa L.02 OH 0.002 162,400.00 324.80
Mandor L.04 OH 0.0005 203,000.00 101.50
JUMLAH TENAGA KERJA 1,035.30
B. BAHAN
Pipa PVC Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.2. Pemotongan 1 buah pipa PVC Ø 90 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.014 121,800.00 1,705.20
Tukang pipa L.02 OH 0.007 162,400.00 1,136.80
Mandor L.04 OH 0.001 203,000.00 203.00
JUMLAH TENAGA KERJA 3,045.00
B. BAHAN
Pipa PVC Ø 90 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.3. Pemotongan 1 buah pipa PVC Ø 110 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.022 121,800.00 2,679.60
Tukang pipa L.02 OH 0.011 162,400.00 1,786.40
Mandor L.04 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 4,872.00
B. BAHAN
Pipa PVC Ø 110 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.4. Pemotongan 1 buah pipa PVC Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.031 121,800.00 3,775.80
Tukang pipa L.02 OH 0.015 162,400.00 2,436.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 6,820.80
B. BAHAN
Pipa PVC Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.5. Pemotongan 1 buah pipa PVC Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang pipa L.02 OH 0.040 162,400.00 6,496.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 17,985.80
B. BAHAN
Pipa PVC Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.017 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.6. Pemotongan 1 buah pipa PVC Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.128 121,800.00 15,590.40
Tukang pipa L.02 OH 0.064 162,400.00 10,393.60
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 28,623.00
B. BAHAN
Pipa PVC Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.03 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.7. Pemotongan 1 buah pipa PVC Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.155 121,800.00 18,879.00
Tukang pipa L.02 OH 0.077 162,400.00 12,504.80
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 34,428.80
B. BAHAN
Pipa PVC Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.037 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.8. Pemotongan 1 buah pipa PVC Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.331 121,800.00 40,315.80
Tukang pipa L.02 OH 0.166 162,400.00 26,958.40
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 73,973.20
B. BAHAN
Pipa PVC Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.086 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.9. Pemotongan 1 buah pipa PVC Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.420 121,800.00 51,156.00
Tukang pipa L.02 OH 0.210 162,400.00 34,104.00
Mandor L.04 OH 0.0420 203,000.00 8,526.00
JUMLAH TENAGA KERJA 93,786.00
B. BAHAN
Pipa PVC Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.054 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.10. Pemotongan 1 buah pipa PVC Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.518 121,800.00 63,092.40
Tukang pipa L.02 OH 0.259 162,400.00 42,061.60
Mandor L.04 OH 0.0520 203,000.00 10,556.00
JUMLAH TENAGA KERJA 115,710.00
B. BAHAN
Pipa PVC Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.069 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.11. Pemotongan 1 buah pipa PVC Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.623 121,800.00 75,881.40
Tukang pipa L.02 OH 0.311 162,400.00 50,506.40
Mandor L.04 OH 0.0620 203,000.00 12,586.00
JUMLAH TENAGA KERJA 138,973.80
B. BAHAN
Pipa PVC Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.086 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.12. Pemotongan 1 buah pipa PVC Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.089 121,800.00 132,640.20
Tukang pipa L.02 OH 0.545 162,400.00 88,508.00
Mandor L.04 OH 0.1090 203,000.00 22,127.00
JUMLAH TENAGA KERJA 243,275.20
B. BAHAN
Pipa PVC Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.16 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.13. Pemotongan 1 buah pipa PVC Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.141 121,800.00 138,973.80
Tukang pipa L.02 OH 0.571 162,400.00 92,730.40
Mandor L.04 OH 0.1140 203,000.00 23,142.00
JUMLAH TENAGA KERJA 254,846.20
B. BAHAN
Pipa PVC Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.168 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.14. Pemotongan 1 buah pipa PVC Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.285 121,800.00 156,513.00
Tukang pipa L.02 OH 0.643 162,400.00 104,423.20
Mandor L.04 OH 0.1290 203,000.00 26,187.00
JUMLAH TENAGA KERJA 287,123.20
B. BAHAN
Pipa PVC Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.191 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.15. Pemotongan 1 buah pipa PVC Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 121,800.00 174,052.20
Tukang pipa L.02 OH 0.715 162,400.00 116,116.00
Mandor L.04 OH 0.1430 203,000.00 29,029.00
JUMLAH TENAGA KERJA 319,197.20
B. BAHAN
Pipa PVC Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.213 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.16. Pemotongan 1 buah pipa PVC Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.573 121,800.00 191,591.40
Tukang pipa L.02 OH 0.787 162,400.00 127,808.80
Mandor L.04 OH 0.1570 203,000.00 31,871.00
JUMLAH TENAGA KERJA 351,271.20
B. BAHAN
Pipa PVC Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.236 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.17. Pemotongan 1 buah pipa HDPE Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.002 121,800.00 243.60
Tukang pipa L.02 OH 0.001 162,400.00 162.40
Mandor L.04 OH 0.0002 203,000.00
Operator L.08 OH 0.0340 203,000.00 6,902.00
JUMLAH TENAGA KERJA 7,308.00
B. BAHAN
Pipa HDPE Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.004 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.18. Pemotongan 1 buah pipa HDPE Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.006 121,800.00 730.80
Tukang pipa L.02 OH 0.003 162,400.00 487.20
Mandor L.04 OH 0.0010 203,000.00 203.00
Operator L.08 OH 0.0710 203,000.00 14,413.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Pipa HDPE Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.005 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.19. Pemotongan 1 buah pipa HDPE Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.009 121,800.00 1,096.20
Tukang pipa L.02 OH 0.005 162,400.00 812.00
Mandor L.04 OH 0.0010 203,000.00 203.00
Operator L.08 OH 0.0960 203,000.00 19,488.00
JUMLAH TENAGA KERJA 21,599.20
B. BAHAN
Pipa HDPE Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.006 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.20. Pemotongan 1 buah pipa HDPE Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.016 121,800.00 1,948.80
Tukang pipa L.02 OH 0.008 162,400.00 1,299.20
Mandor L.04 OH 0.0020 203,000.00
Operator L.08 OH 0.1210 203,000.00 24,563.00
JUMLAH TENAGA KERJA 27,811.00
B. BAHAN
Pipa HDPE Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.009 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.21. Pemotongan 1 buah pipa HDPE Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.044 121,800.00 5,359.20
Tukang pipa L.02 OH 0.022 162,400.00 3,572.80
Mandor L.04 OH 0.0040 203,000.00
Operator L.08 OH 0.1710 203,000.00 34,713.00
JUMLAH TENAGA KERJA 43,645.00
B. BAHAN
Pipa HDPE Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.017 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.22. Pemotongan 1 buah pipa HDPE Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.067 121,800.00 8,160.60
Tukang pipa L.02 OH 0.033 162,400.00 5,359.20
Mandor L.04 OH 0.0070 203,000.00
Operator L.08 OH 0.2210 203,000.00 44,863.00
JUMLAH TENAGA KERJA 58,382.80
B. BAHAN
Pipa HDPE Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.023 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.23. Pemotongan 1 buah pipa HDPE Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 121,800.00 10,962.00
Tukang pipa L.02 OH 0.045 162,400.00 7,308.00
Mandor L.04 OH 0.0090 203,000.00
Operator L.08 OH 0.2710 203,000.00 55,013.00
JUMLAH TENAGA KERJA 73,283.00
B. BAHAN
Pipa HDPE Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.03 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.24. Pemotongan 1 buah pipa HDPE Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.177 121,800.00 21,558.60
Tukang pipa L.02 OH 0.088 162,400.00 14,291.20
Mandor L.04 OH 0.0180 203,000.00
Operator L.08 OH 0.3710 203,000.00 75,313.00
JUMLAH TENAGA KERJA 111,162.80
B. BAHAN
Pipa HDPE Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.055 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.25. Pemotongan 1 buah pipa HDPE Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.225 121,800.00 27,405.00
Tukang pipa L.02 OH 0.113 162,400.00 18,351.20
Mandor L.04 OH 0.0230 203,000.00
Operator L.08 OH 0.4210 203,000.00 85,463.00
JUMLAH TENAGA KERJA 131,219.20
B. BAHAN
Pipa HDPE Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.07 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.26. Pemotongan 1 buah pipa HDPE Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.277 121,800.00 33,738.60
Tukang pipa L.02 OH 0.139 162,400.00 22,573.60
Mandor L.04 OH 0.0280 203,000.00
Operator L.08 OH 0.4710 203,000.00 95,613.00
JUMLAH TENAGA KERJA 151,925.20
B. BAHAN
Pipa HDPE Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.085 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.27. Pemotongan 1 buah pipa HDPE Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.333 121,800.00 40,559.40
Tukang pipa L.02 OH 0.167 162,400.00 27,120.80
Mandor L.04 OH 0.0330 203,000.00 6,699.00
Operator L.08 OH 0.5710 203,000.00 115,913.00
JUMLAH TENAGA KERJA 190,292.20
B. BAHAN
Pipa HDPE Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.101 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.28. Pemotongan 1 buah pipa HDPE Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.601 121,800.00 73,201.80
Tukang pipa L.02 OH 0.301 162,400.00 48,882.40
Mandor L.04 OH 0.0600 203,000.00 12,180.00
Operator L.08 OH 0.7710 203,000.00 156,513.00
JUMLAH TENAGA KERJA 290,777.20
B. BAHAN
Pipa HDPE Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.179 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.29. Pemotongan 1 buah pipa HDPE Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.913 121,800.00 111,203.40
Tukang pipa L.02 OH 0.456 162,400.00 74,054.40
Mandor L.04 OH 0.0910 203,000.00
Operator L.08 OH 0.8710 203,000.00 176,813.00
JUMLAH TENAGA KERJA 362,070.80
B. BAHAN
Pipa HDPE Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.27 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.30. Pemotongan 1 buah pipa HDPE Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.125 121,800.00 137,025.00
Tukang pipa L.02 OH 0.562 162,400.00 91,268.80
Mandor L.04 OH 0.1120 203,000.00
Operator L.08 OH 0.9710 203,000.00 197,113.00
JUMLAH TENAGA KERJA 425,406.80
B. BAHAN
Pipa HDPE Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.332 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.31. Pemotongan 1 buah pipa HDPE Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.238 121,800.00 150,788.40
Tukang pipa L.02 OH 0.619 162,400.00 100,525.60
Mandor L.04 OH 0.1240 203,000.00
Operator L.08 OH 1.0710 203,000.00 217,413.00
JUMLAH TENAGA KERJA 468,727.00
B. BAHAN
Pipa HDPE Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.365 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.32. Pemotongan 1 buah pipa HDPE Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.019 121,800.00 2,314.20
Tukang pipa L.02 OH 0.010 162,400.00 1,624.00
Mandor L.04 OH 0.0020 203,000.00
JUMLAH TENAGA KERJA 3,938.20
B. BAHAN
Pipa GIP Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.33. Pemotongan 1 buah pipa GIP Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.019 121,800.00 2,314.20
Tukang pipa L.02 OH 0.010 162,400.00 1,624.00
Mandor L.04 OH 0.0020 203,000.00
JUMLAH TENAGA KERJA 3,938.20
B. BAHAN
Pipa GIP Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.34. Pemotongan 1 buah pipa GIP Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.058 121,800.00 7,064.40
Tukang pipa L.02 OH 0.029 162,400.00 4,709.60
Mandor L.04 OH 0.0060 203,000.00
JUMLAH TENAGA KERJA 11,774.00
B. BAHAN
Pipa GIP Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.35. Pemotongan 1 buah pipa GIP Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.092 121,800.00 11,205.60
Tukang pipa L.02 OH 0.046 162,400.00 7,470.40
Mandor L.04 OH 0.0090 203,000.00
JUMLAH TENAGA KERJA 18,676.00
B. BAHAN
Pipa GIP Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.36. Pemotongan 1 buah pipa GIP Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.131 121,800.00 15,955.80
Tukang pipa L.02 OH 0.066 162,400.00 10,718.40
Mandor L.04 OH 0.0130 203,000.00
JUMLAH TENAGA KERJA 26,674.20
B. BAHAN
Pipa GIP Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.37. Pemotongan 1 buah pipa GIP Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.340 121,800.00 41,412.00
Tukang pipa L.02 OH 0.170 162,400.00 27,608.00
Mandor L.04 OH 0.0340 203,000.00
JUMLAH TENAGA KERJA 69,020.00
B. BAHAN
Pipa GIP Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.38. Pemotongan 1 buah pipa GIP Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.475 121,800.00 57,855.00
Tukang pipa L.02 OH 0.237 162,400.00 38,488.80
Mandor L.04 OH 0.0470 203,000.00
JUMLAH TENAGA KERJA 96,343.80
B. BAHAN
Pipa GIP Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.39. Pemotongan 1 buah pipa GIP Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.504 121,800.00 61,387.20
Tukang pipa L.02 OH 0.252 162,400.00 40,924.80
Mandor L.04 OH 0.0500 203,000.00
JUMLAH TENAGA KERJA 102,312.00
B. BAHAN
Pipa GIP Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.40. Pemotongan 1 buah pipa GIP Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.738 121,800.00 89,888.40
Tukang pipa L.02 OH 0.369 162,400.00 59,925.60
Mandor L.04 OH 0.0740 203,000.00
JUMLAH TENAGA KERJA 149,814.00
B. BAHAN
Pipa GIP Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.41. Pemotongan 1 buah pipa GIP Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.848 121,800.00 103,286.40
Tukang pipa L.02 OH 0.424 162,400.00 68,857.60
Mandor L.04 OH 0.0850 203,000.00
JUMLAH TENAGA KERJA 172,144.00
B. BAHAN
Pipa GIP Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.42. Pemotongan 1 buah pipa GIP Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.941 121,800.00 114,613.80
Tukang pipa L.02 OH 0.471 162,400.00 76,490.40
Mandor L.04 OH 0.0940 203,000.00
JUMLAH TENAGA KERJA 191,104.20
B. BAHAN
Pipa GIP Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.43. Pemotongan 1 buah pipa GIP Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.864 121,800.00 105,235.20
Tukang pipa L.02 OH 0.432 162,400.00 70,156.80
Mandor L.04 OH 0.0860 203,000.00
JUMLAH TENAGA KERJA 175,392.00
B. BAHAN
Pipa GIP Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.44. Pemotongan 1 buah pipa GIP Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.567 121,800.00 190,860.60
Tukang pipa L.02 OH 0.783 162,400.00 127,159.20
Mandor L.04 OH 0.1570 203,000.00
JUMLAH TENAGA KERJA 318,019.80
B. BAHAN
Pipa GIP Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.45. Pemotongan 1 buah pipa GIP Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.770 121,800.00 215,586.00
Tukang pipa L.02 OH 0.885 162,400.00 143,724.00
Mandor L.04 OH 0.1770 203,000.00
JUMLAH TENAGA KERJA 359,310.00
B. BAHAN
Pipa GIP Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.46. Pemotongan 1 buah pipa GIP Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.974 121,800.00 240,433.20
Tukang pipa L.02 OH 0.987 162,400.00 160,288.80
Mandor L.04 OH 0.1970 203,000.00
JUMLAH TENAGA KERJA 400,722.00
B. BAHAN
Pipa GIP Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.47. Pemotongan 1 buah pipa GIP Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.178 121,800.00 265,280.40
Tukang pipa L.02 OH 1.089 162,400.00 176,853.60
Mandor L.04 OH 0.2180 203,000.00
JUMLAH TENAGA KERJA 442,134.00
B. BAHAN
Pipa GIP Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.48. Pemotongan 1 buah pipa GIP Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.382 121,800.00 290,127.60
Tukang pipa L.02 OH 1.191 162,400.00 193,418.40
Mandor L.04 OH 0.2380 203,000.00
JUMLAH TENAGA KERJA 483,546.00
B. BAHAN
Pipa GIP Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.49. Pemotongan 1 buah pipa DCI Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.071 121,800.00 8,647.80
Tukang pipa L.02 OH 0.014 162,400.00 2,273.60
Mandor L.04 OH 0.0070 203,000.00
JUMLAH TENAGA KERJA 10,921.40
B. BAHAN
Pipa DCI Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.003 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.50. Pemotongan 1 buah pipa DCI Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.112 121,800.00 13,641.60
Tukang pipa L.02 OH 0.022 162,400.00 3,572.80
Mandor L.04 OH 0.0110 203,000.00
JUMLAH TENAGA KERJA 17,214.40
B. BAHAN
Pipa DCI Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.01 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.51. Pemotongan 1 buah pipa DCI Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.159 121,800.00 19,366.20
Tukang pipa L.02 OH 0.032 162,400.00 5,196.80
Mandor L.04 OH 0.0160 203,000.00
JUMLAH TENAGA KERJA 24,563.00
B. BAHAN
Pipa DCI Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.018 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.52. Pemotongan 1 buah pipa DCI Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.366 121,800.00 44,578.80
Tukang pipa L.02 OH 0.073 162,400.00 11,855.20
Mandor L.04 OH 0.0370 203,000.00
JUMLAH TENAGA KERJA 56,434.00
B. BAHAN
Pipa DCI Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.054 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.53. Pemotongan 1 buah pipa DCI Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.476 121,800.00 57,976.80
Tukang pipa L.02 OH 0.095 162,400.00 15,428.00
Mandor L.04 OH 0.0480 203,000.00
JUMLAH TENAGA KERJA 73,404.80
B. BAHAN
Pipa DCI Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.073 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.54. Pemotongan 1 buah pipa DCI Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.512 121,800.00 62,361.60
Tukang pipa L.02 OH 0.102 162,400.00 16,564.80
Mandor L.04 OH 0.0510 203,000.00
JUMLAH TENAGA KERJA 78,926.40
B. BAHAN
Pipa DCI Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.079 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.55. Pemotongan 1 buah pipa DCI Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.941 121,800.00 114,613.80
Tukang pipa L.02 OH 0.188 162,400.00 30,531.20
Mandor L.04 OH 0.0940 203,000.00
JUMLAH TENAGA KERJA 145,145.00
B. BAHAN
Pipa DCI Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.158 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.56. Pemotongan 1 buah pipa DCI Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.137 121,800.00 138,486.60
Tukang pipa L.02 OH 0.227 162,400.00 36,864.80
Mandor L.04 OH 0.1140 203,000.00
JUMLAH TENAGA KERJA 175,351.40
B. BAHAN
Pipa DCI Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.176 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.57. Pemotongan 1 buah pipa DCI Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.312 121,800.00 159,801.60
Tukang pipa L.02 OH 0.262 162,400.00 42,548.80
Mandor L.04 OH 0.1310 203,000.00
JUMLAH TENAGA KERJA 202,350.40
B. BAHAN
Pipa DCI Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.192 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.58. Pemotongan 1 buah pipa DCI Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.309 121,800.00 159,436.20
Tukang pipa L.02 OH 0.262 162,400.00 42,548.80
Mandor L.04 OH 0.1310 203,000.00
JUMLAH TENAGA KERJA 201,985.00
B. BAHAN
Pipa DCI Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.192 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.59. Pemotongan 1 buah pipa DCI Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.598 121,800.00 316,436.40
Tukang pipa L.02 OH 0.520 162,400.00 84,448.00
Mandor L.04 OH 0.2600 203,000.00
JUMLAH TENAGA KERJA 400,884.40
B. BAHAN
Pipa DCI Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.31 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.60. Pemotongan 1 buah pipa DCI Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.370 121,800.00 410,466.00
Tukang pipa L.02 OH 0.674 162,400.00 109,457.60
Mandor L.04 OH 0.3370 203,000.00
JUMLAH TENAGA KERJA 519,923.60
B. BAHAN
Pipa DCI Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.381 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.61. Pemotongan 1 buah pipa DCI Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.021 121,800.00 489,757.80
Tukang pipa L.02 OH 0.804 162,400.00 130,569.60
Mandor L.04 OH 0.4020 203,000.00
JUMLAH TENAGA KERJA 620,327.40
B. BAHAN
Pipa DCI Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.441 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.62. Pemotongan 1 buah pipa DCI Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.731 121,800.00 576,235.80
Tukang pipa L.02 OH 0.946 162,400.00 153,630.40
Mandor L.04 OH 0.4730 203,000.00
JUMLAH TENAGA KERJA 729,866.20
B. BAHAN
Pipa DCI Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.506 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.63. Pemotongan 1 buah pipa DCI Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.502 121,800.00 670,143.60
Tukang pipa L.02 OH 1.100 162,400.00 178,640.00
Mandor L.04 OH 0.5500 203,000.00
JUMLAH TENAGA KERJA 848,783.60
B. BAHAN
Pipa DCI Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.576 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.64. Pemotongan 1 buah pipa baja Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 121,800.00 3,410.40
Tukang pipa L.02 OH 0.006 162,400.00 974.40
Mandor L.04 OH 0.0030 203,000.00
JUMLAH TENAGA KERJA 4,384.80
B. BAHAN
Pipa baja Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.037 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.65. Pemotongan 1 buah pipa baja Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.085 121,800.00 10,353.00
Tukang pipa L.02 OH 0.017 162,400.00 2,760.80
Mandor L.04 OH 0.0080 203,000.00
JUMLAH TENAGA KERJA 13,113.80
B. BAHAN
Pipa baja Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.04 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.66. Pemotongan 1 buah pipa baja Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.133 121,800.00 16,199.40
Tukang pipa L.02 OH 0.027 162,400.00 4,384.80
Mandor L.04 OH 0.0130 203,000.00
JUMLAH TENAGA KERJA 20,584.20
B. BAHAN
Pipa baja Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.042 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.2.67. Pemotongan 1 buah pipa baja Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.184 121,800.00 22,411.20
Tukang pipa L.02 OH 0.037 162,400.00 6,008.80
Mandor L.04 OH 0.0180 203,000.00
JUMLAH TENAGA KERJA 28,420.00
B. BAHAN
Pipa baja Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.045 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.68. Pemotongan 1 buah pipa baja Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.476 121,800.00 57,976.80
Tukang pipa L.02 OH 0.095 162,400.00 15,428.00
Mandor L.04 OH 0.0480 203,000.00
JUMLAH TENAGA KERJA 73,404.80
B. BAHAN
Pipa baja Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.06 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.69. Pemotongan 1 buah pipa baja Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.663 121,800.00 80,753.40
Tukang pipa L.02 OH 0.133 162,400.00 21,599.20
Mandor L.04 OH 0.0660 203,000.00
JUMLAH TENAGA KERJA 102,352.60
B. BAHAN
Pipa baja Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.068 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.2.70. Pemotongan 1 buah pipa baja Ø 300 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.745 121,800.00 90,741.00
Tukang pipa L.02 OH 0.149 162,400.00 24,197.60
Mandor L.04 OH 0.0740 203,000.00
JUMLAH TENAGA KERJA 114,938.60
B. BAHAN
Pipa baja Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.072 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.71. Pemotongan 1 buah pipa baja Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.440 121,800.00 175,392.00
Tukang pipa L.02 OH 0.288 162,400.00 46,771.20
Mandor L.04 OH 0.1440 203,000.00
JUMLAH TENAGA KERJA 222,163.20
B. BAHAN
Pipa baja Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.105 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.72. Pemotongan 1 buah pipa baja Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.399 121,800.00 170,398.20
Tukang pipa L.02 OH 0.280 162,400.00 45,472.00
Mandor L.04 OH 0.1400 203,000.00
JUMLAH TENAGA KERJA 215,870.20
B. BAHAN
Pipa baja Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.107 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.73. Pemotongan 1 buah pipa baja Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.558 121,800.00 189,764.40
Tukang pipa L.02 OH 0.312 162,400.00 50,668.80
Mandor L.04 OH 0.1560 203,000.00
JUMLAH TENAGA KERJA 240,433.20
B. BAHAN
Pipa baja Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.107 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.74. Pemotongan 1 buah pipa baja Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.437 121,800.00 175,026.60
Tukang pipa L.02 OH 0.287 162,400.00 46,608.80
Mandor L.04 OH 0.1440 203,000.00
JUMLAH TENAGA KERJA 221,635.40
B. BAHAN
Pipa baja Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.113 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.75. Pemotongan 1 buah pipa baja Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.624 121,800.00 319,603.20
Tukang pipa L.02 OH 0.525 162,400.00 85,260.00
Mandor L.04 OH 0.2620 203,000.00
JUMLAH TENAGA KERJA 404,863.20
B. BAHAN
Pipa baja Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.166 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.76. Pemotongan 1 buah pipa baja Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.971 121,800.00 361,867.80
Tukang pipa L.02 OH 0.594 162,400.00 96,465.60
Mandor L.04 OH 0.2970 203,000.00
JUMLAH TENAGA KERJA 458,333.40
B. BAHAN
Pipa baja Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.183 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.77. Pemotongan 1 buah pipa baja Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.319 121,800.00 404,254.20
Tukang pipa L.02 OH 0.664 162,400.00 107,833.60
Mandor L.04 OH 0.3320 203,000.00
JUMLAH TENAGA KERJA 512,087.80
B. BAHAN
Pipa baja Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.201 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.78. Pemotongan 1 buah pipa baja Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.667 121,800.00 446,640.60
Tukang pipa L.02 OH 0.733 162,400.00 119,039.20
Mandor L.04 OH 0.3670 203,000.00
JUMLAH TENAGA KERJA 565,679.80
B. BAHAN
Pipa baja Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.218 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.79. Pemotongan 1 buah pipa baja Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.015 121,800.00 489,027.00
Tukang pipa L.02 OH 0.803 162,400.00 130,407.20
Mandor L.04 OH 0.4020 203,000.00
JUMLAH TENAGA KERJA 619,434.20
B. BAHAN
Pipa baja Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.236 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

A. 8.4.3.1. Pemasangan 1 Buah Valve Æ 150 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 121,800.00 174,052.20
Tukang pipa L.02 OH 0.715 162,400.00 116,116.00
Mandor L.04 OH 0.143 203,000.00 29,029.00
JUMLAH TENAGA KERJA 319,197.20
B. BAHAN
Valve Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.100 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.2. Pemasangan 1 Buah Valve Æ 200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 121,800.00 208,765.20
Tukang pipa L.02 OH 0.857 162,400.00 139,176.80
Mandor L.04 OH 0.171 203,000.00 34,713.00
JUMLAH TENAGA KERJA 382,655.00
B. BAHAN
Valve Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.300 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.3. Pemasangan 1 Buah Valve Æ 250 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 121,800.00 208,765.20
Tukang pipa L.02 OH 0.857 162,400.00 139,176.80
Mandor L.04 OH 0.171 203,000.00 34,713.00
JUMLAH TENAGA KERJA 382,655.00
B. BAHAN
Valve Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.400 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.4. Pemasangan 1 Buah Valve Æ 300 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 121,800.00 243,600.00
Tukang pipa L.02 OH 1.000 162,400.00 162,400.00
Mandor L.04 OH 0.200 203,000.00 40,600.00
JUMLAH TENAGA KERJA 446,600.00
B. BAHAN
Valve Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.5. Pemasangan 1 Buah Valve Æ 400 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.429 121,800.00 417,652.20
Tukang pipa L.02 OH 1.715 162,400.00 278,516.00
Mandor L.04 OH 0.343 203,000.00 69,629.00
JUMLAH TENAGA KERJA 765,797.20
B. BAHAN
Valve Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.6. Pemasangan 1 Buah Valve Æ 450 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.429 121,800.00 417,652.20
Tukang pipa L.02 OH 1.715 162,400.00 278,516.00
Mandor L.04 OH 0.343 203,000.00 69,629.00
JUMLAH TENAGA KERJA 765,797.20
B. BAHAN
Valve Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.7. Pemasangan 1 Buah Valve Æ 500 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 121,800.00 487,200.00
Tukang pipa L.02 OH 2.000 162,400.00 324,800.00
Mandor L.04 OH 0.400 203,000.00 81,200.00
JUMLAH TENAGA KERJA 893,200.00
B. BAHAN
Valve Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.8. Pemasangan 1 Buah Valve Æ 600 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.421 121,800.00 173,077.80
Tukang pipa L.02 OH 0.711 162,400.00 115,466.40
Mandor L.04 OH 0.142 203,000.00 28,826.00
JUMLAH TENAGA KERJA 317,370.20
B. BAHAN
Valve Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.600 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.300 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.9. Pemasangan 1 Buah Valve Æ 700 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 121,800.00 174,052.20
Tukang pipa L.02 OH 0.715 162,400.00 116,116.00
Mandor L.04 OH 0.143 203,000.00 29,029.00
JUMLAH TENAGA KERJA 319,197.20
B. BAHAN
Valve Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.500 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.10. Pemasangan 1 Buah Valve Æ 800 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.786 121,800.00 217,534.80
Tukang pipa L.02 OH 0.893 162,400.00 145,023.20
Mandor L.04 OH 0.179 203,000.00 36,337.00
JUMLAH TENAGA KERJA 398,895.00
B. BAHAN
Valve Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.500 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.11. Pemasangan 1 Buah Valve Æ 900 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 121,800.00 208,765.20
Tukang pipa L.02 OH 0.857 162,400.00 139,176.80
Mandor L.04 OH 0.171 203,000.00 34,713.00
JUMLAH TENAGA KERJA 382,655.00
B. BAHAN
Valve Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.750 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.750 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.12. Pemasangan 1 Buah Valve Æ 1000 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.571 162,400.00 417,530.40
Tukang pipa L.02 OH 1.286 203,000.00 261,058.00
Mandor L.04 OH 0.257 203,000.00 52,171.00
JUMLAH TENAGA KERJA 730,759.40
B. BAHAN
Valve Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.13. Pemasangan 1 Buah Valve Æ 1100 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang pipa L.02 OH 1.500 162,400.00 243,600.00
Mandor L.04 OH 0.300 203,000.00 60,900.00
JUMLAH TENAGA KERJA 669,900.00
B. BAHAN
Valve Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.14. Pemasangan 1 Buah Valve Æ 1200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang pipa L.02 OH 1.500 162,400.00 243,600.00
Mandor L.04 OH 0.300 203,000.00 60,900.00
JUMLAH TENAGA KERJA 669,900.00
B. BAHAN
Valve Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.15. Pemasangan 1 Buah Tee Æ 150 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.106 121,800.00 12,910.80
Tukang pipa L.02 OH 0.053 162,400.00 8,607.20
Mandor L.04 OH 0.011 203,000.00 2,233.00
JUMLAH TENAGA KERJA 23,751.00
B. BAHAN
Tee Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.028 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.16. Pemasangan 1 Buah Tee Æ 200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.216 121,800.00 26,308.80
Tukang pipa L.02 OH 0.108 162,400.00 17,539.20
Mandor L.04 OH 0.022 203,000.00 4,466.00
JUMLAH TENAGA KERJA 48,314.00
B. BAHAN
Tee Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.029 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.17. Pemasangan 1 Buah Tee Æ 250 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.326 121,800.00 39,706.80
Tukang pipa L.02 OH 0.163 162,400.00 26,471.20
Mandor L.04 OH 0.033 203,000.00 6,699.00
JUMLAH TENAGA KERJA 72,877.00
B. BAHAN
Tee Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.18. Pemasangan 1 Buah Tee Æ 300 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.436 121,800.00 53,104.80
Tukang pipa L.02 OH 0.218 162,400.00 35,403.20
Mandor L.04 OH 0.044 203,000.00 8,932.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Tee Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.19. Pemasangan 1 Buah Tee Æ 400 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.656 121,800.00 79,900.80
Tukang pipa L.02 OH 0.328 162,400.00 53,267.20
Mandor L.04 OH 0.066 203,000.00 13,398.00
JUMLAH TENAGA KERJA 146,566.00
B. BAHAN
Tee Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.20. Pemasangan 1 Buah Tee Æ 450 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.766 121,800.00 93,298.80
Tukang pipa L.02 OH 0.383 162,400.00 62,199.20
Mandor L.04 OH 0.077 203,000.00 15,631.00
JUMLAH TENAGA KERJA 171,129.00
B. BAHAN
Tee Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.21. Pemasangan 1 Buah Tee Æ 500 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.876 121,800.00 106,696.80
Tukang pipa L.02 OH 0.438 162,400.00 71,131.20
Mandor L.04 OH 0.088 203,000.00 17,864.00
JUMLAH TENAGA KERJA 195,692.00
B. BAHAN
Tee Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.600 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.22. Pemasangan 1 Buah Tee Æ 600 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.096 121,800.00 133,492.80
Tukang pipa L.02 OH 0.548 162,400.00 88,995.20
Mandor L.04 OH 0.110 203,000.00 22,330.00
JUMLAH TENAGA KERJA 244,818.00
B. BAHAN
Tee Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.193 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.096 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.23. Pemasangan 1 Buah Tee Æ 700 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.316 121,800.00 160,288.80
Tukang pipa L.02 OH 0.658 162,400.00 106,859.20
Mandor L.04 OH 0.132 203,000.00 26,796.00
JUMLAH TENAGA KERJA 293,944.00
B. BAHAN
Tee Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.225 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.113 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.24. Pemasangan 1 Buah Tee Æ 800 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.536 121,800.00 187,084.80
Tukang pipa L.02 OH 0.768 162,400.00 124,723.20
Mandor L.04 OH 0.154 203,000.00 31,262.00
JUMLAH TENAGA KERJA 343,070.00
B. BAHAN
Tee Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.257 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.129 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.25. Pemasangan 1 Buah Tee Æ 900 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.756 121,800.00 213,880.80
Tukang pipa L.02 OH 0.876 162,400.00 142,262.40
Mandor L.04 OH 0.176 203,000.00 35,728.00
JUMLAH TENAGA KERJA 391,871.20
B. BAHAN
Tee Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.321 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.161 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.26. Pemasangan 1 Buah Tee Æ 1000 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.976 121,800.00 240,676.80
Tukang pipa L.02 OH 0.988 162,400.00 160,451.20
Mandor L.04 OH 0.198 203,000.00 40,194.00
JUMLAH TENAGA KERJA 441,322.00
B. BAHAN
Tee Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.366 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.183 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.27. Pemasangan 1 Buah Tee Æ 1100 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.196 121,800.00 267,472.80
Tukang pipa L.02 OH 1.098 162,400.00 178,315.20
Mandor L.04 OH 0.220 203,000.00 44,660.00
JUMLAH TENAGA KERJA 490,448.00
B. BAHAN
Tee Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.386 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.193 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.28. Pemasangan 1 Buah Tee Æ 1200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.416 121,800.00 294,268.80
Tukang pipa L.02 OH 1.208 162,400.00 196,179.20
Mandor L.04 OH 0.242 203,000.00 49,126.00
JUMLAH TENAGA KERJA 539,574.00
B. BAHAN
Tee Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.450 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.225 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

A. 8.4.4.1. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.466 121,800.00 178,558.80
Tukang pipa L.02 OH 0.733 162,400.00 119,039.20
Mandor L.04 OH 0.147 203,000.00 29,841.00
JUMLAH TENAGA KERJA 327,439.00
B. BAHAN
Pipa Ø 80 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.606 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.075 #N/A #N/A
sewa pompa submersible 3m3/h hari 0.968 #N/A #N/A
Sewa Tripot/Tackel & hari 0.865 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.2. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.646 121,800.00 200,482.80
Tukang pipa L.02 OH 0.823 162,400.00 133,655.20
Mandor L.04 OH 0.165 203,000.00 33,495.00
JUMLAH TENAGA KERJA 367,633.00
B. BAHAN
Pipa Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.65 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.159 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.078 #N/A #N/A
Sewa Tripot/Tackel & hari 0.911 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.3. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.096 121,800.00 255,292.80
Tukang pipa L.02 OH 1.048 162,400.00 170,195.20
Mandor L.04 OH 0.210 203,000.00 42,630.00
JUMLAH TENAGA KERJA 468,118.00
B. BAHAN
Pipa Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.76 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.369 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.353 #N/A #N/A
Sewa Tripot/Tackel & hari 1.026 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.4. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.546 121,800.00 310,102.80
Tukang pipa L.02 OH 1.273 162,400.00 206,735.20
Mandor L.04 OH 0.255 203,000.00 51,765.00
JUMLAH TENAGA KERJA 568,603.00
B. BAHAN
Pipa Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.87 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.579 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.628 #N/A #N/A
Sewa Tripot/Tackel & hari 1.141 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.5. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.996 121,800.00 364,912.80
Tukang pipa L.02 OH 1.498 162,400.00 243,275.20
Mandor L.04 OH 0.300 203,000.00 60,900.00
JUMLAH TENAGA KERJA 669,088.00
B. BAHAN
Pipa Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.98 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.789 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.903 #N/A #N/A
Sewa Tripot/Tackel & hari 1.256 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.6. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.446 121,800.00 419,722.80
Tukang pipa L.02 OH 1.723 162,400.00 279,815.20
Mandor L.04 OH 0.345 203,000.00 70,035.00
JUMLAH TENAGA KERJA 769,573.00
B. BAHAN
Pipa Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.09 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.999 #N/A #N/A
sewa pompa submersible 3m3/h hari 2.178 #N/A #N/A
Sewa Tripot/Tackel & hari 1.371 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.7. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.346 121,800.00 529,342.80
Tukang pipa L.02 OH 2.173 162,400.00 352,895.20
Mandor L.04 OH 0.435 203,000.00 88,305.00
JUMLAH TENAGA KERJA 970,543.00
B. BAHAN
Pipa Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.31 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.419 #N/A #N/A
sewa pompa submersible 3m3/h hari 2.728 #N/A #N/A
Sewa Tripot/Tackel & hari 1.601 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.8. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.796 121,800.00 584,152.80
Tukang pipa L.02 OH 2.398 162,400.00 389,435.20
Mandor L.04 OH 0.480 203,000.00 97,440.00
JUMLAH TENAGA KERJA 1,071,028.00
B. BAHAN
Pipa Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.42 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.629 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.003 #N/A #N/A
Sewa Tripot/Tackel & hari 1.716 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.9. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.246 121,800.00 638,962.80
Tukang pipa L.02 OH 2.623 162,400.00 425,975.20
Mandor L.04 OH 0.525 203,000.00 106,575.00
JUMLAH TENAGA KERJA 1,171,513.00
B. BAHAN
Pipa Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.53 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.839 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.278 #N/A #N/A
Sewa Tripot/Tackel & hari 1.831 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.10. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.146 121,800.00 748,582.80
Tukang pipa L.02 OH 3.073 162,400.00 499,055.20
Mandor L.04 OH 0.615 203,000.00 124,845.00
JUMLAH TENAGA KERJA 1,372,483.00
B. BAHAN
Pipa Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.75 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 2.259 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.828 #N/A #N/A
Sewa Tripot/Tackel & hari 2.061 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.11. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.046 121,800.00 858,202.80
Tukang pipa L.02 OH 3.523 162,400.00 572,135.20
Mandor L.04 OH 0.705 203,000.00 143,115.00
JUMLAH TENAGA KERJA 1,573,453.00
B. BAHAN
Pipa Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.97 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 2.679 #N/A #N/A
sewa pompa submersible 3m3/h hari 4.378 #N/A #N/A
Sewa Tripot/Tackel & hari 2.291 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.12. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.946 121,800.00 967,822.80
Tukang pipa L.02 OH 3.973 162,400.00 645,215.20
Mandor L.04 OH 0.795 203,000.00 161,385.00
JUMLAH TENAGA KERJA 1,774,423.00
B. BAHAN
Pipa Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 2.19 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 3.099 #N/A #N/A
sewa pompa submersible 3m3/h hari 4.928 #N/A #N/A
Sewa Tripot/Tackel & hari 2.521 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A. 8.4.5.1. Pengetesan 1 m pipa Ø 50 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.002 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.2. Pengetesan 1 m pipa Ø 75 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.004 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.3. Pengetesan 1 m pipa Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.008 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.4. Pengetesan 1 m pipa Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.018 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.5. Pengetesan 1 m pipa Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.031 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.6. Pengetesan 1 m pipa Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.049 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.7. Pengetesan 1 m pipa Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.071 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.8. Pengetesan 1 m pipa Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.126 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.9. Pengetesan 1 m pipa Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.158 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.10. Pengetesan 1 m pipa Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 121,800.00 974.40
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 1,136.80
B. BAHAN
Air test ( air bersih ) m3 0.283 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
DAFTAR ANALISA PEKERJAAN
BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
TAHUN ANGGARAN 2022
(Koefisien Analisa Berdasarkan Permen PUPR No. 1 Tahun 2022)

A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.1.1.1.11. Pembuatan 1 m2 steger/perancah dari bambu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Bambu Ø 6 - 8/600 cm btg 1.250 -
Tali ijuk m3 0.186 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 497,350.00
E. Profit 15% * D 74,602.50
F. Harga Satuan Pekerjaan (D+E) 571,952.50

A. 1.1.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.042 121,800.00 5,115.60
Tukang L.02 OH 0.004 162,400.00 649.60
Kepala Tukang L.03 OH 0.002 203,000.00 406.00
Mandor L.04 OH 0.042 203,000.00 8,526.00
JUMLAH TENAGA KERJA 14,697.20
B. BAHAN
Kawat jaring Lbr 0.1434 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 14,697.20
E. Profit 15% * D 2,204.58
F. Harga Satuan Pekerjaan (D+E) 16,901.78

A. 1.1.1.16. Pembuatan 1 m2 Pagar panel beton pracetak 5x50x240 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 121,800.00 45,675.00
Tukang L.02 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.012 203,000.00 2,436.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 72,268.00
B. BAHAN
Panel beton pracetak Lbr 0.986 -
Kolom beton pracetak btg 0.525 -
Semen Portland kg 45.000 -
Pasir beton m3 0.074 -
Koral beton m3 0.146 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 72,268.00
E. Profit 15% * D 10,840.20
F. Harga Satuan Pekerjaan (D+E) 83,108.20

A. 2.2.1.1. Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 2,409,839.14 3,012,298.92
Semen Portland kg 2.500 80,388.00 200,970.00
Pasir beton m3 0.005 1,674,750.00 8,373.75
Batu pecah 1 - 2 m3 0.009 586.21 5.28
Kayu gergajian kelas III, balok m3 0.072 86,275.00 6,211.80
Paku berbagai ukuran (2"-5") kg 0.060 153,518.75 9,211.13
Residu atau ter ltr 0.400 429,852.50 171,941.00

Page 316 of 649


JUMLAH HARGA BAHAN 3,409,011.87
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,506,451.87
E. Profit 15% * D 525,967.78
F. Harga Satuan Pekerjaan (D+E) 4,032,419.65

Page 317 of 649


A. 2.2.1.2. Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 2,409,839.14 3,012,298.92
Seng gelombang uk. 1,80 x 0,90 (m) lbr 1.200 60,291.00 72,349.20
Semen Portland kg 2.500 1,627.00 4,067.50
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Kayu gergajian kelas III, balok m3 0.072 2,635,329.08 189,743.69
Paku berbagai ukuran (2"-5") kg 0.060 17,287.99 1,037.28
Cat menie ltr 0.450 48,500.00 21,825.00
JUMLAH HARGA BAHAN 3,308,799.09
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,406,239.09
E. Profit 15% * D 510,935.86
F. Harga Satuan Pekerjaan (D+E) 3,917,174.96

A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 5,000.00 5,000.00
Kawat berduri kg 25.000 110,986.80 2,774,669.98
Semen Portland kg 2.000 1,627.00 3,254.00
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Paku berbagai ukuran (2"-5") kg 0.030 17,287.99 518.64

JUMLAH HARGA BAHAN 2,790,920.11


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,888,360.11
E. Profit 15% * D 433,254.02
F. Harga Satuan Pekerjaan (D+E) 3,321,614.13

A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.012 2,635,329.08 31,623.95
Paku berbagai ukuran (2"-5") Kg 0.020 17,287.99 345.76
Kayu gergajian kelas III, papan m3 0.007 2,535,470.00 17,748.29

JUMLAH HARGA BAHAN 49,718.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 81,183.00
E. Profit 15% * D 12,177.45
F. Harga Satuan Pekerjaan (D+E) 93,360.45

A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 121,800.00 243,600.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Tukang Batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 801,850.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.180 2,635,329.08 474,359.24
Paku berbagai ukuran (2"-5") kg 0.080 17,287.99 1,383.04
Besi strip 2 x 3 cm kg 1.100 10,048.50 11,053.35
Semen portland kg 35.000 1,627.00 56,945.00
Pasir pasang m3 0.150 150,000.00 22,500.00
Pasir beton m3 0.100 150,000.00 15,000.00
Batu pecah 1 - 2 m3 0.150 747,500.00 112,125.00
Batu bata merah besar bh 30.000 2,300.00 69,000.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 0.250 60,291.00 15,072.75
Jendela nako (kerangka + kaca 5 mm) bh 0.200 187,795.30 37,559.06
Kaca bening tebal 5 mm m2 0.080 147,936.25 11,834.90
Kunci pintu tanam (ex.dexon) bh 0.150 210,599.81 31,589.97
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 0.060 97,237.00 5,834.22
Page 318 of 649
JUMLAH HARGA BAHAN 870,506.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,672,356.53
E. Profit 15% * D 250,853.48
F. Harga Satuan Pekerjaan (D+E) 1,923,210.00

Page 319 of 649


A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 3.000 5,000.00 15,000.00
Kayu gergajian kelas III, balok m3 0.276 2,635,329.08 727,350.83
Paku berbagai ukuran (2"-5") kg 0.700 17,287.99 12,101.59
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50

JUMLAH HARGA BAHAN 844,888.92


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,250,888.92
E. Profit 15% * D 187,633.34
F. Harga Satuan Pekerjaan (D+E) 1,438,522.26

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.700 5,000.00 8,500.00
Kayu gergajian kelas III, balok m3 0.210 2,635,329.08 553,419.11
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 10.500 1,627.00 17,083.50
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Seng BJLS 30 lebar 45 cm Lbr 0.250 16,747.50 4,186.88

JUMLAH HARGA BAHAN 720,687.38


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,218,037.38
E. Profit 15% * D 182,705.61
F. Harga Satuan Pekerjaan (D+E) 1,400,742.99

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.186 2,635,329.08 490,171.21
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 18.000 1,627.00 29,286.00
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 1.350 97,237.00 131,269.95

JUMLAH HARGA BAHAN 794,475.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,291,825.06
E. Profit 15% * D 193,773.76
F. Harga Satuan Pekerjaan (D+E) 1,485,598.81

A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 22,330.00
E. Profit 15% * D 3,349.50
F. Harga Satuan Pekerjaan (D+E) 25,679.50

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
Page 320 of 649
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 54,810.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.036 2,535,470.00 91,276.92
Kayu gergajian kelas III, balok m3 0.014 2,635,329.08 36,894.61
Paku berbagai ukuran (2"-5") m3 0.080 17,287.99 1,383.04

JUMLAH HARGA BAHAN 129,554.57


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,364.57
E. Profit 15% * D 27,654.68
F. Harga Satuan Pekerjaan (D+E) 212,019.25

Page 321 of 649


A. 2.2.1.12. Pembuatan 1 m2 jalan sementara

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 122,815.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.150 425,000.00 63,750.00
Batu pecah 1 - 2 m3 0.090 747,500.00 67,275.00
Pasir pasang m3 0.010 150,000.00 1,500.00

JUMLAH HARGA BAHAN 132,525.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 255,340.00
E. Profit 15% * D 38,301.00
F. Harga Satuan Pekerjaan (D+E) 293,641.00

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 121,800.00 1,624,081.20
Mandor L.04 OH 0.666 203,000.00 135,198.00
JUMLAH TENAGA KERJA 1,759,279.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,759,279.20
E. Profit 15% * D 263,891.88
F. Harga Satuan Pekerjaan (D+E) 2,023,171.08

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 121,800.00 812,040.60
Mandor L.04 OH 0.333 203,000.00 67,599.00
JUMLAH TENAGA KERJA 879,639.60
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 879,639.60
E. Profit 15% * D 131,945.94
F. Harga Satuan Pekerjaan (D+E) 1,011,585.54

A.1.5.1 HARGA SATUAN PEKERJAAN TANAH


A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 121,800.00 91,350.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 96,425.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 96,425.00
E. Profit 15% * D 14,463.75
F. Harga Satuan Pekerjaan (D+E) 110,888.75

A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 121,800.00 109,620.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 118,755.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,755.00
E. Profit 15% * D 17,813.25
F. Harga Satuan Pekerjaan (D+E) 136,568.25

Page 322 of 649


A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 121,800.00 127,890.00
Mandor L.04 OH 0.067 203,000.00 13,601.00
JUMLAH TENAGA KERJA 141,491.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 141,491.00
E. Profit 15% * D 21,223.65
F. Harga Satuan Pekerjaan (D+E) 162,714.65

A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.032 203,000.00 6,496.00
JUMLAH TENAGA KERJA 128,296.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 128,296.00
E. Profit 15% * D 19,244.40
F. Harga Satuan Pekerjaan (D+E) 147,540.40

A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,880.00
E. Profit 15% * D 29,232.00
F. Harga Satuan Pekerjaan (D+E) 224,112.00

A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 155,295.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 155,295.00
E. Profit 15% * D 23,294.25
F. Harga Satuan Pekerjaan (D+E) 178,589.25

A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 7,105.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,105.00
E. Profit 15% * D 1,065.75
F. Harga Satuan Pekerjaan (D+E) 8,170.75

Page 323 of 649


A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 121,800.00 40,194.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 42,224.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 42,224.00
E. Profit 15% * D 6,333.60
F. Harga Satuan Pekerjaan (D+E) 48,557.60

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,962.92


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 45,522.75
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 54,238.22
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 49,180.13
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 74,704.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 59,529.75

A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 38,570.00
B. BAHAN
Pasir urug/Timbun m3 1.200 102,500.00 123,000.00
JUMLAH HARGA BAHAN 123,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 161,570.00
E. Profit 15% * D 24,235.50
F. Harga Satuan Pekerjaan (D+E) 185,805.50

Page 324 of 649


A. 2.3.1.12. Pemasangan 1 m3 lapisan pudel 1KP : 3PP : 7TL

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.080 203,000.00 16,240.00
JUMLAH TENAGA KERJA 186,760.00
B. BAHAN
Kapur padam m3 0.135 -
Pasir pasang m3 0.400 150,000.00 60,000.00
Tanah liat m3 0.948 -

JUMLAH HARGA BAHAN 60,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 246,760.00
E. Profit 15% * D 37,014.00
F. Harga Satuan Pekerjaan (D+E) 283,774.00

A. 1.5.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 121,800.00 18,270.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 21,315.00
B. BAHAN
Ijuk kg 6.000 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 21,315.00
E. Profit 15% * D 3,197.25
F. Harga Satuan Pekerjaan (D+E) 24,512.25

A. 2.3.1.14. Pemasangan 1 m3 sirtu padat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 121,800.00 30,450.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 35,525.00
B. BAHAN
Sirtu m3 1.200 150,248.42 180,298.10

JUMLAH HARGA BAHAN 180,298.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 215,823.10
E. Profit 15% * D 32,373.47
F. Harga Satuan Pekerjaan (D+E) 248,196.57

A.3.1.1 HARGA SATUAN PEKERJAAN PONDASI


A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00

JUMLAH HARGA BAHAN 911,404.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,246,354.00
E. Profit 15% * D 186,953.10
F. Harga Satuan Pekerjaan (D+E) 1,433,307.10

A. 3.2.1.1.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00

Page 325 of 649


JUMLAH HARGA BAHAN 838,546.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,173,496.86
E. Profit 15% * D 176,024.53
F. Harga Satuan Pekerjaan (D+E) 1,349,521.39

Page 326 of 649


A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00

JUMLAH HARGA BAHAN 853,201.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,188,151.00
E. Profit 15% * D 178,222.65
F. Harga Satuan Pekerjaan (D+E) 1,366,373.65

A. 3.2.1.2.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 351,327.27 421,592.72
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 764,793.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,099,743.72
E. Profit 15% * D 164,961.56
F. Harga Satuan Pekerjaan (D+E) 1,264,705.28

A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00

JUMLAH HARGA BAHAN 812,872.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,147,822.00
E. Profit 15% * D 172,173.30
F. Harga Satuan Pekerjaan (D+E) 1,319,995.30

A. 3.2.1.3.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00

JUMLAH HARGA BAHAN 740,014.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,074,964.86
E. Profit 15% * D 161,244.73
F. Harga Satuan Pekerjaan (D+E) 1,236,209.59

A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Page 327 of 649
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00

JUMLAH HARGA BAHAN 784,509.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,119,459.00
E. Profit 15% * D 167,918.85
F. Harga Satuan Pekerjaan (D+E) 1,287,377.85

Page 328 of 649


A. 3.2.1.4.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00

JUMLAH HARGA BAHAN 711,651.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,601.86
E. Profit 15% * D 156,990.28
F. Harga Satuan Pekerjaan (D+E) 1,203,592.14

A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00

JUMLAH HARGA BAHAN 745,657.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,080,607.00
E. Profit 15% * D 162,091.05
F. Harga Satuan Pekerjaan (D+E) 1,242,698.05

A. 3.2.1.5.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 8PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00

JUMLAH HARGA BAHAN 672,799.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,007,749.86
E. Profit 15% * D 151,162.48
F. Harga Satuan Pekerjaan (D+E) 1,158,912.34

A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland Kg 0.170 1,627.00 276.59
Batu kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00

JUMLAH HARGA BAHAN 573,386.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 908,336.15
E. Profit 15% * D 136,250.42
F. Harga Satuan Pekerjaan (D+E) 1,044,586.57

A. 3.2.1.6.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 1KP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
Page 329 of 649
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 0.170 1,627.00 276.59
Batu Kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00

JUMLAH HARGA BAHAN 500,529.01


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 835,479.01
E. Profit 15% * D 125,321.85
F. Harga Satuan Pekerjaan (D+E) 960,800.86

Page 330 of 649


A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00

JUMLAH HARGA BAHAN 693,518.21


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,028,468.21
E. Profit 15% * D 154,270.23
F. Harga Satuan Pekerjaan (D+E) 1,182,738.44

A. 3.2.1.7.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3KP : 10PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00

JUMLAH HARGA BAHAN 620,661.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 955,611.06
E. Profit 15% * D 143,341.66
F. Harga Satuan Pekerjaan (D+E) 1,098,952.72

A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00

JUMLAH HARGA BAHAN 664,488.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 999,438.48
E. Profit 15% * D 149,915.77
F. Harga Satuan Pekerjaan (D+E) 1,149,354.26

A. 3.2.1.8.a Pemasangan 1 m3 Pondasi batu gunung campuran 1/4SP : 1KP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00

JUMLAH HARGA BAHAN 591,631.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 926,581.34
E. Profit 15% * D 138,987.20
F. Harga Satuan Pekerjaan (D+E) 1,065,568.54

A. 3.2.1.9. Pemasangan 1 m3 batu hitam kosong (anstamping)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Page 331 of 649
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Pasir urug/timbun m3 0.432 102,500.00 44,280.00

JUMLAH HARGA BAHAN 554,280.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 728,454.00
E. Profit 15% * D 109,268.10
F. Harga Satuan Pekerjaan (D+E) 837,722.10

Page 332 of 649


A. 3.2.1.9.a Pemasangan 1 m3 batu putih kosong (anstamping)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Pasir urug/timbun m3 0.432 102,500.00 44,280.00

JUMLAH HARGA BAHAN 481,422.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 655,596.86
E. Profit 15% * D 98,339.53
F. Harga Satuan Pekerjaan (D+E) 753,936.39

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 425,000.00 204,000.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00

JUMLAH HARGA BAHAN 2,633,873.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,237,798.10
E. Profit 15% * D 485,669.71
F. Harga Satuan Pekerjaan (D+E) 3,723,467.81

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
batu gunung m3 0.480 364,285.71 174,857.14
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00

JUMLAH HARGA BAHAN 2,604,730.24


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,208,655.24
E. Profit 15% * D 481,298.29
F. Harga Satuan Pekerjaan (D+E) 3,689,953.53

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 425,000.00 191,250.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00

JUMLAH HARGA BAHAN 903,518.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,366,155.00
E. Profit 15% * D 204,923.25
F. Harga Satuan Pekerjaan (D+E) 1,571,078.25

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu gunung, diameter 100 cm.

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
Page 333 of 649
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
batu gunung m3 0.450 364,285.71 163,928.57
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00

JUMLAH HARGA BAHAN 876,196.57


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,338,833.57
E. Profit 15% * D 200,825.04
F. Harga Satuan Pekerjaan (D+E) 1,539,658.61

Page 334 of 649


A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78

Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,054,758.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,322,921.42
E. Profit 15% *D 198,438.21
F. Harga Satuan Pekerjaan (D+E) 1,521,359.63

A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 299.0000 1,627.00 486,473.00
Pasir beton (Kg) kg 799.0000 83.33 66,583.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 515.52 524,281.03
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,092,340.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,360,503.34
E. Profit 15% *D 204,075.50
F. Harga Satuan Pekerjaan (D+E) 1,564,578.84

A. 4.1.1.1. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,004,290.36


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga

Page 335 of 649


(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,139,205.54


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,407,368.54
E. Profit 15% *D 211,105.28
F. Harga Satuan Pekerjaan (D+E) 1,618,473.82

Page 336 of 649


A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,448,284.91
E. Profit 15% *D 217,242.74
F. Harga Satuan Pekerjaan (D+E) 1,665,527.65

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,484,696.19
E. Profit 15% *D 222,704.43
F. Harga Satuan Pekerjaan (D+E) 1,707,400.62

A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 384.0000 1,627.00 624,768.00
Pasir beton (Kg) kg 692.0000 83.33 57,666.67
Batu pecah 1 - 2 (Kg) kg 1,039.0000 515.52 535,622.41
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,233,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,501,223.05
E. Profit 15% *D 225,183.46
F. Harga Satuan Pekerjaan (D+E) 1,726,406.51

A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 406.0000 1,627.00 660,562.00
Pasir beton (Kg) kg 684.0000 83.33 57,000.00
Batu pecah 1 - 2 (Kg) kg 1,026.0000 515.52 528,920.69
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,261,485.66
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,648.66
E. Profit 15% *D 229,447.30
F. Harga Satuan Pekerjaan (D+E) 1,759,095.96

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
Page 337 of 649
B. BAHAN
Semen portland kg 413.0000 1,627.00 671,951.00
Pasir beton (Kg) kg 681.0000 83.33 56,750.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 515.52 526,343.10
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,270,047.07
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,538,210.07
E. Profit 15% *D 230,731.51
F. Harga Satuan Pekerjaan (D+E) 1,768,941.58

Page 338 of 649


A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 439.0000 1,627.00 714,253.00
Pasir beton (Kg) kg 670.0000 83.33 55,833.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 515.52 518,610.34
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,303,699.65
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,644,739.65
E. Profit 15% *D 246,710.95
F. Harga Satuan Pekerjaan (D+E) 1,891,450.59

A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 448.0000 1,627.00 728,896.00
Pasir beton (Kg) kg 667.0000 83.33 55,583.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 515.52 515,517.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,314,999.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,656,039.54
E. Profit 15% *D 248,405.93
F. Harga Satuan Pekerjaan (D+E) 1,904,445.47

A. 4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 400.0000 1,627.00 650,800.00
Pasir beton m3 0.4800 150,000.00 72,000.00
Batu pecah 1 - 2 (Kg) m3 0.8000 515.52 412.41
Storox - 100 kg 1.2000 -

JUMLAH HARGA BAHAN 723,212.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,064,252.41
E. Profit 15% *D 159,637.86
F. Harga Satuan Pekerjaan (D+E) 1,223,890.28

A. 4.1.1.14. Membuat 1 m' PVC waterstop lebar 150 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Batu L.02 OH 0.0300 162,400.00 4,872.00
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Waterstop lebar 150 mm m3 1.0500 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 13,398.00
E. Profit 15% *D 2,009.70
F. Harga Satuan Pekerjaan (D+E) 15,407.70

A. 4.1.1.15. Membuat 1 m' PVC waterstop lebar 200 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Batu L.02 OH 0.0350 162,400.00 5,684.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 16,443.00
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 -
Page 339 of 649
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 16,443.00
E. Profit 15% *D 2,466.45
F. Harga Satuan Pekerjaan (D+E) 18,909.45

Page 340 of 649


A. 4.1.1.16. Membuat 1 m' PVC waterstop lebar 230 mm - 320 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu/Pipa L.02 OH 0.0400 162,400.00 6,496.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 17,864.00
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 17,864.00
E. Profit 15% *D 2,679.60
F. Harga Satuan Pekerjaan (D+E) 20,543.60

A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Besi L.02 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.0070 203,000.00 1,421.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 22,127.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1500 23,111.11 3,466.67
JUMLAH HARGA BAHAN 143,133.76
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 165,260.76
E. Profit 15% *D 24,789.11
F. Harga Satuan Pekerjaan (D+E) 190,049.87

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Besi L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1000 23,111.11 2,311.11

JUMLAH HARGA BAHAN 141,978.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,812.20
E. Profit 15% *D 23,671.83
F. Harga Satuan Pekerjaan (D+E) 181,484.03

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang Besi L.02 OH 0.0250 162,400.00 4,060.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 12,383.00
B. BAHAN
Besi jaring kawat baja kg 10.2000 22,330.00 227,766.00
Kawat beton kg 0.0500 23,111.11 1,155.56

JUMLAH HARGA BAHAN 228,921.56


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 241,304.56
E. Profit 15% *D 36,195.68
F. Harga Satuan Pekerjaan (D+E) 277,500.24

A. 4.1.1.18. Membuat 1 m2 bekisting untuk pondasi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 111,599.56


Page 341 of 649
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 227,715.56
E. Profit 15% *D 34,157.33
F. Harga Satuan Pekerjaan (D+E) 261,872.89

Page 342 of 649


A. 4.1.1.20. ck Membuat 1 m2 bekisting untuk pondasi (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
JUMLAH HARGA BAHAN 94,760.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,876.15
E. Profit 15% *D 31,631.42
F. Harga Satuan Pekerjaan (D+E) 242,507.57

A. 4.1.1.19. Membuat 1 m2 bekisting untuk sloof

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 2,635,329.08 118,589.81
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 124,776.21


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 240,892.21
E. Profit 15% *D 36,133.83
F. Harga Satuan Pekerjaan (D+E) 277,026.04

A. 4.1.1.21. ck Membuat 1 m2 bekisting untuk sloof (kls IV)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0450 2,239,343.75 100,770.47
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter - - -
JUMLAH HARGA BAHAN 105,956.87
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 222,072.87
E. Profit 15% *D 33,310.93
F. Harga Satuan Pekerjaan (D+E) 255,383.79

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 217,105.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 364,483.20
E. Profit 15% *D 54,672.48
F. Harga Satuan Pekerjaan (D+E) 419,155.68

A. 4.1.1.22. ck Membuat 1 m2 bekisting untuk kolom (kls IV)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Page 343 of 649
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 142,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,014.53
E. Profit 15% *D 43,502.18
F. Harga Satuan Pekerjaan (D+E) 333,516.71

Page 344 of 649


A. 4.1.1.21. Membuat 1 m2 bekisting untuk balok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0180 2,822,286.84 50,801.16
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 225,572.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 372,950.06
E. Profit 15% *D 55,942.51
F. Harga Satuan Pekerjaan (D+E) 428,892.57

A. 4.1.1.23. ck Membuat 1 m2 bekisting untuk balok (kls IV)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0180 2,409,839.14 43,377.10
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 149,866.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 297,244.05
E. Profit 15% *D 44,586.61
F. Harga Satuan Pekerjaan (D+E) 341,830.66

A. 4.1.1.22. Membuat 1 m2 bekisting untuk lantai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00

JUMLAH HARGA BAHAN 237,105.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 384,483.20
E. Profit 15% *D 57,672.48
F. Harga Satuan Pekerjaan (D+E) 442,155.68

A. 4.1.1.24.ck Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 162,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 310,014.53
E. Profit 15% *D 46,502.18
F. Harga Satuan Pekerjaan (D+E) 356,516.71

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Page 345 of 649
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0200 2,822,286.84 56,445.74
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
Penjaga jarak bekisting/spacer buah - - -

JUMLAH HARGA BAHAN 209,863.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 357,241.34
E. Profit 15% *D 53,586.20
F. Harga Satuan Pekerjaan (D+E) 410,827.55

Page 346 of 649


A. 4.1.1.25. ck Membuat 1 m2 bekisting untuk dinding (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0200 2,409,839.14 48,196.78
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
JUMLAH HARGA BAHAN 137,292.29
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 284,670.29
E. Profit 15% *D 42,700.54
F. Harga Satuan Pekerjaan (D+E) 327,370.83

A. 4.1.1.25. Membuat 1 m2 bekisting untuk tangga

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.1500 10,000.00 1,500.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 190,251.91


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 337,629.91
E. Profit 15% *D 50,644.49
F. Harga Satuan Pekerjaan (D+E) 388,274.40

A. 4.1.1.26. ck Membuat 1 m2 bekisting untuk tangga (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 120,243.09
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 267,621.09
E. Profit 15% *D 40,143.16
F. Harga Satuan Pekerjaan (D+E) 307,764.26

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 2,635,329.08 69,572.69
Paku berbagai ukuran (2"-5") kg 0.6000 17,287.99 10,372.79
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 5,000.00 2,500.00

JUMLAH HARGA BAHAN 82,445.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 111,474.48
E. Profit 15% *D 16,721.17
F. Harga Satuan Pekerjaan (D+E) 128,195.65

A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 121,800.00 21,924.00
Tukang Batu L.02 OH 0.0200 162,400.00 3,248.00
Tukang Kayu L.02 OH 0.0200 162,400.00 3,248.00
Page 347 of 649
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,713.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 2,635,329.08 5,270.66
Paku berbagai ukuran (2"-5") kg 0.0100 17,287.99 172.88
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.0000 13,301.63 39,904.88
Kawat beton kg 0.4500 23,111.11 10,400.00
Semen portland kg 4.0000 1,627.00 6,508.00
Pasir beton m3 0.0060 150,000.00 900.00
Batu pecah 1 - 2 m3 0.0090 747,500.00 6,727.50

JUMLAH HARGA BAHAN 69,883.92


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 104,596.92
E. Profit 15% *D 15,689.54
F. Harga Satuan Pekerjaan (D+E) 120,286.46

Page 348 of 649


A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 121,800.00 36,174.60
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Kayu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Besi L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,327.20
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 2,635,329.08 7,905.99
Paku berbagai ukuran (2"-5") kg 0.0200 17,287.99 345.76
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.6000 13,301.63 47,885.86
Kawat beton kg 0.0500 23,111.11 1,155.56
Semen portland kg 5.5000 1,627.00 8,948.50
Pasir beton m3 0.0090 150,000.00 1,350.00
Batu pecah 1 - 2 m3 0.0150 747,500.00 11,212.50

JUMLAH HARGA BAHAN 78,804.16


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 136,131.36
E. Profit 15% *D 20,419.70
F. Harga Satuan Pekerjaan (D+E) 156,551.07

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1320 121,800.00 16,077.60
Tukang Batu L.02 OH 0.0220 162,400.00 3,572.80
Kepala Tukang L.03 OH 0.0020 203,000.00 406.00
Mandor L.04 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 21,477.40
B. BAHAN
Semen portland kg 26.0800 1,627.00 42,432.16
Pasir beton (Kg) kg 60.8000 83.33 5,066.67
Batu pecah 1 - 2 (Kg) kg 82.3200 515.52 42,437.38
Air ltr 17.2000 69.78 1,200.24

JUMLAH HARGA BAHAN 91,136.44


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 112,613.84
E. Profit 15% *D 16,892.08
F. Harga Satuan Pekerjaan (D+E) 129,505.92

A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 121,800.00 20,097.00
Tukang Batu L.02 OH 0.0280 162,400.00 4,547.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 26,877.20
B. BAHAN
Semen portland kg 32.6000 1,627.00 53,040.20
Pasir beton (Kg) kg 76.0000 83.33 6,333.33
Batu pecah 1 - 2 (Kg) kg 102.9000 515.52 53,046.72
Air ltr 21.5000 69.78 1,500.30

JUMLAH HARGA BAHAN 113,920.55


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 140,797.75
E. Profit 15% *D 21,119.66
F. Harga Satuan Pekerjaan (D+E) 161,917.42

A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 121,800.00 24,116.40
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0030 203,000.00 609.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 32,114.60
B. BAHAN
Semen portland kg 32.1200 1,627.00 52,259.24
Pasir beton (Kg) kg 91.2000 83.33 7,600.00
Batu pecah 1 - 2 (Kg) kg 123.4800 515.52 63,656.07
Air ltr 25.8000 69.78 1,800.36

JUMLAH HARGA BAHAN 125,315.67


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,430.27

Page 349 of 649


E. Profit 15% *D 23,614.54
F. Harga Satuan Pekerjaan (D+E) 181,044.80

A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 121,800.00 30,206.40
Tukang Batu L.02 OH 0.0410 162,400.00 6,658.40
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 40,315.80
B. BAHAN
Semen portland kg 48.9000 1,627.00 79,560.30
Pasir beton (Kg) kg 114.0000 83.33 9,500.00
Batu pecah 1 - 2 (Kg) kg 154.3500 515.52 79,570.09
Air ltr 32.2500 69.78 2,250.45

JUMLAH HARGA BAHAN 170,880.83


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 211,196.63
E. Profit 15% *D 31,679.49
F. Harga Satuan Pekerjaan (D+E) 242,876.13

Page 350 of 649


A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0070 121,800.00 852.60
Tukang Batu L.02 OH 0.0760 162,400.00 12,342.40
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 15,022.00
B. BAHAN
Lantai kerja tebal 10 cm m3 0.0800 -
Besi Hollow 50 x 50 x 3 mm x 6 Meter kg 9.3940 -
Kayu gergajian kelas III, balok m3 0.0050 -
Phenol film 12 mm lbr 0.0800 -
Minyak bekisting liter 0.0200 -
Dinabolt dia 12 mm ( 10-15 cm) bh 3.8820 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 15,022.00
E. Profit 15% *D 2,253.30
F. Harga Satuan Pekerjaan (D+E) 17,275.30

A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 121,800.00 487.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 7,673.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0050 -
Phenol film 12 mm lbr 0.0430 -
Minyak bekisting liter 0.2000 -
Paku 5-7 cm Kg 0.0460 -
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,673.40
E. Profit 15% *D 1,151.01
F. Harga Satuan Pekerjaan (D+E) 8,824.41

A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 121,800.00 487.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 7,673.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0040 -
Phenol film 12 mm lbr 0.0480 -
Minyak bekisting liter 0.2000 -
Paku 5-7 cm kg 0.0460 -
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,673.40
E. Profit 15% *D 1,151.01
F. Harga Satuan Pekerjaan (D+E) 8,824.41

A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0530 121,800.00 6,455.40
Tukang Kayu L.02 OH 0.0180 162,400.00 2,923.20
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 10,393.60
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 10,393.60
E. Profit 15% *D 1,559.04
F. Harga Satuan Pekerjaan (D+E) 11,952.64

A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0890 121,800.00 10,840.20
Page 351 of 649
Tukang Kayu L.02 OH 0.0300 162,400.00 4,872.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 16,727.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 16,727.20
E. Profit 15% *D 2,509.08
F. Harga Satuan Pekerjaan (D+E) 19,236.28

Page 352 of 649


A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0710 121,800.00 8,647.80
Tukang Kayu L.02 OH 0.0240 162,400.00 3,897.60
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 13,560.40
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 13,560.40
E. Profit 15% *D 2,034.06
F. Harga Satuan Pekerjaan (D+E) 15,594.46

A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0640 121,800.00 7,795.20
Tukang Batu L.02 OH 0.2440 162,400.00 39,625.60
Tukang vibrator L.02 OH 0.1280 162,400.00 20,787.20
Kepala Tukang L.03 OH 0.0340 203,000.00 6,902.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 89,929.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,929.00
E. Profit 15% *D 13,489.35
F. Harga Satuan Pekerjaan (D+E) 103,418.35

A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0690 121,800.00 8,404.20
Tukang Batu L.02 OH 0.2420 162,400.00 39,300.80
Tukang vibrator L.02 OH 0.1380 162,400.00 22,411.20
Kepala Tukang L.03 OH 0.0370 203,000.00 7,511.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 92,446.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,446.20
E. Profit 15% *D 13,866.93
F. Harga Satuan Pekerjaan (D+E) 106,313.13

A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0610 121,800.00 7,429.80
Tukang Batu L.02 OH 0.2130 162,400.00 34,591.20
Tukang vibrator L.02 OH 0.1220 162,400.00 19,812.80
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0730 203,000.00 14,819.00
JUMLAH TENAGA KERJA 83,351.80
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,351.80
E. Profit 15% *D 12,502.77
F. Harga Satuan Pekerjaan (D+E) 95,854.57

A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0670 182,700.00 12,240.90
Pembantu operator crane L.09 OH 0.0670 121,800.00 8,160.60
Pekerja L.01 OH 0.0670 121,800.00 8,160.60
Tukang Batu L.02 OH 0.0670 162,400.00 10,880.80
Tukang erection L.02 OH 0.1340 162,400.00 21,761.60
Kepala Tukang L.03 OH 0.0670 203,000.00 13,601.00
Mandor L.04 OH 0.0670 203,000.00 13,601.00
JUMLAH TENAGA KERJA 88,406.50
B. BAHAN

Page 353 of 649


JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Crane UH 0.0670 280,491.24 18,792.91
Sewa Pipe Support buah hari 1.1000

JUMLAH HARGA ALAT 18,792.91


D. Jumlah (A+B+C) 107,199.41
E. Profit 15% *D 16,079.91
F. Harga Satuan Pekerjaan (D+E) 123,279.33

Page 354 of 649


A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0610 182,700.00 11,144.70
Pembantu operator crane L.09 OH 0.0610 121,800.00 7,429.80
Pekerja L.01 OH 0.0610 121,800.00 7,429.80
Tukang Batu L.02 OH 0.0610 162,400.00 9,906.40
Tukang erection L.02 OH 0.1220 162,400.00 19,812.80
Kepala Tukang L.03 OH 0.0610 203,000.00 12,383.00
Mandor L.04 OH 0.0610 203,000.00 12,383.00
JUMLAH TENAGA KERJA 80,489.50
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
Sewa Scafolding UH 1.1000

JUMLAH HARGA ALAT 5,329.33


D. Jumlah (A+B+C) 85,818.83
E. Profit 15% *D 12,872.83
F. Harga Satuan Pekerjaan (D+E) 98,691.66

A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0830 182,700.00 15,164.10
Pembantu operator crane L.09 OH 0.0830 121,800.00 10,109.40
Pekerja L.01 OH 0.0830 121,800.00 10,109.40
Tukang Batu L.02 OH 0.0830 162,400.00 13,479.20
Tukang erection L.02 OH 0.1660 162,400.00 26,958.40
Kepala Tukang L.03 OH 0.0830 203,000.00 16,849.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 109,518.50
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33
Sewa Scafolding UH 1.1000

JUMLAH HARGA ALAT 5,329.33


D. Jumlah (A+B+C) 114,847.83
E. Profit 15% *D 17,227.18
F. Harga Satuan Pekerjaan (D+E) 132,075.01

A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33

JUMLAH HARGA ALAT 5,329.33


D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33

JUMLAH HARGA ALAT 5,329.33


D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
Page 355 of 649
A. TENAGA
Pekerja L.01 OH 0.0190 121,800.00 2,314.20
Tukang Batu L.02 OH 0.0380 162,400.00 6,171.20

JUMLAH TENAGA KERJA 8,485.40


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
Sewa crane UH 0.0190 280,491.24 5,329.33

JUMLAH HARGA ALAT 5,329.33


D. Jumlah (A+B+C) 13,814.73
E. Profit 15% *D 2,072.21
F. Harga Satuan Pekerjaan (D+E) 15,886.94

Page 356 of 649


A. 4.1.2.20. Bahan 1 m3 grouting campuran

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Semen grout kg 1,200.0000 1,400.00 1,680,000.00
Screening kg 650.0000 -
Air liter 350.0000 69.78 24,423.44

JUMLAH HARGA BAHAN 1,704,423.44


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,704,423.44
E. Profit 15% *D 255,663.52
F. Harga Satuan Pekerjaan (D+E) 1,960,086.95

A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

JUMLAH TENAGA KERJA -


B. BAHAN
Semen grout kg 1,850.0000 1,400.00 2,590,000.00
Air liter 400.0000 69.78 27,912.50

JUMLAH HARGA BAHAN 2,617,912.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,617,912.50
E. Profit 15% *D 392,686.88
F. Harga Satuan Pekerjaan (D+E) 3,010,599.38

A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Batu L.02 OH 0.3670 162,400.00 59,600.80
Kepala Tukang L.03 OH 0.0740 203,000.00 15,022.00
Mandor L.04 OH 0.0370 203,000.00 7,511.00
JUMLAH TENAGA KERJA 82,133.80
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 82,133.80
E. Profit 15% *D 12,320.07
F. Harga Satuan Pekerjaan (D+E) 94,453.87

A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1470 121,800.00 17,904.60
Tukang kayu L.02 OH 0.1470 162,400.00 23,872.80
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 45,837.40
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0120 2,635,329.08 31,623.95
Kayu gergajian kelas III, papan m3 0.0040 2,535,470.00 10,141.88
Paku berbagai ukuran (2"-5") kg 0.2640 17,287.99 4,564.03

JUMLAH HARGA BAHAN 46,329.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,167.26
E. Profit 15% *D 13,825.09
F. Harga Satuan Pekerjaan (D+E) 105,992.35

A. 4.1.2.24. Upah 1 titik join dengan sling

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2200 121,800.00 26,796.00
Tukang kayu L.02 OH 0.2200 162,400.00 35,728.00
Tukang Besi L.02 OH 0.2200 162,400.00 35,728.00
Mandor L.04 OH 0.0110 203,000.00 2,233.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 100,485.00
Page 357 of 649
E. Profit 15% *D 15,072.75
F. Harga Satuan Pekerjaan (D+E) 115,557.75

Page 358 of 649


A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. 4.2.1.1. Pemasangan 1 kg besi profil

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las Konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 18,879.00


B. BAHAN
Besi profil kg 1.1500 9,825.20 11,298.98

JUMLAH HARGA BAHAN 11,298.98


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,177.98
E. Profit 15% *D 4,526.70
F. Harga Satuan Pekerjaan (D+E) 34,704.68

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 18,879.00


B. BAHAN
Besi Baja IWF kg 1.1500 11,420.26 13,133.30

JUMLAH HARGA BAHAN 13,133.30


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 32,012.30
E. Profit 15% *D 4,801.84
F. Harga Satuan Pekerjaan (D+E) 36,814.14

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Las Konstruksi L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0010 203,000.00 203.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 29,638.00


B. BAHAN
Solar liter 1.0000 18,100.00 18,100.00
Minyak pelumas (oli) liter 0.1000 31,881.15 3,188.12

JUMLAH HARGA BAHAN 21,288.12


C. PERALATAN
Sewa alat jam 0.8000 -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 50,926.12
E. Profit 15% *D 7,638.92
F. Harga Satuan Pekerjaan (D+E) 58,565.03

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Las biasa L.02 OH 1.0500 162,400.00 170,520.00
Kepala tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L,04 OH 0.0520 203,000.00 10,556.00

JUMLAH TENAGA KERJA 330,281.00


B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,825.20 147,378.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 46,223.10 2,311.16

JUMLAH HARGA BAHAN 534,662.76


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 864,943.76
E. Profit 15% *D 129,741.56
F. Harga Satuan Pekerjaan (D+E) 994,685.32

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

Page 359 of 649


Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0200 203,000.00 4,060.00

JUMLAH TENAGA KERJA 16,240.00


B. BAHAN
Kawat Las Listrik kg 0.4000 46,223.10 18,489.24
Solar kg 0.3000 18,100.00 5,430.00
Minyak pelumas (oli) kg 0.0400 31,881.15 1,275.25

JUMLAH HARGA BAHAN 25,194.49


C. PERALATAN
Sewa alat jam 0.1700 72,706.21 12,360.06

JUMLAH HARGA ALAT 12,360.06


D. Jumlah (A+B+C) 53,794.54
E. Profit 15% *D 8,069.18
F. Harga Satuan Pekerjaan (D+E) 61,863.72

Page 360 of 649


A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 121,800.00 79,170.00
Tukang Las biasa L.02 OH 0.6500 162,400.00 105,560.00
Kepala tukang L.03 OH 0.0650 203,000.00 13,195.00
Mandor L,04 OH 0.0320 203,000.00 6,496.00

JUMLAH TENAGA KERJA 204,421.00


B. BAHAN
Besi scuare tube m 4.7600 #N/A #N/A
Besi lis kaca (1 x 1) cm m 4.5220 #N/A #N/A
Pengelasan cm 20.0000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Las biasa L.02 OH 1.2000 162,400.00 194,880.00
Kepala tukang L.03 OH 0.1200 203,000.00 24,360.00
Mandor L,04 OH 0.0600 203,000.00 12,180.00

JUMLAH TENAGA KERJA 377,580.00


B. BAHAN
Rolling door-Galvalum tebal 0,4 mm m2 1.0000 401,940.00 401,940.00

JUMLAH HARGA BAHAN 401,940.00


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 779,520.00
E. Profit 15% *D 116,928.00
F. Harga Satuan Pekerjaan (D+E) 896,448.00

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 121,800.00 53,592.00
Tukang L.02 OH 0.4400 162,400.00 71,456.00
Kepala tukang L.03 OH 0.0440 203,000.00 8,932.00
Mandor L,04 OH 0.0220 203,000.00 4,466.00

JUMLAH TENAGA KERJA 138,446.00


B. BAHAN
Rolling door tebal 0,4 mm (PVC) m2 1.0000 279,125.00 279,125.00

JUMLAH HARGA BAHAN 279,125.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 417,571.00
E. Profit 15% *D 62,635.65
F. Harga Satuan Pekerjaan (D+E) 480,206.65

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang L.02 OH 0.8000 162,400.00 129,920.00
Kepala tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L,04 OH 0.0400 203,000.00 8,120.00

JUMLAH TENAGA KERJA 164,024.00


B. BAHAN
Sunscreen alumunium m2 1.0000 1,674,750.00 1,674,750.00

JUMLAH HARGA BAHAN 1,674,750.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,838,774.00
E. Profit 15% *D 275,816.10
F. Harga Satuan Pekerjaan (D+E) 2,114,590.10

A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang L.02 OH 1.0000 162,400.00 162,400.00
Kepala tukang L.03 OH 0.1000 203,000.00 20,300.00
Page 361 of 649
Mandor L,04 OH 0.0500 203,000.00 10,150.00

JUMLAH TENAGA KERJA 314,650.00


B. BAHAN
Rolling door-alumunium tebal 0,6 mm m2 1.0000 413,719.08 413,719.08

JUMLAH HARGA BAHAN 413,719.08


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 728,369.08
E. Profit 15% *D 109,255.36
F. Harga Satuan Pekerjaan (D+E) 837,624.44

Page 362 of 649


A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 121,800.00 5,237.40
Tukang khusus aluminium L.02 OH 0.0430 162,400.00 6,983.20
Kepala tukang L.03 OH 0.0043 203,000.00 872.90
Mandor L,04 OH 0.0021 203,000.00 426.30

JUMLAH TENAGA KERJA 13,519.80


B. BAHAN
Kusen Alumunium 3 inch Coklat m 1.1000 92,111.25 101,322.38
Skrup fixer buah 2.0000 2,344.65 4,689.30
Sealant tube 0.0600 38,798.38 2,327.90

JUMLAH HARGA BAHAN 108,339.58


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 121,859.38
E. Profit 15% *D 18,278.91
F. Harga Satuan Pekerjaan (D+E) 140,138.28

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0085 203,000.00 1,725.50
Mandor L,04 OH 0.0042 203,000.00 852.60

JUMLAH TENAGA KERJA 26,735.10


B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Alumunium strip m 14.6000 -

JUMLAH HARGA BAHAN 466,697.00


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 493,432.10
E. Profit 15% *D 74,014.82
F. Harga Satuan Pekerjaan (D+E) 567,446.92

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 26,999.00


B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56

JUMLAH HARGA BAHAN 507,318.06


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 534,317.06
E. Profit 15% *D 80,147.56
F. Harga Satuan Pekerjaan (D+E) 614,464.62

A. 4.2.1.13. ck Pemasangan 1 m2 pintu kaca rangka aluminium

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 26,999.00


B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56
Kaca bening tebal 5 mm m2 1.1000 147,936.25 162,729.88
JUMLAH HARGA BAHAN 670,047.94
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,046.94
E. Profit 15% *D 104,557.04
F. Harga Satuan Pekerjaan (D+E) 801,603.98

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
Page 363 of 649
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang khusus aluminium L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Venetion blinds m2 1.0000 90,324.85 90,324.85

JUMLAH HARGA BAHAN 90,324.85


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 200,553.85
E. Profit 15% *D 30,083.08
F. Harga Satuan Pekerjaan (D+E) 230,636.93

Page 364 of 649


A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 121,800.00 203,406.00
Tukang las konstruksi L.02 OH 1.6700 162,400.00 271,208.00
Kepala tukang L.03 OH 0.1670 203,000.00 33,901.00
Mandor L,04 OH 0.0830 203,000.00 16,849.00

JUMLAH TENAGA KERJA 525,364.00


B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 10,048.50 62,069.58
Pengelasan cm 27.0800 206.25 5,585.25

JUMLAH HARGA BAHAN 67,654.83


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 593,018.83
E. Profit 15% *D 88,952.83
F. Harga Satuan Pekerjaan (D+E) 681,971.66

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 31,465.00


B. BAHAN
Kawat nyamuk logam m2 1.1000 26,516.88 29,168.56
Pengelasan cm 11.1100 206.25 2,291.44
Besi strip 2 x 3 cm kg 1.7160 10,048.50 17,243.23

JUMLAH HARGA BAHAN 48,703.23


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 80,168.23
E. Profit 15% *D 12,025.23
F. Harga Satuan Pekerjaan (D+E) 92,193.46

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Jendela nako (kerangka + kaca 5 mm) m2 1.1000 187,795.30 206,574.83
Paku sekrup 1 cm -2,5 cm buah 10.0000 26,423.83 264,238.33
Besi strip 2 x 3 cm m 7.0000 10,048.50 70,339.50

JUMLAH HARGA BAHAN 541,152.66


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 602,255.66
E. Profit 15% *D 90,338.35
F. Harga Satuan Pekerjaan (D+E) 692,594.01

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Seng plat BJLS 27 uk. 0.9 x 1.83 (m) m 1.0500 55,825.00 58,616.25
Paku sekrup 1 cm -2,5 cm kg 0.0150 26,423.83 396.36
Kayu gergajian kelas III, papan m3 0.0190 2,535,470.00 48,173.93

JUMLAH HARGA BAHAN 107,186.54


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 168,289.54
E. Profit 15% *D 25,243.43
F. Harga Satuan Pekerjaan (D+E) 193,532.97

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
Page 365 of 649
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang besi L.02 OH 0.3000 162,400.00 48,720.00
Kepala tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L,04 OH 0.0080 203,000.00 1,624.00

JUMLAH TENAGA KERJA 74,704.00


B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) m 1.0500 44,660.00 46,893.00
Paku sekrup 1 cm -2,5 cm kg 0.0100 26,423.83 264.24
Besi strip 2 x 3 cm m3 0.5000 10,048.50 5,024.25

JUMLAH HARGA BAHAN 52,181.49


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 126,885.49
E. Profit 15% *D 19,032.82
F. Harga Satuan Pekerjaan (D+E) 145,918.31

Page 366 of 649


A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Besi L.02 OH 0.2500 162,400.00 40,600.00
Kepala tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L,04 OH 0.0130 203,000.00 2,639.00

JUMLAH TENAGA KERJA 78,764.00


B. BAHAN
Besi Hollow 40x40 mm t : 1,8mm m 3.5000 9,769.38 34,192.81
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,769.38 9,769.38

JUMLAH HARGA BAHAN 43,962.19


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 122,726.19
E. Profit 15% *D 18,408.93
F. Harga Satuan Pekerjaan (D+E) 141,135.12

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Besi Hollow 40 x 40 x 1.8 mm x 6 Meter m 4.0000 9,625.00 38,500.00
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,625.00 9,625.00

JUMLAH HARGA BAHAN 48,125.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 158,354.00
E. Profit 15% *D 23,753.10
F. Harga Satuan Pekerjaan (D+E) 182,107.10

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 115,710.00
B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 43.5000 1,627.00 70,774.50
Pasir pasang m3 0.0800 150,000.00 12,000.00
JUMLAH HARGA BAHAN 277,380.45
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 393,090.45
E. Profit 15% *D 58,963.57
F. Harga Satuan Pekerjaan (D+E) 452,054.02

A. 4.4.1.1. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 43.5000 1,627.00 70,774.50
Pasir pasang m3 0.0800 150,000.00 12,000.00

JUMLAH HARGA BAHAN 280,574.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 396,284.50

Page 367 of 649


E. Profit 15% *D 59,442.67
F. Harga Satuan Pekerjaan (D+E) 455,727.18

A. 4.4.1.2. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 32.9500 1,627.00 53,609.65
Pasir pasang m3 0.0910 150,000.00 13,650.00

C. PERALATAN JUMLAH HARGA BAHAN 261,865.60


- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 377,575.60
E. Profit 15% *D 56,636.34
F. Harga Satuan Pekerjaan (D+E) 434,211.94

Page 368 of 649


A. 4.4.1.2.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 32.9500 1,627.00 53,609.65
Pasir pasang m3 0.0910 150,000.00 13,650.00

JUMLAH HARGA BAHAN 265,059.65


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 380,769.65
E. Profit 15% *D 57,115.45
F. Harga Satuan Pekerjaan (D+E) 437,885.10

A. 4.4.1.3. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 4PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 26.5500 1,627.00 43,196.85
Pasir pasang m3 0.0930 150,000.00 13,950.00

C. PERALATAN JUMLAH HARGA BAHAN 251,752.80


- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 367,462.80
E. Profit 15% *D 55,119.42
F. Harga Satuan Pekerjaan (D+E) 422,582.22

A. 4.4.1.3.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 26.5500 1,627.00 43,196.85
Pasir pasang m3 0.0930 150,000.00 13,950.00

JUMLAH HARGA BAHAN 254,946.85


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 370,656.85
E. Profit 15% *D 55,598.53
F. Harga Satuan Pekerjaan (D+E) 426,255.38

A. 4.4.1.4. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 22.2200 1,627.00 36,151.94
Pasir pasang m3 0.1020 150,000.00 15,300.00

JUMLAH HARGA BAHAN 246,057.89


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 361,767.89

Page 369 of 649


E. Profit 15% *D 54,265.18
F. Harga Satuan Pekerjaan (D+E) 416,033.07

A. 4.4.1.4.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 22.2200 1,627.00 36,151.94
Pasir pasang m3 0.1020 150,000.00 15,300.00

JUMLAH HARGA BAHAN 249,251.94


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 364,961.94
E. Profit 15% *D 54,744.29
F. Harga Satuan Pekerjaan (D+E) 419,706.23

Page 370 of 649


A. 4.4.1.5. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah kecil buah 140.0000 1,390.04 194,605.95
Semen portland kg 18.5000 1,627.00 30,099.50
Pasir pasang m3 0.1220 150,000.00 18,300.00

JUMLAH HARGA BAHAN 243,005.45


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 358,715.45
E. Profit 15% *D 53,807.32
F. Harga Satuan Pekerjaan (D+E) 412,522.77

A. 4.4.1.5.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 18.5000 1,627.00 30,099.50
Pasir pasang m3 0.1220 150,000.00 18,300.00

JUMLAH HARGA BAHAN 246,199.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 361,909.50
E. Profit 15% *D 54,286.42
F. Harga Satuan Pekerjaan (D+E) 416,195.93

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 10.0800 1,627.00 16,400.16
Kapur padam m3 0.0275 79,092.86 2,175.05
Pasir pasang m3 0.0925 150,000.00 13,875.00

JUMLAH HARGA BAHAN 230,250.21


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 345,960.21
E. Profit 15% *D 51,894.03
F. Harga Satuan Pekerjaan (D+E) 397,854.25

A. 4.4.1.7. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

Page 371 of 649


JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 18.9500 1,627.00 30,831.65
Pasir pasang m3 0.0380 150,000.00 5,700.00

JUMLAH HARGA BAHAN 133,834.63


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 191,689.63
E. Profit 15% *D 28,753.44
F. Harga Satuan Pekerjaan (D+E) 220,443.07

Page 372 of 649


A. 4.4.1.7.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 18.9500 1,627.00 30,831.65
Pasir pasang m3 0.0380 150,000.00 5,700.00

JUMLAH HARGA BAHAN 135,431.65


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 193,286.65
E. Profit 15% *D 28,993.00
F. Harga Satuan Pekerjaan (D+E) 222,279.65

A. 4.4.1.8. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien (Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 14.3700 1,627.00 23,379.99
Pasir pasang m3 0.0400 150,000.00 6,000.00

JUMLAH HARGA BAHAN 126,682.97


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,537.97
E. Profit 15% *D 27,680.69
F. Harga Satuan Pekerjaan (D+E) 212,218.66

A. 4.4.1.8.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 14.3700 1,627.00 23,379.99
Pasir pasang m3 0.0400 150,000.00 6,000.00

JUMLAH HARGA BAHAN 128,279.99


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,134.99
E. Profit 15% *D 27,920.25
F. Harga Satuan Pekerjaan (D+E) 214,055.24

A. 4.4.1.9. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 11.5000 1,627.00 18,710.50
Pasir pasang m3 0.0430 150,000.00 6,450.00

JUMLAH HARGA BAHAN 122,463.48


C. PERALATAN
-

Page 373 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 180,318.48
E. Profit 15% *D 27,047.77
F. Harga Satuan Pekerjaan (D+E) 207,366.25

Page 374 of 649


A. 4.4.1.9. ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 11.5000 1,627.00 18,710.50
Pasir pasang m3 0.0430 150,000.00 6,450.00

JUMLAH HARGA BAHAN 124,060.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 181,915.50
E. Profit 15% *D 27,287.33
F. Harga Satuan Pekerjaan (D+E) 209,202.83

A. 4.4.1.10. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 5PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 119,802.34
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 177,657.34
E. Profit 15% *D 26,648.60
F. Harga Satuan Pekerjaan (D+E) 204,305.94

A. 4.4.1.10.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 121,399.36
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 179,254.36
E. Profit 15% *D 26,888.15
F. Harga Satuan Pekerjaan (D+E) 206,142.51

A. 4.4.1.11. Pemasangan 1 m2 dinding Bata Merah (5x11x22)cm tebal 1/2 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah kecil buah 70.0000 1,390.04 97,302.98
Semen portland kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0490 150,000.00 7,350.00
JUMLAH HARGA BAHAN 118,189.62
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 176,044.62

Page 375 of 649


E. Profit 15% *D 26,406.69
F. Harga Satuan Pekerjaan (D+E) 202,451.31

A. 4.4.1.11.ck Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0490 150,000.00 7,350.00
JUMLAH HARGA BAHAN 119,786.64
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 177,641.64
E. Profit 15% *D 26,646.25
F. Harga Satuan Pekerjaan (D+E) 204,287.89

Page 376 of 649


A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 6.5000 1,627.00 10,575.50
Pasir pasang m3 0.0500 150,000.00 7,500.00

JUMLAH HARGA BAHAN 116,975.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 174,830.50
E. Profit 15% *D 26,224.58
F. Harga Satuan Pekerjaan (D+E) 201,055.08

A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23.ck Pemasangan 1 m2 dinding terawang (rooster) 20x20 cm, camp. 1 SP : 4PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 20x20 (cm) buah 25.0000 15,072.75 376,818.75
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 399,965.75


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 457,820.75
E. Profit 15% *D 68,673.11
F. Harga Satuan Pekerjaan (D+E) 526,493.86

Page 377 of 649


A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 66,990.00


B. BAHAN
Batu bata berongga uk. 5x11x24 (cm) buah 70.0000 1,563.10 109,417.00
Semen portland kg 14.0000 1,627.00 22,778.00
Pasir pasang m3 0.0320 150,000.00 4,800.00

JUMLAH HARGA BAHAN 136,995.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 203,985.00
E. Profit 15% *D 30,597.75
F. Harga Satuan Pekerjaan (D+E) 234,582.75

Page 378 of 649


A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 105,966.00


B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 8,708.70 73,153.08
Semen Mortar kg 0.4730 7,458.22 3,527.74

JUMLAH HARGA BAHAN 76,680.82


C. PERALATAN

%
Peralatan 10.0000 766.81 7,668.08
(bahan)

JUMLAH HARGA ALAT 7,668.08


D. Jumlah (A+B+C) 190,314.90
E. Profit 15% *D 28,547.23
F. Harga Satuan Pekerjaan (D+E) 218,862.13

A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 121,800.00 81,727.80
Tukang Batu L.02 OH 0.1300 162,400.00 21,112.00
Kepala tukang L.03 OH 0.0130 203,000.00 2,639.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 106,087.80


B. BAHAN
Bata Ringan 10x20x60cm m3 8.4000 11,165.00 93,786.00
Semen Mortar kg 0.0630 7,458.22 469.87

JUMLAH HARGA BAHAN 94,255.87


C. PERALATAN

%
Peralatan 10.0000 942.56 9,425.59
(bahan)

JUMLAH HARGA ALAT 9,425.59


D. Jumlah (A+B+C) 209,769.25
E. Profit 15% *D 31,465.39
F. Harga Satuan Pekerjaan (D+E) 241,234.64

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 15.5040 1,627.00 25,225.01
Pasir pasang m3 0.0160 150,000.00 2,400.00
JUMLAH HARGA BAHAN 27,625.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 94,615.01
E. Profit 15% *D 14,192.25
F. Harga Satuan Pekerjaan (D+E) 108,807.26

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 10.2240 1,627.00 16,634.45
Pasir pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 19,634.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,624.45
E. Profit 15% *D 12,993.67
F. Harga Satuan Pekerjaan (D+E) 99,618.12

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Page 379 of 649
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 7.7760 1,627.00 12,651.55
Pasir pasang m3 0.0230 150,000.00 3,450.00
JUMLAH HARGA BAHAN 16,101.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,091.55
E. Profit 15% *D 12,463.73
F. Harga Satuan Pekerjaan (D+E) 95,555.28

Page 380 of 649


A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.2400 1,627.00 10,152.48
Pasir pasang m3 0.0240 150,000.00 3,600.00
JUMLAH HARGA BAHAN 13,752.48
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 80,742.48
E. Profit 15% *D 12,111.37
F. Harga Satuan Pekerjaan (D+E) 92,853.85

A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,324.37
E. Profit 15% *D 11,898.66
F. Harga Satuan Pekerjaan (D+E) 91,223.02

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 4.4160 1,627.00 7,184.83
Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 11,234.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,224.83
E. Profit 15% *D 11,733.72
F. Harga Satuan Pekerjaan (D+E) 89,958.56

A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.9360 1,627.00 6,403.87
Pasir pasang m3 0.0280 150,000.00 4,200.00
JUMLAH HARGA BAHAN 10,603.87
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 77,593.87
E. Profit 15% *D 11,639.08
F. Harga Satuan Pekerjaan (D+E) 89,232.95

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.4560 1,627.00 5,622.91
Pasir pasang m3 0.0290 150,000.00 4,350.00
JUMLAH HARGA BAHAN 9,972.91
C. PERALATAN
-
JUMLAH HARGA ALAT -
Page 381 of 649
D. Jumlah ( A+B+C) 76,962.91
E. Profit 15% *D 11,544.44
F. Harga Satuan Pekerjaan (D+E) 88,507.35

Page 382 of 649


A. 4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP :3PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 5.7600 1,627.00 9,371.52
2. KP m3 0.0030 -
Pasir pasang m3 0.0130 150,000.00 1,950.00
JUMLAH HARGA BAHAN 11,321.52
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 80,747.52
E. Profit 15% *D 12,112.13
F. Harga Satuan Pekerjaan (D+E) 92,859.65

A. 4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP :8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 3.0000 1,627.00 4,881.00
2. KP m3 0.0050 -
Pasir pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 7,881.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 77,307.00
E. Profit 15% *D 11,596.05
F. Harga Satuan Pekerjaan (D+E) 88,903.05

A. 4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP :1PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland m3 0.0090 1,627.00 14.64
2. KP m3 0.0090 -
Pasir pasang m3 0.0090 150,000.00 1,350.00
JUMLAH HARGA BAHAN 1,364.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,790.64
E. Profit 15% *D 10,618.60
F. Harga Satuan Pekerjaan (D+E) 81,409.24

A. 4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 121,800.00 43,848.00
Tukang Batu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 69,426.00
B. BAHAN
Semen portland Kg 0.0070 1,627.00 11.39
2. KP m3 0.0070 -
Pasir pasang m3 0.0150 150,000.00 2,250.00
JUMLAH HARGA BAHAN 2,261.39
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,687.39
E. Profit 15% *D 10,753.11
F. Harga Satuan Pekerjaan (D+E) 82,440.50

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 13.6320 1,627.00 22,179.26

Page 383 of 649


Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 26,229.26
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 115,955.26
E. Profit 15% *D 17,393.29
F. Harga Satuan Pekerjaan (D+E) 133,348.55

Page 384 of 649


A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 70,847.00
B. BAHAN
Semen portland Kg 10.3680 1,627.00 16,868.74
Pasir pasang m3 0.0310 150,000.00 4,650.00
JUMLAH HARGA BAHAN 21,518.74
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 92,365.74
E. Profit 15% *D 13,854.86
F. Harga Satuan Pekerjaan (D+E) 106,220.60

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 18,336.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 108,062.64
E. Profit 15% *D 16,209.40
F. Harga Satuan Pekerjaan (D+E) 124,272.04

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 6.9120 1,627.00 11,245.82
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 16,495.82
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 106,221.82
E. Profit 15% *D 15,933.27
F. Harga Satuan Pekerjaan (D+E) 122,155.10

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 5.8880 1,627.00 9,579.78
Pasir pasang m3 0.0360 150,000.00 5,400.00
JUMLAH HARGA BAHAN 14,979.78
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 104,705.78
E. Profit 15% *D 15,705.87
F. Harga Satuan Pekerjaan (D+E) 120,411.64

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
Page 385 of 649
D. Jumlah ( A+B+C) 46,032.37
E. Profit 15% *D 6,904.86
F. Harga Satuan Pekerjaan (D+E) 52,937.22

Page 386 of 649


A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu L.03 OH 0.4000 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.0400 203,000.00 8,120.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 83,636.00
B. BAHAN
Semen portland Kg 0.5000 1,627.00 813.50
Pasir pasang m3 0.0130 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,763.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,399.50
E. Profit 15% *D 12,959.93
F. Harga Satuan Pekerjaan (D+E) 99,359.43

A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Semen portland Kg 4.3200 1,627.00 7,028.64
Pasir pasang Kg 0.0060 150,000.00 900.00
JUMLAH HARGA BAHAN 7,928.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,783.64
E. Profit 15% *D 9,867.55
F. Harga Satuan Pekerjaan (D+E) 75,651.19

A. 4.4.2.24. Pemasangan 1 m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 3.1080 1,627.00 5,056.72
JUMLAH HARGA BAHAN 5,056.72
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 38,754.72
E. Profit 15% *D 5,813.21
F. Harga Satuan Pekerjaan (D+E) 44,567.92

A. 4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Batu L.03 OH 0.0350 162,400.00 5,684.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Semen portland Kg 1.6000 1,627.00 2,603.20
JUMLAH HARGA BAHAN 2,603.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 18,437.20
E. Profit 15% *D 2,765.58
F. Harga Satuan Pekerjaan (D+E) 21,202.78

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.3400 1,627.00 10,315.18
Pasir pasang m3 0.0120 150,000.00 1,800.00
JUMLAH HARGA BAHAN 12,115.18
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,105.18
E. Profit 15% *D 11,865.78

Page 387 of 649


F. Harga Satuan Pekerjaan (D+E) 90,970.96

Page 388 of 649


A. 4.4.2.27. Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Semen portland Kg 3.2500 1,627.00 5,287.75
JUMLAH HARGA BAHAN 5,287.75
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 49,947.75
E. Profit 15% *D 7,492.16
F. Harga Satuan Pekerjaan (D+E) 57,439.91

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 121,800.00 32,886.00
Tukang Batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0140 203,000.00 2,842.00
Mandor L.04 OH 0.0140 203,000.00 2,842.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Ubin abu-abu 20 x 20 (cm) Bh 26.5000 7,257.25 192,317.13
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 215,987.93
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 276,481.93
E. Profit 15% *D 41,472.29
F. Harga Satuan Pekerjaan (D+E) 317,954.21

A. 4.4.3.35.ck Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 40x40 (cm) polos doos 1.0500 58,333.33 61,250.00
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 117,645.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 171,237.00
E. Profit 15% *D 25,685.55
F. Harga Satuan Pekerjaan (D+E) 196,922.55

A. 4.4.3.35. ck Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 30x30 (cm) polos doos 1.0500 59,286.15 62,250.46
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 118,645.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 172,237.46
E. Profit 15% *D 25,835.62
F. Harga Satuan Pekerjaan (D+E) 198,073.08

A. 4.4.3.36. ck Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00

Page 389 of 649


Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik KM/WC antislip 20x20 (cm) doos 1.0500 65,076.00 68,329.80
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.5000 22,250.00 11,125.00
JUMLAH HARGA BAHAN 103,125.60
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 156,717.60
E. Profit 15% *D 23,507.64
F. Harga Satuan Pekerjaan (D+E) 180,225.24

Page 390 of 649


A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint Keramik 10 x 30 cm (Polos) Bh 10.6000 8,932.00 94,679.20
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0500 22,250.00 1,112.50
JUMLAH HARGA BAHAN 98,096.48
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 131,794.48
E. Profit 15% *D 19,769.17
F. Harga Satuan Pekerjaan (D+E) 151,563.65

A. 4.4.3.39.ck Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint keramik 10x40 Cm ( polos) Bh 5.3000 3,645.83 19,322.92
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0250 22,250.00 556.25
JUMLAH HARGA BAHAN 22,183.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,881.95
E. Profit 15% *D 8,382.29
F. Harga Satuan Pekerjaan (D+E) 64,264.24

A. 4.4.3.42. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Marmer 100 x 100 cm Bh 1.0600 279,125.00 295,872.50
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.1340 22,250.00 2,981.50
JUMLAH HARGA BAHAN 318,929.13
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 475,239.13
E. Profit 15% *D 71,285.87
F. Harga Satuan Pekerjaan (D+E) 546,525.00

A. 4.4.3.45. Pemasangan 1 m2 lantai parquet kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Parquette lantai m2 1.0500 116,674.25 122,507.96
Lem (standar aica aibond) Kg 0.6000 31,634.17 18,980.50
JUMLAH HARGA BAHAN 141,488.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,798.46
E. Profit 15% *D 44,669.77
F. Harga Satuan Pekerjaan (D+E) 342,468.23

A. 4.4.3.54. ck Pemasangan 1 m2 dinding keramik 20cmx 25cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik 20x25 (cm) polos Bh 20.0000 3,200.00 64,000.00

Page 391 of 649


Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 1.9400 22,250.00 43,165.00
JUMLAH HARGA BAHAN 124,996.10
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 325,966.10
E. Profit 15% *D 48,894.91
F. Harga Satuan Pekerjaan (D+E) 374,861.01

Page 392 of 649


A. 4.4.3.56. Pemasangan 1 m2 dinding batu paras
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu paras Bh 1.1000 174,174.00 191,591.40
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 215,958.65
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 372,268.65
E. Profit 15% *D 55,840.30
F. Harga Satuan Pekerjaan (D+E) 428,108.95

A. 4.4.3.57. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu alam m2 1.1000 200,970.00 221,067.00
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 245,434.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 401,744.25
E. Profit 15% *D 60,261.64
F. Harga Satuan Pekerjaan (D+E) 462,005.89

A. 4.4.3.59. Pemasangan 1 m2 wallpaper lebar 50cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Batu L.02 OH 0.1750 162,400.00 28,420.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 74,907.00
B. BAHAN
Wallpaper polos m 2.2000 42,371.18 93,216.59
Lem (standar Fox)/ perekat Kg 0.2500 25,902.80 6,475.70
JUMLAH HARGA BAHAN 99,692.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 174,599.29
E. Profit 15% *D 26,189.89
F. Harga Satuan Pekerjaan (D+E) 200,789.18

A. 4.4.3.62. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0030 3,534,693.04 10,604.08
Paku sekrup (kg) Kg 0.0500 49,126.00 2,456.30
JUMLAH HARGA BAHAN 13,060.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 50,818.38
E. Profit 15% *D 7,622.76
F. Harga Satuan Pekerjaan (D+E) 58,441.14

A. 4.4.3.65. Pemasangan 1 m² paving block berwarna tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 122,063.90
B. BAHAN
Conblock tebal 6 cm (polos) m² 1.0100 61,266.67 61,879.33
Pasir beton m3 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 69,379.33
C. PERALATAN

Page 393 of 649


Peralatan % 10.0000 6,937.93 69,379.33
JUMLAH HARGA ALAT 69,379.33
D. Jumlah ( A+B+C) 260,822.57
E. Profit 15% *D 39,123.38
F. Harga Satuan Pekerjaan (D+E) 299,945.95

Page 394 of 649


A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72

A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 251,720.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0150 3,036,293.94 45,544.41
Paku berbagai ukuran (2"-5") Kg 0.0100 17,287.99 172.88
JUMLAH HARGA BAHAN 45,717.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,437.29
E. Profit 15% *D 44,615.59
F. Harga Satuan Pekerjaan (D+E) 342,052.88

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39

A. 4.5.1.9.a Pemasangan 1 m list gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List gypsum m 1.0500 24,510.57 25,736.10
Paku sekrup (kg) Kg 0.0100 49,126.00 491.26
JUMLAH HARGA BAHAN 26,227.36
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 42,061.36
E. Profit 15% *D 6,309.20
F. Harga Satuan Pekerjaan (D+E) 48,370.56

A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List kayu profil m 1.0500 40,007.92 42,008.31
Paku sekrup 1 cm -2,5 cm Kg 0.0100 26,423.83 264.24
JUMLAH HARGA BAHAN 42,272.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
Page 395 of 649
D. Jumlah ( A+B+C) 58,106.55
E. Profit 15% *D 8,715.98
F. Harga Satuan Pekerjaan (D+E) 66,822.53

Page 396 of 649


A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40.2mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m1 4.0000 9,625.00 38,500.00
Assesoris (perkuatan, las dll) Ls 100%*rangka 9,625.00 9,625.00
JUMLAH HARGA BAHAN 48,125.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 158,354.00
E. Profit 15% *D 23,753.10
F. Harga Satuan Pekerjaan (D+E) 182,107.10

A. 4.5.1.4.a Pemasangan 1 m2 langit-langit eternit ukuran( 1 x 1 m) tebal 4 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 4 mm Lembar 1.5000 26,433.14 39,649.71
Paku berbagai ukuran (2"-5") Kg 0.0500 17,287.99 864.40
JUMLAH HARGA BAHAN 40,514.11
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,979.11
E. Profit 15% *D 10,796.87
F. Harga Satuan Pekerjaan (D+E) 82,775.97

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Atap Genteng kodok Bh 25.0000 4,577.65 114,441.25
JUMLAH HARGA BAHAN 114,441.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 148,139.25
E. Profit 15% *D 22,220.89
F. Harga Satuan Pekerjaan (D+E) 170,360.14

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 85,666.00
B. BAHAN
Bubungan atap (nok) genteng kodok Bh 5.0000 4,745.13 23,725.63
Semen portland Kg 8.0000 1,627.00 13,016.00
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 41,541.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 127,207.63
E. Profit 15% *D 19,081.14
F. Harga Satuan Pekerjaan (D+E) 146,288.77

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0670 162,400.00 10,880.80
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 30,774.80
B. BAHAN
Rooflight fibreglass uk. 1,8 x 0,9 (m) Lembar 0.6000 98,810.25 59,286.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 60,553.23
C. PERALATAN
-
Page 397 of 649
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 91,328.03
E. Profit 15% *D 13,699.20
F. Harga Satuan Pekerjaan (D+E) 105,027.23

Page 398 of 649


A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 0.5000 83,151.34 41,575.67
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 44,366.39
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,846.39
E. Profit 15% *D 11,526.96
F. Harga Satuan Pekerjaan (D+E) 88,373.35

A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 0.6000 73,549.44 44,129.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 46,920.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,400.38
E. Profit 15% *D 11,910.06
F. Harga Satuan Pekerjaan (D+E) 91,310.44

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 0.6000 65,426.90 39,256.14
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 42,046.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 73,308.86
E. Profit 15% *D 10,996.33
F. Harga Satuan Pekerjaan (D+E) 84,305.19

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 0.7500 59,397.80 44,548.35
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 47,339.07
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,601.07
E. Profit 15% *D 11,790.16
F. Harga Satuan Pekerjaan (D+E) 90,391.23

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 102,106.58 35,737.30
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,528.02
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,790.02
E. Profit 15% *D 10,468.50
F. Harga Satuan Pekerjaan (D+E) 80,258.53

Page 399 of 649


A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 91,895.93 38,596.29
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,387.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,649.01
E. Profit 15% *D 10,897.35
F. Harga Satuan Pekerjaan (D+E) 83,546.36

A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 81,685.27 35,941.52
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,732.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,994.24
E. Profit 15% *D 10,499.14
F. Harga Satuan Pekerjaan (D+E) 80,493.37

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 71,474.61 36,452.05
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 39,242.77
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,504.77
E. Profit 15% *D 10,575.72
F. Harga Satuan Pekerjaan (D+E) 81,080.48

A. 4.5.2.15. a Pemasangan 1 m2 atap zincalum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0,4 mm m 1.0000 68,106.50 68,106.50
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 48,009.50 38,407.60
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,198.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,460.32
E. Profit 15% *D 10,869.05
F. Harga Satuan Pekerjaan (D+E) 83,329.37

Page 400 of 649


A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 0.3700 97,693.75 36,146.69
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,937.41
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,199.41
E. Profit 15% *D 10,529.91
F. Harga Satuan Pekerjaan (D+E) 80,729.32

A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 0.3800 87,924.38 33,411.26
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 36,201.98
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,463.98
E. Profit 15% *D 10,119.60
F. Harga Satuan Pekerjaan (D+E) 77,583.58

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 0.4600 82,621.00 38,005.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 40,796.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,058.38
E. Profit 15% *D 10,808.76
F. Harga Satuan Pekerjaan (D+E) 82,867.14

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 0.4900 73,298.23 35,916.13
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,706.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,968.85
E. Profit 15% *D 10,495.33
F. Harga Satuan Pekerjaan (D+E) 80,464.18

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 0.5700 61,295.85 34,938.63
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 37,729.35
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 68,991.35
E. Profit 15% *D 10,348.70
F. Harga Satuan Pekerjaan (D+E) 79,340.06

Page 401 of 649


A. 4.5.2.30. Pemasangan 1 m2 genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 6,268.35 68,951.85
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 69,470.49
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 114,130.49
E. Profit 15% *D 17,119.57
F. Harga Satuan Pekerjaan (D+E) 131,250.06

A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 47,500.00 61,750.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 66,818.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 109,651.32
E. Profit 15% *D 16,447.70
F. Harga Satuan Pekerjaan (D+E) 126,099.01

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 47,500.00 95,000.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 100,068.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 142,901.32
E. Profit 15% *D 21,435.20
F. Harga Satuan Pekerjaan (D+E) 164,336.51

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 89,320.00
B. BAHAN
Bubungan atap (nok) genteng beton Bh 3.5000 7,368.90 25,791.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
Semen portland Kg 10.8000 1,627.00 17,571.60
Pasir pasang m3 0.0320 150,000.00 4,800.00
Semen warna (sika graut) Kg 1.0000 22,250.00 22,250.00
JUMLAH HARGA BAHAN 71,679.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 160,999.83
E. Profit 15% *D 24,149.97
F. Harga Satuan Pekerjaan (D+E) 185,149.80

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Kayu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.11 OH 0.0150 203,000.00 3,045.00
Mandor L.15 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Bubungan atap (nok) metal (biasa/ polos) Bh 1.1000 36,286.25 39,914.88
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 41,181.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 101,675.95
E. Profit 15% *D 15,251.39

Page 402 of 649


F. Harga Satuan Pekerjaan (D+E) 116,927.35

Page 403 of 649


A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Kayu L.03 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.11 OH 0.0060 203,000.00 1,218.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 26,796.00
B. BAHAN
Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 0.7000 40,194.00 28,135.80
Paku berbagai ukuran (1/2"-1") Kg 0.0200 25,341.59 506.83
JUMLAH HARGA BAHAN 28,642.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,438.63
E. Profit 15% *D 8,315.79
F. Harga Satuan Pekerjaan (D+E) 63,754.43

A. 4.5.2.40. Pemasangan 1 m1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 32,277.00
B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 0.3000 44,660.00 13,398.00
Paku berbagai ukuran (1/2"-1") Kg 0.0400 25,341.59 1,013.66
JUMLAH HARGA BAHAN 14,411.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 46,688.66
E. Profit 15% *D 7,003.30
F. Harga Satuan Pekerjaan (D+E) 53,691.96

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.11 OH 0.0050 203,000.00 1,015.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Aluminium foil air cell bubble m2 1.0500 68,414.47 71,835.19
JUMLAH HARGA BAHAN 71,835.19
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 100,864.19
E. Profit 15% *D 15,129.63
F. Harga Satuan Pekerjaan (D+E) 115,993.82

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 121,800.00 852,600.00
Tukang kayu L.03 OH 21.0000 162,400.00 3,410,400.00
Kepala tukang L.03 OH 2.1000 203,000.00 426,300.00
Mandor L.04 OH 0.3500 203,000.00 71,050.00
JUMLAH TENAGA KERJA 4,760,350.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,622,735.97 3,985,009.57
Paku berbagai ukuran (2"-5") Kg 1.2500 17,287.99 21,609.98
Lem kayu Kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN 4,042,452.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,802,802.88
E. Profit 15% *D 1,320,420.43
F. Harga Satuan Pekerjaan (D+E) 10,123,223.32

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 121,800.00 730,800.00
Tukang kayu L.03 OH 18.0000 162,400.00 2,923,200.00
Kepala Tukang L.03 OH 1.8000 203,000.00 365,400.00
Mandor L.04 OH 0.3000 203,000.00 60,900.00
JUMLAH TENAGA KERJA 4,080,300.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,822,286.84 3,386,744.21
Paku berbagai ukuran (2"-5") kg 1.2500 17,287.99 21,609.98
Lem kayu kg 1.0000 35,833.33 35,833.33

JUMLAH HARGA BAHAN 3,444,187.52


C. PERALATAN
Page 404 of 649
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 7,524,487.52
E. Profit 15% *D 1,128,673.13
F. Harga Satuan Pekerjaan (D+E) 8,653,160.65

Page 405 of 649


A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-

JUMLAH HARGA BAHAN 122,316.16


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 360,435.16
E. Profit 15% *D 54,065.27
F. Harga Satuan Pekerjaan (D+E) 414,500.43

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,535,470.00 101,418.80
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-

JUMLAH HARGA BAHAN 102,283.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 340,402.20
E. Profit 15% *D 51,060.33
F. Harga Satuan Pekerjaan (D+E) 391,462.53

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
JUMLAH HARGA BAHAN 139,368.42
PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 819,418.42
E. Profit 15% *D 122,912.76
F. Harga Satuan Pekerjaan (D+E) 942,331.19

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 3,036,293.94 72,871.05
Lem kayu kg 0.3000 35,833.33 10,750.00
- -

JUMLAH HARGA BAHAN 83,621.05


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 627,661.05
E. Profit 15% *D 94,149.16
F. Harga Satuan Pekerjaan (D+E) 721,810.21

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Kayu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 3,036,293.94 194,322.81
Page 406 of 649
Lem kayu kg 0.5000 35,833.33 17,916.67
-

JUMLAH HARGA BAHAN 212,239.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 892,289.48
E. Profit 15% *D 133,843.42
F. Harga Satuan Pekerjaan (D+E) 1,026,132.90

Page 407 of 649


A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Kayu L.03 OH 2.1000 162,400.00 341,040.00
Kepala Tukang L.03 OH 0.2100 203,000.00 42,630.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 476,035.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 183,625.14
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,660.14
E. Profit 15% *D 98,949.02
F. Harga Satuan Pekerjaan (D+E) 758,609.16

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,534,693.04 90,488.14
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 198,205.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 742,245.93
E. Profit 15% *D 111,336.89
F. Harga Satuan Pekerjaan (D+E) 853,582.82

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Kayu L.03 OH 2.0000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.2000 203,000.00 40,600.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 515,011.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,534,693.04 212,081.58
Paku berbagai ukuran (1/2"-1") kg 0.1500 25,341.59 3,801.24
-

JUMLAH HARGA BAHAN 215,882.82


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 730,893.82
E. Profit 15% *D 109,634.07
F. Harga Satuan Pekerjaan (D+E) 840,527.89

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,534,693.04 88,367.33
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.3000 35,833.33 10,750.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25

JUMLAH HARGA BAHAN 191,988.82


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 736,028.82
E. Profit 15% *D 110,404.32
F. Harga Satuan Pekerjaan (D+E) 846,433.15

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 121,800.00 103,530.00
Tukang Kayu L.03 OH 2.5500 162,400.00 414,120.00
Kepala Tukang L.03 OH 0.2550 203,000.00 51,765.00
Mandor L.04 OH 0.0430 203,000.00 8,729.00
Page 408 of 649
JUMLAH TENAGA KERJA 578,144.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.8000 35,833.33 28,666.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
Formika lembar 0.5000 94,902.50 47,451.25

JUMLAH HARGA BAHAN 244,896.76


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 823,040.76
E. Profit 15% *D 123,456.11
F. Harga Satuan Pekerjaan (D+E) 946,496.88

Page 409 of 649


A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 121,800.00 487,200.00
Tukang Kayu L.03 OH 12.0000 162,400.00 1,948,800.00
Kepala Tukang L.03 OH 1.2000 203,000.00 243,600.00
Mandor L.04 OH 0.2000 203,000.00 40,600.00
JUMLAH TENAGA KERJA 2,720,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 5.6000 17,287.99 96,812.73

JUMLAH HARGA BAHAN 3,352,055.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 6,072,255.75
E. Profit 15% *D 910,838.36
F. Harga Satuan Pekerjaan (D+E) 6,983,094.12

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.0000 162,400.00 3,248,000.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,540,095.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,622,735.97 4,347,283.16
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 5.6000 17,287.99 96,812.73
- -

JUMLAH HARGA BAHAN 4,594,823.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 9,134,918.39
E. Profit 15% *D 1,370,237.76
F. Harga Satuan Pekerjaan (D+E) 10,505,156.15

A. 4.6.1.15. Pemasangan 1m3 konstruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.1000 162,400.00 3,264,240.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,556,335.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 3.0000 17,287.99 51,863.96
- -

JUMLAH HARGA BAHAN 3,307,106.99


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,863,441.99
E. Profit 15% *D 1,179,516.30
F. Harga Satuan Pekerjaan (D+E) 9,042,958.28

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0360 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
Page 410 of 649
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0570 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00
- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

Page 411 of 649


A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang kayu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,822,286.84 39,512.02
Paku berbagai ukuran (2"-5") kg 0.0570 17,287.99 985.42

JUMLAH HARGA BAHAN 40,497.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,255.43
E. Profit 15% *D 11,738.31
F. Harga Satuan Pekerjaan (D+E) 89,993.75

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0750 203,000.00 15,225.00
JUMLAH TENAGA KERJA 88,305.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2000 17,287.99 3,457.60

- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.3000 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 81,200.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 17,287.99 4,322.00

- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80

- -

JUMLAH HARGA BAHAN 39,903.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,638.48
E. Profit 15% *D 13,445.77
F. Harga Satuan Pekerjaan (D+E) 103,084.26

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Page 412 of 649
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40

- -

JUMLAH HARGA BAHAN 39,039.08


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,774.08
E. Profit 15% *D 13,316.11
F. Harga Satuan Pekerjaan (D+E) 102,090.20

Page 413 of 649


A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.4500 203,000.00 91,350.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 184,324.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,635,329.08 73,789.21
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20

- -

JUMLAH HARGA BAHAN 76,382.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 260,706.41
E. Profit 15% *D 39,105.96
F. Harga Satuan Pekerjaan (D+E) 299,812.37

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 102,109.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 110,533.50 95,058.81
Lem kayu kg 0.5600 35,833.33 20,066.67

JUMLAH HARGA BAHAN 196,742.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 298,851.71
E. Profit 15% *D 44,827.76
F. Harga Satuan Pekerjaan (D+E) 343,679.46

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 136,010.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 89,040.88 76,575.15
Lem kayu kg 0.5600 35,833.33 20,066.67

JUMLAH HARGA BAHAN 178,259.05


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 314,269.05
E. Profit 15% *D 47,140.36
F. Harga Satuan Pekerjaan (D+E) 361,409.41

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang kayu L.03 OH 1.8000 162,400.00 292,320.00
Kepala Tukang L.03 OH 0.1800 203,000.00 36,540.00
Mandor L.04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 408,030.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,534,693.04 24,742.85
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80
Paku sekrup (kg) kg 0.1500 49,126.00 7,368.90

JUMLAH HARGA BAHAN 33,840.55


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 441,870.55
E. Profit 15% *D 66,280.58
F. Harga Satuan Pekerjaan (D+E) 508,151.13

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Page 414 of 649
Tukang kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 17,052.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 89,040.88 35,616.35
Paku berbagai ukuran (1/2"-1") kg 0.0500 25,341.59 1,267.08

JUMLAH HARGA BAHAN 36,883.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,935.43
E. Profit 15% *D 8,090.31
F. Harga Satuan Pekerjaan (D+E) 62,025.74

Page 415 of 649


A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Kunci antik buah 1.0000 489,230.00 489,230.00

JUMLAH HARGA BAHAN 489,230.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 606,767.00
E. Profit 15% *D 91,015.05
F. Harga Satuan Pekerjaan (D+E) 697,782.05

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Kunci tanam buah 1.0000 182,826.88 182,826.88

JUMLAH HARGA BAHAN 182,826.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 276,409.88
E. Profit 15% *D 41,461.48
F. Harga Satuan Pekerjaan (D+E) 317,871.36

A. 4.6.2.2.a Pemasangan 1 set Handle + kunci untuk pintu kusen alumunium Alumunium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Handle + kunci untuk pintu kusen alumunium Alumuniumbuah 1.0000 614,075.00 614,075.00

JUMLAH HARGA BAHAN 614,075.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 707,658.00
E. Profit 15% *D 106,148.70
F. Harga Satuan Pekerjaan (D+E) 813,806.70

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci KM buah 1.0000 104,798.75 104,798.75

JUMLAH HARGA BAHAN 104,798.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 197,366.75
E. Profit 15% *D 29,605.01
F. Harga Satuan Pekerjaan (D+E) 226,971.76

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci silinder buah 1.0000 62,168.75 62,168.75

JUMLAH HARGA BAHAN 62,168.75


C. PERALATAN

Page 416 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 154,736.75
E. Profit 15% *D 23,210.51
F. Harga Satuan Pekerjaan (D+E) 177,947.26

Page 417 of 649


A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 22,506.29 22,506.29

JUMLAH HARGA BAHAN 22,506.29


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 51,900.69
E. Profit 15% *D 7,785.10
F. Harga Satuan Pekerjaan (D+E) 59,685.79

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Spring knip buah 1.0000 21,660.10 21,660.10

JUMLAH HARGA BAHAN 21,660.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 52,516.10
E. Profit 15% *D 7,877.41
F. Harga Satuan Pekerjaan (D+E) 60,393.52

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kait angin biasa buah 1.0000 13,625.00 13,625.00

JUMLAH HARGA BAHAN 13,625.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,481.00
E. Profit 15% *D 6,672.15
F. Harga Satuan Pekerjaan (D+E) 51,153.15

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door closer set 1.0000 275,000.00 275,000.00

JUMLAH HARGA BAHAN 275,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 373,049.00
E. Profit 15% *D 55,957.35
F. Harga Satuan Pekerjaan (D+E) 429,006.35

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 39,179.00
B. BAHAN
Kunci Selot bh 1.0000 19,800.00 19,800.00

JUMLAH HARGA BAHAN 19,800.00


C. PERALATAN

JUMLAH HARGA ALAT -


Page 418 of 649
D. Jumlah (A+B+C) 58,979.00
E. Profit 15% *D 8,846.85
F. Harga Satuan Pekerjaan (D+E) 67,825.85

Page 419 of 649


A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door holder bh 1.0000 131,188.75 131,188.75

JUMLAH HARGA BAHAN 131,188.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 229,237.75
E. Profit 15% *D 34,385.66
F. Harga Satuan Pekerjaan (D+E) 263,623.41

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Door stop bh 1.0000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,503.00
E. Profit 15% *D 10,575.45
F. Harga Satuan Pekerjaan (D+E) 81,078.45

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Rell pintu dorong set 1.0000 273,542.50 273,542.50

JUMLAH HARGA BAHAN 273,542.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 391,079.50
E. Profit 15% *D 58,661.92
F. Harga Satuan Pekerjaan (D+E) 449,741.43

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 106,067.50 116,674.25
Sealant kg 0.0500 38,798.38 1,939.92

JUMLAH HARGA BAHAN 118,614.17


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 148,008.57
E. Profit 15% *D 22,201.29
F. Harga Satuan Pekerjaan (D+E) 170,209.85

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca gelap (ray band) tebal 5 mm m2 1.1000 131,747.00 144,921.70
Sealant kg 0.0500 38,798.38 1,939.92
JUMLAH HARGA BAHAN 146,861.62
C. PERALATAN

JUMLAH HARGA ALAT -


Page 420 of 649
D. Jumlah (A+B+C) 176,256.02
E. Profit 15% *D 26,438.40
F. Harga Satuan Pekerjaan (D+E) 202,694.42

Page 421 of 649


A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0009 203,000.00 182.70
JUMLAH TENAGA KERJA 33,312.30
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 156,310.00 171,941.00
Sealant kg 0.0700 38,798.38 2,715.89

JUMLAH HARGA BAHAN 174,656.89


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,969.19
E. Profit 15% *D 31,195.38
F. Harga Satuan Pekerjaan (D+E) 239,164.56

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 48,983.90
B. BAHAN
Kaca Buram tebal = 12mm m2 1.1000 490,245.00 539,269.50
Sealant kg 0.0700 38,798.38 2,715.89

JUMLAH HARGA BAHAN 541,985.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 590,969.29
E. Profit 15% *D 88,645.39
F. Harga Satuan Pekerjaan (D+E) 679,614.68

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 139,562.50 153,518.75

JUMLAH HARGA BAHAN 153,518.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,374.75
E. Profit 15% *D 27,656.21
F. Harga Satuan Pekerjaan (D+E) 212,030.96

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,956.60
B. BAHAN
Kaca cermin 8 mm m2 1.1000 156,310.00 171,941.00

JUMLAH HARGA BAHAN 171,941.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 206,897.60
E. Profit 15% *D 31,034.64
F. Harga Satuan Pekerjaan (D+E) 237,932.24

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 635,288.50 698,817.35

JUMLAH HARGA BAHAN 698,817.35


C. PERALATAN

Page 422 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 729,673.35
E. Profit 15% *D 109,451.00
F. Harga Satuan Pekerjaan (D+E) 839,124.35

Page 423 of 649


A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 121,800.00 9,135.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 37,352.00
B. BAHAN
Kaca patri m2 1.1000 952,374.50 1,047,611.95
Sealant kg 0.0500 38,798.38 1,939.92

JUMLAH HARGA BAHAN 1,049,551.87


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,086,903.87
E. Profit 15% *D 163,035.58
F. Harga Satuan Pekerjaan (D+E) 1,249,939.45

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Soda api kg 0.0500 19,448.85 972.44

JUMLAH HARGA BAHAN 972.44


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,408.44
E. Profit 15% *D 511.27
F. Harga Satuan Pekerjaan (D+E) 3,919.71

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50

JUMLAH HARGA BAHAN 1,116.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,552.50
E. Profit 15% *D 532.88
F. Harga Satuan Pekerjaan (D+E) 4,085.38

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 3,451.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50

JUMLAH HARGA BAHAN 1,116.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,567.50
E. Profit 15% *D 685.13
F. Harga Satuan Pekerjaan (D+E) 5,252.63

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.0090 162,400.00 1,461.60
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,814.60
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat Dasar kg 0.1700 60,500.00 10,285.00
Cat Penutup kg 0.2600 60,500.00 15,730.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 44,615.05

Page 424 of 649


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 56,429.65
E. Profit 15% *D 8,464.45
F. Harga Satuan Pekerjaan (D+E) 64,894.10

Page 425 of 649


A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,059.05
E. Profit 15% *D 11,558.86
F. Harga Satuan Pekerjaan (D+E) 88,617.91

A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0630 203,000.00 12,789.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Teak Oil liter 0.3600 267.96 96.47
JUMLAH HARGA BAHAN 96.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 28,597.67
E. Profit 15% *D 4,289.65
F. Harga Satuan Pekerjaan (D+E) 32,887.32

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 18,473.00
B. BAHAN
Pelitur liter 0.1500 65,315.25 9,797.29
Pelitur Jadi liter 0.3720 65,315.25 24,297.27
Ampelas lb 2.0000 6,777.78 13,555.56
JUMLAH HARGA BAHAN 47,650.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 66,123.12
E. Profit 15% *D 9,918.47
F. Harga Satuan Pekerjaan (D+E) 76,041.58

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Residu atau ter liter 0.3500 60,402.65 21,140.93
JUMLAH HARGA BAHAN 21,140.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 34,538.93
E. Profit 15% *D 5,180.84
F. Harga Satuan Pekerjaan (D+E) 39,719.77

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 121,800.00 19,488.00
Tukang cat L.02 OH 0.1600 162,400.00 25,984.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 49,329.00
B. BAHAN
cat Vernis liter 0.1500 65,744.67 9,861.70
Dempul kayu kg 0.0500 37,660.40 1,883.02
Ampelas lb 0.1000 6,777.78 677.78
JUMLAH HARGA BAHAN 12,422.50
C. PERALATAN
Page 426 of 649
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 61,751.50
E. Profit 15% *D 9,262.72
F. Harga Satuan Pekerjaan (D+E) 71,014.22

Page 427 of 649


A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0063 203,000.00 1,278.90
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 14,555.10
B. BAHAN
Plamir tembok kg 0.1000 45,869.54 4,586.95
Cat Dasar kg 0.1000 77,842.38 7,784.24
Cat penutup kg 0.2600 77,842.38 20,239.02
JUMLAH HARGA BAHAN 32,610.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 47,165.31
E. Profit 15% *D 7,074.80
F. Harga Satuan Pekerjaan (D+E) 54,240.11

A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Cat dasar kg 0.1200 77,842.38 9,341.09
Cat penutup kg 0.1800 77,842.38 14,011.63
JUMLAH HARGA BAHAN 23,352.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,045.51
E. Profit 15% *D 5,256.83
F. Harga Satuan Pekerjaan (D+E) 40,302.34

Dihitung-1 1 M2 Pengecatan Genteng dengan Cat Spesial

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Wallpaper polos m2 1.2000 42,371.18 50,845.41
Lem (standar Fox)/ perekat kg 0.2000 25,902.80 5,180.56
JUMLAH HARGA BAHAN 56,025.97
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,509.47
E. Profit 15% *D 14,326.42
F. Harga Satuan Pekerjaan (D+E) 109,835.89

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA BAHAN 5,131.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,615.42
Page 428 of 649
E. Profit 15% *D 6,692.31
F. Harga Satuan Pekerjaan (D+E) 51,307.73

Page 429 of 649


A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2250 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.0225 203,000.00 4,567.50
Mandor L.04 OH 0.0075 203,000.00 1,522.50
JUMLAH TENAGA KERJA 73,080.00
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
Minyak pelarut/ pengencer cat (solvent) liter 0.0100 12,738.25 127.38
Kayu dolken Ø8-10 (cm) panjang 4 m m3 0.0100 5,000.00 50.00
Kuas bh 0.0020 28,191.63 56.38

JUMLAH HARGA BAHAN 5,083.77


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,163.77
E. Profit 15% *D 11,724.56
F. Harga Satuan Pekerjaan (D+E) 89,888.33

A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 76,388.90
B. BAHAN
Menie A kg 0.1000 41,993.47 4,199.35
Menie B kg 0.1000 41,993.47 4,199.35
Minyak pelarut/ pengencer cat (solvent) liter 0.0800 12,738.25 1,019.06
Cat kg 0.0100 41,993.47 419.93
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 76,388.90
E. Profit 15% *D 11,458.34
F. Harga Satuan Pekerjaan (D+E) 87,847.23

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 20,097.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat kg 0.0100 41,993.47 419.93
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN 4,523.33


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 24,620.33
E. Profit 15% *D 3,693.05
F. Harga Satuan Pekerjaan (D+E) 28,313.37

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 198,940.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.1100 12,738.25 1,401.21
Cat dasar kg 0.1700 41,993.47 7,138.89
Kuas bh 0.0800 28,191.63 2,255.33
Cat antara kg 0.0100 41,993.47 419.93
Cat penutup kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 11,635.30
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,575.30
E. Profit 15% *D 31,586.29
F. Harga Satuan Pekerjaan (D+E) 242,161.59

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Page 430 of 649
Tukang cat L.02 OH 0.7000 162,400.00 113,680.00
Kepala Tukang L.03 OH 0.0700 203,000.00 14,210.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 180,670.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat dasar kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 4,241.41
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,911.41
E. Profit 15% *D 27,736.71
F. Harga Satuan Pekerjaan (D+E) 212,648.12

Page 431 of 649


A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 121,800.00 401,940.00
Tukang batu L.02 OH 1.100 162,400.00 178,640.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 615,090.00
B. BAHAN
Closet Duduk / Monoblock unit 1.000 1,404,557.00 1,404,557.00
Perlengkapan Ls 6% x clooset 84,273.42 84,273.42
JUMLAH HARGA BAHAN 1,488,830.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,103,920.42
E. Profit 15% * D 315,588.06
F. Harga Satuan Pekerjaan (D+E) 2,419,508.48

A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 428,330.00
B. BAHAN
Closed jongkok porcelaint (lokal) unit 1.000 221,129.03 221,129.03
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00
JUMLAH HARGA BAHAN 230,891.03
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,221.03
E. Profit 15% * D 98,883.15
F. Harga Satuan Pekerjaan (D+E) 758,104.18

A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Closed jongkok terraso unit 1.000 244,222.22 244,222.22
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Batu bata merah besar bh 7.000 2,300.00 16,100.00
JUMLAH HARGA BAHAN 271,584.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 677,584.22
E. Profit 15% * D 101,637.63
F. Harga Satuan Pekerjaan (D+E) 779,221.86

A. 5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.100 203,000.00 20,300.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 314,650.00
B. BAHAN
Urinoir unit 1.000 1,060,675.00 1,060,675.00
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 30.000 318,202.50 318,202.50
JUMLAH HARGA BAHAN 1,390,139.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,704,789.50
E. Profit 15% * D 255,718.43
F. Harga Satuan Pekerjaan (D+E) 1,960,507.93

A. 5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Tukang batu L.02 OH 1.450 162,400.00 235,480.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.060 203,000.00 12,180.00

Page 432 of 649


JUMLAH TENAGA KERJA 424,270.00
B. BAHAN
Wastafel unit 1.000 921,112.50 921,112.50
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 12.000 110,533.50 110,533.50
JUMLAH HARGA BAHAN 1,042,908.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,467,178.00
E. Profit 15% * D 220,076.70
F. Harga Satuan Pekerjaan (D+E) 1,687,254.70

Page 433 of 649


A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12%x bak 46,959.99 46,959.99
JUMLAH HARGA BAHAN 438,293.24
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,727,343.24
E. Profit 15% * D 259,101.49
F. Harga Satuan Pekerjaan (D+E) 1,986,444.73

A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 121,800.00 730,800.00
Tukang batu L.02 OH 3.000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 1,284,990.00
B. BAHAN
Batu bata merah besar bh 150.000 2,300.00 345,000.00
Semen portland kg 120.000 1,627.00 195,240.00
Pasir pasang m3 0.300 150,000.00 45,000.00
Porcelaint uk. 11x 11 cm bh 360.000 1,339.80 482,328.00
Semen warna (sika graut) kg 6.000 22,250.00 133,500.00
JUMLAH HARGA BAHAN 1,201,068.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,486,058.00
E. Profit 15% * D 372,908.70
F. Harga Satuan Pekerjaan (D+E) 2,858,966.70

A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 0,30 m³ unit 1.000 237,256.25 237,256.25
Perlengkapan Ls 12%x bak 28,470.75 3,416.49
JUMLAH HARGA BAHAN 240,672.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,722.74
E. Profit 15% * D 229,458.41
F. Harga Satuan Pekerjaan (D+E) 1,759,181.15

A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Tukang batu L.02 OH 0.450 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.045 203,000.00 9,135.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 121,800.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12.000 46,959.99 5,635.20
JUMLAH HARGA BAHAN 396,968.45
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 518,768.45
E. Profit 15% * D 77,815.27
F. Harga Satuan Pekerjaan (D+E) 596,583.72

A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 121,800.00 3,654.00
Tukang batu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 61,509.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
JUMLAH HARGA BAHAN 493,891.75
C. PERALATAN
Page 434 of 649
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 555,400.75
E. Profit 15% * D 83,310.11
F. Harga Satuan Pekerjaan (D+E) 638,710.86

Page 435 of 649


A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Tukang batu L.02 OH 0.500 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 102,515.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
Semen portland kg 20.000 1,627.00 32,540.00
Pasir pasang m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 533,931.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 636,446.75
E. Profit 15% * D 95,467.01
F. Harga Satuan Pekerjaan (D+E) 731,913.76

A. 5.1.1.14. Pemasangan 1 buah floor drain

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Floor drain (PVC) Unit 1.000 10,001.98 10,001.98
JUMLAH HARGA BAHAN 10,001.98
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,504.98
E. Profit 15% * D 4,575.75
F. Harga Satuan Pekerjaan (D+E) 35,080.73

A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.160 121,800.00 263,088.00
Tukang batu L.02 OH 0.720 162,400.00 116,928.00
Kepala Tukang L.03 OH 0.072 203,000.00 14,616.00
Mandor L.04 OH 0.011 203,000.00 2,233.00
JUMLAH TENAGA KERJA 396,865.00
B. BAHAN
Batu bata merah besar bh 40.000 2,300.00 92,000.00
Semen portland kg 44.000 1,627.00 71,588.00
Pasir pasang m3 0.070 150,000.00 10,500.00
Pasir beton m3 0.060 150,000.00 9,000.00
Batu kerikil m3 0.070 400,000.00 28,000.00
Baja Tulangan (Polos) U24 kg 1.600 13,760.36 22,016.57
JUMLAH HARGA BAHAN 233,104.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 629,969.57
E. Profit 15% * D 94,495.44
F. Harga Satuan Pekerjaan (D+E) 724,465.00

A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 70.000 2,300.00 161,000.00
Semen portland kg 77.000 1,627.00 125,279.00
Pasir pasang m3 0.130 150,000.00 19,500.00
Pasir beton m3 0.090 150,000.00 13,500.00
Batu kerikil m3 0.020 400,000.00 8,000.00
Baja Tulangan (Polos) U24 kg 2.600 13,760.36 35,776.92
JUMLAH HARGA BAHAN 363,055.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 945,056.92
E. Profit 15% * D 141,758.54
F. Harga Satuan Pekerjaan (D+E) 1,086,815.46

A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
Page 436 of 649
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,175,916.72
E. Profit 15% * D 176,387.51
F. Harga Satuan Pekerjaan (D+E) 1,352,304.23

Page 437 of 649


A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 0,5 (inch)/1,8mm m 1.200 31,747.51 38,097.01
Perlengkapan ls 35%x pipa 11,111.63 11,111.63
JUMLAH HARGA BAHAN 49,208.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,709.84
E. Profit 15% * D 11,656.48
F. Harga Satuan Pekerjaan (D+E) 89,366.31

A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,110.33
E. Profit 15% * D 22,366.55
F. Harga Satuan Pekerjaan (D+E) 171,476.88

A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 0,75 (inch)/1,8mm m 1.200 38,623.29 46,347.95
Perlengkapan % 35%x pipa 13,518.15 13,518.15
JUMLAH HARGA BAHAN 59,866.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,367.30
E. Profit 15% * D 13,255.09
F. Harga Satuan Pekerjaan (D+E) 101,622.39

A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 1 (inch)/1,8mm m 1.200 42,584.69 51,101.63
Perlengkapan % 35%x pipa 14,904.64 14,904.64
JUMLAH HARGA BAHAN 66,006.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 94,507.47
E. Profit 15% * D 14,176.12
F. Harga Satuan Pekerjaan (D+E) 108,683.59

A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.108 121,800.00 13,154.40
Tukang batu L.02 OH 0.180 162,400.00 29,232.00
Kepala Tukang L.03 OH 0.018 203,000.00 3,654.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 47,055.40
B. BAHAN
Pipa besi galvanis Ø 1,5 (inch)/1,8mm m 1.200 75,508.39 90,610.06
Perlengkapan % 35%x pipa 26,427.94 26,427.94
JUMLAH HARGA BAHAN 117,038.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 164,093.40
Page 438 of 649
E. Profit 15% * D 24,614.01
F. Harga Satuan Pekerjaan (D+E) 188,707.41

Page 439 of 649


A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 3 (inch) t=4 mm m 1.200 142,699.48 171,239.38
Perlengkapan % 35%x pipa 49,944.82 49,944.82
JUMLAH HARGA BAHAN 221,184.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 280,257.20
E. Profit 15% * D 42,038.58
F. Harga Satuan Pekerjaan (D+E) 322,295.78

A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 4 (inch)/1,8mm m 1.200 143,937.15 172,724.58
Perlengkapan % 35%x pipa 50,378.00 50,378.00
JUMLAH HARGA BAHAN 223,102.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 282,175.58
E. Profit 15% * D 42,326.34
F. Harga Satuan Pekerjaan (D+E) 324,501.92

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø1/2 (inch) AW, panjang 4 m m 1.200 6,791.67 8,150.00
Perlengkapan % 35%x pipa 2,377.08 2,377.08
JUMLAH HARGA BAHAN 10,527.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 26,279.88
E. Profit 15% * D 3,941.98
F. Harga Satuan Pekerjaan (D+E) 30,221.87

A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø3/4 (inch) AW, panjang 4 m m 1.200 9,968.75 11,962.50
Perlengkapan % 35%x pipa 3,489.06 3,489.06
JUMLAH HARGA BAHAN 15,451.56
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 31,204.36
E. Profit 15% * D 4,680.65
F. Harga Satuan Pekerjaan (D+E) 35,885.02

A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø 1 (inch) AW, panjang 4 m m 1.200 12,937.50 15,525.00
Perlengkapan % 35%x pipa 4,528.13 4,528.13
JUMLAH HARGA BAHAN 20,053.13
C. PERALATAN

JUMLAH HARGA ALAT -


Page 440 of 649
D. Jumlah (A+B+C) 35,805.93
E. Profit 15% * D 5,370.89
F. Harga Satuan Pekerjaan (D+E) 41,176.81

Page 441 of 649


A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 1,5(inch) AW, panjang 4 m m 1.200 19,035.70 22,842.84
Perlengkapan % 35%x pipa 6,662.49 6,662.49
JUMLAH HARGA BAHAN 29,505.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,134.53
E. Profit 15% * D 7,970.18
F. Harga Satuan Pekerjaan (D+E) 61,104.71

A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 2 (inch) AW, panjang 4 m m 1.200 25,000.00 30,000.00
Perlengkapan % 35%x pipa 8,750.00 8,750.00
JUMLAH HARGA BAHAN 38,750.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 62,379.20
E. Profit 15% * D 9,356.88
F. Harga Satuan Pekerjaan (D+E) 71,736.08

A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 3 (inch) AW, panjang 4 m m 1.200 48,125.00 57,750.00
Perlengkapan % 35%x pipa 16,843.75 16,843.75
JUMLAH HARGA BAHAN 74,593.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 109,936.05
E. Profit 15% * D 16,490.41
F. Harga Satuan Pekerjaan (D+E) 126,426.46

A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 4-6 (inch) AW, panjang 4 m m 1.200 75,906.25 91,087.50
Perlengkapan % 35%x pipa 26,567.19 26,567.19
JUMLAH HARGA BAHAN 117,654.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 152,996.99
E. Profit 15% * D 22,949.55
F. Harga Satuan Pekerjaan (D+E) 175,946.54

A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang batu L.02 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.007 203,000.00 1,421.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Pipa beton Ø 20 cm, panjang 1m' bh 1.100 96,726.46 106,399.10
Batu bata merah kecil m3 0.027 1,390.04 37.53
Semen portland kg 3.920 1,627.00 6,377.84
Pasir pasang m3 0.056 150,000.00 8,400.00
Pasir urug/timbun m3 0.024 102,500.00 2,460.00
JUMLAH HARGA BAHAN 123,674.47
C. PERALATAN
Page 442 of 649
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 154,936.47
E. Profit 15% * D 23,240.47
F. Harga Satuan Pekerjaan (D+E) 178,176.94

Page 443 of 649


A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 121,800.00 46,284.00
Tukang batu L.02 OH 0.190 162,400.00 30,856.00
Kepala Tukang L.03 OH 0.019 203,000.00 3,857.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 84,854.00
B. BAHAN
Pipa beton Ø 60 cm, panjang 1m' bh 1.100 160,289.31 176,318.24
Batu bata merah kecil m3 0.550 1,390.04 764.52
Semen portland kg 10.300 1,627.00 16,758.10
Pasir pasang m3 0.061 150,000.00 9,150.00
Pasir urug/timbun m3 0.069 102,500.00 7,072.50
JUMLAH HARGA BAHAN 210,063.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 294,917.36
E. Profit 15% * D 44,237.60
F. Harga Satuan Pekerjaan (D+E) 339,154.97

Dihitung 1. ck Pemasangan 1 m2 Rangka atap baja ringan C.75


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize


m2 1.0000 183,093.75 183,093.75

JUMLAH HARGA ALAT 183,093.75


D. Jumlah (A+B+C) 183,093.75
E. Profit 15% *D 27,464.06
F. Harga Satuan Pekerjaan (D+E) 210,557.81

Dihitung 2. ck Pemasangan 1 m2 Plafond PVC (ex. Shunda Plafond)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00

JUMLAH HARGA ALAT 260,000.00


D. Jumlah (A+B+C) 260,000.00
E. Profit 15% *D 39,000.00
F. Harga Satuan Pekerjaan (D+E) 299,000.00

Dihitung 3. ck Pemasangan 1 m2 Plafond PVC (ex. Wifon)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00

JUMLAH HARGA ALAT 185,000.00


D. Jumlah (A+B+C) 185,000.00
E. Profit 15% *D 27,750.00
F. Harga Satuan Pekerjaan (D+E) 212,750.00

A. 4.5.2.15. ckPemasangan 1 m2 atap Spandek zincalum, t=0.4mm


Harga Satuan Jumlah Harga
No. Uraian KodeSatuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0,4 m2 1.0000 68,106.50 68,106.50
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16

Page 444 of 649


Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 199,000.00 148,653.00
Screw Bh 9.150 1,450.00 13,267.50
JUMLAH HARGA BAHAN 161,920.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,182.50
E. Profit 0.150 *D 28,977.38
F. Harga Satuan Pekerjaan (D+E) 222,159.88

Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 32 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.010 203,000.00 2,030.00
Mandor L.15 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 65,000.00 241,150.00
Screw Bh 16.129 1,450.00 23,387.05
JUMLAH HARGA BAHAN 264,537.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 309,197.05
E. Profit 0.150 *D 46,379.56
F. Harga Satuan Pekerjaan (D+E) 355,576.61

Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10°)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39

Dihitung 7.ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.013 203,000.00 2,639.00
Mandor L.15 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubungan Atap Selulosa Bitumen
108,000.00
(Ukuran 1060x 50 cm) Lbr 1.474 159,192.00
Sekrup / Paku Bh 10.256 1,450.00 14,871.20
JUMLAH HARGA BAHAN 174,063.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 208,045.40
E. Profit 0.150 *D 31,206.81
F. Harga Satuan Pekerjaan (D+E) 239,252.21

Pangkalpinang, Februari 2022

KEPALA BIDANG
CIPTA KARYA

PAHALA R. TOBING, ST.


NIP. 19810831 200604 1 007

Page 445 of 649


A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,054,758.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,322,921.42
E. Profit 15% *D 198,438.21
F. Harga Satuan Pekerjaan (D+E) 1,521,359.63

A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 299.0000 1,627.00 486,473.00
Pasir beton (Kg) kg 799.0000 83.33 66,583.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 515.52 524,281.03
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,092,340.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,360,503.34
E. Profit 15% *D 204,075.50
F. Harga Satuan Pekerjaan (D+E) 1,564,578.84

A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN
Semen portland kg 230.0000 1,627.00 374,210.00
Pasir beton (Kg) kg 893.0000 83.33 74,416.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 515.52 529,436.21
Air ltr 200.0000 69.78 13,956.25
JUMLAH HARGA BAHAN 992,019.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,186,899.12
E. Profit 15% *D 178,034.87
F. Harga Satuan Pekerjaan (D+E) 1,364,933.99

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,139,205.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,407,368.54
E. Profit 15% *D 211,105.28
F. Harga Satuan Pekerjaan (D+E) 1,618,473.82

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,448,284.91
E. Profit 15% *D 217,242.74
F. Harga Satuan Pekerjaan (D+E) 1,665,527.65

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,484,696.19
E. Profit 15% *D 222,704.43
F. Harga Satuan Pekerjaan (D+E) 1,707,400.62

A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 384.0000 Err:504 Err:504
Pasir beton (Kg) kg 692.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,039.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 406.0000 Err:504 Err:504
Pasir beton (Kg) kg 684.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,026.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 413.0000 Err:504 Err:504
Pasir beton (Kg) kg 681.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,021.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 439.0000 Err:504 Err:504
Pasir beton (Kg) kg 670.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,006.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 448.0000 Err:504 Err:504
Pasir beton (Kg) kg 667.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,000.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 400.0000 Err:504 Err:504
Pasir beton m3 0.4800 Err:504 Err:504
Batu pecah 1 - 2 (Kg) m3 0.8000 Err:504 Err:504
Storox - 100 kg 1.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.14. Membuat 1 m' PVC waterstop lebar 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Batu L.02 OH 0.0300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 150 mm m3 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.15. Membuat 1 m' PVC waterstop lebar 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Batu L.02 OH 0.0350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.16. Membuat 1 m' PVC waterstop lebar 230 mm - 320 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu/Pipa L.02 OH 0.0400 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Besi L.02 OH 0.0700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0070 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi beton kg 10.5000 Err:504 Err:504
Kawat beton kg 0.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang Besi L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi beton kg 10.5000 Err:504 Err:504
Kawat beton kg 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang Besi L.02 OH 0.0250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Jaring kawat baja dilas kg 10.2000 Err:504 Err:504
Kawat beton kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.20. Membuat 1 m2 bekisting untuk pondasi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang Kayu L.02 OH 0.2600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.3000 Err:504 Err:504
Minyak bekisting liter 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.21. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang Kayu L.02 OH 0.2600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.3000 Err:504 Err:504
Minyak bekisting liter 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.23. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0180 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.24. Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0200 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 Err:504 Err:504
Penjaga jarak bekisting/spacer buah - - -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.26. Membuat 1 m2 bekisting untuk tangga


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.1500 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.6000 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 Err:504 Err:504
Tukang Batu L.02 OH 0.0200 Err:504 Err:504
Tukang Kayu L.02 OH 0.0200 Err:504 Err:504
Tukang Besi L.02 OH 0.0200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.0100 Err:504 Err:504
Minyak bekisting liter - Err:504 Err:504
Besi beton kg 3.0000 Err:504 Err:504
Kawat beton kg 0.4500 Err:504 Err:504
Semen portland kg 4.0000 Err:504 Err:504
Pasir beton m3 0.0060 Err:504 Err:504
Batu pecah 1 - 2 m3 0.0090 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 Err:504 Err:504
Tukang Batu L.02 OH 0.0330 Err:504 Err:504
Tukang Kayu L.02 OH 0.0330 Err:504 Err:504
Tukang Besi L.02 OH 0.0330 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.0200 Err:504 Err:504
Minyak bekisting liter - Err:504 Err:504
Besi beton kg 3.6000 Err:504 Err:504
Kawat beton kg 0.0500 Err:504 Err:504
Semen portland kg 5.5000 Err:504 Err:504
Pasir beton m3 0.0090 Err:504 Err:504
Batu pecah 1 - 2 m3 0.0150 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1320 Err:504 Err:504
Tukang Batu L.02 OH 0.0220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0020 Err:504 Err:504
Mandor L.04 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 26.0800 Err:504 Err:504
Pasir beton (Kg) kg 60.8000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 82.3200 Err:504 Err:504
Air ltr 17.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 Err:504 Err:504
Tukang Batu L.02 OH 0.0280 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.6000 Err:504 Err:504
Pasir beton (Kg) kg 76.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 102.9000 Err:504 Err:504
Air ltr 21.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 Err:504 Err:504
Tukang Batu L.02 OH 0.0330 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.1200 Err:504 Err:504
Pasir beton (Kg) kg 91.2000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 123.4800 Err:504 Err:504
Air ltr 25.8000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 Err:504 Err:504
Tukang Batu L.02 OH 0.0410 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 48.9000 Err:504 Err:504
Pasir beton (Kg) kg 114.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 154.3500 Err:504 Err:504
Air ltr 32.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0070 Err:504 Err:504
Tukang Batu L.02 OH 0.0760 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Lantai kerja tebal 10 cm m3 0.0800 Err:504 Err:504
Besi hollow 50.50.3 mm kg 9.3940 Err:504 Err:504
Kayu gergajian kelas III, balok m3 0.0050 Err:504 Err:504
Phenol film 12 mm lbr 0.0800 Err:504 Err:504
Minyak bekisting liter 0.0200 Err:504 Err:504
Dinabolt dia 12 mm ( 10-15 cm) bh 3.8820 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0050 Err:504 Err:504
Phenol film 12 mm lbr 0.0430 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Paku 5-7 cm Kg 0.0460 #REF!
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0040 Err:504 Err:504
Phenol film 12 mm lbr 0.0480 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Paku 5-7 cm kg 0.0460 #REF! #REF!
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0530 Err:504 Err:504
Tukang Kayu L.02 OH 0.0180 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0890 Err:504 Err:504
Tukang Kayu L.02 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0710 Err:504 Err:504
Tukang Kayu L.02 OH 0.0240 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0640 Err:504 Err:504
Tukang Batu L.02 OH 0.2440 Err:504 Err:504
Tukang vibrator L.02 OH 0.1280 Err:504 Err:504
Kepala Tukang L.03 OH 0.0340 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0690 Err:504 Err:504
Tukang Batu L.02 OH 0.2420 Err:504 Err:504
Tukang vibrator L.02 OH 0.1380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0370 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0610 Err:504 Err:504
Tukang Batu L.02 OH 0.2130 Err:504 Err:504
Tukang vibrator L.02 OH 0.1220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0670 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0670 Err:504 Err:504
Pekerja L.01 OH 0.0670 Err:504 Err:504
Tukang Batu L.02 OH 0.0670 Err:504 Err:504
Tukang erection L.02 OH 0.1340 Err:504 Err:504
Kepala Tukang L.03 OH 0.0670 Err:504 Err:504
Mandor L.04 OH 0.0670 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 6.6760 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0670 Err:504 Err:504
Sewa pipe support UH 1.1000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0610 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0610 Err:504 Err:504
Pekerja L.01 OH 0.0610 Err:504 Err:504
Tukang Batu L.02 OH 0.0610 Err:504 Err:504
Tukang erection L.02 OH 0.1220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0610 Err:504 Err:504
Mandor L.04 OH 0.0610 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 6.1100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0610 Err:504 Err:504
Sewa pipe support UH 1.1000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0830 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0830 Err:504 Err:504
Pekerja L.01 OH 0.0830 Err:504 Err:504
Tukang Batu L.02 OH 0.0830 Err:504 Err:504
Tukang erection L.02 OH 0.1660 Err:504 Err:504
Kepala Tukang L.03 OH 0.0830 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 8.2770 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0830 Err:504 Err:504
Sewa pipe support UH 2.2000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.20. Bahan 1 m3 grouting campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,200.0000 Err:504 Err:504
Screening kg 650.0000 Err:504 Err:504
Air liter 350.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,850.0000 Err:504 Err:504
Air liter 400.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Batu L.02 OH 0.3670 Err:504 Err:504
Kepala Tukang L.03 OH 0.0740 Err:504 Err:504
Mandor L.04 OH 0.0370 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1470 Err:504 Err:504
Tukang kayu L.02 OH 0.1470 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0120 Err:504 Err:504
Kayu gergajian kelas III, papan m3 0.0040 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2640 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.24. Upah 1 titik join dengan sling


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2200 Err:504 Err:504
Tukang kayu L.02 OH 0.2200 Err:504 Err:504
Tukang Besi L.02 OH 0.2200 Err:504 Err:504
Mandor L.04 OH 0.0110 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.0600 Err:504 Err:504
Kepala tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi profil kg 1.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.0600 Err:504 Err:504
Kepala tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi baja IWF kg 1.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0010 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.0000 Err:504 Err:504
Minyak pelumas liter 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa alat jam 0.8000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Las biasa L.02 OH 1.0500 Err:504 Err:504
Kepala tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L,04 OH 0.0520 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 Err:504 Err:504
Besi plat baja kg 32.8000 Err:504 Err:504
Kawat Las Listrik kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang Besi L.02 OH 0.0200 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kawat Las Listrik kg 0.4000 Err:504 Err:504
Solar kg 0.3000 Err:504 Err:504
Minyak pelumas kg 0.0400 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa alat jam 0.1700 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 Err:504 Err:504
Tukang Las biasa L.02 OH 0.6500 Err:504 Err:504
Kepala tukang L.03 OH 0.0650 Err:504 Err:504
Mandor L,04 OH 0.0320 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi scuare tube m 4.7600 Err:504 Err:504
Besi lis kaca (1 x 1) cm m 4.5220 Err:504 Err:504
Pengelasan cm 20.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 Err:504 Err:504
Tukang Las biasa L.02 OH 1.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.1200 Err:504 Err:504
Mandor L,04 OH 0.0600 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pintu gulung besi' m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 Err:504 Err:504
Tukang L.02 OH 0.4400 Err:504 Err:504
Kepala tukang L.03 OH 0.0440 Err:504 Err:504
Mandor L,04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pintu lipat m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang L.02 OH 0.8000 Err:504 Err:504
Kepala tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L,04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sunscreen aluminium m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang L.02 OH 1.0000 Err:504 Err:504
Kepala tukang L.03 OH 0.1000 Err:504 Err:504
Mandor L,04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rolling door aluminium m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0430 Err:504 Err:504
Kepala tukang L.03 OH 0.0043 Err:504 Err:504
Mandor L,04 OH 0.0021 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 1.1000 Err:504 Err:504
Skrup fixer buah 2.0000 Err:504 Err:504
Sealant tube 0.0600 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0850 Err:504 Err:504
Kepala tukang L.03 OH 0.0085 Err:504 Err:504
Mandor L,04 OH 0.0042 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 4.4000 Err:504 Err:504
Aluminium strip m 14.6000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0850 Err:504 Err:504
Kepala tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 4.4000 Err:504 Err:504
Profil kaca m 4.5000 Err:504 Err:504
Sealant tube 0.2700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.3500 Err:504 Err:504
Kepala tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vebetions blinds & vertical blinds m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 Err:504 Err:504
Tukang las konstruksi L.02 OH 1.6700 Err:504 Err:504
Kepala tukang L.03 OH 0.1670 Err:504 Err:504
Mandor L,04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi strip kg 6.1770 #REF! #REF!
Pengelasan cm 27.0800 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kawat nyamuk m2 1.1000 #REF! #REF!
Pengelasan cm 11.1100 Err:504 Err:504
Baja strip (0,2 x 2) cm kg 1.7160 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang besi L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 Err:504 Err:504
Paku skrup 1 - 2,5 cm buah 10.0000 #REF! #REF!
Baja strip m 7.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang besi L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat m 1.0500 Err:504 Err:504
Paku skrup 1 - 2,5 cm kg 0.0150 #REF! #REF!
papan kayu kelas III m3 0.0190 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang besi L.02 OH 0.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L,04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat m 1.0500 Err:504 Err:504
Paku skrup 1 - 2,5 cm kg 0.0100 #REF! #REF!
Besi strip m3 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Besi L.02 OH 0.2500 Err:504 Err:504
Kepala tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L,04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Besi L.02 OH 0.3500 Err:504 Err:504
Kepala tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 Err:504 Err:504
Tukang Besi L.02 OH 0.734 Err:504 Err:504
Kepala tukang L.03 OH 0.073 Err:504 Err:504
Mandor L,04 OH 0.037 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Baja ringan canai dingin C75 Kg 3.0650 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Peralatan % 10.0000 Err:504 Err:504

JUMLAH HARGA ALAT Err:504


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.22. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 Err:504 Err:504
Tukang Besi L.02 OH 0.7604 Err:504 Err:504
Kepala tukang L.03 OH 0.0760 Err:504 Err:504
Mandor L,04 OH 0.0380 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Baja ringan canai dingin C75 Kg 4.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
Peralatan % 10.0000 Err:504 Err:504

JUMLAH HARGA ALAT Err:504


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 43.5000 Err:504 Err:504
Pasir pasang m3 0.0800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 32.9500 Err:504 Err:504
Pasir pasang m3 0.0910 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 26.5500 Err:504 Err:504
Pasir pasang m3 0.0930 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.4. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 22.2200 Err:504 Err:504
Pasir pasang m3 0.1020 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 18.5000 Err:504 Err:504
Pasir pasang m3 0.1220 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 10.0800 Err:504 Err:504
Kapur padam m3 0.0275 Err:504 Err:504
Pasir pasang m3 0.0925 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 18.9500 Err:504 Err:504
Pasir pasang m3 0.0380 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 14.3700 Err:504 Err:504
Pasir pasang m3 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.9. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 11.5000 Err:504 Err:504
Pasir pasang m3 0.0430 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 9.6800 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 8.3200 Err:504 Err:504
Pasir pasang m3 0.0490 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 6.5000 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 4.5000 Err:504 Err:504
Kapur padam m3 0.0150 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.14. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0180 Err:504 Err:504
Kapur padam m3 0.0180 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.15. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0140 Err:504 Err:504
Kapur padam m3 0.0140 Err:504 Err:504
Pasir pasang m3 0.0280 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.16. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 20 buah 12.5000 Err:504 Err:504
Semen portland kg 30.3200 Err:504 Err:504
Pasir pasang m3 0.7280 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.17. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 20 buah 12.5000 Err:504 Err:504
Semen portland kg 24.2600 Err:504 Err:504
Pasir pasang m3 0.7720 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.18. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L,04 OH 0.0160 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 15 buah 12.5000 Err:504 Err:504
Semen portland kg 22.7400 Err:504 Err:504
Pasir pasang m3 0.5500 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.19. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L,04 OH 0.0160 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 15 buah 12.5000 Err:504 Err:504
Semen portland kg 18.2000 Err:504 Err:504
Pasir pasang m3 0.5820 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.20. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 10 buah 12.5000 Err:504 Err:504
Semen portland kg 15.1600 Err:504 Err:504
Pasir pasang m3 0.3640 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.21. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 10 buah 12.5000 Err:504 Err:504
Semen portland kg 12.1300 Err:504 Err:504
Pasir pasang m3 0.3880 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata rooster buah 30.0000 #REF! #REF!
Semen portland kg 11.0000 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata rooster buah 30.0000 #REF! #REF!
Semen portland kg 11.0000 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata berongga ekspose buah 70.0000 Err:504 Err:504
Semen portland kg 14.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 Err:504 Err:504
Tukang Batu L.02 OH 1.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.1300 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 Err:504 Err:504
Semen Mortar kg 0.4730 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 Err:504 Err:504
Tukang Batu L.02 OH 1.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.1300 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Bata Ringan 10x20x60cm m3 8.4000 Err:504 Err:504
Semen Mortar kg 0.0630 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504

B. BAHAN
Semen portland Kg 15.5040 Err:504 Err:504
Pasir pasang m3 0.0160 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.2240 Err:504 Err:504
Pasir pasang m3 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 7.7760 Err:504 Err:504
Pasir pasang m3 0.0230 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.2400 Err:504 Err:504
Pasir pasang m3 0.0240 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.1840 Err:504 Err:504
Pasir pasang m3 0.0260 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 4.4160 Err:504 Err:504
Pasir pasang m3 0.0270 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.9360 Err:504 Err:504
Pasir pasang m3 0.0280 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.4560 Err:504 Err:504
Pasir pasang m3 0.0290 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP :3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.7600 Err:504 Err:504
2. KP m3 0.0030 Err:504 Err:504
Pasir pasang m3 0.0130 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP :8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.0000 Err:504 Err:504
2. KP m3 0.0050 Err:504 Err:504
Pasir pasang m3 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP :1PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland m3 0.0090 Err:504 Err:504
2. KP m3 0.0090 Err:504 Err:504
Pasir pasang m3 0.0090 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 0.0070 Err:504 Err:504
2. KP m3 0.0070 Err:504 Err:504
Pasir pasang m3 0.0150 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 13.6320 Err:504 Err:504
Pasir pasang m3 0.0270 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.3680 Err:504 Err:504
Pasir pasang m3 0.0310 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 8.3200 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.9120 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.8880 Err:504 Err:504
Pasir pasang m3 0.0360 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4400 Err:504 Err:504
Tukang Batu L.03 OH 0.2200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0220 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland m3 0.0090 Err:504 Err:504
2. KP m3 0.0090 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.1840 Err:504 Err:504
Pasir pasang m3 0.0260 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.20. ngan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu L.03 OH 0.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0400 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 0.5000 Err:504 Err:504
Pasir pasang m3 0.0130 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 Err:504 Err:504
Tukang Batu L.03 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0230 Err:504 Err:504
Mandor L.04 OH 0.0230 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.0000 Err:504 Err:504
Batu granit Kg 15.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 Err:504 Err:504
Tukang Batu L.03 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0230 Err:504 Err:504
Mandor L.04 OH 0.0230 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.0000 Err:504 Err:504
Batu granit Kg 15.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 4.3200 Err:504 Err:504
Pasir pasang Kg 0.0060 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.24. m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.1080 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.25. an 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Batu L.03 OH 0.0350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 1.6000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.3400 Err:504 Err:504
Pasir pasang m3 0.0120 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Batu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - Err:504 Err:504
Tukang Batu L.03 OH - Err:504 Err:504
Kepala Tukang L.03 OH - Err:504 Err:504
Mandor L.04 OH - Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Mortar Kg - Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.29. Pemasangan 1 m2 plesteran acian dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - Err:504 Err:504
Tukang Batu L.03 OH - Err:504 Err:504
Kepala Tukang L.03 OH - Err:504 Err:504
Mandor L.04 OH - Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Mortar Kg - Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A. 4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 Err:504 Err:504
Tukang Batu L.02 OH 0.1350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0140 Err:504 Err:504
Mandor L.04 OH 0.0140 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 26.5000 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A. 4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40cm x40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna (sika graut) Kg 1.3000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna (sika graut) Kg 1.5000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 Err:504 Err:504
Tukang Batu L.02 OH 0.1350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0140 Err:504 Err:504
Mandor L.04 OH 0.0140 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 26.5000 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Semen warna Kg 1.0000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.7. Pemasangan 1 m2 lantai ubin traso ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin traso Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.8. Pemasangan 1 m2 lantai ubin traso ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin traso Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin granit Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin granit Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.11. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.12. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0120 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 3.1000 Err:504 Err:504
Semen portland Kg 9.6000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.16. Pemasangan 1 m1plint ubin PC abu-abu ukuran 15cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.6500 Err:504 Err:504
Pasir pasang m3 0.0040 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.17. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.2400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.18. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.2400 Err:504 Err:504
Pasir pasang m 3
0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.19. Pemasangan 1 m1 plint ubin warna ukuran 10cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1500 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.20. Pemasangan 1 m1 plint ubin warna ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.21. Pemasangan 1 m1 plint ubin warna ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.22. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin teraso Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.23. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin teraso Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.24. Pemasangan 1 m1 plint ubin granit ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin granit Bh 2.6500 Err:504 Err:504
Semen Portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.25. Pemasangan 1 m1 plint ubin granit ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin granit Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.26. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux kerang Bh 2.6300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.27. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux kerang Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.28. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 1.7000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m 3
0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.29. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.30. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.02 OH 0.1800 Err:504 Err:504
Kepala Tukang L.03 OH 0.0180 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Teraso cor m3 0.0360 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 53.0000 Err:504 Err:504
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 106.0000 Err:504 Err:504
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 3.2000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 33cm x 33cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 Err:504 Err:504
Semen Portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 #REF! #REF!
Semen portland Kg 10.0000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.36. masangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Batu L.02 OH 0.5250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0530 Err:504 Err:504
Mandor L.04 OH 0.0530 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 33.0000 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 4.3700 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 11.8700 Err:504 Err:504
Semen portland Kg 14.1500 Err:504 Err:504
Pasir pasang m3 0.0390 Err:504 Err:504
Semen warna Kg 2.0000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.0250 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.40. Pemasangan 1 m1 plint keramik ukuran 10cm x 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 10.6000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.41. Pemasangan 1 m1 plint keramik ukuran 5cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 0.5700 Err:504 Err:504
Pasir pasang m3 0.0015 Err:504 Err:504
Semen warna Kg 0.0130 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.42. Pemasangan 1 m1 plint internal cove artistik 5cm x 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7500 Err:504 Err:504
Tukang Batu L.02 OH 0.7500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0750 Err:504 Err:504
Mandor L.04 OH 0.0380 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.43. angan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Marmer Bh 1.0600 #REF! #REF!
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.1340 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.44. Pemasangan 1 m2 lantai karpet


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1700 Err:504 Err:504
Tukang Batu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Karpet m2 1.0500 Err:504 Err:504
Lem Kg 0.3500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.45. Pemasangan 1 m2 underlayer ( pelapis bawah karpet )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Underlayer m2 1.0500 Err:504 Err:504
Lem Kg 0.3500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.46. Pemasangan 1 m2 lantai parquet kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Parquet m2 1.0500 #REF! #REF!
Lem Kg 0.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A. 4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Parquet m2 1.0500 #REF! #REF!
Lem Kg 0.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.48. Pemasangan 1 m2 dinding porslen 11cmx 11cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen doos 1.0500 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.49. Pemasangan 1 m2 dinding porslen 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen Bh 53.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.50. Pemasangan 1 m2 dinding porslen 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen Bh 26.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 1.9400 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 53.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 106.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.9000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.53. Pemasangan 1 m2 dinding keramik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 53.0000 #REF! #REF!
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.54. Pemasangan 1 m2 dinding keramik 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik Bh 26.5000 #REF! #REF!
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 1.9400 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.55. Pemasangan 1 m2 dinding marmer 100cmx 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.6500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0650 Err:504 Err:504
Mandor L.04 OH 0.0650 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Marmer Bh 1.0600 #REF! #REF!
Semen portland Kg 12.4400 Err:504 Err:504
Pasir pasang m3 0.0250 Err:504 Err:504
Semen warna Kg 0.6500 #REF! #REF!
Paku 12cm Bh 3.0300 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cmx 7cmx 24cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata pelapis Bh 63.0000 Err:504 Err:504
Semen portland Kg 12.4400 Err:504 Err:504
Pasir pasang m3 0.0250 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.57. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata paras Bh 1.1000 Err:504 Err:504
Semen portland Kg 11.7500 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata tempel hitam m2 1.1000 Err:504 Err:504
Semen portland Kg 11.7500 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cmx 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vynil Bh 11.8700 Err:504 Err:504
Lem Kg 0.3500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wallpaper m 2.2000 #REF! #REF!
Lem Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.61. Pemasangan 1 m2 floor harderner


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Floor harderner Kg 5.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.62. Pemasangan 1 m1 plint vynil 15cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu L.02 OH 0.0800 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vynil Bh 1.7600 Err:504 Err:504
Lem Kg 0.0800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.63. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu kelas 1 m3 0.0030 #REF! #REF!
Paku/ skrup 5cm Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.64. Pemasangan 1 m² paving block natural tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.65. Pemasangan 1 m² paving block natural tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 2.0700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.66. Pemasangan 1 m² paving block berwarna tebal 6 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block warna 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.67. Pemasangan 1 m² paving block berwarna tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block warna 8 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 2.0700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 Err:504 Err:504
Tukang Kayu L.02 OH 0.0700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0070 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Asbes semen m2 1.1000 Err:504 Err:504
Paku tripleks Kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x 30 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 12.0000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x60 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 5.8000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran ( 60 x 120 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 1.5000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Tripleks Lembar 0.3750 Err:504 Err:504
Paku tripleks Kg 0.0300 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.02 OH 0.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu papan m3 0.0150 Err:504 Err:504
Paku tripleks Kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.7. t gypsum board ukuran ( 120x240x9 )cm, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Gypsum board Lembar 0.3640 #REF! #REF!
Paku skrup Kg 0.1100 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Besi L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0250 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil Allum "T" m 3.6000 Err:504 Err:504
Kawat dia 4mm Kg 0.1500 Err:504 Err:504
Ramset Bh 1.0500 #REF! #REF!
Akustik 60 x 120 Lembar 1.5000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
List kayu profil m 1.0500 Err:504 Err:504
Paku Kg 0.0100 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.10. angan 1 m2 Rangka langit-langit besi hollow 40.40


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Besi L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka metal hollow 40.40.2mm m1 4.0000 #REF! #REF!
Assesoris (perkuatan, las dll) Ls 100%*rangka #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0075 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng palentong Bh 25.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng kodok Bh 25.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/ super


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng palentong Bh 12.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.4. Pemasangan 1 m1 bubung genteng palentong


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 5.0000 Err:504 Err:504
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 5.0000 #REF! #REF!
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.6. Pemasangan 1 m1 bubung genteng palentong besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 4.0000 Err:504 Err:504
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0670 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rooflight 90 x 180 Lembar 0.6000 #REF! #REF!
Paku biasa 1/2" - 1" Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.8. 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.5000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.9. 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.6000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.10. 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.6000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.11. 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.7500 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.12. 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.13. 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.14. 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.15. 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.16. 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.17. 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.3700 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.18. 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.3800 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.19. 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.4600 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.20. 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.4900 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.21. 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.5700 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.22. Pemasangan 1 m1 bubung stel gelombang 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.4000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.23. Pemasangan 1 m1 bubung stel gelombang 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.24. Pemasangan 1 m1 bubung stel gelombang 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.0500 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.25. Pemasangan 1 m1 nok paten 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.26. Pemasangan 1 m1 nok paten 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.27. Pemasangan 1 m1 nok paten 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.28. Pemasangan 1 m1 nok stel rata 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.29. Pemasangan 1 m1 nok stel rata 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.5.2.30. Pemasangan 1 m2 genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 Err:504 Err:504
Paku biasa 2"-5" Kg 0.0300 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.31. Pemasangan 1 m2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0030 Err:504 Err:504
Mandor L.15 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng aspal Bh 6.9000 Err:504 Err:504
Plywood 6mm Lembar 0.3500 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0300 Err:504 Err:504
Plastic aerator Bh 0.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.32. n 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.33. gan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.34. Pemasangan 1 m2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1660 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sirap kayu Bh 30.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng beton Bh 3.5000 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Semen portland Kg 10.8000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
Semen warna Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.36. Pemasangan 1 m1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng aspal Bh 2.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Kayu balok borneo m3 0.0035 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Kayu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0150 Err:504 Err:504
Mandor L.15 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng metal Bh 1.1000 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.38. Pemasangan 1 m1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat 3 x 6" Lembar 0.4000 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Paku biasa 2"-5" Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.03 OH 0.0600 Err:504 Err:504
Kepala Tukang L.11 OH 0.0060 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng gelombang 3"x 6" Lembar 0.7000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.5.2.40. Pemasangan 1 m1 nok atap seng
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat 3"x 6" bjls 28 Lembar 0.3000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.41. Pemasangan 1 m2 atap alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.7500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0800 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Alumunium gel. Tbl 0,55 Lembar 1.0500 #REF! #REF!
Paku hak panj. 15cm Kg 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.42. Pemasangan 1 m1 nok alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.03 OH 1.0000 Err:504 Err:504
Kepala Tukang L.11 OH 0.1000 Err:504 Err:504
Mandor L.15 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok standard 40 x 18 Bh 1.2000 Err:504 Err:504
Paku hak panj. 15cm Kg 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0050 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Alumunium foil m2 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 Err:504 Err:504
Tukang kayu L.03 OH 21.0000 Err:504 Err:504
Kepala tukang L.03 OH 2.1000 Err:504
Mandor L.04 OH 0.3500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok Kayu m3 1.1000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem Kayu Kg 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.03 OH 18.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.2000 #REF! #REF!
Paku 10 cm kg 1.2500 #REF! #REF!
Lem kayu kg 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Kayu L.03 OH 1.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Paku 5-7 cm kg 0.0500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang kayu L.03 OH 1.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Paku 5-7 cm kg 0.0500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.03 OH 3.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0240 #REF! #REF!
Lem Kayu kg 0.3000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Kayu L.03 OH 3.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0640 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Kayu L.03 OH 2.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2100 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
Plywood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0256 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
Plywood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 Err:504 Err:504
Tukang Kayu L.03 OH 2.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2000 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0600 #REF! #REF!
Paku 1-2,5 cm kg 0.1500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.3000 Err:504 Err:504
Teakwood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 Err:504 Err:504
Tukang Kayu L.03 OH 2.5500 Err:504 Err:504
Kepala Tukang L.03 OH 0.2550 Err:504 Err:504
Mandor L.04 OH 0.0430 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.8000 Err:504 Err:504
Teakwood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
Formika lembar 0.5000 Err:504 Err:504

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang Kayu L.03 OH 12.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.1000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 5.6000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.03 OH 20.0000 Err:504 Err:504
Kepala Tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.2000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 5.6000 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.03 OH 20.1000 Err:504 Err:504
Kepala Tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.1000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 3.0000 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Reng 2 x 3cm m3 0.0360 Err:504 Err:504
Paku 5 dan 10 cm kg 0.2500 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Reng 2 x 3cm m3 0.0570 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2500 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang kayu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu kelas II m3 0.0140 #REF! #REF!
Paku berbagai ukuran (2"-5") kg 0.0570 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0750 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 Err:504 Err:504
Paku 7 - 10 cm kg 0.2500 #REF! #REF!

- -

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0108 #REF! #REF!
Paku 5 - 7 cm kg 0.1000 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0108 #REF! #REF!
Paku 5 - 7 cm kg 0.0500 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.4500 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 0.0280 #REF! #REF!
Paku 5 - 7 cm kg 0.1500 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu 6 x 12 m3 0.0280 #REF! #REF!
Paku 5 - 10 cm kg 0.1500 #REF! #REF!
Teakwood tebal 4mm uk 120x240 lembar 0.8600 #REF! #REF!
Lem Kayu kg 0.5600 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu 6 x 12 m3 0.0280 #REF! #REF!
Paku 5 - 10 cm kg 0.1500 #REF! #REF!
plywood tebal 4mm uk 120x240 lembar 0.8600 #REF! #REF!
Lem Kayu kg 0.5600 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang kayu L.03 OH 1.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.1800 Err:504 Err:504
Mandor L.04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0070 #REF! #REF!
Paku 5 - 10 cm kg 0.1000 #REF! #REF!
Paku skrup 10 cm kg 0.1500 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plywood tebal 4mm lembar 0.4000 #REF! #REF!
Paku 1 - 2,5 cm kg 0.0500 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bilik bambu m2 1.5000 Err:504 Err:504
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Paku kg 0.0120 Err:504
List kayu 2/4 m3 0.0030 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam antik buah 1.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam biasa buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam KM buah 1.0000 #REF!
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci silinder buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel pintu buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel kupu-kupu buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.7. Pemasangan 1 buah engsel angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel angin buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Spring knip buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kait angin buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door closer set 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci slot bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door holder bh 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door stop bh 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.14. Pemasangan 1 buah Rel pintu sorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rel pintu sorong set 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci lemari set 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 3mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 5mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 Err:504 Err:504
Tukang kayu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0009 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 8mm m2 1.1000 #REF! #REF!
Sealant kg 0.0700 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca buram 12 mm m2 1.1000 #REF! #REF!
Sealant kg 0.0700 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca cermin 5 mm m2 1.1000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 Err:504 Err:504
Tukang kayu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca cermin 8 mm m2 1.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca wireglassed 5 mm m2 1.1000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca patri 5 mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Soda api kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sabun kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sabun kg 0.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang cat L.02 OH 0.0090 Err:504 Err:504
Kepala Tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat menie kg 0.2000 Err:504 Err:504
Plamir tembok kg 0.1500 Err:504 Err:504
Cat dasar kg 0.1700 #REF! #REF!
Cat penutup kg 0.2600 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 Err:504 Err:504
Ampelas lbr 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang cat L.02 OH 0.1050 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat menie kg 0.2000 Err:504 Err:504
Plamir tembok kg 0.1500 Err:504 Err:504
Cat dasar kg 0.1700 #REF! #REF!
Cat penutup kg 0.3500 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 Err:504 Err:504
Ampelas lbr 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0630 Err:504 Err:504
Kepala Tukang L.03 OH 0.0630 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Teak Oil liter 0.3600 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0160 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Politur liter 0.1500 Err:504 Err:504
Politur jadi liter 0.3720 #REF! #REF!
Ampelas lb 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Residu atau ter liter 0.3500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 Err:504 Err:504
Tukang cat L.02 OH 0.1600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0160 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
cat Vernis liter 0.1500 Err:504 Err:504
Dempul kayu kg 0.0500 Err:504 Err:504
Ampelas lb 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.0630 Err:504 Err:504
Kepala Tukang L.03 OH 0.0063 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plamur kg 0.1000 #REF! #REF!
Cat dasar kg 0.1000 #REF! #REF!
Cat penutup kg 0.2600 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 Err:504 Err:504
Tukang cat L.02 OH 0.0420 Err:504 Err:504
Kepala Tukang L.03 OH 0.0042 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat dasar kg 0.1200 #REF! #REF!
Cat penutup kg 0.1800 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.12. 1 M2 Pelaburan tembok dengan kalkarim

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 Err:504 Err:504
Tukang cat L.02 OH 0.0420 Err:504 Err:504
Kepala Tukang L.03 OH 0.0042 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kajkarim kg 0.1000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.13. 1 M2 Pelaburan tembok dengan kapur sirih

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang cat L.02 OH 0.0010 Err:504 Err:504
Kepala Tukang L.03 OH 0.0001 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kapur sirih kg 0.1500 Err:504 Err:504
Ampelas lembar 0.1000 Err:504 Err:504
Alang-alang ikat 0.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.14. 1 M2 Pelaburan tembok lama dengan kapur sirih ( pemeliharaan )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0050 Err:504 Err:504
Kepala Tukang L.03 OH 0.0005 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kapur sirih kg 0.3000 Err:504 Err:504
Ampelas lembar 0.2000 Err:504 Err:504
Alang-alang ikat 0.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wallpaper m2 1.2000 #REF! #REF!
Lem kg 0.2000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie besi kg 0.1000 Err:504 Err:504
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang cat L.02 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0225 Err:504 Err:504
Mandor L.04 OH 0.0075 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie besi kg 0.1000 Err:504 Err:504
Pengencer liter 0.0100 #REF! #REF!
Perancah kayu m3 0.0100 #REF! #REF!
Kuas bh 0.0020 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang cat L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie A kg 0.1000 Err:504 Err:504
Menie B kg 0.1000 Err:504 Err:504
Pengencer liter 0.0800 #REF! #REF!
Cat kg 0.0100 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang cat L.02 OH 0.0600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.3000 #REF! #REF!
Cat kg 0.0100 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang cat L.02 OH 0.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L.04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.1100 #REF! #REF!
Cat dasar kg 0.1700 Err:504 Err:504
Kuas bh 0.0800 Err:504 Err:504
Cat antara kg 0.0100 Err:504 Err:504
Cat penutup kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang cat L.02 OH 0.7000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0700 Err:504 Err:504
Mandor L.04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.3000 #REF! #REF!
Cat dasar kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.22. 1 M2 Pelituran 10 m² dengan plitur melamic

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 Err:504 Err:504
Tukang cat L.02 OH 12.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.1000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wood filler kg 1.5000 Err:504 Err:504
woodstain kg 1.5000 Err:504 Err:504
sanding kg 1.5000 Err:504 Err:504
melamic kg 2.4000 Err:504 Err:504
thinner Ltr 2.0000 Err:504 Err:504
Amplas Lmbr 6.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 2.2.1.16. Pembuatan 1 m2 Pagar panel beton pracetak 5x50x213 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 121,800.00 45,675.00
Tukang L.02 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.03 OH 0.012 203,000.00 2,436.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 72,268.00
B. BAHAN
Panel beton pracetak Lbr 0.986 #N/A #N/A
Kolom beton pracetak btg 0.525 #N/A #N/A
Semen PC kg 45.000 #N/A #N/A
Pasir beton m3 0.074 150,000.00 11,100.00
Koral beton m3 0.146 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 10% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

harga pasaran september 2018


Rp. 320,000
per m1
A. 4.4.3.35.a Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Ubin keramik doos 1.0500 #N/A #N/A
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
DAFTAR ANALISA PEKERJAAN
BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
TAHUN ANGGARAN 2021
(Koefisien Analisa Berdasarkan PermenPUPR No.28/PRT/M/2016)

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1. Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Semen Portland kg 2.500 1,627.00 4,067.50
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Kayu gergajian kelas III, balok m3 0.072 2,635,329.08 189,743.69
Paku berbagai ukuran (2"-5") kg 0.060 17,287.99 1,037.28
Residu atau ter ltr 0.400 60,402.65 24,161.06
JUMLAH HARGA BAHAN 232,737.03
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 330,177.03
E. Profit 15% * D 49,526.55
F. Harga Satuan Pekerjaan (D+E) 379,703.59

A. 2.2.1.2. Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Seng gelombang uk. 1,80 x 0,90 (m) lbr 1.200 60,291.00 72,349.20
Semen Portland kg 2.500 1,627.00 4,067.50
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Kayu gergajian kelas III, balok m3 0.072 2,635,329.08 189,743.69
Paku berbagai ukuran (2"-5") kg 0.060 17,287.99 1,037.28
Cat menie ltr 0.450 48,500.00 21,825.00
JUMLAH HARGA BAHAN 302,750.17
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 400,190.17
E. Profit 15% * D 60,028.53
F. Harga Satuan Pekerjaan (D+E) 460,218.70

A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.020 203,000.00 4,060.00
Mandor L.04 OH 0.020 203,000.00 4,060.00
JUMLAH TENAGA KERJA 97,440.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 5,000.00 5,000.00
Kawat berduri kg 25.000 110,986.80 2,774,669.98
Semen Portland kg 2.000 1,627.00 3,254.00
Pasir beton m3 0.005 150,000.00 750.00
Batu pecah 1 - 2 m3 0.009 747,500.00 6,727.50
Paku berbagai ukuran (2"-5") kg 0.030 17,287.99 518.64

JUMLAH HARGA BAHAN 2,790,920.11


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,888,360.11
E. Profit 15% * D 433,254.02
F. Harga Satuan Pekerjaan (D+E) 3,321,614.13

A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.012 2,635,329.08 31,623.95
Paku berbagai ukuran (2"-5") Kg 0.020 17,287.99 345.76
Kayu gergajian kelas III, papan m3 0.007 2,535,470.00 17,748.29

JUMLAH HARGA BAHAN 49,718.00


C. PERALATAN

Page 555 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 81,183.00
E. Profit 15% * D 12,177.45
F. Harga Satuan Pekerjaan (D+E) 93,360.45

Page 556 of 649


A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 121,800.00 243,600.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Tukang Batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 801,850.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.180 2,635,329.08 474,359.24
Paku berbagai ukuran (2"-5") kg 0.080 17,287.99 1,383.04
Besi strip 2 x 3 cm kg 1.100 10,048.50 11,053.35
Semen portland kg 35.000 1,627.00 56,945.00
Pasir pasang m3 0.150 150,000.00 22,500.00
Pasir beton m3 0.100 150,000.00 15,000.00
Batu pecah 1 - 2 m3 0.150 747,500.00 112,125.00
Batu bata merah besar bh 30.000 2,300.00 69,000.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 0.250 60,291.00 15,072.75
Jendela nako (kerangka + kaca 5 mm) bh 0.200 187,795.30 37,559.06
Kaca bening tebal 5 mm m2 0.080 147,936.25 11,834.90
Kunci pintu tanam (ex.dexon) bh 0.150 210,599.81 31,589.97
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 0.060 97,237.00 5,834.22

JUMLAH HARGA BAHAN 870,506.53


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,672,356.53
E. Profit 15% * D 250,853.48
F. Harga Satuan Pekerjaan (D+E) 1,923,210.00

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 3.000 5,000.00 15,000.00
Kayu gergajian kelas III, balok m3 0.276 2,635,329.08 727,350.83
Paku berbagai ukuran (2"-5") kg 0.700 17,287.99 12,101.59
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50

JUMLAH HARGA BAHAN 844,888.92


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,250,888.92
E. Profit 15% * D 187,633.34
F. Harga Satuan Pekerjaan (D+E) 1,438,522.26

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.700 5,000.00 8,500.00
Kayu gergajian kelas III, balok m3 0.210 2,635,329.08 553,419.11
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 10.500 1,627.00 17,083.50
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Seng BJLS 30 lebar 45 cm Lbr 0.250 16,747.50 4,186.88

JUMLAH HARGA BAHAN 720,687.38


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,218,037.38
E. Profit 15% * D 182,705.61
F. Harga Satuan Pekerjaan (D+E) 1,400,742.99

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang Kayu L.02 OH 2.000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.200 203,000.00 40,600.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 497,350.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 5,000.00 6,250.00
Kayu gergajian kelas III, balok m3 0.186 2,635,329.08 490,171.21
Paku berbagai ukuran (2"-5") kg 0.300 17,287.99 5,186.40
Semen portland kg 18.000 1,627.00 29,286.00
Pasir beton m3 0.030 150,000.00 4,500.00
Batu pecah 1 - 2 m3 0.050 747,500.00 37,375.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 60,291.00 90,436.50
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 1.350 97,237.00 131,269.95

JUMLAH HARGA BAHAN 794,475.06


C. PERALATAN

Page 557 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,291,825.06
E. Profit 15% * D 193,773.76
F. Harga Satuan Pekerjaan (D+E) 1,485,598.81

Page 558 of 649


A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 121,800.00 12,180.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 22,330.00
E. Profit 15% * D 3,349.50
F. Harga Satuan Pekerjaan (D+E) 25,679.50

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 54,810.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.036 2,535,470.00 91,276.92
Kayu gergajian kelas III, balok m3 0.014 2,635,329.08 36,894.61
Paku berbagai ukuran (2"-5") m3 0.080 17,287.99 1,383.04

JUMLAH HARGA BAHAN 129,554.57


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,364.57
E. Profit 15% * D 27,654.68
F. Harga Satuan Pekerjaan (D+E) 212,019.25

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 122,815.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.150 425,000.00 63,750.00
Batu pecah 1 - 2 m3 0.090 747,500.00 67,275.00
Pasir pasang m3 0.010 150,000.00 1,500.00

JUMLAH HARGA BAHAN 132,525.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 255,340.00
E. Profit 15% * D 38,301.00
F. Harga Satuan Pekerjaan (D+E) 293,641.00

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 121,800.00 1,624,081.20
Mandor L.04 OH 0.666 203,000.00 135,198.00
JUMLAH TENAGA KERJA 1,759,279.20
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,759,279.20
E. Profit 15% * D 263,891.88
F. Harga Satuan Pekerjaan (D+E) 2,023,171.08

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 121,800.00 812,040.60
Mandor L.04 OH 0.333 203,000.00 67,599.00
JUMLAH TENAGA KERJA 879,639.60
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 879,639.60
E. Profit 15% * D 131,945.94
F. Harga Satuan Pekerjaan (D+E) 1,011,585.54

Page 559 of 649


A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 121,800.00 91,350.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 96,425.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 96,425.00
E. Profit 15% * D 14,463.75
F. Harga Satuan Pekerjaan (D+E) 110,888.75

A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 121,800.00 109,620.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 118,755.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,755.00
E. Profit 15% * D 17,813.25
F. Harga Satuan Pekerjaan (D+E) 136,568.25

A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 121,800.00 127,890.00
Mandor L.04 OH 0.067 203,000.00 13,601.00
JUMLAH TENAGA KERJA 141,491.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 141,491.00
E. Profit 15% * D 21,223.65
F. Harga Satuan Pekerjaan (D+E) 162,714.65

A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Mandor L.04 OH 0.032 203,000.00 6,496.00
JUMLAH TENAGA KERJA 128,296.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 128,296.00
E. Profit 15% * D 19,244.40
F. Harga Satuan Pekerjaan (D+E) 147,540.40

A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,880.00
E. Profit 15% * D 29,232.00
F. Harga Satuan Pekerjaan (D+E) 224,112.00

Page 560 of 649


A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Mandor L.04 OH 0.045 203,000.00 9,135.00
JUMLAH TENAGA KERJA 155,295.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 155,295.00
E. Profit 15% * D 23,294.25
F. Harga Satuan Pekerjaan (D+E) 178,589.25

A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 7,105.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,105.00
E. Profit 15% * D 1,065.75
F. Harga Satuan Pekerjaan (D+E) 8,170.75

A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 121,800.00 40,194.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 42,224.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 42,224.00
E. Profit 15% * D 6,333.60
F. Harga Satuan Pekerjaan (D+E) 48,557.60

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

Pengurugan kembali 1 m 3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,962.92


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 45,522.75
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 54,238.22
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 49,180.13
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 74,704.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 59,529.75

A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 121,800.00 60,900.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 71,050.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,050.00
E. Profit 15% * D 10,657.50
F. Harga Satuan Pekerjaan (D+E) 81,707.50

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Mandor L.04 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 38,570.00
B. BAHAN
Pasir urug/timbun m3 1.200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

Page 561 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

Page 562 of 649


A. 2.3.1.14. Pemasangan 1 m3 sirtu padat
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 121,800.00 30,450.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 35,525.00
B. BAHAN
Sirtu m3 1.200 150,248.42 180,298.10

JUMLAH HARGA BAHAN 180,298.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 215,823.10
E. Profit 15% * D 32,373.47
F. Harga Satuan Pekerjaan (D+E) 248,196.57

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00

JUMLAH HARGA BAHAN 911,404.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,246,354.00
E. Profit 15% * D 186,953.10
F. Harga Satuan Pekerjaan (D+E) 1,433,307.10

A. 3.2.1.1.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 202.000 1,627.00 328,654.00
Pasir pasang m3 0.485 150,000.00 72,750.00

JUMLAH HARGA BAHAN 838,546.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,173,496.86
E. Profit 15% * D 176,024.53
F. Harga Satuan Pekerjaan (D+E) 1,349,521.39

A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00

JUMLAH HARGA BAHAN 853,201.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,188,151.00
E. Profit 15% * D 178,222.65
F. Harga Satuan Pekerjaan (D+E) 1,366,373.65

A. 3.2.1.2.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 163.000 1,627.00 265,201.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 780,343.86
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,115,293.86
Page 563 of 649
E. Profit 15% * D 167,294.08
F. Harga Satuan Pekerjaan (D+E) 1,282,587.94

Page 564 of 649


A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00

JUMLAH HARGA BAHAN 812,872.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,147,822.00
E. Profit 15% * D 172,173.30
F. Harga Satuan Pekerjaan (D+E) 1,319,995.30

A. 3.2.1.3.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 5PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 136.000 1,627.00 221,272.00
Pasir pasang m3 0.544 150,000.00 81,600.00

JUMLAH HARGA BAHAN 740,014.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,074,964.86
E. Profit 15% * D 161,244.73
F. Harga Satuan Pekerjaan (D+E) 1,236,209.59

A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00

JUMLAH HARGA BAHAN 784,509.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,119,459.00
E. Profit 15% * D 167,918.85
F. Harga Satuan Pekerjaan (D+E) 1,287,377.85

A. 3.2.1.4.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 6PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 117.000 1,627.00 190,359.00
Pasir pasang m3 0.561 150,000.00 84,150.00

JUMLAH HARGA BAHAN 711,651.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,601.86
E. Profit 15% * D 156,990.28
F. Harga Satuan Pekerjaan (D+E) 1,203,592.14

A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00

JUMLAH HARGA BAHAN 745,657.00


C. PERALATAN

JUMLAH HARGA ALAT -

Page 565 of 649


D. Jumlah (A+B+C) 1,080,607.00
E. Profit 15% * D 162,091.05
F. Harga Satuan Pekerjaan (D+E) 1,242,698.05

Page 566 of 649


A. 3.2.1.5.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 91.000 1,627.00 148,057.00
Pasir pasang m3 0.584 150,000.00 87,600.00

JUMLAH HARGA BAHAN 672,799.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,007,749.86
E. Profit 15% * D 151,162.48
F. Harga Satuan Pekerjaan (D+E) 1,158,912.34

A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland Kg 0.170 1,627.00 276.59
Batu kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00

JUMLAH HARGA BAHAN 573,386.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 908,336.15
E. Profit 15% * D 136,250.42
F. Harga Satuan Pekerjaan (D+E) 1,044,586.57

A. 3.2.1.6.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 1KP : 2PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 0.170 1,627.00 276.59
Batu Kapur m3 0.170 71,232.70 12,109.56
Pasir pasang m3 0.340 150,000.00 51,000.00

JUMLAH HARGA BAHAN 500,529.01


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 835,479.01
E. Profit 15% * D 125,321.85
F. Harga Satuan Pekerjaan (D+E) 960,800.86

A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00

JUMLAH HARGA BAHAN 693,518.21


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,028,468.21
E. Profit 15% * D 154,270.23
F. Harga Satuan Pekerjaan (D+E) 1,182,738.44

A. 3.2.1.7.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3KP : 10PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 61.000 1,627.00 99,247.00
Batu Kapur m3 0.147 71,232.70 10,471.21
Pasir pasang m3 0.492 150,000.00 73,800.00

Page 567 of 649


JUMLAH HARGA BAHAN 620,661.06
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 955,611.06
E. Profit 15% * D 143,341.66
F. Harga Satuan Pekerjaan (D+E) 1,098,952.72

Page 568 of 649


A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00

JUMLAH HARGA BAHAN 664,488.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 999,438.48
E. Profit 15% * D 149,915.77
F. Harga Satuan Pekerjaan (D+E) 1,149,354.26

A. 3.2.1.8.a Pemasangan 1 m3 Pondasi batu gunung campuran 1/4SP : 1KP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 121,800.00 182,700.00
Tukang Batu L.02 OH 0.750 162,400.00 121,800.00
Kepala Tukang L.03 OH 0.075 203,000.00 15,225.00
Mandor L.04 OH 0.075 203,000.00 15,225.00
JUMLAH TENAGA KERJA 334,950.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Semen portland kg 41.000 1,627.00 66,707.00
Batu Kapur m3 0.131 71,232.70 9,331.48
Pasir pasang m3 0.523 150,000.00 78,450.00

JUMLAH HARGA BAHAN 591,631.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 926,581.34
E. Profit 15% * D 138,987.20
F. Harga Satuan Pekerjaan (D+E) 1,065,568.54

A. 3.2.1.9. Pemasangan 1 m3 batu hitam kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 425,000.00 510,000.00
Pasir urug/timbun m3 0.432 102,500.00 44,280.00

JUMLAH HARGA BAHAN 554,280.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 728,454.00
E. Profit 15% * D 109,268.10
F. Harga Satuan Pekerjaan (D+E) 837,722.10

A. 3.2.1.9.a Pemasangan 1 m3 batu putih kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 121,800.00 95,004.00
Tukang Batu L.02 OH 0.390 162,400.00 63,336.00
Kepala Tukang L.03 OH 0.039 203,000.00 7,917.00
Mandor L.04 OH 0.039 203,000.00 7,917.00
JUMLAH TENAGA KERJA 174,174.00
B. BAHAN
batu gunung m3 1.200 364,285.71 437,142.86
Pasir urug/timbun m3 0.432 102,500.00 44,280.00

JUMLAH HARGA BAHAN 481,422.86


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 655,596.86
E. Profit 15% * D 98,339.53
F. Harga Satuan Pekerjaan (D+E) 753,936.39

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 425,000.00 204,000.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00

JUMLAH HARGA BAHAN 2,633,873.10

Page 569 of 649


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,237,798.10
E. Profit 15% * D 485,669.71
F. Harga Satuan Pekerjaan (D+E) 3,723,467.81

Page 570 of 649


A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 121,800.00 414,120.00
Tukang Batu L.02 OH 0.850 162,400.00 138,040.00
Kepala Tukang L.03 OH 0.085 203,000.00 17,255.00
Mandor L.04 OH 0.170 203,000.00 34,510.00
JUMLAH TENAGA KERJA 603,925.00
B. BAHAN
batu gunung m3 0.480 364,285.71 174,857.14
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00
Besi beton kg 126.000 13,301.63 1,676,005.10
Kawat beton kg 1.800 23,111.11 41,600.00

JUMLAH HARGA BAHAN 2,604,730.24


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,208,655.24
E. Profit 15% * D 481,298.29
F. Harga Satuan Pekerjaan (D+E) 3,689,953.53

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 425,000.00 191,250.00
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00

JUMLAH HARGA BAHAN 903,518.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,366,155.00
E. Profit 15% * D 204,923.25
F. Harga Satuan Pekerjaan (D+E) 1,571,078.25

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu gunung, diameter 100 cm.


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 121,800.00 292,320.00
Tukang Batu L.02 OH 0.800 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.080 203,000.00 16,240.00
Mandor L.04 OH 0.119 203,000.00 24,157.00
JUMLAH TENAGA KERJA 462,637.00
B. BAHAN
batu gunung m3 0.450 364,285.71 163,928.57
Semen Portland kg 194.000 1,627.00 315,638.00
Pasir beton m3 0.312 150,000.00 46,800.00
Batu pecah 0,5 - 1 m3 0.468 747,500.00 349,830.00

JUMLAH HARGA BAHAN 876,196.57


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,338,833.57
E. Profit 15% * D 200,825.04
F. Harga Satuan Pekerjaan (D+E) 1,539,658.61

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen Portland kg 247.0000 1,627.00 401,869.00
Pasir beton (Kg) kg 869.0000 83.33 72,416.67
Batu pecah 1 - 2 (Kg) kg 999.0000 515.52 515,001.72
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,004,290.36
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,272,453.36
E. Profit 15% *D 190,868.00
F. Harga Satuan Pekerjaan (D+E) 1,463,321.36

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 276.0000 1,627.00 449,052.00
Page 571 of 649
Pasir beton (Kg) kg 828.0000 83.33 69,000.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 515.52 521,703.45
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,054,758.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,322,921.42
E. Profit 15% *D 198,438.21
F. Harga Satuan Pekerjaan (D+E) 1,521,359.63

Page 572 of 649


A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 299.0000 1,627.00 486,473.00
Pasir beton (Kg) kg 799.0000 83.33 66,583.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 515.52 524,281.03
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,092,340.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,360,503.34
E. Profit 15% *D 204,075.50
F. Harga Satuan Pekerjaan (D+E) 1,564,578.84

A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 121,800.00 146,160.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0600 203,000.00 12,180.00
JUMLAH TENAGA KERJA 194,880.00
B. BAHAN
Semen portland kg 230.0000 1,627.00 374,210.00
Pasir beton (Kg) kg 893.0000 83.33 74,416.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 515.52 529,436.21
Air ltr 200.0000 69.78 13,956.25

JUMLAH HARGA BAHAN 992,019.12


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,186,899.12
E. Profit 15% *D 178,034.87
F. Harga Satuan Pekerjaan (D+E) 1,364,933.99

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 326.0000 1,627.00 530,402.00
Pasir beton (Kg) kg 760.0000 83.33 63,333.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 515.52 530,467.24
Air ltr 215.0000 69.78 15,002.97

JUMLAH HARGA BAHAN 1,139,205.54


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,407,368.54
E. Profit 15% *D 211,105.28
F. Harga Satuan Pekerjaan (D+E) 1,618,473.82

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 352.0000 1,627.00 572,704.00
Pasir beton (Kg) kg 731.0000 83.33 60,916.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 515.52 531,498.28
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,180,121.91
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,448,284.91
E. Profit 15% *D 217,242.74
F. Harga Satuan Pekerjaan (D+E) 1,665,527.65

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 371.0000 1,627.00 603,617.00
Pasir beton (Kg) kg 698.0000 83.33 58,166.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 515.52 539,746.55
Air ltr 215.0000 69.78 15,002.97

Page 573 of 649


JUMLAH HARGA BAHAN 1,216,533.19
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,484,696.19
E. Profit 15% *D 222,704.43
F. Harga Satuan Pekerjaan (D+E) 1,707,400.62

Page 574 of 649


A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 384.0000 1,627.00 624,768.00
Pasir beton (Kg) kg 692.0000 83.33 57,666.67
Batu pecah 1 - 2 (Kg) kg 1,039.0000 515.52 535,622.41
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,233,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,501,223.05
E. Profit 15% *D 225,183.46
F. Harga Satuan Pekerjaan (D+E) 1,726,406.51

A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 406.0000 1,627.00 660,562.00
Pasir beton (Kg) kg 684.0000 83.33 57,000.00
Batu pecah 1 - 2 (Kg) kg 1,026.0000 515.52 528,920.69
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,261,485.66
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,648.66
E. Profit 15% *D 229,447.30
F. Harga Satuan Pekerjaan (D+E) 1,759,095.96

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 121,800.00 200,970.00
Tukang Batu L.02 OH 0.2750 162,400.00 44,660.00
Kepala Tukang L.03 OH 0.0280 203,000.00 5,684.00
Mandor L.04 OH 0.0830 203,000.00 16,849.00
JUMLAH TENAGA KERJA 268,163.00
B. BAHAN
Semen portland kg 413.0000 1,627.00 671,951.00
Pasir beton (Kg) kg 681.0000 83.33 56,750.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 515.52 526,343.10
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,270,047.07
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,538,210.07
E. Profit 15% *D 230,731.51
F. Harga Satuan Pekerjaan (D+E) 1,768,941.58

A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 439.0000 1,627.00 714,253.00
Pasir beton (Kg) kg 670.0000 83.33 55,833.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 515.52 518,610.34
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,303,699.65
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,644,739.65
E. Profit 15% *D 246,710.95
F. Harga Satuan Pekerjaan (D+E) 1,891,450.59

A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 121,800.00 255,780.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.1050 203,000.00 21,315.00
JUMLAH TENAGA KERJA 341,040.00
B. BAHAN
Semen portland kg 448.0000 1,627.00 728,896.00
Pasir beton (Kg) kg 667.0000 83.33 55,583.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 515.52 515,517.24
Air ltr 215.0000 69.78 15,002.97
JUMLAH HARGA BAHAN 1,314,999.54
C. PERALATAN

JUMLAH HARGA ALAT -

Page 575 of 649


D. Jumlah (A+B+C) 1,656,039.54
E. Profit 15% *D 248,405.93
F. Harga Satuan Pekerjaan (D+E) 1,904,445.47

Page 576 of 649


A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Besi L.02 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.0070 203,000.00 1,421.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 22,127.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1500 23,111.11 3,466.67
JUMLAH HARGA BAHAN 143,133.76
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 165,260.76
E. Profit 15% *D 24,789.11
F. Harga Satuan Pekerjaan (D+E) 190,049.87

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Besi L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Besi beton kg 10.5000 13,301.63 139,667.09
Kawat beton kg 0.1000 23,111.11 2,311.11

JUMLAH HARGA BAHAN 141,978.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,812.20
E. Profit 15% *D 23,671.83
F. Harga Satuan Pekerjaan (D+E) 181,484.03

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang Besi L.02 OH 0.0250 162,400.00 4,060.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 12,383.00
B. BAHAN
Besi jaring kawat baja kg 10.2000 22,330.00 227,766.00
Kawat beton kg 0.0500 23,111.11 1,155.56

JUMLAH HARGA BAHAN 228,921.56


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 241,304.56
E. Profit 15% *D 36,195.68
F. Harga Satuan Pekerjaan (D+E) 277,500.24

A. 4.1.1.20. Membuat 1 m2 bekisting untuk pondasi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 111,599.56


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 227,715.56
E. Profit 15% *D 34,157.33
F. Harga Satuan Pekerjaan (D+E) 261,872.89

A. 4.1.1.20. ck Membuat 1 m2 bekisting untuk pondasi (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
JUMLAH HARGA BAHAN 94,760.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,876.15
E. Profit 15% *D 31,631.42
F. Harga Satuan Pekerjaan (D+E) 242,507.57

A. 4.1.1.21. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
Page 577 of 649
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 2,635,329.08 118,589.81
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter 0.1000 10,000.00 1,000.00

JUMLAH HARGA BAHAN 124,776.21


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 240,892.21
E. Profit 15% *D 36,133.83
F. Harga Satuan Pekerjaan (D+E) 277,026.04

Page 578 of 649


A. 4.1.1.21. ck Membuat 1 m2 bekisting untuk sloof (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 121,800.00 63,336.00
Tukang Kayu L.02 OH 0.2600 162,400.00 42,224.00
Kepala Tukang L.03 OH 0.0260 203,000.00 5,278.00
Mandor L.04 OH 0.0260 203,000.00 5,278.00
JUMLAH TENAGA KERJA 116,116.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0450 2,239,343.75 100,770.47
Paku berbagai ukuran (2"-5") kg 0.3000 17,287.99 5,186.40
Minyak bekisting liter - - -
JUMLAH HARGA BAHAN 105,956.87
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 222,072.87
E. Profit 15% *D 33,310.93
F. Harga Satuan Pekerjaan (D+E) 255,383.79

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 217,105.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 364,483.20
E. Profit 15% *D 54,672.48
F. Harga Satuan Pekerjaan (D+E) 419,155.68

A. 4.1.1.22. ck Membuat 1 m2 bekisting untuk kolom (kls IV)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 142,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,014.53
E. Profit 15% *D 43,502.18
F. Harga Satuan Pekerjaan (D+E) 333,516.71

A. 4.1.1.23. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0180 2,822,286.84 50,801.16
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 225,572.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 372,950.06
E. Profit 15% *D 55,942.51
F. Harga Satuan Pekerjaan (D+E) 428,892.57

A. 4.1.1.23. ck Membuat 1 m2 bekisting untuk balok (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20

Page 579 of 649


Kayu gergajian kelas IV, balok m3 0.0180 2,409,839.14 43,377.10
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 149,866.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 297,244.05
E. Profit 15% *D 44,586.61
F. Harga Satuan Pekerjaan (D+E) 341,830.66

Page 580 of 649


A. 4.1.1.24. Membuat 1 m2 bekisting untuk lantai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,635,329.08 105,413.16
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00

JUMLAH HARGA BAHAN 237,105.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 384,483.20
E. Profit 15% *D 57,672.48
F. Harga Satuan Pekerjaan (D+E) 442,155.68

A. 4.1.1.24.ck Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 2,239,343.75 89,573.75
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 162,636.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 310,014.53
E. Profit 15% *D 46,502.18
F. Harga Satuan Pekerjaan (D+E) 356,516.71

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.2000 10,000.00 2,000.00
Kayu gergajian kelas II, balok m3 0.0200 2,822,286.84 56,445.74
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
Penjaga jarak bekisting/spacer buah - - -

JUMLAH HARGA BAHAN 209,863.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 357,241.34
E. Profit 15% *D 53,586.20
F. Harga Satuan Pekerjaan (D+E) 410,827.55

A. 4.1.1.25. ck Membuat 1 m2 bekisting untuk dinding (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0200 2,409,839.14 48,196.78
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 5,000.00 15,000.00
JUMLAH HARGA BAHAN 137,292.29
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 284,670.29
E. Profit 15% *D 42,700.54
F. Harga Satuan Pekerjaan (D+E) 327,370.83

A. 4.1.1.26. Membuat 1 m2 bekisting untuk tangga


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN

Page 581 of 649


Kayu gergajian kelas III, balok m3 0.0300 2,635,329.08 79,059.87
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Minyak bekisting liter 0.1500 10,000.00 1,500.00
Kayu gergajian kelas II, balok m3 0.0150 2,822,286.84 42,334.30
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 144,121.54 50,442.54
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 190,251.91


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 337,629.91
E. Profit 15% *D 50,644.49
F. Harga Satuan Pekerjaan (D+E) 388,274.40

Page 582 of 649


A. 4.1.1.26. ck Membuat 1 m2 bekisting untuk tangga (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 121,800.00 80,388.00
Tukang Kayu L.02 OH 0.3300 162,400.00 53,592.00
Kepala Tukang L.03 OH 0.0330 203,000.00 6,699.00
Mandor L.04 OH 0.0330 203,000.00 6,699.00
JUMLAH TENAGA KERJA 147,378.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 2,239,343.75 67,180.31
Paku berbagai ukuran (2"-5") kg 0.4000 17,287.99 6,915.20
Kayu gergajian kelas IV, balok m3 0.0150 2,409,839.14 36,147.59
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 5,000.00 10,000.00
JUMLAH HARGA BAHAN 120,243.09
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 267,621.09
E. Profit 15% *D 40,143.16
F. Harga Satuan Pekerjaan (D+E) 307,764.26

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 2,635,329.08 69,572.69
Paku berbagai ukuran (2"-5") kg 0.6000 17,287.99 10,372.79
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 5,000.00 2,500.00

JUMLAH HARGA BAHAN 82,445.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 111,474.48
E. Profit 15% *D 16,721.17
F. Harga Satuan Pekerjaan (D+E) 128,195.65

A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 121,800.00 21,924.00
Tukang Batu L.02 OH 0.0200 162,400.00 3,248.00
Tukang Kayu L.02 OH 0.0200 162,400.00 3,248.00
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,713.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 2,635,329.08 5,270.66
Paku berbagai ukuran (2"-5") kg 0.0100 17,287.99 172.88
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.0000 13,301.63 39,904.88
Kawat beton kg 0.4500 23,111.11 10,400.00
Semen portland kg 4.0000 1,627.00 6,508.00
Pasir beton m3 0.0060 150,000.00 900.00
Batu pecah 1 - 2 m3 0.0090 747,500.00 6,727.50

JUMLAH HARGA BAHAN 69,883.92


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 104,596.92
E. Profit 15% *D 15,689.54
F. Harga Satuan Pekerjaan (D+E) 120,286.46

A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 121,800.00 36,174.60
Tukang Batu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Kayu L.02 OH 0.0330 162,400.00 5,359.20
Tukang Besi L.02 OH 0.0330 162,400.00 5,359.20
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,327.20
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 2,635,329.08 7,905.99
Paku berbagai ukuran (2"-5") kg 0.0200 17,287.99 345.76
Minyak bekisting liter - 10,000.00 -
Besi beton kg 3.6000 13,301.63 47,885.86
Kawat beton kg 0.0500 23,111.11 1,155.56
Semen portland kg 5.5000 1,627.00 8,948.50
Pasir beton m3 0.0090 150,000.00 1,350.00
Batu pecah 1 - 2 m3 0.0150 747,500.00 11,212.50

JUMLAH HARGA BAHAN 78,804.16


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 136,131.36
E. Profit 15% *D 20,419.70
F. Harga Satuan Pekerjaan (D+E) 156,551.07

Page 583 of 649


A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las Konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 18,879.00


B. BAHAN
Besi profil kg 1.1500 9,825.20 11,298.98

JUMLAH HARGA BAHAN 11,298.98


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,177.98
E. Profit 15% *D 4,526.70
F. Harga Satuan Pekerjaan (D+E) 34,704.68

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang Las konstruksi L.02 OH 0.0600 162,400.00 9,744.00
Kepala tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 18,879.00


B. BAHAN
Besi Baja IWF kg 1.1500 11,420.26 13,133.30

JUMLAH HARGA BAHAN 13,133.30


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 32,012.30
E. Profit 15% *D 4,801.84
F. Harga Satuan Pekerjaan (D+E) 36,814.14

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Las Konstruksi L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0010 203,000.00 203.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 29,638.00


B. BAHAN
Solar liter 1.0000 18,100.00 18,100.00
Minyak pelumas (oli) liter 0.1000 31,881.15 3,188.12

JUMLAH HARGA BAHAN 21,288.12


C. PERALATAN
Sewa alat jam 0.8000 - -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 50,926.12
E. Profit 15% *D 7,638.92
F. Harga Satuan Pekerjaan (D+E) 58,565.03

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 121,800.00 127,890.00
Tukang Las biasa L.02 OH 1.0500 162,400.00 170,520.00
Kepala tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L,04 OH 0.0520 203,000.00 10,556.00

JUMLAH TENAGA KERJA 330,281.00


B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,825.20 147,378.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 46,223.10 2,311.16

JUMLAH HARGA BAHAN 534,662.76


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 864,943.76
E. Profit 15% *D 129,741.56
F. Harga Satuan Pekerjaan (D+E) 994,685.32

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang Besi L.02 OH 0.0200 162,400.00 3,248.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0200 203,000.00 4,060.00

JUMLAH TENAGA KERJA 16,240.00


B. BAHAN
Kawat Las Listrik kg 0.4000 46,223.10 18,489.24
Solar kg 0.3000 18,100.00 5,430.00
Page 584 of 649
Minyak pelumas (oli) kg 0.0400 31,881.15 1,275.25

JUMLAH HARGA BAHAN 25,194.49


C. PERALATAN
Sewa alat jam 0.1700 - -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 41,434.49
E. Profit 15% *D 6,215.17
F. Harga Satuan Pekerjaan (D+E) 47,649.66

Page 585 of 649


A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang L.02 OH 0.8000 162,400.00 129,920.00
Kepala tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L,04 OH 0.0400 203,000.00 8,120.00

JUMLAH TENAGA KERJA 164,024.00


B. BAHAN
Sunscreen alumunium m2 1.0000 1,674,750.00 1,674,750.00

JUMLAH HARGA BAHAN 1,674,750.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,838,774.00
E. Profit 15% *D 275,816.10
F. Harga Satuan Pekerjaan (D+E) 2,114,590.10

A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang L.02 OH 1.0000 162,400.00 162,400.00
Kepala tukang L.03 OH 0.1000 203,000.00 20,300.00
Mandor L,04 OH 0.0500 203,000.00 10,150.00

JUMLAH TENAGA KERJA 314,650.00


B. BAHAN
Rolling door-alumunium tebal 0,8 mm m2 1.0000 429,852.50 429,852.50

JUMLAH HARGA BAHAN 429,852.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 744,502.50
E. Profit 15% *D 111,675.38
F. Harga Satuan Pekerjaan (D+E) 856,177.88

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 121,800.00 5,237.40
Tukang khusus aluminium L.02 OH 0.0430 162,400.00 6,983.20
Kepala tukang L.03 OH 0.0043 203,000.00 872.90
Mandor L,04 OH 0.0021 203,000.00 426.30

JUMLAH TENAGA KERJA 13,519.80


B. BAHAN
Kusen Alumunium 3 inch silver m 1.1000 67,548.25 74,303.08
Skrup fixer buah 2.0000 2,344.65 4,689.30
Sealant tube 0.0600 38,798.38 2,327.90

JUMLAH HARGA BAHAN 81,320.28


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 94,840.08
E. Profit 15% *D 14,226.01
F. Harga Satuan Pekerjaan (D+E) 109,066.09

A. 4.2.1.13. ck Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 121,800.00 10,353.00
Tukang khusus aluminium L.02 OH 0.0850 162,400.00 13,804.00
Kepala tukang L.03 OH 0.0090 203,000.00 1,827.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 26,999.00


B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 106,067.50 466,697.00
Profil kaca m 4.5000 6,699.00 30,145.50
Sealant tube 0.2700 38,798.38 10,475.56
Kaca bening tebal 5 mm m2 1.1000 147,936.25 162,729.88
JUMLAH HARGA BAHAN 670,047.94
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,046.94
E. Profit 15% *D 104,557.04
F. Harga Satuan Pekerjaan (D+E) 801,603.98

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang khusus aluminium L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Vertical blinds m2 1.0000 70,618.63 70,618.63

Page 586 of 649


JUMLAH HARGA BAHAN 70,618.63
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 180,847.63
E. Profit 15% *D 27,127.14
F. Harga Satuan Pekerjaan (D+E) 207,974.77

Page 587 of 649


A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 121,800.00 203,406.00
Tukang las konstruksi L.02 OH 1.6700 162,400.00 271,208.00
Kepala tukang L.03 OH 0.1670 203,000.00 33,901.00
Mandor L,04 OH 0.0830 203,000.00 16,849.00

JUMLAH TENAGA KERJA 525,364.00


B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 10,048.50 62,069.58
Pengelasan cm 27.0800 2,125.00 57,545.00

JUMLAH HARGA BAHAN 119,614.58


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 644,978.58
E. Profit 15% *D 96,746.79
F. Harga Satuan Pekerjaan (D+E) 741,725.37

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0050 203,000.00 1,015.00

JUMLAH TENAGA KERJA 31,465.00


B. BAHAN
Kawat nyamuk logam m2 1.1000 26,516.88 29,168.56
Pengelasan cm 11.1100 2,125.00 23,608.75
Besi strip 2 x 3 cm kg 1.7160 10,048.50 17,243.23

JUMLAH HARGA BAHAN 70,020.54


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 101,485.54
E. Profit 15% *D 15,222.83
F. Harga Satuan Pekerjaan (D+E) 116,708.37

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Jendela nako (kerangka + kaca 5 mm) m2 1.1000 187,795.30 206,574.83
Paku sekrup 1 cm -2,5 cm buah 10.0000 26,423.83 264,238.33
Besi strip 2 x 3 cm m 7.0000 10,048.50 70,339.50

JUMLAH HARGA BAHAN 541,152.66


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 602,255.66
E. Profit 15% *D 90,338.35
F. Harga Satuan Pekerjaan (D+E) 692,594.01

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang besi L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0010 203,000.00 203.00

JUMLAH TENAGA KERJA 61,103.00


B. BAHAN
Seng plat BJLS 27 uk. 0.9 x 1.83 (m) m 1.0500 55,825.00 58,616.25
Paku sekrup 1 cm -2,5 cm kg 0.0150 26,423.83 396.36
Kayu gergajian kelas III, papan m3 0.0190 2,535,470.00 48,173.93

JUMLAH HARGA BAHAN 107,186.54


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 168,289.54
E. Profit 15% *D 25,243.43
F. Harga Satuan Pekerjaan (D+E) 193,532.97

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang besi L.02 OH 0.3000 162,400.00 48,720.00
Kepala tukang L.03 OH 0.0300 203,000.00 6,090.00
Mandor L,04 OH 0.0080 203,000.00 1,624.00

JUMLAH TENAGA KERJA 74,704.00

Page 588 of 649


B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) m 1.0500 44,660.00 46,893.00
Paku sekrup 1 cm -2,5 cm kg 0.0100 26,423.83 264.24
Besi strip 2 x 3 cm m3 0.5000 10,048.50 5,024.25

JUMLAH HARGA BAHAN 52,181.49


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 126,885.49
E. Profit 15% *D 19,032.82
F. Harga Satuan Pekerjaan (D+E) 145,918.31

Page 589 of 649


A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Besi L.02 OH 0.2500 162,400.00 40,600.00
Kepala tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L,04 OH 0.0130 203,000.00 2,639.00

JUMLAH TENAGA KERJA 78,764.00


B. BAHAN
Besi Hollow 40x40 mm t : 1,8mm m 3.5000 9,769.38 34,192.81
assesoris (perkuatan, las, dll) Ls 100%xrangka 9,769.38 9,769.38

JUMLAH HARGA BAHAN 43,962.19


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 122,726.19
E. Profit 15% *D 18,408.93
F. Harga Satuan Pekerjaan (D+E) 141,135.12

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L,04 OH 0.0180 203,000.00 3,654.00

JUMLAH TENAGA KERJA 110,229.00


B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m 4.0000 127,454.06 509,816.23
assesoris (perkuatan, las, dll) Ls 100%xrangka 127,454.06 127,454.06

JUMLAH HARGA BAHAN 637,270.29


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 747,499.29
E. Profit 15% *D 112,124.89
F. Harga Satuan Pekerjaan (D+E) 859,624.18

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 43.5000 1,627.00 70,774.50
Pasir pasang m3 0.0800 150,000.00 12,000.00

JUMLAH HARGA BAHAN 280,574.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 396,284.50
E. Profit 15% *D 59,442.67
F. Harga Satuan Pekerjaan (D+E) 455,727.18

A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 32.9500 1,627.00 53,609.65
Pasir pasang m3 0.0910 150,000.00 13,650.00

JUMLAH HARGA BAHAN 265,059.65


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 380,769.65
E. Profit 15% *D 57,115.45
F. Harga Satuan Pekerjaan (D+E) 437,885.10

A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Page 590 of 649
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 26.5500 1,627.00 43,196.85
Pasir pasang m3 0.0930 150,000.00 13,950.00

JUMLAH HARGA BAHAN 254,946.85


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 370,656.85
E. Profit 15% *D 55,598.53
F. Harga Satuan Pekerjaan (D+E) 426,255.38

Page 591 of 649


A. 4.4.1.4. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 22.2200 1,627.00 36,151.94
Pasir pasang m3 0.1020 150,000.00 15,300.00

JUMLAH HARGA BAHAN 249,251.94


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 364,961.94
E. Profit 15% *D 54,744.29
F. Harga Satuan Pekerjaan (D+E) 419,706.23

A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 18.5000 1,627.00 30,099.50
Pasir pasang m3 0.1220 150,000.00 18,300.00

JUMLAH HARGA BAHAN 246,199.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 361,909.50
E. Profit 15% *D 54,286.42
F. Harga Satuan Pekerjaan (D+E) 416,195.93

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang Batu L.02 OH 0.2000 162,400.00 32,480.00
Kepala tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L,04 OH 0.0300 203,000.00 6,090.00

JUMLAH TENAGA KERJA 115,710.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,300.00 197,800.00
Semen portland kg 10.0800 1,627.00 16,400.16
Kapur padam m3 0.0275 - -
Pasir pasang m3 0.0925 150,000.00 13,875.00

JUMLAH HARGA BAHAN 228,075.16


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 343,785.16
E. Profit 15% *D 51,567.77
F. Harga Satuan Pekerjaan (D+E) 395,352.93

A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 18.9500 1,627.00 30,831.65
Pasir pasang m3 0.0380 150,000.00 5,700.00

JUMLAH HARGA BAHAN 135,431.65


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 193,286.65
E. Profit 15% *D 28,993.00
F. Harga Satuan Pekerjaan (D+E) 222,279.65

A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

Page 592 of 649


JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 14.3700 1,627.00 23,379.99
Pasir pasang m3 0.0400 150,000.00 6,000.00

JUMLAH HARGA BAHAN 128,279.99


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,134.99
E. Profit 15% *D 27,920.25
F. Harga Satuan Pekerjaan (D+E) 214,055.24

Page 593 of 649


A. 4.4.1.9. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 11.5000 1,627.00 18,710.50
Pasir pasang m3 0.0430 150,000.00 6,450.00

JUMLAH HARGA BAHAN 124,060.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 181,915.50
E. Profit 15% *D 27,287.33
F. Harga Satuan Pekerjaan (D+E) 209,202.83

A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 9.6800 1,627.00 15,749.36
Pasir pasang m3 0.0450 150,000.00 6,750.00

JUMLAH HARGA BAHAN 121,399.36


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 179,254.36
E. Profit 15% *D 26,888.15
F. Harga Satuan Pekerjaan (D+E) 206,142.51

A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0490 150,000.00 7,350.00

JUMLAH HARGA BAHAN 119,786.64


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 177,641.64
E. Profit 15% *D 26,646.25
F. Harga Satuan Pekerjaan (D+E) 204,287.89

A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 6.5000 1,627.00 10,575.50
Pasir pasang m3 0.0500 150,000.00 7,500.00

JUMLAH HARGA BAHAN 116,975.50


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 174,830.50
E. Profit 15% *D 26,224.58
F. Harga Satuan Pekerjaan (D+E) 201,055.08

A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

Page 594 of 649


JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,300.00 98,900.00
Semen portland kg 4.5000 1,627.00 7,321.50
Kapur bakar m3 0.0150 79,092.86 1,186.39
Pasir pasang m3 0.0500 150,000.00 7,500.00

JUMLAH HARGA BAHAN 114,907.89


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 172,762.89
E. Profit 15% *D 25,914.43
F. Harga Satuan Pekerjaan (D+E) 198,677.33

Page 595 of 649


A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 8,150.45 244,513.50
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 267,660.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 325,515.50
E. Profit 15% *D 48,827.33
F. Harga Satuan Pekerjaan (D+E) 374,342.83

A. 4.4.1.23.a Pemasangan 1 m2 dinding terawang (rooster) 20x20 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1000 162,400.00 16,240.00
Kepala tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 57,855.00


B. BAHAN
Rooster block uk. 20x20 (cm) buah 25.0000 15,072.75 376,818.75
Semen portland kg 11.0000 1,627.00 17,897.00
Pasir pasang m3 0.0350 150,000.00 5,250.00

JUMLAH HARGA BAHAN 399,965.75


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 457,820.75
E. Profit 15% *D 68,673.11
F. Harga Satuan Pekerjaan (D+E) 526,493.86

A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.02 OH 0.1500 162,400.00 24,360.00
Kepala tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L,04 OH 0.0150 203,000.00 3,045.00

JUMLAH TENAGA KERJA 66,990.00


B. BAHAN
Batu bata berongga uk. 5x11x24 (cm) buah 70.0000 1,563.10 109,417.00
Semen portland kg 14.0000 1,627.00 22,778.00
Pasir pasang m3 0.0320 150,000.00 4,800.00

JUMLAH HARGA BAHAN 136,995.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 203,985.00
E. Profit 15% *D 30,597.75
F. Harga Satuan Pekerjaan (D+E) 234,582.75

A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Batu L.02 OH 1.3000 162,400.00 211,120.00
Kepala tukang L.03 OH 0.1300 203,000.00 26,390.00
Mandor L,04 OH 0.0030 203,000.00 609.00

Page 596 of 649


JUMLAH TENAGA KERJA 319,725.00
B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 8,708.70 73,153.08
Semen Mortar kg 0.4730 7,458.22 3,527.74

JUMLAH HARGA BAHAN 76,680.82


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 396,405.82
E. Profit 15% *D 59,460.87
F. Harga Satuan Pekerjaan (D+E) 455,866.69

Page 597 of 649


A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 121,800.00 81,727.80
Tukang Batu L.02 OH 1.3000 162,400.00 211,120.00
Kepala tukang L.03 OH 0.1300 203,000.00 26,390.00
Mandor L,04 OH 0.0030 203,000.00 609.00

JUMLAH TENAGA KERJA 319,846.80


B. BAHAN
Bata Ringan 10x20x60cm m3 8.4000 11,165.00 93,786.00
Semen Mortar kg 0.0630 7,458.22 469.87

JUMLAH HARGA BAHAN 94,255.87


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 414,102.67
E. Profit 15% *D 62,115.40
F. Harga Satuan Pekerjaan (D+E) 476,218.07

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 15.5040 1,627.00 25,225.01
Pasir pasang m3 0.0160 150,000.00 2,400.00
JUMLAH HARGA BAHAN 27,625.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 94,615.01
E. Profit 15% *D 14,192.25
F. Harga Satuan Pekerjaan (D+E) 108,807.26

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 10.2240 1,627.00 16,634.45
Pasir pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 19,634.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,624.45
E. Profit 15% *D 12,993.67
F. Harga Satuan Pekerjaan (D+E) 99,618.12

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 7.7760 1,627.00 12,651.55
Pasir pasang m3 0.0230 150,000.00 3,450.00
JUMLAH HARGA BAHAN 16,101.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,091.55
E. Profit 15% *D 12,463.73
F. Harga Satuan Pekerjaan (D+E) 95,555.28

A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.2400 1,627.00 10,152.48
Pasir pasang m3 0.0240 150,000.00 3,600.00
JUMLAH HARGA BAHAN 13,752.48
C. PERALATAN
-

Page 598 of 649


JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 80,742.48
E. Profit 15% *D 12,111.37
F. Harga Satuan Pekerjaan (D+E) 92,853.85

Page 599 of 649


A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,324.37
E. Profit 15% *D 11,898.66
F. Harga Satuan Pekerjaan (D+E) 91,223.02

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 4.4160 1,627.00 7,184.83
Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 11,234.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,224.83
E. Profit 15% *D 11,733.72
F. Harga Satuan Pekerjaan (D+E) 89,958.56

A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.9360 1,627.00 6,403.87
Pasir pasang m3 0.0280 150,000.00 4,200.00
JUMLAH HARGA BAHAN 10,603.87
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 77,593.87
E. Profit 15% *D 11,639.08
F. Harga Satuan Pekerjaan (D+E) 89,232.95

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 3.4560 1,627.00 5,622.91
Pasir pasang m3 0.0290 150,000.00 4,350.00
JUMLAH HARGA BAHAN 9,972.91
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,962.91
E. Profit 15% *D 11,544.44
F. Harga Satuan Pekerjaan (D+E) 88,507.35

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 13.6320 1,627.00 22,179.26
Pasir pasang m3 0.0270 150,000.00 4,050.00
JUMLAH HARGA BAHAN 26,229.26
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 115,955.26
E. Profit 15% *D 17,393.29
F. Harga Satuan Pekerjaan (D+E) 133,348.55

Page 600 of 649


A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 121,800.00 31,668.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 70,847.00
B. BAHAN
Semen portland Kg 10.3680 1,627.00 16,868.74
Pasir pasang m3 0.0310 150,000.00 4,650.00
JUMLAH HARGA BAHAN 21,518.74
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 92,365.74
E. Profit 15% *D 13,854.86
F. Harga Satuan Pekerjaan (D+E) 106,220.60

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 8.3200 1,627.00 13,536.64
Pasir pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 18,336.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 108,062.64
E. Profit 15% *D 16,209.40
F. Harga Satuan Pekerjaan (D+E) 124,272.04

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 6.9120 1,627.00 11,245.82
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 16,495.82
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 106,221.82
E. Profit 15% *D 15,933.27
F. Harga Satuan Pekerjaan (D+E) 122,155.10

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Batu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0220 203,000.00 4,466.00
JUMLAH TENAGA KERJA 89,726.00
B. BAHAN
Semen portland Kg 5.8880 1,627.00 9,579.78
Pasir pasang m3 0.0360 150,000.00 5,400.00
JUMLAH HARGA BAHAN 14,979.78
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 104,705.78
E. Profit 15% *D 15,705.87
F. Harga Satuan Pekerjaan (D+E) 120,411.64

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 5.1840 1,627.00 8,434.37
Pasir pasang m3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 12,334.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 46,032.37
E. Profit 15% *D 6,904.86
F. Harga Satuan Pekerjaan (D+E) 52,937.22

Page 601 of 649


A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 121,800.00 9,744.00
Tukang Batu L.03 OH 0.4000 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.0400 203,000.00 8,120.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 83,636.00
B. BAHAN
Semen portland Kg 0.5000 1,627.00 813.50
Pasir pasang m3 0.0130 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,763.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,399.50
E. Profit 15% *D 12,959.93
F. Harga Satuan Pekerjaan (D+E) 99,359.43

A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 57,855.00
B. BAHAN
Semen portland Kg 4.3200 1,627.00 7,028.64
Pasir pasang Kg 0.0060 150,000.00 900.00
JUMLAH HARGA BAHAN 7,928.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,783.64
E. Profit 15% *D 9,867.55
F. Harga Satuan Pekerjaan (D+E) 75,651.19

A. 4.4.2.24. Pemasangan 1 m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Batu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Semen portland Kg 3.1080 1,627.00 5,056.72
JUMLAH HARGA BAHAN 5,056.72
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 38,754.72
E. Profit 15% *D 5,813.21
F. Harga Satuan Pekerjaan (D+E) 44,567.92

A. 4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang Batu L.03 OH 0.0350 162,400.00 5,684.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
Semen portland Kg 1.6000 1,627.00 2,603.20
JUMLAH HARGA BAHAN 2,603.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 18,437.20
E. Profit 15% *D 2,765.58
F. Harga Satuan Pekerjaan (D+E) 21,202.78

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 121,800.00 36,540.00
Tukang Batu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0150 203,000.00 3,045.00
JUMLAH TENAGA KERJA 66,990.00
B. BAHAN
Semen portland Kg 6.3400 1,627.00 10,315.18
Pasir pasang m3 0.0120 150,000.00 1,800.00
JUMLAH HARGA BAHAN 12,115.18
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,105.18
E. Profit 15% *D 11,865.78
F. Harga Satuan Pekerjaan (D+E) 90,970.96

Page 602 of 649


A. 4.4.2.27. Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Batu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Semen portland Kg 3.2500 1,627.00 5,287.75
JUMLAH HARGA BAHAN 5,287.75
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 49,947.75
E. Profit 15% *D 7,492.16
F. Harga Satuan Pekerjaan (D+E) 57,439.91

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 121,800.00 32,886.00
Tukang Batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0140 203,000.00 2,842.00
Mandor L.04 OH 0.0140 203,000.00 2,842.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Ubin abu-abu 20 x 20 (cm) Bh 26.5000 7,257.25 192,317.13
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 215,987.93
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 276,481.93
E. Profit 15% *D 41,472.29
F. Harga Satuan Pekerjaan (D+E) 317,954.21

A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 121,800.00 32,886.00
Tukang Batu L.02 OH 0.1350 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.0140 203,000.00 2,842.00
Mandor L.04 OH 0.0140 203,000.00 2,842.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Ubin berwarna 20 x 20 (cm) Bh 26.5000 9,825.20 260,367.80
Semen portland Kg 10.4000 1,627.00 16,920.80
Semen warna (sika graut) Kg 1.0000 22,250.00 22,250.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 306,288.60
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 366,782.60
E. Profit 15% *D 55,017.39
F. Harga Satuan Pekerjaan (D+E) 421,799.99

A. 4.4.3.13. Pemasangan 1 m2 lantai ubin Keramik ukuran 60cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 60x60 (cm) putih/ berwarna granit Bh 3.1000 #N/A #N/A
Semen portland Kg 9.6000 1,627.00 15,619.20
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
Pasir pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.35.ck Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 40x40 (cm) polos doos 1.0500 58,333.33 61,250.00
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m 3
0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 117,645.00
C. PERALATAN

Page 603 of 649


-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 171,237.00
E. Profit 15% *D 25,685.55
F. Harga Satuan Pekerjaan (D+E) 196,922.55

Page 604 of 649


A. 4.4.3.35. ck Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 30x30 (cm) polos doos 1.0500 59,286.15 62,250.46
Semen portland Kg 10.0000 1,627.00 16,270.00
Pasir pasang m 3
0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 1.5000 22,250.00 33,375.00
JUMLAH HARGA BAHAN 118,645.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 172,237.46
E. Profit 15% *D 25,835.62
F. Harga Satuan Pekerjaan (D+E) 198,073.08

A. 4.4.3.36. ck Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 121,800.00 29,232.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0120 203,000.00 2,436.00
JUMLAH TENAGA KERJA 53,592.00
B. BAHAN
Keramik 20x20 (cm) polos doos 1.0500 57,644.48 60,526.71
Semen portland Kg 10.4000 1,627.00 16,920.80
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.5000 22,250.00 11,125.00
JUMLAH HARGA BAHAN 95,322.51
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 148,914.51
E. Profit 15% *D 22,337.18
F. Harga Satuan Pekerjaan (D+E) 171,251.68

A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint Keramik 10 x 30 cm (Polos) Bh 5.3000 8,932.00 47,339.60
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m3 0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0250 22,250.00 556.25
JUMLAH HARGA BAHAN 50,200.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,898.63
E. Profit 15% *D 12,584.79
F. Harga Satuan Pekerjaan (D+E) 96,483.42

A. 4.4.3.39.ck Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 121,800.00 10,962.00
Tukang Batu L.02 OH 0.0900 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Plint keramik 10x40 Cm ( polos) Bh 5.3000 3,645.83 19,322.92
Semen portland Kg 1.1400 1,627.00 1,854.78
Pasir pasang m 3
0.0030 150,000.00 450.00
Semen warna (sika graut) Kg 0.0250 22,250.00 556.25
JUMLAH HARGA BAHAN 22,183.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,881.95
E. Profit 15% *D 8,382.29
F. Harga Satuan Pekerjaan (D+E) 64,264.24

A. 4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Marmer 100 x 100 cm Bh 1.0600 279,125.00 295,872.50
Semen portland Kg 8.1900 1,627.00 13,325.13
Pasir pasang m3 0.0450 150,000.00 6,750.00
Semen warna (sika graut) Kg 0.1340 22,250.00 2,981.50
JUMLAH HARGA BAHAN 318,929.13

Page 605 of 649


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 475,239.13
E. Profit 15% *D 71,285.87
F. Harga Satuan Pekerjaan (D+E) 546,525.00

Page 606 of 649


A. 4.4.3.46. Pemasangan 1 m2 lantai parquet kayu
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Parquette lantai m2 1.0500 116,674.25 122,507.96
Lem (standar aica aibond) Kg 0.6000 31,634.17 18,980.50
JUMLAH HARGA BAHAN 141,488.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,798.46
E. Profit 15% *D 44,669.77
F. Harga Satuan Pekerjaan (D+E) 342,468.23

A. 4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Parquette lantai m2 1.0500 116,674.25 122,507.96
Lem (standar aica aibond) Kg 0.6000 31,634.17 18,980.50
JUMLAH HARGA BAHAN 141,488.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,798.46
E. Profit 15% *D 44,669.77
F. Harga Satuan Pekerjaan (D+E) 342,468.23

A. 4.4.3.54. ck Pemasangan 1 m2 dinding keramik 20cmx 25cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 121,800.00 109,620.00
Tukang Batu L.02 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0450 203,000.00 9,135.00
JUMLAH TENAGA KERJA 200,970.00
B. BAHAN
Keramik 20x25 (cm) polos Bh 20.0000 3,200.00 64,000.00
Semen portland Kg 9.3000 1,627.00 15,131.10
Pasir pasang m3 0.0180 150,000.00 2,700.00
Semen warna (sika graut) Kg 1.9400 22,250.00 43,165.00
JUMLAH HARGA BAHAN 124,996.10
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 325,966.10
E. Profit 15% *D 48,894.91
F. Harga Satuan Pekerjaan (D+E) 374,861.01

A. 4.4.3.57. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu paras Bh 1.1000 174,174.00 191,591.40
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m 3
0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 215,958.65
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 372,268.65
E. Profit 15% *D 55,840.30
F. Harga Satuan Pekerjaan (D+E) 428,108.95

A. 4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Batu L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 156,310.00
B. BAHAN
Batu alam m2 1.1000 200,970.00 221,067.00
Semen portland Kg 11.7500 1,627.00 19,117.25
Pasir pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 245,434.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 401,744.25
Page 607 of 649
E. Profit 15% *D 60,261.64
F. Harga Satuan Pekerjaan (D+E) 462,005.89

Page 608 of 649


A. 4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Batu L.02 OH 0.1750 162,400.00 28,420.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 74,907.00
B. BAHAN
Wallpaper polos m 2.2000 42,371.18 93,216.59
Lem (standar Fox)/ perekat Kg 0.2500 25,902.80 6,475.70
JUMLAH HARGA BAHAN 99,692.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 174,599.29
E. Profit 15% *D 26,189.89
F. Harga Satuan Pekerjaan (D+E) 200,789.18

A. 4.4.3.63. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Batu L.02 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0030 3,534,693.04 10,604.08
Paku sekrup (kg) Kg 0.0500 49,126.00 2,456.30
JUMLAH HARGA BAHAN 13,060.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 50,818.38
E. Profit 15% *D 7,622.76
F. Harga Satuan Pekerjaan (D+E) 58,441.14

A. 4.4.3.66. Pemasangan 1 m² paving block berwarna tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Batu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 122,063.90
B. BAHAN
Conblock tebal 6 cm (polos) m² 1.0100 61,266.67 61,879.33
Pasir beton m3 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 69,379.33
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 191,443.23
E. Profit 15% *D 28,716.49
F. Harga Satuan Pekerjaan (D+E) 220,159.72

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 121,800.00 3,654.00
Tukang Kayu L.02 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.0070 203,000.00 1,421.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 17,255.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 5 mm m2 1.1000 30,703.75 33,774.13
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 114,999.50 43,124.81
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 43,643.45
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,108.45
E. Profit 15% *D 11,266.27
F. Harga Satuan Pekerjaan (D+E) 86,374.72

Page 609 of 649


A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 251,720.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0150 3,036,293.94 45,544.41
Paku berbagai ukuran (2"-5") Kg 0.0100 17,287.99 172.88
JUMLAH HARGA BAHAN 45,717.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 297,437.29
E. Profit 15% *D 44,615.59
F. Harga Satuan Pekerjaan (D+E) 342,052.88

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 22,330.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 58,250.00 21,203.00
Paku sekrup (kg) Kg 0.1100 49,126.00 5,403.86
JUMLAH HARGA BAHAN 26,606.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,936.86
E. Profit 15% *D 7,340.53
F. Harga Satuan Pekerjaan (D+E) 56,277.39

A. 4.5.1.9.a Pemasangan 1 m list gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List gypsum m 1.0500 24,510.57 25,736.10
Paku sekrup (kg) Kg 0.0100 49,126.00 491.26
JUMLAH HARGA BAHAN 26,227.36
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 42,061.36
E. Profit 15% *D 6,309.20
F. Harga Satuan Pekerjaan (D+E) 48,370.56

A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang Kayu L.02 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.03 OH 0.0050 203,000.00 1,015.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 15,834.00
B. BAHAN
List kayu profil m 1.0500 40,007.92 42,008.31
Paku sekrup 1 cm -2,5 cm Kg 0.0100 26,423.83 264.24
JUMLAH HARGA BAHAN 42,272.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 58,106.55
E. Profit 15% *D 8,715.98
F. Harga Satuan Pekerjaan (D+E) 66,822.53

A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40.2mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Besi L.02 OH 0.3500 162,400.00 56,840.00
Kepala Tukang L.03 OH 0.0350 203,000.00 7,105.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 110,229.00
B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m1 4.0000 127,454.06 509,816.23
Assesoris (perkuatan, las dll) Ls 100%*rangka 127,454.06 127,454.06
JUMLAH HARGA BAHAN 637,270.29
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 747,499.29
E. Profit 15% *D 112,124.89
F. Harga Satuan Pekerjaan (D+E) 859,624.18

Page 610 of 649


A. 4.5.1.4.a Pemasangan 1 m2 langit-langit eternit ukuran( 1 x 1 m) tebal 4 mm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang Kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 31,465.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 4 mm Lembar 1.5000 26,433.14 39,649.71
Paku berbagai ukuran (2"-5") Kg 0.0500 17,287.99 864.40
JUMLAH HARGA BAHAN 40,514.11
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,979.11
E. Profit 15% *D 10,796.87
F. Harga Satuan Pekerjaan (D+E) 82,775.97

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 33,698.00
B. BAHAN
Atap Genteng kodok Bh 25.0000 4,577.65 114,441.25
JUMLAH HARGA BAHAN 114,441.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 148,139.25
E. Profit 15% *D 22,220.89
F. Harga Satuan Pekerjaan (D+E) 170,360.14

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0020 203,000.00 406.00
JUMLAH TENAGA KERJA 85,666.00
B. BAHAN
Bubungan atap (nok) genteng kodok Bh 5.0000 4,745.13 23,725.63
Semen portland Kg 8.0000 1,627.00 13,016.00
Pasir pasang m 3
0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 41,541.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 127,207.63
E. Profit 15% *D 19,081.14
F. Harga Satuan Pekerjaan (D+E) 146,288.77

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0670 162,400.00 10,880.80
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 30,774.80
B. BAHAN
Rooflight fibreglass uk. 1,8 x 0,9 (m) Lembar 0.6000 98,810.25 59,286.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 60,553.23
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 91,328.03
E. Profit 15% *D 13,699.20
F. Harga Satuan Pekerjaan (D+E) 105,027.23

A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 0.5000 83,151.34 41,575.67
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 44,366.39
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,846.39
E. Profit 15% *D 11,526.96
F. Harga Satuan Pekerjaan (D+E) 88,373.35

Page 611 of 649


A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.11 OH 0.0080 203,000.00 1,624.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 0.6000 73,549.44 44,129.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 46,920.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 79,400.38
E. Profit 15% *D 11,910.06
F. Harga Satuan Pekerjaan (D+E) 91,310.44

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 0.6000 65,426.90 39,256.14
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 42,046.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 73,308.86
E. Profit 15% *D 10,996.33
F. Harga Satuan Pekerjaan (D+E) 84,305.19

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 0.7500 59,397.80 44,548.35
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 47,339.07
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,601.07
E. Profit 15% *D 11,790.16
F. Harga Satuan Pekerjaan (D+E) 90,391.23

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 102,106.58 35,737.30
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,528.02
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,790.02
E. Profit 15% *D 10,468.50
F. Harga Satuan Pekerjaan (D+E) 80,258.53

A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 91,895.93 38,596.29
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,387.01
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,649.01
E. Profit 15% *D 10,897.35
F. Harga Satuan Pekerjaan (D+E) 83,546.36

Page 612 of 649


A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 81,685.27 35,941.52
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,732.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,994.24
E. Profit 15% *D 10,499.14
F. Harga Satuan Pekerjaan (D+E) 80,493.37

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 71,474.61 36,452.05
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 39,242.77
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,504.77
E. Profit 15% *D 10,575.72
F. Harga Satuan Pekerjaan (D+E) 81,080.48

A. 4.5.2.15. a Pemasangan 1 m2 atap zincalum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck",
68,106.50
T=0,4 mm m 1.0000 68,106.50
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 48,009.50 38,407.60
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 41,198.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,460.32
E. Profit 15% *D 10,869.05
F. Harga Satuan Pekerjaan (D+E) 83,329.37

A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 0.3700 97,693.75 36,146.69
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,937.41
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 70,199.41
E. Profit 15% *D 10,529.91
F. Harga Satuan Pekerjaan (D+E) 80,729.32

Page 613 of 649


A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 0.3800 87,924.38 33,411.26
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 36,201.98
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,463.98
E. Profit 15% *D 10,119.60
F. Harga Satuan Pekerjaan (D+E) 77,583.58

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 0.4600 82,621.00 38,005.66
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 40,796.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,058.38
E. Profit 15% *D 10,808.76
F. Harga Satuan Pekerjaan (D+E) 82,867.14

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 0.4900 73,298.23 35,916.13
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 38,706.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,968.85
E. Profit 15% *D 10,495.33
F. Harga Satuan Pekerjaan (D+E) 80,464.18

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 0.5700 61,295.85 34,938.63
Paku asbes Kg 0.1200 23,255.99 2,790.72
JUMLAH HARGA BAHAN 37,729.35
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 68,991.35
E. Profit 15% *D 10,348.70
F. Harga Satuan Pekerjaan (D+E) 79,340.06

A. 4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 6,268.35 68,951.85
Paku berbagai ukuran (2"-5") Kg 0.0300 17,287.99 518.64
JUMLAH HARGA BAHAN 69,470.49
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 114,130.49
E. Profit 15% *D 17,119.57
F. Harga Satuan Pekerjaan (D+E) 131,250.06

Page 614 of 649


A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 47,500.00 61,750.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 66,818.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 109,651.32
E. Profit 15% *D 16,447.70
F. Harga Satuan Pekerjaan (D+E) 126,099.01

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.0100 203,000.00 2,030.00
Mandor L.15 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 42,833.00
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 47,500.00 95,000.00
Paku berbagai ukuran (1/2"-1") Kg 0.2000 25,341.59 5,068.32
JUMLAH HARGA BAHAN 100,068.32
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 142,901.32
E. Profit 15% *D 21,435.20
F. Harga Satuan Pekerjaan (D+E) 164,336.51

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang Kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.11 OH 0.0200 203,000.00 4,060.00
Mandor L.15 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 89,320.00
B. BAHAN
Bubungan atap (nok) genteng beton Bh 3.5000 7,368.90 25,791.15
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
Semen portland Kg 10.8000 1,627.00 17,571.60
Pasir pasang m3 0.0320 150,000.00 4,800.00
Semen warna (sika graut) Kg 1.0000 22,250.00 22,250.00
JUMLAH HARGA BAHAN 71,679.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 160,999.83
E. Profit 15% *D 24,149.97
F. Harga Satuan Pekerjaan (D+E) 185,149.80

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang Kayu L.03 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.11 OH 0.0150 203,000.00 3,045.00
Mandor L.15 OH 0.0130 203,000.00 2,639.00
JUMLAH TENAGA KERJA 60,494.00
B. BAHAN
Bubungan atap (nok) metal (biasa/ polos) Bh 1.1000 36,286.25 39,914.88
Paku berbagai ukuran (1/2"-1") Kg 0.0500 25,341.59 1,267.08
JUMLAH HARGA BAHAN 41,181.95
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 101,675.95
E. Profit 15% *D 15,251.39
F. Harga Satuan Pekerjaan (D+E) 116,927.35

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang Kayu L.03 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.11 OH 0.0060 203,000.00 1,218.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 26,796.00
B. BAHAN
Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 0.7000 40,194.00 28,135.80
Paku berbagai ukuran (1/2"-1") Kg 0.0200 25,341.59 506.83
JUMLAH HARGA BAHAN 28,642.63
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 55,438.63
E. Profit 15% *D 8,315.79
F. Harga Satuan Pekerjaan (D+E) 63,754.43

Page 615 of 649


A. 4.5.2.40. Pemasangan 1 m1 nok atap seng
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 32,277.00
B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 0.3000 44,660.00 13,398.00
Paku berbagai ukuran (1/2"-1") Kg 0.0400 25,341.59 1,013.66
JUMLAH HARGA BAHAN 14,411.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 46,688.66
E. Profit 15% *D 7,003.30
F. Harga Satuan Pekerjaan (D+E) 53,691.96

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang Kayu L.03 OH 0.0500 162,400.00 8,120.00
Kepala Tukang L.11 OH 0.0050 203,000.00 1,015.00
Mandor L.15 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 29,029.00
B. BAHAN
Aluminium foil air cell bubble m2 1.0500 68,414.47 71,835.19
JUMLAH HARGA BAHAN 71,835.19
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 100,864.19
E. Profit 15% *D 15,129.63
F. Harga Satuan Pekerjaan (D+E) 115,993.82

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 121,800.00 852,600.00
Tukang kayu L.03 OH 21.0000 162,400.00 3,410,400.00
Kepala tukang L.03 OH 2.1000 203,000.00 426,300.00
Mandor L.04 OH 0.3500 203,000.00 71,050.00
JUMLAH TENAGA KERJA 4,760,350.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,622,735.97 3,985,009.57
Paku berbagai ukuran (2"-5") Kg 1.2500 17,287.99 21,609.98
Lem kayu Kg 1.0000 35,833.33 35,833.33
JUMLAH HARGA BAHAN 4,042,452.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,802,802.88
E. Profit 15% *D 1,320,420.43
F. Harga Satuan Pekerjaan (D+E) 10,123,223.32

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 121,800.00 730,800.00
Tukang kayu L.03 OH 18.0000 162,400.00 2,923,200.00
Kepala Tukang L.03 OH 1.8000 203,000.00 365,400.00
Mandor L.04 OH 0.3000 203,000.00 60,900.00
JUMLAH TENAGA KERJA 4,080,300.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,822,286.84 3,386,744.21
Paku berbagai ukuran (2"-5") kg 1.2500 17,287.99 21,609.98
Lem kayu kg 1.0000 35,833.33 35,833.33

JUMLAH HARGA BAHAN 3,444,187.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,524,487.52
E. Profit 15% *D 1,128,673.13
F. Harga Satuan Pekerjaan (D+E) 8,653,160.65

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang Kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-

JUMLAH HARGA BAHAN 122,316.16


C. PERALATAN

Page 616 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 360,435.16
E. Profit 15% *D 54,065.27
F. Harga Satuan Pekerjaan (D+E) 414,500.43

Page 617 of 649


A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 121,800.00 42,630.00
Tukang kayu L.03 OH 1.0500 162,400.00 170,520.00
Kepala Tukang L.03 OH 0.1050 203,000.00 21,315.00
Mandor L.04 OH 0.0180 203,000.00 3,654.00
JUMLAH TENAGA KERJA 238,119.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,535,470.00 101,418.80
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40
-

JUMLAH HARGA BAHAN 102,283.20


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 340,402.20
E. Profit 15% *D 51,060.33
F. Harga Satuan Pekerjaan (D+E) 391,462.53

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Batu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 3,036,293.94 121,451.76
Lem kayu kg 0.5000 35,833.33 17,916.67
- -

JUMLAH HARGA BAHAN 139,368.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 819,418.42
E. Profit 15% *D 122,912.76
F. Harga Satuan Pekerjaan (D+E) 942,331.19

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 3,036,293.94 72,871.05
Lem kayu kg 0.3000 35,833.33 10,750.00
- -

JUMLAH HARGA BAHAN 83,621.05


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 627,661.05
E. Profit 15% *D 94,149.16
F. Harga Satuan Pekerjaan (D+E) 721,810.21

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 121,800.00 121,800.00
Tukang Kayu L.03 OH 3.0000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.3000 203,000.00 60,900.00
Mandor L.04 OH 0.0500 203,000.00 10,150.00
JUMLAH TENAGA KERJA 680,050.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 3,036,293.94 194,322.81
Lem kayu kg 0.5000 35,833.33 17,916.67
- -

JUMLAH HARGA BAHAN 212,239.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 892,289.48
E. Profit 15% *D 133,843.42
F. Harga Satuan Pekerjaan (D+E) 1,026,132.90

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 121,800.00 85,260.00
Tukang Kayu L.03 OH 2.1000 162,400.00 341,040.00
Kepala Tukang L.03 OH 0.2100 203,000.00 42,630.00
Mandor L.04 OH 0.0350 203,000.00 7,105.00
JUMLAH TENAGA KERJA 476,035.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67

Page 618 of 649


Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 183,625.14
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,660.14
E. Profit 15% *D 98,949.02
F. Harga Satuan Pekerjaan (D+E) 758,609.16

Page 619 of 649


A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,534,693.04 90,488.14
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.5000 35,833.33 17,916.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 89,040.88 89,040.88
JUMLAH HARGA BAHAN 198,205.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 742,245.93
E. Profit 15% *D 111,336.89
F. Harga Satuan Pekerjaan (D+E) 853,582.82

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 121,800.00 81,606.00
Tukang Kayu L.03 OH 2.0000 162,400.00 324,800.00
Kepala Tukang L.03 OH 0.2000 203,000.00 40,600.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 515,011.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,534,693.04 212,081.58
Paku berbagai ukuran (1/2"-1") kg 0.1500 25,341.59 3,801.24
-

JUMLAH HARGA BAHAN 215,882.82


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 730,893.82
E. Profit 15% *D 109,634.07
F. Harga Satuan Pekerjaan (D+E) 840,527.89

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 121,800.00 97,440.00
Tukang Kayu L.03 OH 2.4000 162,400.00 389,760.00
Kepala Tukang L.03 OH 0.2400 203,000.00 48,720.00
Mandor L.04 OH 0.0400 203,000.00 8,120.00
JUMLAH TENAGA KERJA 544,040.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,534,693.04 88,367.33
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.3000 35,833.33 10,750.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25

JUMLAH HARGA BAHAN 191,988.82


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 736,028.82
E. Profit 15% *D 110,404.32
F. Harga Satuan Pekerjaan (D+E) 846,433.15

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 121,800.00 103,530.00
Tukang Kayu L.03 OH 2.5500 162,400.00 414,120.00
Kepala Tukang L.03 OH 0.2550 203,000.00 51,765.00
Mandor L.04 OH 0.0430 203,000.00 8,729.00
JUMLAH TENAGA KERJA 578,144.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 3,036,293.94 75,907.35
Paku berbagai ukuran (1/2"-1") kg 0.0300 25,341.59 760.25
Lem kayu kg 0.8000 35,833.33 28,666.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 92,111.25 92,111.25
Formika lembar 0.5000 94,902.50 47,451.25

JUMLAH HARGA BAHAN 244,896.76


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 823,040.76
E. Profit 15% *D 123,456.11
F. Harga Satuan Pekerjaan (D+E) 946,496.88

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 121,800.00 487,200.00
Tukang Kayu L.03 12.0000 162,400.00 1,948,800.00
Kepala Tukang L.03 OH 1.2000 203,000.00 243,600.00
Mandor L.04 OH 0.2000 203,000.00 40,600.00
JUMLAH TENAGA KERJA 2,720,200.00

Page 620 of 649


B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 5.6000 17,287.99 96,812.73

JUMLAH HARGA BAHAN 3,352,055.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 6,072,255.75
E. Profit 15% *D 910,838.36
F. Harga Satuan Pekerjaan (D+E) 6,983,094.12

Page 621 of 649


A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.0000 162,400.00 3,248,000.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,540,095.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,622,735.97 4,347,283.16
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 5.6000 17,287.99 96,812.73
- -

JUMLAH HARGA BAHAN 4,594,823.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 9,134,918.39
E. Profit 15% *D 1,370,237.76
F. Harga Satuan Pekerjaan (D+E) 10,505,156.15

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 121,800.00 816,060.00
Tukang kayu L.03 OH 20.1000 162,400.00 3,264,240.00
Kepala Tukang L.03 OH 2.0100 203,000.00 408,030.00
Mandor L.04 OH 0.3350 203,000.00 68,005.00
JUMLAH TENAGA KERJA 4,556,335.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,822,286.84 3,104,515.52
Besi strip 2 x 3 cm kg 15.0000 10,048.50 150,727.50
Paku berbagai ukuran (2"-5") kg 3.0000 17,287.99 51,863.96
- -

JUMLAH HARGA BAHAN 3,307,106.99


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,863,441.99
E. Profit 15% *D 1,179,516.30
F. Harga Satuan Pekerjaan (D+E) 9,042,958.28

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 121,800.00 14,616.00
Tukang kayu L.03 OH 0.1200 162,400.00 19,488.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 37,758.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,822,286.84 39,512.02
Paku berbagai ukuran (2"-5") kg 0.0570 17,287.99 985.42

- -

JUMLAH HARGA BAHAN 40,497.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,255.43
E. Profit 15% *D 11,738.31
F. Harga Satuan Pekerjaan (D+E) 89,993.75

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80

- -

JUMLAH HARGA BAHAN 39,903.48


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 89,638.48
E. Profit 15% *D 13,445.77
F. Harga Satuan Pekerjaan (D+E) 103,084.26

A. 4.6.1.21. ck Pemasangan 1m' lisplank ukuran lebar 20cm, kalsiplank/GRC 6mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
Page 622 of 649
B. BAHAN
Listplank GRC m1 1.0000 19,352.67 19,352.67
Paku sekrup (kg) kg 0.1000 49,126.00 4,912.60
JUMLAH HARGA BAHAN 24,265.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 74,000.27
E. Profit 15% *D 11,100.04
F. Harga Satuan Pekerjaan (D+E) 85,100.31

Page 623 of 649


A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang kayu L.03 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 49,735.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,534,693.04 38,174.68
Paku berbagai ukuran (2"-5") kg 0.0500 17,287.99 864.40

JUMLAH HARGA BAHAN 39,039.08


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,774.08
E. Profit 15% *D 13,316.11
F. Harga Satuan Pekerjaan (D+E) 102,090.20

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.4500 203,000.00 91,350.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 184,324.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,635,329.08 73,789.21
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20

- -

JUMLAH HARGA BAHAN 76,382.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 260,706.41
E. Profit 15% *D 39,105.96
F. Harga Satuan Pekerjaan (D+E) 299,812.37

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 121,800.00 18,270.00
Tukang kayu L.03 OH 0.4500 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.0450 203,000.00 9,135.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 102,109.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 110,533.50 95,058.81
Lem kayu kg 0.5600 35,833.33 20,066.67

JUMLAH HARGA BAHAN 196,742.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 298,851.71
E. Profit 15% *D 44,827.76
F. Harga Satuan Pekerjaan (D+E) 343,679.46

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 121,800.00 24,360.00
Tukang kayu L.03 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0100 203,000.00 2,030.00
JUMLAH TENAGA KERJA 136,010.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,822,286.84 79,024.03
Paku berbagai ukuran (2"-5") kg 0.1500 17,287.99 2,593.20
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 89,040.88 76,575.15
Lem kayu kg 0.5600 35,833.33 20,066.67

JUMLAH HARGA BAHAN 178,259.05


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 314,269.05
E. Profit 15% *D 47,140.36
F. Harga Satuan Pekerjaan (D+E) 361,409.41

Page 624 of 649


A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 121,800.00 73,080.00
Tukang kayu L.03 OH 1.8000 162,400.00 292,320.00
Kepala Tukang L.03 OH 0.1800 203,000.00 36,540.00
Mandor L.04 OH 0.0300 203,000.00 6,090.00
JUMLAH TENAGA KERJA 408,030.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,534,693.04 24,742.85
Paku berbagai ukuran (2"-5") kg 0.1000 17,287.99 1,728.80
Paku sekrup (kg) kg 0.1500 49,126.00 7,368.90

JUMLAH HARGA BAHAN 33,840.55


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 441,870.55
E. Profit 15% *D 66,280.58
F. Harga Satuan Pekerjaan (D+E) 508,151.13

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 121,800.00 3,045.00
Tukang kayu L.03 OH 0.0750 162,400.00 12,180.00
Kepala Tukang L.03 OH 0.0080 203,000.00 1,624.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 17,052.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 89,040.88 35,616.35
Paku berbagai ukuran (1/2"-1") kg 0.0500 25,341.59 1,267.08

JUMLAH HARGA BAHAN 36,883.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,935.43
E. Profit 15% *D 8,090.31
F. Harga Satuan Pekerjaan (D+E) 62,025.74

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Kunci antik buah 1.0000 489,230.00 489,230.00

JUMLAH HARGA BAHAN 489,230.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 606,767.00
E. Profit 15% *D 91,015.05
F. Harga Satuan Pekerjaan (D+E) 697,782.05

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 93,583.00
B. BAHAN
Kunci tanam buah 1.0000 182,826.88 182,826.88

JUMLAH HARGA BAHAN 182,826.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 276,409.88
E. Profit 15% *D 41,461.48
F. Harga Satuan Pekerjaan (D+E) 317,871.36

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci KM buah 1.0000 104,798.75 104,798.75

JUMLAH HARGA BAHAN 104,798.75


C. PERALATAN

Page 625 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 197,366.75
E. Profit 15% *D 29,605.01
F. Harga Satuan Pekerjaan (D+E) 226,971.76

Page 626 of 649


A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 121,800.00 609.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 92,568.00
B. BAHAN
Kunci silinder buah 1.0000 62,168.75 62,168.75

JUMLAH HARGA BAHAN 62,168.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,736.75
E. Profit 15% *D 23,210.51
F. Harga Satuan Pekerjaan (D+E) 177,947.26

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 22,506.29 22,506.29

JUMLAH HARGA BAHAN 22,506.29


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 51,900.69
E. Profit 15% *D 7,785.10
F. Harga Satuan Pekerjaan (D+E) 59,685.79

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Spring knip buah 1.0000 21,660.10 21,660.10

JUMLAH HARGA BAHAN 21,660.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 52,516.10
E. Profit 15% *D 7,877.41
F. Harga Satuan Pekerjaan (D+E) 60,393.52

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kait angin biasa buah 1.0000 13,625.00 13,625.00

JUMLAH HARGA BAHAN 13,625.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,481.00
E. Profit 15% *D 6,672.15
F. Harga Satuan Pekerjaan (D+E) 51,153.15

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door closer set 1.0000 275,000.00 275,000.00

JUMLAH HARGA BAHAN 275,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 373,049.00
E. Profit 15% *D 55,957.35
F. Harga Satuan Pekerjaan (D+E) 429,006.35

Page 627 of 649


A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang kayu L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0010 203,000.00 203.00
JUMLAH TENAGA KERJA 39,179.00
B. BAHAN
Kunci Selot bh 1.0000 19,800.00 19,800.00

JUMLAH HARGA BAHAN 19,800.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 58,979.00
E. Profit 15% *D 8,846.85
F. Harga Satuan Pekerjaan (D+E) 67,825.85

A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 121,800.00 6,090.00
Tukang kayu L.02 OH 0.5000 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.0500 203,000.00 10,150.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 98,049.00
B. BAHAN
Door holder bh 1.0000 131,188.75 131,188.75

JUMLAH HARGA BAHAN 131,188.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 229,237.75
E. Profit 15% *D 34,385.66
F. Harga Satuan Pekerjaan (D+E) 263,623.41

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 121,800.00 1,218.00
Tukang kayu L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0100 203,000.00 2,030.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Door stop bh 1.0000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,503.00
E. Profit 15% *D 10,575.45
F. Harga Satuan Pekerjaan (D+E) 81,078.45

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang kayu L.02 OH 0.6000 162,400.00 97,440.00
Kepala Tukang L.03 OH 0.0600 203,000.00 12,180.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 117,537.00
B. BAHAN
Rell pintu dorong set 1.0000 273,542.50 273,542.50

JUMLAH HARGA BAHAN 273,542.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 391,079.50
E. Profit 15% *D 58,661.92
F. Harga Satuan Pekerjaan (D+E) 449,741.43

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 106,067.50 116,674.25
Sealant kg 0.0500 38,798.38 1,939.92

JUMLAH HARGA BAHAN 118,614.17


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 148,008.57
E. Profit 15% *D 22,201.29
F. Harga Satuan Pekerjaan (D+E) 170,209.85

Page 628 of 649


A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0008 203,000.00 162.40
JUMLAH TENAGA KERJA 29,394.40
B. BAHAN
Kaca bening tebal 5 mm m2 1.1000 147,936.25 162,729.88
Sealant kg 0.0500 38,798.38 1,939.92

JUMLAH HARGA BAHAN 164,669.79


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 194,064.19
E. Profit 15% *D 29,109.63
F. Harga Satuan Pekerjaan (D+E) 223,173.82

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0009 203,000.00 182.70
JUMLAH TENAGA KERJA 33,312.30
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 156,310.00 171,941.00
Sealant kg 0.0700 38,798.38 2,715.89

JUMLAH HARGA BAHAN 174,656.89


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,969.19
E. Profit 15% *D 31,195.38
F. Harga Satuan Pekerjaan (D+E) 239,164.56

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 139,562.50 153,518.75

JUMLAH HARGA BAHAN 153,518.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,374.75
E. Profit 15% *D 27,656.21
F. Harga Satuan Pekerjaan (D+E) 212,030.96

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 121,800.00 2,070.60
Tukang kayu L.02 OH 0.1700 162,400.00 27,608.00
Kepala Tukang L.03 OH 0.0170 203,000.00 3,451.00
Mandor L.04 OH 0.0090 203,000.00 1,827.00
JUMLAH TENAGA KERJA 34,956.60
B. BAHAN
Kaca cermin 8 mm m2 1.1000 156,310.00 171,941.00

JUMLAH HARGA BAHAN 171,941.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 206,897.60
E. Profit 15% *D 31,034.64
F. Harga Satuan Pekerjaan (D+E) 237,932.24

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 30,856.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 635,288.50 698,817.35

JUMLAH HARGA BAHAN 698,817.35


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 729,673.35
E. Profit 15% *D 109,451.00
F. Harga Satuan Pekerjaan (D+E) 839,124.35

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

Page 629 of 649


Pekerja L.01 OH 0.0750 121,800.00 9,135.00
Tukang kayu L.02 OH 0.1500 162,400.00 24,360.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0040 203,000.00 812.00
JUMLAH TENAGA KERJA 37,352.00
B. BAHAN
Kaca patri m2 1.1000 952,374.50 1,047,611.95
Sealant kg 0.0500 38,798.38 1,939.92

JUMLAH HARGA BAHAN 1,049,551.87


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,086,903.87
E. Profit 15% *D 163,035.58
F. Harga Satuan Pekerjaan (D+E) 1,249,939.45

Page 630 of 649


A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Soda api kg 0.0500 19,448.85 972.44

JUMLAH HARGA BAHAN 972.44


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,408.44
E. Profit 15% *D 511.27
F. Harga Satuan Pekerjaan (D+E) 3,919.71

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 2,436.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50

JUMLAH HARGA BAHAN 1,116.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,552.50
E. Profit 15% *D 532.88
F. Harga Satuan Pekerjaan (D+E) 4,085.38

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 121,800.00 1,827.00
Mandor L.04 OH 0.0080 203,000.00 1,624.00
JUMLAH TENAGA KERJA 3,451.00
B. BAHAN
Sabun kg 0.0500 22,330.00 1,116.50

JUMLAH HARGA BAHAN 1,116.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,567.50
E. Profit 15% *D 685.13
F. Harga Satuan Pekerjaan (D+E) 5,252.63

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.0090 162,400.00 1,461.60
Kepala Tukang L.03 OH 0.0060 203,000.00 1,218.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,814.60
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat Dasar kg 0.1700 60,500.00 10,285.00
Cat Penutup kg 0.2600 60,500.00 15,730.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 44,615.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 56,429.65
E. Profit 15% *D 8,464.45
F. Harga Satuan Pekerjaan (D+E) 64,894.10

A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 121,800.00 8,526.00
Tukang cat L.02 OH 0.1050 162,400.00 17,052.00
Kepala Tukang L.03 OH 0.0040 203,000.00 812.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 26,999.00
B. BAHAN
Cat menie kg 0.2000 48,500.00 9,700.00
Plamir tembok kg 0.1500 45,869.54 6,880.43
Cat dasar kg 0.1700 60,500.00 10,285.00
Cat penutup kg 0.3500 60,500.00 21,175.00
Kuas bh 0.0100 28,191.63 281.92
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 12,738.25 382.15
Ampelas lbr 0.2000 6,777.78 1,355.56
JUMLAH HARGA BAHAN 50,060.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,059.05
E. Profit 15% *D 11,558.86
F. Harga Satuan Pekerjaan (D+E) 88,617.91
Page 631 of 649
A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0630 203,000.00 12,789.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Teak Oil liter 0.3600 267.96 96.47
JUMLAH HARGA BAHAN 96.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 28,597.67
E. Profit 15% *D 4,289.65
F. Harga Satuan Pekerjaan (D+E) 32,887.32

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 121,800.00 4,872.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 18,473.00
B. BAHAN
Pelitur liter 0.1500 65,315.25 9,797.29
Pelitur Jadi liter 0.3720 65,315.25 24,297.27
Ampelas lb 2.0000 6,777.78 13,555.56
JUMLAH HARGA BAHAN 47,650.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 66,123.12
E. Profit 15% *D 9,918.47
F. Harga Satuan Pekerjaan (D+E) 76,041.58

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Mandor L.04 OH 0.0060 203,000.00 1,218.00
JUMLAH TENAGA KERJA 13,398.00
B. BAHAN
Residu atau ter liter 0.3500 60,402.65 21,140.93
JUMLAH HARGA BAHAN 21,140.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 34,538.93
E. Profit 15% *D 5,180.84
F. Harga Satuan Pekerjaan (D+E) 39,719.77

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 121,800.00 19,488.00
Tukang cat L.02 OH 0.1600 162,400.00 25,984.00
Kepala Tukang L.03 OH 0.0160 203,000.00 3,248.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 49,329.00
B. BAHAN
cat Vernis liter 0.1500 65,744.67 9,861.70
Dempul kayu kg 0.0500 37,660.40 1,883.02
Ampelas lb 0.1000 6,777.78 677.78
JUMLAH HARGA BAHAN 12,422.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 61,751.50
E. Profit 15% *D 9,262.72
F. Harga Satuan Pekerjaan (D+E) 71,014.22

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.0630 162,400.00 10,231.20
Kepala Tukang L.03 OH 0.0063 203,000.00 1,278.90
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 14,555.10
B. BAHAN
Plamir Tembok kg 0.1000 45,869.54 4,586.95
Cat Dasar kg 0.1000 77,842.38 7,784.24
Cat penutup kg 0.2600 77,842.38 20,239.02
JUMLAH HARGA BAHAN 32,610.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 47,165.31
E. Profit 15% *D 7,074.80
F. Harga Satuan Pekerjaan (D+E) 54,240.11

Page 632 of 649


A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 121,800.00 3,410.40
Tukang cat L.02 OH 0.0420 162,400.00 6,820.80
Kepala Tukang L.03 OH 0.0042 203,000.00 852.60
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 11,692.80
B. BAHAN
Cat dasar kg 0.1200 77,842.38 9,341.09
Cat penutup kg 0.1800 77,842.38 14,011.63
JUMLAH HARGA BAHAN 23,352.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,045.51
E. Profit 15% *D 5,256.83
F. Harga Satuan Pekerjaan (D+E) 40,302.34

Dihitung-1 1 M2 Pengecatan Genteng dengan Cat Spesial

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 121,800.00 12,180.00
Tukang cat L.02 OH 0.1000 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.0150 203,000.00 3,045.00
Mandor L.04 OH 0.0050 203,000.00 1,015.00
JUMLAH TENAGA KERJA 32,480.00
B. BAHAN
Cat genteng KW II kg 0.3000 65,050.11 19,515.03
JUMLAH HARGA BAHAN 19,515.03
C. PERALATAN
Kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA ALAT 281.92
D. Jumlah (A+B+C) 52,276.95
E. Profit 15% *D 7,841.54
F. Harga Satuan Pekerjaan (D+E) 60,118.49

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Wallpaper polos m2 1.2000 42,371.18 50,845.41
Lem (standar Fox)/ perekat kg 0.2000 25,902.80 5,180.56
JUMLAH HARGA BAHAN 56,025.97
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,509.47
E. Profit 15% *D 14,326.42
F. Harga Satuan Pekerjaan (D+E) 109,835.89

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 121,800.00 2,436.00
Tukang cat L.02 OH 0.2000 162,400.00 32,480.00
Kepala Tukang L.03 OH 0.0200 203,000.00 4,060.00
Mandor L.04 OH 0.0025 203,000.00 507.50
JUMLAH TENAGA KERJA 39,483.50
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
kuas bh 0.0100 28,191.63 281.92
JUMLAH HARGA BAHAN 5,131.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 44,615.42
E. Profit 15% *D 6,692.31
F. Harga Satuan Pekerjaan (D+E) 51,307.73

A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2250 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.0225 203,000.00 4,567.50
Mandor L.04 OH 0.0075 203,000.00 1,522.50
JUMLAH TENAGA KERJA 73,080.00
B. BAHAN
Cat menie kg 0.1000 48,500.00 4,850.00
Minyak pelarut/ pengencer cat (solvent) liter 0.0100 12,738.25 127.38
Kayu dolken Ø8-10 (cm) panjang 4 m m3 0.0100 5,000.00 50.00
Kuas bh 0.0020 28,191.63 56.38

JUMLAH HARGA BAHAN 5,083.77


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,163.77
E. Profit 15% *D 11,724.56
F. Harga Satuan Pekerjaan (D+E) 89,888.33

Page 633 of 649


A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 121,800.00 30,450.00
Tukang cat L.02 OH 0.2500 162,400.00 40,600.00
Kepala Tukang L.03 OH 0.0250 203,000.00 5,075.00
Mandor L.04 OH 0.0013 203,000.00 263.90
JUMLAH TENAGA KERJA 76,388.90
B. BAHAN
Menie A kg 0.1000 48,500.00 4,850.00
Menie B kg 0.1000 48,500.00 4,850.00
Minyak pelarut/ pengencer cat (solvent) liter 0.0800 12,738.25 1,019.06
Cat kg 0.0100 41,372.88 413.73
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 76,388.90
E. Profit 15% *D 11,458.34
F. Harga Satuan Pekerjaan (D+E) 87,847.23

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 121,800.00 7,308.00
Tukang cat L.02 OH 0.0600 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.0120 203,000.00 2,436.00
Mandor L.04 OH 0.0030 203,000.00 609.00
JUMLAH TENAGA KERJA 20,097.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat kg 0.0100 48,500.00 485.00
Kuas bh 0.0100 28,191.63 281.92

JUMLAH HARGA BAHAN 4,588.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 24,685.39
E. Profit 15% *D 3,702.81
F. Harga Satuan Pekerjaan (D+E) 28,388.20

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.8000 162,400.00 129,920.00
Kepala Tukang L.03 OH 0.0800 203,000.00 16,240.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 198,940.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.1100 12,738.25 1,401.21
Cat dasar kg 0.1700 41,993.47 7,138.89
Kuas bh 0.0800 28,191.63 2,255.33
Cat antara kg 0.0100 41,993.47 419.93
Cat penutup kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 11,635.30
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 210,575.30
E. Profit 15% *D 31,586.29
F. Harga Satuan Pekerjaan (D+E) 242,161.59

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 121,800.00 48,720.00
Tukang cat L.02 OH 0.7000 162,400.00 113,680.00
Kepala Tukang L.03 OH 0.0700 203,000.00 14,210.00
Mandor L.04 OH 0.0200 203,000.00 4,060.00
JUMLAH TENAGA KERJA 180,670.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 12,738.25 3,821.48
Cat dasar kg 0.0100 41,993.47 419.93
JUMLAH HARGA BAHAN 4,241.41
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 184,911.41
E. Profit 15% *D 27,736.71
F. Harga Satuan Pekerjaan (D+E) 212,648.12

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 121,800.00 401,940.00
Tukang batu L.02 OH 1.100 162,400.00 178,640.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 615,090.00
Page 634 of 649
B. BAHAN
Closet Duduk / Monoblock unit 1.000 1,404,557.00 1,404,557.00
Perlengkapan Ls 6% x clooset 84,273.42 84,273.42
JUMLAH HARGA BAHAN 1,488,830.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,103,920.42
E. Profit 15% * D 315,588.06
F. Harga Satuan Pekerjaan (D+E) 2,419,508.48

Page 635 of 649


A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.160 203,000.00 32,480.00
JUMLAH TENAGA KERJA 428,330.00
B. BAHAN
Closed jongkok porcelaint (lokal) unit 1.000 221,129.03 221,129.03
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00
JUMLAH HARGA BAHAN 230,891.03
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 659,221.03
E. Profit 15% * D 98,883.15
F. Harga Satuan Pekerjaan (D+E) 758,104.18

A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.500 162,400.00 243,600.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 406,000.00
B. BAHAN
Closed jongkok terraso unit 1.000 244,222.22 244,222.22
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Batu bata merah besar bh 7.000 2,300.00 16,100.00
JUMLAH HARGA BAHAN 271,584.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 677,584.22
E. Profit 15% * D 101,637.63
F. Harga Satuan Pekerjaan (D+E) 779,221.86

A. 5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 121,800.00 121,800.00
Tukang batu L.02 OH 1.000 162,400.00 162,400.00
Kepala Tukang L.03 OH 0.100 203,000.00 20,300.00
Mandor L.04 OH 0.050 203,000.00 10,150.00
JUMLAH TENAGA KERJA 314,650.00
B. BAHAN
Urinoir unit 1.000 1,060,675.00 1,060,675.00
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 30.000 318,202.50 318,202.50
JUMLAH HARGA BAHAN 1,390,139.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,704,789.50
E. Profit 15% * D 255,718.43
F. Harga Satuan Pekerjaan (D+E) 1,960,507.93

A. 5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 121,800.00 146,160.00
Tukang batu L.02 OH 1.450 162,400.00 235,480.00
Kepala Tukang L.03 OH 0.150 203,000.00 30,450.00
Mandor L.04 OH 0.060 203,000.00 12,180.00
JUMLAH TENAGA KERJA 424,270.00
B. BAHAN
Wastafel unit 1.000 921,112.50 921,112.50
Semen portland kg 6.000 1,627.00 9,762.00
Pasir pasang m3 0.010 150,000.00 1,500.00
Perlengkapan % 12.000 110,533.50 110,533.50
JUMLAH HARGA BAHAN 1,042,908.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,467,178.00
E. Profit 15% * D 220,076.70
F. Harga Satuan Pekerjaan (D+E) 1,687,254.70

A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12%x bak 46,959.99 46,959.99
JUMLAH HARGA BAHAN 438,293.24

Page 636 of 649


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,727,343.24
E. Profit 15% * D 259,101.49
F. Harga Satuan Pekerjaan (D+E) 1,986,444.73

Page 637 of 649


A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 121,800.00 730,800.00
Tukang batu L.02 OH 3.000 162,400.00 487,200.00
Kepala Tukang L.03 OH 0.300 203,000.00 60,900.00
Mandor L.04 OH 0.030 203,000.00 6,090.00
JUMLAH TENAGA KERJA 1,284,990.00
B. BAHAN
Batu bata merah besar bh 150.000 2,300.00 345,000.00
Semen portland kg 120.000 1,627.00 195,240.00
Pasir pasang m3 0.300 150,000.00 45,000.00
Porcelaint uk. 11x 11 cm bh 360.000 1,339.80 482,328.00
Semen warna (sika graut) kg 6.000 22,250.00 133,500.00
JUMLAH HARGA BAHAN 1,201,068.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,486,058.00
E. Profit 15% * D 372,908.70
F. Harga Satuan Pekerjaan (D+E) 2,858,966.70

A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 121,800.00 365,400.00
Tukang batu L.02 OH 4.500 162,400.00 730,800.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.900 203,000.00 182,700.00
JUMLAH TENAGA KERJA 1,289,050.00
B. BAHAN
Bak mandi fibreglass volume 0,30 m³ unit 1.000 237,256.25 237,256.25
Perlengkapan Ls 12%x bak 28,470.75 3,416.49
JUMLAH HARGA BAHAN 240,672.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,529,722.74
E. Profit 15% * D 229,458.41
F. Harga Satuan Pekerjaan (D+E) 1,759,181.15

A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 121,800.00 36,540.00
Tukang batu L.02 OH 0.450 162,400.00 73,080.00
Kepala Tukang L.03 OH 0.045 203,000.00 9,135.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 121,800.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 391,333.25 391,333.25
Perlengkapan % 12.000 46,959.99 5,635.20
JUMLAH HARGA BAHAN 396,968.45
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 518,768.45
E. Profit 15% * D 77,815.27
F. Harga Satuan Pekerjaan (D+E) 596,583.72

A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 121,800.00 3,654.00
Tukang batu L.02 OH 0.300 162,400.00 48,720.00
Kepala Tukang L.03 OH 0.030 203,000.00 6,090.00
Mandor L.04 OH 0.015 203,000.00 3,045.00
JUMLAH TENAGA KERJA 61,509.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
JUMLAH HARGA BAHAN 493,891.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 555,400.75
E. Profit 15% * D 83,310.11
F. Harga Satuan Pekerjaan (D+E) 638,710.86

A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 121,800.00 6,090.00
Tukang batu L.02 OH 0.500 162,400.00 81,200.00
Kepala Tukang L.03 OH 0.050 203,000.00 10,150.00
Mandor L.04 OH 0.025 203,000.00 5,075.00
JUMLAH TENAGA KERJA 102,515.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 471,561.75 471,561.75
Water drain + Assesories bh 1.000 22,330.00 22,330.00
Semen portland kg 20.000 1,627.00 32,540.00
Pasir pasang m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 533,931.75
C. PERALATAN

Page 638 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 636,446.75
E. Profit 15% * D 95,467.01
F. Harga Satuan Pekerjaan (D+E) 731,913.76

Page 639 of 649


A. 5.1.1.14. Pemasangan 1 buah floor drain

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.03 OH 0.010 203,000.00 2,030.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 20,503.00
B. BAHAN
Floor drain (PVC) Unit 1.000 10,001.98 10,001.98
JUMLAH HARGA BAHAN 10,001.98
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,504.98
E. Profit 15% * D 4,575.75
F. Harga Satuan Pekerjaan (D+E) 35,080.73

A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.160 121,800.00 263,088.00
Tukang batu L.02 OH 0.720 162,400.00 116,928.00
Kepala Tukang L.03 OH 0.072 203,000.00 14,616.00
Mandor L.04 OH 0.011 203,000.00 2,233.00
JUMLAH TENAGA KERJA 396,865.00
B. BAHAN
Batu bata merah besar bh 40.000 2,300.00 92,000.00
Semen portland kg 44.000 1,627.00 71,588.00
Pasir pasang m3 0.070 150,000.00 10,500.00
Pasir beton m3 0.060 150,000.00 9,000.00
Batu kerikil m3 0.070 400,000.00 28,000.00
Baja Tulangan (Polos) U24 kg 1.600 13,760.36 22,016.57
JUMLAH HARGA BAHAN 233,104.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 629,969.57
E. Profit 15% * D 94,495.44
F. Harga Satuan Pekerjaan (D+E) 724,465.00

A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 70.000 2,300.00 161,000.00
Semen portland kg 77.000 1,627.00 125,279.00
Pasir pasang m3 0.130 150,000.00 19,500.00
Pasir beton m3 0.090 150,000.00 13,500.00
Batu kerikil m3 0.020 400,000.00 8,000.00
Baja Tulangan (Polos) U24 kg 2.600 13,760.36 35,776.92
JUMLAH HARGA BAHAN 363,055.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 945,056.92
E. Profit 15% * D 141,758.54
F. Harga Satuan Pekerjaan (D+E) 1,086,815.46

A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 121,800.00 389,760.00
Tukang batu L.02 OH 1.150 162,400.00 186,760.00
Kepala Tukang L.03 OH 0.011 203,000.00 2,233.00
Mandor L.04 OH 0.016 203,000.00 3,248.00
JUMLAH TENAGA KERJA 582,001.00
B. BAHAN
Batu bata merah besar bh 123.000 2,300.00 282,900.00
Semen portland kg 114.000 1,627.00 185,478.00
Pasir pasang m3 0.184 150,000.00 27,600.00
Pasir beton m3 0.120 150,000.00 18,000.00
Batu kerikil m3 0.033 400,000.00 13,200.00
Baja Tulangan (Polos) U24 kg 4.850 13,760.36 66,737.72
JUMLAH HARGA BAHAN 593,915.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,175,916.72
E. Profit 15% * D 176,387.51
F. Harga Satuan Pekerjaan (D+E) 1,352,304.23

A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20

Page 640 of 649


B. BAHAN
Pipa besi galvanis Ø 0,5 (inch)/1,8mm m 1.200 31,747.51 38,097.01
Perlengkapan ls 35%x pipa 11,111.63 11,111.63
JUMLAH HARGA BAHAN 49,208.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 77,709.84
E. Profit 15% * D 11,656.48
F. Harga Satuan Pekerjaan (D+E) 89,366.31

Page 641 of 649


A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 121,800.00 1,218.00
Tukang batu L.02 OH 0.400 162,400.00 64,960.00
Kepala Tukang L.03 OH 0.040 203,000.00 8,120.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 75,313.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 73,689.00 73,689.00
Seal tape bh 0.025 4,333.33 108.33
JUMLAH HARGA BAHAN 73,797.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,110.33
E. Profit 15% * D 22,366.55
F. Harga Satuan Pekerjaan (D+E) 171,476.88

A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 0,75 (inch)/1,8mm m 1.200 38,623.29 46,347.95
Perlengkapan % 35%x pipa 13,518.15 13,518.15
JUMLAH HARGA BAHAN 59,866.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,367.30
E. Profit 15% * D 13,255.09
F. Harga Satuan Pekerjaan (D+E) 101,622.39

A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.027 203,000.00 5,481.00
JUMLAH TENAGA KERJA 28,501.20
B. BAHAN
Pipa besi galvanis Ø 1 (inch)/1,8mm m 1.200 42,584.69 51,101.63
Perlengkapan % 35%x pipa 14,904.64 14,904.64
JUMLAH HARGA BAHAN 66,006.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 94,507.47
E. Profit 15% * D 14,176.12
F. Harga Satuan Pekerjaan (D+E) 108,683.59

A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.108 121,800.00 13,154.40
Tukang batu L.02 OH 0.180 162,400.00 29,232.00
Kepala Tukang L.03 OH 0.018 203,000.00 3,654.00
Mandor L.04 OH 0.005 203,000.00 1,015.00
JUMLAH TENAGA KERJA 47,055.40
B. BAHAN
Pipa besi galvanis Ø 1,5 (inch)/1,8mm m 1.200 75,508.39 90,610.06
Perlengkapan % 35%x pipa 26,427.94 26,427.94
JUMLAH HARGA BAHAN 117,038.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 164,093.40
E. Profit 15% * D 24,614.01
F. Harga Satuan Pekerjaan (D+E) 188,707.41

A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 3 (inch) t=4 mm m 1.200 142,699.48 171,239.38
Perlengkapan % 35%x pipa 49,944.82 49,944.82
JUMLAH HARGA BAHAN 221,184.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 280,257.20
E. Profit 15% * D 42,038.58
F. Harga Satuan Pekerjaan (D+E) 322,295.78

Page 642 of 649


A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 121,800.00 16,443.00
Tukang batu L.02 OH 0.225 162,400.00 36,540.00
Kepala Tukang L.03 OH 0.023 203,000.00 4,669.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 59,073.00
B. BAHAN
Pipa besi galvanis Ø 4 (inch)/1,8mm m 1.200 143,937.15 172,724.58
Perlengkapan % 35%x pipa 50,378.00 50,378.00
JUMLAH HARGA BAHAN 223,102.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 282,175.58
E. Profit 15% * D 42,326.34
F. Harga Satuan Pekerjaan (D+E) 324,501.92

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø1/2 (inch) AW, panjang 4 m m 1.200 6,791.67 8,150.00
Perlengkapan % 35%x pipa 2,377.08 2,377.08
JUMLAH HARGA BAHAN 10,527.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 26,279.88
E. Profit 15% * D 3,941.98
F. Harga Satuan Pekerjaan (D+E) 30,221.87

A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø3/4 (inch) AW, panjang 4 m m 1.200 9,968.75 11,962.50
Perlengkapan % 35%x pipa 3,489.06 3,489.06
JUMLAH HARGA BAHAN 15,451.56
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 31,204.36
E. Profit 15% * D 4,680.65
F. Harga Satuan Pekerjaan (D+E) 35,885.02

A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 121,800.00 4,384.80
Tukang batu L.02 OH 0.060 162,400.00 9,744.00
Kepala Tukang L.03 OH 0.006 203,000.00 1,218.00
Mandor L.04 OH 0.002 203,000.00 406.00
JUMLAH TENAGA KERJA 15,752.80
B. BAHAN
Pipa PVC Ø 1 (inch) AW, panjang 4 m m 1.200 12,937.50 15,525.00
Perlengkapan % 35%x pipa 4,528.13 4,528.13
JUMLAH HARGA BAHAN 20,053.13
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,805.93
E. Profit 15% * D 5,370.89
F. Harga Satuan Pekerjaan (D+E) 41,176.81

A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 1,5(inch) AW, panjang 4 m m 1.200 19,035.70 22,842.84
Perlengkapan % 35%x pipa 6,662.49 6,662.49
JUMLAH HARGA BAHAN 29,505.33
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,134.53
E. Profit 15% * D 7,970.18
F. Harga Satuan Pekerjaan (D+E) 61,104.71

Page 643 of 649


A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 121,800.00 6,577.20
Tukang batu L.02 OH 0.090 162,400.00 14,616.00
Kepala Tukang L.03 OH 0.009 203,000.00 1,827.00
Mandor L.04 OH 0.003 203,000.00 609.00
JUMLAH TENAGA KERJA 23,629.20
B. BAHAN
Pipa PVC Ø 2 (inch) AW, panjang 4 m m 1.200 25,000.00 30,000.00
Perlengkapan % 35%x pipa 8,750.00 8,750.00
JUMLAH HARGA BAHAN 38,750.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 62,379.20
E. Profit 15% * D 9,356.88
F. Harga Satuan Pekerjaan (D+E) 71,736.08

A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 3 (inch) AW, panjang 4 m m 1.200 48,125.00 57,750.00
Perlengkapan % 35%x pipa 16,843.75 16,843.75
JUMLAH HARGA BAHAN 74,593.75
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 109,936.05
E. Profit 15% * D 16,490.41
F. Harga Satuan Pekerjaan (D+E) 126,426.46

A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 121,800.00 9,865.80
Tukang batu L.02 OH 0.135 162,400.00 21,924.00
Kepala Tukang L.03 OH 0.014 203,000.00 2,740.50
Mandor L.04 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 35,342.30
B. BAHAN
Pipa PVC Ø 4-6 (inch) AW, panjang 4 m m 1.200 75,906.25 91,087.50
Perlengkapan % 35%x pipa 26,567.19 26,567.19
JUMLAH HARGA BAHAN 117,654.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 152,996.99
E. Profit 15% * D 22,949.55
F. Harga Satuan Pekerjaan (D+E) 175,946.54

A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang batu L.02 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.03 OH 0.007 203,000.00 1,421.00
Mandor L.04 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Pipa beton Ø 20 cm, panjang 1m' bh 1.100 96,726.46 106,399.10
Batu bata merah kecil m3 0.027 1,390.04 37.53
Semen portland kg 3.920 1,627.00 6,377.84
Pasir pasang m3 0.056 150,000.00 8,400.00
Pasir urug/timbun m3 0.024 102,500.00 2,460.00
JUMLAH HARGA BAHAN 123,674.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,936.47
E. Profit 15% * D 23,240.47
F. Harga Satuan Pekerjaan (D+E) 178,176.94

A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 121,800.00 46,284.00
Tukang batu L.02 OH 0.190 162,400.00 30,856.00
Kepala Tukang L.03 OH 0.019 203,000.00 3,857.00
Mandor L.04 OH 0.019 203,000.00 3,857.00
JUMLAH TENAGA KERJA 84,854.00
B. BAHAN
Pipa beton Ø 60 cm, panjang 1m' bh 1.100 160,289.31 176,318.24
Batu bata merah kecil m3 0.550 1,390.04 764.52
Semen portland kg 10.300 1,627.00 16,758.10
Pasir pasang m3 0.061 150,000.00 9,150.00
Pasir urug/timbun m3 0.069 102,500.00 7,072.50
JUMLAH HARGA BAHAN 210,063.36
C. PERALATAN

Page 644 of 649


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 294,917.36
E. Profit 15% * D 44,237.60
F. Harga Satuan Pekerjaan (D+E) 339,154.97

Page 645 of 649


Dihitung 1. ck Pemasangan 1 m2 Rangka atap baja ringan C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize


m2 1.0000 183,093.75 183,093.75

JUMLAH HARGA ALAT 183,093.75


D. Jumlah (A+B+C) 183,093.75
E. Profit 15% *D 27,464.06
F. Harga Satuan Pekerjaan (D+E) 210,557.81

Dihitung 2. ck Pemasangan 1 m2 Plafond PVC (ex. Shunda Plafond)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00

JUMLAH HARGA ALAT 260,000.00


D. Jumlah (A+B+C) 260,000.00
E. Profit 15% *D 39,000.00
F. Harga Satuan Pekerjaan (D+E) 299,000.00

Dihitung 3. ck Pemasangan 1 m2 Plafond PVC (ex. Wifon)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 185,000.00 185,000.00

JUMLAH HARGA ALAT 185,000.00


D. Jumlah (A+B+C) 185,000.00
E. Profit 15% *D 27,750.00
F. Harga Satuan Pekerjaan (D+E) 212,750.00

A. 4.5.2.15. ck Pemasangan 1 m2 atap Spandek zincalum, t=0.4mm


Harga Satuan Jumlah Harga
No. Uraian KodeSatuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.0700 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.0070 203,000.00 1,421.00
Mandor L.15 OH 0.0070 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0, m2 1.0000 68,106.50 68,106.50
Paku sekrup (kg) Kg 0.1200 49,126.00 5,895.12
JUMLAH HARGA BAHAN 74,001.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,263.62
E. Profit 15% *D 15,789.54
F. Harga Satuan Pekerjaan (D+E) 121,053.16

Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 199,000.00 148,653.00
Screw Bh 9.150 1,450.00 13,267.50
JUMLAH HARGA BAHAN 161,920.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,182.50
E. Profit 0.150 *D 28,977.38
F. Harga Satuan Pekerjaan (D+E) 222,159.88

Page 646 of 649


Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 32 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 121,800.00 24,360.00
Tukang Kayu L.03 OH 0.100 162,400.00 16,240.00
Kepala Tukang L.11 OH 0.010 203,000.00 2,030.00
Mandor L.15 OH 0.010 203,000.00 2,030.00
JUMLAH TENAGA KERJA 44,660.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 65,000.00 241,150.00
Screw Bh 16.129 1,450.00 23,387.05
JUMLAH HARGA BAHAN 264,537.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 309,197.05
E. Profit 0.150 *D 46,379.56
F. Harga Satuan Pekerjaan (D+E) 355,576.61

Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap > 10 °)
Uk. 200 x 97 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 121,800.00 17,052.00
Tukang Kayu L.03 OH 0.070 162,400.00 11,368.00
Kepala Tukang L.11 OH 0.007 203,000.00 1,421.00
Mandor L.15 OH 0.007 203,000.00 1,421.00
JUMLAH TENAGA KERJA 31,262.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.732 199,000.00 145,668.00
Screw Bh 11.465 1,450.00 16,624.25
JUMLAH HARGA BAHAN 162,292.25
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 193,554.25
E. Profit 0.150 *D 29,033.14
F. Harga Satuan Pekerjaan (D+E) 222,587.39

Dihitung 7.ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 121,800.00 10,231.20
Tukang Kayu L.03 OH 0.125 162,400.00 20,300.00
Kepala Tukang L.11 OH 0.013 203,000.00 2,639.00
Mandor L.15 OH 0.004 203,000.00 812.00
JUMLAH TENAGA KERJA 33,982.20
B. BAHAN
Bubungan Atap Selulosa Bitumen
108,000.00
(Ukuran 1060x 50 cm) Lbr 1.474 159,192.00
Sekrup / Paku Bh 10.256 1,450.00 14,871.20
JUMLAH HARGA BAHAN 174,063.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 208,045.40
E. Profit 0.150 *D 31,206.81
F. Harga Satuan Pekerjaan (D+E) 239,252.21

Pangkalpinang, Februari 2022

KEPALA BIDANG
CIPTA KARYA

PAHALA R. TOBING, ST.


NIP. 19810831 200604 1 007

Page 647 of 649


Dihitung 5. ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.010 200,000.00 2,000.00
Mandor L.15 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 54,390.00 201,786.90
Screw Bh 16.129 1,200.00 19,354.80
JUMLAH HARGA BAHAN 221,141.70
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 265,141.70
E. Profit 0.150 *D 39,771.26
F. Harga Satuan Pekerjaan (D+E) 304,912.96

Dihitung 6. ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap 5 - 10)
Uk. 195 x 96 x 0.30 cm, Jarak Rangka Gording atau Reng Max. 32 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.878 150,000.00 131,700.00
Screw Bh 13.740 1,200.00 16,488.00
JUMLAH HARGA BAHAN 148,188.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 178,988.00
E. Profit 0.150 *D 26,848.20
F. Harga Satuan Pekerjaan (D+E) 205,836.20

Dihitung 7. ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.125 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.013 200,000.00 2,600.00
Mandor L.15 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 40,680.00
B. BAHAN
Nok / Ridge Onduline Lbr 1.438 85,000.00 122,230.00
Sekrup / Paku Bh 10.000 1,200.00 12,000.00
JUMLAH HARGA BAHAN 134,230.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 174,910.00
E. Profit 0.150 *D 26,236.50
F. Harga Satuan Pekerjaan (D+E) 201,146.50

Pangkalpinang, Februari 2021

Mengetahui, Menyetujui,

KEPALA DINAS PEKERJAAN UMUM DAN KEPALA BIDANG CIPTA KARYA


PENATAAN RUANG KOTA PANGKALPINANG

SUPARLAN DULASPAR, ST. PAHALA R. TOBING, ST.


NIP. 19620705 198503 1020 NIP. 19810831 200604 1 007

Page 58 of 58
p 18 18 14.5 14.5 65
t depan 1
t samping 1.7
t belakang 1.7
pintu 3
galian 23.4
pondasi 12.1875
sloof 0.75

Vous aimerez peut-être aussi