Vous êtes sur la page 1sur 39

Observation_ID ProjectId SegmentId ClusterId BUId

1112842 764 54 147 42


1112840 764 54 147 42
1112839 764 54 147 42
1112648 764 54 147 42
1112643 764 54 147 42
1112640 764 54 147 42
1112608 764 54 147 42
1112511 764 54 147 42
1112506 764 54 147 42
1112503 764 54 147 42
1112479 764 54 147 42
1112475 764 54 147 42
1112390 764 54 147 42
1112378 764 54 147 42
1112371 764 54 147 42
1112367 764 54 147 42
1112362 764 54 147 42
1112355 764 54 147 42
1112349 764 54 147 42
1112344 764 54 147 42
1112339 764 54 147 42
1112337 764 54 147 42
1112336 764 54 147 42
1112328 764 54 147 42
1112321 764 54 147 42
1112308 764 54 147 42
1112301 764 54 147 42
1112290 764 54 147 42
1112285 764 54 147 42
1112276 764 54 147 42
1112104 764 54 147 42
1112103 764 54 147 42
1111865 764 54 147 42
1111864 764 54 147 42
1111862 764 54 147 42
1111860 764 54 147 42
1111859 764 54 147 42
1111856 764 54 147 42
1111855 764 54 147 42
1111853 764 54 147 42
1111851 764 54 147 42
1111847 764 54 147 42
1111805 764 54 147 42
1111799 764 54 147 42
1111795 764 54 147 42
1111791 764 54 147 42
1111760 764 54 147 42
1111756 764 54 147 42
1111751 764 54 147 42
1111746 764 54 147 42
1111741 764 54 147 42
1111737 764 54 147 42
1111735 764 54 147 42
1111597 764 54 147 42
1111596 764 54 147 42
1111595 764 54 147 42
1111594 764 54 147 42
1111593 764 54 147 42
1111592 764 54 147 42
1111591 764 54 147 42
1111590 764 54 147 42
1111589 764 54 147 42
1111588 764 54 147 42
1111586 764 54 147 42
1111585 764 54 147 42
1111584 764 54 147 42
1111583 764 54 147 42
1111582 764 54 147 42
1111581 764 54 147 42
1111580 764 54 147 42
1111579 764 54 147 42
1111578 764 54 147 42
1111577 764 54 147 42
1111576 764 54 147 42
1111575 764 54 147 42
1111574 764 54 147 42
1111573 764 54 147 42
1111572 764 54 147 42
1111562 764 54 147 42
1111561 764 54 147 42
1111559 764 54 147 42
1111558 764 54 147 42
1111556 764 54 147 42
1111552 764 54 147 42
1111551 764 54 147 42
1111547 764 54 147 42
1111545 764 54 147 42
1111544 764 54 147 42
1111542 764 54 147 42
1111540 764 54 147 42
1111539 764 54 147 42
1111537 764 54 147 42
1111536 764 54 147 42
1111534 764 54 147 42
1111526 764 54 147 42
1111525 764 54 147 42
1111524 764 54 147 42
1111523 764 54 147 42
1111522 764 54 147 42
1111521 764 54 147 42
1111520 764 54 147 42
1111518 764 54 147 42
1111517 764 54 147 42
1111499 764 54 147 42
ProjectName SegmentName ClusterName
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
LE200287 - Ad Dhakhliya Water Transmission project WI - Oman WI - Oman
BUName Source
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Vehicle Earth Moving Equipment Inspection Checklist
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
Water International BU Raised Manually
RiskCategory UAUC
Low Potential Waste Management (Environmental Aspect)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Waste Management (Environmental Aspect)
Low Potential No/Poor Barricading(Physical Hazard)
Medium Potential No/Poor Barricading(Physical Hazard)
Low Potential Improper or No Access (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Waste Management (Environmental Aspect)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Waste Management (Environmental Aspect)
Low Potential Storage of Material (Physical Hazard)
Medium Potential Confined Space (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Medium Potential Storage of Material (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Waste Management (Environmental Aspect)
Low Potential Emergency Preparedness (Physical Hazard)
Low Potential Emergency Preparedness (Physical Hazard)
Low Potential Chemical Hazards
Low Potential Chemical Hazards
Low Potential Chemical Hazards
Medium Potential Chemical Hazards
Low Potential Chemical Hazards
Low Potential Poor Housekeeping Practice (Physical Hazard)
Medium Potential Slip/trip/Fall (Physical Hazard)
Low Potential Tools & Tackles (Physical Hazard)
Low Potential Lifting Activities (Physical Hazard)
Low Potential Lifting Activities (Physical Hazard)
Low Potential Fire Hazard (Physical Hazard)
Low Potential Improper or No Access (Physical Hazard)
Medium Potential Storage of Material (Physical Hazard)
Low Potential Improper or No Access (Physical Hazard)
Medium Potential Scaffolding / Staging (Physical Hazard)
Medium Potential Scaffolding / Staging (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Fire Hazard (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Medium Potential Slip/trip/Fall (Physical Hazard)
Low Potential Tools & Tackles (Physical Hazard)
Medium Potential No/Poor Barricading(Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Tools & Tackles (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Medium Potential Posters/Layout/Signage Display (Physical Hazard)
Low Potential Work at Height (Physical Hazard)
Low Potential Work at Height (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Confined Space (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Moving/Rotating Parts (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Improper or No Access (Physical Hazard)
Low Potential Posters/Layout/Signage Display (Physical Hazard)
Low Potential Posters/Layout/Signage Display (Physical Hazard)
Low Potential Chemical Hazards
Low Potential Chemical Hazards
Medium Potential IMS Document Non-Compliance (Physical Hazard)
Low Potential Vehicles & Heavy Machineries (Physical Hazard)
Low Potential Vehicles & Heavy Machineries (Physical Hazard)
Low Potential Electrically Unsafe (Physical Hazard)
Low Potential Unauthorised Operation (Physical Hazard)
Low Potential Unauthorised Operation (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Medium Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Medium Potential No/Poor Barricading(Physical Hazard)
Medium Potential Scaffolding / Staging (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Storage of Material (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Medium Potential Storage of Material (Physical Hazard)
Low Potential No/Poor Barricading(Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Poor Housekeeping Practice (Physical Hazard)
Medium Potential Waste Management (Environmental Aspect)
Low Potential Electrically Unsafe (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential No/Poor Barricading(Physical Hazard)
Low Potential Improper or No Access (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Low Potential Fire Hazard (Physical Hazard)
Low Potential Slip/trip/Fall (Physical Hazard)
Low Potential Scaffolding / Staging (Physical Hazard)
Medium Potential Improper or No Access (Physical Hazard)
Medium Potential Moving/Rotating Parts (Physical Hazard)
Activity
Pump House
Buildings
Buildings
Transmission Lines
Transmission Lines
Transmission Lines
Transmission Lines
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Buildings
Pump House
Pump House
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Pump House
Pump House
Pump House
Transmission Lines
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan

Distribution network
Distribution network
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Switch Yard
Transmission Lines
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Buildings
Pump House
Pump House
Buildings
Pump House
Buildings
Buildings
Pump House
Pump House
Pump House
Pump House
Pump House
Pump House
Pump House
Pump House
Pump House
Buildings
Pump House
Boundary Wall
Transmission Lines
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Pump House
Pump House
Buildings
Buildings
Pump House
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Reservoirs (CWR & RWR)
Road Works
Channels,Chambers,Filter House,Flash Mixer,SBR,Sumps,Pits & Tan
Transmission Lines
Pump House
Observation Report
SubActivity
Concreting
Reinforcement
Backfilling
Concreting - 1.8m below Ground Level
Backfilling
Cleaning
Pipe Laying using Trenchless Method (Jackpushing (or) HDD)
Other Activities - Civil
Concreting
Concreting
Housekeeping
Other Activities
Other Activities
Other Activities - Civil
Other Activities
Housekeeping
Other Activities
Pipe Laying and Alignment
Scaffolding
Housekeeping
Housekeeping
Housekeeping
Other Activities
Other Activities
Other Activities
Other Activities - (Non Civil)
Other Activities
Other Activities
Other Activities
Housekeeping
Backfilling
Backfilling
Lifting Activity
Lifting Activity
Form Work
Form Work
Form Work
Form Work
Form Work
Form Work
Form Work
Form Work

Backfilling
Backfilling
Backfilling
Backfilling
Dewatering
Formwork activities
Backfilling
Other Activities - Civil
Other Activities
Other Activities
Excavation
Work at Height
Work at Height
Form Work
Form Work
Reinforcement
Form Work
Scaffolding
Housekeeping
Scaffolding works
Housekeeping
Reinforcement
Housekeeping
Lifting Activity
Concreting Activates
Other Activities
Other Activities
Painting
Painting
Hydrotesting
Lifting Activity
Hydrotesting
Cable Routing
Lifting Activity
Lifting Activity
Reinforcement
Concreting
Other Activities - Civil
Concreting
Cable Routing - Indoor
Erection
Installation of Access Control System
Other Activities
Cable Routing
Plastering work
Form Work
Excavation
Excavation
Plastering work
Other Activities - Civil
Other Activities - Civil
Electrical Works
Electrical Works
Electrical Works
Other Activities
Housekeeping
Backfilling
Surveying
Backfilling
Pipe Laying using Trenchless Method (Jackpushing (or) HDD)
Buffing/Finishing Work
Observation Report
ProposedCorrectiveAction
All waste shall be sent to the waste yard.
Floor opening shall be covered or protected to avoid any fall.
Workmen shall be engaged for maintaining housekeeping.
Concrete waste shall be removed from the site and swift instrction need to be given to miller drivers.
Open IV chamber shall be barricaded properly with interlocking arrangements.
Fallen barricading arrangements to.be reinstated properly.
Materilas (hose and pipes ) shall be removed from the access.
Proper housekeeping shall be done and materials shall be stacked properly.
Concrete waste shall be remove from the area and dispose into the waste yard.
Adequate cover slab shall be provided on the FOC chamber.
Waste materials shall be dispose from the area and maintain the good housekeeping.
Proper housekeeping shall be done and materials shall be stacked properly.
air ventilation to be ensured for working inside gfs tank
Hard barricading shall be provided on the chamber edge
intermediate steps to be provided for access area.
Housekeeping shall be done inside pumphouse
access to be cleared. material to be removed from access area
need to remove materials inside OQ ROW
scaffolding inspection & tag to be installed
Housekeeping shall be done & proper material segregation, stacking to be done. barricading to be done
Housekeeping shall be done & remove scrap materials
waste removal to be done
eyewash inspection & water change to be ensured
siren inspection & effectiveness to be ensured
paint drums to be closed & stored safely
drip tray to be cleaned & chemicals to be removed
A/C inspection to be done
Proper segregation and staking of chemicals shall be done
complete MSDS of chemicals to be provided
Housekeeping shall be done & remove scrap materials
Hard barricading's and sign boards shall be provided around the chamber opening area.
Proper cleaning shall be done in and around roller machine and ensu
advised the supervisor to secure properly with barricades around the swing radius area
advised the supervisor to secure properly with barricades around the swing radius area
advised the supervisor to secure the cylinder properly on the stora
advised the supervisor to secure the ladder properly with proper 3 point contact supports
advised the supervisor to secure the argon cylinder on the trolley's
advised the supervisor to ensure proper access egress arranagements in place
advised the supervisors to secure the intermediate transom on the scaffolding structure
advised the SE to ensure proper cross bracings supports are in place for the scaffolding structure
advised the supevisor to ensure proper toe boards on place for the scaffolding structure
advised the supervisor to replace the damaged planks from the chamber location
Fire cylinder shall be refill and provide into the equipment
All scattered construction materials and PVC barriers shall be stored properly at one place and maintain the good
Hard barricading's and sign boards shall be provided around the tr
1 Ton roller shall be inspected by P&M depat. prior to use on site.
Adequate hard barricading shall be provided at the edge area of chamber.
The scaffold structure must be immediate dismantled from the area.
Proper housekeeping shall be done and materials shall be stacked properly.
Inspection sticker shall be provided on plate compactor machine.
Proper housekeeping shall be done and materials shall be stacked properly.
Housekeeping shall be done and remove unused material from the area.
Proper housekeeping shall be done and materials shall be stacked properly.
proper barrication shall be provided
proper harness shall be provided
proper harness shall be provided
proper access shall be provided
proper housekeeping shall be provided
proper housekeeping shall be provided
inspection shall be carried out for scaffolding
proper housekeeping shall be provided
proper housekeeping shall be provided
proper barrication shall be provided
proper housekeeping shall be provided
face shield shall be provided
proper housekeeping shall be provided
proper site ppes shall be ensured
access shall be cleared
proper barrication shall be provided
proper barrication shall be provided
proper ventilation shall be provided
proper ventilation shall be provided
SEC shall be raised before starting the work
proper belt shall be replaced
proper barrication shall be provided
electrical cable shall be removed form the access area
crane shall be locked
crane shall be locked
House keeping to be done.
Accumulated concrete waste shall be removed and stored in a designated dumping yard
House keeping to be done.
Edge protection arrangements with warning sign boards shall be provided
Appropriate scaffold shall be provide and it should be inspected by scaffolding inspector prior to us e
House keeping to be done.
House keeping to be done.
scaff materials shall be removed from the access and stored in a designated area
Materials shall be stored in a safe manner and area shall be barricaded
Open floor area shall be covered by wooden planks.
steel rod shall be removed or protect with mushroom caps.
Breaker shall be removed from the access and stored in a designated area
barricading shall be provided in excavated area.
Inspection of the scaffolding platform shall be carried out and appropriate tag shall be provided.
House keeping to be done.
House keeping to be done.
Joint is not allowed in power cable without suitable cable jointer.
Cable routing shall be avoid on the access and cable protection shall be provided.
Barricading shall be provided around the pit.
Ladder shall be secured by a ladder clamp.
Inspection tag shall be placed on the access platform .
Diesel cane shall be kept in designated chemical area.
Rebar cap shall be provided.
Scaffolding ladder shall be secured by the clamp.
Appropriate access and egress arragemements shall be furnished for MT 8 receiving pit.
provide handle
Interface PostedBy
Shahid Ali
Shahid Ali
Shahid Ali
ift instrction need to be given to miller drivers. Unnikuttan NB
erlocking arrangements. Unnikuttan NB
Unnikuttan NB
Unnikuttan NB
be stacked properly. AMARJIT NANAWARE
pose into the waste yard. AMARJIT NANAWARE
AMARJIT NANAWARE
aintain the good housekeeping. AMARJIT NANAWARE
be stacked properly. AMARJIT NANAWARE
Unnikrishnan
Unnikrishnan
Unnikrishnan
Unnikrishnan
Unnikrishnan
Unnikrishnan
Unnikrishnan
ation, stacking to be done. barricading to be done Unnikrishnan
Unnikrishnan
Admin Interface Unnikrishnan
Unnikrishnan
PM Interface Unnikrishnan
Unnikrishnan
Unnikrishnan
PM Interface Unnikrishnan
Unnikrishnan
Unnikrishnan
Unnikrishnan
ound the chamber opening area. AMARJIT NANAWARE
PM Interface AMARJIT NANAWARE
des around the swing radius area Balasubramaniam Kamaraj
des around the swing radius area Balasubramaniam Kamaraj
PM Interface,Admin Interface Balasubramaniam Kamaraj
ith proper 3 point contact supports Balasubramaniam Kamaraj
the trolley's Balasubramaniam Kamaraj
arranagements in place Balasubramaniam Kamaraj
nsom on the scaffolding structure Balasubramaniam Kamaraj
ts are in place for the scaffolding structure Balasubramaniam Kamaraj
place for the scaffolding structure Balasubramaniam Kamaraj
from the chamber location Balasubramaniam Kamaraj
PM Interface AMARJIT NANAWARE
hall be stored properly at one place and maintain the good AMARJIT NANAWARE
PM Interface,Admin Interface AMARJIT NANAWARE
PM Interface AMARJIT NANAWARE
ge area of chamber. AMARJIT NANAWARE
from the area. AMARJIT NANAWARE
be stacked properly. AMARJIT NANAWARE
PM Interface AMARJIT NANAWARE
be stacked properly. AMARJIT NANAWARE
rial from the area. AMARJIT NANAWARE
be stacked properly. AMARJIT NANAWARE
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
PM Interface,Admin Interface ANOOP BM
Unnikuttan NB
red in a designated dumping yard Unnikuttan NB
Unnikuttan NB
ds shall be provided Unnikuttan NB
nspected by scaffolding inspector prior to us e Unnikuttan NB
Unnikuttan NB
Unnikuttan NB
tored in a designated area Unnikuttan NB
all be barricaded Unnikuttan NB
Shahid Ali
Unnikuttan NB
n a designated area Unnikuttan NB
Shahid Ali
out and appropriate tag shall be provided. Shahid Ali
Unnikuttan NB
Admin Interface Unnikuttan NB
Shahid Ali
otection shall be provided. Shahid Ali
Shahid Ali
Shahid Ali
Shahid Ali
Shahid Ali
Shahid Ali
Shahid Ali
e furnished for MT 8 receiving pit. Unnikuttan NB
Unnikuttan NB
SiteEngineer SectionIncharge SubContractor
A Venkatesh Kalimuthu Rajendran Nil
A Venkatesh Kalimuthu Rajendran GQT
A Venkatesh Kalimuthu Rajendran GQT
Mritunjay Kumar Karthik M Lnt
Mritunjay Kumar Karthik M lnt
Mritunjay Kumar Karthik M lnt
Mritunjay Kumar Karthik M QEC
Rambha Venkata Rao R Selvakumar L&T
Rama Krishna R Selvakumar L&T
Karthick R Selvakumar L&T
Rambha Venkata Rao R Selvakumar L&T
Rambha Venkata Rao R Selvakumar L&T
T.Rajkumar K D V SARMA L&T Team
RANJEET YADAV L&T Team
RANJEET YADAV K D V SARMA NA
RANJEET YADAV K D V SARMA L&T Team
T.Rajkumar Vijayanand J Al tasnim
Mritunjay Kumar Karthik M DIYAN
Ajith P Nair V V SRIDHARAN NA
Ajith P Nair V V SRIDHARAN L&T Team
RANJEET YADAV K D V SARMA L&T Team
N.Nagaraju MANOJ K ABRAHAM NA
RANJEET YADAV K D V SARMA L&T Team
RANJEET YADAV K D V SARMA L&T Team
Muhammad Usman Rasheed K D V SARMA NA
Muhammad Usman Rasheed K D V SARMA NA
Robert Kennedy K D V SARMA NA
Muhammad Usman Rasheed K D V SARMA NA
Muhammad Usman Rasheed K D V SARMA NA
Ajith P Nair V V SRIDHARAN NA
Uthayakumar M R Selvakumar L&T
Uthayakumar M R Selvakumar Rmoz Al Khaleej
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
ROHIT KUMAR R Selvakumar L&T
Villyaraja R Selvakumar
Uthayakumar M R Selvakumar L&T
Uthayakumar M R Selvakumar L&T
Uthayakumar M R Selvakumar Zakka Trading
Uthayakumar M R Selvakumar L&T
Uthayakumar M R Selvakumar L&T
Rambha Venkata Rao R Selvakumar L&T
Villyaraja R Selvakumar Rmoz Al Khaleej
Karthick R Selvakumar L&T
Rama Krishna R Selvakumar L&T
Rambha Venkata Rao R Selvakumar L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran Garland
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran Middle East Wealth
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Ribu VV Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
Ribu VV Kalimuthu Rajendran Middle East Wealth
Ribu VV Kalimuthu Rajendran Middle East Wealth
A Venkatesh Kalimuthu Rajendran L&T
A Venkatesh Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Venkadesh N Kalimuthu Rajendran L&T
Bhanu Prakash R Bharath Kumar Reddy Nawada
Bhanu Prakash R Bharath Kumar Reddy Nawada
PALANI HARIKRISHNAN R Bharath Kumar Reddy L&T
Bhanu Prakash R Bharath Kumar Reddy REEDO
Chandu Kishore Panchumarthi V V SRIDHARAN Auora
PALANI HARIKRISHNAN Vijayanand J NA
Chandu Kishore Panchumarthi V V SRIDHARAN AiR Mec
Bhanu Prakash R Bharath Kumar Reddy L&T
Chandu Kishore Panchumarthi V V SRIDHARAN Auora
RANJEET YADAV K D V SARMA Nil
Bhanu Prakash R Bharath Kumar Reddy Nawada
Bhanu Prakash R Bharath Kumar Reddy L&T
RANJEET YADAV K D V SARMA Nil
RANJEET YADAV K D V SARMA Nil
Bhanu Prakash R Bharath Kumar Reddy L&T
K. Ravichandran MANOJ K ABRAHAM L&T
Robert Kennedy K D V SARMA Nil
Robert Kennedy K D V SARMA Nil
Ajith P Nair K D V SARMA AL Daam
T.Rajkumar K D V SARMA Nil
Muhammad Usman Rasheed K D V SARMA Nil
Muhammad Usman Rasheed K D V SARMA Nil
RANJEET YADAV K D V SARMA Nil
RANJEET YADAV K D V SARMA Nil
Afaq Ahmed Karthik M qec
Bhanu Prakash K D V SARMA althasnim
ThirdPartyStaff PostedDate ClosedDate
10/18/2023 11:42:58 AM
10/18/2023 11:40:37 AM
10/18/2023 11:37:44 AM
nill 10/17/2023 6:05:27 PM
nill 10/17/2023 6:01:39 PM
nill 10/17/2023 5:57:53 PM
nill 10/17/2023 5:18:44 PM
10/17/2023 3:39:39 PM
10/17/2023 3:37:38 PM
10/17/2023 3:36:24 PM
10/17/2023 3:16:16 PM
10/17/2023 3:14:42 PM
NA 10/17/2023 12:59:17 PM
NA 10/17/2023 12:50:51 PM
NA 10/17/2023 12:44:04 PM
NA 10/17/2023 12:39:02 PM
NA 10/17/2023 12:34:08 PM
NA 10/17/2023 12:24:11 PM
NA 10/17/2023 12:16:44 PM
NA 10/17/2023 12:09:36 PM
NA 10/17/2023 12:04:35 PM
NA 10/17/2023 12:01:31 PM
NA 10/17/2023 11:57:26 AM 10/18/2023 12:26:48 AM
NA 10/17/2023 11:52:46 AM 10/18/2023 12:27:11 AM
NA 10/17/2023 11:44:50 AM
NA 10/17/2023 11:33:23 AM
NA 10/17/2023 11:28:35 AM
NA 10/17/2023 11:25:21 AM
NA 10/17/2023 11:22:00 AM
NA 10/17/2023 11:12:04 AM
NA 10/16/2023 6:50:58 PM 10/17/2023 9:10:53 PM
NA 10/16/2023 6:50:01 PM 10/17/2023 9:11:28 PM
10/16/2023 1:53:23 PM 10/17/2023 9:08:43 PM
10/16/2023 1:53:23 PM 10/18/2023 8:47:59 AM
10/16/2023 1:51:50 PM 10/18/2023 8:48:44 AM
10/16/2023 1:50:22 PM 10/18/2023 9:04:01 AM
10/16/2023 1:49:14 PM 10/18/2023 9:03:33 AM
10/16/2023 1:47:57 PM 10/18/2023 9:00:15 AM
10/16/2023 1:46:42 PM 10/18/2023 8:59:32 AM
10/16/2023 1:45:21 PM 10/18/2023 9:02:05 AM
10/16/2023 1:44:08 PM 10/17/2023 9:09:07 PM
10/16/2023 1:40:47 PM 10/18/2023 8:59:15 AM
NA 10/16/2023 12:32:16 PM 10/16/2023 6:45:04 PM
10/16/2023 12:27:35 PM 10/17/2023 9:12:04 PM
10/16/2023 12:25:40 PM 10/17/2023 9:15:18 PM
10/16/2023 12:24:04 PM 10/17/2023 9:14:36 PM
10/16/2023 11:52:05 AM
10/16/2023 11:50:40 AM
NA 10/16/2023 11:44:48 AM 10/16/2023 5:19:32 PM
NA 10/16/2023 11:42:47 AM 10/16/2023 5:19:39 PM
NA 10/16/2023 11:40:52 AM 10/16/2023 6:45:12 PM
NA 10/16/2023 11:39:07 AM
NA 10/16/2023 11:37:24 AM 10/16/2023 4:05:51 PM
10/15/2023 11:08:33 PM 10/16/2023 11:56:50 PM
10/15/2023 11:05:09 PM 10/16/2023 11:58:39 PM
10/15/2023 11:01:43 PM 10/17/2023 6:49:50 PM
10/15/2023 10:56:31 PM 10/17/2023 11:06:49 AM
10/15/2023 10:52:07 PM 10/17/2023 6:50:20 PM
10/15/2023 10:46:36 PM
10/15/2023 10:43:15 PM 10/17/2023 6:50:57 PM
10/15/2023 10:39:20 PM 10/17/2023 6:52:09 PM
10/15/2023 10:33:55 PM 10/17/2023 12:00:17 AM
10/15/2023 10:29:44 PM 10/17/2023 11:07:47 AM
10/15/2023 10:25:09 PM 10/17/2023 12:01:26 AM
10/15/2023 10:20:25 PM 10/17/2023 12:01:47 AM
10/15/2023 10:18:05 PM 10/17/2023 6:52:42 PM
10/15/2023 10:13:21 PM 10/17/2023 6:53:17 PM
10/15/2023 8:47:18 PM 10/17/2023 6:54:09 PM
10/15/2023 8:45:01 PM 10/15/2023 8:45:10 PM
10/15/2023 8:45:01 PM 10/17/2023 6:55:01 PM
10/15/2023 8:41:26 PM 10/15/2023 8:41:35 PM
10/15/2023 8:41:25 PM 10/17/2023 6:51:32 PM
10/15/2023 8:38:51 PM 10/17/2023 12:02:16 AM
10/15/2023 8:37:13 PM 10/17/2023 12:03:10 AM
10/15/2023 8:35:38 PM 10/17/2023 12:03:55 AM
10/15/2023 8:32:48 PM 10/17/2023 12:04:45 AM
10/15/2023 8:30:37 PM 10/15/2023 8:30:54 PM
10/15/2023 8:30:37 PM 10/17/2023 12:05:33 AM
NILL 10/15/2023 4:52:42 PM 10/16/2023 7:00:08 PM
NILL 10/15/2023 4:51:47 PM 10/16/2023 6:58:31 PM
NILL 10/15/2023 4:50:41 PM 10/17/2023 7:52:48 PM
NILL 10/15/2023 4:48:23 PM 10/16/2023 6:56:06 PM
NILL 10/15/2023 4:46:16 PM 10/17/2023 7:53:23 PM
NILL 10/15/2023 4:38:12 PM 10/17/2023 7:54:50 PM
NILL 10/15/2023 4:35:44 PM 10/17/2023 7:54:12 PM
NILL 10/15/2023 4:31:15 PM 10/16/2023 5:12:07 PM
NILL 10/15/2023 4:27:57 PM 10/17/2023 7:55:34 PM
10/15/2023 4:26:39 PM 10/16/2023 5:57:02 PM
NILL 10/15/2023 4:25:51 PM 10/16/2023 5:13:31 PM
NILL 10/15/2023 4:23:40 PM 10/17/2023 10:41:45 AM
10/15/2023 4:23:34 PM 10/16/2023 5:58:03 PM
10/15/2023 4:19:54 PM 10/16/2023 5:58:57 PM
NILL 10/15/2023 4:19:16 PM 10/16/2023 5:14:33 PM
NILL 10/15/2023 4:13:55 PM 10/17/2023 9:48:21 AM
10/15/2023 2:00:50 PM 10/17/2023 5:19:54 PM
10/15/2023 1:52:59 PM 10/17/2023 5:20:10 PM
10/15/2023 1:46:04 PM 10/16/2023 5:59:33 PM
10/15/2023 1:40:35 PM 10/15/2023 5:43:51 PM
10/15/2023 1:33:03 PM 10/17/2023 11:16:49 AM
10/15/2023 1:29:06 PM 10/17/2023 11:17:02 AM
10/15/2023 1:22:54 PM 10/15/2023 4:35:39 PM
10/15/2023 1:15:57 PM 10/15/2023 5:44:29 PM
nill 10/15/2023 12:32:03 PM 10/16/2023 5:12:47 PM
nil 10/15/2023 11:20:39 AM 10/16/2023 5:16:17 PM
EscalationLevel Status ActionTaken
1 Pending
1 Pending
1 Pending
1 Action Taken concrete wastage remove
1 Action Taken barricades provide I V chember
1 Action Taken barricades provide
1 Action Taken pipe material removed
1 Pending
1 Pending
1 Pending
1 Pending
1 Pending
1 Action Taken Exhaust blower fan fixed
1 Action Taken hard barricade provided
1 Pending
1 Pending
1 Pending
1 Pending
1 Pending
1 Pending
1 Pending
1 Pending
1 Approved eye wash insepaction and change water
1 Approved insepaction done this month
1 Action Taken paint drum stored properly
1 Action Taken chemical tray cleaned
1 Action Taken AC Not working conduction unfit
1 Action Taken All paint drums segrated
1 Pending
1 Pending
1 Approved Barrication done around the chamber
1 Approved Instructed subcontractor to clean the roller and to do re inspectio
1 Approved sir crane removed from the site
1 Approved Sir crane removed from the site.
1 Approved sir no any gas cylinder available at site.All removed
1 Approved removed
2 Approved all removed from the site.still no gas cylinder available at site
1 Approved excess removed and closed sir because we are going for saroundin
2 Approved scaffolding removed sir
2 Approved scaffolding removed sir
1 Approved sir chamber concrete completed.scaffolding removed by 18/10/20
1 Approved scaffolding removed sir
1 Approved New Fire cylinder kept inside the shovel
1 Approved Surplus material removed from site
1 Approved Barrier shifted to the location. Tomorrow installation will be compl
1 Approved Roller was dehired by subcontractor zakka. It will be removed from s
2 Action Taken barrier shifted to the location will be installed by tomorrow
1 Pending
1 Approved materials are removed and house keeping is done
1 Approved Inspection done
1 Approved unwanted materials are removed and house keeping is done
1 Action Taken done
1 Approved House keeping is done and material stocking placed
1 Approved Rectified
1 Approved Rectified
1 Approved Fullbody harness provided
1 Approved Safe access provided
1 Approved Proper house keeping done
2 Pending
1 Approved Tag privided
1 Approved Materials stacked in the organised manner
1 Approved Rectified
1 Approved Doors closed
1 Approved Rectified
1 Approved Rectified
1 Approved housekeeping done
1 Approved Clearly we instructed to all operators and drivers that they should
1 Approved Repairing work inprogress. other activities stopped in basement un
1 Approved
1 Approved barrication provided
1 Approved
1 Approved Ventilation fan engaged in basement where activities are goingon
1 Approved Rectified
1 Approved Belt changed
1 Approved Rectified
1 Approved Rectified
1 Approved
1 Approved Rectified
1 Approved house keeping has been done
1 Approved house keeping done
1 Approved removed
1 Approved edge protection has been arranged
2 Approved Removed from site
1 Approved removed
1 Approved House keeping done
1 Approved material has been removed
1 Approved Scaffolding seggrgated
1 Approved cover to open aria
1 Approved caps are arranged
2 Approved breaker has been removed
1 Approved barricade provided
1 Approved scaffolding insepaction done
1 Approved house keeping done
2 Approved Vendor identification & finalization in process debris will be remo
1 Approved cable joint removed
1 Approved Temporary power cable removed near the door
1 Approved barrications provided
1 Approved Ladder removed from site
1 Approved Tag provided
1 Approved Diesel can removed from this location
1 Approved Rebar cap provided
1 Approved leddar clump provide
1 Approved work in progress, will arrange by tomorrow
1 Approved handle has been arranged
ObsDescription ILLevel WPlevel
Waste concrete and plastic sheet found laying inside the pump house in BPS 4
Floor opening found without any protection inside the chlorination building at BPS 4
Poor housekeeping found inside the chlorination building in tank area at BPS 4
It has been noticed that concrete waste direct dump on the ground without providing any secondary containment arrangeme
It has been observed that Iv chamber near ch 13 barricading arrangements not interlocked properly .
It has been observed that in CH 13 WO chamber barricading arrangements fully fallen due to wind .
It has been observed that access obstructed with dewatering hose and pipes.
Poor housekeeping and improper storage of material @ Summit reservoir section 2 ( Nearby Tank 02)
Concrete waste materials not removed from the site area @ Summit reservoir section 2 ( Nearby Guard house)
No cover slab provided on the FOC chamber area @ BPS 3 Section 2( Guard House)
Waste materials not removed inside the pump house BPS 3 Section 2
Scattered materials not stored properly inside the Pump station BPS 3 Section 2
air ventilation not provided inside gfs tank 02
INCOMPLETE BARRICADING ALONG chamber.
unsafe access
Poor housekeeping inside the pump house & dust accumulated inside area
materials kept along pumphouse access area
CS pipes kept inside OQ ROW
scaff tag not installed for the chiller unit scaffolding support
scattered materials at yard area
scattered hessian cloths along the yard area
waste removal pending from bps02
Eye wash station inspection & water quality not displayed
emergency siren inspection & effectiveness not done for the month of october
poor storage of paint drums inside chemical store area
accumulated chemicals inside drip tray
A/C inspection inside chemical store not done
poor segregation of chemicals inside store area
complete MSDS of all chemicals not available
poor housekeeping practices
No hard barricading's, sign boards provided around the chamber pit @ Near CH 3+000 Km Section 2 ( Towards summit reserv
Oil spillage found around 1 ton roller machine @ Near CH 3+000 Km Section 2 ( Towards summit reservoir road)
mobile crane lifting swing radius has been found to be not barricaded properly
mobile crane lifting swing radius has been found to be not barricaded properly
compressed gas cylinder has been found to be left unattended on the work location
no 3 point contact has been provided for the ladders
argon compressed gas cylinder has been found to be not secured on the cylinder trolleys
access egress has been found to be in damaged condition for egress inside the trench
scaffolding planks are not secured with intermediate transoms
no proper cross bracings supports has been in place for the scaffolding structure
no toe boards has been in place for the work platform erected for the chamber
use of damaged planks has been used for erecting chamber work scaffolding on the off take line chamber
Fire cylinder found expired inside the Showel equipment 5056 YM ( Azag Trading) @ Summit Reservoir Section 2A
Scattered PVC barriers not removed from the location after completion of works @ CH 16+400 Km section 2 Samail area
Hard barrication not provided at the edge of excavated trench @ CH 16+400 Km section 2 Samail area
One ton roller found without P&M inspection at site @ CH 16+400 Km section 2 Samail area
No hard barricading's, sign boards provided around the chamber pit @CH 16+400 Km section 2 Samail area
Unsafe scaffolding structure to be dismantle inside the pit area of dewatering location @ CH 3+900 Km Samail area Section 2
Scattered shuttering materials not removed from the site area @ Chlorination building @ BPS 3 Section 2
Inspection sticker not available on plate compactor @ BPS 3 Section 2
Poor housekeeping and improper storage of material , unwanted materials stored inside @ Chlorination building @ BPS 3 Sec
Poor housekeeping and improper storage of construction material nearby store area @ Summit reservoir section 2
Poor housekeeping and improper storage of material nearby store area @ Summit reservoir section 2
No barrication provided to the open chamber at BPS 4 area, which leads fall hazards
No harness provided to the workmen working at height area for car parking scaffolding works
No harness provided to the workmen working at height area, which leads hazards to the workmen
Improper access provided to the chlorination building area, which leads trip fall hazards
No proper housekeeping identified at the car parking work area, which leads trip fall hazards
Poor housekeeping and improper material management ientified at the BPS 4 area near barbending work shope
Using red tag scaffolding for work at height activity at electrical building area
Improper material managements at the scaffolding erected area, which leads trip fall hazards
No proper material management at the BPS 4 pump house area, which leads hazards to the workmen
No barrication provided for the chlorination building area, which leads fall hazards
Material stored improperly at the chamber area, which leads tip fall hazards
No face shield using while doing for the pipe cutting job, which leads hazards to the workmen
poor housekeeping identified at the transformer area near pump house
Vehicle operator found not wearing site PPEs while entering to the construction site , which leads hazards to the workmen
Access area found restricted with scaffolding at basement . which leads hazards in case of emergency
No barriation provided fort the MEWP standing at the access area for installation of fire fighting equipment's
No barriation provided fort the MEWP standing at the access area for installation of fire fighting equipment's
No proper ventilation arragmetns for the workmen fixing the chemical cement at the electrical building groves
No proper ventilation arragmetns for the workmen fixing the chemical cement at the electrical building groves
No sec raised for the hydrotesting activity at BPS 4 area, which will be the system deviation
Lifting belt found damage for handling the compressor at BPS 4 area. leads trip fall hazards
Compressor using for hydrotesting work found stored at the open are without any barrication arrangements, which leads una
Cable routing identified for hydrotesting activity over the ground area, where vehicle and man movement occurred. which lea
EOT crane found leave idle, without locking the remote key. which leads unauthorized operation of EOT crane
EOT crane found leave idle, without locking the remote key. which leads unauthorized operation of EOT crane
Poor house keeping inside the car parking
It has been noticed that concreate waste direct dump on ground without providing a secondary containment arrangements
It has been observed that inside the chlorination building poor HK unwanted UPVC pipes unattended
It has been noticed that inside the chlorination building edge protection arrangements found missing .
It has been noticed that sub con aoura workers working in a incomplete mobile scaffolding,(NO edge protection )
It has been noticed that inside the chlorination building poor house keeping observed ,platform erection subcontractor not r
It has been noticed that inside the chlorination building poor house keeping observed, unattended electrical cables, pipes sca
It has been observed that scaffolding materials stored in front of electrical building stair case
It has been noticed that mobile scaffolding materials and cable trey stored in a unsafe manner
Floor opening found inside the chlorination building, planks found removed which was provided for the protection.
It has been observed that steel rod penetrated for shelter support and rod found without mushroom caps
It has been noticed that excavator breaker found unattended In front of the access
excavated cable trench found without any barricading behind the electrical building in BPS 2
Access scaffolding platform found without inspection tag in chlorination building.
It has been observed that poor house keeping behind the assembly point (unattended pallets ,end caps scattered)
It has been observed that inside the BPS 1 COMPOUND waste over flowing from the temporary waste yard, Many time highli
Joint found on the electrical power cable used in electrical building at BPS 2
Temporary power cable found routing on the access of the electrical building and also cable was found between the door, the
Electrical light foundation pit found without barricading infront of the tank 1 in BPS 2.
Unsecured ladder found used as a access to go inside the chamber.
Scaffolding access platform of the outlet chamber of the tank 1 found without any inspection tag.
Diesel cane found kept at site in direct sun light without fire protection near the tank 2 area in BPS 2.
Rebar cap found not provided on the steel bar which is used for survey marking.
Ladder found secured by inappropriate rope in outlet chamber scaffolding of tank 1
It has been noticed that no any designated access and egress arrangements provided for MT receiving pit.
doing grinding work without handle
DeliverableLevel

roviding any secondary containment arrangements.


t interlocked properly .
ly fallen due to wind .

tion 2 ( Nearby Tank 02)


section 2 ( Nearby Guard house)

CH 3+000 Km Section 2 ( Towards summit reservoir road)


( Towards summit reservoir road)

on the off take line chamber


ng) @ Summit Reservoir Section 2A
ks @ CH 16+400 Km section 2 Samail area
m section 2 Samail area
2 Samail area
400 Km section 2 Samail area
location @ CH 3+900 Km Samail area Section 2
building @ BPS 3 Section 2

ored inside @ Chlorination building @ BPS 3 Section 2


e area @ Summit reservoir section 2
mmit reservoir section 2

affolding works
ards to the workmen

rip fall hazards


area near barbending work shope

trip fall hazards


hazards to the workmen

to the workmen

on site , which leads hazards to the workmen


ds in case of emergency
tion of fire fighting equipment's
tion of fire fighting equipment's
t at the electrical building groves
t at the electrical building groves
tem deviation
p fall hazards
any barrication arrangements, which leads unauthorized operation
vehicle and man movement occurred. which leads trip fall hazards
thorized operation of EOT crane
thorized operation of EOT crane

iding a secondary containment arrangements


UPVC pipes unattended
gements found missing .
e scaffolding,(NO edge protection )
bserved ,platform erection subcontractor not removed unwanted materials
bserved, unattended electrical cables, pipes scattered
lding stair case
a unsafe manner
hich was provided for the protection.
und without mushroom caps

ilding in BPS 2

ttended pallets ,end caps scattered)


m the temporary waste yard, Many time highlight this issues no action taken.

and also cable was found between the door, there is a chance of the cable damaged.
any inspection tag.
he tank 2 area in BPS 2.

rovided for MT receiving pit.