28 frizeer 1 5,000.00
total 94,710,466.50
8190801
102901267.5
8190801
102901267.5
Specification and Bill OF Qua
Item Description
A. Sub Structure
I. Excavation and Earth Work
1.1 Site clearing excavation to remove top soil to an averagedepth of 200mm
1.2 Bulk excavation in ordinary soil to remove Vegetation roots to a depth not exceeding
500mm starting from cleared surface.
1.3 trench excavation in ordinary soil for footing to depth of 1500 mm; starting from
cleared surface.
1.4 Fill around masonary with selected materials brought from out side well rolled and
compacted in layers not exceeding 200 mm thick.
1.5 Fill under hard core with selected materials brought from out side well rolled and
compacted in layers not exceeding 200 mm thick.
1.6 Cart away surplus excavated material to appropriate tip.
1.7 250mm thick basaltic stone hardcore well rolled consolidated and blended with crushed
stone.
Total Carried To Summary
II.Concrete Work
2.1 50mm thick lean concrete in class C-5 with minimum Cement content of 150 kg/m 3.
a) Under ground floor
b) Under ground floor slab
2.2 Reinforced concrete quality C-25,minimum cement content of 360 kg of cement/m 3
filled in to form work and vibrated around rod reinforcement (formwork and
reinforcement measured separately)
a) in shear wall
b) in foundation column
c) In grade beams
d) In 10 cm thick ground floor slab
2.3 10mm thick Styrofoam joint filler board 100mm wide in movement joint between edge
of concrete slab and grade beams
2.4 Supply and fix in position timbered or steel or a combination of two Formwork;
sufficient to contain the wet concrete with out leakage. Enough to support temporary
loading and pressure from placing compaction or vibration without displacement or
appreciable deflection.
flash mounting board with complate accessories and busbar of 3*32A. AND separated
neutral made of hard plastic lockable door with main swich of 3*20A CAN,3 phase and
consisting of 3pcs 10AMP
8.30 Light points PVC insulated conductor of 2*2.5
8.40 light points in rigid thermoplastic conduit of 16mm
fed by pvc conductor of 3x2.5mm2
(wire to be of ethioplastic or approved equivalent)
8.50 Philips TMS 1012/236/ I with 2*TLD 36W540
8.60 Massive 32003/21/10 EZ7 60w lamp
8.70 single(774001+774041)
8.80 Duoble(774005+774042)
8.90 Two-Way(774006+774041)
8.1 double Two-Way(774006+774041)
8.11 4x2.5/26 sqmm
8.12 4x2.5/ s qmm
8.13 TV Point PVC conduit of 19mm dia . Include .juction boxes with cover
m2 140.00 40.00
m3 43.00 140.00
m3 22.20 140.00
m3 17.76 220.00
m3 43.00 180.00
m 3
116.50 170.00
m2 86.00 180.00
m2 11.66 140.00
m2 86.00 140.00
m3 93.24 3,400.00
m 3
2.47 3,400.00
m3 3.55 3,400.00
m 2
90.30 620.00
ML 115.00 20.00
m2 88.20 320.00
m 2
6.00 320.00
m2 71.04 320.00
m3 78.40 1250
m3 2.43 3,600.00
m3
3.55 3,600.00
m2 43.20 360.00
m2
568.80 360.00
m2 119.88 620.00
No. 1 92,160.00
No. 6 32,760.00
ML 20.00 1,000.00
m2 310.50 100.00
m2 310.50 100.00
m2 310.50 100.00
m2 0.00 550.00
m2 216.00 320.00
m2 115.20 500.00
m2 0.00 850.00
ml 67.60 850.00
ml 67.60 850.00
ml 215.60 60.00
ml 0.00 55.00
ml 75.60 850.00
m2 310.50 500.00
m 2
310.50 300.00
m2 310.50 300.00
NO 4 2,000.00
NO 16 65.00
NO 12 65.00
NO 8 255.00
No 18 390.00
PCs 18 65.00
" 4 65.00
" 5 55.00
" 4 80.00
m 867 55.00
m 670 46.00
no
fice Building
Amount
5,600.00
6,020.00
3,108.00
3,907.20
7,740.00
19,805.00
15,480.00
61,660.20
1,631.70
12,040.00
317,016.00
8,411.61
12,076.80
55,986.00
2,300.00
28,224.00
1,920.00
22,732.80
642200
123,661.20
921,700.00
-
-
-
2,149,900.11
98,000.00
98,000.00
2,309,560.31
8,748.00
12,787.20
15,552.00
204,768.00
662,610.00
318,500.00
226,200.00
-
-
-
1,449,165.20
74,325.60
74,325.60
92,160.00
196,560.00
20,000.00
308,720.00
31,050.00
31,050.00
31,050.00
69,120.00
57,600.00
-
57,460.0
57,460.0
12,936.00
64,260.00
411,986.00
155,250.00
93,150.00
93,150.00
308,720.00
8,000.00
1,040.00
-
-
780.00
2,040.00
7,020.00
1,170.00
260.00
275.00
320.00
47,685.00
30,820.00
99,410.00
2,652,326.80
4,961,887.11
Summary of BOQ For Bekri Abdi