DEVIS ESTIMATIF ET QUANTITATIF DE TOUT LE PROJET

PROMOTEUR : MONSIEUR JAFF EMMANUEL

ETUDIER PAR : INGENIEUR NKUIDA TCHOUA ROMANIK

LOT 1 MATERIEL A ACHETER


N°A DESIGNATION UNITE QTE PU PT
A-1 Pelles bêches + pelles rondes U 6 3,000 18,000
A-2 Brouettes soudé U 1 35,000 35,000
A-3 machettes U 1 4,500 4,500
A-4 Pioches U 4 3,000 12,000
A-5 vibreur U 1 200,000 200,000
A-6 Fils d'implantation 5mm U 5 2,000 10,000
A-7 Seaux macon U 10 1,000 10,000
TOTAL MATERIEL A ACHETER 289,500

LOT 2 IMPLANTATION DU BATIMENT

N°B DESIGNATION UNITE QTE PU PT


B-1 Implantation du Projet U 1 50,000 50,000
TOTAL D'IMPLANTATION 50,000

LOT 3 FONDATION DU BATIMENT

N°C DESIGNATION UNITE QTE PU PT


C-1 Fer de 6 (Ø 6) Barre 180 1,700 306,000
C-2 Fer de 10 (HA10) FE 500 Barre 120 5,100 612,000
C-3 Fer de 12 (HA12) FE 500 Barre 160 7,200 1,152,000
C-4 Fil d'attache Rlx 130 850 110,500
C-5 Pointes Toc Carton 1 34,000 34,000
C-6 Pointes Ordinaire Carton 1 43,000 43,000
C-7 Parpaing de 20 Pgs 900 350 315,000
C-8 Ciment 42,5R Sacs 320 5,400 1,728,000
C-9 Planches de coffrage + Usinage U 75 5,000 375,000
C-10 Latte coffrage U 130 1,200 156,000
C-11 Gravier 5/15 10 roue 2 200,000 400,000
C-12 Granulat de 15/25 10 Roue 2 200 000 #VALUE!
C-13 Sable gros drain 10 roue 4 80,000 320,000

TOTAL DU MATERIELS FONDATION DU BATIMENT 5,951,500

MAIN D'ŒUVRE 1,500,000

IMPREVUES + TRANSPORT DU MATERIELS 200,000

TOTAL DU MATERIELS + MAIN D'ŒUVRE + TRANSPORT + IMPREVUES DE LA


7,651,500
FONDATION

LOT 4 REMBLAI DE LA FONDATION

N°D DESIGNATION UNITE QTE PU PT

D-1 Nivellement des Pièces m2 262.27 500 131,135

TOTAL DU REMBLAI DE LA FONDATION DU BATIMENT 131,135

LOT 8 COULAGE DES POTEAUX ET ELEVATION DES MURS DU REZ DE CHAUSSEE ( RDC )

N°H DESIGNATION UNITE QTE PU P,T

H-1 Fer de 6 (Ø 6) Barre 120 1,700 204,000

H-2 Fer de 8 (HA8) FE 500 Barre 50 3,200 160,000

H-3 Fer de 10 (HA10) FE 500 Barre 30 5,100 153,000

H-4 Fer de 12 (HA12) FE 500 Barre 60 7,200 432,000

H-5 Fil d'attache Rlx 50 850 42,500

H-6 Pointes Toc Pqt 3 1 500 #VALUE!

H-7 Pointes de 80 Pqt 5 4,500 22,500

H-8 Parpaing de 15x15x40 Pgs 6,000 225 1,350,000

H-9 Ciment 42,5R Sacs 150 5,400 810,000


Planches de coffrage sciée avec
H-10 U 40 5,000 200,000
les fonds 15

H-11 Latte coffrage U 70 1,400 98,000

H-12 Gravier 5/15 10 Roue 1 200,000 200,000

H-13 Sable gros drain 10 Roue 3 80,000 240,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET LE DU


3,916,500
RDC

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 700,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET LE


4,691,500
COULAGE DES POTEAUX + TRANSPORT + IMPREVUES DU RDC

LOT 9 COULAGE DE LA DALLE DU RDC

N°I DESIGNATION UNITE QTE PU P,T

I-1 Fer de 6 (Ø 6) Barre 320 1,700 544,000

I-2 Fer de 8 (HA8) FE 500 Barre 75 3,200 240,000

I-3 Fer de 10 (HA10) FE 500 Barre 130 5,100 663,000

I-4 Fer de 12 (HA12) FE 500 Barre 200 7,200 1,440,000

I-5 Fil d'attache Rx 100 850 85,000

I-6 Pointes de 80 pqt 20 4,500 90,000

I-7 Pointe Toc Pqt 18 1 500 #VALUE!

I-8 Planches de coffrage U 75 5,000 375,000

I-9 Lattes U 342 1,400 478,800

I-10 Contre plaquet U 10 3 800 #VALUE!

I-11 Hourdis U 2,800 350 980,000

I-12 Bambour de Chine U 450 400 180,000

I-13 Ciment 42,5R Sacs 200 5,500 1,100,000


I-14 Gravier 5/15 10 Roue 1 200,000 200,000

I-15 Sable gros drain 10 Roue 2 75,000 150,000

TOTAL DU MATERIEL POUR LE COULAGE DU DEMI CHAINAGE ET


6,590,800
DALLE DU RDC

IMPREVUES + TRANSPORT DU MATERIELS 100,000

MAIN D'ŒUVRE 1,500,000

TOTAL DU MATERIEL POUR LE COULAGE DU DEMI CHAINAGE ET


8,190,800
DALLE + TRANSPORT + IMPREVUES DU RDC

LOT 10 COULLAGE DE L’ESCALIER ET LA RAMPE DU RDC

N°J DESIGNATION UNITE QTE PU P,T

J-1 Ciment 42,5R Sacs 100 5,400 540,000

J-2 Planches sciée en fond de 16 U 15 5,000 75,000

J-3 Fer de 10 (HA10) FE 500 Barre 45 5,100 229,500

J-4 Fer de 12 (HA12) FE 500 Barre 45 7,200 324,000

J-5 Contre plaquet U 5 3 800 #VALUE!

J-6 Pointes de 80 Pqt 5 4,500 22,500

J-7 Pointe Toc Pqt 10 1 500 #VALUE!

J-8 Fil d'attache Rlx 25 850 21,250

TOTAL DU MATERIEL POUR LE COULAGE DE L’ESCALIER DU RDC 1,246,250

TRANSPORT DU MATERIELS + IMPREVUES 50,000

MAIN D'ŒUVRE 600,000

TOTAL DU MATERIEL POUR LE COULAGE DE L’ESCALIER ET LA RAMPE


1,296,250
DU RDC+ TRANSPORT + IMPREVUES

ETAGE 1

LOT 11 COULAGE DES POTEAUX ET ELEVATION DES MURS DE L'ETAGE 1

N°K DESIGNATION UNITE QTE PU PT

K-1 Fer de 6 (Ø 6) Barre 120 1,700 204,000

K-2 Fer de 8 (HA8) FE 500 Barre 50 3,400 170,000

K-3 Fer de 10 (HA10) FE 500 Barre 50 5,100 255,000

K-4 Fer de 12 (HA12) FE 500 Barre 40 7,200 288,000

K-5 Fil d'attache Rlx 50 850 42,500

K-6 Pointes Toc Pqt 3 1 500 #VALUE!

K-7 Pointes de 80 Pqt 5 4,500 22,500

K-8 Parpaing de 15x15x40 Pgs 6,000 225 1,350,000

K-9 Ciment 42,5R Sacs 150 5,400 810,000

Planches de coffrage sciée avec


K-10 U 40 5,000 200,000
les fonds 15

K-11 Latte coffrage U 70 1,400 98,000

K-12 Gravier 5/15 10 Roue 1 200,000 200,000

K-13 Sable gros drain 10 Roue 3 80,000 240,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET POTEAUX


3,884,500
DE L'ETAGE 1

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 800,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET LE


4,759,500
COULAGE DES POTEAUX + TRANSPORT + IMPREVUES DE L'ETAGE 1

LOT 12 COULAGE DE LA DALLE DE L'ETAGE 1

N°L DESIGNATION UNITE QTE PU P,T

L-1 Fer de 6 (Ø 6) Barre 320 1,700 544,000

L-2 Fer de 8 (HA8) FE 500 Barre 75 3,200 240,000

L-3 Fer de 10 (HA10) FE 500 Barre 130 5,100 663,000

L-4 Fer de 12 (HA12) FE 500 Barre 200 7,200 1,440,000

L-5 Fil d'attache Rx 100 850 85,000

L-6 Pointes de 80 pqt 20 4,500 90,000

L-7 Pointe Toc Pqt 18 1 500 #VALUE!

L-8 Planches de coffrage U 75 5,000 375,000

L-9 Lattes U 342 1,400 478,800

L-10 Contre plaquet U 10 3 800 #VALUE!

L-11 Hourdis U 2,800 350 980,000

L-12 Bambour de Chine U 450 400 180,000

L-13 Ciment 42,5R Sacs 200 5,500 1,100,000

L-14 Gravier 5/15 10 Roue 1 200,000 200,000

L-15 Sable gros drain 10 Roue 2 75,000 150,000

TOTAL DU MATERIEL POUR LE COULAGE DU DEMI CHAINAGE ET


6,590,800
DALLE DE L'ETAGE 1

IMPREVUES + TRANSPORT DU MATERIELS 100,000

MAIN D'ŒUVRE 1,750,000

TOTAL DU MATERIEL POUR LE COULAGE DU DEMI CHAINAGE ET


8,440,800
DALLE + TRANSPORT + IMPREVUES DE L'ETAGE 1

LOT 13 COULLAGE DE L’ESCALIER ET LA RAMPE DE L'ETAGE 1

N°M DESIGNATION UNITE QTE PU P,T

M-1 Ciment 42,5R Sacs 100 5,400 540,000

M-2 Planches sciée en fond de 16 U 15 5,000 75,000

M-3 Fer de 10 (HA10) FE 500 Barre 45 5,100 229,500

M-4 Fer de 12 (HA12) FE 500 Barre 45 7,200 324,000

M-5 Contre plaquet U 5 3 800 #VALUE!

M-6 Pointes de 80 Pqt 5 4,500 22,500

M-7 Pointe Toc Pqt 10 1 500 #VALUE!

M-8 Fil d'attache Rlx 25 850 21,250

TOTAL DU MATERIEL POUR LE COULAGE DE L’ESCALIER DE L'ETAGE 1 1,246,250

TRANSPORT DU MATERIELS + IMPREVUES 50,000

MAIN D'ŒUVRE 750,000

TOTAL DU MATERIEL POUR LE COULAGE DE L’ESCALIER ET LA


1,296,250
RAMPEDE L'ETAGE 1 + TRANSPORT + IMPREVUES

ETAGE 2

LOT 14 COULAGE DES POTEAUX ET ELEVATION DES MURS DE L'ETAGE 2

N°N DESIGNATION UNITE QTE PU PT

N-1 Fer de 6 (Ø 6) Barre 180 1,700 306,000

N-2 Fer de 8 (HA8) FE 500 Barre 85 3,200 272,000

N-3 Fer de 10 (HA10) FE 500 Barre 50 5,100 255,000

N-4 Fer de 12 (HA12) FE 500 Barre 60 7,200 432,000

N-5 Fil d'attache Rlx 50 850 42,500

N-6 Pointes Toc Pqt 5 1 500 #VALUE!

N-7 Pointes de 80 Pqt 5 4,500 22,500

N-8 Parpaing de 15x15x40 Pgs 6,000 300 1,800,000

N-9 Ciment 42,5R Sacs 200 5,400 1,080,000

Planches de coffrage sciée avec


N-10 U 50 5,000 250,000
les fonds 15

N-11 Latte coffrage U 150 1,400 210,000

N-12 Gravier 5/15 10 Roue 2 200,000 400,000

N-13 Sable gros drain 10 Roue 3 80,000 240,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET POTEAUX


5,317,500
DE L'ETAGE 2

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 950,000

TOTAL DU MATERIEL POUR LES ELEVATIONS DES MURS ET LE


5,392,500
COULAGE DES POTEAUX + TRANSPORT + IMPREVUES DE L'ETAGE 2

LOT 15 CHAINAGE + ACROTERE

N°O DESIGNATION UNITE QTE PU PT

O-1 Fer de 6 (Ø 6) Barre 90 1,700 153,000

O-2 Fer de 8 (HA8) FE 500 Barre 40 3,200 128,000

O-3 Fer de 10 (HA10) FE 500 Barre 150 5,100 765,000

O-4 Fer de 12 (HA12) FE 500 Barre 135 7,200 972,000

O-5 Fil d'attache Rlx 80 850 68,000

O-6 Pointes Toc Pqt 20 1 500 #VALUE!

O-7 Pointes de 80 Pqt 25 4,500 112,500

O-8 Ciment 42,5R Sacs 150 5,400 810,000

O-9 Planches de coffrage U 85 5,000 425,000

O-10 Latte coffrage U 123 1,400 172,200

O-11 Gravier 5/15 10 Roue 1 200,000 200,000

O-12 Sable gros drain 10 Roue 1 80,000 80,000

TOTAL DU MATERIEL POUR LE CHAINAGE + ACROTERE 3,915,700

IMPREVUES + TRANSPORT DU MATERIELS 150,000

MAIN D'ŒUVRE 1,500,000

TOTAL DU MATERIEL POUR LE CHAINAGE + ACROTERE + TRANSPORT


5,565,700
+ IMPREVUES DE L'ETAGE 2

LOT 16 CHARPENTE ET COUVERTURE

N°P DESIGNATION UNITE QTE PU PT

P-1 Bastings de 12 x 3 x 5 m U 230 3,000 690,000

P-2 Lattes de 8 x 4 x 5 m U 120 1,800 216,000

P-3 Chevron pour les pannes U 105 3,800 399,000

P-4 Rivetteuse U 1 3,500 3,500

P-5 Parquet de Rivet U 1 4,000 4,000

P-6 Bandes Oulée U 25 4,500 112,500

P-7 Boite de Toiturole U 3 6,500 19,500

P-8 Tôles Fetiere Crainté U 25 5,500 137,500

P-9 Tôles bac de 6m 5/10 U 55 24,000 1,320,000

P-10 Rondelle U 20 1,000 20,000

P-11 Cavalier U 15 2,500 37,500

P-12 Tirsfond U 15 7,500 112,500

P-13 Pointe de 30 pqt 5 3,500 17,500

P-14 Pointe de 80 pqt 8 4,500 36,000

P-15 Pointe de 70 pqt 8 4,500 36,000

P-16 Pointe de 100 pqt 10 4,500 45,000

TOTAL DE LA CHARPENTE ET COUVERTURE 3,206,500

IMPREVUES + TRANSPORT DU MATERIELS 200,000

MAIN D'ŒUVRE 1,400,000

TOTAL DU MATERIEL DE LA CHARPENTE ET COUVERTURE IMPREVUES


4,806,500
+ TRANSPORT

LOT 17 TRAVAUX D'ETANCHEITE SUR L'ACROTERE

N°Q DESIGNATION UNITE QTE PU PT

Q-1 Membrane Granulée U 8 45,000 360,000

Q-2 Primaire ( Flintkote ) U 2 42,000 84,000

Q-3 Recharge gaz U 2 6,500 13,000

Q-4 Balais Coco U 2 1,200 2,400

TOTAL MATERIEL D'ETANCHEITE SUR L'ACROTERE 459,400

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 200,000

TOTAL MATERIEL + IMPREVUES + TRANSPORT DU MATERIELS 734,400

LOT 18 ASSAINISSEMENT( fosse septique, Regard et Puisard )


N°R DESIGNATION UNITE QTE PU PT

Parpaings de (15x20x40) pour


R-1 Pgs 1,000 250 250,000
Fosse et regard

R-2 Ciment 42,5R Sacs 40 5,400 216,000

R-3 Fer de 6 (Ø 6) Barre 15 1,700 25,500

R-4 Fer de 8 (HA8) FE 500 Barre 40 3,200 128,000

R-5 Fer de 10 (HA10) FE 500 Barre 25 5,100 127,500

R-6 Fer de 12 (HA12) FE 500 Barre 30 7,200 216,000

R-7 Fil d'attache Rx 15 850 12,750

R-8 Sable gros grain 10 roues 1 80,000 80,000

TOTAL MATERIEL POUR L'ASSAINISSEMENT 1,055,750

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 800,000

TOTAL MATERIEL + IMPREVUES + TRANSPORT DU MATERIELS 1,930,750

RECAPITULATIF DES TRAVAUX DU GROS ŒUVRE DU BATIMENT

TOTAL DU MATERIEL DU GROS ŒUVRE DU BATIMENT #REF!

TOTAL DES IMPREVUES DU GROS ŒUVRE DU BATIMENT #REF!

TOTAL DE LA MAIN D'ŒUVRE DU BATIMENT #REF!

BUDGET POUR LE GROS ŒUVRE DU BATIMENT #REF!

SECONDE ŒUVRE ( FINITION DES TRAVAUX )

LOT 1 MENUISERIE METALLIQUE DE TOUT LE BATIMENT

N°A DESIGNATION UNITE QTE PU PT

A-1 Antivol sur toutes les fenêtres m2 128 15,000 1,915,200

A-2 Portes Esternes et InterneS m2 17 15,000 250,800

Garde-Corps sur la Veranda et les


A-3 m2 26 15,000 391,350
terrasse

A-4 Garde-Corps sur les Escaliers m2 24 15,000 360,000

TOTAL MATERIEL POUR LA MENUISERIE METALLIQUE DE


2,917,350
TOUT LE BATIMENT
IMPREVUES + TRANSPORT DU MATERIELS 75,000
MAIN D'ŒUVRE 800,000

TOTAL MATERIEL + IMPREVUES + TRANSPORT DU


3,792,350
MATERIELS

LOT 2 MENUISERIE BOIS DE TOUT LE BATIMENT

N°B DESIGNATION UNITE QTE PU PT


Porte en bois de 90X210 pour les
B-1 4 U 85,000 340,000
Bureaux

Porte en bois de 130X220 pour


B-2 15 U 150,000 2,250,000
les Salle de Classe

Placard en bois de 40 cm de
B-3 3 U 100,000 300,000
profondeur dans les Bureaux

TOTAL MATERIEL POUR LA MENUISERIE METALLIQUE DE


2,890,000
TOUT LE BATIMENT
IMPREVUES + TRANSPORT DU MATERIELS 175,000

MAIN D'ŒUVRE 400,000

TOTAL MATERIEL + IMPREVUES + TRANSPORT DU


3,465,000
MATERIELS

LOT 3 MENUISERIE ALLUMINIUM ET VITRERIE DE TOUT LE BATIMENT

N°C DESIGNATION UNITE QTE PU PT


C-1 Fenêtre de 60 x 60 19 U 30,000 570,000

C-2 Fenêtre de 100 x 120 3 U 65,000 195,000

C-3 Fenêtre de 200 x 120 24 U 120,000 2,880,000

C-4 Porte de 75 x 220 15 U 110,000 1,650,000

C-4 Porte de 150 x 220 6 U 150,000 900,000

C-5 Porte d'entrée de 250 x 220 1 U 200,000 200,000

C-6 Balcon vitré 50 ml 50,000 2,500,000

TOTAL MATERIEL POUR LA MENUISERIE ALLUMINIUM ET


8,895,000
VITRERIE DE TOUT LE BATIMENT

IMPREVUES + TRANSPORT DU MATERIELS 75,000

MAIN D'ŒUVRE 500,000

TOTAL MATERIEL + IMPREVUES + TRANSPORT DU


9,470,000
MATERIELS

CARRELAGE INTERIEUR DE TOUT LE BATIMENT

LOT 4 CARRELAGE DU REZ DE CHAUSSEE

N°D DESIGNATION UNITE QTE PU PT


Class One ( Carreaux grés cérame
D-1 m² 31 13,000 399,620
de 30*30 )
Class Two ( Carreaux grés cérame
D-2 m² 31 13,000 399,620
de 30*30 )
Salle de Sport ( Carreaux grés
D-3 ml 41 13,000 530,400
cérame de 30*30 )
Couloir ( Carreaux grés cérame de
D-4 m² 30 13,000 392,080
30*30 )
Accueil ( Carreaux grés cérame de
D-5 ml 9 13,000 122,850
30*30 )

Entrée ( Carreaux grés cérame de


D-6 m² 2 13,000 26,650
30*30 )

Magasin ( Carreaux grés cérame


D-7 m² 4 13,000 47,320
de 30*30 )

Carreaux antiderapant pour sol de


D-8 m² 48 10,000 484,300
toilettes

D-9 Ciment ordinaire sacs 166 5,500 912,098

D-10 Ciment colle sacs 207 3,500 725,533

D-11 Ciment ordinaire pour chape sacs 124 5,500 684,074

D-12 Sable de la chape m3 41 3,500 145,107

D-13 Seaux u 10 1,000 10,000

D-14 Raclette u 2 1,000 2,000

D-15 Balais coco u 2 1,200 2,400

D-16 Raccord divers ff 25,000

SOUS TOTAL DU CARRELAGE DU REZ DE CHAUSSEE 4,909,051


MAIN D'ŒUVRE 600,000
TOTAL DU CARRELAGE DU REZ DE CHAUSSEE + MAIN
5,509,051
D'ŒUVRE
LOT 5 CARRELAGE DE L'ETAGE 1
N°E DESIGNATION UNITE QTE PU PT
Class Three ( Carreaux grés
E-1 m² 31 13,000 399,620
cérame de 30*30 )

Class Foor ( Carreaux grés cérame


E-2 m² 31 13,000 399,620
de 30*30 )

Salle d'informatique ( Carreaux


E-3 ml 41 13,000 530,400
grés cérame de 30*30 )

Couloir ( Carreaux grés cérame de


E-4 m² 30 13,000 392,080
30*30 )

Accueil ( Carreaux grés cérame de


E-5 ml 9 13,000 122,850
30*30 )

Entrée ( Carreaux grés cérame de


E-6 m² 2 13,000 26,650
30*30 )

Magasin ( Carreaux grés cérame


E-7 m² 4 13,000 47,320
de 30*30 )

Carreaux antiderapant pour sol de


E-8 m² 48 10,000 484,300
toilettes

E-9 Ciment ordinaire sacs 166 5,500 912,098

E-10 Ciment colle sacs 207 3,500 725,533

E-11 Ciment ordinaire pour chape sacs 124 5,500 684,074

E-12 Sable de la chape m3 41 3,500 145,107

E-13 Seaux u 10 1,000 10,000

E-14 Raclette u 2 1,000 2,000

E-15 Balais coco u 2 1,200 2,400

E-16 Raccord divers ff 25,000

SOUS TOTAL DU CARRELAGE DE L'ETAGE 1 4,909,051

MAIN D'ŒUVRE 700,000

TOTAL DU CARRELAGE DE L'ETAGE 1 + MAIN D'ŒUVRE 5,609,051

LOT 6 CARRELAGE DE L'ETAGE 2

N°F DESIGNATION UNITE QTE PU PT

Class Five ( Carreaux grés cérame


F-1 m² 31 13,000 399,620
de 30*30 )

Class Six ( Carreaux grés cérame


F-2 m² 31 13,000 399,620
de 30*30 )

Class Seven ( Carreaux grés


F-3 ml 41 13,000 530,400
cérame de 30*30 )

Couloir ( Carreaux grés cérame de


F-4 m² 30 13,000 392,080
30*30 )

Accueil ( Carreaux grés cérame de


F-5 ml 9 13,000 122,850
30*30 )

Entrée ( Carreaux grés cérame de


F-6 m² 2 13,000 26,650
30*30 )

Magasin ( Carreaux grés cérame


F-7 m² 4 13,000 47,320
de 30*30 )

Carreaux antiderapant pour sol de


F-8 m² 48 10,000 484,300
toilettes

F-9 Ciment ordinaire sacs 166 5,500 912,098

F-10 Ciment colle sacs 207 3,500 725,533

F-11 Ciment ordinaire pour chape sacs 124 5,500 684,074

F-12 Sable de la chape m3 41 3,500 145,107

F-13 Seaux u 10 1,000 10,000

F-14 Raclette u 2 1,000 2,000

F-15 Balais coco u 2 1,200 2,400

F-16 Raccord divers ff 25,000

SOUS TOTAL DU CARRELAGE DE L'ETAGE 2 4,909,051

MAIN D'ŒUVRE 800,000

TOTAL DU CARRELAGE DE L'ETAGE 2 + MAIN D'ŒUVRE 5,709,051

LOT 7 COULAGE DU SOL ET CREPISSAGE DES MURS DE TOUT LE BATIMENT

N°G DESIGNATION UNITE QTE PU PT

G-1 Ciment 42,5R Sacs 385 5,400 2,079,000

G-2 Tamis U 15 2,500 37,500

G-3 Planches U 70 5,000 350,000

G-4 Lattes U 200 1,400 280,000

G-5 Eponges U 50 200 10,000

G-6 Sable gros grain 10 roues 2 80,000 160,000

G-7 Sable fin 10 roues 15 70,000 1,050,000

SOUS TOTAL DU COULAGE DU SOL ET CREPISSAGE DES


3,966,500
MURS DE TOUT LE BATIMEN

MAIN D'ŒUVRE 1,650,000

TOTAL DU COULAGE DU SOL ET CREPISSAGE + MAIN


5,616,500
D'ŒUVRE