Vous êtes sur la page 1sur 5

Your temporary usage period for IBM SPSS Statistics will expire in 6461 days.

NEW FILE.
DATASET NAME DataSet1 WINDOW=FRONT.

SAVE OUTFILE='E:\Documents\tugas statistik.sav'


/COMPRESSED.
DATASET ACTIVATE DataSet1.

SAVE OUTFILE='E:\Documents\tugas statistik.sav'


/COMPRESSED.
REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R ANOVA COLLIN TOL CHANGE ZPP
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT Y
/METHOD=ENTER X1 X2 X3 X4 X5 X6.

Regression

Notes
Output Created 23-APR-2018 14:16:23
Comments
Input Data E:\Documents\tugas
statistik.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working Data 24
File
Missing Value Handling Definition of Missing User-defined missing values
are treated as missing.
Cases Used Statistics are based on cases
with no missing values for
any variable used.
Syntax REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS
BCOV R ANOVA COLLIN
TOL CHANGE ZPP
/CRITERIA=PIN(.05)
POUT(.10)
/NOORIGIN
/DEPENDENT Y
/METHOD=ENTER X1 X2
X3 X4 X5 X6.
Resources Processor Time 00:00:00,05
Elapsed Time 00:00:00,11
Memory Required 5520 bytes
Additional Memory Required 0 bytes
for Residual Plots

[DataSet1] E:\Documents\tugas statistik.sav

Variables Entered/Removeda
Variables Variables
Model Entered Removed Method
1 No of Conduits, . Enter
GOR, BS&W ,
Gas, IPSC Net,
Grossb

a. Dependent Variable: Net Availability


b. All requested variables entered.

Model Summary
Change Statistics
Adjusted R Std. Error of the R Square
Model R R Square Square Estimate Change F Change df1
1 .969a .938 .916 10768.21623 .938 42.900 6
Model Summary
Change Statistics
Model df2 Sig. F Change
1 17 .000

a. Predictors: (Constant), No of Conduits, GOR, BS&W , Gas, IPSC Net, Gross

ANOVAa
Model Sum of Squares df Mean Square F Sig.
1 Regression 29846854520.65 6 4974475753.443 42.900 .000b
7
Residual 1971226172.301 17 115954480.724
Total 31818080692.95 23
8

a. Dependent Variable: Net Availability


b. Predictors: (Constant), No of Conduits, GOR, BS&W , Gas, IPSC Net, Gross

Coefficientsa
Standardized
Unstandardized Coefficients Coefficients
Model B Std. Error Beta t Sig.
1 (Constant) -9623.949 14715.177 -.654 .522
Gross -.859 .621 -1.386 -1.383 .185
IPSC Net .969 .476 1.043 2.034 .058
BS&W 29958.718 44552.990 .082 .672 .510
Gas .349 .204 .278 1.715 .104
GOR -7257.299 5541.886 -.101 -1.310 .208
No of Conduits 1533.920 691.330 1.077 2.219 .040

Coefficientsa
Correlations Collinearity Statistics
Model Zero-order Partial Part Tolerance VIF
1 (Constant)
Gross .949 -.318 -.083 .004 275.914
IPSC Net .944 .442 .123 .014 72.081
BS&W .250 .161 .041 .247 4.053
Gas .845 .384 .104 .139 7.212
GOR .037 -.303 -.079 .615 1.627
No of Conduits .945 .474 .134 .015 64.651

a. Dependent Variable: Net Availability

Coefficient Correlationsa
Model No of Conduits GOR BS&W Gas
1 Correlations No of Conduits 1.000 -.091 .634 .532
GOR -.091 1.000 -.178 -.385
BS&W .634 -.178 1.000 .425
Gas .532 -.385 .425 1.000
IPSC Net .654 -.390 .816 .406
Gross -.903 .295 -.810 -.612
Covariances No of Conduits 477937.331 -348590.918 19538444.545 74.901
GOR -348590.918 30712503.800 -43990144.955 -434.778
BS&W 19538444.545 -43990144.955 1984968876.932 3859.742
Gas 74.901 -434.778 3859.742 .042
IPSC Net 215.410 -1030.520 17306.203 .039
Gross -387.580 1017.051 -22425.807 -.077

Coefficient Correlationsa
Model IPSC Net Gross
1 Correlations No of Conduits .654 -.903
GOR -.390 .295
BS&W .816 -.810
Gas .406 -.612
IPSC Net 1.000 -.899
Gross -.899 1.000
Covariances No of Conduits 215.410 -387.580
GOR -1030.520 1017.051
BS&W 17306.203 -22425.807
Gas .039 -.077
IPSC Net .227 -.266
Gross -.266 .386

a. Dependent Variable: Net Availability


Collinearity Diagnosticsa
Variance Proportions
Model Dimension Eigenvalue Condition Index (Constant) Gross IPSC Net BS&W
1 1 6.468 1.000 .00 .00 .00 .00
2 .280 4.807 .01 .00 .00 .00
3 .172 6.124 .00 .00 .00 .11
4 .043 12.336 .23 .00 .00 .14
5 .029 14.975 .15 .00 .00 .03
6 .007 29.523 .00 .00 .16 .05
7 .000 115.493 .60 1.00 .83 .67

Collinearity Diagnosticsa
Variance Proportions
Model Dimension Gas GOR No of Conduits
1 1 .00 .00 .00
2 .00 .13 .00
3 .01 .14 .00
4 .14 .12 .00
5 .45 .41 .01
6 .04 .12 .18
7 .34 .08 .81

a. Dependent Variable: Net Availability

Vous aimerez peut-être aussi