PLATAFORMA DE SERVICIO
MEDIDAS DEL CLIENTE COMERCIAL-TUBOS
LONGITUD ESTIMADA LONGITUD DE
N° DEL PILOTE FABRICACION
DIAMETRO (m) SUGERIDA (m)
PILOTE NO. MUROTHK. (mm) DIAMETRO DEPILOTE (mm) MUROTHK. (mm)
DEPILOTE (mm)
ACCESO DE PLATAFORMA
MEDIDAS DEL CLIENTE COMERCIAL-TUBOS
LONGITUD ESTIMADA LONGITUD DE
N° DEL PILOTE FABRICACION
DIAMETRO (m) SUGERIDA (m)
PILOTE NO. MUROTHK. (mm) DIAMETRO DEPILOTE (mm) MUROTHK. (mm)
DEPILOTE (mm)
PLATAFORMA A TIERRA
MEDIDAS DEL CLIENTE COMERCIAL-TUBOS
LONGITUD ESTIMADA LONGITUD DE
N° DEL PILOTE FABRICACION
DIAMETRO (m) SUGERIDA (m)
PILOTE NO. MUROTHK. (mm) DIAMETRO DEPILOTE (mm) MUROTHK. (mm)
DEPILOTE (mm)
P
L
A
N
LONGITUD
C
PINTADAEL. (m) H
A
18 ### S
18 ### 1
18 ### .
18 ### 2
0
18 ### X
18 ### 2
18 ### .
4
18 ### 0
18 ### N
18 ### °
18 ### D
18 ### E
### P
###
L
A
N
LONGITUD
C
PINTADAEL. (m) H
N
A
18 ### °S
18 ### D
1
18 ### E.
2
P
0
LX
A
2
N
.
LONGITUD
C
4
PINTADAEL. (m) H
0
A
10.16 ### S
10.16 ### 1
10 ### .
10 ### 2
0
11 ### X
11 ### 2
11 ### .
4
11 ### 0
11 ###
11 ###
11 ###
11 ###
11 ###
11 ###
11 ###
11 ###
12 ###
12 ###
13 ###
13 ###
14 ###
14 ###
15 ###
15 ###
16 N
###
16 °
###
18 ###
D
18 E
###
### P
L
A
N
LONGITUD
C
PINTADAEL. (m) H
A
4 S
###
6.5 ### 1
9 .
###
9.5 ### 2
0
9.5 ### X
4 2
###
6.5 ### .
4
9 0
###
9.5 ###
9.5 ###
4 ###
6.5 ###
9 ###
9.5 ###
9.5 ###
5 ###
7 ###
9 ###
9.5 ###
9.5 ###
6 ###
7.5 ###
9 ###
9.5 ###
9.5 ###
7 ###
8 ###
9 ###
8 ###
8.5 ###
9 ###
###
Mina Justa
Contract 101946-SOP-0514B - Main Price
Contract Pricing Schedule
DISCIPLINE: General
MAIN AREA DESCRIPTION: Port Marine Facilities
SUBAREA DESCRIPTION:
WBS /
REV. WBS DESCRIPTION PWP
AREA
A1 DIRECT COSTS
P TRESTLE
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
0514
DESCRIPTION
Piles for the Trestle. Fabrication includes splicing of supplied pile segments into piles and coating of the
splice lcoations
Steel pilecaps for the trestle, including fabrication, welding, and coating
Installation of pilecaps on the installed piles, including but not limited to lifting, field welding, coating touch up
Steel girders for the trestle, including fabrication, welding, and coating
Installation of girders between the installed pilecaps, including but not limited to lifting, field welding, coating
touch up
Steel beams and tubular bracing with all connection hardware, including fabrication, and coating
Installation of beams and bracing, including but not limited to lifting, field welding, bolting, coating touch up
Grating for the roadway along the trestle, including supply of all connection hardware
Installation of grating for the trestle roadway
Grating outside of the roadway along the trestle, including supply of all connection hardware
Installation of grating outside of the trestle roadway
Handrails along the perimeter of the trestle, including but not limited to fabrication and coating
Installation of handrails along the perimeter of the trestle
Bullrails along the trestle roadway, including but not limited to fabrication, coating and supply of all connection
hardware
Installation of bullrails along the trestle roadway
Piles for the Land Platform. Fabrication includes splicing of supplied pile segments into piles and coating of
the splice lcoations
Steel pilecaps for the Land Platform, including fabrication, welding, and coating
Installation of pilecaps on the installed piles, including but not limited to lifting, field welding, coating touch up
Steel beams and tubular bracing with all connection hardware, including fabrication, and coating
Installation of beams and bracing, including but not limited to lifting, field welding, bolting, coating touch up
Grating for the roadway sections of the Land Platform, including supply of all connection hardware
Installation of roadway grating
Grating for the walkway sections of the Land Platform, including supply of all connection hardware
Installation of walkway grating
Handrails along the perimeter of the Land Platform, including but not limited to fabrication and coating
Piles for the Service Platform. Fabrication includes splicing of supplied pile segments into piles and coating
of the splice lcoations
Piles for the caissons. Fabrication includes splicing of supplied pile segments into piles, coating is not
required
Piles for the Caissons, including all works as required based on Contractor's installation methodology, such
as, but not limited to, pitching, driving, drilling, grouting, testing, and underwater cutoff
Steel pilecaps for the Service Platform, including fabrication, welding, and coating
Installation of pilecaps on the installed piles, including but not limited to lifting, field welding, coating touch up
Steel girders for the Service Platform, including fabrication, welding, and coating
Installation of girders between the installed pilecaps, including but not limited to lifting, field welding, coating
touch up
Steel beams and tubular bracing with all connection hardware, including fabrication, and coating
Installation of beams and bracing, including but not limited to lifting, field welding, bolting, coating touch up
Grating for the roadway sections of the Service Platform, including supply of all connection hardware
Grating for the walkway sections of the Service Platform, including supply of all connection hardware
Handrails along the perimeter of the Service Platform, including but not limited to fabrication and coating
USD 8,273,467.27
USD 3,345,096.36
101946-5500-S-922
101946-5500-S-923 26.00 ea 94,244.06 2,450,345.64
101946-5500-S-924
101946-5500-S-927
49.60 t 2,726.08 135,213.40
101946-5500-S-928
101946-5500-S-927
49.60 t 680.07 33,731.40
101946-5500-S-928
101946-5500-S-930 100.00 t 2,726.08 272,607.66
N° de N° DE
Descrición de la partida
Partida PILOTES
FABRICACION 3
INSTALACION 3
Estructuras Metálicas :ROYECTO: PORT- MARINE FACILITIES - MINERA MA
FABRICACION
PLANCHAS
176.00 KG 668,514.00 0.86 0.50 0.070
176.00 KG 668,514.00 0.86 0.50 0.070
84.00 KG 319,063.50 0.86 0.50 0.070
PLANCHAS
21.00 KG 79,765.88 0.86 0.50 0.070
21.00 KG 79,765.88 - - -
21.00 KG 79,765.88 - - -
VALOR TOTAL EN SOLES SIN EL IGV
1.36
OTROS
MANO DE OBRA (Ingenieria y TRANSPORTE (carga y SOLDADO/PINTADO E RENTABILIDAD ESPERADA
(Dolares) Logistica) descarga ) (Dolares) INCADO EN OBRA (Dolares)
(Dolares)
4219135.35274193
103410.18
ACCESO DE PLATAFORMA
MEDIDAS DEL CLIENTE COMERCIAL-PLANCHAS
LONGITUD ESTIMADA LONGITUD DE
LONGITUD
N° DEL PILOTE FABRICACION
DIAMETRO DE PINTADAEL. (m)
PILOTE NO. MUROTHK. (mm) PLANCHA COMERCIAL (MURO THK.)(mm) (m) SUGERIDA (m)
PILOTE (mm)
PLATAFORMA A TIERRA
MEDIDAS DEL CLIENTE COMERCIAL-PLANCHAS
LONGITUD ESTIMADA LONGITUD DE
LONGITUD
N° DEL PILOTE FABRICACION
DIAMETRO PINTADAEL. (m)
PILOTE NO. MUROTHK. (mm) PLANCHA COMERCIAL (MURO THK.)(mm) (m) SUGERIDA (m)
DEPILOTE (mm)
PLATAFORMA DE SERVICIO
MEDIDAS DEL CLIENTE COMERCIAL-PLANCHAS
LONGITUD ESTIMADA LONGITUD DE
LONGITUD
N° DEL PILOTE FABRICACION
DIAMETRO PINTADAEL. (m)
PILOTE NO. MUROTHK. (mm) PLANCHA COMERCIAL (MURO THK.)(mm) (m) SUGERIDA (m)
DEPILOTE (mm)
0.762
3.00 TRANSPORTE, PUESTA EN OBRA Y RETIRADA DE EQUIPO COMPLETO PARA PERFORACIÓN DE PILOTE
2.01 Transporte, puesta en obra y retirada de equipo completo para perfo Glb 1.00 25,000.00
2.02 % herramientas % 2.00% 25,000.00
SUB-TOTAL 4.00
4.00 OTROS
4.02 Pruebas de carga dinámica en pilotes und 74.00 5,100.00
4.03 Stand by cuadrilla de Pilotes(3operador , 4ayudante de grua y 8ma hra 296.00 249.00
4.04 Grúa para Izaje y manipuleo de pilotes dìa 60.00 880.00
SUB-TOTAL 6.00
TOTAL PROPUESTA, sin I.G.V.
PESO TOTAL
PRECIO DE KILOS EN DOLARES
O TOTAL DE PILOTES
74 PLATAFORMA DE SERVICIO
Parcial PLATAFORMA DE SERVICIO-CAISSON PILE SCHEDULE
soles ACCESO DE PLATAFORMA
PLATAFORMA A TIERRA
30,000.00
15,000.00
22,500.00
2,800.00
2,400.00
22,800.00
6,300.00 30
10,000.00
111,800.00
528,360.00
20,128.00
548,488.00
25,000.00
500.00
25,500.00
2,431,788.46
18,500.00
29,600.00
74,000.00
2,377,620.00
1,320,900.00
2,113,440.00
8,365,848.46
377,400.00
73,704.00
52,800.00
503,904.00
9,555,540.46
1,735,857.38
1.64
129128.9251125
37979.1 28725.8544 1.3221224027
84 Tiempo dias
N° pilotes LONG APROX DE PILOTE TOTAL DE N° DE TUBOS DE 6m empalme insitu Pintado
12 42.00 84.00 8 4
3 42.00 21.00 2 1
28 37.71 176.00 19 10
31 34.06 176.00 21 11
74 457.00
T 1max= 21 11
T 1= 21 11
mpo dias
Incado total (dias) dias/pilote
8 20 1.67
2 5 1.67
19 48 1.71
21 53 1.71
total= 126
T 2max= 53
T2 = 60
PRESUPUESTO
CONSTRUCCION DE PILOTES CON TUBO DE ACERO
N° PILOTES
P.U.
Item Descripción Unidad Cantidad soles
1.00 OBRAS PRELIMINARES
1.01 Movilización y Desmovilización de equipos y personal.
1.01.1 Movilización y desmovilización de equipos y materiales. Glb 1.00 30,000.00
1.01.2 Movilización y desmovilización de personal. Glb 1.00 15,000.00
1.02 Obras provisionales Oficina y almacén. unidad 1.00 22,500.00
1.03 Alojamiento y Alimentación (35 personas por día). persona/día 35.00 80.00
1.04 Transporte local del personal (MARCONA-MUELLE). día 60.00 40.00
1.05 Camioneta pick-up para apoyo logístico. día 60.00 380.00
1.06 Suministro de agua Glb 1.00 6,300.00
1.07 Trazo y replanteo topográfico. día 50.00 200.00
SUB-TOTAL 1.00
4.00 OTROS
4.02 Pruebas de carga dinámica en pilotes und 74.00 5,100.00
4.03 Stand by cuadrilla de Pilotes(3operador , 4ayudante de grua y 8ma hra 296.00 249.00
4.04 Grúa para Izaje y manipuleo de pilotes dìa 60.00 880.00
SUB-TOTAL 4.00
475,524.00
20,128.00
495,652.00
2,431,788.46
18,500.00
29,600.00
148,000.00
2,113,440.00
1,374,740.51
6,116,068.96
377,400.00
73,704.00
52,800.00
503,904.00
7,227,424.96
1,735,857.38
1.24
97667.90491787
28725.9
84 Tiempo dias
LONG APROX DE PILOTE TOTAL DE N° DE TUBOS DE 6m empalme insitu Pintado Incado
42.00 84.00 8 4 8
42.00 21.00 2 1 2
37.71 176.00 19 10 19
34.06 176.00 21 11 21
457.00 total=
T 1max= 21 11 T 2max=
T 1= 21 11 T2 =
total (dias) dias/pilote TIEMPOS
20 1.67
5 1.67
48 1.71
53 1.71
126
53
60
CALCULO DE F
319,063.50 150 30 29
319,063.50 60 5 115
MATERIAL DE SEGURIDAD 5%
Total (S/.) =
PRECIO /KILO
N° DE TUBOS SOBRANTES
4
5
0
0
1
29 248.793
130500 520
13800 -
7215
151515.00
0.140 DOLARES
ANALISIS DE MANO DE OBRA PARA 21 PILOTES
TIEMPO
N° DE PILOTES
PESO TOTAL
DE OBRA
CUADRILLA T/H/T (HORAS) COSTO/HH COSTO (S/.)
HERRAMIENTAS
VECES TIEMPO SOLES/DIA COSTO (S/.)
5040
- 21.00 60 2520
- 21.00 25 1050
- 21.00 15 630
- 10.50 40 840
TOTAL= 5040
ON PERSONAL Y SEGURIDAD
VECES UND COSTO/UNIT COSTO (S/.)
1 UND 12 228
1 PARES 30 240
1 UND 50 200
1 UND 30 120
1 PARES 50 950
1 UND 47 893
2 UND 7 266
1 UND 20 160
3 UND 3 171
2 PARES 8 304
TOTAL= 3532
Mina Justa
Contract 101946-SOP-0514B - Main Price
Contract Pricing Schedule
DISCIPLINE: General
MAIN AREA DESCRIPTION: Port Marine Facilities
SUBAREA DESCRIPTION:
WBS /
REV. WBS DESCRIPTION PWP CWP
AREA
A1 DIRECT COSTS
A1.01 TRESTLE
A1.02.15 5511 SUPPLY OF CONCRETE FOR CRANE PAD AND ABUTMENT 0514 0514
A1.02.16 5511 SUPPLY OF REINFORCING STEEL FOR CRANE PAD AND 0514 0514
ABUTMENT
A1.04.08 5561 SUPPLY OF SEAWATER INTAKE HEAD PROTECTION FRAME 0514 0514
A1.05.02 5552 INSTALLATION OF ONSHORE ACID PIPES AND VALVES 0514 0514
A1.06.06 5541 DESIGN AND SUPPLY OF MOORING BUOY ANCHORS 0514 0514
A1.07 OTHER
A1.07.01 5541 DESIGN AND SUPPLY OF CATHODIC PROTECTION SYSTEM 0514 0514
5512,
A1.07.02 INSTALLATION OF CATHODIC PROTECTION SYSTEM 0514 0514
5521, 5531
A1.08.02 5561 REQUIRED MATERIALS FOR SUPPORTS AND INSTALATION 0514 0514
A1.09 ELECTRICAL
A1.09.01 5551 SULPHURIC ACID SYSTEM 0203B 0514
A1.09.32 5513 EARTHWORKS FOR INSTALATION OF THE E&I CABLING 0514 0514
A1.10 PROCUREMENT
A1.10.01 5531 SUPPLY OF JIB CRANE 0514 0514
A1.10.02 5531 NITROGEN PACKAGE GENERATION 0514 0514
A2 INDIRECT COSTS
A2.01 0000 SITE MOBILISATION & DEMOBILISATION
A2.01.01 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.01.02 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.01.03 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.01.04 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.01.05 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.01.06 0000 SITE MOBILISATION & DEMOBILISATION 0514 0514
A2.02 0000 SITE FACILITIES
A2.02.01 0000 SITE FACILITIES 0514 0514
A2.02.02 0000 SITE FACILITIES 0514 0514
A2.03 0000 MAINTENANCE
A2.03.01 0000 MAINTENANCE 0514 0514
A2.03.02 0000 MAINTENANCE 0514 0514
A2.03.03 0000 MAINTENANCE 0514 0514
A2.03.04 0000 MAINTENANCE 0514 0514
A2.03.05 0000 MAINTENANCE 0514 0514
A2.03.06 0000 MAINTENANCE 0514 0514
A2.04 0000 EQUIPMENT
Steel pilecaps for the trestle, including fabrication, welding, and coating
Steel girders for the trestle, including fabrication, welding, and coating
Piles for the Land Platform. Fabrication includes splicing of supplied pile
segments into piles and coating of the splice lcoations
Piles for the Land Platform, including all works as required based on
Contractor's installation methodology, such as, but not limited to,
pitching, driving, drilling, grouting, testing. Quantity is based on length
of pile installed below seabed.
Steel pilecaps for the Land Platform, including fabrication, welding, and
coating
Installation of pilecaps on the installed piles, including but not limited to
lifting, field welding, coating touch up
Steel beams and tubular bracing with all connection hardware, including
fabrication, and coating
Installation of beams and bracing, including but not limited to lifting, field
welding, bolting, coating touch up
Grating for the roadway sections of the Land Platform, including supply
of all connection hardware
Installation of roadway grating
Grating for the walkway sections of the Land Platform, including supply
of all connection hardware
Installation of walkway grating
Handrails along the perimeter of the Land Platform, including but not
limited to fabrication and coating
Bullrails along the Service Platform roadway area, including but not
limited to fabrication, coating and supply of all connection hardware
Installation of bullrails
Contractor may source the concrete from the on site batch
facility/supplier
Supply of reinforcing steel and wire mesh for the crane pad, including
abutment
Concrete crane pad for the maintenance and abutment for platform
access located adjacent to the land platform, including concrete forming,
reinforcing steel installation, concrete placement, curing and testing
Any earthworks required for the installation of the concrete crane pad
earthworks required for the installation of the concrete crane pad that
includes the area behind the required protection wall
Piles for the Service Platform, including all works as required based on
Contractor's installation methodology, such as, but not limited to,
pitching, driving, drilling, grouting, testing. Quantity is based on length of
pile installed below seabed.
Piles for the caissons. Fabrication includes splicing of supplied pile
segments into piles, coating is not required
Piles for the Caissons, including all works as required based on
Contractor's installation methodology, such as, but not limited to,
pitching, driving, drilling, grouting, testing, and underwater cutoff
Steel pilecaps for the Service Platform, including fabrication, welding,
and coating
Installation of pilecaps on the installed piles, including but not limited to
lifting, field welding, coating touch up
Steel girders for the Service Platform, including fabrication, welding, and
coating
Installation of girders between the installed pilecaps, including but not
limited to lifting, field welding, coating touch up
Steel beams and tubular bracing with all connection hardware, including
fabrication, and coating
Installation of beams and bracing, including but not limited to lifting, field
welding, bolting, coating touch up
Grating for the roadway sections of the Service Platform, including
supply of all connection hardware
Installation of roadway grating
Grating for the walkway sections of the Service Platform, including
supply of all connection hardware
Installation of walkway grating
Handrails along the perimeter of the Service Platform, including but not
limited to fabrication and coating
Bullrails along the Service Platform roadway area, including but not
limited to fabrication, coating and supply of all connection hardware
Installation of bullrails
Caissons for the seawater system and acid system, including but not
limited to, supply, fabrication, coating of caissons, topside and piping
connections, and reinforcing steel
Installation of caissons, including but not limited to, lifting, subsea
placement, reinforcement installation and concrete placement for the pile
connection, topside connections, and coating touch up
Boat berth, including structural steel members, pile clamps, grating,
fenders, handrails, mooring cleats, coating of all steel, ladder
Concrete anchor blocks for the seawater intake, including but not limited
to concrete, reinforcement, bolts, neoprene, curing and testing of
concrete
Brackets supporting the seawater intake piping along the steel structure
5561-SC-501
5561-SC-502
5561-PU-504 Pump seawater vertically from the sea to the top of the marine service
5561-PU-505 platform
5561-SC-501
Seawater intake head piping and steel protection frame
5561-SC-502
5552-PU-518
5552-PU-519
Design and supply of 15m3 acid system overflow tank with valves and
fittings suitable for sulfuric acid.
Installation of acid overflow tank including connections to the acid piping
from the booster pump area.
Including but not limited to sinker anchor block, chain, swivel and
shackles
Design and supply of mooring buoy anchors, including but not limited to
anchors, any additional geotechnical investigation deemed necessary by
the contractor
Installation of the mooring buoy anchors, including any necessary
seabed preparation
Design and supply of anchor chains and hardware for the mooring
buoys, including but not limited to chains, shackles and swivels. Unit of
measure is based on total chain length required
Installation and testing of mooring buoys (supplied by others) and anchor
chains, including connection of all hardware
Commissioning and testing of mooring system, including load test, set-up
and commissioning of navigation lights
The Contractor will be responsible for carrying out its own quantity take-
offs for the supply and installation of all electrical bulks
Supply and install supports, mounting brackets, stands, fittings and all
other minor materials required to complete the installation
QQABA-45000 FRP Cable ladder - 450mm STRAIGHT, incl. fixing accessories & divider
QQABE-45000 FRP Cable ladder - 450mm SUN COVER, incl. fixing accessories
QQABB-45000 FRP Cable ladder - 450mm BEND, incl. fixing accessories
QQABD-45000 FRP Cable ladder - 450mm RISER, incl. fixing accessories
QGWXX-12000 Earth Cable-Cu, Gn/Y PVC 1C x 120mm2
QGWXX-07000 Earth Cable-Cu, Gn/Y PVC 1C x 70mm2
QNDXX-12000 Earth Cable-Bare Cu 1C x 120mm2
DB-L&SP, 125A, 24 pole, main switch, ext. ltg contactor, fully fitted CB,
QMBBB-03600
IP66
QMABX-01600 GPO - Switched 16A metal, double, surface mounted, IP66
QMAAX-06300 W.O - 3ph 63A, 5 pin (3ph+N+E), metal, surface mounted, IP66, incl plug
UNIT
REFERENCE DRAWINGS / EXTENDED PRICE
QTY UoM PRICE
DOCUMENTS (USD)
(USD)
USD 2,283,407.16
USD 937,913.05
101946-5500-S-922
101946-5500-S-923 26 ea -
101946-5500-S-924
101946-5500-S-922
101946-5500-S-923 585 m -
101946-5500-S-924
101946-5500-S-927
64,550.99 kg 2.73 175,970.95
101946-5500-S-928
101946-5500-S-927
64,550.99 kg 0.68 43,899.10
101946-5500-S-928
101946-5500-S-922
101946-5500-S-923 697.50 m -
101946-5500-S-924
101946-5500-S-960
35.00 m3 -
101946-5500-S-961
101946-5500-B-501
3066101.00 m3 -
101946-5500-P-924
101946-5500-S-960
1.00 LS -
101946-5500-S-961
101946-5500-E-501
1.00 LS -
101946-5500-E-502
101946-5500-E-501
1.00 LS -
101946-5500-E-502
101946-0000-C-0009
20000.00 m2 -
101946-5000-G-501A
4.00 LS -
101946-5500-S-960
101946-5500-S-961 50.00 m3 -
101946-5500-S-962
101946-5500-S-960
101946-5500-S-961 1.00 ea -
101946-5500-S-962
101946-5500-S-960
101946-5500-S-961 48.46 m -
101946-5500-S-962
USD 692,930.04
101946-5500-S-922
101946-5500-S-923 12.00 ea -
101946-5500-S-924
101946-5500-S-922
101946-5500-S-923 270.00 m -
101946-5500-S-924
3.00 ea -
3.00 ea -
101946-5500-P-902
480.00 m -
101946-5500-P-905
101946-5500-P-904
1.00 ea -
101946-5500-P-905
101946-5500-C-901 1.00 LS -
101946-5500-P-908 2.00 ea -
101946-5500-P-904
1.00 ea -
101946-5500-P-905
101946-0000-P-015
101946-5500-P-923 1.00 LS -
101946-5500-P-924
USD -
101946-5500-P-921 2.00 ea -
101946-5500-P-921
101946-5500-P-923
420 m -
101946-5500-P-924
101946-0000-P-015
101946-5500-P-921 1.00 LS -
101946-5500-P-921 1.00 LS -
101946-5500-P-921
101946-5500-P-923
1.00 LS -
101946-5500-P-924
101946-0000-P-015
4.00 ea -
101946-5500-P-921 1.00 ea -
USD -
101946-5500-S-970
'101946-5500-S-971 1.00 ea -
1.00 ea -
1.00 ea -
1.00 ea -
1.00 ea -
4.00 ea -
4.00 ea -
588.00 m -
4.00 ea -
4.00 ea -
USD -
1.00 LS -
1.00 LS -
1.00 LS
1.00 LS
1.00 LS
1.00 LS
USD -
6.00 ea -
6.00 ea -
USD -
6.00 ea -
6.00 ea -
6.00 ea -
6.00 ea -
8.00 ea -
12.00 ea -
24.00 ea -
4.00 ea -
10.00 ea -
2.00 ea -
2.00 ea -
60.00 ea -
2400.00 m -
200.00 m -
2.00 ea -
3.00 ea -
2.00 ea -
3.00 ea -
101946-5500-E-501 450.00 m
101946-5500-E-501 250.00 m
10.00 ea
6.00 ea
250.00 m
200.00 m
800.00 m
1.00 ea
101946-0000-E-041 1.00 ea
101946-0000-E-041 1.00 ea
101946-0000-E-062 27.00 ea
101946-0000-E-062 6.00 ea
101946-0000-E-062 10.00 ea
101946-5500-P-924 800.00 m3 -
USD -
1.00 ea -
1.00 ea -
USD -
Global
Global
Global
Global
Global
Global
USD -
m2
m2
USD -
Month
Month
Month
Month
Month
Month
USD -
Unit-week
Unit-week
Unit-week
Gallons
USD -
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
USD -
ea
ea
unit-day
unit-day
Global
Global
Global
Global
Additional Description
COTIZAR
JOSE ZAVALA
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
COTIZAR
Radar
Installation only
Installation only
Installation only
Installation only
Installation only
Installation only
Installation only. Buried earth grid
Installation only
Installation only
Installation only
COSTO VENTA
FABRICACIÓN
MATERIALES 1,731,492.11
M.O DE FABRICACIÓN 509,262.39
PINTURA 1,018,524.77
INGENIERIA 101,852.48
PERNOS 162,963.96
INSUMOS 203,704.95
LOGISTICA 122,222.97
TRANSPORTE 370,372.64
4,220,396.28
MONTAJE
MANO DE OBRA 432,101.42
EQUIPOS 40,000.00
CAPATAZ 15,000.00
RELEVO CAPATAZ 15,000.00
RESIDENTE 30,000.00
ASISTENTE RESIDENTE 21,000.00
ANDAMIOS
GRÚA / MAN LIFT 190,080.00
PREVENCIONISTA 19,500.00 15,000.00
RELEVO PREVENCIONISTA 15,000.00
TOPOGRAFO 15,000.00 18,000.00
CALIDAD 19,500.00 15,000.00
RELEVO CALIDAD 16,500.00
EXAMENES MEDICOS 17,000.00
OFICINA-ALMACEN 7,200.00
GASTOS ADMINISTRAT 9,000.00
ALIMENTACION Y ALOJAMIENTO 178,200.00
BAÑOS QUIMICOS 2,772.00
MUESTRAS 10,000.00
1,052,853.42
COSTO VENTA
rent.
cont.
28.25 30000
1.30 6,500.00
5,000.00
0.83 5,000.00
1.30 6,500.00
5,500.00
rent.
cont.
0.68006861
0.08
0.02424242
P.U (FABRICACIÓN)
0.85 2.81
0.25 0.83
0.5 1.65
0.05 0.17
0.08 0.26
0.1 0.33
0.06 0.20
0.18181818 0.60
5% 9.00
P.U (MONTAJE)
0.53 0.70
0.06
0.02
0.02
0.05
0.03
0.00
0.31
0.03
0.02
0.02
0.03
0.03
0.03
0.01
0.01
0.29
0.00
CD 8.54
GG
UTI
P.U 8.54
10.4178196
SUPPLY OF PILECAPS (STEELWORK)
PL 25MM
PLANCHA SUPERIOR E
INFERIOR KG 13.00 2.00 4.50 0.50
PL 12.7MM
PLANCHAS VERTICALES KG 13.00 2.00 4.50
PL 30MM
SUPERIOR E INFERIOR KG 13.00 2.00 1.01
REFUERZOS LONG (X3) KG 13.00 6.00 1.01
REFUERZOS TRANS (X2) KG 13.00 4.00 1.01
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
52
196.25 11,480.63
0
0.80 98.13 9,184.50 52
0
1.01 251.20 6,688.93 52
0.80 251.20 15,863.07
0.80 251.20 10,575.38
53,792.50 5,379.25 0
53,792.50 5,379.25 0
64,550.99 KG
64.550994064
% Desperdicio
por tipo de corte
de perfil
0.25
25.0%
25.0%
15.7%
SUPPLY OF GIRDERS (STEELWORK)
PL 25MM
ALAS KG 13.00 2.00 16.00 0.35
PL 20MM
ALMA KG 13.00 1.00 16.00
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
196.25 28,574.00 52
0
0.80 157.00 26,124.80 26
54,698.80 5,469.88 0
54,698.80 5,469.88 0
65,638.56 KG
% Desperdicio
por tipo de corte
de perfil
1
33.3%
33.3%
SUPPLY OF BEAMS AND BRACES (STEELWORK)
W 250x67 (W 10x45)
W 250x67 (W 10x45) KG 13.00 7.00 4.50
PL 25MM
UNION BRACES CON
GIRDERS KG 13.00 20.00 0.46 0.20
PLANCHA EN
INTERSECCIÓN DE BRACES KG 13.00 10.00 1.10 0.20
PLANCHA EN UNION
BRACES CON GIRDERS KG 13.00 20.00 0.76 0.21
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
0
52.62 32,947.38 208
0
520
196.25 4,694.30
196.25 5,612.75
196.25 8,100.73
78,779.37 7,877.94 0
78,779.37 7,877.94 0
94,535.25 KG
% Desperdicio
por tipo de corte
de perfil
0.25
25.0%
99.7%
0.3%
SUPPLY OF ROADWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
2
436.80
436.80 21.84 0
436.80 8.74 0
467.38 M2
% Desperdicio
por tipo de corte
de perfil
1
33.3%
SUPPLY OF WALKWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
322.40 2
230.88
553.28 27.66 0
553.28 11.07 0
592.01 M2
% Desperdicio
por tipo de corte
de perfil
0.225
22.5%
SUPPLY OF HANDRAILS
SUPPLY OF HANDRAILS
LADO IZQUIERDO KG 1.00 1.00 208.00
LADO DERECHO KG 1.00 1.00 208.00
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
15.00 3,120.00 2
15.00 3,120.00
6,240.00 312.00 0
6,240.00 124.80 0
6,676.80 KG
% Desperdicio
por tipo de corte
de perfil
1
33.3%
SUPPLY OF BULLRAILS
SUPPLY OF BULLRAILS
LADO IZQUIERDO KG 1.00 1.00 208.00
LADO DERECHO KG 1.00 1.00 208.00
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
30.20 6,281.60 2
30.20 6,281.60
12,563.20 628.16 0
12,563.20 251.26 0
13,442.62 KG
% Desperdicio
por tipo de corte
de perfil
1
33.3%
SUPPLY OF PILECAPS (STEELWORK)
PL 25MM
PLANCHA SUPERIOR E
INFERIOR KG 9.00 2.00 4.50 0.50
PL 12.7MM
PLANCHAS VERTICALES KG 9.00 2.00 4.50
PL 30MM
SUPERIOR E INFERIOR KG 12.00 2.00 1.01
REFUERZOS LONG (X3) KG 12.00 3.00 1.01
REFUERZOS TRANS (X2) KG 12.00 2.00 1.01
ACCESORIOS,CARTELAS, CONSUMIBLES
%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
36
196.25 7,948.13
0
0.80 98.13 6,358.50 36
0
1.01 251.20 6,174.39 48
0.80 251.20 7,321.42
0.80 251.20 4,880.94
32,683.38 32,683.38
32,683.38 3,268.34 0
68,635.09 KG
% Desperdicio
por tipo de corte
de perfil
0.25
25.0%
25.0%
15.7%
SUPPLY OF GIRDERS (STEELWORK)
PL 25MM
EJE A,B,C,D KG 8.00 2.00 6.87 0.35
EJE 1'.1'',2',2'' KG 4.00 8.00 4.50 0.35
PL 20MM
EJE A,B,C,D KG 8.00 1.00 6.87
EJE 1'.1'',2',2'' KG 4.00 8.00 4.50
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
196.25 7,544.64 32
196.25 9,891.00 64
0
0.80 157.00 6,897.95 16
0.80 157.00 18,086.40
42,419.99 4,242.00 0
42,419.99 4,242.00 0
50,903.98 KG
% Desperdicio
por tipo de corte
de perfil
1
85.6%
25.0%
85.6%
SUPPLY OF BEAMS AND BRACES (STEELWORK)
W 250x67 (W 10x45)
W 250x67 (W 10x45) KG 1.00 4.00 18.35
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
66.97 4,915.60 8
4,915.60 491.56 0
4,915.60 491.56 0
5,898.72 KG
% Desperdicio
por tipo de corte
de perfil
1
94.2%
SUPPLY OF ROADWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
2
76.36 76.36
76.36 3.82 0
76.36 1.53 0
81.71 M2
% Desperdicio
por tipo de corte
de perfil
#DIV/0!
#DIV/0!
SUPPLY OF WALKWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
109.00 109.00 2
109.00 5.45 0
109.00 2.18 0
116.62 M2
% Desperdicio
por tipo de corte
de perfil
#DIV/0!
#DIV/0!
SUPPLY OF HANDRAILS
SUPPLY OF HANDRAILS
TOTAL KG 1.00 1.00 51.28
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
15.00 769.20 2
769.20 38.46 0
769.20 15.38 0
823.04 KG
% Desperdicio
por tipo de corte
de perfil
1
45.3%
SUPPLY OF BULLRAILS
SUPPLY OF BULLRAILS
TOTAL KG 1.00 1.00 36.87
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
30.20 1,113.47 2
1,113.47 55.67 0
1,113.47 22.27 0
1,191.42 KG
% Desperdicio
por tipo de corte
de perfil
1
85.5%
SUPPLY OF CAISSONS
PL 30MM
PLATE WITH HOLE KG 3.00 1.00
PL 25MM
CAISSON KG 3.00 1.00 15.80 5.65
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
196.25 52,603.11 6
55,323.62 5,532.36 0
55,323.62 5,532.36 0
66,388.34 KG
% Desperdicio
por tipo de corte
de perfil
#DIV/0!
#DIV/0!
36.7%
SUPPLY OF BOAT BERTH
HSS D356x13
SP-C KG 1.00 2.00 1.71 1.12
SP-B KG 1.00 2.00 1.71 1.12
HSS D152x10
EN SP-C KG 1.00 2.00 1.23 0.48
EN SP-C' (HORIZONTAL) KG 1.00 1.00 1.23 0.48
EN SP-C' (DIAGONAL) KG 1.00 1.00 1.47 0.48
EN SP-C'' (HORIZONTAL) KG 1.00 1.00 1.23 0.48
EN SP-C'' (DIAGONAL) KG 1.00 1.00 1.47 0.48
EN SP-C''' (HORIZONTAL) KG 1.00 1.00 1.23 0.48
EN SP-C''' (DIAGONAL) KG 1.00 1.00 1.47 0.48
EN SP-B KG 1.00 2.00 1.23 0.48
ENTRE EJE SP-C Y SP-B
(LONGITUDINALES) KG 1.00 4.00 4.50 0.48
ENTRE EJE SP-B Y SP-B'
(LONGITUDINALES) KG 1.00 2.00 2.00 0.48
ENTRE EJE SP-B Y SP-B'
(DIAGONAL) KG 1.00 2.00 2.90 0.48
ENTRE EJES SP-C Y SP-B
(VERTICALES) KG 1.00 3.00 2.59 0.48
HSS D219x10
VERTICALES KG 1.00 4.00 2.90 0.48
PL 30MM
PLANCHA 30x485x430 KG 2.00 2.00 0.49 0.43
PL 20MM
PLANCHA 20x370x370 KG 4.00 2.00 0.37 0.37
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 12%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
98.13 375.32 4
98.13 375.32 4
74.58 87.68
74.58 43.80
74.58 52.35
74.58 43.80
74.58 52.35
74.58 43.80
74.58 52.35
74.58 87.68
8
74.58 641.02
4
74.58 142.45
4
74.58 206.55
74.58 276.70
74.58 413.10 8
251.20 209.55 8
149.15 163.35 16
3,103.83 310.38 0
3,103.83 372.46 0
3,950.02 KG
% Desperdicio
por tipo de corte
de perfil
0.145
14.5%
14.5%
25.0%
0.0%
3.3%
3.3%
3.0%
1.3%
SUPPLY OF ACCESS STAIRS
PL 25MM
EJE A,B,C,D,E KG 5.00 2.00 22.00 0.35
EJE F,G KG 2.00 2.00 11.00 0.35
PL 20MM
EJE A,B,C,D,E KG 5.00 1.00 22.00
EJE F,G KG 2.00 1.00 11.00
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
196.25 15,111.25 20
196.25 3,022.25
0
0.80 157.00 13,816.00 10
0.80 157.00 2,763.20
34,712.70 3,471.27 0
34,712.70 3,471.27 0
41,655.24 KG
% Desperdicio
por tipo de corte
de perfil
1
33.3%
33.3%
SUPPLY OF PILECAPS (STEELWORK)
PL 25MM
EQUIDISTANTES A 4.75M
(TOP AND BOTTOM) KG 20.00 2.00 4.75 0.50
EQUIDISTANTES A 4.00M
(TOP AND BOTTOM) KG 6.00 2.00 4.00 0.50
PL 12.7MM
EQUIDISTANTES A 4.75M
(TOP AND BOTTOM) KG 20.00 2.00 4.75
EQUIDISTANTES A 4.00M
(TOP AND BOTTOM) KG 6.00 2.00 4.00
PL 30MM
SUPERIOR E INFERIOR KG 31.00 2.00 1.01
REFUERZOS LONG (X3) KG 31.00 3.00 1.01
REFUERZOS TRANS (X2) KG 31.00 2.00 1.01
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
80
196.25 18,643.75
196.25 4,710.00
0
80
0.80 98.13 14,915.00
0
1.01 251.20 15,950.52 124
0.80 251.20 18,913.66
0.80 251.20 12,609.10
89,510.03 8,951.00 0
89,510.03 8,951.00 0
107,412.03 KG
% Desperdicio
por tipo de corte
de perfil
0.20833333
20.8%
20.8%
15.7%
SUPPLY OF GIRDERS (STEELWORK)
PL 25MM
EJE A,B,C,D,E KG 5.00 2.00 22.00 0.35
EJE F,G KG 2.00 2.00 11.00 0.35
PL 20MM
EJE A,B,C,D,E KG 5.00 1.00 22.00
EJE F,G KG 2.00 1.00 11.00
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
196.25 15,111.25 20
196.25 3,022.25
0
0.80 157.00 13,816.00 10
0.80 157.00 2,763.20
34,712.70 3,471.27 0
34,712.70 3,471.27 0
41,655.24 KG
% Desperdicio
por tipo de corte
de perfil
1
33.3%
33.3%
SUPPLY OF BEAMS AND BRACES (STEELWORK)
W 250x67 (W 10x45)
EJE A-E KG 1.00 8.00 19.00
EJE E,G KG 1.00 4.00 8.00
PL 25MM
UNION BRACES CON
GIRDERS KG 2.00 10.00 0.46 0.20
PLANCHA EN
INTERSECCIÓN DE BRACES KG 2.00 8.00 1.10 0.20
PLANCHA EN UNION
BRACES CON GIRDERS KG 2.00 20.00 0.46 0.21
ACCESORIOS,CARTELAS, CONSUMIBLES
% 10%
DESPERDICIOS
% 10%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
66.97 10,179.44 16
66.97 2,143.04
0
52.62 3,059.09 16
52.62 3,059.09
0
40
196.25 361.10
196.25 690.80
196.25 758.31
20,250.86 2,025.09 0
20,250.86 2,025.09 0
24,301.04 KG
% Desperdicio
por tipo de corte
de perfil
#REF!
83.3%
78.9%
0.3%
SUPPLY OF ROADWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
418.00 2
418.00 20.90 0
418.00 8.36 0
447.26 M2
% Desperdicio
por tipo de corte
de perfil
1
83.3%
SUPPLY OF WALKWAY GRATING
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
44.00
44.00 2.20 0
44.00 0.88 0
47.08 M2
% Desperdicio
por tipo de corte
de perfil
#REF!
SUPPLY OF HANDRAILS
SUPPLY OF HANDRAILS
EJE LP-A KG 1.00 1.00 15.51
EJE LP-5 KG 1.00 1.00 6.94
EJE LP-5 KG 1.00 1.00 8.1
EJE LP-E KG 1.00 1.00 10.99
EJE LP-3 KG 1.00 1.00 7.97
EJE LP-G KG 1.00 1.00 11.4
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
15.00 232.65 2
15.00 104.10
15.00 121.50
15.00 164.85 2
15.00 119.55
15.00 171.00
913.65 45.68 0
913.65 18.27 0
977.61 KG
% Desperdicio
por tipo de corte
de perfil
1
41.5%
16.8%
SUPPLY OF BULLRAILS
SUPPLY OF BULLRAILS
SUPPLY OF BULLRAILS KG 1.00 1.00 9.50
ACCESORIOS,CARTELAS, CONSUMIBLES
% 5%
DESPERDICIOS
% 2%
TOTAL
N° Uniones
Área (m2) Peso/m o Densidad
Alto (m) Subtotal de
m2 (kg/m3) soldadura
30.20 286.90 2
286.90 14.35 0
286.90 5.74 0
306.98 KG
% Desperdicio
por tipo de corte
de perfil
1
41.7%