RECAPITULATIF DES INFORMATIONS DES PROFILS EN T

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Longueur Point d'axe Fichier profil Point extrême du profil


Profil n° Abscisse Côté
d'application X Y Z type X
P1 0.000 17.175 563418.509 3588512.223 980.279 G voie 8 m 563423.168
D voie 7 m 563414.103
P2 34.350 25.068 563444.049 3588489.770 979.191 G voie 8 m 563446.645
D voie 7 m 563441.756
P3 50.137 16.605 563458.775 3588484.174 977.842 G voie 8 m 563459.305
D voie 7 m 563458.283
P4 67.559 26.618 563476.188 3588484.203 977.223 G voie 8 m 563476.494
D voie 7 m 563475.907
P5 103.372 23.002 563511.383 3588478.041 974.196 G voie 8 m 563513.352
D voie 7 m 563509.616
P6 113.563 5.096 563520.663 3588473.830 973.607 G voie 8 m 563522.962
D voie 7 m 563518.595
S DES PROFILS EN TRAVERS - VOIE SECONDAIRE -08-

final 1035 voirie.dwg

Point extrême du profil Distance au pt d'axe (m) Point d'entrée en terre Distance au pt d'axe (m)
Y Z Largeur 2D Largeur 3D X Y Z Largeur 2D Largeur 3D
3588515.441 980.079 5.663 5.667 563423.168 3588515.441 980.079 5.663 5.667
3588509.180 980.867 5.354 5.386 563414.103 3588509.180 980.867 5.354 5.386
3588494.808 978.984 5.667 5.671 563446.645 3588494.808 978.984 5.667 5.671
3588485.320 979.237 5.007 5.007 563441.756 3588485.320 979.237 5.007 5.007
3588489.662 977.906 5.513 5.514 563459.305 3588489.662 977.906 5.513 5.514
3588479.073 977.711 5.125 5.127 563458.283 3588479.073 977.711 5.125 5.127
3588489.706 977.250 5.511 5.511 563476.494 3588489.706 977.250 5.511 5.511
3588479.157 977.197 5.055 5.055 563475.907 3588479.157 977.197 5.055 5.055
3588483.298 974.069 5.614 5.615 563513.352 3588483.298 974.069 5.614 5.615
3588473.322 974.310 5.038 5.040 563509.616 3588473.322 974.310 5.038 5.040
3588478.896 973.557 5.563 5.563 563522.962 3588478.896 973.557 5.563 5.563
3588469.270 973.652 5.008 5.008 563518.595 3588469.270 973.652 5.008 5.008
RECAPITULATIF DES EMPRISES ET DU DECAPAGE - VOIE SECONDAIRE -08-

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1
Volume total de décapage (m³) : 315.5255

Longueur Emprise (m) Décapage du TN


Profil n° Abscisse
d'application Gauche Droite Totale Epaisseur Largeur Surface (m²)
P1 0.000 17.175 5.663 5.354 11.017 0.260 11.017 189.22
P2 34.350 25.068 5.667 5.007 10.673 0.260 10.673 267.57
P3 50.137 16.605 5.513 5.125 10.639 0.260 10.639 176.65
P4 67.559 26.618 5.511 5.055 10.566 0.260 10.566 281.23
P5 103.372 23.002 5.614 5.038 10.652 0.260 10.652 245.02
P6 113.563 5.096 5.563 5.008 10.570 0.260 10.570 53.86
1213.5596
CONDAIRE -08-

final 1035 voirie.dwg

Décapage du TN
Cumul Vol.
Volume (m³)
(m³)
49.198 49.198
69.568 118.766
45.929 164.695
73.120 237.815
63.706 301.521
14.004 315.526
RECAPITULATIF DES CUBATURES DEBLAI-REMBLAI PAR PROFIL - VOIE SECOND

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Méthode : Linéaire (Les entrées en terre sont recherchées jusqu'au TN)


Volume cumulé déblais (m³) 228.659
Volume cumulé remblais (m³) 11.268

Longueur Déblais R
Profil n° Abscisse Cumul Vol.
d'application Surf. G (m²) Surf. D (m²) Surf. Tot (m²) Volume (m³) Surf. G (m²)
(m³)
P1 0.000 17.175 0.67 1.73 2.40 41.248 41.248 0.19
P2 34.350 25.068 0.79 1.07 1.86 46.736 87.984 0.16
P3 50.137 16.605 1.25 0.70 1.95 32.430 120.414 0.00
P4 67.559 26.618 1.15 0.85 2.00 53.309 173.723 0.00
P5 103.372 23.002 0.76 1.19 1.95 44.917 218.640 0.06
P6 113.563 5.096 0.94 1.02 1.97 10.019 228.659 0.02
ROFIL - VOIE SECONDAIRE -08-

final 1035 voirie.dwg

es jusqu'au TN)

Remblais
Cumul Vol.
Surf. D (m²) Surf. Tot (m²) Volume (m³)
(m³)
0.03 0.21 3.687 3.687
0.00 0.16 4.033 7.721
0.07 0.08 1.299 9.020
0.02 0.02 0.516 9.536
0.01 0.07 1.624 11.160
0.00 0.02 0.108 11.268
CUBATURES DEBLAI-REMBLAI (DANS L'EMPRISE DE LA LIGNE 'PROJET') - VOIE SEC

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Méthode : Linéaire (Les entrées en terre sont recherchées jusqu'au TN)


Volume cumulé déblais (m³) 228.389
Volume cumulé remblais (m³) 5.606

Longueur Déblais (dans l'emprise de la ligne Projet) Remblais (dans l'e


Profil n° Abscisse Cumul Vol.
d'application Surf. G (m²) Surf. D (m²) Surf. Tot (m²) Volume (m³) Surf. G (m²)
(m³)
P1 0.000 17.175 0.67 1.72 2.39 40.978 40.978 0.13
P2 34.350 25.068 0.79 1.07 1.86 46.736 87.714 0.10
P3 50.137 16.605 1.25 0.70 1.95 32.430 120.144 0.00
P4 67.559 26.618 1.15 0.85 2.00 53.309 173.453 0.00
P5 103.372 23.002 0.76 1.19 1.95 44.917 218.370 0.02
P6 113.563 5.096 0.94 1.02 1.97 10.019 228.389 0.00
'PROJET') - VOIE SECONDAIRE -08-

final 1035 voirie.dwg

es jusqu'au TN)

Remblais (dans l'emprise de la ligne Projet)


Cumul Vol.
Surf. D (m²) Surf. Tot (m²) Volume (m³)
(m³)
0.00 0.13 2.179 2.179
0.00 0.10 2.398 4.577
0.03 0.03 0.512 5.089
0.00 0.00 0.000 5.089
0.00 0.02 0.517 5.606
0.00 0.00 0.000 5.606
RECAPITULATIF DE L'UTILISATION DES MATERIAUX - VOIE SECONDAIRE

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Méthode : Linéaire

Nom du matériau : BITUME GODRON (COUCHE DE ROULEMENT)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.22 63.55 3.813 0.19 54.96 3.298 0.41
P2 25.068 0.22 92.75 5.565 0.19 80.22 4.813 0.41
P3 16.605 0.22 61.44 3.686 0.19 53.13 3.188 0.41
P4 26.618 0.22 98.48 5.909 0.19 85.18 5.111 0.41
P5 23.002 0.22 85.11 5.106 0.19 73.61 4.416 0.41
P6 5.096 0.22 18.85 1.131 0.19 16.31 0.978 0.41

Nom du matériau : FONDATION (COUCHE DE FONDATION)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.74 63.55 12.709 0.64 54.96 10.992 1.38
P2 25.068 0.74 92.75 18.551 0.64 80.22 16.044 1.38
P3 16.605 0.74 61.44 12.287 0.64 53.13 10.627 1.38
P4 26.618 0.74 98.48 19.697 0.64 85.18 17.035 1.38
P5 23.002 0.74 85.11 17.022 0.64 73.61 14.721 1.38
P6 5.096 0.74 18.85 3.771 0.64 16.31 3.261 1.38

Nom du matériau : GRAVE-BITUME (COUCHE DE BASE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.74 63.55 12.709 0.64 54.96 10.992 1.38
P2 25.068 0.74 92.75 18.551 0.64 80.22 16.044 1.38
P3 16.605 0.74 61.44 12.287 0.64 53.13 10.627 1.38
P4 26.618 0.74 98.48 19.697 0.64 85.18 17.035 1.38
P5 23.002 0.74 85.11 17.022 0.64 73.61 14.721 1.38
P6 5.096 0.74 18.85 3.771 0.64 16.31 3.261 1.38

Nom du matériau : CANIVEAU (Caniveau)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.06 5.15 0.953 0.06 5.15 0.953 0.11
P2 25.068 0.06 7.52 1.391 0.06 7.52 1.391 0.11
P3 16.605 0.06 4.98 0.922 0.06 4.98 0.922 0.11
P4 26.618 0.06 7.99 1.477 0.06 7.99 1.477 0.11
P5 23.002 0.06 6.90 1.277 0.06 6.90 1.277 0.11
P6 5.096 0.06 1.53 0.283 0.06 1.53 0.283 0.11

Nom du matériau : CIMENT (PAVER)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.07 22.84 1.142 0.07 22.84 1.142 0.13
P2 25.068 0.07 33.34 1.667 0.07 33.34 1.667 0.13
P3 16.605 0.07 22.08 1.104 0.07 22.08 1.104 0.13
P4 26.618 0.07 35.40 1.770 0.07 35.40 1.770 0.13
P5 23.002 0.07 30.59 1.530 0.07 30.59 1.530 0.13
P6 5.096 0.07 6.78 0.339 0.07 6.78 0.339 0.13

Nom du matériau : SABLE (SABLE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.13 22.84 2.284 0.13 22.84 2.284 0.27
P2 25.068 0.13 33.34 3.334 0.13 33.34 3.334 0.27
P3 16.605 0.13 22.08 2.208 0.13 22.08 2.208 0.27
P4 26.618 0.13 35.40 3.540 0.13 35.40 3.540 0.27
P5 23.002 0.13 30.59 3.059 0.13 30.59 3.059 0.27
P6 5.096 0.13 6.78 0.678 0.13 6.78 0.678 0.27

Nom du matériau : GRAVE-BITUME (POSE CANIVEAU ET BORDURE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.03 8.07 0.572 0.03
P2 25.068 0.00
P3 16.605 0.03 7.80 0.553 0.03
P4 26.618 0.00
P5 23.002 0.03 10.81 0.766 0.03
P6 5.096 0.00

Nom du matériau : BORDURE (Bordure T3)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.05 2.92 0.781 0.05
P2 25.068 0.00
P3 16.605 0.05 2.82 0.756 0.05
P4 26.618 0.00
P5 23.002 0.05 3.91 1.047 0.05
P6 5.096 0.00

Nom du matériau : GRAVE-BITUME (COUCHE DE BASE TROTTOIR)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 17.175 0.31 22.84 5.329 0.31
P2 25.068 0.00
P3 16.605 0.31 22.08 5.152 0.31
P4 26.618 0.00
P5 23.002 0.31 30.59 7.137 0.31
P6 5.096 0.00
- VOIE SECONDAIRE -08-

final 1035 voirie.dwg

783.58 47.015
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
118.51 7.110 118.51 7.110
172.97 10.378 291.48 17.489
114.57 6.874 406.05 24.363
183.66 11.020 589.71 35.383
158.71 9.523 748.43 44.906
35.16 2.110 783.58 47.015

783.58 156.717
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
118.51 23.701 118.51 23.701
172.97 34.594 291.48 58.296
114.57 22.914 406.05 81.210
183.66 36.732 589.71 117.942
158.71 31.743 748.43 149.685
35.16 7.032 783.58 156.717

783.58 156.717
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
118.51 23.701 118.51 23.701
172.97 34.594 291.48 58.296
114.57 22.914 406.05 81.210
183.66 36.732 589.71 117.942
158.71 31.743 748.43 149.685
35.16 7.032 783.58 156.717

68.14 12.605
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
10.30 1.906 10.30 1.906
15.04 2.783 25.35 4.689
9.96 1.843 35.31 6.532
15.97 2.955 51.28 9.487
13.80 2.553 65.08 12.040
3.06 0.566 68.14 12.605

302.08 15.104
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
45.69 2.284 45.69 2.284
66.68 3.334 112.37 5.618
44.17 2.208 156.54 7.827
70.80 3.540 227.34 11.367
61.19 3.059 288.52 14.426
13.55 0.678 302.08 15.104

302.08 30.208
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
45.69 4.569 45.69 4.569
66.68 6.668 112.37 11.237
44.17 4.417 156.54 15.654
70.80 7.080 227.34 22.734
61.19 6.119 288.52 28.852
13.55 1.355 302.08 30.208

26.69 1.891
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
8.07 0.572 8.07 0.572
0.00 0.000 8.07 0.572
7.80 0.553 15.88 1.125
0.00 0.000 15.88 1.125
10.81 0.766 26.69 1.891
0.00 0.000 26.69 1.891

9.65 2.584
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
2.92 0.781 2.92 0.781
0.00 0.000 2.92 0.781
2.82 0.756 5.74 1.537
0.00 0.000 5.74 1.537
3.91 1.047 9.65 2.584
0.00 0.000 9.65 2.584

75.52 17.619
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
22.84 5.329 22.84 5.329
0.00 0.000 22.84 5.329
22.08 5.152 44.93 10.481
0.00 0.000 44.93 10.481
30.59 7.137 75.52 17.619
0.00 0.000 75.52 17.619
RECAPITULATIF DES MATERIAUX UTILISES PAR PROFIL - VOIE SECONDAIRE -0

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Méthode : Linéaire

CANIVEAU 0 €/ml
GRAVE-
0 €/m³ 0 €/tonne
BITUME
FONDATION 0 €/m³ 0 €/tonne
BITUME
0 €/m³ 0 €/tonne
GODRON
BORDURE 0 €/m³ 0 €/tonne
CIMENT 0 €/m³ 0 €/tonne
SABLE 0 €/m³ 0 €/tonne

Longueur Cumul Aire


Profil n° Matériau Largeur Coupe (m²) Aire (m²) Volume (m³)
d'application (m²)
P1 17.175 BITUME GODRON 6.900 0.41 7.110
17.175 FONDATION 6.900 1.38 23.701
17.175 GRAVE-BITUME 6.900 1.38 23.701
17.175 CANIVEAU 0.600 0.11 10.30 10.30 1.906
17.175 CIMENT 2.660 0.13 2.284
17.175 SABLE 2.660 0.27 4.569
17.175 GRAVE-BITUME 0.470 0.03 0.572
17.175 BORDURE 0.170 0.05 0.781
17.175 GRAVE-BITUME 1.330 0.31 5.329
P2 25.068 BITUME GODRON 6.900 0.41 10.378
25.068 FONDATION 6.900 1.38 34.594
25.068 GRAVE-BITUME 6.900 1.38 34.594
25.068 CANIVEAU 0.600 0.11 15.04 25.35 2.783
25.068 CIMENT 2.660 0.13 3.334
25.068 SABLE 2.660 0.27 6.668
P3 16.605 BITUME GODRON 6.900 0.41 6.874
16.605 FONDATION 6.900 1.38 22.914
16.605 GRAVE-BITUME 6.900 1.38 22.914
16.605 GRAVE-BITUME 0.470 0.03 0.553
16.605 CANIVEAU 0.600 0.11 9.96 35.31 1.843
16.605 BORDURE 0.170 0.05 0.756
16.605 CIMENT 2.660 0.13 2.208
16.605 SABLE 2.660 0.27 4.417
16.605 GRAVE-BITUME 1.330 0.31 5.152
P4 26.618 BITUME GODRON 6.900 0.41 11.020
26.618 FONDATION 6.900 1.38 36.732
26.618 GRAVE-BITUME 6.900 1.38 36.732
26.618 CANIVEAU 0.600 0.11 15.97 51.28 2.955
26.618 CIMENT 2.660 0.13 3.540
26.618 SABLE 2.660 0.27 7.080
P5 23.002 BITUME GODRON 6.900 0.41 9.523
23.002 FONDATION 6.900 1.38 31.743
23.002 GRAVE-BITUME 6.900 1.38 31.743
23.002 CANIVEAU 0.600 0.11 13.80 65.08 2.553
23.002 CIMENT 2.660 0.13 3.059
23.002 SABLE 2.660 0.27 6.119
23.002 GRAVE-BITUME 0.470 0.03 0.766
23.002 BORDURE 0.170 0.05 1.047
23.002 GRAVE-BITUME 1.330 0.31 7.137
P6 5.096 BITUME GODRON 6.900 0.41 2.110
5.096 FONDATION 6.900 1.38 7.032
5.096 GRAVE-BITUME 6.900 1.38 7.032
5.096 CANIVEAU 0.600 0.11 3.06 68.14 0.566
5.096 CIMENT 2.660 0.13 0.678
5.096 SABLE 2.660 0.27 1.355
OIE SECONDAIRE -08-

nal 1035 voirie.dwg

Cumul Vol.
Coût Cumul Coût
(m³)
7.110 0.00 0.00
23.701 0.00 0.00
23.701 0.00 0.00
1.906 0.00 0.00
2.284 0.00 0.00
4.569 0.00 0.00
24.273 0.00 0.00
0.781 0.00 0.00
29.602 0.00 0.00
17.489 0.00 0.00
58.296 0.00 0.00
64.197 0.00 0.00
4.689 0.00 0.00
5.618 0.00 0.00
11.237 0.00 0.00
24.363 0.00 0.00
81.210 0.00 0.00
87.111 0.00 0.00
87.664 0.00 0.00
6.532 0.00 0.00
1.537 0.00 0.00
7.827 0.00 0.00
15.654 0.00 0.00
92.816 0.00 0.00
35.383 0.00 0.00
117.942 0.00 0.00
129.548 0.00 0.00
9.487 0.00 0.00
11.367 0.00 0.00
22.734 0.00 0.00
44.906 0.00 0.00
149.685 0.00 0.00
161.291 0.00 0.00
12.040 0.00 0.00
14.426 0.00 0.00
28.852 0.00 0.00
162.057 0.00 0.00
2.584 0.00 0.00
169.195 0.00 0.00
47.015 0.00 0.00
156.717 0.00 0.00
176.226 0.00 0.00
12.605 0.00 0.00
15.104 0.00 0.00
30.208 0.00 0.00
RECAPITULATIF GLOBAL DES MATERIAUX - VOIE SECONDAIRE -08-
D:\les 04 phase 05.09.2020\pos garet taam 13-
Nom du dessin
04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Méthode : Linéaire

Masse Coût
Nom du matériau Quantité Coût Prix (€/tonne)
(tonne) (masse*prix)
CANIVEAU 226.62 m 0.00 €
GRAVE-BITUME 176.23 m³ 0.00 €
FONDATION 156.72 m³ 0.00 €
BITUME GODRON 47.02 m³ 0.00 €
BORDURE 2.58 m³ 0.00 €
CIMENT 15.10 m³ 0.00 €
SABLE 30.21 m³ 0.00 €

Type de couche Volume (m³)


<Indéfini> 427.8537

Couche (Matériau) Volume (m³)


COUCHE DE ROULEMENT (BITUME
47.0151
GODRON)
SABLE (SABLE) 30.2078
COUCHE DE FONDATION (FONDATION) 156.7170
COUCHE DE BASE (GRAVE-BITUME) 156.7170
Bordure T3 (BORDURE) 2.5836
PAVER (CIMENT) 15.1039
POSE CANIVEAU ET BORDURE
1.8908
(GRAVE-BITUME)
COUCHE DE BASE TROTTOIR (GRAVE-
17.6187
BITUME)
RECAPITULATIF DES TABULATIONS - VOIE SECONDAIRE -08-

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Elément Longueur d'application Altitude


Profil n° Abscisse
Origine Axe Projet Avant Après Total TN
P1 0.000 Extremité Arc AD 0.000 17.175 17.175 980.279
P2 34.350 Passage Arc AD 17.175 7.894 25.068 979.191
P3 50.137 Passage Arc AD 7.894 8.711 16.605 977.842
P4 67.559 Passage Arc AD 8.711 17.907 26.618 977.223
P5 103.372 Passage AD AD 17.907 5.096 23.002 974.196
P6 113.563 Extremité AD AD 5.096 0.000 5.096 973.607
NDAIRE -08-

final 1035 voirie.dwg

Altitude Point d'axe


Projet X Y
980.279 563418.509 3588512.223
979.191 563444.049 3588489.770
977.842 563458.775 3588484.174
977.223 563476.188 3588484.203
974.196 563511.383 3588478.041
973.607 563520.663 3588473.830
RECAPITULATIF DES INFORMATIONS DES POINTS TYPES - VOIE S

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Point d'axe
Profil n° Abscisse Côté Fichier profil type
X Y Z
P1 0.000 563418.509 3588512.223 980.279 G voie 8 m
D voie 7 m
P2 34.350 563444.049 3588489.770 979.191 G voie 8 m
D voie 7 m
P3 50.137 563458.775 3588484.174 977.842 G voie 8 m
D voie 7 m
P4 67.559 563476.188 3588484.203 977.223 G voie 8 m
D voie 7 m
P5 103.372 563511.383 3588478.041 974.196 G voie 8 m
D voie 7 m
P6 113.563 563520.663 3588473.830 973.607 G voie 8 m
D voie 7 m
S DES POINTS TYPES - VOIE SECONDAIRE -08-

aret etaam final 1035 voirie.dwg

Devers (%) / Largeur (m) / Denivelé (m) /


Type Dist. axe (m) Altitude (m)
pt de ref pt de ref pt de ref
Fil d'eau 4.000 -10.000 0.300 -0.030 980.157
Fil d'eau 3.500 -10.000 0.300 -0.030 980.169
Fil d'eau 4.000 -10.000 0.300 -0.030 979.068
Fil d'eau 3.500 -10.000 0.300 -0.030 979.081
Fil d'eau 4.000 -10.000 0.300 -0.030 977.720
Fil d'eau 3.500 -10.000 0.300 -0.030 977.732
Fil d'eau 4.000 -10.000 0.300 -0.030 977.100
Fil d'eau 3.500 -10.000 0.300 -0.030 977.113
Fil d'eau 4.000 -10.000 0.300 -0.030 974.074
Fil d'eau 3.500 -10.000 0.300 -0.030 974.086
Fil d'eau 4.000 -10.000 0.300 -0.030 973.484
Fil d'eau 3.500 -10.000 0.300 -0.030 973.497
RECAPITULATIF DES INFORMATIONS DES POINTS TYPES - VOIE SECONDAIRE -0

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Fil d'eau
Gauche Droite
Profil n° Abscisse Devers (%) /
X Y Z Dist. axe (m) X Y
pt de ref
P1 0.000 563421.800 3588514.496 980.157 4.000 -10.000 563415.629 3588510.234
P2 34.350 563445.882 3588493.326 979.068 4.000 -10.000 563442.446 3588486.659
P3 50.137 563459.160 3588488.156 977.720 4.000 -10.000 563458.439 3588480.690
P4 67.559 563476.410 3588488.197 977.100 4.000 -10.000 563475.993 3588480.709
P5 103.372 563512.786 3588481.787 974.074 4.000 -10.000 563510.155 3588474.763
P6 113.563 563522.316 3588477.473 973.484 4.000 -10.000 563519.218 3588470.643

Fil d'eau Gauche Droite


Longueur 2D 110.961 114.961
Longueur 3D 111.194 115.191
VOIE SECONDAIRE -08-

final 1035 voirie.dwg

Droite
Devers (%) /
Z Dist. axe (m)
pt de ref
980.169 3.500 -10.000
979.081 3.500 -10.000
977.732 3.500 -10.000
977.113 3.500 -10.000
974.086 3.500 -10.000
973.497 3.500 -10.000
RECAPITULATIF DES EXTREMITES DES LIGNES DES PROFILS EN TRAVERS - VOI

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Longueur Point d'axe Extrémité de la ligne Projet


Profil n° Abscisse Côté
d'application X Y Z Projet Z TN Déport (m)
P1 0.000 17.175 563418.509 3588512.223 980.279 980.279 G 5.500
D 5.000
P2 34.350 25.068 563444.049 3588489.770 979.191 979.191 G 5.500
D 5.000
P3 50.137 16.605 563458.775 3588484.174 977.842 977.842 G 5.500
D 5.000
P4 67.559 26.618 563476.188 3588484.203 977.223 977.223 G 5.500
D 5.000
P5 103.372 23.002 563511.383 3588478.041 974.196 974.196 G 5.500
D 5.000
P6 113.563 5.096 563520.663 3588473.830 973.607 973.607 G 5.500
D 5.000
LS EN TRAVERS - VOIE SECONDAIRE -08-

final 1035 voirie.dwg

Extrémité de la ligne Projet Extrémité de la ligne FdF Extrémité de la ligne Talus


Altitude (m) Déport (m) Altitude (m) Déport (m) Altitude (m)
980.324 5.500 980.324 5.663 980.079
980.336 5.000 980.336 5.354 980.867
979.235 5.500 979.235 5.667 978.984
979.247 5.000 979.247 5.007 979.237
977.886 5.500 977.886 5.513 977.906
977.899 5.000 977.899 5.125 977.711
977.267 5.500 977.267 5.511 977.250
977.279 5.000 977.279 5.055 977.197
974.240 5.500 974.240 5.614 974.069
974.253 5.000 974.253 5.038 974.310
973.651 5.500 973.651 5.563 973.557
973.663 5.000 973.663 5.008 973.652
RECAPITULATIF DES SURFACES 2D ET 3D DES LIGNES - VOIE SECONDAIRE -08-
D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035
Nom du dessin
voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Ligne Projet
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 10.500 180.34 180.34 10.732 184.32 184.32
P2 34.350 25.068 10.500 263.22 443.55 10.732 269.04 453.36
P3 50.137 16.605 10.500 174.35 617.90 10.732 178.20 631.56
P4 67.559 26.618 10.500 279.48 897.39 10.732 285.66 917.22
P5 103.372 23.002 10.500 241.52 1138.91 10.732 246.86 1164.08
P6 113.563 5.096 10.500 53.50 1192.41 10.732 54.69 1218.76

Ligne FdF
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 10.500 180.34 180.34 11.695 200.87 200.87
P2 34.350 25.068 10.500 263.22 443.55 11.695 293.18 494.05
P3 50.137 16.605 10.500 174.35 617.90 11.695 194.20 688.25
P4 67.559 26.618 10.500 279.48 897.39 11.695 311.30 999.55
P5 103.372 23.002 10.500 241.52 1138.91 11.695 269.02 1268.57
P6 113.563 5.096 10.500 53.50 1192.41 11.695 59.59 1328.16

Ligne Talus
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 0.517 8.89 8.89 0.933 16.02 16.02
P2 34.350 25.068 0.173 4.35 13.24 0.313 7.84 23.86
P3 50.137 16.605 0.139 2.30 15.54 0.250 4.15 28.02
P4 67.559 26.618 0.066 1.75 17.29 0.118 3.15 31.16
P5 103.372 23.002 0.152 3.50 20.79 0.275 6.31 37.48
P6 113.563 5.096 0.070 0.36 21.15 0.127 0.65 38.13

base
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 3.200 54.96 54.96 3.601 61.85 61.85
P2 34.350 25.068 0.000 0.00 54.96 0.000 0.00 61.85
P3 50.137 16.605 3.700 61.44 116.40 4.101 68.10 129.94
P4 67.559 26.618 0.000 0.00 116.40 0.000 0.00 129.94
P5 103.372 23.002 3.200 73.61 190.00 3.601 82.83 212.78
P6 113.563 5.096 0.000 0.00 190.00 0.000 0.00 212.78

caniveau
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 0.600 10.30 10.30 0.940 16.14 16.14
P2 34.350 25.068 0.600 15.04 25.35 0.940 23.56 39.71
P3 50.137 16.605 0.600 9.96 35.31 0.940 15.61 55.32
P4 67.559 26.618 0.600 15.97 51.28 0.940 25.02 80.34
P5 103.372 23.002 0.600 13.80 65.08 0.940 21.62 101.96
P6 113.563 5.096 0.600 3.06 68.14 0.940 4.79 106.75

pose bordure et caniveau


Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 0.000 0.00 0.00 0.090 1.55 1.55
P2 34.350 25.068 0.000 0.00 0.00 0.000 0.00 1.55
P3 50.137 16.605 0.000 0.00 0.00 0.090 1.49 3.04
P4 67.559 26.618 0.000 0.00 0.00 0.000 0.00 3.04
P5 103.372 23.002 0.000 0.00 0.00 0.090 2.07 5.11
P6 113.563 5.096 0.000 0.00 0.00 0.000 0.00 5.11

roulement
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 17.175 6.900 118.51 118.51 7.022 120.60 120.60
P2 34.350 25.068 6.900 172.97 291.48 7.022 176.03 296.64
P3 50.137 16.605 6.900 114.57 406.05 7.022 116.60 413.24
P4 67.559 26.618 6.900 183.66 589.71 7.022 186.91 600.15
P5 103.372 23.002 6.900 158.71 748.43 7.022 161.52 761.68
P6 113.563 5.096 6.900 35.16 783.58 7.022 35.78 797.46
RECAPITULATIF DES POINTS DE CONTROLE DES PROFILS

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:31:45
Profil en long VOIE SECONDAIRE -08-
Courbe projet Proj 1

Fichier profil Pente (%)


Profil n° Abscisse Côté N° point Type
type min max calculé
TROLE DES PROFILS TYPES

final 1035 voirie.dwg

dX (m) dZ (m)
min max calculé min max calculé