REPUBLIC OF THE PHILIPPINES

19
9
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

19
8
19
7
.02 1 OFFICE OF THE

19
6
16 4.0
NCE BUILDING OFFICIAL
ENTRA
0

5
4.0 C1
/F1
0
4.0
GATE

6.00
C1
TOLEDO CITY
1

/F1
C1
/F1
C1

C1

4.00 4.
/F RECOMMENDING APPROVAL :

5
1 C1/F1 2

5.6

/F1
0
4.0

0
C1/F1 3

00 4.00
C1

4.0
/F
1

0
C1 HEAD STRUCTURAL SECTION DATE :

4.0
/F C1/F1 4
1 19 APPROVED :

0
C1 4

4.0

4.00 4.
.66
/F C1/F1
1 19 5

45

0
3

4.0
C1
/F
19 1 C1/F1 6

00 4.00
0
2 BUILDING OFFICIAL : DATE :

4.0
C1
/F
19
1

0
1 C1/F1 7

4.0
C1
/F
1 19

4.00 4.
0

4.0
C1
/F C1/F1 8
18

18
1

0
9

4.0
C1

4
/F C1/F1

18
9

00 4.00
1 18

0
8

4.0
C1

3
18
/F
1 18 C1/F1 10

2
18
4.8
0 C1
/F 7

1
18

18
1

4.00 4.
.81 C1/F1
24 4.0
0 6 11

0
17

C1

0
0 18

4. 0
4.0

/F1
17
5 C1/F1 12

00 4.00
C1
0
4.0

8
17

/F1
C1
0
4.0

7
17
C1/F1 13

/F1
C
0

162
4.0

1/F
6
17
.06

4.00 4.
C1
163

1
6
17 5.0 C1/F1 14

/F1
164

C1
0
4.0

/F1
165

C1
C1/F1 15

00 4.00
0
4.0

/
4.0 18.

166

F1
0 36 0

C1
35 4.0

167
4.0
3.

/F1
0 C1/F1 16

C1
C1/F1 4.0
00 4.31

/F1
4. 0 4.00

C1

4.00 4.
4.0 4.00
0 4.00 C1/F1 17

/F1
0

C1
.0 2.3

C1/F1
4.00

/F1
4 6

/F

C1/F1
1

C1/F1
C1
00

/F1
C1

C1/F1
4. C1/F1 18

00 4.00
/F

C1/F1
C1/F1
C1

/F1
1

C1/F1
00

16
C1
4.

C1

/F1
/F
5

73
.3 C1/F1 19

/F1
0
72

16 9

C1
47

C1
0 4.00 0
4. 4.0

74
/F1

C1
/F
4.00

0
28.31

4.00 4.
C1

174
0 0

1
4.0

C1
C1/F1 20

C1
0
71

173

75
4.

5
/F

172

/F1
1

171
/F1

C
00

15

76
C1

170

1/F
4. C1
70

169
/F
C1/F1 21

00 4.00
8

C1
168
1

4.3
1
7
00

15
C1
/F1
149

7
4.

/F1

5
C1

/F

C1
6
148

179.69
1
0 C1/F1 22

15

/F1
C1

4.0
0
147

4.

C1
0 /F1

/F

5
4.0

0
146

C1

/F1
00

15 3

4.00 4.
C1

C1
4.
145

4.0
4.0 C1/F1 23
/F
1

/F1
1/F
144

0
C1
1
C1

0
2.49 4.0
C

5
143

/F1
/F

4.00

4.0
C1
C1/F1 24

00 4.00
1

0 1
142

15 1 4.0 /F
C1

4.00

0
8.49 C1

/F1
69
141

C1
3
/F

4.00
2 0

4.0
4.0
1
140

/F1
1

1
C1/F

4.00 /F C1/F1 25

C1
00
5

0
0 C1
C1/F

4.00 4. 4.0 68

/F1
15
C1/F

4.0
C1
1

4.
0
4.00 4.0 /F1
1
C1/F

C1/F1 26

/F1

0
0

00
C1
4.00 67

78
C1
1

0
C1/F

4.0

4.0
4.00

/F1
/F1
1

79

4.00 4.
C1/F

C1

0
0 C1
4.00 4.0 C1/F1 27
66
1

/F1
C1/F

139

80
C1

4.0
0
1
C1/F

4.0 /F1

0
F1
C1
1

C1

81
65
C1/F

138 0 C1/F1 28

00 4.00
4.0

4.0
1

/F1
C1/F
2.94

/F1

82
C1/F

C1
0
1

0
1 4.0 C1
64

/F1
137 C1/F1 29
1

83
C1
C1/F

4.0
0
4.00

1 4.0 /F1

/F1

0
C1

84
C1
0
63

4.00 4.
136 4.0

/F1

4.0
C1/F C1/F1 30

85
C1
/F1
4.00

1 0
4.0
4

0
C1

/
62
22.9

F1

86
C1
0

4.0
135 C1/F 4.0 C1/F1 31

00 4.00
/F1

/F1
4.00

87

0
C1
0 C1
4.0 61

/F1

4.0
8
C1
134 C1/F
4.0
0 /F1 C1/F1 32

8
4.00

0
1 C1

/F1
60

89
C1
0

4.0
4.0

4.00 4.
/F1
C1/F /F1

90
C1

C1/F1 33

0
C1
4.00

1 0
4.0 59
/F1

11

4.0
C1

91
0
/F1

3.0
C1/F1 4.0
/F1

0
C1 C1/F1 34

00 4.00
58

92
C1

5
0
4.0

4.0
/F1

133 /F1

9
C1
4.75

0
0 C1
C1/F1 4.0

3
57 C1/F1 35
/F1

8
94
C1

4.0
4.0
0 1.4 /F1
19
/F1

0
C1

4.00 4.
95
C1

132 56
4.00 4.

C1/F1 0
C1/F1
4.0 36

4.0
/ F1

/F1
96
C1

0
4.0 C1
55
/F1

131 C1/F1
97
C1

C1/F1

4.0
0 37

00 4.00
00 4.00

4.0 /F1
/F1

0
C1
98
C1

130 4.0
0
54
/F1

4.0
C1/F1 C1/F1 38
99
C1

0 1
4.0 1/F

0
/F1

53 C
10
C1

4.0

4.00 4.
129
4.00 4.

C1/F1 4.0
0

/F1
/F1

C1/F1 39
1

0
C1

C1
0

0
4.0 52
1
/F1

10

4.0
C1

128 C1/F1 4.0


0 /F1 1
40

00 4.00
C1 C1/F
2
00 4.00

/F1

51
C1

4.0
4.0
3
/F1

10

/F1 C1/F1
127
52.75

C1

C1/F1

0
0 C1 41
4.0 50
4
/F1

10

4.0
C1

0
4.0 C1/F1

4.00 4.
5

126
/F1

0
4.00 4.

/F1
10

C1/F1
49
C1

4.0
0 C1 42

4.0
6
/F1

10
C1

0
0 C1/F1
125 4.0 /F1
C1/F1 48
7
/F1

10

43

00
C1
00 4.00

C1

4.0
0
4.0
8
/F1

10

0
/F1 C1/F1
C1

124 C1/F1 4.0


0
47 C1

5.69
9

4.0
/F1

11
C1

0
4.0
46 44
0
/F1

123
4.00 4.

C1

C1/F1
11

4.6
4.0 C1/F1
/F1

11
C1

9
4.0
0
45
2
/F1

122
11
C1

C1/F1 0
00 4.00

4.0 PROPOSED PERIMETER FENCE


3
/F1

11

2
0
121 4.0
FENCE LAYOUT PLAN
4
11

4.0
0 A
5
11

C1/F1
6
3.4 SCALE 1:500 M
6

S- 1
11
7
11
8
11
12
9
0

FROM THE OFFICE OF: CIVIL ENGINEER: SEAL PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: DRAFTED: RTG SHEET NO.:

DATE: 06 - 28 - 2021
ENGR. FATIMA F. CUYOS AS SHOWN
MR. ANDRELO SOLON & MRS. JOSEPHINE SOLON CHECKED: S-1
LICENSED CIVIL ENGINEER PROPOSED PERIMETER FENCE OWNER
PROJECT NO.
PRC: 0073612
DATE : 08-21-1995
P.T.R. NO.: 733375
DATE : 1-20-2021
CLIENT:
S 4
T.I.N. : 246-380-122 PLACE : BALAMBAN, CEBU LOCATION: BRGY. SAM-ANG, TOLEDO CITY, CEBU ADDRESS: TOLEDO CITY, CEBU
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

OFFICE OF THE
BUILDING OFFICIAL
0.200
TOLEDO CITY

RECOMMENDING APPROVAL :
2 - 12MMØ

0.200
HEAD STRUCTURAL SECTION DATE :

0.400
GENERAL STRUCTURAL/CONSTRUCTION NOTES AND SPECIFICATIONS APPROVED :

2 - 12MMØ
(A) GENERAL REQUIREMENTS STRUCTURAL MEMBER 28 DAY STRENGTH MAX. SLUMP MAX. SIZE AGG. 2 - 12MMØ

0.300
BUILDING OFFICIAL : DATE :
A. SLAB ON GRADE 20.7 MPa (3,000 PSI) 100MM (4") 25MM (1")
1. ALL STRUCTURAL MATERIALS AND WORK SHALL CONFORM TO THE
B. FOOTINGS & RETAINING WALLS 20.7 MPa (3,000 PSI) 100MM (4") 19MM (3/4") STIRRUPS: 10MMØ @ 0.20M O.C.
REQUIREMENTS OF THE LATEST EDITION OF THE NATIONAL STRUCTURAL CODE OF 2 - 12MMØ
C. COLUMNS / SHEARWALLS 20.7 MPa (3,000 PSI) 100MM (4") 19MM (3/4")
THE PHILIPPINES (NSCP 2001).
D. BEAMS & SLABS 20.7 MPa (3,000 PSI) 100MM (4") 19MM (3/4")
2. VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING STIRRUPS: 10MMØ @ 0.20M O.C. PROPOSED PERIMETER FENCE
WORK. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. 3. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR
3. NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL
12MMØ AND SMALLER BARS WHILE BARS 16MMM Ø AND LARGER SHALL BE GRADE
60. PROPOSED PERIMETER FENCE
MID-HEIGHT BEAM MHB-1
NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT.
4. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF
4. ALL FABRICATION, DETAILING AND PLACING SHALL CONFORM TO THE PROVISIONS
SET BY THE NSCP 2001 EDITION. A TIE BEAM TB-1 DETAIL B DETAIL (IF NECESSARY)
THE WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK SHOWN ON SCALE 1:10 M SCALE 1:10 M
5. CLEAR DISTANCE SPACING BETWEEN PARALLED BARS IN A LAYER SHALL NOT BE S- 2 S- 2
THE DRAWINGS.
LESS THAN 1.50 TIMES THE NOMINAL DIAMETER OF THE BAR, OR 1.33 TIMES
5. PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT BE PLACED IN SLABS, BEAMS, OR MAXIMUM
WALLS UNLESS SPECIFICALLY SHOWN OR NOTED NOR SHALL ANY STRUCTURAL 1
SIZE AGGREGATE, NOR LESS THAN 38MM (1 2"). 0.350
MEMBER BE CUT FOR PIPES, DUCTS, ETC. UNLESS SPECIFICALLY SHOWN. OBTAIN
PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR INSTALLATION OF ANY 0.300 8 - 10MMØ BARS
6. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:
ADDITIONAL PIPES, DUCTS, ETC. 25mmØ G.I.
LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR FOOTINGS (CAST AGAINST & EXPOSED TO EARTH) . . . . . 75MM (3") PIPE SCH. 40
OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED.

0.250
WHERE CONCRETE IS EXPOSED TO
6. LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR EARTH BUT POURED AGAINST FORMS . . . . . . . . . . . . . . . . 50MM (2") RC COLUMN

0.250
OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED. SLAB ON GRADE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40MM ( 1 1/2") (SEE DETAIL)

7. TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF THE COLUMN TIES OR SPIRALS AND BEAM STIRRUPS . . . . . . . 40MM ( 1 1/2")
STRUCTURE DURING CONSTRUCTION. NEITHER THE OWNER NOR PLAN
ARCHITECT/ENGINEER WILL ENFORCE SAFETY MEASURES OR REGULATIONS. IT SUSPENDED SLABS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20MM ( 3/4")
SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROVIDE ADEQUATE SHORING VERTICAL BARS: 6 - 12MMØ
AND BRACING OF THE STRUCTURE FOR ALL THE LOADS THAT MAYBE IMPOSED 7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP AT LEAST 40
DURING CONSTRUCTION. FURTHER, THE CONTRACTOR SHALL DESIGN, CONSTRUCT TIMES LATERAL TIES: 10MMØ @ 0.15M O.C
AND MAINTAIN ALL SAFETY DEVICES AND SHALL BE SOLELY RESPONSIBLE DIAMETER OR 600MM WHICHEVER IS GREATER. STAGGER BOTTOM AT LEAST 1.50M 25mmØ G.I.
FROM SPLICES IN OTHER BOTTOM REINFORCEMENT. STAGGER SPLICES FOR TOP PIPE SCH. 40
FORCONFORMING TO ALL SAFETY AND HEALTH STANDARDS, LAWS AND
REINFORCEMENT SIMILARLY. PROPOSED PERIMETER FENCE

0.500
REGULATIONS.
8. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER IN CASE OF CHANGES TO 8. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY
THE WORKING DRAWINGS. POSITION AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. C COLUMN DETAIL
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS SCALE 1:10 M
S- 2
(C) FOUNDATION IMMEDIATELY AFTER POURING BY THE USE OF CURING COMPOUNDS, OR OTHER 8 - 10MMØ BARS
APPROVED METHODS.
1. FOOTINGS SHALL BEAR ON SOLID UNDISTURBED EARTH (CONTROLLED,

(EMBEDMENT)
COMPACTED 10. STRIPPING OF FORMS AND SHORES:

0.150 M
STRUCTURAL FILL OR BOTH) AT LEAST 450MM BELOW LOWEST ADJACENT FINISHED FOUNDATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 HRS.
GRADE. SUSPENDED SLAB EXCEPT WHEN
2. FOOTING IS DESIGNED FOR ASSUMED ALLOWABLE SOIL/FOUNDATION PRESSURE OF ADDITIONAL LOADS ARE IMPOSED . . . . . . . . . . . . . . . . . . . . . . . . 8 DAYS
144 kPa (3,000 psf). BEAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 DAYS A A
RC COLUMN
3. SUB-GRADE PREPARATION INCLUDING DRAINAGE, EXCAVATION, COMPACTION, (SEE DETAIL)
AND FILLING REQUIREMENTS, SHALL CONFORM STRICTLY WITH THE (F) MASONRY AND CONCRETE BLOCKS NGL
RECOMMENDATIONS GIVEN IN THE SOILS REPORT OR AS DIRECTED BY THE SOILS
ENGINEER. 1. CONCRETE HOLLOW BLOCKS, UNLESS OTHERWISE SPECIFIED SHALL BE 150MM
THICK. LOAD BEARING BLOCKS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH 0.250

0.80
4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION OF TB - 1 (200X300) TB - 1 (200X300)
HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN 750 PSI (5.175 MPa) WHILE NON-LOAD BEARING SHALL HAVE A MINIMUM SECTION
FOUNDATION CAPACITY.

0.25
COMPRESSIVE STRENGTH OF 400 PSI (2.76 MPa).
5. ROOF AND AREA DRAINAGE SHALL BE DIRECTED AWAY FROM THE FOUNDATIONS.
2. PROVIDE 1-16MMØ VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS, G.I. PIPE TO CONCRETE COLUMN
6. EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL FOR WALLS SHALL BE
EACH SIDE OF OPENINGS.
3. LINTEL BEAMS SHALL BEAR AT LEAST 200MM (8") ON EACH SIDE OF MASONRY
1.00
6-12MMØ BOTTOM BARS
BOTHWAYS D TYP. CONNECTION DETAIL "B"
PERVIOUS MATERIAL ACCEPTABLE TO THE GEOTECHNICAL ENGINEER. DO NOT SECTION SCALE 1:10 M
WALL S- 2
PLACE
OPENING. 1.00
BACKFILL BEHIND WALLS BEFORE THEY HAVE ATTAINED THEIR DESIGN 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
STRENGTH. 0.30
WALL THICKNESS VERTICAL BARS HORIZONTAL BARS
SHORE AND PROTECT WALLS FROM LATERAL LOADS UNTIL THE SUPPORTING
MEMBERS ARE IN PLACE AND HAVE DEVELOPED SPECIFIED STRENGTHS. 8 IN. (200 mm) . . . . . . . . . . 12MMØ @ 400 mm 10MMØ @ 600 mm 0.150

0.25
6 IN (150 mm) . . . . . . . . . . . 10MMØ @ 400 mm 10MMØ @ 600 mm
(D) REINFORCED CONCRETE 4 IN. (100 mm) . . . . . . . . . . 10MMØ @ 400 mm 10MMØ @ 600 mm

1.00
1. CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED AND PLACED IN 12MMØ
5. BLOCK WALL REINFORCING BARS SHALL BE LAPPED OF 30 BAR DIAMETERS WHERE
ACCORDANCE WITH THE PROVISIONS SET BY THE NSCP 2001. SPLICED, HORIZONTAL/VERTICAL DOWELS FROM FOOTINGS, COLUMNS/WALLS OR 6-12MMØ BOTTOM BARS

0.250
BOTHWAYS
SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OR A
WITH CORRESPONDING MAXIMUM SLUMP AND MAXIMUM SIZE AGGREGATE AS MINIMUM OF 400MM WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL
12MMØ
FOLLOWS: REINFORCEMENTS OF WALL. PLAN

PROPOSED PERIMETER FENCE STIRRUPS: 10MMØ @ 0.20M

COLUMN & PROPOSED PERIMETER FENCE


E FOOTING C1/F1 DETAIL F LINTEL BEAM LB-1 DETAIL
SCALE 1:30 M SCALE 1:10 M
S- 2 S- 2

FROM THE OFFICE OF: CIVIL ENGINEER: SEAL PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: DRAFTED: RTG SHEET NO.:

DATE: 06 - 28 - 2021
ENGR. FATIMA F. CUYOS AS SHOWN
MR. ANDRELO SOLON & MRS. JOSEPHINE SOLON CHECKED: S-2
LICENSED CIVIL ENGINEER PROPOSED PERIMETER FENCE OWNER
PROJECT NO.
PRC: 0073612
DATE : 08-21-1995
P.T.R. NO.: 733375
DATE : 1-20-2021
CLIENT:
S 4
T.I.N. : 246-380-122 PLACE : BALAMBAN, CEBU LOCATION: BRGY. SAM-ANG, TOLEDO CITY, CEBU ADDRESS: TOLEDO CITY, CEBU
REPUBLIC OF THE PHILIPPINES
5-ROW OF DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
GALVANIZED 25mmØ G.I. PIPE SCH. 40
BARBED WIRE GA. 14 (EPOXY PAINTED)
OFFICE OF THE
4.00 4.00 4.00 BUILDING OFFICIAL
TOLEDO CITY

0.50

0.50
RECOMMENDING APPROVAL :

LB - 1 (150X250) LB - 1 (150X250) LB - 1 (150X250) LB - 1 (150X250) LB - 1 (150X250)


HEAD STRUCTURAL SECTION DATE :
APPROVED :

BUILDING OFFICIAL : DATE :


2.00

2.00
6" THK CHB 6" THK CHB 6" THK CHB
WITH 10MMØ VERTICAL BARS @ 0.40M WITH 10MMØ VERTICAL BARS @ 0.40M WITH 10MMØ VERTICAL BARS @ 0.40M
& 10MMØ HORIZONTAL BARS @ 0.60M & 10MMØ HORIZONTAL BARS @ 0.60M & 10MMØ HORIZONTAL BARS @ 0.60M
NGL ELEV. +0.00
0.55

0.55
0.80

0.80
TB - 1 (200X300) TB - 1 (200X300) TB - 1 (200X300) TB - 1 (200X300) TB - 1 (200X300)
0.25

0.25
C1 / F1 (1.0x1.0x0.3) C1 / F1 (1.0x1.0x0.3) C1 / F1 (1.0x1.0x0.3) C1 / F1 (1.0x1.0x0.3)

PROPOSED PERIMETER FENCE


A FENCE ELEVATION TYPE 1 DETAIL
SCALE 1:30 M
S- 3

4.00 4.00 4.00

0.50
LB - 1 (150X250)

2.00
0.50
LB - 1 (150X250)

2.00
6" THK CHB
W/ 10MMØ VERT. BARS @ 0.40M
0.50

& 10MMØ HOR. BARS @ 0.60M


NGL ELEV. +0.00

LB - 1 (150X250) 2.00

6" THK CHB

0.80
TB - 1 (200X300)
W/ 10MMØ VERT. BARS @ 0.40M
& 10MMØ HOR. BARS @ 0.60M
LB - 1 (150X250)
1.29

0.81
TB - 1 (200X300) C1 / F1 (1.0x1.0x0.3)
2.00

6" THK CHB


W/ 10MMØ VERT. BARS @ 0.40M
& 10MMØ HOR. BARS @ 0.60M
C1 / F1 (1.0x1.0x0.3)
6" THK CHB
0.82

W/ 10MMØ VERT. BARS @ 0.40M TB - 1 (200X300)


& 10MMØ HOR. BARS @ 0.60M

C1 / F1 (1.0x1.0x0.3)
0.81

TB - 1 (200X300)

C1 / F1 (1.0x1.0x0.3)
PROPOSED PERIMETER FENCE
B FENCE ELEVATION TYPE-2 DETAIL
SCALE 1:30 M
S- 3

FROM THE OFFICE OF: CIVIL ENGINEER: SEAL PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: DRAFTED: RTG SHEET NO.:

DATE: 06 - 28 - 2021
ENGR. FATIMA F. CUYOS AS SHOWN
MR. ANDRELO SOLON & MRS. JOSEPHINE SOLON CHECKED: S-3
LICENSED CIVIL ENGINEER PROPOSED PERIMETER FENCE OWNER
PROJECT NO.
PRC: 0073612
DATE : 08-21-1995
P.T.R. NO.: 733375
DATE : 1-20-2021
CLIENT:
S 4
T.I.N. : 246-380-122 PLACE : BALAMBAN, CEBU LOCATION: BRGY. SAM-ANG, TOLEDO CITY, CEBU ADDRESS: TOLEDO CITY, CEBU
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

4.00 4.00 4.00 OFFICE OF THE


BUILDING OFFICIAL
TOLEDO CITY

0.50
RECOMMENDING APPROVAL :

LB - 1 (150X250)

HEAD STRUCTURAL SECTION DATE :

2.00

0.50
APPROVED :

LB - 1 (150X250)

2.00
BUILDING OFFICIAL : DATE :
6" THK CHB
W/ 10MMØ VERT. BARS @ 0.40M

0.50
& 10MMØ HOR. BARS @ 0.60M
NGL ELEV. +0.00

LB - 1 (150X250)

2.00
6" THK CHB

0.80
TB - 1 (200X300)
W/ 10MMØ VERT. BARS @ 0.40M
& 10MMØ HOR. BARS @ 0.60M
LB - 1 (150X250)

0.81
C1 / F1 (1.0x1.0x0.3) TB - 1 (200X300)

2.00
6" THK CHB
W/ 10MMØ VERT. BARS @ 0.40M
& 10MMØ HOR. BARS @ 0.60M
C1 / F1 (1.0x1.0x0.3)
6" THK CHB

0.82
TB - 1 (200X300) W/ 10MMØ VERT. BARS @ 0.40M
& 10MMØ HOR. BARS @ 0.60M

C1 / F1 (1.0x1.0x0.3)

0.81
TB - 1 (200X300)

C1 / F1 (1.0x1.0x0.3)
PROPOSED PERIMETER FENCE
A FENCE ELEVATION TYPE-3 DETAIL
SCALE 1:30 M
S- 4

FROM THE OFFICE OF: CIVIL ENGINEER: SEAL PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: DRAFTED: RTG SHEET NO.:

DATE: 06 - 28 - 2021
ENGR. FATIMA F. CUYOS AS SHOWN
MR. ANDRELO SOLON & MRS. JOSEPHINE SOLON CHECKED: S-4
LICENSED CIVIL ENGINEER PROPOSED PERIMETER FENCE OWNER
PROJECT NO.
PRC: 0073612
DATE : 08-21-1995
P.T.R. NO.: 733375
DATE : 1-20-2021
CLIENT:
S 4
T.I.N. : 246-380-122 PLACE : BALAMBAN, CEBU LOCATION: BRGY. SAM-ANG, TOLEDO CITY, CEBU ADDRESS: TOLEDO CITY, CEBU