Vous êtes sur la page 1sur 13

REPUBLIC OF CAMEROON

REPUBLIQUE DU CAMEROUN Peace - Work - Fatherland


Paix - Travail - Patrie ********
******** MINISTRY OF PUBLICS
MINISTERE DES TRAVAUX PUBLICS WORKS
******** ********
DELEGATION REGIONALE DE L'OUEST WESTERN REGIONAL
******** DELEGATION
DELEGATION DEPARTEMENTALE DU
********
HAUT-NKAM
DIVISIONAL DELEGATION
******** FOR UPPER NKAM
SERVICE TECHNIQUE ********
******** TECHNICAL SERVICE
*******

MARCHE N°01/M/DHNK/CKKEM/CIPM-TBEC/2019 POUR LES TRAVAUX DE CONSTRUCTION D'UNE


TRIBUNE DE 200 PLACES ASSISES ET REHABILITATION D'UNE PARTIE DE LA CLOTURE DU STADE
MUNICIPAL DE KEKEM DANS LE DPARTEMENT DU HAUT NKAM

ATTACHEMENT N°01 DES PRESTATIONS EXECUTEES AU MOIS DE Titulaire: ETS 2NBO


DECEMBRE 2019 BP: 15 461 Douala

UNIT
N° DESIGNATION PU QUANTITE MONTANT TOTAL POURCENTAGE
E
MARCH RELEV ACTUALI ACTUALIS %EXECU %VARIATIO
  MARCHE RELEVEE TE N
      E EE SEE EE
LOT 100 TRAVAUX PREPARATOIRES
  (Etudes)                    
101 Installation de chantier Ff 650 000 1,0 1,00 1,00 650 000 650 000 650 000 100,0% 0,00%
  Sous-Total 100           650 000 650 000 650 000 100,0% 0,00%
  LOT 200 TERRASSEMENT                    
201 Fouilles en rigoles et puits m3 1 000 48,0 5,78 5,78 48 000 5 780 5 780 100,0% -87,96%
202 Remblai avec apport de terre m3 3 000 50,0 0,00 0,00 150 000 0 0 #DIV/0! -100,00%
203 Dressage au sable des parties dégradées de m3 5 000 248,0 0,00 0,00 1 240 000 0 0 #DIV/0! -100,00%
l’Aire de jeux
  Sous-Total 200           1 438 000 5 780 5 780 100,0% -99,60%
  LOT 300 FONDATION (clôture de 110
ml et Tribune (200 places)                    
  I-CLOTURE                    
Béton de propreté ( ép,= 5cm) dosé à 150
301 kg/m3
m3 80 000 3,00 0,41 0,41 240 000 32 800 32 800 100,0% -86,33%
302 Agglos de 20*20*40 bourrés m2 7 000 88 0 0,00 616 000 0 0   -100,00%
BA dosé à 350kg/m3 (Semelles, longrines et
303 amorces poteaux)
m3 110 000 5,94 6,12 6,12 653 400 673 200 673 200 100,0% 3,03%

BA dosé à 350kg/m3 pour (Chaînage haut


304 m3 110 000 7,13 6,19 6,19 784 300 680 900 680 900 100,0% -13,18%
15x20 cm et Poteaux de 20x20 cm) y/c
renforcement des autres poteaux existants,
305 Agglos de 15x20x40 pour élévation m2 6 000 308 225,16 225,16 1 848 000 1 350 960 1 350 960 100,0% -26,90%
306 Enduits au mortier de ciment ml 2 500 1360,5 0 0 3 401 250 0 0 #DIV/0! -100,00%
  Sous-Total 300           7 542 950 2 737 860 2 737 860 100,0% -63,70%
  II- TRIBUNE ET GRADINS                    
  LOT 400 FONDATIONS                    
401 Fouilles en rigoles et en puits m3 1 000 52,3 67,86 67,86 52 300 67 860 67 860 100,0% 29,75%
402 Remblai avec apport de terre m² 3 000 100 226,81 226,81 300 000 680 430 680 430 100,0% 126,81%
Béton de propreté ( ép,= 5cm) dosé à 150
403 kg/m3
m3 80 000 3,23 5,214 5,21 258 400 417 120 417 120 100,0%
61,42%
404 Agglos de 20*20*40 bourrés m2 7 000 122,9 73,09 73,09 860 300 511 630 511 630 100,0% -40,53%
BA dosé à 350kg/m3 ( Semelles, longrines
405 et amorces poteaux)
m3 110 000 9,88 12,16 12,16 1 086 800 1 337 600 1 337 600 100,0% 23,08%

Béton légèrement armé de 300 kg/m3 pour


406 dallage ép, 8 cm
m2 110 000 125,84 206,661 206,66 13 842 400 22 732 710 22 732 710 100,0% 64,23%

  Sous-Total 400           16 400 200 25 747 350 25 747 350 100,0% 56,99%
  LOT 500 R D C                    
Maçonnerie en élévation de 10x20x40 cm
501 creux
m2 5 500 20 15 15 110 000 82 500 82 500
100,0% -25,00%
Maçonnerie en élévation de 15x20x40 cm
502 creux
m2 6 000 313 224,812 224,812 1 878 000 1 348 872 1 348 872 100,0% -28,18%

Béton armé dosé à 350 kg/m3 pour poteaux,


503 poutre et linteaux
m3 110 000 11,9 13,1 13,1 1 309 000 1 441 000 1 441 000 100,0% 10,08%

504 Béton armé dosé à 350 kg/m3 pour Gradins m3 110 000 15,8 11,757 11,757 1 738 000 1 293 270 1 293 270 100,0% -25,59%
505 Plancher à hourdis m2 2 000 139,4 125,86 125,86 278 800 251 720 251 720 100,0% -9,71%
Enduits au mortier de ciment dosé à
506 400kg/m3 taloché sur mur
m2 2 000 999 655,3 655,3 1 998 000 1 310 600 1 310 600 100,0% -34,40%

Enduits au mortier de ciment dosé à


507 400kg/m3 taloché sous dalle et sous Gradins
m2 2 000 199,4 191,41 191,41 398 800 382 820 382 820 100,0% -4,01%

  Sous-Total 500           7 710 600 6 110 782 6 110 782 100,0% -20,75%
  LOT 600 ETAGE                    
601 Gardes corps Métallique ml 60 000 74,5 69,7 69,7 4 470 000 4 182 000 4 182 000 100,0% -6,44%
Béton armé dosé à 350 kg/m3 pour poteaux,
602 poutre et Chaînage haut
m3 110 000 5,31 7,84 7,84 584 100 862 400 862 400 100,0% 47,65%

  Sous-Total 600           5 054 100 5 044 400 5 044 400 100,0% -0,19%
LOT 700 CHARPENTE-
  COUVERTURE                    
Pannes en chevrons 8cmx8cm et lattes en
701 bois de charpente y/c toutes sujétions de m3 120 000 3,1 1,663 1,663 372 000 199 560 199 560 100,0% -46,35%
fixations de pose

702 Planche de rive y/c toutes sujétions de pose ml 12 000 78,2 74,6 74,6 938 400 895 200 895 200 100,0% -4,60%
703 Tôles de rive y/c toutes sujétions de pose ml 3 500 78,2 74,6 74,6 273 700 261 100 261 100 100,0% -4,60%
704 Tôles Bac Alu 5/10e m2 5 500 350 293,8 293,8 1 925 000 1 615 900 1 615 900 100,0% -16,06%

705 Divers accessoires de pose y/c toutes Ff 60 000 1 1 1 60 000 60 000 100,0% 0,00%
sujétions de pose 60 000
  Sous-Total 700           3 569 100 3 031 760 3 031 760 100,0% -15,06%
  LOT 800 MENUISERIE METALLIQUE                    
801 Portail de 3mx2mx220 U 300 000 1 1 1 300 000 300 000 300 000 100,0% 0,00%

802 Porte Métallique de10x220 fixée sur cadre U 110 000 2 2 2 220 000 220 000 220 000 100,0% 0,00%
en bois dûr
Grille de protection sur fenêtres de 150x120
803 fixées sur cadre en bois
U 50 000 4 4 4 200 000 200 000 200 000 100,0% 0,00%

804 Grille de protection sur fenêtres de 50x120 U 40 000 2 2 2 80 000 80 000 80 000 100,0% 0,00%
fixées sur cadre en bois dur

805 Grille de protection sur fenêtres de 50x80 U 40 000 8 8 8 320 000 320 000 320 000 100,0% 0,00%
fixées sur cadre en bois dur
  Sous-Total 800           1 120 000 1 120 000 1 120 000 100,0% 0,00%
  LOT 900 MENUISERIE ALUMINIUM                    
901 Fenêtre de 150x120 vitrées U 70 000 4 4 4 280 000 280 000 280 000 100,0% 0,00%
902 Fenêtre de 50x120 vitrées U 50 000 2 2 2 100 000 100 000 100 000 100,0% 0,00%
903 Fenêtre de 80x50vitrées U 50 000 8 8 8 400 000 400 000 400 000 100,0% 0,00%
  Sous-Total 900           780 000 780 000 780 000 100,0% 0,00%
LOT 1000 MENUISERIE BOIS
  INTERIEUR
                   
1001 Porte en bois de 100x220 U 50 000 2 2 2 100 000 100 000 100 000 100,0% 0,00%
1002 Porte en bois de 70x220 U 40 000 8 8 8 320 000 320 000 320 000 100,0% 0,00%
  Sous-Total 1000           420 000 420 000 420 000 100,0% 0,00%
  LOT 1100 ELECTRICITE                    
  a-Mise en terre                    
1101 Cuivre nu de 29 mmm² Ml 1 500 70,1 70,1 70,1 105 150 105 150 105 150 100,0% 0,00%
1102 Serre câble o 16 U 1 500 6 6 6 9 000 9 000 9 000 100,0% 0,00%
1103 Piquets de terre de 2,00 m U 5 000 2 2 2 10 000 10 000 10 000 100,0% 0,00%
1104 Barrette de coupure U 5 000 1 1 1 5 000 5 000 5 000 100,0% 0,00%
  Sous-Total 1100           129 150 129 150 129 150 100,0% 0,00%
  b-Foureautage                    
1105 Tube annelé o 16 rl 5 000 3 3 3 15 000 15 000 15 000 100,0% 0,00%
1106 Tube annelé o20 rl 5 000 2 2 2 10 000 10 000 10 000 100,0% 0,00%
1107 Boîte d'encastrement U 500 2 2 2 1 000 1 000 1 000 100,0% 0,00%
1108 Boîte de dérivation U 4 000 4 4 4 16 000 16 000 16 000 100,0% 0,00%
  Sous-Total Fourreautage           42 000 42 000 42 000 100,0% 0,00%
  c-Câblage et filerie                    
1109 Câble THT 1,5 mm² rl 14 000 4 4 4 56 000 56 000 56 000 100,0% 0,00%
1110 Câble THT 2,5 mm² rl 15 000 2 2 2 30 000 30 000 30 000 100,0% 0,00%
1111 Câble THT 4 mm² rl 16 000 2 2 2 32 000 32 000 32 000 100,0% 0,00%
1112 Barrette de jonction 10 A U 1 500 15 15 15 22 500 22 500 22 500 100,0% 0,00%
1113 Barrette de jonction 16 A U 1 500 12 13 13 18 000 19 500 19 500 100,0% 8,33%
  Sous-Total Cablage           158 500 160 000 160 000 100,0% 0,95%
  d-Appareils et appareillages                    
1114 Interrupteurs SA U 1 200 4 10 10 4 800 12 000 12 000 100,0% 150,00%
1115 Interrupteurs VV U 1 200 6 0 0 7 200 0 0 #DIV/0! -100,00%
1116 Prise de courant 2p+T U 1 200 8 8 8 9 600 9 600 9 600 100,0% 0,00%
1117 Prise de courant 3p+T U 1 200 6 3 3 7 200 3 600 3 600 100,0% -50,00%
1118 Prise de courant 2p+T U 1 200 4 4 4 4 800 4 800 4 800 100,0% 0,00%
1119 Intérrupteur SA étanche U 1 200 8 6 6 9 600 7 200 7 200 100,0% -25,00%
1120 Tableau de commnade +équipement U 40 000 2 2 2 80 000 80 000 80 000 100,0% 0,00%
1121 Applique sanitaire complète U 3 000 8 12 12 24 000 36 000 36 000 100,0% 50,00%
1122 Eclairage extérieur avec projecteur U 15 000 12 12 12 180 000 180 000 180 000 100,0% 0,00%
1123 Réglage R B éco GC/IL I36 U 1 000 12 12 12 12 000 12 000 12 000 100,0% 0,00%
1124 Divers accessoires de pose Ff 100 000 1 1 1 100 000 100 000 100 000 100,0% 0,00%
  Sous-Total Appareil-Appareillage           439 200 445 200 445 200 100,0% 1,37%
LOT 1200 PLOMBERIES-
  SANITAIRES-ASSAINISSEMENT
                   

1201 Raccordement au réseau C D E y/c toutes Ff 300 000 1 0 0 300 000 0 0 #DIV/0! -100,00%
sujetions
1202 Fourniture et pose du W C complet U 50 000 4 4 4 200 000 200 000 200 000 100,0% 0,00%

1203 Fourniture et pose des lavabos de 50 avec U 35 000 4 4 4 140 000 140 000 140 000 100,0% 0,00%
presto

1204 Fourniture et pose de bac en porcelaine U 15 000 6 0 0 90 000 0 0 #DIV/0! -100,00%


avec robinet évier presto pourla lave main
1205 Fourniture et pose de miroir U 8 000 4 4 4 32 000 32 000 32 000 100,0% 0,00%
1206 Fourniture et pose porte savon U 2 500 8 8 8 20 000 20 000 20 000 100,0% 0,00%
1207 Fourniture et pose de serviette U 2 500 4 4 4 10 000 10 000 10 000 100,0% 0,00%
1208 Fourniture et pose papier hygiénique en U 2 000 4 4 4 8 000 8 000
porcelaine 8 000 100,0% 0,00%

1209 Fourniture et pose de colonne douche U 12 000 4 4 4 48 000 48 000


complète 48 000 100,0% 0,00%
1210 Fourniture et posede siphon de sol U 2 000 10 10 10 20 000 20 000 20 000 100,0% 0,00%
1211 Assainissement complète Ff 10 000 1 1 1 10 000 10 000 10 000 100,0% 0,00%

1222 Evacuation complète y/c construction des Ff 25 000 1 1 1 25 000 25 000


regards 50x50 25 000 100,0% 0,00%
1223 Fosse septique fonctionnelle y/c Puisards U 400 000 1 1 1 400 000 400 000 400 000 100,0% 0,00%
1224 Accessoires de pose Ff 44 339 1 1 1 44 339 44 339 44 339 100,0% 0,00%
  Sous-Total 1200           1 347 339 957 339 957 339 100,0% -28,95%
  LOT 1300 CARELAGE                    
1301 Carreaux mosaîques de 5x5 sol toilettes m² 9 500 37,8 158 158 359 100 1 501 000 1 501 000 100,0% 317,99%
1302 Carreaux de faîences sur mur des toilettes m² 8 500 75 96 96 637 500 816 000 816 000 100,0% 28,00%
  Sous-Total 1300           996 600 2 317 000 2 317 000 100,0% 132,49%
  LOT 1400 PEINTURE                    
1401 Impression à la chaux m² 390 746 846,70 846,7 290 940 330 213 330 213 100,0% 13,50%
1402 Mur tribune intérieure pantex 1300 m² 1 100 413 628,70 628,7 454 300 691 570 691 570 100,0% 52,23%
1403 Mur tribune extérieur 1800 m² 1 050 373 218,43 218,43 391 650 229 352 229 352 100,0% -41,44%
1404 Menuiserie bois et Métallique m² 1 200 65 69,06 69,06 78 000 82 872 82 872 100,0% 6,25%
  Sous-Total 1400           1 214 890 1 334 007 1 334 007 100,0% 9,80%
  LOT 1500 V R D                    

  Caniveaux enbéton armé +dalettes en béton ml 5 000 398 0 0 1 990 000 0 0 #DIV/0! -100,00%
aux entrées
  Regards U 5 000 6 0 0 30 000 0 0 #DIV/0! -100,00%
  Sous Total 1500           2 020 000 0 0 #DIV/0! -100,00%
  MONTANT HORS TAXES           51 032 629 51 032 628 51 032 628 100,0% 0,00%
  TVA(19,25%)           9 823 781 9 823 781 9 823 781    
  IR(2,2%)           1 122 718 1 122 718 1 122 718    
  TOTAL GENERAL TTC           60 856 410 60 856 408 60 856 408    
NET A MANDATER           49 909 911 49 909 910 49 909 910    
L'ENTREPRISE LE MAITRE D'OEUVRE
     
     
     
     
     
     
     
     
     
     
     
     
                 

REPUBLIC OF CAMEROON
REPUBLIQUE DU CAMEROUN Peace - Work - Fatherland
Paix - Travail - Patrie ********
******** MINISTRY OF PUBLICS
MINISTERE DES TRAVAUX PUBLICS WORKS
******** ********
DELEGATION REGIONALE DE L'OUEST WESTERN REGIONAL
******** DELEGATION
DELEGATION DEPARTEMENTALE DU
********
HAUT-NKAM
DIVISIONAL DELEGATION
******** FOR UPPER NKAM
SERVICE TECHNIQUE ********
******** TECHNICAL SERVICE
*******
MARCHE N°01/M/DHNK/CKKEM/CIPM-TBEC/2019 POUR LES TRAVAUX DE CONSTRUCTION D'UNE
TRIBUNE DE 200 PLACES ASSISES ET REHABILITATION D'UNE PARTIE DE LA CLOTURE DU STADE
MUNICIPAL DE KEKEM DANS LE DPARTEMENT DU HAUT NKAM

ATTACHEMENT N°01 DES PRESTATIONS EXECUTEES AU MOIS DE Titulaire: ETS 2NBO


DECEMBRE 2019 BP: 15 461 Douala

UNIT
N° DESIGNATION PU QUANTITE MONTANT TOTAL POURCENTAGE
E
MARC RELEVE ACTUAL ACTUALIS %EXEC %VARIATIO
  MARCHE RELEVEE UTE N
      HE E ISEE EE
LOT 100 TRAVAUX
  PREPARATOIRES (Etudes)                    
101 Installation de chantier Ff 650 000 1,0 1,00 1,00 650 000 650 000 650 000 100,0% 0,00%
  Sous-Total 100           650 000 650 000 650 000 100,0% 0,00%
  LOT 200 TERRASSEMENT                    
201 Fouilles en rigoles et puits m3 1 000 48,0 5,78 5,78 48 000 5 780 5 780 100,0% -87,96%
202 Remblai avec apport de terre m3 3 000 50,0 0,00 0,00 150 000 0 0 #DIV/0! -100,00%
203 Dressage au sable des parties dégradées m3 5 000 248,0 0,00 0,00 1 240 000 0 0 #DIV/0! -100,00%
De l ‘aire de jeux
  Sous-Total 200           1 438 000 5 780 5 780 100,0% -99,60%
LOT 300 FONDATION (clôture de 110
 
ml et Tribune (200 places)                    
  I-CLOTURE                    
Béton de propreté ( ép,= 5cm) dosé à 150
301 kg/m3
m3 80 000 3,00 0,41 0,41 240 000 32 800 32 800 100,0% -86,33%
302 Agglos de 20*20*40 bourrés m2 7 000 88 0 0,00 616 000 0 0   -100,00%
BA dosé à 350kg/m3 (Semelles, longrines
303 et amorces poteaux)
m3 110 000 5,94 6,12 6,12 653 400 673 200 673 200 100,0% 3,03%
BA dosé à 350kg/m3 pour (Chaînage haut
15x20 cm et Poteaux de 20x20 cm) y/c
304 renforcement des autres poteaux
m3 110 000 7,13 6,19 6,19 784 300 680 900 680 900 100,0% -13,18%
existants,
305 Agglos de 15x20x40 pour élévation m2 6 000 308 225,16 225,16 1 848 000 1 350 960 1 350 960 100,0% -26,90%
306 Enduits au mortier de ciment ml 2 500 1360,5 0 0 3 401 250 0 0 #DIV/0! -100,00%
  Sous-Total 300           7 542 950 2 737 860 2 737 860 100,0% -63,70%
  II- TRIBUNE ET GRADINS                    
  LOT 400 FONDATIONS                    
401 Fouilles en rigoles et en puits m3 1 000 52,3 67,86 67,86 52 300 67 860 67 860 100,0% 29,75%
402 Remblai avec apport de terre m² 3 000 100 226,81 226,81 300 000 680 430 680 430 100,0% 126,81%
Béton de propreté ( ép,= 5cm) dosé à 150
403 kg/m3
m3 80 000 3,23 5,214 5,21 258 400 417 120 417 120 100,0%
61,42%
404 Agglos de 20*20*40 bourrés m2 7 000 122,9 73,09 73,09 860 300 511 630 511 630 100,0% -40,53%
BA dosé à 350kg/m3 (Semelles, longrines
405 et amorces poteaux)
m3 110 000 9,88 12,16 12,16 1 086 800 1 337 600 1 337 600 100,0% 23,08%
Béton légèrement armé de 300 kg/m3
406 pour dallage ép, 8 cm
m2 110 000 125,84 207,842 207,842 13 842 400 22 862 620 22 862 620 100,0% 65,16%
  Sous-Total 400           16 400 200 25 877 260 25 877 260 100,0% 57,79%
  LOT 500 R D C                    
Maçonnerie en élévation de 10x20x40 cm
501 creux
m2 5 500 20 15 15 110 000 82 500 82 500
100,0% -25,00%
Maçonnerie en élévation de 15x20x40 cm
502 creux
m2 6 000 313 224,812 224,812 1 878 000 1 348 872 1 348 872 100,0% -28,18%
Béton armé dosé à 350 kg/m3 pour
503 poteaux, poutre et linteaux
m3 110 000 11,9 13,1 13,1 1 309 000 1 441 000 1 441 000 100,0% 10,08%
Béton armé dosé à 350 kg/m3 pour
504 Gradins
m3 110 000 15,8 11,757 11,757 1 738 000 1 293 270 1 293 270 100,0% -25,59%
505 Plancher à hourdis m2 2 000 139,4 125,86 125,86 278 800 251 720 251 720 100,0% -9,71%
Enduits au mortier de ciment dosé à
506 400kg/m3 taloché sur mur
m2 2 000 999 655,3 655,3 1 998 000 1 310 600 1 310 600 100,0% -34,40%
Enduits au mortier de ciment dosé à
507 400kg/m3 taloché sous dalle et sous m2 2 000 199,4 126,41 126,41 398 800 252 820 252 820 100,0% -36,60%
Gradins
  Sous-Total 500           7 710 600 5 980 782 5 980 782 100,0% -22,43%
  LOT 600 ETAGE                    
601 Gardes corps Métallique ml 60 000 74,5 69,7 69,7 4 470 000 4 182 000 4 182 000 100,0% -6,44%
Béton armé dosé à 350 kg/m3 pour
602 poteaux, poutre et Chaînage haut
m3 110 000 5,31 7,84 7,84 584 100 862 400 862 400 100,0% 47,65%
  Sous-Total 600           5 054 100 5 044 400 5 044 400 100,0% -0,19%
LOT 700 CHARPENTE-
  COUVERTURE                    
Pannes en chevrons 8cmx8cm et lattes en
701 bois de charpente y/c toutes sujétions de m3 120 000 3,1 1,663 1,663 372 000 199 560 199 560 100,0% -46,35%
fixations de pose
Planche de rive y/c toutes sujétions de
702 pose
ml 12 000 78,2 74,6 74,6 938 400 895 200 895 200 100,0% -4,60%
703 Tôles de rive y/c toutes sujétions de pose ml 3 500 78,2 74,6 74,6 273 700 261 100 261 100 100,0% -4,60%
704 Tôles Bac Alu 5/10e m2 5 500 350 293,8 293,8 1 925 000 1 615 900 1 615 900 100,0% -16,06%
705 Divers accessoires de pose y/c toutes Ff 60 000 1 1 1 60 000 60 000 100,0% 0,00%
sujétions de pose 60 000
  Sous-Total 700           3 569 100 3 031 760 3 031 760 100,0% -15,06%
LOT 800 MENUISERIE
  METALLIQUE
                   
801 Portail de 3mx2mx220 U 300 000 1 1 1 300 000 300 000 300 000 100,0% 0,00%
802 Porte Métallique de10x220 fixée sur U 110 000 2 2 2 220 000 220 000 220 000 100,0% 0,00%
cadre en bois dûr
Grille de protection sur fenêtres de
803 150x120 fixée sur cadre en bois
U 50 000 4 4 4 200 000 200 000 200 000 100,0% 0,00%

804 Grille de protection sur fenêtres de U 40 000 2 2 2 80 000 80 000 80 000 100,0% 0,00%
50x120 fixée sur cadre en bois dur
805 Grille de protection sur fenêtres de 50x80 U 40 000 8 8 8 320 000 320 000 320 000 100,0% 0,00%
fixées sur cadre en bois dur
  Sous-Total 800           1 120 000 1 120 000 1 120 000 100,0% 0,00%
LOT 900 MENUISERIE
  ALUMINIUM
                   
901 Fenêtre de 150x120 vitrées U 70 000 4 4 4 280 000 280 000 280 000 100,0% 0,00%
902 Fenêtre de 50x120 vitrées U 50 000 2 2 2 100 000 100 000 100 000 100,0% 0,00%
903 Fenêtre de 80x50vitrées U 50 000 8 8 8 400 000 400 000 400 000 100,0% 0,00%
  Sous-Total 900           780 000 780 000 780 000 100,0% 0,00%
LOT 1000 MENUISERIE BOIS
  INTERIEUR
                   
1001 Porte en bois de 100x220 U 50 000 2 2 2 100 000 100 000 100 000 100,0% 0,00%
1002 Porte en bois de 70x220 U 40 000 8 8 8 320 000 320 000 320 000 100,0% 0,00%
  Sous-Total 1000           420 000 420 000 420 000 100,0% 0,00%
  LOT 1100 ELECTRICITE                    
  a-Mise en terre                    
1101 Cuivre nu de 29 mmm² Ml 1 500 70,1 70,1 70,1 105 150 105 150 105 150 100,0% 0,00%
1102 Serre câble o 16 U 1 500 6 6 6 9 000 9 000 9 000 100,0% 0,00%
1103 Piquets de terre de 2,00 m U 5 000 2 2 2 10 000 10 000 10 000 100,0% 0,00%
1104 Barrette de coupure U 5 000 1 1 1 5 000 5 000 5 000 100,0% 0,00%
  Sous-Total 1100           129 150 129 150 129 150 100,0% 0,00%
  b-Fouretage                    
1105 Tube annelé o 16 rl 5 000 3 3 3 15 000 15 000 15 000 100,0% 0,00%
1106 Tube annelé o20 rl 5 000 2 2 2 10 000 10 000 10 000 100,0% 0,00%
1107 Boîte d'encastrement U 500 2 2 2 1 000 1 000 1 000 100,0% 0,00%
1108 Boîte de dérivation U 4 000 4 4 4 16 000 16 000 16 000 100,0% 0,00%
  Sous-Total Fourreau Tage           42 000 42 000 42 000 100,0% 0,00%
  c-Câblage et filerie                    
1109 Câble THT 1,5 mm² rl 14 000 4 4 4 56 000 56 000 56 000 100,0% 0,00%
1110 Câble THT 2,5 mm² rl 15 000 2 2 2 30 000 30 000 30 000 100,0% 0,00%
1111 Câble THT 4 mm² rl 16 000 2 2 2 32 000 32 000 32 000 100,0% 0,00%
1112 Barrette de jonction 10 A U 1 500 15 15 15 22 500 22 500 22 500 100,0% 0,00%
1113 Barrette de jonction 16 A U 1 500 12 13 13 18 000 19 500 19 500 100,0% 8,33%
  Sous-Total Câblage           158 500 160 000 160 000 100,0% 0,95%
  d-Appareils et appareillages                    
1114 Interrupteurs SA U 1 200 4 10 10 4 800 12 000 12 000 100,0% 150,00%
1115 Interrupteurs VV U 1 200 6 0 0 7 200 0 0 #DIV/0! -100,00%
1116 Prise de courant 2p+T U 1 200 8 8 8 9 600 9 600 9 600 100,0% 0,00%
1117 Prise de courant 3p+T U 1 200 6 3 3 7 200 3 600 3 600 100,0% -50,00%
1118 Prise de courant 2p+T U 1 200 4 4 4 4 800 4 800 4 800 100,0% 0,00%
1119 Interrupteur SA étanche U 1 200 8 6 6 9 600 7 200 7 200 100,0% -25,00%
1120 Tableau de commande +équipement U 40 000 2 2 2 80 000 80 000 80 000 100,0% 0,00%
1121 Applique sanitaire complète U 3 000 8 12 12 24 000 36 000 36 000 100,0% 50,00%
1122 Eclairage extérieur avec projecteur U 15 000 12 12 12 180 000 180 000 180 000 100,0% 0,00%
1123 Réglage R B éco GC/IL I36 U 1 000 12 12 12 12 000 12 000 12 000 100,0% 0,00%
1124 Divers accessoires de pose Ff 100 000 1 1 1 100 000 100 000 100 000 100,0% 0,00%
  Sous-Total Appareil-Appareillage           439 200 445 200 445 200 100,0% 1,37%
LOT 1200 PLOMBERIES-
  SANITAIRES-ASSAINISSEMENT
                   
1201 Raccordement au réseau C D E y/c toutes Ff 300 000 1 0 0 300 000 0 0 #DIV/0! -100,00%
sujétions
1202 Fourniture et pose du W C complet U 50 000 4 4 4 200 000 200 000 200 000 100,0% 0,00%
1203 Fourniture et pose des lavabos de 50 avec U 35 000 4 4 4 140 000 140 000 140 000 100,0% 0,00%
presto
Fourniture et pose de bac en porcelaine
1204 avec robinet évier presto pour la lave U 15 000 6 0 0 90 000 0 0 #DIV/0! -100,00%
main
1205 Fourniture et pose de miroir U 8 000 4 4 4 32 000 32 000 32 000 100,0% 0,00%
1206 Fourniture et pose porte savon U 2 500 8 8 8 20 000 20 000 20 000 100,0% 0,00%
1207 Fourniture et pose de serviette U 2 500 4 4 4 10 000 10 000 10 000 100,0% 0,00%
1208 Fourniture et pose papier hygiénique en U 2 000 4 4 4 8 000 8 000
porcelaine 8 000 100,0% 0,00%
1209 Fourniture et pose de colonne douche U 12 000 4 4 4 48 000 48 000
complète 48 000 100,0% 0,00%
1210 Fourniture et possède siphon de sol U 2 000 10 10 10 20 000 20 000 20 000 100,0% 0,00%
1211 Assainissement complète Ff 10 000 1 1 1 10 000 10 000 10 000 100,0% 0,00%
1222 Evacuation complète y/c construction des Ff 25 000 1 1 1 25 000 25 000
regards 50x50 25 000 100,0% 0,00%
1223 Fosse septique fonctionnelle y/c Puisards U 400 000 1 1 1 400 000 400 000 400 000 100,0% 0,00%
1224 Accessoires de pose Ff 44 339 1 1 1 44 339 44 339 44 339 100,0% 0,00%
  Sous-Total 1200           1 347 339 957 339 957 339 100,0% -28,95%
  LOT 1300 CARELAGE                    
1301 Carreaux mosaïques de 5x5 sol toilettes m² 9 500 37,8 158 158 359 100 1 501 000 1 501 000 100,0% 317,99%
1302 Carreaux de faïences sur mur des toilettes m² 8 500 75 96 96 637 500 816 000 816 000 100,0% 28,00%
  Sous-Total 1300           996 600 2 317 000 2 317 000 100,0% 132,49%
  LOT 1400 PEINTURE                    
1401 Impression à la chaux m² 390 746 846,94 846,935 290 940 330 305 330 305 100,0% 13,53%
1402 Mur tribune intérieure pantex 1300 m² 1 100 413 628,70 628,7 454 300 691 570 691 570 100,0% 52,23%
1403 Mur tribune extérieur 1800 m² 1 050 373 218,43 218,43 391 650 229 352 229 352 100,0% -41,44%
1404 Menuiserie bois et Métallique m² 1 200 65 69,06 69,06 78 000 82 872 82 872 100,0% 6,25%
  Sous-Total 1400           1 214 890 1 334 098 1 334 098 100,0% 9,81%
  LOT 1500 V R D                    
  Caniveaux en béton armé +dalettes en ml 5 000 398 0 0 1 990 000 0 0 #DIV/0! -100,00%
béton aux entrées
  Regards U 5 000 6 0 0 30 000 0 0 #DIV/0! -100,00%
  Sous Total 1500           2 020 000 0 0 #DIV/0! -100,00%
  MONTANT HORS TAXES           51 032 629 51 032 629 51 032 629 100,0% 0,00%
  TVA(19,25%)           9 823 781 9 823 781 9 823 781    
  IR(2,2%)           1 122 718 1 122 718 1 122 718    
  TOTAL GENERAL TTC           60 856 410 60 856 410 60 856 410    