Poids des Superstructures (Remplir les cases grisées) 02/28/2023

Désignation Unité Poids Larg. Epai. Section Nbre G nominal Variations G max G min
M M M2/Ml max min
Barrière normale
BN4 t/ml 0.065 0 5.00% -5.00% 0 0
BN4-16/Tetra S16 t/ml 0.07 0 5.00% -5.00% 0 0
Tetra S13 t/ml 0.06 0 5.00% -5.00% 0 0
BN5 t/ml 0.05 0 5.00% -5.00% 0 0
BN1 t/ml 0.62 0 5.00% -5.00% 0 0
BN2/GBA t/ml 0.605 0 5.00% -5.00% 0 0
DBA t/ml 0.665 0 5.00% -5.00% 0 0
Garde corps
Double Fonction t/ml 0.035 0 5.00% -5.00% 0 0
S7 t/ml 0.034 0 5.00% -5.00% 0 0
S8 t/ml 0.024 2 0.048 5.00% -5.00% 0.0504 0.0456
S9 t/ml 0.017 0 5.00% -5.00% 0 0
Balustrade béton t/ml 0.02 0 0 5.00% -5.00% 0 0
Parapet maçonnerie t/m3 2.40 0.40 0.80 0.32 0 0 5.00% -5.00% 0 0
Mur antibruit t/ml 0.07 0 5.00% -5.00% 0 0
Glissière sur platine t/ml 0.02 0 5.00% -5.00% 0 0
Béton sous trottoir t/m3 2.40 0.45 0.20 0.09 2 0.432 5.00% -5.00% 0.4536 0.4104
Bordure de trottoir
T1 t/ml 0.05 0 5.00% -5.00% 0 0
T2 t/ml 0.08 2 0.166 5.00% -5.00% 0.1743 0.1577
T3 t/ml 0.11 0 5.00% -5.00% 0 0
Dallette sous trottoir t/m3 2.50 0 0 5.00% -5.00% 0 0
Chape sur trottoirs t/m3 2.40 0.65 0.04 0.026 2 0.1248 5.00% -5.00% 0.13104 0.11856
Corniche béton
coulée en place t/m3 2.50 0.00 0 0 5.00% -5.00% 0 0
préfabriquée t/m3 2.50 0.19 2 0.9485 3.00% -3.00% 0.976955 0.920045
Corniche métal t/ml 0.10 0 5.00% -5.00% 0 0
Corniche caniv. métal t/ml 0.40 0 20.00% -20.00% 0 0
contre corniche t/m3 2.50 0.15 0.55 0.0825 2 0.4125 5.00% -5.00% 0.433125 0.391875
contre bordure t/m3 2.50 0 0 5.00% -5.00% 0 0
murette t/m3 2.50 0.25 0.25 0.0625 2 0.3125 5.00% -5.00% 0.328125 0.296875
Caillebotis t/m2 0.03 0 5.00% -5.00% 0 0
Canalisations t/ml 0.15 0 0 20.00% -20.00% 0 0
Chape d’étanchéité
Remblais t/m3 2.2 7.7 0.35 2.695 5.929 20.00% -20.00% 7.1148 4.7432
préfabriquée t/m3 2.2 7.7 0.01 0.077 0.1694 5.00% -5.00% 0.17787 0.16093
Revêtement bitumineux t/m3 2.3 6.5 0.08 0.52 1.196 40.00% -20.00% 1.6744 0.9568
Renformis t/m3 2.4 0 0 0 0 20.00% -20.00% 0 0

TOTAL T/ML Psidp Psida G nominal Gmax Gmin


9.7387 11.514615 8.201985
TOTAL T/M2 Pipo Picf G nominal Gmax Gmin
1.13 1.34 0.95
longueur tablier 2.6 largeur tablier 8.62
TOTAL T G nominal Gmax Gmin
25.321 29.938 21.325

647758378.xls 02/28/2023
LT LT

h
b
b

Voie franchie Voie portée

Gpe 1 Gpe 2 Gpe 3 Gpe 1


DBA 0.6 0.6 0.6 Chaussée 7
BDG 0.5 0.6 0.7 Trottoir 1.5
Chaussée 7 7.5 8 Dévers 0.025
BAU 2.25 2.5 3 Ep. roulement 0.06
Fossé 0.5 0.6 0.65 Ep. Étanchéité 0.03
Balancement 0.8 0.7 0.6
Dévers 0.03 0.03 0.03

Autres caractéristiques

Gabarit m
Pente longitudinale 0.5 %
Nbre travée 4
Côte voie m

PREDIMENSIONNEMENT

Gpe 1 Gpe 2 Gpe 3


Portée L = 18 17 16.5
Portée de rive Lr = 12 11 10.5

Ep Dalle = 65 65 60

caractéristiques géométriques

bi hi yi Si yi*Si
[1] 10 0.65 0.325 6.5 2.1125
[2] 7 0.0875 0.67916667 0.30625 0.2080
Gpe 1 [3'] 1 0.45 0.15 0.225 0.0338
Gpe 1
[3"] 1 0.45 0.15 0.225 0.0338
TOTAL 6.35625 2.25299479

yG = 0.3545 m IGy =

v= 0.3545 m

v' = 0.3830 m

bi hi yi Si yi*Si
[1] 10.5 0.65 0.325 6.825 2.2181
[2] 7.5 0.09375 0.68125 0.3515625 0.2395
Gpe 2 [3'] 1 0.45 0.15 0.225 0.0338
[3"] 1 0.45 0.15 0.225 0.0338
TOTAL 6.7265625 2.39012695

yG = 0.3553 m IGy =

v= 0.3553 m

v' = 0.3884 m

bi hi yi Si yi*Si
[1] 10.5 0.6 0.3 6.3 1.8900
[2] 8 0.1 0.63333333 0.4 0.2533
Gpe 3 [3'] 1 0.4 0.13333333 0.2 0.0267
[3"] 1 0.4 0.13333333 0.2 0.0267
TOTAL 6.3 2.09

yG = 0.3317 m IGy =

v= 0.3317 m

v' = 0.3683 m
Gpe 2 Gpe 3
7.5 8
1.5 1.25
0.025 0.025
0.06 0.06
0.03 0.03

yi²*Si IG0i
0.6866 0.2289
0.1413 0.0001
0.0051 0.0025
0.0051 0.0025
0.8177006293 0.2239219293

0.2430 m4

yi²*Si IG0i
0.7209 0.2403
0.1632 0.0002
0.0051 0.0025
0.0051 0.0025
0.8739263306 0.2354

0.2601 m4

yi²*Si IG0i
0.5670 0.1890
0.1604 0.0002
0.0036 0.0018
0.0036 0.0018
0.7203333333 0.1856666667

0.2127 m4
1- CHARGES PERMANENTES :

GROUPE 1

Tablier :
Poids = 158.9063 KN/ml

G = 158.9063 KN/ml

Superstructures :
Remplissage trottoir = 11.2678 KN/ml
Corniche = 7.3325 KN/ml
Bordure = 1.1000 KN/ml
Revêtement = 10.0800 KN/ml
Etanchéité = 6.0720 KN/ml
Contre bordure = 1.6463 KN/ml
Garde corps = 0.1000 KN/ml

G' = 37.5985 KN/ml

G nominale = 194.4783 KN/ml


CAS 1 : Charge permanente : Gmin

On prend : Gmin = 184.1162 KN/ml

CAS 2 : Charge permanente : Gmax

On prend : Gmax = 203.7520 KN/ml

GROUPE 2
Tablier :
Poids = 168.1641 KN/ml

G = 168.1641 KN/ml

Superstructures :
Remplissage trottoir = 11.2678 KN/ml
Corniche = 7.3325 KN/ml
Bordure = 1.1000 KN/ml
Revêtement = 10.8000 KN/ml
Etanchéité = 6.4020 KN/ml
Contre corniche = 1.6463 KN/ml
Garde corps = 0.1000 KN/ml

G' = 38.5485 KN/ml

G nominale = 206.7125 KN/ml


CAS 1 : Charge permanente : Gmin

On prend : Gmin = 196.0600 KN/ml

CAS 2 : Charge permanente : Gmax

On prend : Gmax = 216.2767 KN/ml

GROUPE 3

Tablier :
Poids = 157.5000 KN/ml

G = 157.5000 KN/ml

Superstructures :
Remplissage trottoir = 9.4356 KN/ml
Corniche = 7.3325 KN/ml
Bordure = 1.1000 KN/ml
Revêtement = 11.5200 KN/ml
Etanchéité = 6.4020 KN/ml
Contre bordure = 1.6463 KN/ml
Garde corps = 0.1000 KN/ml

G' = 37.4363 KN/ml

G nominale = 194.9363 KN/ml


CAS 1 : Charge permanente : Gmin
On prend : Gmin = 184.5513 KN/ml

CAS 2 : Charge permanente : Gmax

On prend : Gmax = 204.2330 KN/ml


Min Max

154.1391 KN/ml 163.6734 KN/ml

154.1391 KN/ml 163.6734 KN/ml

10.7044 KN/ml 11.8312 KN/ml


5.8660 KN/ml 8.7989 KN/ml
1.0450 KN/ml 1.1550 KN/ml
8.0640 KN/ml 12.0960 KN/ml
4.8576 KN/ml 6.2542 KN/ml
1.5639 KN/ml 1.7286 KN/ml
0.0950 KN/ml 0.1050 KN/ml

32.1959 KN/ml 41.9688 KN/ml


Min Max

163.1191 KN/ml 173.2090 KN/ml

163.1191 KN/ml 173.2090 KN/ml

10.7044 KN/ml 11.8312 KN/ml


5.8660 KN/ml 8.7989 KN/ml
1.0450 KN/ml 1.1550 KN/ml
8.6400 KN/ml 12.9600 KN/ml
5.1216 KN/ml 6.5941 KN/ml
1.5639 KN/ml 1.7286 KN/ml
0.0950 KN/ml 0.1050 KN/ml

32.9409 KN/ml 43.0677 KN/ml

Min Max

152.7750 KN/ml 162.2250 KN/ml

152.7750 KN/ml 162.2250 KN/ml

8.9638 KN/ml 9.9074 KN/ml


5.8660 KN/ml 8.7989 KN/ml
1.0450 KN/ml 1.1550 KN/ml
9.2160 KN/ml 13.8240 KN/ml
5.1216 KN/ml 6.5941 KN/ml
1.5639 KN/ml 1.7286 KN/ml
0.0950 KN/ml 0.1050 KN/ml

31.7763 KN/ml 42.0080 KN/ml


GROUPE 1

2- CHARGES DE CHAUSSEE :

- Classe du pont : Première


- Largeur chargeable Lc : 7.00 m
- Largeur roulable LR : 7.00 m
- Nombre de voies : 2
- Largeur de voie 3.50 m
- Largeur nominale de voies vo : 3.50 m
- Portée L : 18.00 m
Rive L' = 12.00 m

donc : a1 = 0.75
a2 = 1

CAS 1 : Surcharges de trottoir

TR = 0,15*1*2
TR = 0.4500T/ml

CAS 2 : Surcharges AL 1 travée

1 Travée chargée :
L = 18.00 m
A(L) = 0,23 + 36/(L+12)
A(L) = 1.43 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 7.5075T/ml

QAL = 135.1350 T

CAS 3 : Surcharges AL 2 travées

A(L) = 0,23 + 36/(L1 + L2 +12)

2 Travées chargées :

A(L) = 1.0871 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 5.7075 T/ml

QAL = 171.2250 T

Calcul des efforts de freinage correspondants :


A(L) = 1.43 T/m² 1 Travée chargé
A(L) = 1.09 T/m² 2 Travées chargés

L'effort de freinage correspondant à une charge est donné par la formule suivante :

A (l). S
H=
20+0. 0035 .S

S étant la surface chargée.

S = 126.0000 m² 1 Travée chargée


S = 252.0000 m² 2 Travées chargées
On trouve donc :

Fral = 8.8146 T 1 Travée chargée


Fral = 13.1194 T 2 Travées chargées

L'effort de freinage de AL est inférieur à l'effort de freinage de BC (FrBc = 30T).


On prenant la même distibution que pour le freinage Bc, la valeur maximale en découlant est :

Fral = 30.00 T
Fral = 30.00 T
GROUPE 2

2- CHARGES DE CHAUSSEE :

- Classe du pont : Première


- Largeur chargeable Lc : 7.50 m
- Largeur roulable LR : 7.50 m
- Nombre de voies : 2
- Largeur de voie 3.75 m
- Largeur nominale de voies vo : 3.50 m
- Portée L : 17.00 m
Rive L' = 11.00 m

donc : a1 = 1
a2 = 0.93333333

CAS 1 : Surcharges de trottoir

TR = 0,15*1*2
TR = 0.4500T/ml

CAS 2 : Surcharges AL 1 travée

1 Travée chargée :
L = 17.00 m
A(L) = 0,23 + 36/(L+12)
A(L) = 1.47 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 10.2997T/ml

QAL = 175.0941 T

CAS 3 : Surcharges AL 2 travées

A(L) = 0,23 + 36/(L1 + L2 +12)

2 Travées chargées :

A(L) = 1.1300 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 7.9100 T/ml

QAL = 229.3900 T

Calcul des efforts de freinage correspondants :


A(L) = 1.47 T/m² 1 Travée chargé
A(L) = 1.13 T/m² 2 Travées chargés

L'effort de freinage correspondant à une charge est donné par la formule suivante :

A (l). S
H=
20+0.0035 .S

S étant la surface chargée.

S = 127.5000 m² 1 Travée chargée


S = 255.0000 m² 2 Travées chargées
On trouve donc :

Fral = 9.1753 T 1 Travée chargée


Fral = 13.7920 T 2 Travées chargées

L'effort de freinage de AL est inférieur à l'effort de freinage de BC (FrBc = 30T).


On prenant la même distibution que pour le freinage Bc, la valeur maximale en découlant est :

Fral = #REF!
Fral = #VALUE!
GROUPE 3

2- CHARGES DE CHAUSSEE :

- Classe du pont : Première


- Largeur chargeable Lc : 8.00 m
- Largeur roulable LR : 8.00 m
- Nombre de voies : 2
- Largeur de voie 4.00 m
- Largeur nominale de voies vo : 3.50 m
- Portée L : 16.50 m
Rive L' = 10.50 m

donc : a1 = 1
a2 = 0.875

CAS 1 : Surcharges de trottoir

TR = 0,125*1*2
TR = 0.3750T/ml

CAS 2 : Surcharges AL 1 travée

1 Travée chargée :
L = 16.50 m
A(L) = 0,23 + 36/(L+12)
A(L) = 1.49 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 10.4521T/ml

QAL = 172.4597 T

CAS 3 : Surcharges AL 2 travées

A(L) = 0,23 + 36/(L1 + L2 +12)

2 Travées chargées :

A(L) = 1.1531 T/m²

qAL = a1*a2*A(L)*Lc
qAL = 8.0715 T/ml

QAL = 230.0388 T

Calcul des efforts de freinage correspondants :


A(L) = 1.49 T/m² 1 Travée chargé
A(L) = 1.15 T/m² 2 Travées chargés

L'effort de freinage correspondant à une charge est donné par la formule suivante :

A (l). S
H=
20+0.0035 .S

S étant la surface chargée.

S = 132.0000 m² 1 Travée chargée


S = 264.0000 m² 2 Travées chargées
On trouve donc :

Fral = 9.6323 T 1 Travée chargée


Fral = 14.5485 T 2 Travées chargées

L'effort de freinage de AL est inférieur à l'effort de freinage de BC (FrBc = 30T).


découlant est : On prenant la même distibution que pour le freinage Bc, la valeur maximale en découlant est :

Fral = #REF!
Fral = #VALUE!
formule suivante :

C (FrBc = 30T).
r maximale en découlant est :
GROUPE 1

CAS : Surcharge BC
ELEMENTS A DISPOSER

bc = 1.1
bt = 1

Travée 1

Charge 12 24 30 42 54
Abscisse 0 1.5 6 10.5 12

SBc = 118.8000 T
SBc = 1188.0000 KN

Travée 2

Charge 12 24 30 42 54 60
Abscisse 0 1.5 6 10.5 12 16.5

SBc = 132.0000 T
SBc = 1320.0000 KN

CAS : Surcharge Bt
Travée 1

Charge 16 32
Abscisse 0 1.35

SBt = 64.0000 T
SBt = 640.0000 KN

Travée 2

Charge 16 32
Abscisse 0 1.35

SBt = 64.0000 T
SBt = 640.0000 KN

CAS : Surcharge Br

Travée 1

SBr = 10.0000 T
SBr = 100.0000 KN

Travée 2

SBr = 10.0000 T
SBr = 100.0000 KN
CAS : Surcharge MC120

ELEMENTS A DISPOSER

Charge 0 110 110 220


Abscisse 0 6.1 36.6 42.7

Système Mc120 :
S = 1100.0000 KN

COEFFICIENTS DE MAJORATION DYNAMIQUE (flexion longitudinale)

Portée G B Mc120

Travée 1 12 2333.7394 KN 1.1937 1.1809

Travée 2 18 3500.6091 KN 1.1630 1.1307

COEFFICIENTS DE MAJORATION DYNAMIQUE (flexion transversale)

Portée G B Mc120

Travée 1 7 1361.3480 KN 1.2427 1.2675

Travée 2 7 1361.3480 KN 1.2427 1.2675


GROUPE 2

CAS : Surcharge BC
ELEMENTS A DISPOSER

Travée 1

Charge 12 24 30
Abscisse 0 1.5 6

SBc = 118.8000 T
SBc = 1188.0000 KN

Travée 2

Charge 12 24 30
Abscisse 0 1.5 6

SBc = 0.0000 T
SBc = 0.0000 KN

CAS : Surcharge Bt
Travée 1

Charge 12 24 30
Abscisse 0 1.5 6

SBt = 64.0000 T
SBt = 640.0000 KN

Travée 2

Charge 12 24 30
Abscisse 0 1.5 6

SBt = 64.0000 T
SBt = 640.0000 KN

CAS : Surcharge Br

Travée 1

SBr = 10.0000 T
SBr = 100.0000 KN

Travée 2

SBr = 10.0000 T
SBr = 100.0000 KN
CAS : Surcharge MC120

ELEMENTS A DISPOSER

Charge 0 110 110


Abscisse 0 6.1 36.6

Système Mc120 :
S= 1100.0000 KN

COEFFICIENTS DE MAJORATION DYNAMIQUE (flexion longitudina

Portée G B

Travée 1 11 2273.8380 KN 1.1943

Travée 2 17 3514.1133 KN 1.1669

COEFFICIENTS DE MAJORATION DYNAMIQUE (flexion transversa

Portée G B

Travée 1 7.5 1550.3441 KN 1.2360

Travée 2 7.5 1550.3441 KN 1.2360


UPE 2

CAS :
ELEMENTS A DISPOSER

bc = 1.1
bt = 1

Travée 1

42 54 Charge 12
10.5 12 Abscisse 0

SBc = 118.8000 T
SBc = 1188.0000 KN

Travée 3

42 54 Charge 12
10.5 12 Abscisse 0

SBc = 0.0000 T
SBc = 0.0000 KN

CAS :
Travée 1

42 54 Charge 12
10.5 12 Abscisse 0

SBt =
SBt =

Travée 3

42 54 Charge 12
10.5 12 Abscisse 0

SBt =
SBt =

CAS :

Travée 1

SBr =
SBr =

Travée 3

SBr =
SBr =
CAS :

ELEMENTS A DISPOSER

220 Charge 0
42.7 Abscisse 0

Système Mc120 :
S=

DYNAMIQUE (flexion longitudinale) COEFFICIENTS DE MAJORA

Mc120 Portée

1.1897 Travée 1 10.5

1.1345 Travée 2 16.5

DYNAMIQUE (flexion transversale) COEFFICIENTS DE MAJORA

Mc120 Portée

1.2504 Travée 1 8

1.2504 Travée 2 8
GROUPE 3

Surcharge BC
MENTS A DISPOSER

bc = 1.1
bt = 1

24 30 42 54
1.5 6 10.5 12

24 30 42 54
1.5 6 10.5 12

Surcharge Bt
24 30 42 54
1.5 6 10.5 12

64.0000 T
640.0000 KN

24 30 42 54
1.5 6 10.5 12

64.0000 T
640.0000 KN

Surcharge Br

10.0000 T
100.0000 KN

10.0000 T
100.0000 KN
Surcharge MC120

MENTS A DISPOSER

110 110 220


6.1 36.6 42.7

ème Mc120 :
1100.0000 KN

FFICIENTS DE MAJORATION DYNAMIQUE (flexion longitudinale)

G B Mc120

2046.8314 KN 1.2051 1.2001

3216.4493 KN 1.1437 1.1403

FFICIENTS DE MAJORATION DYNAMIQUE (flexion transversale)

G B Mc120

1559.4906 KN 1.2299 1.2438

1559.4906 KN 1.2299 1.2438


Equations des L.I des MOMENTS SUR APPUIS

L' = 12 m L = 18 m

Travée 1 Travée 2 Travée 3 Travée 4

A 0.0015114379 -0.0012799564 0.0003540305 -0.000122549


M1 B 0.0000 0.0544117647 -0.00122549 0.0044117647
C -0.2176 -0.5647058824 0.15 -0.0352941176

MOMENTS

L' = 12 m L = 18 m

Abscisse Travée 1 Travée 2 Travée 3 Travée 4

A -0.000408497 0.0011801017 -0.001084418 0.0004084967


M2 B 0.0000 -0.0073529412 0.0490196078 -0.0147058824
C 0.0588235294 -0.1176470588 -0.5 0.1176470588
GROUPE 1

MOMENTS FLECHISSANTS

Equations des L.I en Travée 1

L' = 12 m L= 18 m

Section Abscisse Travée 1 G Travée 1 D Travée 2 Travée 3

A 7.55719E-05 7.55719E-05 -6.39978E-05 1.770153E-05


0,05 L 0.6000 B 0.0000 0.0000 0.0027205882 -0.000735294
C 0.9391 -0.0609 -0.028235294 0.0075
D 0.0000 0.6000 0.0000 0.0000

A 0.0001511438 0.0001511438 -0.000127996 3.540305E-05


0,1 L 1.2000 B 0.0000 0.0000 0.0054411765 -0.001470588
C 0.8782 -0.1218 -0.056470588 0.015
D 0.0000 1.2000 0.0000 0.0000

A 0.0003022876 0.0003022876 -0.000255991 7.08061E-05


0,2 L 2.4000 B 0.0000 0.0000 0.0108823529 -0.002941176
C 0.7565 -0.2435 -0.112941176 0.03
D 0.0000 2.4000 0.0000 0.0000

A 0.0004534314 0.0004534314 -0.000383987 0.0001062092


0,3 L 3.6000 B 0.0000 0.0000 0.0163235294 -0.004411765
C 0.6347 -0.3653 -0.169411765 0.045
D 0.0000 3.6000 0.0000 0.0000

A 0.0006045752 0.0006045752 -0.000511983 0.0001416122


0,4 L 4.8000 B 0.0000 0.0000 0.0217647059 -0.005882353
C 0.5129 -0.4871 -0.225882353 0.06
D 0.0000 4.8000 0.0000 0.0000

A 0.000755719 0.000755719 -0.000639978 0.0001770153


0,5 L 6.0000 B 0.0000 0.0000 0.0272058824 -0.007352941
C 0.3912 -0.6088 -0.282352941 0.075
D 0.0000 6.0000 0.0000 0.0000

A 0.0009068627 0.0009068627 -0.000767974 0.0002124183


0,6 L 7.2000 B 0.0000 0.0000 0.0326470588 -0.008823529
C 0.2694 -0.7306 -0.338823529 0.09
D 0.0000 7.2000 0.0000 0.0000

A 0.0010580065 0.0010580065 -0.000895969 0.0002478214


0,7 L 8.4000 B 0.0000 0.0000 0.0380882353 -0.010294118
C 0.1476 -0.8524 -0.395294118 0.105
D 0.0000 8.4000 0.0000 0.0000

A 0.0012091503 0.0012091503 -0.001023965 0.0002832244


0,8 L 9.6000 B 0.0000 0.0000 0.0435294118 -0.011764706
C 0.0259 -0.9741 -0.451764706 0.12
D 0.0000 9.6000 0.0000 0.0000

A 0.0013602941 0.0013602941 -0.001151961 0.0003186275


0,9 L 10.8000 B 0.0000 0.0000 0.0489705882 -0.013235294
C -0.0959 -1.0959 -0.508235294 0.135
D 0.0000 10.8000 0.0000 0.0000

A 0.001435866 0.001435866 -0.001215959 0.000336329


0,95 L 11.4000 B 0.0000 0.0000 0.0516911765 -0.013970588
C -0.1568 -1.1568 -0.536470588 0.1425
D 0.0000 11.4000 0.0000 0.0000

Equations des L.I en Travée 2

L' = 12 m L= 18 m

Section Abscisse Travée 1 Travée 2 G Travée 2 D Travée 3

A 0.0014154412 -0.001156954 -0.001156954 0.0003071331


0,05 L 0.9000 B 0.0000 0.0509558824 0.0509558824 -0.011519608
C -0.203823529 0.4076470588 -0.592352941 0.1175
D 0.0000 0.0000 0.9000 0.0000

A 0.0013194444 -0.001033951 -0.001033951 0.0002602357


0,1 L 1.8000 B 0.0000 0.0475 0.0475 -0.008333333
C -0.19 0.38 -0.62 0.085
D 0.0000 0.0000 1.8000 0.0000

A 0.001127451 -0.000787945 -0.000787945 0.000166441


0,2 L 3.6000 B 0.0000 0.0405882353 0.0405882353 -0.001960784
C -0.162352941 0.3247058824 -0.675294118 0.02
D 0.0000 0.0000 3.6000 0.0000

A 0.0009354575 -0.000541939 -0.000541939 7.264618E-05


0,3 L 5.4000 B 0.0000 0.0336764706 0.0336764706 0.0044117647
C -0.134705882 0.2694117647 -0.730588235 -0.045
D 0.0000 0.0000 5.4000 0.0000

A 0.0007434641 -0.000295933 -0.000295933 -2.11486E-05


0,4 L 7.2000 B 0.0000 0.0267647059 0.0267647059 0.0107843137
C -0.107058824 0.2141176471 -0.785882353 -0.11
D 0.0000 0.0000 7.2000 0.0000

A 0.0005514706 -4.99274E-05 -4.99274E-05 -0.000114943


0,5 L 9.0000 B 0.0000 0.0198529412 0.0198529412 0.0171568627
C -0.079411765 0.1588235294 -0.841176471 -0.175
D 0.0000 0.0000 9.0000 0.0000

A 0.0003594771 0.0001960784 0.0001960784 -0.000208738


0,6 L 10.8000 B 0.0000 0.0129411765 0.0129411765 0.0235294118
C -0.051764706 0.1035294118 -0.896470588 -0.24
D 0.0000 0.0000 10.8000 0.0000

A 0.0001674837 0.0004420842 0.0004420842 -0.000302533


0,7 L 12.6000 B 0.0000 0.0060294118 0.0060294118 0.0299019608
C -0.024117647 0.0482352941 -0.951764706 -0.305
D 0.0000 0.0000 12.6000 0.0000
A -2.45098E-05 0.0006880901 0.0006880901 -0.000396328
0,8 L 14.4000 B 0.0000 -0.000882353 -0.000882353 0.0362745098
C 0.0035294118 -0.007058824 -1.007058824 -0.37
D 0.0000 0.0000 14.4000 0.0000

A -0.000216503 0.0009340959 0.0009340959 -0.000490122


0,9 L 16.2000 B 0.0000 -0.007794118 -0.007794118 0.0426470588
C 0.0311764706 -0.062352941 -1.062352941 -0.435
D 0.0000 0.0000 16.2000 0.0000

A -0.0003125 0.0010570988 0.0010570988 -0.00053702


0,95 L 17.1000 B 0.0000 -0.01125 -0.01125 0.0458333333
C 0.045 -0.09 -1.09 -0.4675
D 0.0000 0.0000 17.1000 0.0000

SURFACES D'INFLUENCES

VALEURS DES SURFACES DANS LA TRAVEE 1

L' = 12 m L= 18 m

Section Abscisse TOTAL Travée 1 G Travée 1 D Travée 2 Travée 3

0,05 L 0.6000 2.2818 0.1690 2.8592 -0.9649 0.2501

0,1 L 1.2000 4.2035 0.6324 5.0641 -1.9297 0.5003

0,2 L 2.4000 6.9671 2.1811 7.7718 -3.8594 1.0006

0,3 L 3.6000 8.2906 4.1319 8.6375 -5.7891 1.5009

0,4 L 4.8000 8.1741 5.9893 8.1566 -7.7188 2.0012

0,5 L 6.0000 6.6176 7.2860 6.7963 -9.6485 2.5015

0,6 L 7.2000 3.6212 7.5924 4.9864 -11.5782 3.0018


0,7 L 8.4000 -0.8153 6.5259 3.1094 -13.5079 3.5021

0,8 L 9.6000 -6.6918 3.7601 1.4916 -15.4376 4.0024

0,9 L 10.8000 -14.0082 -0.9652 0.3934 -17.3674 4.5026

0,95 L 11.4000 -18.2065 -4.1238 0.1002 -18.3322 4.7528

Equations des L.I en Travée 2

L' = 12 m L= 18 m

Section Abscisse TOTAL Travée 1 Travée 2 G Travée 2 D Travée 3

0,05 L 0.9000 -34.7803 -7.3376 0.1773 -11.6483 4.7013

0,1 L 1.8000 -25.0132 -6.8400 0.7052 -5.1602 4.3996

0,2 L 3.6000 -7.9090 -5.8447 2.7022 4.4448 3.7963

0,3 L 5.4000 5.9552 -4.8494 5.5804 9.9287 3.1930

0,4 L 7.2000 16.5794 -3.8541 8.6811 11.9501 2.5897

0,5 L 9.0000 23.9636 -2.8588 11.1747 11.3385 1.9864


0,6 L 10.8000 28.1078 -1.8635 12.1388 9.0165 1.3831

0,7 L 12.6000 29.0119 -0.8682 10.6349 5.9224 0.7797

0,8 L 14.4000 26.6761 0.1271 5.7866 2.9328 0.1764

0,9 L 16.2000 21.1003 1.1224 -3.1437 0.7852 -0.4269

0,95 L 17.1000 17.0974 1.6200 -9.3128 0.2003 -0.7285


Travée 4

-6.127451E-06
0.0002205882
-0.0017647059
0.0000

-1.22549E-05
0.0004411765
-0.0035294118
0.0000

-2.45098E-05
0.0008823529
-0.0070588235
0.0000

-3.676471E-05
0.0013235294
-0.0105882353
0.0000

-4.901961E-05
0.0017647059
-0.0141176471
0.0000

-6.127451E-05
0.0022058824
-0.0176470588
0.0000

-7.352941E-05
0.0026470588
-0.0211764706
0.0000

-8.578431E-05
0.0030882353
-0.0247058824
0.0000

-9.803922E-05
0.0035294118
-0.0282352941
0.0000

-0.0001102941
0.0039705882
-0.0317647059
0.0000

-0.0001164216
0.0041911765
-0.0335294118
0.0000

Travée 4

-9.599673E-05
-0.0034558824
-0.0705882353
0.0000

-6.944444E-05
-0.0025
-0.0705882353
0.0000

-1.633987E-05
-0.0005882353
-0.0705882353
0.0000

3.676471E-05
0.0013235294
-0.0705882353
0.0000

8.986928E-05
0.0032352941
-0.0705882353
0.0000

0.0001429739
0.0051470588
-0.0705882353
0.0000

0.0001960784
0.0070588235
-0.0705882353
0.0000

0.000249183
0.0089705882
-0.0705882353
0.0000
0.0003022876
0.0108823529
-0.0705882353
0.0000

0.0003553922
0.0127941176
-0.0705882353
0.0000

0.0003819444
0.01375
-0.0705882353
0.0000

Travée 4

-0.0318

-0.0635

-0.1271

-0.1906

-0.2541

-0.3176

-0.3812
-0.4447

-0.5082

-0.5718

-0.6035

Travée 4

-20.6729

-18.1178

-13.0076

-7.8975

-2.7874

2.3228
7.4329

12.5431

17.6532

22.7634

25.3185
GROUPE

EFFORTS TRANCHANTS

Equations des L.I

L' = 12 m L= 18 m

Travée 1 Travée 2 Travée 3 Travée 4

A 0.0001259532 -7.110869E-05 1.966836E-05 -6.80828E-06


B 0.0000 0.0030228758 -6.80828E-05 0.000245098
TRAVEE 1 C -0.1015 -0.031372549 0.0083333333 -0.001960784
D 1.0000 0.0000 0.0000 0.0000

A -0.000159995 0.0001366699 -7.99138E-05 2.950254E-05


B 0.0000 -0.0034313725 0.0027913943 -0.001062092
TRAVEE 2 C 0.0230392157 -0.0307189542 -0.036111111 0.008496732
D 0.0000 1.0000 0.0000 0.0000

SURFACES D'INFLUENCES

L' = 12 m L= 18 m

TOTAL Travée 1 Travée 2 Travée 3 Travée 4

Aire côté gauche 5.9735 5.3471 -1.0721 1.7338 -0.0353


TRAVEE 1
Aire côté droit -7.0975 -6.6529 -1.0721 0.6627 -0.0353

Aire côté gauche 8.4013 0.8294 9.9397 -2.5208 0.1529


TRAVEE 2
Aire côté droit -8.4844 0.8294 -8.0603 -1.4064 0.1529
L' = 12 m L = 18 m

Pour la Travée 1

A 0.00151144
B 0
C -0.21764706
D 0 Paramètre d'entrtoisement

M10 = 0
θ1 = 0.42172063
M11 = -7.83529412

2be = 9.38363856

Le = 11.1254203

Théta
y - 32b/32 - 31b/32 - 30b/32 - 29b/32 - 28b/32 - 27b/32 - 26b/32
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625
0.0000 0.9100 0.9155 0.9210 0.9265 0.9321 0.9377 0.9434
1.2500 0.7645 0.7719 0.7793 0.7867 0.7943 0.8019 0.8096
2.5000 0.6501 0.6585 0.6669 0.6754 0.6839 0.6925 0.7013
3.7500 0.5595 0.5684 0.5774 0.5864 0.5955 0.6047 0.6140
5.0000 0.4824 0.4917 0.5011 0.5105 0.5200 0.5296 0.5394

1.1000
1.1000

1.0500
Valeurs de K

1.0000

0.9608
0.9549
0.9491
0.9500 0.9434
0.9377
0.9321
0.9265
0.9210
0.9155
0.9100

0.9000

0.8500

0.8000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938

2.0000
2.0000

1.8000

1.6000

1.4000
Valeurs de K

1.2000

1.0000

0.8000

0.6000 0.5595 0.5698


0.5394 0.5493
0.5200 0.5296
0.5011 0.5105
0.4824 0.4917

0.4000

0.2000

0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938
0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938

1.2000

1.0000

0.8096 0.8174
0.7943 0.8019
0.8000 0.7793 0.7867
0.7645 0.7719
Axis Title

0.6000

0.4000

0.2000

0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063
0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063

1.4000

1.2000

1.0000
Axis Title

0.8000

0.7013 0.7102
0.6839 0.6925
0.6669 0.6754
0.6501 0.6585

0.6000

0.4000

0.2000

0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063
0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063

1.8000

1.6000

1.4000

1.2000
Axis Title

1.0000

0.8000
Axis Tit
1.0000

0.8000

0.6332
0.6235
0.6140
0.6047
0.5955
0.6000 0.5864
0.5774
0.5684
0.5595

0.4000

0.2000

0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500

Pour la Travée 2

A -0.00125448 0.0011801
B 0.05967742 -0.01470588
C -0.61935484 -0.11764706
D 0 0

M20 = -17.2451613
M21 = -16.6764706 Paramètre d'entrtoisement

θ2 = 0.31037006
2be = 9.38363856

Le = 15.1168554

Théta Alfa= 1 => K1


y - 32b/32 - 31b/32 - 30b/32 - 29b/32 - 28b/32 - 27b/32 - 26b/32
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188 -4.0625
0.0000 0.9627 0.9651 0.9675 0.9699 0.9724 0.9748 0.9772
1.2500 0.8690 0.8733 0.8776 0.8820 0.8863 0.8907 0.8951
2.5000 0.7890 0.7947 0.8004 0.8061 0.8119 0.8177 0.8235
3.7500 0.7196 0.7264 0.7332 0.7401 0.7469 0.7539 0.7608
5.0000 0.6565 0.6642 0.6720 0.6798 0.6876 0.6955 0.7035

1.0400

1.0200
Valeurs de K

1.0000

0.9800
0.9724
0.9699
0.9675
0.9651
0.9627

0.9600

0.9400

0.9200
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750
0.9200
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750

1.6000

1.4000

1.2000
Valeurs de K

1.0000

0.8000

0.6876 0.6955
0.6720 0.6798
0.6565 0.6642

0.6000

0.4000

0.2000
0.2000

0.0000
-5.0000 -4.8438 -4.6875 -4.5313 -4.3750 -4.2188
- 25b/32 - 24b/32 - 23b/32 - 22b/32 - 21b/32 - 20b/32 - 19b/32 - 18b/32
-3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125
0.9491 0.9549 0.9608 0.9667 0.9727 0.9788 0.9848 0.9910
0.8174 0.8254 0.8334 0.8417 0.8500 0.8586 0.8672 0.8761
0.7102 0.7193 0.7285 0.7379 0.7475 0.7574 0.7674 0.7777
0.6235 0.6332 0.6431 0.6532 0.6635 0.6741 0.6850 0.6961
0.5493 0.5595 0.5698 0.5804 0.5913 0.6024 0.6138 0.6256
1.0212
1.0152
1.0092
1.0032
0.9971
0.9910
0.9848
0.9788
0.9727
0.9667
0.9608
0.9549
91

63 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313
0.6761 0.6898
0.6501 0.6629
0.6256 0.6377
0.6024 0.6138
0.5804 0.5913
0.5595 0.5698
3

3 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313
3 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313

0.8942 0.9035
0.8761 0.8851
0.8586 0.8672
0.8417 0.8500
0.8254 0.8334
0.8096 0.8174
19

188 -4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438
188 -4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438

0.8
0.8101
0.7990
0.7883
0.7777
0.7674
0.7475 0.7574
0.7285 0.7379
0.7102 0.7193
0.7013

-4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1
-4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1
0.7437
0.7313
0.7193
0.7075
0.6961
0.6850
0.6741
0.6635
0.6532
0.6431
0.6332
0.6235

5 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875
- 25b/32 - 24b/32 - 23b/32 - 22b/32 - 21b/32 - 20b/32 -19 b/32 - 18b/32
-3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125
0.9797 0.9822 0.9847 0.9872 0.9896 0.9921 0.9946 0.9971
0.8996 0.9041 0.9086 0.9132 0.9178 0.9225 0.9272 0.9319
0.8294 0.8354 0.8414 0.8475 0.8537 0.8599 0.8662 0.8727
0.7679 0.7750 0.7822 0.7894 0.7968 0.8043 0.8119 0.8196
0.7115 0.7196 0.7279 0.7362 0.7446 0.7532 0.7619 0.7708

0.997
0.9946
0.9921
0.9896
0.9872
0.9847
0.9822
0.9797
0.9772
0.9748
0.9724
0.9699

5 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.812
5 -4.5313 -4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.812

0.7708 0.77
0.7532 0.7619
0.7362 0.7446
0.7196 0.7279
0.7035 0.7115
0.6876 0.6955
-4.3750 -4.2188 -4.0625 -3.9063 -3.7500 -3.5938 -3.4375 -3.2813 -3.1250 -2.9688 -2.8125 -2.65
- 17b/32 - 16b/32 - 15b/32 -14b/32 - 13b/32 - 12b/32 - 11b/32 - 10b/32
-2.6563 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625
0.9971 1.0032 1.0092 1.0152 1.0212 1.0270 1.0326 1.0381
0.8851 0.8942 0.9035 0.9129 0.9224 0.9321 0.9418 0.9516
0.7883 0.7990 0.8101 0.8213 0.8329 0.8446 0.8567 0.8689
0.7075 0.7193 0.7313 0.7437 0.7564 0.7695 0.7829 0.7967
0.6377 0.6501 0.6629 0.6761 0.6898 0.7038 0.7183 0.7332

1.0666
1.0640
1.0607
1.0570
1.0528
1.0666
1.0640
1.0607
1.0570
1.0528
1.0482
1.0433
1.0381
1.0326
1.0270
1.0212
1.0152
92

38 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688
0.8514
0.8330
0.8151
0.7977
0.7808
0.7645
0.7486
0.7332
0.7183
0.7038
0.6761 0.6898
9

8 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688
8 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688

0.9912 1.0010
0.9714 0.9813
0.9516 0.9615
0.9321 0.9418
0.9129 0.9224
0.8942 0.9035
1

3 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813
3 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813

0.9473
0.9338
0.9204
0.9072
0.8942
0.8814
0.8689
0.8567
0.8446
0.8329
0.8213
0.8101
0.7990

-2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250
-2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250

0.9
0.8872
0.8711
0.8555
0.8402
0.8254
0.8108
0.7967
0.7829
0.7695
0.7564
0.9
0.8872
0.8711
0.8555
0.8402
0.8254
0.8108
0.7967
0.7829
0.7695
0.7564
0.7437
0.7313

-2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4
- 17b/32 - 16b/32 - 15b/32 -14b/32 - 13b/32 - 12b/32 - 11b/32 - 10b/32
-2.6563 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625
0.9996 1.0020 1.0044 1.0067 1.0090 1.0113 1.0134 1.0155
0.9367 0.9416 0.9464 0.9513 0.9562 0.9612 0.9662 0.9711
0.8791 0.8857 0.8924 0.8992 0.9060 0.9129 0.9200 0.9271
0.8274 0.8354 0.8435 0.8517 0.8601 0.8686 0.8772 0.8860
0.7798 0.7890 0.7983 0.8078 0.8175 0.8274 0.8375 0.8478

1.
1.0174
1.0155
1.0134
1.0113
1.0090
1.0067
1.0044
1.0020
0.9996
0.9971
0.9946
921

250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1
250 -2.9688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1

0.8583 0.8690
0.8375 0.8478
0.8175 0.8274
0.7983 0.8078
0.7798 0.7890
619 0.7708
688 -2.8125 -2.6563 -2.5000 -2.3438 -2.1875 -2.0313 -1.8750 -1.7188 -1.5625 -1.4063 -1.2500
- 9b/32 - 8b/32 - 7b/32 - 6b/32 - 5b/32 - 4b/32 - 3b/32 - 2b/32
-1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688 -0.3125
1.0433 1.0482 1.0528 1.0570 1.0607 1.0640 1.0666 1.0686
0.9615 0.9714 0.9813 0.9912 1.0010 1.0108 1.0204 1.0299
0.8814 0.8942 0.9072 0.9204 0.9338 0.9473 0.9611 0.9750
0.8108 0.8254 0.8402 0.8555 0.8711 0.8872 0.9035 0.9203
0.7486 0.7645 0.7808 0.7977 0.8151 0.8330 0.8514 0.8704

Valeurs d
1.0686 1.0699 1.0703 1.0699 1.0686
1.0666 1.0666
1.0640 1.0640
07 1.0607
1.0570
1.052
Valeurs d
1.0686 1.0699 1.0703 1.0699 1.0686
1.0666 1.0666
1.0640 1.0640
07 1.0607
1.0570
1.052

813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938
Axis Title
1.0670
1.0428
1.0192
0.9962
0.9738
0.9519
0.9307
0.9100
0.8899
0.8704
0.8514
0.8330

-0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938
Axis Title
-0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938
Axis Title

1.0806 1.0874
1.0652 1.0731
1.0482 1.0569
1.0299 1.0392
1.0108 1.0204
0.9912 1.0010

-0.9375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813
Axis Title
-0.9375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813
Axis Title

1.0886
1.0745
1.0603
1.0460
1.0317
1.0174
1.0032
0.9890
0.9750
0.9611
0.9473
0.9338
204

375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375
Axis Title
375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375
Axis Title

1.0865
1.0668
1.0474
1.0282
1.0094
0.9909
0.9727
0.9549
0.9374
0.9203
0.9035
0.8872
0.8711
1.0094
0.9909
0.9727
0.9549
0.9374
0.9203
0.9035
0.8872
0.8711

0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938
Axis Title
- 9b/32 - 8b/32 - 7b/32 - 6b/32 - 5b/32 - 4b/32 - 3b/32 - 2b/32
-1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688 -0.3125
1.0174 1.0193 1.0210 1.0225 1.0239 1.0250 1.0260 1.0267
0.9761 0.9811 0.9860 0.9910 0.9959 1.0007 1.0055 1.0102
0.9343 0.9416 0.9489 0.9563 0.9638 0.9714 0.9790 0.9866
0.8950 0.9041 0.9133 0.9227 0.9323 0.9420 0.9518 0.9618
0.8583 0.8690 0.8799 0.8910 0.9024 0.9140 0.9258 0.9379

1.0267 1.0271 1.0273 1.0271


1.0250 1.0260
1.0239
1.0225
1.0210
1.0193
1.0174
1.0155

1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563
Axis Title
1.5625 -1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563
Axis Title

0.988
0.9755
0.9627
0.9502
0.9379
0.9258
0.9140
0.9024
0.8910
0.8690 0.8799
0.8583
-1.4063 -1.2500 -1.0938 -0.9375 -0.7813 -0.6250 -0.4688 -0.3125 -0.1563 0.0000 0.1563 0.312
Axis Title
- b/32 0 b/32 2b/32 3b/32 4b/32 5b/32 6b/32
-0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375
1.0699 1.0703 1.0699 1.0686 1.0666 1.0640 1.0607 1.0570
1.0392 1.0482 1.0569 1.0652 1.0731 1.0806 1.0874 1.0937
0.9890 1.0032 1.0174 1.0317 1.0460 1.0603 1.0745 1.0886
0.9374 0.9549 0.9727 0.9909 1.0094 1.0282 1.0474 1.0668
0.8899 0.9100 0.9307 0.9519 0.9738 0.9962 1.0192 1.0428

Valeurs de K pour y = 0

607
1.0570
1.0528
Valeurs de K pour y = 0

607
1.0570
1.0528
1.0482
1.0433
1.0381
1.0326
1.0270
1.0212
1.0152
1.0092
1.0032
0.997

813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.656

Valeurs de K pour y = b
Valeurs de K pour y = b

1.3417
1.3116
1.2821
1.2532
1.2248
1.1970
1.1698
1.1432
1.1172
1.0918
1.0670
1.0428

0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563
0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563

1.1077 1.1108 1.1131 1.1148 1.1159 1.1165 1.1167 1


1.0992 1.1039
1.0874 1.0937
1.0806

0.6250 0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2
0.6250 0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2

1.2132 1
1.2031
1.1923
1.1808
1.1688
1.1563
1.1433
1.1300
1.1165
1.1026
1.0886
1.0745

0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2
0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2

1.2923
1.2715
1.2507
1.2298
1.2089
1.1881
1.1675
1.1469
1.1266
1.1064
1.0865
1.0668
474
813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563
- b/32 0 b/32 2b/32 3b/32 4b/32 5b/32 6b/32
-0.1563 0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375
1.0271 1.0273 1.0271 1.0267 1.0260 1.0250 1.0239 1.0225
1.0148 1.0193 1.0236 1.0279 1.0319 1.0358 1.0395 1.0429
0.9943 1.0020 1.0097 1.0175 1.0252 1.0329 1.0406 1.0482
0.9719 0.9822 0.9926 1.0031 1.0138 1.0246 1.0354 1.0464
0.9502 0.9627 0.9755 0.9885 1.0017 1.0152 1.0289 1.0429

1.0273 1.0271 1.0267 1.0260 1.0250 1.0239


1.0225
1.0210
1.0193
1.0174
1.0155
1.0134

0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188
Axis Title
0.0000 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188
Axis Title

1.1164
1.1012
1.0863
1.0716
1.0571
1.0429
1.0289
1.0152
1.0017
0.9885
0.9755
27
00 0.1563 0.3125 0.4688 0.6250 0.7813 0.9375 1.0938 1.2500 1.4063 1.5625 1.7188
tle
7b/32 8b/32 9b/32 10b/32 11b/32 12b/32 13b/32 14b/32
1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875
1.0528 1.0482 1.0433 1.0381 1.0326 1.0270 1.0212 1.0152
1.0992 1.1039 1.1077 1.1108 1.1131 1.1148 1.1159 1.1165
1.1026 1.1165 1.1300 1.1433 1.1563 1.1688 1.1808 1.1923
1.0865 1.1064 1.1266 1.1469 1.1675 1.1881 1.2089 1.2298
1.0670 1.0918 1.1172 1.1432 1.1698 1.1970 1.2248 1.2532
092
1.0032
0.9971
0.9910
0.9848
0.9788
0.9727
0.9667
0.9608
0.9549
0.9491
0.9434
0.937

438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.218
1.6690
1.6345
1.6003
1.5664
1.5329
1.4999
1.4673
1.4351
1.4035
1.3723
1.3417
1.3116

2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188
2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188

1.1165 1.1167 1.1165 1.1159 1.1151 1.1140 1.1128 1.1113 1.1098 1.1081 1.1064 1.1046 1.1

2.1875 2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0
2.1875 2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0

1.2823 1.28
1.2715 1.2770
1.2597 1.2658
1.2464 1.2533
1.2311 1.2390
1.2132 1.2225
1.2031

2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.21
2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.21

1.4842
1.4670
1.4494
1.4313
1.4127
1.3935
1.3738
1.3538
1.3335
1.3130
1.2923
1.2715
2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188
7b/32 8b/32 9b/32 10b/32 11b/32 12b/32 13b/32 14b/32
1.0938 1.2500 1.4063 1.5625 1.7188 1.8750 2.0313 2.1875
1.0210 1.0193 1.0174 1.0155 1.0134 1.0113 1.0090 1.0067
1.0461 1.0490 1.0516 1.0540 1.0560 1.0579 1.0595 1.0609
1.0558 1.0633 1.0708 1.0781 1.0853 1.0923 1.0991 1.1058
1.0575 1.0687 1.0800 1.0914 1.1028 1.1142 1.1257 1.1373
1.0571 1.0716 1.0863 1.1012 1.1164 1.1318 1.1474 1.1632

1.0155
1.0134
1.0113
1.0090
1.0067
1.0044
1.0020
0.9996
0.9971
0.9946
0.9921
0.989

1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.281
1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.281

1.2799
1.2627
1.2456
1.2287
1.2121
1.1956
1.1793
1.1632
1.1474
1.1318
1.1164
1.1012
1.5625 1.7188 1.8750 2.0313 2.1875 2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813
15b/32 16b/32 17b/32 18b/32 19b/32 20b/32 21b/32 22b/32
2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375
1.0092 1.0032 0.9971 0.9910 0.9848 0.9788 0.9727 0.9667
1.1167 1.1165 1.1159 1.1151 1.1140 1.1128 1.1113 1.1098
1.2031 1.2132 1.2225 1.2311 1.2390 1.2464 1.2533 1.2597
1.2507 1.2715 1.2923 1.3130 1.3335 1.3538 1.3738 1.3935
1.2821 1.3116 1.3417 1.3723 1.4035 1.4351 1.4673 1.4999
491
0.9434
0.9377
0.9321
0.9265
0.9210
0.9155
0.9100

9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000

1.8448
1.8094
1.8448
1.8094
1.7740
1.7388
1.7038
1.6690
1.6345

4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000


4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000

1.1064 1.1046 1.1028 1.1010 1.0991 1.0973 1.0955 1.0936 1.0918

Valeurs de K pour y = b/4

3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000


3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000

1.3021 1.3069 1.3116


1.2874 1.2924 1.2973
.2770 1.2823

Valeurs de K pour y = b/2

.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000


.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000

1.5664
1.5502
1.5340
1.5176
1.5010
1.4842
1.4670

Valeurs de K pour y = 3b/4


Valeurs de K pour y = 3b/4

4.0625 4.2188 4.3750 4.5313 4.6875 4.8438 5.0000


15b/32 16b/32 17b/32 18b/32 19b/32 20b/32 21b/32 22b/32
2.3438 2.5000 2.6563 2.8125 2.9688 3.1250 3.2813 3.4375
1.0044 1.0020 0.9996 0.9971 0.9946 0.9921 0.9896 0.9872
1.0622 1.0633 1.0643 1.0652 1.0660 1.0667 1.0673 1.0678
1.1123 1.1185 1.1244 1.1301 1.1355 1.1408 1.1459 1.1509
1.1488 1.1604 1.1719 1.1833 1.1948 1.2061 1.2174 1.2285
1.1793 1.1956 1.2121 1.2287 1.2456 1.2627 1.2799 1.2973

946
0.9921
0.9896
0.9872
0.9847
0.9822
0.9797
0.9772
0.9748
0.9724
0.9699
0.9675
0.

688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.
688 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875 4.

1
1.4410
1.4228
1.4045
1.3864
1.3683
1.3504
1.3326
1.3149
1.2973
1.2799
1.2627
6
8 3.1250 3.2813 3.4375 3.5938 3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875
23b/32 24b/32 25b/32 26b/32 27b/32 28b/32 29b/32 30b/32
3.5938 3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875
0.9608 0.9549 0.9491 0.9434 0.9377 0.9321 0.9265 0.9210
1.1081 1.1064 1.1046 1.1028 1.1010 1.0991 1.0973 1.0955
1.2658 1.2715 1.2770 1.2823 1.2874 1.2924 1.2973 1.3021
1.4127 1.4313 1.4494 1.4670 1.4842 1.5010 1.5176 1.5340
1.5329 1.5664 1.6003 1.6345 1.6690 1.7038 1.7388 1.7740
K pour y = b/4
23b/32 24b/32 25b/32 26b/32 27b/32 28b/32 29b/32 30b/32
3.5938 3.7500 3.9063 4.0625 4.2188 4.3750 4.5313 4.6875
0.9847 0.9822 0.9797 0.9772 0.9748 0.9724 0.9699 0.9675
1.0683 1.0687 1.0692 1.0695 1.0699 1.0702 1.0706 1.0709
1.1557 1.1604 1.1649 1.1695 1.1739 1.1783 1.1826 1.1870
1.2395 1.2504 1.2610 1.2715 1.2819 1.2921 1.3023 1.3124
1.3149 1.3326 1.3504 1.3683 1.3864 1.4045 1.4228 1.4410

COURBE DE K POUR y = 0
0.9699
0.9675
0.9651
0.9627

4.5313 4.6875 4.8438 5.0000


4.5313 4.6875 4.8438 5.0000

1.4777
1.4594
1.4410
1.4228

Valeurs de K pour y = b
4.5313 4.6875 4.8438 5.0000
31b/32 32b/32
4.8438 5.0000
0.9155 0.9100
1.0936 1.0918
1.3069 1.3116
1.5502 1.5664
1.8094 1.8448
31b/32 32b/32
4.8438 5.0000
0.9651 0.9627
1.0712 1.0716
1.1913 1.1956
1.3225 1.3326
1.4594 1.4777
SURCHARGE AL

en Travée 1

x1 = -3.5938 m y1 = 0.9608

x2 = -3.4375 m y2 = 0.9667

x= -3.5000 m y= 0.9643

S1 = 0.0603 S2 = 7.0688

S= 7.1895

K0A = 1.0271

en Travée 2

x1 = -3.5938 m y1 = 0.9822

x2 = -3.4375 m y2 = 0.9872

x= -3.5000 m y= 0.9852

S1 = 0.0616 S2 = 6.9536

S= 7.0768

K0A = 1.0110

SURCHARGE Bc
en Travée 1

x= 3.1250 m Kb1 = 1.4351

x= 1.2500 m Kb2 = 1.0918

x1 = 0.6250 m y1 = 0.9962

x2 = 0.7813 m y2 = 1.0192

x= 0.7500 m Kb3 = 1.0146

x= -1.2500 m Kb4 = 0.7645

en Travée 2

x= 3.1250 m Kb1 = 1.2627

x= 1.2500 m Kb2 = 1.0716


x1 = 0.6250 m y1 = 1.0152

x2 = 0.7813 m y2 = 1.0289

x= 0.7500 m Kb3 = 1.0262

x= -1.2500 m Kb4 = 0.8690

SURCHARGE Bt

en Travée 1

x= 3.1250 m Kb1 = 1.4351

x= 1.2500 m Kb2 = 1.0918

x1 = 0.1563 m y1 = 0.9307
x2 = 0.3125 m y2 = 0.9519

x= 0.2500 m Kb3 = 0.9434

x1 = -1.8750 m y1 = 0.7038

x2 = -1.7188 m y2 = 0.7183

x= -1.7500 m Kb4 = 0.7154

en Travée 2

x= 3.1250 m Kb1 = 1.2627

x= 1.2500 m Kb2 = 1.0716

x1 = 0.1563 m y1 = 0.9755

x2 = 0.3125 m y2 = 0.9885

x= 0.2500 m Kb3 = 0.9833

x1 = -1.8750 m y1 = 0.8274

x2 = -1.7188 m y2 = 0.8375

x= -1.7500 m Kb4 = 0.8355

SURCHARGE Mc 120
en Travée 1

x1 = 3.4375 m y1 = 1.4999

x2 = 3.5938 m y2 = 1.5329

x= 3.5000 m y= 1.5131

S1 = 0.0942 S2 = 1.3165

S= 2.2836

KbMc120 = 1.1418

x1 = 3.4375 m y1 = 0.9667

x2 = 3.5938 m y2 = 0.9608

x= 3.5000 m y= 0.9643

S1 = 0.0603 S2 = 0.9233

S= 2.1768

K0Mc120 = 1.0884
en Travée 2

x1 = 3.4375 m y1 = 1.2973

x2 = 3.5938 m y2 = 1.3149

x= 3.5000 m y= 1.3043

S1 = 0.0813 S2 = 1.1680

S= 2.1886

KbMc120 = 1.0943

Le convoi-type E
en Travée 1

x1 = -1.7188 m y1 = 1.0326

x2 = -1.5625 m y2 = 1.0381

x= -1.6500 m y= 1.0350

S1 = 0.0907 S2 = 3.3079

S= 3.4893

K0E = 1.0574

x1 = -1.7188 m y1 = 0.6898

x2 = -1.5625 m y2 = 0.7183

x= -1.6500 m y= 0.7023

S1 = 0.0622 S2 = 2.8735

S= 3.0363

KbE = 0.9201

en Travée 2

x1 = -1.7188 m y1 = 1.0134

x2 = -1.5625 m y2 = 1.0155

x= -1.6500 m y= 1.0143

S1 = 0.0888 S2 = 3.1969

S= 3.3555

K0E = 1.0168

TROTTOIR
En Travée 1

x1 = 3.4375 m y1 = 1.4999

x2 = 3.5938 m y2 = 1.5329

x= 3.5000 m y= 1.5131

S1 = 0.1428 S2 = 2.3727

S= 3.3078

KbTrott = 1.1026

x1 = 3.4375 m y1 = 0.9667

x2 = 3.5938 m y2 = 0.9608

x= 3.5000 m y= 0.9643

S1 = 0.0902 S2 = 1.3149

S= 2.8103

K0Trott = 0.9368
En Travée 2

x1 = 0.0000 m y1 = 1.2973

x2 = 0.0000 m y2 = 1.3149

x= 0.0000 m y= #DIV/0!

S1 = #DIV/0! S2 = 1.9628

S= #DIV/0!

KbTrott = #DIV/0!
x1 = -3.5938 m y1 = 0.5698

x2 = -3.4375 m y2 = 0.5804

x= -3.5000 m y= 0.5762

S1 = 0.0361 S2 = 6.5623

S= 6.6926

KbA =

x1 = -3.5938 m y1 = 0.5698

x2 = -3.4375 m y2 = 0.5804

x= -3.5000 m y= 0.5762

S1 = 0.0361 S2 = 0.0000

S= 0.1303

KbA =
x1 = 0.1563 m

x2 = 0.3125 m

x= 0.2500 m

x1 = 2.1875 m

x2 = 2.3438 m

KbBc = 1.0765
x= 2.2500 m

x= -0.2500 m

x= -2.2500 m

x1 = 0.1563 m

x2 = 0.3125 m

x= 0.2500 m
x1 = 2.1875 m

x2 = 2.3438 m

KbBc = 1.0574
x= 2.2500 m

x= -0.2500 m

x= -2.2500 m
KbBt = 1.0464

KbBt = 1.0382
x1 = 0.1563 m y1 = 0.9307 x1 =

x2 = 0.3125 m y2 = 0.9519 x2 =

x= 0.2000 m y= 0.9366 x=

S3 = 0.0408

S5 =

x1 = 0.1563 m y1 = 1.0699 x1 =

x2 = 0.3125 m y2 = 1.0686 x2 =

x= 0.2000 m y= 1.0695 x=

S3 = 0.0468

S5 =
x1 = 0.1563 m y1 = 0.9755 x1 =

x2 = 0.3125 m y2 = 0.9885 x2 =

x= 0.2000 m y= 0.9791 x=

S3 = 0.0428

S5 =
x1 = 1.5625 m y1 = 1.0381

x2 = 1.7188 m y2 = 1.0326

x= 1.6500 m y= 1.0350

S3 = 0.0907

x1 = 1.5625 m y1 = 1.1432

x2 = 1.7188 m y2 = 1.1698

x= 1.6500 m y= 1.1581

S3 = 0.1007

x1 = 1.5625 m y1 = 1.0134

x2 = 1.7188 m y2 = 1.0155

x= 1.6500 m y= 1.0146

S3 = 0.0698
x1 = -3.4375 m y1 = 0.5804

x2 = -3.5938 m y2 = 0.5698

x= -3.5000 m y= 0.5762

S3 = 0.0537 S5 =

x1 = -3.5938 m y1 = 0.9608

x2 = -3.4375 m y2 = 0.9667
S5 =
x= -3.5000 m y= 0.9643

S3 = 0.0902
x1 = -3.4375 m y1 = 0.7362

x2 = -3.5938 m y2 = 0.7279

x= 0.0000 m y= 0.9194

S3 = 2.9600 S5 =
x1 = 3.4375 m y1 = 1.4999

x2 = 3.5938 m y2 = 1.5329

x= 3.5000 m y= 1.5131

S3 = 0.0942

0.9561

x1 = 3.4375 m y1 = 1.4999

x2 = 3.5938 m y2 = 1.5329

x= 3.5000 m y= 1.5131

S3 = 0.0942

0.0186
y1 = 1.0699

y2 = 1.0192

K01 = 1.0395

y1 = 1.0152

y2 = 1.0092

K0Bc = 1.0262
K02 = 1.0128

K03 = 1.0395

K04 = 1.0128

y1 = 1.0699

y2 = 1.0192

K01 = 1.0395
y1 = 1.0152

y2 = 1.0092

K0Bc = 1.0262
K02 = 1.0128

K03 = 1.0395

K04 = 1.0128
-0.9375 m y1 = 0.7977

-0.7813 m y2 = 0.8151

-0.8000 m y= 0.8130

S4 = 0.0153

0.8168

-0.9375 m y1 = 1.0570

-0.7813 m y2 = 1.0607

-0.8000 m y= 1.0603

S4 = 0.1456

1.0007
-0.9375 m y1 = 0.8910

-0.7813 m y2 = 0.9024

-0.8000 m y= 0.9010

S4 = 0.0169

0.8796
0.7386

1.3149
0.9728
x1 = -3.5938 m y1 = 0.8334 x1 =

x2 = -3.4375 m y2 = 0.8417 x2 =

x= -3.5000 m y= 0.8384 x=

S1 = 0.0525 S2 = 7.0261

S= 7.1480

Kb/4A = 1.0211

x1 = -3.5938 m y1 = 0.8334 x1 =

x2 = -3.4375 m y2 = 0.8417 x2 =

x= -3.5000 m y= 0.8384 x=

S1 = 0.0525 S2 = 0.0000

S= 0.1218

Kb/4A = 0.0174
3.4375 m y1 = 1.1098

3.5938 m y2 = 1.1081

3.5000 m y= 1.1091

S3 = 0.0693

3.4375 m y1 = 1.1098

3.5938 m y2 = 1.1081

3.5000 m y= 1.1091

S3 = 0.0693
MOMENTS FLECHISSANTS

En Travée 1 LR = 12.00 m

SOLLICITATIONS N
SECTION ABSCISSE
MG A(l)
Min 3723.1400 -711.3600
0,00 L 0 Max 4110.0300 2793.3260
K 1.0000 1.0271
Min -1110.7500 6298.0120
0,05 L 0.6 Max -2971.8200 9802.6980
K 1.0000 1.0271
Min -6693.9600 13307.3840
0,1 L 1.2 Max -8555.0300 16812.0700
K 1.0000 1.0271
Min -12277.1700 20316.7560
0,2 L 2.4 Max -14138.2400 23821.4420
K 1.0000 1.0271
Min -17860.3800 27326.1280
0,3 L 3.6 Max -19721.4500 30830.8140
K 1.0000 1.0271
Min -23443.5900 34335.5000
0,4 L 4.8 Max -25304.6600 37840.1860
K 1.0000 1.0271
Min -29026.8000 41344.8720
0,5 L 6 Max -30887.8700 44849.5580
K 1.0000 1.0271
Min -34610.0100 48354.2440
0,6 L 7.2 Max -36471.0800 51858.9300
K 1.0000 1.0271
Min -40193.2200 55363.6160
0,7 L 8.4 Max -42054.2900 58868.3020
K 1.0000 1.0271
Min -45111.7621 62372.9880
0,8 L 9.6 Max -46574.0314 65877.6740
K 1.0000 1.0271
Min -50960.8393 69382.3600
0,9 L 10.8 Max -52423.1086 72887.0460
K 1.0000 1.0271
Min -54916.1578 76391.7320
0,95 L 11.4 Max -56234.5974 79896.4180
K 1.0000 1.0271
Min -60189.9159 83401.1040
L 12 Max -61508.3554 86905.7900
K 1.0000 1.0271

En Travée 2 L = 18.0000
SOLLICITATIONS N
SECTION ABSCISSE
MG A(l)
Min 3723.1400 -711.3600
0,00 L 0 Max 4110.0300 2793.3260
K 1.0000 1.0116
Min -1110.7500 1406.6975
0,05 L 0.9 Max -2971.8200 1762.8833
K -4832.8900 2119.0691
Min -6693.9600 2475.2549
0,1 L 1.8 Max -8555.0300 2831.4407
K -10416.1000 3187.6265
Min -12277.1700 3543.8123
0,2 L 3.6 Max -14138.2400 3899.9981
K -15999.3100 4256.1839
Min -17860.3800 4612.3697
0,3 L 5.4 Max -19721.4500 4968.5555
K -21582.5200 5324.7413
Min -23443.5900 5680.9271
0,4 L 7.2 Max -25304.6600 6037.1129
K -27165.7300 6393.2987
Min -29026.8000 6749.4845
0,5 L 9 Max -30887.8700 7105.6703
K -32748.9400 7461.8561
Min -34610.0100 7818.0419
0,6 L 10.8 Max -36471.0800 8174.2277
K -38332.1500 8530.4135
Min -40193.2200 8886.5993
0,7 L 12.6 Max -42054.2900 9242.7851
K -43915.3600 9598.9709
Min -45111.7621 9827.9475
0,8 L 14.4 Max -46574.0314 10107.8077
K -48036.3007 10387.6680
Min -50960.8393 10947.3885
0,9 L 16.2 Max -52423.1086 11227.2488
K -53885.3779 11507.1091
Min -54916.1578 11704.3876
0,95 L 17.1 Max -56234.5974 11956.7207
K -57553.0369 12209.0537
Min -60189.9159 12713.7198
L 18 Max -61508.3554 12966.0528
K -62826.7950 13218.3858
SOLLICITATIONS NON PONDEREES
Bc Bt Mc120 E Trott MG
-533.6200 -754.7400 -30.6270 3723.1400
2177.7200 3348.5600 116.3900 4110.0300
1.0765 1.0464 1.1418 1.0574 1.1026
4889.0600 7451.8600 263.4070 3723.1400
7600.4000 11555.1600 410.4240 -2971.8200
1.0765 1.0464 1.1418 1.0574 1.1026
10311.7400 15658.4600 557.4410 3723.1400
13023.0800 19761.7600 704.4580 -8555.0300
1.0765 1.0464 1.1418 1.0574 1.1026
15734.4200 23865.0600 851.4750 3723.1400
18445.7600 27968.3600 998.4920 -14138.2400
1.0765 1.0464 1.1418 1.0574 1.1026
21157.1000 32071.6600 1145.5090 3723.1400
23868.4400 36174.9600 1292.5260 -19721.4500
1.0765 1.0464 1.1418 1.0574 1.1026
26579.7800 40278.2600 1439.5430 3723.1400
29291.1200 44381.5600 1586.5600 -25304.6600
1.0765 1.0464 1.1418 1.0574 1.1026
32002.4600 48484.8600 1733.5770 3723.1400
34713.8000 52588.1600 1880.5940 -30887.8700
1.0765 1.0464 1.1418 1.0574 1.1026
37425.1400 56691.4600 2027.6110 3723.1400
40136.4800 60794.7600 2174.6280 -36471.0800
1.0765 1.0464 1.1418 1.0574 1.1026
42847.8200 64898.0600 2321.6450 3723.1400
45559.1600 69001.3600 2468.6620 -42054.2900
1.0765 1.0464 1.1418 1.0574 1.1026
48270.5000 73104.6600 2615.6790 3723.1400
50981.8400 77207.9600 2762.6960 -46574.0314
1.0765 1.0464 1.1418 1.0574 1.1026
53693.1800 81311.2600 2909.7130 3723.1400
56404.5200 85414.5600 3056.7300 -52423.1086
1.0765 1.0464 1.1418 1.0574 1.1026
59115.8600 89517.8600 3203.7470 3723.1400
61827.2000 93621.1600 3350.7640 -56234.5974
1.0765 1.0464 1.1418 1.0574 1.1026
64538.5400 97724.4600 3497.7810 3723.1400
67249.8800 101827.7600 3644.7980 -61508.3554
1.0765 1.0464 1.1418 1.0574 1.1026
SOLLICITATIONS NON PONDEREES
Bc Mc120 E Trott MG
-533.6200 -754.7400 -30.6270 3723.1400
2177.7200 3348.5600 116.3900 4110.0300
1.1171 1.1557 1.0723
1083.1428 1620.8876 60.6444 3723.1400
1350.5114 1998.8355 76.4941 ###
1617.8799 2376.7833 92.3437
1885.2485 2754.7312 108.1934 3723.1400
2152.6170 3132.6790 124.0430 ###
2419.9856 3510.6269 139.8927
2687.3541 3888.5747 155.7423 3723.1400
2954.7227 4266.5226 171.5920 ###
3222.0912 4644.4704 187.4416
3489.4598 5022.4183 203.2913 3723.1400
3756.8283 5400.3661 219.1409 ###
4024.1969 5778.3140 234.9906
4291.5654 6156.2618 250.8402 3723.1400
4558.9340 6534.2097 266.6899 ###
4826.3025 6912.1575 282.5395
5093.6711 7290.1054 298.3892 3723.1400
5361.0396 7668.0532 314.2388 ###
5628.4082 8046.0011 330.0885
5895.7767 8423.9489 345.9381 3723.1400
6163.1453 8801.8968 361.7878 ###
6430.5138 9179.8446 377.6374
6697.8824 9557.7925 393.4871 3723.1400
6965.2509 9935.7403 409.3367 ###
7232.6195 10313.6882 425.1864
7404.4992 10556.6546 435.3754 3723.1400
7614.5745 10853.6137 447.8287 ###
7824.6498 11150.5727 460.2820
8244.8004 11744.4907 485.1886 3723.1400
8454.8757 12041.4498 497.6419 ###
8664.9510 12338.4088 510.0952
8813.0368 12547.7405 518.8737 3723.1400
9002.4490 12815.4905 530.1021 ###
9191.8611 13083.2404 541.3305
9570.6854 13618.7403 563.7873 3723.1400
9760.0976 13886.4902 575.0157 ###
9949.5097 14154.2402 586.2440
SOLLICITATIONS PONDEREES
A(l) Bc Bt Mc120 E Trott
-711.3600 -533.6200 -754.7400 -30.6270
2868.9600 2344.2943 3823.3532 128.3311

-711.3600 -533.6200 -754.7400 -30.6270


10068.1227 8181.7564 13193.5693 452.5315

-711.3600 -533.6200 -754.7400 -30.6270


17267.2854 14019.2184 22563.7854 776.7320

-711.3600 -533.6200 -754.7400 -30.6270


24466.4480 19856.6805 31934.0015 1100.9325

-711.3600 -533.6200 -754.7400 -30.6270


31665.6107 25694.1425 41304.2176 1425.1330

-711.3600 -533.6200 -754.7400 -30.6270


38864.7734 31531.6046 50674.4337 1749.3335

-711.3600 -533.6200 -754.7400 -30.6270


46063.9360 37369.0666 60044.6498 2073.5340

-711.3600 -533.6200 -754.7400 -30.6270


53263.0987 43206.5287 69414.8659 2397.7345

-711.3600 -533.6200 -754.7400 -30.6270


60462.2613 49043.9907 78785.0819 2721.9349

-711.3600 -533.6200 -754.7400 -30.6270


67661.4240 54881.4528 88155.2980 3046.1354

-711.3600 -533.6200 -754.7400 -30.6270


74860.5867 60718.9148 97525.5141 3370.3359

-711.3600 -533.6200 -754.7400 -30.6270


82059.7493 66556.3769 106895.7302 3694.5364

-711.3600 -533.6200 -754.7400 -30.6270


89258.9120 72393.8389 116265.9463 4018.7369
SOLLICITATIONS PONDEREES
A(l) Bc Mc120 E Trott
-711.3600 -533.6200 -754.7400 -30.6270
2825.7286 2432.7310 3869.9308 124.8050

-711.3600 -533.6200 -754.7400 -30.6270


3735671.3985 2184965.1679 4750798.7170 7063.7436

-711.3600 -533.6200 -754.7400 -30.6270


9025575.2079 5209302.0347 10997667.0098 17352.7040

-711.3600 -533.6200 -754.7400 -30.6270


### 9520385.8490 19815737.6944 32163.4697

-711.3600 -533.6200 -754.7400 -30.6270


### 15118216.6109 31205010.7707 51496.0406

-711.3600 -533.6200 -754.7400 -30.6270


### 22002794.3202 45165486.2388 75350.4169

-711.3600 -533.6200 -754.7400 -30.6270


### 30174118.9771 61697164.0987 103726.5984

-711.3600 -533.6200 -754.7400 -30.6270


### 39632190.5815 80800044.3502 136624.5853

-711.3600 -533.6200 -754.7400 -30.6270


### 50377009.1335 ### 174044.3774

-711.3600 -533.6200 -754.7400 -30.6270


### 59581379.0878 ### 206127.4946

-711.3600 -533.6200 -754.7400 -30.6270


### 73261083.1941 ### 253844.7355

-711.3600 -533.6200 -754.7400 -30.6270


### 82749260.7022 ### 286960.4516

-711.3600 -533.6200 -754.7400 -30.6270


### 97108185.3642 ### 337099.4962
ELS ELU

8061.7143

10674.2809

14785.4875

18896.6940

23007.9006

27119.1072

31230.3137

35341.5203

39452.7269

44627.4020

48472.7414

54355.6692

58776.3277
ELS ELU

8104.7658

19120341.6204

100125067.6968

246153178.7057

457437611.8895

733811390.4878

1075274514.5007

1481826983.9281

1953468798.7700

2363446167.6276

2980124670.6292

3411935110.3945

4070378281.7295
EFFORTS TRANCHANTS

En Travée 1

SOLLICITATIONS NON PONDEREES


SECTION ABSCISSE MG A(l) Bc Bt
Min 3723.14 -711.36 -533.62
Max 4110.03 2793.326 2177.72
0,00 L K 1 1.0116 1.1171
Min -1110.75 1406.69747 1083.1428
Max -2971.82 1762.88327 1350.51135
0,05 L 7.6 K -4832.89 2119.06907 1617.8799
Min -6693.96 2475.25487 1885.24845
Max -8555.03 2831.44067 2152.617
0,1 L 8.6 K -10416.1 3187.62647 2419.98555
Min -12277.17 3543.81227 2687.3541
Max -14138.24 3899.99807 2954.72265
0,2 L 9.6 K -15999.31 4256.18387 3222.0912
Min -17860.38 4612.36967 3489.45975
Max -19721.45 4968.55547 3756.8283
0,3 L 10.6 K -21582.52 5324.74127 4024.19685
Min -23443.59 5680.92707 4291.5654
Max -25304.66 6037.11287 4558.93395
0,4 L 11.6 K -27165.73 6393.29867 4826.3025
Min -29026.8 6749.48447 5093.67105
Max -30887.87 7105.67027 5361.0396
0,5 L 12.6 K -32748.94 7461.85607 5628.40815
Min -34610.01 7818.04187 5895.7767
Max -36471.08 8174.22767 6163.14525
0,6 L 13.6 K -38332.15 8530.41347 6430.5138
Min -40193.22 8886.59927 6697.88235
Max -42054.29 9242.78507 6965.2509
0,7 L 14.6 K -43915.36 9598.97087 7232.61945
Min -45111.7621 9827.94745 7404.49923
Max -46574.0314 10107.8077 7614.57452
0,8 L 15.6 K -48036.3007 10387.668 7824.64981
Min -50960.8393 10947.3885 8244.80039
Max -52423.1086 11227.2488 8454.87568
0,9 L 16.6 K -53885.3779 11507.1091 8664.95097
Min -54916.1578 11704.3876 8813.03683
Max -56234.5974 11956.7207 9002.44897
0,95 L 17.6 K -57553.0369 12209.0537 9191.86112
Min -60189.9159 12713.7198 9570.68541
Max -61508.3554 12966.0528 9760.09756
L 18.6 K -62826.795 13218.3858 9949.5097
En Travée 2

SOLLICITATIONS NON PONDEREES


SECTION ABSCISSE MG A(l) Bc
Min 3723.14 -711.36 -533.62
Max 4110.03 2793.326 2177.72
0,00 L 6.6 K 1 1.0116 1.1171
Min -1110.75 1406.69747 1083.1428
Max -2971.82 1762.88327 1350.51135
0,05 L 7.6 K -4832.89 2119.06907 1617.8799
Min -6693.96 2475.25487 1885.24845
Max -8555.03 2831.44067 2152.617
0,1 L 8.6 K -10416.1 3187.62647 2419.98555
Min -12277.17 3543.81227 2687.3541
Max -14138.24 3899.99807 2954.72265
0,2 L 9.6 K -15999.31 4256.18387 3222.0912
Min -17860.38 4612.36967 3489.45975
Max -19721.45 4968.55547 3756.8283
0,3 L 10.6 K -21582.52 5324.74127 4024.19685
Min -23443.59 5680.92707 4291.5654
Max -25304.66 6037.11287 4558.93395
0,4 L 11.6 K -27165.73 6393.29867 4826.3025
Min -29026.8 6749.48447 5093.67105
Max -30887.87 7105.67027 5361.0396
0,5 L 12.6 K -32748.94 7461.85607 5628.40815
Min -34610.01 7818.04187 5895.7767
Max -36471.08 8174.22767 6163.14525
0,6 L 13.6 K -38332.15 8530.41347 6430.5138
Min -40193.22 8886.59927 6697.88235
Max -42054.29 9242.78507 6965.2509
0,7 L 14.6 K -43915.36 9598.97087 7232.61945
Min -45111.7621 9827.94745 7404.49923
Max -46574.0314 10107.8077 7614.57452
0,8 L 15.6 K -48036.3007 10387.668 7824.64981
Min -50960.8393 10947.3885 8244.80039
Max -52423.1086 11227.2488 8454.87568
0,9 L 16.6 K -53885.3779 11507.1091 8664.95097
Min -54916.1578 11704.3876 8813.03683
Max -56234.5974 11956.7207 9002.44897
0,95 L 17.6 K -57553.0369 12209.0537 9191.86112
Min -60189.9159 12713.7198 9570.68541
Max -61508.3554 12966.0528 9760.09756
L 18.6 K -62826.795 13218.3858 9949.5097
ONS NON PONDEREES SOLLICITATIONS PONDEREES
Mc120 E Trott MG A(l) Bc Bt Mc120
-754.74 -30.627 3723.14 -711.36 -533.62 -754.74
3348.56 116.39 4110.03 2825.72858 2432.73101 3869.93079
1.1557 1.0723
1620.8876 60.6444 3723.14 -711.36 -533.62 -754.74
1998.83545 76.49405 14362479.2 3735671.4 2184965.17 4750798.72
2376.7833 92.3437
2754.73115 108.19335 3723.14 -711.36 -533.62 -754.74
3132.679 124.043 89110048 9025575.21 5209302.03 10997667
3510.62685 139.89265
3888.5747 155.7423 3723.14 -711.36 -533.62 -754.74
4266.52255 171.59195 226202085 16599108.9 9520385.85 19815737.7
4644.4704 187.4416
5022.41825 203.29125 3723.14 -711.36 -533.62 -754.74
5400.3661 219.1409 425638589 26456272.3 15118216.6 31205010.8
5778.31395 234.99055
6156.2618 250.8402 3723.14 -711.36 -533.62 -754.74
6534.20965 266.68985 687419561 38597065.6 22002794.3 45165486.2
6912.1575 282.5395
7290.10535 298.38915 3723.14 -711.36 -533.62 -754.74
7668.0532 314.2388 1011545001 53021488.8 30174119 61697164.1
8046.00105 330.08845
8423.9489 345.9381 3723.14 -711.36 -533.62 -754.74
8801.89675 361.78775 1398014909 69729541.8 39632190.6 80800044.4
9179.8446 377.6374
9557.79245 393.48705 3723.14 -711.36 -533.62 -754.74
9935.7403 409.3367 1846829285 88721224.6 50377009.1 102474127
10313.6882 425.18635
10556.6546 435.375411 3723.14 -711.36 -533.62 -754.74
10853.6137 447.828707 2237244179 104996551 59581379.1 121024008
11150.5727 460.282004
11744.4907 485.188596 3723.14 -711.36 -533.62 -754.74
12041.4498 497.641893 2824839014 129193177 73261083.2 148572329
12338.4088 510.095189
12547.7405 518.873743 3723.14 -711.36 -533.62 -754.74
12815.4905 530.102125 3236471856 145980245 82749260.7 167668143
13083.2404 541.330507
13618.7403 563.787271 3723.14 -711.36 -533.62 -754.74
13886.4902 575.015653 3864372836 171390288 97108185.4 196552718
14154.2402 586.244035
ONS NON PONDEREES SOLLICITATIONS PONDEREES
Mc120 E Trott MG A(l) Bc Mc120
-754.74 -30.627 3723.14 -711.36 -533.62 -754.74
3348.56 116.39 4110.03 2825.72858 2432.73101 3869.93079
1.1557 1.0723
1620.8876 60.6444 3723.14 -711.36 -533.62 -754.74
1998.83545 76.49405 14362479.2 3735671.4 2184965.17 4750798.72
2376.7833 92.3437
2754.73115 108.19335 3723.14 -711.36 -533.62 -754.74
3132.679 124.043 89110048 9025575.21 5209302.03 10997667
3510.62685 139.89265
3888.5747 155.7423 3723.14 -711.36 -533.62 -754.74
4266.52255 171.59195 226202085 16599108.9 9520385.85 19815737.7
4644.4704 187.4416
5022.41825 203.29125 3723.14 -711.36 -533.62 -754.74
5400.3661 219.1409 425638589 26456272.3 15118216.6 31205010.8
5778.31395 234.99055
6156.2618 250.8402 3723.14 -711.36 -533.62 -754.74
6534.20965 266.68985 687419561 38597065.6 22002794.3 45165486.2
6912.1575 282.5395
7290.10535 298.38915 3723.14 -711.36 -533.62 -754.74
7668.0532 314.2388 1011545001 53021488.8 30174119 61697164.1
8046.00105 330.08845
8423.9489 345.9381 3723.14 -711.36 -533.62 -754.74
8801.89675 361.78775 1398014909 69729541.8 39632190.6 80800044.4
9179.8446 377.6374
9557.79245 393.48705 3723.14 -711.36 -533.62 -754.74
9935.7403 409.3367 1846829285 88721224.6 50377009.1 102474127
10313.6882 425.18635
10556.6546 435.375411 3723.14 -711.36 -533.62 -754.74
10853.6137 447.828707 2237244179 104996551 59581379.1 121024008
11150.5727 460.282004
11744.4907 485.188596 3723.14 -711.36 -533.62 -754.74
12041.4498 497.641893 2824839014 129193177 73261083.2 148572329
12338.4088 510.095189
12547.7405 518.873743 3723.14 -711.36 -533.62 -754.74
12815.4905 530.102125 3236471856 145980245 82749260.7 167668143
13083.2404 541.330507
13618.7403 563.787271 3723.14 -711.36 -533.62 -754.74
13886.4902 575.015653 3864372836 171390288 97108185.4 196552718
14154.2402 586.244035
EREES
E Trott ELS ELU
-30.627
124.804997 8104.76579

-30.627
7063.7436 19120341.6

-30.627
17352.704 100125068

-30.627
32163.4697 246153179

-30.627
51496.0406 457437612

-30.627
75350.4169 733811390

-30.627
103726.598 1075274515

-30.627
136624.585 1481826984

-30.627
174044.377 1953468799

-30.627
206127.495 2363446168

-30.627
253844.736 2980124671

-30.627
286960.452 3411935110

-30.627
337099.496 4070378282
EREES
E Trott ELS ELU
-30.627
124.804997 8104.76579

-30.627
7063.7436 19120341.6

-30.627
17352.704 100125068

-30.627
32163.4697 246153179

-30.627
51496.0406 457437612

-30.627
75350.4169 733811390

-30.627
103726.598 1075274515

-30.627
136624.585 1481826984

-30.627
174044.377 1953468799

-30.627
206127.495 2363446168

-30.627
253844.736 2980124671

-30.627
286960.452 3411935110

-30.627
337099.496 4070378282
PONT KORIFLA INGENIEUR : D. EL RHAZI

VERIFICATION DES NEOPRENES :

Données :

Réactions d'appui :

- Charges permanentes Rg = 83.61 t


- Charges de chaussée Rq = 47.23 t

Matériaux :

- Béton fc28 = 30 MPa gb = 1.50


- Aciers frettés fe = 235 MPa

Module d'élasticité transversal : G = 0.80 MPa

On tiendra compte , pour le calcul du raccourcissement par retrait, de la valeur 4,00E-4


du fait que les poutres seront préfabriquées à l'avance et stockées pour une longue durée.

Raccourcissement par retrait du béton = 4.00E-04


(cas le plus défavorable)

Température moyenne : Dt = 30°


Dont 10° variation rapide
Raccourcissement total du béton : (température + retrait)

Dl / l = a.Dt + 4,00E-4

a = 1.00E-05
Dl / l = 7.00E-04

1- Aire de l'appareil d'appui :

La contrainte moyenne de compression ne peut dépasser 15 Mpa.


On obtient pour un appareil, avec la réaction verticale maximale.

smax = N/S < 150 kg/cm²

Soit : S > N / 150

avec : N = Rg + 1,2*Rq
N = 140.29 t

S > 935 cm²


PONT KORIFLA INGENIEUR : D. EL RHAZI

2- Hauteur nette :

La condition généralement prépondérante est : tH1 < 0,5*G

On prends pour toutes les piles :


n= 6
t = 10 mm Soit : T = 60 mm

Pour les culées on prends :


n= 6
t = 10 mm Soit : T = 60 mm

3- Dimensions en plan :

La plus petite dimension 'a' doit vérifier la condition de non flambement suivante :
5*T < a < 10*T

Piles : 300 mm < a < 600 mm


Culées : 300 mm < a < 600 mm

En prenant pour les piles :

a = 30 cm
b = 35 cm

On trouve : S= 1050 cm² > 935 cm² Ok.

On prend pour les culées :

a = 30 cm
b = 40 cm

On trouve : S= 1200 cm² > 935 cm² Ok.

4- Conditions de non cheminement et de non glissement :

A vide, les deux conditions suivantes doivent être remplies :

smin > 20 kg/cm²


et
Hmax < f.N

N = 83.61 t
smin = N / a.b
PONT KORIFLA INGENIEUR : D. EL RHAZI

Piles :
smin = 79.63 kg/cm² > 20 kg/cm² Ok.

Culées :
smin = 69.68 kg/cm² > 20 kg/cm² Ok.

Le coefficient de frottement f prend la valeur suivante :

f = 0,12 + 0,2/sm

Piles : f = 0.13 sm = 13.36 MPa


Culées : f = 0.14 sm = 11.69 MPa

Piles :
Hmax = 2.93 t < f.N = 11.28 t Ok.

Culées :
Hmax = 8.74 t < f.N = 11.46 t Ok.

5- Vérification des contraintes de cisaillement :

Sous l'effort normal :

tN = 1,5 . sm / b

b = a.b / (2.t.(a + b))

Piles : sm = 13.36 MPa


b = 8.08

Culées : sm = 11.69 MPa


b = 8.57

Piles : tN = 2.48 MPa


Culées : tN = 2.05 MPa

Sous la rotation :

ta = G/2 * (a / t)² * at

ao = 1.00E-02 rd D'après SETRA


a = 5.00E-03 rd

aT = ao + a
aT = 1.50E-02 rd

at = aT / n
PONT KORIFLA INGENIEUR : D. EL RHAZI

Piles : at = 2.50E-03 rd
Culées : at = 2.50E-03 rd

Piles : ta = 0.90 MPa


Culées : ta = 0.90 MPa

Sous l'effort horizontal :

Dans le cas d'une distorsion, la distribution des contraintes au niveau du plan de


frettage est uniforme.

Deux cas se présentent :


- La déformation "u" de l'appareil est lente (dilatation, retrait, fluage) et connue.
Elle permet de déterminer l'angle de distorsion g, la contrainte tH1 et l'effort correspondant H1.
- L'appareil est soumis à un effort dynamique H2 (freinage, vent, force centrifuge).

Ces deux contraintes tH1 et tH2 doivent vérifier :

tH1 < 0,5*G = 0.40


tH1 + tH2 < 0,7*G = 0.56

Et si on note tH = tH1 + 0,5*tH2 , la limitation de la contrainte de cisaillement sera exprimée par :

tN + tH + ta < 5*G = 4.00

Les contraintes horizontales seront calculées séparément pour chaque appareil.

Les limites admises des contraintes sont calculées est présentées dans le tableau suivant :

CG P1 P2 CD Condition
tN 2.05 2.48 2.48 2.05
ta 0.90 0.90 0.90 0.90
H1(t) 4.61 0.90 0.90 4.61
tH1 0.38 0.09 0.09 0.38 Ok.
H2 (t) 4.14 2.04 2.04 4.14
tH2 0.34 0.19 0.19 0.34
tH 0.56 0.18 0.18 0.56 Ok.
tH + tN + ta 3.50 3.56 3.56 3.50 Ok.
PONT KORIFLA INGENIEUR : D. EL RHAZI

6- Dimensionnement des frettes :

Soit ts l'épaisseur d'une frette intermédiaire.


La condition à vérifier est :

ts ³ a/b . sm/se

Les frettes ont à priori une épaisseur ts = 3 mm.

ts = 3 mm > 2.11 mm Ok.

Pour les culées on a :

ts = 3 mm > 1.74 mm Ok.

7- Condition de non soulèvement :

La condition de non soulèvement est vérifiée lorsque :


3/b * (t/a)² * smax/G ³ at

Piles :
smax = 1336.06 t/m² < 1500.00 t/m² Ok.
smin = 796.29 t/m² > 200.00 t/m² Ok.

Culées :
smax = 1169.05 t/m² < 1500.00 t/m² Ok.
smin = 696.75 t/m² > 200.00 t/m² Ok.

Piles :
3/b * (t/a)² * smax/G = 7.00E-03 rd > 2.50E-03 rd Ok.
3/b * (t/a)² * smin/G = 4.00E-03 rd > 2.50E-03 rd Ok.

Culées :
3/b * (t/a)² * smax/G = 6.00E-03 rd > 2.50E-03 rd Ok.
3/b * (t/a)² * smin/G = 3.00E-03 rd > 2.50E-03 rd Ok.

On adopte finalement des plaques néoprènes suivantes :

Piles : 300 x 350 x 6(10 + 3)

Culées : 300 x 400 x 6(10 + 3)