LAMPIRAN D: TABEL DENSITY BERBAGAI MATERIAL

No. Material Loose Density Bank Density SF


1 Basalt 1.96 Ton/Lcm 2.97 Ton/Bcm 1.52
2 Bauxite, Kaoline 1.42 Ton/Lcm 1.9 Ton/Bcm 1.34
3 Caliche 1.25 Ton/Lcm 2.26 Ton/Bcm 1.81
4 Carnonite, Uranium ore 1.63 Ton/Lcm 2.2 Ton/Bcm 1.35
5 Cinders 0.56 Ton/Lcm 0.86 Ton/Bcm 1.54
6 Clay Natural bed 1.66 Ton/Lcm 2.02 Ton/Bcm 1.22
7 Clay dry 1.48 Ton/Lcm 1.84 Ton/Bcm 1.24
8 Clay wet 1.66 Ton/Lcm 2.09 Ton/Bcm 1.26
9 Clay and Gravel dry 1.42 Ton/Lcm 1.66 Ton/Bcm 1.17
10 Clay and Gravel wet 1.54 Ton/Lcm 1.84 Ton/Bcm 1.19
11 Coal Bituminous Ash (max) 0.65 Ton/Lcm 0.89 Ton/Bcm 1.37
12 Coal Bituminous Ash (min) 0.53 Ton/Lcm 0.59 Ton/Bcm 1.11
13 Coal Raw Anthracite 1.19 Ton/Lcm 1.6 Ton/Bcm 1.34
14 Coal Raw Bituminous 0.94 Ton/Lcm 1.3 Ton/Bcm 1.38
15 Coal Washed Anthracite 1.1 Ton/Lcm 1.1 Ton/Bcm 1
16 Coal Washed Bituminous 0.83 Ton/Lcm 0.83 Ton/Bcm 1
17 Decomposed Rock 25% rock, 75% Earth 1.57 Ton/Lcm 1.96 Ton/Bcm 1.25
18 Decomposed Rock 50% rock, 50% Earth 1.72 Ton/Lcm 2.28 Ton/Bcm 1.33
19 Decomposed Rock 75% rock, 25% Earth 1.96 Ton/Lcm 2.7 Ton/Bcm 1.38
20 Earth Dry packed 1.51 Ton/Lcm 1.9 Ton/Bcm 1.26
21 Earth Loam 1.25 Ton/Lcm 1.54 Ton/Bcm 1.23
22 Earth Wet excavated 1.6 Ton/Lcm 2.02 Ton/Bcm 1.26
23 Granite, broken 1.66 Ton/Lcm 2.73 Ton/Bcm 1.64
24 Gravel Dry 1.51 Ton/Lcm 1.69 Ton/Bcm 1.12
25 Gravel Dry (6-50mm) 1.69 Ton/Lcm 1.9 Ton/Bcm 1.12
26 Gravel Pitrun 1.93 Ton/Lcm 2.17 Ton/Bcm 1.12
27 Gravel Wet (6-50mm) 2.02 Ton/Lcm 2.26 Ton/Bcm 1.12
28 Gypsum broken 1.81 Ton/Lcm 3.17 Ton/Bcm 1.75
29 Gypsum crushed 1.6 Ton/Lcm 2.79 Ton/Bcm 1.74
30 Hematite, High Grade (max) 3.2 Ton/Lcm 3.8 Ton/Bcm 1.19
31 Hematite, High Grade (min) 2.37 Ton/Lcm 2.8 Ton/Bcm 1.18
32 Limestone, broken 1.54 Ton/Lcm 2.61 Ton/Bcm 1.69
33 Limestone, crushed 1.54 Ton/Lcm 1.54 Ton/Bcm 1
34 Magnetite 2.79 Ton/Lcm 3.26 Ton/Bcm 1.17
35 Pyrite 2.58 Ton/Lcm 3.03 Ton/Bcm 1.17
36 Sand Damp 1.69 Ton/Lcm 1.9 Ton/Bcm 1.12
37 Sand Dry, loose 1.42 Ton/Lcm 1.6 Ton/Bcm 1.13
38 Sand Wet 1.84 Ton/Lcm 2.08 Ton/Bcm 1.13
39 Sand and Clay Compacted 2.4 Ton/Lcm 2.4 Ton/Bcm 1
40 Sand and Clay loose 1.6 Ton/Lcm 2.02 Ton/Bcm 1.26
41 Sand and Clay Dry 1.72 Ton/Lcm 1.93 Ton/Bcm 1.12
42 Sand and Clay Wet 2.02 Ton/Lcm 2.23 Ton/Bcm 1.1
43 Sandstone 1.51 Ton/Lcm 2.52 Ton/Bcm 1.67
44 Shale 1.25 Ton/Lcm 1.66 Ton/Bcm 1.33
45 Slag broken 1.75 Ton/Lcm 2.94 Ton/Bcm 1.68
46 Snow Dry 0.13 Ton/Lcm 0.13 Ton/Bcm 1
47 Snow Wet 0.52 Ton/Lcm 0.52 Ton/Bcm 1
48 Stone Crushed 1.6 Ton/Lcm 2.67 Ton/Bcm 1.67
49 Taconite (max) 2.49 Ton/Lcm 3.62 Ton/Bcm 1.45
50 Taconite (min) 2.14 Ton/Lcm 3.09 Ton/Bcm 1.44
51 Taprock broken 1.75 Ton/Lcm 2.61 Ton/Bcm 1.49
52 Top Soil 0.95 Ton/Lcm 1.37 Ton/Bcm 1.44