1 Terassement
S3 2 1 1 0.25 m3
1.3 Remblai 1
1,3,1 S1 0.6
S1 1.17 0.7 m3
S2 3 1.4 0.7 m3
S3 4 2.38 0.7 m3
S4 3 0.7 m3
S5 1
S6 1
S7 2
1,3,2 1
1 61,02-13,524
1.4 Terre a évacuer 1 m3
2 Fondation
18
Partielles Totals
22.016
0.605
2.002
0.5
1.62
#REF!
0.428
#REF!
1.26
3.276
2.94
1.666
47.496 ( Décapage*0,20 + Déblai ) - Remblai
0.256
0.968
0.288
0.484
0.6756
2.6716
1.024
3.872
1.152
1.936
3.104
1.484
0.504
13.076
10.94
16.9
8.45