wilaya de El Tarf
ETAT D'AVANCEMENT DES PROJETS - ARRETE AU 20/02/2022
PARTIE LOGEMENT PARTIE VRD
Alimentation en EE
MARCHES NOTIFIES TAUX DE CONSOM % TAUX AVCT PHYSIQUE % MARCHES NOTIFIES TAUX DE CONSOM TAUX AVCT PHYSIQUE %
et Gaz %
Avanct
PROJET SITE ENTREPRISE BET SUIVI DELAI (MARCHE EXPIRATION DELAI Y OBS ENTREPRISE
MONTANT (MARCHE + G-O CES MONTANT (MARCHE + EXPIRATION Global
PAYEMENT EFFECTUE ODS DEMARRAGE + AVENANTS) et COMPRIS ARRETS FINANCIER DELAI infra 18% Global PAIEMENT ODS DEMARRAGE Delai FINANCIER DELAI Ass AEP Voirie EE Gaz
AVENANTS) 58,5% 23,5% AVENANTS) DELAI
intempéries ET INTEMPERIES
PROGRAMME 230
20 mois +
300 EL KALA ETB ACHI SALIM / 928,987,195.38 / 6/6/2021 10/27/2022 / 70% 63% 0% 1% 12%
214 jrs
S/TOTAL 1,300
C.S.C.E.C
-CHINE-
31 mois + C.S.C.E.C 99% 99% 98% 95% 95% 98%
600 DREAN SPA BEM MILA 2,024,364,195.93 1,955,523,890.63 9/18/2018 11/11/2021 97% 100% 100% 100% 100% 100% 294,296,108.10 160,194,406.25 5/20/2021 08 mois 1/19/2022 54% 100%
80 jrs -CHINE-
S/TOTAL 1,000
30 mois +
500 EL TARF BEZZALA ARCHI PRO 1,595,546,536.69 366,935,673.80 6/10/2021 12/6/2023 23% 27% 87% 62% 8.84% 38.90%
P90000/2019
163 jrs
479 EL KALA BEZZALA ladjama djallel 1,528,533,582.16 130,155,954.65 6/2/2021 30 mois 12/1/2023 9% 27% 62% 19% 0% 17%
S/TOTAL 979
TOTAL 3,279
wilaya de Guelma
ETAT D'AVANCEMENT DES PROJETS - ARRETE AU 20/02/2022
PARTIE LOGEMENT PARTIE VRD
Alimentation en EE
MARCHES NOTIFIES TAUX DE CONSOM % TAUX AVCT PHYSIQUE % MARCHES NOTIFIES TAUX DE CONSOM TAUX AVCT PHYSIQUE %
et Gaz %
Avanct
PROJET SITE ENTREPRISE BET SUIVI DELAI (MARCHE EXPIRATION DELAI Y OBS ENTREPRISE
MONTANT (MARCHE + G-O CES MONTANT (MARCHE + Global
PAYEMENT EFFECTUE ODS DEMARRAGE + AVENANTS) et COMPRIS ARRETS FINANCIER DELAI infra 18% Global PAIEMENT ODS DEMARRAGE Delai EXPIRATION DELAI FINANCIER DELAI Ass AEP Voirie EE Gaz
AVENANTS) 58,5% 23,5% AVENANTS)
intempéries ET INTEMPERIES
Sarl El Bayrek
GUELMA POS MECISSEHA 39 mois 60% 70% 75%
1,100 ENTES 3,707,843,828.69 3,615,475,754.12 8/24/2017 3/15/2020 98% 100% 100% 100% 99% 99.50% (après résiliation 497,659,261.08 / 12/8/2021 06 mois 6/7/2022 / 33% 75% 80% 65%
32 TAHAR + 603 jrs
de Merad merad)
S/TOTAL 2,400
S/TOTAL 5,400
P90000/2
S/TOTAL 271
TOTAL 8,071
wilaya de Annaba
ETAT D'AVANCEMENT DES PROJETS - ARRETE AU 20/02/2022
PARTIE LOGEMENT PARTIE VRD
Alimentation en EE
MARCHES NOTIFIES TAUX DE CONSOM % TAUX AVCT PHYSIQUE % MARCHES NOTIFIES TAUX DE CONSOM TAUX AVCT PHYSIQUE %
et Gaz %
Avanct
PROJET SITE ENTREPRISE BET SUIVI DELAI (MARCHE EXPIRATION DELAI Y OBS ENTREPRISE
MONTANT (MARCHE + G-O CES MONTANT (MARCHE + EXPIRATION Global
PAYEMENT EFFECTUE ODS DEMARRAGE + AVENANTS) et COMPRIS ARRETS FINANCIER DELAI infra 18% Global PAIEMENT ODS DEMARRAGE Delai FINANCIER DELAI Ass AEP Voirie EE Gaz
AVENANTS) 58,5% 23,5% AVENANTS) DELAI
intempéries ET INTEMPERIES
KALITOUSSA
900
Berrahel
PROGRAMME 230 000
S/TOTAL 5,900
42 mois 16 mois
9,872,068,753.23 9,142,052,671.40 6/24/2018 8/21/2022 93% 86% 100% 100% 92% 94% KUZU 1,261,377,868.00 990,105,666.85 6/4/2020 4/13/2022 78% 88% 95% 95% 95% 95% 95% 95%
GROUPE +418 jrs +161 jrs
2176/2800 draa errich KUZU
URBAN
624/2800 logts livrés le 01/11/2021
38 mois 20 mois
7,894,871,828.29 7,228,147,449.26 6/24/2018 7/8/2022 92% 87% 100% 100% 95% 99% KUZU 1,011,968,349.70 776,145,972.95 6/4/2020 5/22/2022 77% 85% 95% 95% 95% 95% 95% 95%
+319 jrs +141 jrs
738/2200 draa errich KUZU URBAN
120 000/2018
CEDY 37 mois
2,000 EL GANTRA / 6,817,685,572.55 5,039,612,382.56 12/12/2018 7/24/2022 74% 86% 100% 98% 50% 85% 807,304,983.93 232,570,157.15 12/13/2020 14 mois 3/12/2022 29% 93% 65% 60% 45% 35% 20% 40%
–CHINE- + 135 jrs
CEDY
32 mois
CEDY 3,314,786,447.14 2,398,902,514.22 12/3/2019 6/20/2022 72% 88% 100% 92% 40% 82% 333,789,703.74 133,299,067.32 12/29/2020 12 mois 3/11/2022 40% 92% 0% 0% 0% 0% 0% 0%
+ 315 jrs
630/1000 KALITOUSSA /
–CHINE- 370 Logts /1000 livrés le 01/11/2021
2,759,741,964.36 36 mois
1,077 EL GANTRA ZIEC / 3,313,362,000.00 12/17/2018 10/18/2022 83% 78% 100% 100% 50% 88.00% ZIEC 410,870,197.80 133,299,067.32 11/8/2020 08 mois 6/21/2022 29% 50% 65% 60% 45% 30% 25% 45%
+84 jrs
S/TOTAL 3,077
20 mois
724 El Gantra ATLAS BET SEETA 2,502,982,480 623,382,223 6/10/2021 1/10/2023 25% 45% 70% 40% 12% 35%
90000/2019
+ 112 jrs
S/TOTAL 2,104
TOTAL 11,081
0.3244
wilaya de Skikda
ETAT D'AVANCEMENT DES PROJETS - ARRETE AU 20/02/2022
PARTIE LOGEMENT PARTIE VRD
TAUX AVCT PHYSIQUE Alimentation en
MARCHES NOTIFIES TAUX DE CONSOM % TAUX AVCT PHYSIQUE % MARCHES NOTIFIES TAUX DE CONSOM
% EE et Gaz %
BOUZAA-
2,800
ROURA
Livré
PROGRAMME
Gribissa-
1,100
Azzaba
ENTES GART 3,384,425,000.00 3,357,979,423.96 694 logts livré le 05/06/2021 et 406 logts le 01/11/20211
S/TOTAL 4,700
40 mois + 197
1,700 FELFILLA 5,703,463,248.81 4,743,551,248.65 10/2/2018 8/15/2022 83% 85% 100% 100% 71% 85% appel d'offres relancer , Evaluation en cours
jrs
C.S.C.E.C
RAMDANE 32 mois +
400 -CHINE- GART ANNABA 1,532,099,971.57 1,493,001,218.65 10/17/2018 6/1/2022 97% 88% 100% 100% 97% 98% Ammi kheireddine 176,931,481.95 / 12/8/2021 06 mois 6/7/2022 / 33.33% 50% 25% 20% 0% 0% 19%
DJAMEL 350 jrs
24 mois +
500 FELFILLA 1,569,375,000.00 1,077,361,064.35 7/2/2019
548 jrs
5/5/2022 69% 83% 100% 100% 37% 67% l'appel d'offre relancé
120 000/2018
EL 32 mois + 462
1,700 / 5,388,575,000.00 3,042,910,628.39 1/9/2020 11/15/2022 56% 72% 100% 97% 47% 71% levée des résérves CDC en cours
HARROUCH jrs
Z.I.E.C
SIDI 30 mois +
500 -CHINE / 1,652,902,818.18 1,635,645,945.24 12/20/2018 3/9/2022 99% 97% 100% 100% 98% 99.10% 209,629,044.71 / 5/20/2021 08 mois 4/19/2022 / 75.00% 95% 95% 75% 0% 2% 53%
MEZGHICH 263 jrs
ZIEC
EL 35 mois +
1,200 / 3,692,100,000.00 2,900,820,490.05 12/11/2018 5/28/2022 79% 91% 100% 100% 69.84% 84.32% 597,194,006.03 / 1/11/2021 10 mois 4/13/2022 / 80.00% 15% 5% 16% 1% 0% 14%
HARROUCH 201 jrs
C.S.C.E.C 28 mois + 399
1,400 SKIKDA -CHINE- / 4,437,650,000.00 1,293,868,900.08 1/27/2021 12/28/2022 29% 64% 76% 53% 22% 48%
jrs
S/TOTAL 7,400
Entreprise désignée
SARL STE
SEAM (visa sous réserves ;
312 COLLO FRERES 1,124,557,228.63 / / / / / / / / / /
levé des réserves en
BOUHANOUN)
cours)
1,200 Azzaba BEST DESIGN 4,413,489,908.26 / 10/17/2021 24 mois 10/5/2023 / 20% 25% 0% 0% 7%
S/TOTAL 3,764
TOTAL 15,864
wilaya de Tebessa
ETAT D'AVANCEMENT DES PROJETS - ARRETE AU 20/02/2022
PARTIE LOGEMENT PARTIE VRD
TAUX AVCT PHYSIQUE Alimentation en
MARCHES NOTIFIES TAUX DE CONSOM % TAUX AVCT PHYSIQUE % MARCHES NOTIFIES TAUX DE CONSOM
% EE et Gaz %
BOULHEF
1,500 5,129,202,663.60 5,073,285,226.87
EDYR POS 03
SPA ATLAS
GENIE CIVIL SATO projet livré le 05/07/2021
BOULHEF COMPANY
1,500 EDYR EX 5,299,965,318.81 5,295,484,129.01
doukane
S/TOTAL 3,000
ETB ABAHRI 28 mois + 192
926,495,465.11 291,410,260.47 12/13/2018 11/7/2021 31% 100% 74% 71% 12% 42% Résiliation de l'ETP
NACEUR Jrs
BET LOUCIF
300 BIR EL ATER
LAMIA
RAR (BENRAHAL
levée de réserves déposé
ABDELKRIM)
SPA ATLAS
DOUKKANE 30 mois + 66 12 mois + 98 95% 95% 65% 95% 95% 85%
1,400 / 4,973,037,692.02 4,762,008,568.46 12/30/2018 12/27/2021 96% 100% 100% 100% 98% 99% GENIE CIVIL 558,336,826.89 169,288,147.22 11/8/2020 4/13/2022 30.32% 83.33%
SITE 01 SPA ATLAS jrs jrs
COMPANY
120 000/2018
GENIE CIVIL
COMPANY
BOULHEF-
240 SATO 844,220,818.61 770,249,733.04 projet livré le 05/07/2021
DYR
Ouenza-Site
244 767,307,400.72 266,824,192.20 1/10/2021 24 mois 1/9/2023 35% 54% 100% 55% 12% 40% AIT IDIR FAOUZI 75,334,696.20 / 2/8/2022 06 mois 8/7/2022 / 8.33% 0% 0% 10% 0% 0% 2%
01
BENRAHAL BET HIDJAZI
ABDELKRIM CHERIF
156 Ouenza site 02 489,895,794.42 305,456,136.38 7/28/2020 18 mois 5/7/2022 62% 83% 100% 100% 50% 74% ETP désignée AIT IDIR FAOUZI (levée des résérves)
S/TOTAL 2,740
TOTAL 5,740
REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIR
'URBANISME ET DE LA VILLE
ET DU DEVELOPPEMENT DU LOGEMENT
NALE DE ANNABA
Programme 90 000
programme 2020 Total programme
Tranche 2019
0 0 5,740
3,764 0 15,864
2,104 0 11,081
271 0 8,071
979 0 3,279
1,889 0 5,089
9,007 0 49,124