Quantities List-Labor Material Summary of Bekri

Abdi.Building Materials

Remark Desdription of Size Quantity Volume Weight Total


Specification AMOUNT IN BIRR
序号 Goods (Meter) (PCS) (㎡) (kg) Weight kg)

7180 678 26.8 301 204078 16,554,807.36


5680 95 3.25 238 22610 1,834,123.20
HN346*174*6*9
1200 88 580 51040 4,159,760.00
5680 100 245 24500 1,016,750.00
5488 34 1.2 200 6800 551,616.00
7091 34 1.3 232 7888 639,874.56
5498 34 1.2 198 6732 546,099.84
PL6*665
5488 38 440 16720 1,356,326.40
5498 38 700 26600 2,157,792.00
7091 38 558 21204 1,720,068.48
HN346*174*6*9 12000 268 17.1 502 134536 5,532,120.32
11990 102 28.8 2220 226440 9,311,212.80
10390 34 8.5 1926 65484 5,312,062.08
HN700*300*13*14
11990 122 231 28182 1,158,843.84
10390 34 2005 68170 1,439,750.40
7180 3 0.2 476 1428 58,719.36
5680 1 0.16 378 378 30,663.36
HN400*200*8*13
Steel Column 7180 3 488 1464 60,199.68
1
钢梁 5680 1 387 387 15,913.44
7180 8 0.9 302 2416 99,345.92
HN346*174*6*9 5680 1 0.13 240 240 9,868.80
7690 1 0.15 322 322 13,240.64
2770 3 0.1 104 312 12,829.44
2825 1 0.02 107 107 4,399.84
6050 16 249.29 3988.64 164,012.88
HN300*150*6.5*9 5027 3 208.12 624.36 25,673.68
5455 8 224.3 1794.4 73,785.73
5827 8 238 1904 78,292.48
5110 2 211.26 422.52 17,374.02
6760 49 888.89 43555.61 1,355,450.58
12643 10 80 800 32,896.00
11884 15 1552.98 23294.7 957,878.06
HM390*300*10*16 11980 23 1324.66 30467.18 1,252,810.44
12643 24 1555.1 37322.4 1,534,697.09
12000 36 574.45 20680.2 850,369.82
11990 58 2305.45 133716.1 5,498,406.03
4306 4 0.03 87 348 28,229.76
3394 4 0.02 80 320 25,958.40

钢梯 4556 4 0.04 92 368 29,852.16


2 C16
STEEL LADDER 4306 4 689 2756 223,566.72
3394 4 441 1764 72,535.68
4556 4 565.4 2261.6 92,996.99
11884 18 3.1 1280 23040 947,404.80
11980 37 6.3 1286 47582 1,956,571.84
6760 68 6.2 728 49504 1,045,524.48
12643 234 41.3 1360 5683 233,684.96
HM390*300*10*16
11884 20 1576 31520 1,296,102.40
11980 54 1553 83862 1,771,165.44
6670 68 891 60588 1,279,618.56
12643 34 1566 53244 1,124,513.28
HN346*174*6*9 1423 7 1.2 60 420 17,270.40
6050 12 2.2 206 2472 101,648.64
3 Steel Column 5027 3 0.7 192 576 23,685.12
钢柱
5455 12 2.1 206 2472 101,648.64
5827 6 1.1 222 1332 54,771.84
5110 3 0.8 195 585 24,055.20
2270 3 113 339 13,939.68
HN300*150*6.5*9
2825 1 124 124 5,098.88
6050 16 250 4000 164,480.00
5027 4 208 832 34,211.84
5455 8 224.3 1794.4 73,785.73
5827 8 238.4 1907.2 78,424.06
5110 4 212 848 34,869.76
6320 12 0.8 37.16 445.92 18,336.23
7820 20 1.6 45.98 919.6 37,813.95
7490 176 9.6 44.04 7751.04 318,722.76
5990 16 1.2 35.22 563.52 23,171.94
1925 97 1.8 11.32 1098.04 45,151.40
2700 112 3.7 15.88 1778.56 73,134.39
1175 8 0.02 6.91 55.28 2,273.11
1505 4 0.01 8.85 35.4 1,455.65
2255 4 0.02 13.26 53.04 2,181.00
CC180*2.2*20*60
1105 36 0.4 6.5 234 18,982.08
5100 32 0.1 29.99 959.68 39,462.04
880 16 0.2 5.17 82.72 3,401.45
7360 6 0.5 43.28 259.68 10,678.04
4 墙面檀条 7630 6 0.5 44.86 269.16 11,067.86
SHORING OF WALL
1200 32 0.48 7.06 225.92 9,289.83
5860 2 0.1 34.46 68.92 2,833.99
4 墙面檀条
SHORING OF WALL

6130 2 0.1 36.04 72.08 2,963.93


355 12 0.08 2.09 25.08 1,031.29
885 18 0.2 3.81 68.58 2,820.01
2700 96 2.7 11.61 1114.56 45,830.71
1285 70 0.8 5.53 387.1 15,917.55
6190 119 7.2 26.62 3167.78 130,259.11
CC160*2*20*70 1485 2 0.01 6.39 12.78 525.51
6390 7 0.6 27.48 192.36 7,909.84
1085 6 0.06 4.67 28.02 1,152.18
5590 21 0.1 24.04 504.84 20,759.02
5390 21 0.01 23.18 486.78 20,016.39
6320 68 0.04 39.31 2673.08 109,917.05

屋面檀条 7820 69 0.63 48.64 3356.16 138,005.30


5 CC180*2.2*20*70
SHORING OF HOUSE 7490 885 0.72 46.59 41232.15 1,695,466.01
5990 68 0.42 37.26 2533.68 104,184.92

系杆 5614 34 2.2 48 1632 67,107.84


6 PIP114*3
STEEL TIE POLE 7114 119 10.2 62 7378 303,383.36
D 20 D 20 9627 12 24 288 11,842.56
9279 12 0.6 115 1380 56,745.60
8475 6 0.28 105 630 25,905.60
9412 22 0.98 117 2574 105,842.88
8528 12 0.26 106 1272 52,304.64

支撑 9412 6 0.3 117 702 28,866.24


7 L100*8
STEEL STUDDLE 9615 24 23.5 564 23,191.68
9733 24 24 576 23,685.12
9737 12 24 288 11,842.56
9292 12 23 276 11,349.12
9146 12 22.5 270 11,102.40
10970 230 8 105 24150 993,048.00

Corbel Board 12400 754 24 117 88218 1,863,164.16


8 1.0mmt*915w*76h
楼承板 5500 28 0.2 52 1456 59,870.72
12570 40 1.5 119 4760 195,731.20
9 Steel Bolt 预埋锚 ∅24圆钢 0.73 720 2 4 2880 118,425.60

10 Door Material 门料 2.5mm*100*100方管 6 200 8 45 9000 370,080.00


(方管)

Color Steel sheet 0.5mmt*1000*C海蓝 16 16 4500 72000 1,520,640.00


11
彩涂卷 0.5mmt*1000*C白灰 16 16 4500 72000 2,960,640.00

12 Board of Stair 楼 3mmt*1000w 1.5 36 0.2 36 1296 53,291.52


梯平台板
Steel Cullis
13 不 1220*3200 3200 150 2 80 12000 493,440.00
锈钢天沟
1900*2600 1.9 300 70 30 9000 370,080.00
1700*1000 1.7 10 2 12 120 4,934.40
14 Windows 窗
14 Windows 窗
1700*1700 1.7 100 30 20 2000 82,240.00
3800*1000 3.8 150 50 25 3750 154,200.00

15 Padding Material 50mmt 24.32 500 60 10 5000 205,600.00


玻璃棉

16 Rainspout 落水管 ∅160 4 300 30 750 225000 32,000.00


17 Lifter 升降机 8 50 1800 14400 160,000.00
18 Light Grinder 磨光 100# 100 2 3 300 92,000.00

Steel Plate
Folding
19 Equipment 1 125,000.00
Including
Parts as Follow:

20 Transfer Tricycle 4 4 150,000.00


三轮车

21 Tow Truck 拖车 6 6 750,000.00


22 electric folding 1.6*12 12 3 15 500 1500 600,000.00
gate
Steel Channel of
23 Stair 25 12 40 0.01 36 1440 155,520.00
楼梯槽钢
Angle Iron of
24 Stair L75*5 6 20 0.001 6 120 12,960.00
楼梯角钢
0.94 160 5.7 18 2880 311,040.00
Board of Stair
25 3mmt*320w*197h 1.2 92 3.1 22 2024 218,592.00
楼梯踏步板
2.64 30 2.8 48 1440 15,550.00

10mmt*1500*6000 6000 10 1 710 7100 321,000.00


26 Steel Plate
5mm*15000*6000 6000 20 1 350 7100 321,000.00

27 electrom bicycle 4 20,000.00

28 frizeer 1 5,000.00

29 steamed rice on 2 4,000.00

30 win line for cover 35PKGS 1320 1320 54,278.40


steel

31 water drain system 242PKGS 5129 5129 57,034.48


material

32 install bolt 2PKGS 140 140 5,756.80

33 high level bolt 41 2760 2760 113,491.20

34 nail cap 52 1000 1000 81,120.00

35 food mixer 1 100 100 8,112.00

36 conveyor 1 300 300 24,336.00

37 electronic scale 10 50 50 4,056.00

38 water purifier 1 100 100 8,112.00

39 reinforced machine 1 150 150 12,168.00


40 wall coating 200 10 25 5000 120,000.00

41 adhesive 50 2 25 1250 3,000.00

42 spray coating 1 1 30 30 10,000.00


machine

43 limtation stone 100 40 75 7500 1,000.00


point powder

44 plastic board 9mm*300mm*4200mm 1800 20 1 1800 33,480.00

45 melamine board 12mm*1220*2440 300 11 30 9000 360,000.00

46 800mm*800mm 3000 60 15 4500 108,000.00


floor tile
400*800mm 1600 20 7 11200 288,000.00

47 electric metar 50 50 5,000.00

48 water metar 50 40 5,000.00

49 ventilator 75 300 20,000.00

8 9m 1500 3.6 5400 235,980.00


50 rebar
12 9m 2000 5.4 10800 471,960.00

total 94,710,466.50
8190801
102901267.5
8190801
102901267.5
Specification and Bill OF Qua

Item Description
A. Sub Structure
I. Excavation and Earth Work
1.1 Site clearing excavation to remove top soil to an averagedepth of 200mm
1.2 Bulk excavation in ordinary soil to remove Vegetation roots to a depth not exceeding
500mm starting from cleared surface.
1.3 trench excavation in ordinary soil for footing to depth of 1500 mm; starting from
cleared surface.
1.4 Fill around masonary with selected materials brought from out side well rolled and
compacted in layers not exceeding 200 mm thick.
1.5 Fill under hard core with selected materials brought from out side well rolled and
compacted in layers not exceeding 200 mm thick.
1.6 Cart away surplus excavated material to appropriate tip.
1.7 250mm thick basaltic stone hardcore well rolled consolidated and blended with crushed
stone.
Total Carried To Summary
II.Concrete Work
2.1 50mm thick lean concrete in class C-5 with minimum Cement content of 150 kg/m 3.
a) Under ground floor
b) Under ground floor slab
2.2 Reinforced concrete quality C-25,minimum cement content of 360 kg of cement/m 3
filled in to form work and vibrated around rod reinforcement (formwork and
reinforcement measured separately)

a) in shear wall
b) in foundation column
c) In grade beams
d) In 10 cm thick ground floor slab
2.3 10mm thick Styrofoam joint filler board 100mm wide in movement joint between edge
of concrete slab and grade beams
2.4 Supply and fix in position timbered or steel or a combination of two Formwork;
sufficient to contain the wet concrete with out leakage. Enough to support temporary
loading and pressure from placing compaction or vibration without displacement or
appreciable deflection.

a) in isolated footing pad


b) in foundation column
c) In grade beams
2.5 Steel bar reinforcement according to structural drawings. Reinforcement shall be free
from dirt, oil, grease, paint, retarders, etc and any other substances which may affect
the reinforcement and concrete bondage (price include cutting, bending, placing in
position)
a) Ø 8 mm Deformed bar
b) Ø 10 mm Deformed bar
c) Ø 12 mm Deformed bar
d ) Ø 14 mm Deformed bar
e) Ø 16 mm Deformed bar
f) Ø 20 mm Deformed bar
Total Carried To Summary
III.Masonary Work
3.1 500 cm. Thick trachytic or equivalent masonry for foundation wall below ground level
bedded in 1:4 cement mortar to a depth not exceeding 1500mm.(for ramp and steir)

Total Carried To Summary


Sub Total Of A Carried To Summary
B. Super Structure
I. Concrete Work
1.1 Reinforced concrete class C-25 with minimum Cement content of 360kg/m 3 well
spread leveled. And filled into formwork and vibrated around steel reinforcement (steel
and formwork measured separately)
a) In elevation columns.
b) In top tie beams
1.2 Supply & Cut in size and fix in position timbered or steel or a combination of two
Formwork; sufficient to contain the wet concrete with out leakage. Enough to support
temporary loading and pressure from placing compaction or vibration without
displacement or appreciable deflection.
a) In elevation columns.
b) In top tie beams
1.3 Supply and placing in position Reinforcement steel bar according to Structural
drawings price includes cutting , bending ,tying with wire. For Sentry box and Guard
house
a) Ø 8mm Deformed bar
b) Ø 10mm Deformed bar
c) Ø 12mm Deformed bar
d) Ø 14mm Deformed bar
e ) Ø 16mm Deformed bar
f) Ø 20 mm Deformed bar
Total Carried To Summary
II. Block Work
2.1 Class "B" 20cm thick external HCB wall which can satisfy the designed strength ,
bedded in cement mortar (1:3).Price shall include mortar bed
Total Carried To Summary
V. Aluminum Work
5.1 Supply and fix Anodized and polished aluminum doors and windows fabricated with
2mm thick bronze color aluminum profiles including, the best quality cylinderical
door locks, all necessary iron mongaries, glass stopper and other related works. Price
shall also include 5 mm clear glass Glazing and all the necessary works.
1 ) DW (4000 x 2500) mm
5 ) W (1300 x 64000) mm
5.2 Supply and Fix Stair case hand rail made of aluminum profiles consisting of baluster
and handrail all as per shown on the detail drawing. Price shall include fixing
accessories and other necessary works.
Total Carried To Summary
VI. Finishing
Finishing work include all surface pre-cleaning, preparation and post cleaning.
6.1 Apply two coats of cement mortar plaster wall finish to external surface of hollow
block concrete wall with mix ratio ( 1:3 )
6.3 Apply three coats of cement mortar plaster to internal hollow block concrete wall
surface with mix ratio (1: 3 )
6.4 Apply two coats of cement mortar plaster to internal columns, intermediate beams and
top tie beams with mix ratio ( 1:2 )
6.7 Supply and lay 400 x 400 x 40 mm thick parquet flooring . Price includes all the
necessary work.
6.8 Supply and lay 150x 150 x 6 mm thick white ceramic wall tile for toilet area. Price
includes cement mortar backing, white cement grouting and all the necessary work.
6.90 Supply and lay 8 mm thick non slippery colored ceramic floor tile . Price includes
cement mortar backing, white cement grouting and all the necessary work.
6.10 Provide and lay White Welega Marble tile . Joints grouted in cement and sand mortar
(mix.1:3)
a) 30mm thick white Welega marble tile .
b) 300 X 30mm thick for stair tread .
c) 160 X 20mm thick for stair riser .
6.11 100 x 20 mm thick ceramic skirting stuck to wall. price includes cement sand mortar
backing (mix. 1:3) and all the necessary work.
6.12 100 x 20 mm thick Porcelain skirting stuck to wall. price includes cement sand mortar
backing (mix. 1:3) and all the necessary work.
6.13 333 x 30mm thick white marble window sill bedded with cement sand mortar (mix.
1:3)
Total Carried To Summary
VII. Painting
7.1 Apply three coats of approved type Quartz Painte to all external wall surfaces.
7.2 Apply three coats of approved type plastic paint to all internal wall surfaces.
7.3 Apply two coats of approved type plastic paint to all internal columns, intermediate
beams and top tie beams surfaces.
Total Carried To Summary
8. ELECTRICAL INSTALLATION
8.20

flash mounting board with complate accessories and busbar of 3*32A. AND separated
neutral made of hard plastic lockable door with main swich of 3*20A CAN,3 phase and
consisting of 3pcs 10AMP
8.30 Light points PVC insulated conductor of 2*2.5
8.40 light points in rigid thermoplastic conduit of 16mm
fed by pvc conductor of 3x2.5mm2
(wire to be of ethioplastic or approved equivalent)
8.50 Philips TMS 1012/236/ I with 2*TLD 36W540
8.60 Massive 32003/21/10 EZ7 60w lamp
8.70 single(774001+774041)
8.80 Duoble(774005+774042)
8.90 Two-Way(774006+774041)
8.1 double Two-Way(774006+774041)
8.11 4x2.5/26 sqmm
8.12 4x2.5/ s qmm
8.13 TV Point PVC conduit of 19mm dia . Include .juction boxes with cover

Total Carried To Summary


Total Carried To Summary B
Total Carried To Summary A+B
cification and Bill OF Quantity for Office Building

Unit Qty Rate

m2 140.00 40.00

m3 43.00 140.00

m3 22.20 140.00

m3 17.76 220.00

m3 43.00 180.00
m 3
116.50 170.00

m2 86.00 180.00

m2 11.66 140.00
m2 86.00 140.00

m3 93.24 3,400.00
m 3
2.47 3,400.00
m3 3.55 3,400.00
m 2
90.30 620.00

ML 115.00 20.00

m2 88.20 320.00
m 2
6.00 320.00
m2 71.04 320.00

Kg. 4940.00 130.00


Kg. 951.24 130.00
Kg. 7090.00 130.00
Kg. 0.00 130.00
Kg. 0.00 130.00
Kg. 0.00 130.00

m3 78.40 1250

m3 2.43 3,600.00
m3
3.55 3,600.00

m2 43.20 360.00
m2
568.80 360.00

Kg. 5097.00 130.00


Kg. 2450.00 130.00
Kg. 1740.00 130.00
Kg. 0.00 130.00
Kg. 0.00 130.00
Kg. 0.00 130.00

m2 119.88 620.00
No. 1 92,160.00
No. 6 32,760.00

ML 20.00 1,000.00

m2 310.50 100.00

m2 310.50 100.00

m2 310.50 100.00

m2 0.00 550.00

m2 216.00 320.00

m2 115.20 500.00

m2 0.00 850.00
ml 67.60 850.00
ml 67.60 850.00

ml 215.60 60.00

ml 0.00 55.00

ml 75.60 850.00

m2 310.50 500.00
m 2
310.50 300.00

m2 310.50 300.00

NO 4 2,000.00
NO 16 65.00
NO 12 65.00
NO 8 255.00
No 18 390.00
PCs 18 65.00
" 4 65.00
" 5 55.00
" 4 80.00
m 867 55.00
m 670 46.00
no
fice Building

Amount

5,600.00

6,020.00

3,108.00

3,907.20

7,740.00
19,805.00

15,480.00
61,660.20

1,631.70
12,040.00

317,016.00
8,411.61
12,076.80
55,986.00

2,300.00

28,224.00
1,920.00
22,732.80

642200
123,661.20
921,700.00
-
-
-
2,149,900.11

98,000.00
98,000.00
2,309,560.31

8,748.00
12,787.20

15,552.00
204,768.00

662,610.00
318,500.00
226,200.00
-
-
-
1,449,165.20

74,325.60
74,325.60
92,160.00
196,560.00

20,000.00
308,720.00

31,050.00

31,050.00

31,050.00

69,120.00

57,600.00

-
57,460.0
57,460.0

12,936.00

64,260.00
411,986.00

155,250.00
93,150.00

93,150.00
308,720.00

8,000.00
1,040.00
-
-
780.00
2,040.00
7,020.00
1,170.00
260.00
275.00
320.00
47,685.00
30,820.00

99,410.00
2,652,326.80
4,961,887.11
Summary of BOQ For Bekri Abdi

1 ware house A (96x54)


2 ware house B (96X54)
3 ware house C (96X54)
5Office
TOTAL SUMMERY
of BOQ For Bekri Abdi
Amount
31,538,585.34
31,538,585.34
31,538,585.34
4,961,887.11
94,615,756.03