GROS ŒUVRE
BETON DE PROPRETE 24
SEMELLES ISOLES 24
AMORCES POTEAUX 24
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 24
POUTRES 1
LINTEAUX 1
Charge (T)
75 1,5*surf*char
α Br (cm2) b (m)
0.56 644 0.5
B (m) H (m)
3.5 0.3 2.3
H(m) Lt(m)
0.5 50
H(m) Lt(m)
0.3 150
H(m) Lt(m)
0.4 150
Nombre
GROS ŒUVRE
BETON DE PROPRETE 0
SEMELLES ISOLES 0
AMORCES POTEAUX 0
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 30
POUTRES 1
LINTEAUX 1
Charge (T)
30 1,5*surf*char
α Br (cm2) b (m)
0.56 257 0.2
B (m) H (m)
1.3 0.25 1.3
H(m) Lt(m)
0.3 0
H(m) Lt(m)
0.3 0
H(m) Lt(m)
0.4 130
Nombre
GROS ŒUVRE
BETON DE PROPRETE 0
SEMELLES ISOLES 0
AMORCES POTEAUX 0
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 0
POUTRES 1
LINTEAUX 1
Charge (T)
36 1,5*surf*char
α Br (cm2) b (m)
0.56 309 0.25
B (m) H (m)
1.5 0.25 1.4
H(m) Lt(m)
0.3 30
H(m) Lt(m)
0.3 72
H(m) Lt(m)
0.4 72
DEVIS QUANTITATIF ET ESTIMATIF
BATIMENT R+1 SIS YEUMBEUL
DESCRIPTION DES OUVRAGES UNITES QUANTITES
A. GROS ŒUVRE
1. TERRASSEMENT
Decapage terres vegetales m3 51.592
Fouilles
Fouilles en puit m3 54.016
Fouilles en rigole m3 72.000
Remblais contre fondations m3 94.097
Remblais sous dallages m3 40.332
SOUS TOTAL TERRASSEMENT
2. FONDATIONS
Beton de proprete dose a 150 kg/m3 sous :
Semelles isolees m3 3.020
Longrines de redressement m3 0.247
Murs de soubassement m3 1.982
Beton arme dose a 350 kg/m3
Semelles isolees m3 15.687
Amorces poteaux m3 1.089
Longrines de redressement m3 2.250
Longrines m3 6.750
Murs de soubassement en agglos pleins de 15×20×40 m2 120.00
Dallage en Beton arme dose a 250 kg/m3 m3 31.200
SOUS TOTAL FONDATIONS
3. ELEVATIONS
3.1 REZ-DE-CHAUSSEE
Beton arme dose a 350 kg/m3
Poteaux m3 5.760
Poutres m3 9.000
Linteaux m3 4.500
Escalier m3 2.000
Maconnerie en agglos creux de 15×20×40 m2 364.00
Planchers en corps creux
12+4 m2 0.00
16+4 m2 150.00
Planchers en dalles pleines des balcons m3 0.000
Enduits lisses au mortier de ciment
Sur murs ( ep = 1,5cm) m2 666.00
Sous planchers ( ep = 2cm) m2 150.00
Calfeutrement des baies ml 0.0
SOUS TOTAL ELEVATION RDC
3.2 ETAGE
Beton arme dose a 350 kg/m3
Poteaux m3 2.880
Poutres m3 7.200
Linteaux m3 3.600
Escaliers m3 2.000
Maconnerie en agglos creux de 15×20×40 m2 336.00
Planchers en corps creux
12+4 m2 0.00
16+4 m2 170.00
Planchers en dalles pleines des balcons m3 0.000
Enduits lisses au mortier de ciment
Sur murs ( ep = 1,5cm) m2 750.00
Sous planchers ( ep = 2cm) m2 170.00
Calfeutrement des baies ml 0.0
SOUS TOTAL ELEVATION ETAGE
B. SECOND ŒUVRE
1. ETANCHEITE
Etanchéité des toilettes étages m2 #VALUE!
Etanchéité balcons m2 #VALUE!
Etanchéité terrasse m2 #VALUE!
Releve d'etancheite ml #VALUE!
SOUS TOTAL ETANCHEITE
3. MENUISERIE
En bois
Porte en bois 70×220 U 7
Porte en bois 80×220 U 8
Fenetre en bois 60×60 U 4
Metallique
Porte d'entree 120×220 U 1
Porte cage d'escalier 80×220 U 1
Porte garage 300×220 U 0
En aluminium + Vitrerie
Porte salon 120×220 U 1
Porte garage 300×220 U 0
Fenetre 50×50 U 0
Fenetre 120×120 U 8
Fenetre 140×140 U 0
Fenetre 150×120 U 0
Fenetre patio 170×160 U 0
Fenetre 200×120 U 0
Fenetre case escalier U 0
Balcons U 1
SOUS TOTAL MENUISERIE
4. PEINTURE
Preparations et Badigeons m2 0.00
Peinture sur murs m2 0.00
Peinture sous plafonds m2 34.00
Peinture sous escalier m2 0.00
SOUS TOTAL PEINTURE
5. PLOMBERIE SANITAIRE
Installation et tuyauterie ENS 1
Appareillage ENS 1
Robinet de puisage U 0
Evier U 0
Lavabos U 0
Chaise anglais U 0
Chasse haute U 0
Baignoire U 0
Siphon de sol U 0
SOUS TOTAL PLOMBERIE
6. ELECTRICITE
Installation et cablages ENS 1
Appareillage ENS 1
Tableau compteurs
Dijoncteurs repartisseurs U 7
Bouton poussoir sonnerie U 3
Interrupteur U 45
Prise de courant U 29
Lampe U 57
SOUS TOTAL ELECTRICITE
2,500 128,980
-
3,000 162,048
3,500 252,000
2,500 235,243
2,000 80,664
858,935
40,000 120,800
30,000 7,410
30,000 59,460
-
100,000 1,568,700
150,000 163,350
150,000 337,500
150,000 1,012,500
7,000 840,000
75,000 2,340,000
6,449,720
150,000 864,000
150,000 1,350,000
150,000 675,000
150,000 300,000
7,000 2,548,000
-
- -
20,000 3,000,000
150,000 -
-
1,000 666,000
1,500 225,000
500 -
9,628,000
150,000 432,000
150,000 1,080,000
150,000 540,000
150,000 300,000
7,000 2,352,000
-
- -
20,000 3,400,000
150,000 -
-
1,000 750,000
1,500 255,000
500 -
9,109,000
150,000 -
150,000 -
150,000 -
7,000 -
7,000 -
-
7,000 -
-
1,000 -
1,500 -
500 -
1,500 -
-
26,045,655
7,000 -
7,000 -
7,000 -
1,000 -
-
40,000 280,000
50,000 400,000
10,000 40,000
-
100,000 100,000
50,000 50,000
7,000 -
-
100,000 100,000
-
-
60,000 480,000
-
-
-
-
-
200,000 200,000
1,650,000
500 -
1,000 -
1,000 34,000
34,000
600,000 400,000
400,000 600,000
10,000 -
30,000 -
100,000 -
100,000 -
20,000 -
100,000 -
7,000 -
1,000,000
700,000 700,000
300,000 300,000
-
-
-
-
-
-
1,000,000
3,684,000
N 29,729,655
QUANTITE
ELEMENTS DE CONTRUCTION
NIVEAUX (m3)
GROS ŒUVRE
BETON DE PROPRETE 6.94
SEMELLES ISOLEES 27.00
AMORCES POTEAUX 1.80
LONGRINES DE REDRESSEMENT 3.75
FONDATIONS LONGRINES 6.75
DALLAGES 31.20
MACONNERIE AGGLOS PLEINS DE 15×20×40 18.00
SOUBASSEMENT MORTIER DE POSE 3.00
SOUS TOTAL
POTEAUX 5.76
POUTRES 9.00
LINTEAUX 4.50
PLANCHERS EN CORPS CREUX
HOURDIS 0
12+4 NERVURES 0
DALLE DE COMPRESSION 0
HOURDIS 12
16+4 NERVURES 6
DALLE DE COMPRESSION 6
DALLE PLEINE DES BALCONS 0
ELEVATIONS MACONNERIE AGGLOS CREUX DE 15×20×40 36.4
ELEVATION MORTIER DE POSE 9.1
SUR MUR D'EPAISSEUR 1,5 cm 9.99
ENDUITS LISSES AU SOUS PLANCHER 2 cm 3.00
MORTIER DE CIMENT CALFEUTREMENT 1,5 cm 0.00
SOUS ESCALIER 2 cm 0.00
CARRELAGE SOLS 3 cm 0.00
MORTIER DE POSE POUR
CARRELAGE CARRELAGE MURS 2 cm 0.00
PLINTHES 1 cm 0.00
FORME DE PENTE 2% 0.00
ESCALIER 2
SOUS TOTAL
SECOND ŒUVRE
CARRELAGE (m2)
CARRELAGE SOLS 0
CARRELAGE MURS 0
PLINTHES 0
PEINTURE (m2)
LES BADIGEONS (CHAUX) 0
PEINTURE A EAU (SP) 0
PEINTURE A HUILE (MURS) 0
MENUISERIE
PORTE 70 4
EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)
16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110
60
90
90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )
50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 691.2 2% 13.824
130 1170 2% 23.4
90 405 2% 8.1
100 0 2% 0
100 3000 2% 60
125 0 2% 0
EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)
16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110
60
90
90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )
50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 345.6 2% 6.912
130 936 2% 18.72
90 324 2% 6.48
130 0 2% 0
125 0 2% 0
EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)
16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110
60
90
90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )
50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 0 2% 0
130 0 2% 0
90 0 2% 0
0 0 2% 0
125 0 2% 0
130 0 2% 0
Par 100 kg 31 Par 1 kg 62
DESIGNATIONS UNITES QUANTITES P.U
I. GROS ŒUVRE
1 Ciment Tonne 0 65,000 FCFA
2 Sable Cam 16 m3 0 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 0 135,000 FCFA
4 Grains de riz Cam 16 m3 0 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 0 450,000 FCFA
7 Fils de fer Kg 0 1,000 FCFA
Sous total Fondations
1 Ciment Tonne 16 65,000 FCFA
2 Sable Cam 16 m3 3 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 2 135,000 FCFA
4 Grains de riz Cam 16 m3 2 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 2 450,000 FCFA
7 Fils de fer Kg 40 1,000 FCFA
Sous total R-D-C
1 Ciment Tonne 30 65,000 FCFA
2 Sable Cam 16 m3 6 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 3 135,000 FCFA
4 Grains de riz Cam 16 m3 3 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 6 450,000 FCFA
7 Fils de fer Kg 120 1,000 FCFA
Sous total Etage
BP 55,825
- FCFA 10 SI 454,000
- FCFA 1 AMP 72,450
- FCFA 2 LR 119,550
- FCFA LONG 265,925
- FCFA DALL 590,000
- FCFA 1 MS 231,500
- FCFA 26 1,789,250
- FCFA RDC ETAGE
1,040,000 FCFA PO 241,250
240,000 FCFA POUT 369,720
270,000 FCFA LINT 207,280
270,000 FCFA PH16+4 1,646,800
- FCFA DP 124,035
900,000 FCFA ME 683,200
40,000 FCFA END 253,600
2,760,000 FCFA MORT,CARR 163,550
1,950,000 FCFA
480,000 FCFA
405,000 FCFA
405,000 FCFA
- FCFA
2,700,000 FCFA
120,000 FCFA
6,060,000 FCFA
8,820,000 FCFA
ESC 137,450
3,826,885
510,000 FCFA
270,000 FCFA
130,000 FCFA
910,000 FCFA
233,000 FCFA
466,000 FCFA
85,000 FCFA
784,000 FCFA
600,000 FCFA
400,000 FCFA
- FCFA
- FCFA
- FCFA
160,000 FCFA
480,000 FCFA
100,000 FCFA
1,740,000 FCFA
400,000 FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
7,194,000 FCFA
TERRASSE