Axe : B5 CP 11_CP13

DROITE L = 50.86 m

22.66

Echelle en Y : 1/100

Echelle en X : 1/500

Profil dessiné par COVADIS


PC : 438.00 m
Alignements droits et courbes

Pentes et rampes

Distances partielles

Abscisses

Ecarts Projet - TN

Altitudes Projet

Altitudes TN

Numéro de profils en travers


650.00-3.90 448.58 452.48 P17

Déblai : 3935 m²
Remblai : 451 m²
28.21
678.21-4.17 448.31 452.48 P18
21.79

700.00-3.91 448.10 452.01 P19


DROITE L = 86.67 m

Axe : Début Canal B5-CP11


0.00 -2.74 471.07 473.82 P01
50.00
PENTE L = 530.50 m P = -0.96 %

P = -7.15 %
L = 50.00 m
PENTE

50.00
750.00-3.71 447.62 451.33 P20
14.88

764.88-4.37 447.48 451.84 P21


35.12

50.00 -1.95 467.49 469.45 P02

800.00-4.55 447.14 451.68 P22

DROITE L = 171.53 m

50.00
DROITE L = 125.91 m

50.00

100.00-2.84 465.12 467.97 P03


850.00-3.28 446.66 449.94 P23

PENTE L = 189.55 m P = -4.78 %

38.41
40.79

890.79-2.43 446.27 448.70 P24 138.41-3.31 463.30

11.59
9.21
L = 30.78 m

900.00-2.47 446.18 448.65 P25


DROITE

150.00-3.49 462.75 466.23 P04


21.57

21.53
921.57-2.83 445.97 448.80 P26
L = 27.10 m

171.53-3.94 461.71 465.65 P05


DROITE

27.10

28.47
1.33 948.67
950.00-2.59
-2.57 445.72
445.70 448.31
448.27 P27
P28
L = 38.95 m
DROITE

200.00-3.67 460.34 464.01 P06


37.62

39.55
987.62-2.04 445.34 447.39 P29
12.38
DROITE L = 57.11 m

1000.00
-1.80 445.22 447.03 P30

239.55-3.62 458.43
30.50

10.45
250.00-3.86 457.81 461.68 P07
1030.50
-1.60 444.93
14.22

P = -5.97 %
L = 60.45 m
DROITE L = 226.28 m

PENTE
1044.73
-1.71 444.75 446.46 P31
5.27
DROITE L = 43.35 m

1050.00
-1.69 444.69 446.38 P32

50.00
P = -1.26 %
L = 57.57 m
PENTE

38.08

Axe :Fin Canal B5-CP12 300.00-4.92 454.83 459.75 P08


1088.08
-3.85 444.20 448.05 P33
L = 20.39 m

11.92 8.47

Axe :Début Canal B5-CP12


DROITE

1100.00
-0.26 444.18 444.43 P34

1108.47
-0.69 444.16 444.85 P35
50.00

DRO ITE L = 6.75 m


6.75
1115.22
-1.38 444.14 445.52 P36
L = 15.12 m

15.12
DROITE

1130.34
-0.33 444.10 444.43 P37
L = 26.19 m

19.66
DROITE

PENTE L = 150.00 m P = -1.93 %

350.00-3.19 453.86 457.05 P09


1150.00
-0.87 444.06 444.92 P38
6.53
1156.53
-0.66 444.04 444.70 P39
L = 34.24 m
DROITE

34.24

47.81

1190.78
-1.33 443.96 445.29 P40
9.22
L = 19.48 m
DROITE

1200.00
-1.39 443.94 445.33 P41
10.26 2.19 397.81-2.19 452.94
400.00-2.16 452.90
455.13 P10
455.06 P11
1210.26
-1.45 443.92 445.37 P42
L = 12.25 m

12.25
DROITE

1222.51
-1.60 443.89 445.49 P43
DROITE L = 44.26 m

50.00
27.49

1250.00
-1.86 443.82 445.68 P44
16.77

1266.77
-2.01 443.78 445.79 P45 450.00-3.05 451.93 454.98 P12
DROITE L = 59.89 m

33.23

P = -3.84 %
L = 50.00 m
PENTE

50.00
PENTE L = 473.79 m P = -0.24 %

1300.00
-1.73 443.70 445.43 P46
26.66

DROITE L = 229.54 m

1326.66
-1.49 443.64 445.13 P47 500.00-4.50 450.01 454.51 P13
23.34

1350.00
-0.90 443.59 444.48 P48
50.00
DROITE L = 123.63 m

50.00

550.00-3.57 449.53 453.11 P14

1400.00
1.19 443.47 442.28 P49
50.00
50.00

1450.00
2.97 443.35 440.38 P50 600.00-4.07 449.05 453.12 P15
27.34
50.00

Axe : Fin Canal B5-CP11


627.34-4.06 448.79 452.85 P16
Axe : Début Canal B5-CP12
DROITE L = 111.57 m

DROITE L = 50.86 m

22.66

1500.00
3.50 443.23 439.73 P52

650.00-3.90 448.58 452.48 P17


50.00

28.21

678.21-4.17 448.31 452.48 P18


1550.00
1.25 443.11 441.86 P53
11.86

21.79

Axe : Canal B5-CP6_CP14


1561.86
-0.00 443.09 443.09 P54

700.00-3.91 448.10 452.01 P19


D
Date

A
Octobre 2022

ETUDE DU SCHEMA DIRECTEUR D'ASSAINISSEMENT


PROFIL EN LONG DES CANAUX PROJETES

Office National de l'Assainissement et du Drainage (O.N.A.D)


Ministère de l'Assainissement et de la Salubrité
DE LA VILLE DE TOUBA

Union - Discipline - Travail


Canal B5_CP11_CP13

LEGENDE
PHASE: MISSION D

Ouvrage de

Caniveau

Pont

Ouvrage de

Canal à aménager
type Dalot
franchissement de

Voirie

type buse
franchissement de

Volume de Déblai

Volume de Remblai
Etabli par :
Echelle
.......