1 1 Études, installation de chantier et implantation Ft 3,000,000 1 1 0.8 0.2 1 3,000,000 3,000,000 2,400,000 600,000 3,000,000 1
2 2 Amenée net repli de matériels Ft 2,000,000 1 1 0.5 0.5 1 2,000,000 2,000,000 1,000,000 1,000,000 2,000,000 1
3 3 Projet d’exécution et dossier de recollement Ft 1,000,000 1 1 0.5 0.5 1 1,000,000 1,000,000 500,000 500,000 1,000,000 1
6 102 Démolition des ouvrages existants et dépôts hors Ft 2,307,200 1 1 1 0 1 2,307,200 2,307,200 2,307,200 - 2,307,200 1
8 401j Construction des dalots en BA 1x1 ml 400,000 16 39.85 2 37.85 39.85 6,400,000 15,940,000 800,000 15,140,000 15,940,000 1
9 401j Prolongement de deux dalots en BA 1x1 ml 400,000 30 23 1.2 21.8 23 12,000,000 9,200,000 480,000 8,720,000 9,200,000 1
TVA
MONTANT TTC
Page 2
A
Lettre-commande n°02615/LC/MINHDU/CMPM/17
Titulaire: BGT SARL BP: 564 Garoua
3/26/2018
Montant: 33 447 200 Elements positifs Elements négatifs Total Taxes (Fcfa)
Avenant: Prestations Retenue rembours pénalité des
Montant total: 33 886 786 AIR inclue de garantie d'avance de retard paiements AIR TVA
Page 3
Lettre-commande n°02615/LC/MINHDU/CMPM/17 B
Titulaire: BGT SARL BP: 564 Garoua
3/26/2018
Montant: 33 447 200 Elements positifs Elements négatifs Total Taxes (Fcfa)
Avenant: Prestations Retenue rembours pénalité des
Montant total: 33 886 786 AIR inclue de garantie d'avance de retard paiements AIR TVA