Vous êtes sur la page 1sur 20

INTRODUCTION

2015

Confidential - FinalCAD - Knowledge Corp SAS


• 1 • Introduction Confidential - 2015

DESIGN THINKING

Desirability
(What humans need)

Feasability Viability
(technical) (economical)
• 1 • Introduction Confidential - 2015

WHAT IS FINALCAD USED FOR ?

Digitisation of collaborative processes on site

• Structural Works Quality Controls


• Before and after casting supervision
• Quality Control for internal works
• Sub-contractors management
Quality • Snagging
Management • Handover
• Defect Liability Period
• Operation

H&S • Health & Safety for Structural Works stage


Management • Health & Safety for Internal Works stage

Time • Progress for Structural Works stage


Management • Progress for Internal Works stage

Logistics • Logistics follow-up


• 1 • Introduction Confidential - 2015

FOCUSED AND CLOSER TO SITES REALITY


POPULATE INFORMATION.
• 1 • Introduction Confidential - 2015

STRUCTURAL WORKS
QUALITY CONTROL
Contrôle Gros-Oeuvre - Fiche de contrôles

Siège social LE DUFF!


Contrôle GO FinalCAD
Longrines - PV Zone 1 - Longrine LG 22

Contrôle Conformité Commentaires


Implantation X conforme 02/02/2014
Implantation Y non fait 02/02/2014
Attentes non conforme 02/02/2014
Cage d’armature conforme 02/02/2014 Cage partie libage ok le 19/08/2014
Dimension massifs non conforme 02/02/2014
Enrobage conforme 02/02/2014
Recépages conforme 02/02/2014

A systematic and global approach:


Contrôleur interne (Nom, date, Visa) Contrôleur externe (Nom, date, Visa)

• Quality controls on each structural element (piles, beam, slab, walls…)

• View gathering all information in one place for quality controls

Format A4 - Siege_social_le_duff_controle_go-Longrines_pv_zone_1-20140902.pdf Généré avec FinalCAD le 2 septembre 2014 - Page 20 sur 40

• Non-compliancies real-time monitoring

• A PDF and excel automatically created according to each stage


• 1 • Introduction Confidential - 2015

INTERNAL WORKS
QUALITY CONTROL

Creteil Les Bleuets Autocontrôles Bâtiment G


EFIDIS

Batiment G Cage 1 - R+1 Logement gauche T4 SLOVEG - ELECTRICITE

Contrôle Conformité Observation


Distribution goulotte conforme aux plans d'éxecutions Non conforme 13/06/2013

Espace entre les deux prises des chambres 2m10 Non conforme 13/06/2013

Mise en place des étiquettes sur les prises Non fait

Fixation des interphones Non fait

Nettoyage après intervention Conforme 13/06/2013

Hauteur de l'applique salle de bain 1m80 Conforme 27/06/2013

A virtuous approach:

• Pre-loaded point of controls per room Contrôleur Interne (Nom, date, Visa) Contrôleur Externe (Nom, date, Visa)

• From a sampled to a global approach (100% of controls) Format A4 - Creteil_les_bleuets_autocontroles_batiment_g-Electricite-Sloveg-20130717.pdf Généré avec FinalCAD le 17 juillet 2013 - Page 4 sur 26

• Non-compliancies real-time monitoring


• Autonomie sur l’ajout de nouveau contrôle par zone
• A PDF and excel automatically created according to each stage
• 1 • Introduction Confidential - 2015

DEFECT MANAGEMENT, HANDOVER, DLP

Zac de l Europe
CIRMAD

Batiment c r+0 - Logement c05 Armor Peinture - Peinture

1066

1068
1067
1076
1072

1074

1075

1065

1077

1069

Observation Posée le Validation


1065 Plafond a finir de reprendre 14/04/2013

1066 Retouche peinture 14/04/2013

1067 Retouche peinture 14/04/2013

1068 Reprise autour huisserie 14/04/2013

1069 Retouche sur bâti porte palier 14/04/2013

1072 Retouche peinture 14/04/2013

A straightforward and powerful system:


1074

1075
Écaillage peinture

Retouche peinture
14/04/2013

14/04/2013

• Story of each defect (pictures before/after, plans, comments attached to each defect)
1076

1077
Retouche peinture

Enduit à peindre suite reprise


14/04/2013

14/04/2013

• Rights administration (add/rectify/solve/close)


Moins de 7 jours 7 à 15 jours Plus de 15 jours Traîtées

• Unlimited drawing modifications

Format A4 - Zac_de_l_europe-Peinture-Armor_peinture-20130425.pdf Généré avec FinalCAD le 25 avril 2013 - Page 48 sur 119

• A PDF and excel automatically created according to each stage

• Dashboard and global monitoring accessible on emails/mobile/web


• 1 • Introduction Confidential - 2015

HEALTH & SAFETY ENVIRONMENT


QUALITY INSURANCE

Hôtel Industriel des Galants


Meyrin HIG

RDC - Palier 3 Losinger Sécu - Securite

5

6

2 Observation Posée le Validation


5 Protection Trémies Remarque générique pour les gaines 10 et 11 11/07/2014

6 Plinthe Manquante Remarque générique pour les gaines 10 et 11 11/07/2014

5 6

A collaborative process:

• Specific plans setting

• Adapted library
Moins de 7 jours 7 à 15 jours Plus de 15 jours ou date limite dépassée
Format A4 - Hotel_industriel_des_galants-Losinger_secu-Securite-20140711.pdf Généré avec FinalCAD le 11 juillet 2014 - Page 9 sur 18

• A full follow-up with the “story” flow

• A PDF and excel automatically created according to each stage

• Dashboard and global monitoring accessible on emails/mobile/web


• 1 • Introduction Confidential - 2015

BEING CLOSER TO FIELD REALITY


NAVIGATING WITHIN MODELS

Global model Local model


• 1 • Introduction Confidential - 2015

ROBUST TECHNOLOGICAL ARCHITECTURE


INTEGRATED TO A DEDICATED TEAM

Ergonomy/UI Project Service

Project follow-up
Constant innovation
Training
and evolution of system
Support

Security Production service


Users administration Plan preparation
Terminal management Plan modifications
Project settings
Collaboration
Engineering service
Multiple devices synchronisation
Rights administration Specific developments
• 1 • Introduction Confidential - 2015

4,000 PROJECTS, WIDE RANGE OF PROJECTS

International
20%
Outdoor 3%

Offices 22 %

Residential 46 %

80%
Hospital, Hotels 29 %

France

Representatives in PARIS, LONDON and SINGAPORE.


Available in 22 languages
• 1 • Introduction Confidential - 2015

BUILD & RUN

Unlimited support for the all duration of projects

Administration
Document Validation Devices Implementation
and technical
requirement file shipping and training
support

Unlimited plan
Name of projects
Review before Pre-setting
Tags

modifications

Logo
implementation
Delivery address
Authentification

• Plans

Project image
• Planning
Training / tutorials
Training
• Users

List of trades
• Zoning
Goodies/Surprises
• Trades

List of subcontractors
• Room naming

• Companies
Plans • Libraries
• 1 • Introduction Confidential - 2015

DEDICATED OFFERS
FOR THE ALL PROJECT LIFECYCLE

Site Structural Snagging


Preparation Works Handover Operation

Design Foundation Internal DLP


Works
Confidential - 2015

2 - STANDARDISATION

Confidential - FINALCAD - Knowledge Corp SAS


• 2 • Standardisation Confidential - 2015

STANDARDISATION AT EACH STAGE


ON ALL PROJECTS

Quality Controls Internal Works Snagging

Handover Defect Liability Period Health & Safety

FOR EACH PROCESS, ONE STANDARDISATION


• 2 • Standardisation Confidential - 2015

MONTHLY REPORT ACTIVITY

Most frequent non


Monthly report of progress
compliancies

Socle - PH -2 Compliant January 2015


Non compliant 320 point of controls
January - 2015
Not done
Not to be controlled
xx : number of controls

100 %
30 % 40

20 % 24
120
10 %

Walls Pocket Concrete


Piles Walls Column Slab coating Location repair
• 2 • Standardisation Confidential - 2015

TIME REDUCTION

Project
Completion

BEFORE
FINALCAD

WITH
FINALCAD

Internal Works Snagging Handover DLP


• 2 • Standardisation Confidential - 2015

BOOSTING CALENDAR

BEFORE Reducing
FINALCAD errors
WITH
FINALCAD

Speed up
planning

Construction Snagging Handover Delivery


• 2 • Standardisation Confidential - 2015

FORESEE PROBLEMS

Increasing productivity
• Automated creation and sharing of reports for partners

• Improving flow of communication between all stakeholders of


projects. Information communicated from 1 week to real time.

• Supervisors 70% of their time on site, 30% at the office against 50/50
before.

• Enhancing skills for project team.

• Real Time performance monitoring on a WebApp for project top


management

• QR Code technology follow-up

Improving quality
• Structural works quality controls: from a sampling approach (20%) to
a systematic approach (100%).

• Internal works follow up / defect management: defining expected


standard of quality.

• QR Code technology follow-up


Pierre Vauthrin
Asia Director
+33 782 838 013
pierre@finalcad.com

Confidential - FinalCAD - Knowledge Corp SAS

Vous aimerez peut-être aussi