0.100
Cotes Lit de pose Prof. Ø L Longueur Terrass. Lit de pose POSE DE CONDUITE Remblais
Nature Haut diamètre Larg
N° de Long Ø 250 Primaire II aire
TN Projet S:SAB Fouille Moy. Tran. m3 Ø 160
regard m m3 m3 m3
G:GRA m m m
R1
294.91 293.81 S 0.10 1.200 0.250 0.80 0.00
294.50 293.40 47.08
COLLECTEUR SA1
R2 S 0.10 1.200 1.200 0.250 0.80 45.197 3.766 47.080 18.405 23.025
R3
293.27 292.22 S 0.10 1.150 1.175 0.250 0.80 25.43 23.904 2.034 25.430 9.942 11.928
R4
292.68 291.41 S 0.10 1.370 1.260 0.250 0.80 17.52 17.660 1.402 17.520 6.849 9.409
R5
291.89 290.09 S 0.10 1.900 1.635 0.250 0.80 28.49 37.265 2.279 28.490 11.138 23.848
R6
290.99 289.47 S 0.10 1.620 1.760 0.250 0.80 34.98 49.252 2.798 34.980 13.675 32.778
R7
289.75 288.65 S 0.10 1.200 1.410 0.250 0.80 46.56 52.520 3.725 46.560 18.202 30.593
Rexit
288.92 287.79 S 0.10 1.230 1.215 0.250 0.80 38.43 37.354 3.074 38.430 15.024 19.256
R1
290.64 289.55 S 0.10 1.190 1.210 0.250 0.80
COLL SA1-1
R2
290.31 289.21 S 0.10 1.200 1.195 0.250 0.80 33.12 31.663 2.650 33.120 12.948 16.065
R7
289.75 288.65 S 0.10 1.200 1.200 0.250 0.80 50.81 48.778 4.065 50.810 19.864 24.849
Quantité Quantité du
Désignation Unité Avancement
réalisée marché
1- TERRASSEMENT m3 343.59
3- POSE DE CCNDUITE
5- REMBLAI SECODAIRE m3
6- REGARG DE VISITE
7-BOITE DE BRANCHEMENT u