RESULTADOS DE LOS
VACIADO PROBETAS ENSAYO DE COMPRESIÓN SIMPLE
Tramo
Id. Probeta Mes Diámetro Altura Altura Despl. Area Area Peso % PU Edad Carga Resistencia
Fecha Inicial Final Corr. Cemento Fecha Rotura
De A
(cm) (cm) (cm) (cm) cm2 cm2 kg kg/m3 (días) (kg) (kg/cm2)
2 Apr-07 4/25/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/2/2007 7 2387 30.4
2 Apr-07 4/25/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/2/2007 7 2377 30.3
3 450+960 450+860 Apr-07 4/27/2007 10.00 12.82 12.70 0.12 78.54 79.28 5.0 4/30/2007 3 2387 30.4
3 Apr-07 4/27/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 4/30/2007 3 2371 30.2
3 Apr-07 4/27/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 4/30/2007 3 2371 30.2
3 Apr-07 4/27/2007 10.00 12.82 12.70 0.12 78.54 79.28 5.0 4/30/2007 3 2387 30.4
4 Apr-07 4/27/2007 10.00 12.82 12.81 0.01 78.54 78.60 5.0 5/2/2007 5 2393 30.5
4 Apr-07 4/27/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/2/2007 5 2393 30.5
4 Apr-07 4/27/2007 10.00 12.82 12.81 0.01 78.54 78.60 5.0 5/2/2007 5 2387 30.4
4 Apr-07 4/27/2007 10.00 12.82 12.81 0.01 78.54 78.60 5.0 5/2/2007 5 2403 30.6
5 Apr-07 4/27/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/4/2007 7 2419 30.8
5 Apr-07 4/27/2007 10.00 12.82 12.81 0.01 78.54 78.60 5.0 5/4/2007 7 2434 31.0
5 Apr-07 4/27/2007 10.00 12.82 12.81 0.01 78.54 78.60 5.0 5/4/2007 7 2441 31.1
5 Apr-07 4/27/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/4/2007 7 2421 30.8
6 450+860 450+740 Apr-07 4/28/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/1/2007 3 2387 30.4
6 Apr-07 4/28/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/1/2007 3 2403 30.6
6 Apr-07 4/28/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/1/2007 3 2387 30.4
6 Apr-07 4/28/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/1/2007 3 2403 30.6
7 Apr-07 4/28/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/3/2007 5 2387 30.4
7 Apr-07 4/28/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/3/2007 5 2403 30.6
7 Apr-07 4/28/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/3/2007 5 2419 30.8
7 Apr-07 4/28/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/3/2007 5 2428 30.9
8 Apr-07 4/28/2007 10.00 12.82 12.70 0.12 78.54 79.28 5.0 5/5/2007 7 2371 30.2
8 Apr-07 4/28/2007 10.00 12.82 12.70 0.12 78.54 79.28 5.0 5/5/2007 7 2466 31.4
8 Apr-07 4/28/2007 10.00 12.82 12.65 0.17 78.54 79.60 5.0 5/5/2007 7 2403 30.6
8 Apr-07 4/28/2007 10.00 12.82 12.65 0.17 78.54 79.60 5.0 5/5/2007 7 2291 29.2
9 450+740 450+650 Apr-07 4/29/2007 10.00 12.82 12.56 0.26 78.54 80.17 5.0 5/2/2007 3 2309 29.4
9 Apr-07 4/29/2007 10.00 12.82 12.73 0.09 78.54 79.10 5.0 5/2/2007 3 2396 30.5
9 Apr-07 4/29/2007 10.00 12.82 12.52 0.30 78.54 80.42 5.0 5/2/2007 3 2093 26.7
9 Apr-07 4/29/2007 10.00 12.82 12.74 0.08 78.54 79.03 5.0 5/2/2007 3 2217 28.2
10 Apr-07 4/29/2007 10.00 12.82 12.75 0.07 78.54 78.97 5.0 5/4/2007 5 2412 30.7
10 Apr-07 4/29/2007 10.00 12.82 12.53 0.29 78.54 80.36 5.0 5/4/2007 5 2323 29.6
10 Apr-07 4/29/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/4/2007 5 2434 31.0
10 Apr-07 4/29/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/4/2007 5 2450 31.2
11 Apr-07 4/29/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 7 2454 31.2
11 Apr-07 4/29/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 7 2419 30.8
11 Apr-07 4/29/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 7 2403 30.6
11 Apr-07 4/29/2007 10.00 12.82 12.76 0.06 78.54 78.91 5.0 5/6/2007 7 2387 30.4
12 450+650 450+510 May-07 5/1/2007 10.00 12.82 12.50 0.32 78.54 80.55 5.0 5/4/2007 3 1687 21.5
12 May-07 5/1/2007 10.00 12.82 12.57 0.25 78.54 80.10 5.0 5/4/2007 3 1927 24.5
12 May-07 5/1/2007 10.00 12.82 12.69 0.13 78.54 79.34 5.0 5/4/2007 3 2605 33.2
12 May-07 5/1/2007 10.00 12.82 12.64 0.18 78.54 79.66 5.0 5/4/2007 3 1896 24.1
13 May-07 5/1/2007 10.00 12.82 12.65 0.17 78.54 79.60 5.0 5/6/2007 5 2037 25.9
13 May-07 5/1/2007 10.00 12.82 12.76 0.06 78.54 78.91 5.0 5/6/2007 5 1704 21.7
13 May-07 5/1/2007 10.00 12.82 12.65 0.17 78.54 79.60 5.0 5/6/2007 5 2287 29.1
13 May-07 5/1/2007 10.00 12.82 12.65 0.17 78.54 79.60 5.0 5/6/2007 5 2054 26.2
14 May-07 5/1/2007 10.00 12.82 12.75 0.07 78.54 78.97 5.0 5/8/2007 7 2578 32.8
14 May-07 5/1/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/8/2007 7 2578 32.8
14 May-07 5/1/2007 10.00 12.82 12.72 0.10 78.54 79.16 5.0 5/8/2007 7 2407 30.6
14 May-07 5/1/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/8/2007 7 2605 33.2
15 450+510 450+350 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/5/2007 3 2585 32.9
15 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/5/2007 3 2578 32.8
15 May-07 5/2/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/5/2007 3 2578 32.8
15 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/5/2007 3 2585 32.9
16 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/7/2007 5 2595 33.0
FORMULARIO PSC-002 - FRENTE II
RESULTADOS DE LOS
VACIADO PROBETAS ENSAYO DE COMPRESIÓN SIMPLE
Tramo
Id. Probeta Mes Diámetro Altura Altura Despl. Area Area Peso % PU Edad Carga Resistencia
Fecha Inicial Final Corr. Cemento Fecha Rotura
De A
(cm) (cm) (cm) (cm) cm2 cm2 kg kg/m3 (días) (kg) (kg/cm2)
16 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/7/2007 5 2578 32.8
16 May-07 5/2/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/7/2007 5 2595 33.0
16 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/7/2007 5 2578 32.8
17 May-07 5/2/2007 10.00 12.82 12.78 0.04 78.54 78.79 5.0 5/9/2007 7 2665 33.9
17 May-07 5/2/2007 10.00 12.82 12.74 0.08 78.54 79.03 5.0 5/9/2007 7 2672 34.0
17 May-07 5/2/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/9/2007 7 2665 33.9
17 May-07 5/2/2007 10.00 12.82 12.77 0.05 78.54 78.85 5.0 5/9/2007 7 2665 33.9
18 450+350 450+160 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 3 2578 32.8
18 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 3 2578 32.8
18 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 3 2592 33.0
18 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/6/2007 3 2595 33.0
19 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/8/2007 5 2595 33.0
19 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/8/2007 5 2588 33.0
19 May-07 5/3/2007 10.00 12.82 12.76 0.06 78.54 78.91 5.0 5/8/2007 5 2585 32.9
19 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/8/2007 5 2578 32.8
20 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/10/2007 7 2675 34.1
20 May-07 5/3/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/10/2007 7 2665 33.9
20 May-07 5/3/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/10/2007 7 2672 34.0
20 May-07 5/3/2007 10.00 12.82 12.77 0.05 78.54 78.85 5.0 5/10/2007 7 2700 34.4
21 450+160 450+020 May-07 5/4/2007 10.00 12.82 12.77 0.05 78.54 78.85 5.0 5/7/2007 3 2595 33.0
21 May-07 5/4/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/7/2007 3 2588 33.0
21 May-07 5/4/2007 10.00 12.82 12.77 0.05 78.54 78.85 5.0 5/7/2007 3 2578 32.8
21 May-07 5/4/2007 10.00 12.82 12.75 0.07 78.54 78.97 5.0 5/7/2007 3 2578 32.8
22 May-07 5/4/2007 10.00 12.82 12.79 0.03 78.54 78.72 5.0 5/11/2007 7 2665 33.9
22 May-07 5/4/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/11/2007 7 2665 33.9
22 May-07 5/4/2007 10.00 12.82 12.80 0.02 78.54 78.66 5.0 5/11/2007 7 2665 33.9
22 May-07 5/4/2007 10.00 12.82 12.77 0.05 78.54 78.85 5.0 5/11/2007 7 2665 33.9
23 450+020 450+160 May-07 5/7/2007 10.00 12.82 12.69 0.13 78.54 79.34 5.0 5/10/2007 3 2489 31.7
23 May-07 5/7/2007 10.00 12.82 12.70 0.12 78.54 79.28 5.0 5/10/2007 3 2453 31.2
O DE PROBETAS DE SUELO CEMENTO
etera "Roboré - El Carmen"
Revision 1
30.26
Revision 1
30.45
Revision 1
30.96
Revision 1
30.46
Revision 1
30.59
Revision 1
30.73
Revision 1
28.86
Revision 1
30.43
Revision 1
30.88
Revision 1
26.39
Revision 1
25.58
Revision 1
32.10
Revision 1
32.85
Revision 1
32.97
O DE PROBETAS DE SUELO CEMENTO
etera "Roboré - El Carmen"
32.97
Revision 1
33.96
Revision 1
32.88
Revision 1
32.97
Revision 1
34.00
Revision 1
32.94
Revision 1
33.93
Revision 1
32.43
Página:
RESUMEN DENSIDADES SUB BASE SUELO GRAVA CEMENTO
LABORATÓRIO DE HORMIGÓN
Fecha:
Método de la Arena
8.5
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
Nº de Registros La...
Campo
Página:
RESUMEN DENSIDADES SUB BASE SUELO GRAVA CEMENTO
LABORATÓRIO DE HORMIGÓN
Fecha:
Método de la Arena
Reposicion de tramo
450+990 450+740 450+980 28-abr-07 Izq. 11.0 6.6 2.559 5.8 2.433 95.1
450+740 450+650 450+700 29-abr-07 Izq. 11.0 6.7 2.540 5.7 2.416 95.1
450+650 450+510 450+600 01-may-07 Der. 11.0 7.0 2.449 6.5 2.361 96.4
450+510 450+350 450+500 02-may-07 Eje 11.0 7.1 2.457 7.1 2.407 98.0
450+350 450+160 450+300 03-may-07 Der. 10.0 6.9 2.484 6.2 2.405 96.8
450+160 450+020 450+100 04-may-07 Izq. 11.0 6.9 2.484 7.0 2.438 98.1
450+020 449+890 450+000 09-may-07 Izq. 11.0 6.0 2.469 6.0 2.534 102.6
449+900 10-may-07 Eje 10.0 6.0 2.469 6.0 2.364 95.7
449+890 449+790 449+800 11-may-07 Der. 10.5 8.2 2.424 6.7 2.352 97.0
449+790 449+560 449+700 11-may-07 Eje 11.0 8.0 2.424 6.7 2.313 95.4
449+560 449+330 449+450 12-may-07 Izq. 13.0 7.0 2.465 5.0 2.367 96.0
449+330 449+020 449+300 14-may-07 Eje 10.0 6.7 2.467 6.7 2.413 97.8
449+020 448+690 449+000 15-may-07 Eje 12.0 6.2 2.450 6.0 2.416 98.6
448+690 448+555 448+600 16-may-07 Izq. 10.0 7.4 2.432 6.5 2.315 95.2
448+555 448+370 448+500 18-may-07 Der. 11.0 7.5 2.482 7.5 2.384 96.1
448+370 448+050 448+300 19-may-07 Izq. 12.0 7.0 2.485 6.5 2.415 97.2
447+850 447+470 447+800 21-may-07 Eje 12.0 6.5 2.500 6.2 2.487 99.5
447+700 Izq. 12.0 6.5 2.500 7.5 2.542 101.7
447+210 447+080 447+200 24-may-07 Eje 11.0 6.2 2.516 6.0 2.400 95.4
446+930 446+720 446+900 26-may-07 Eje 11.0 6.2 2.489 6.2 2.474 99.4
446+720 446+440 446+700 28-may-07 Der. 10.5 6.2 2.452 6.2 2.474 100.9
446+440 446+240 446+400 30-may-07 Der. 12.0 6.2 2.461 6.2 2.525 102.6
447+080 446+930 447+000 30-may-07 Der. 11.0 6.2 2.461 6.2 2.363 96.0
446+280 446+045 446+200 01-jun-07 Izq. 9.0 5.6 2.594 6.5 2.569 99.0
446+045 445+700 446+000 02-jun-07 Eje 13.0 6.0 2.386 6.0 2.329 97.6
447+237 477+080 447+200 05-jun-07 Der. 13.0 5.8 2.372 5.8 2.304 97.1 Reposicion de tramo
3
4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
CONTROL Y MONITOREO ROBORE - EL CARMEN
RESUMEN DE DENSIDADES PARA SUBRASANTE
FRENTE 2 CAMARGO CORREA
446+280 446+045 446+200 01-jun-07 Izq. 10.0 5.6 2.594 6.5 2.568 99.0
446+045 445+700 446+000 02-jun-07 Eje 13.0 6.0 2.386 6.0 2.329 97.6
445+700 445+400 445+600 04-jun-07 Izq. 12.5 5.8 2.372 6.0 2.379 100.3
447+210 447+080 447+200 05-jun-07 Der. 13.0 5.8 2.372 5.8 2.304 97.1 Reposicion de tramo por
447+100 Eje 11.0 5.8 2.372 5.8 2.279 96.1 saturacion de subrasante
445+400 445+190 445+390 13-jun-07 Eje 13.5 5.8 2.325 5.5 2.327 100.1
445+190 444+941 445+200 14-jun-07 Izq. 11.0 5.8 2.325 5.8 2.246 96.6
445+100 14-jun-07 Eje 11.5 6.1 2.404 6.1 2.250 93.6 Se realizo una calicata para
445+100 Eje 12.0 6.1 2.404 6.1 2.200 91.5 verificar el proctor
444+941 444+609 444+900 15-jun-07 Eje 10.5 5.9 2.343 5.9 2.308 98.5
444+609 444+537 444+600 17-jun-07 Eje 13.5 5.8 2.385 5.8 2.322 97.4
444+537 444+312 444+500 18-jun-07 Izq. 12.5 5.9 2.345 5.9 2.319 98.9
443+938 443+686 443+900 22-jun-07 Izq. 10.5 6.3 2.368 6.3 2.238 94.5 Observado
443+900 Izq. 11.5 6.3 2.368 6.3 2.341 98.9 Verificado
443+686 443+495 443+600 23-jun-07 Izq. 11.0 5.9 2.391 5.9 2.301 96.2
443+495 443+246 443+400 25-jun-07 Eje 12.0 5.9 2.372 5.9 2.332 98.3
443+246 443+005 443+200 26-jun-07 Der. 13.5 5.8 2.386 5.8 2.287 95.9
CONTROL Y MONITOREO ROBORE - EL CARMEN
RESUMEN DE DENSIDADES PARA SUBRASANTE
FRENTE 2 CAMARGO CORREA
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
Nº de
Campo Registros La...
PROMEDIOS
LABORATORIO CAMPO % COMPACTACION
HUMEDAD DENSIDAD HUMEDAD DENSIDAD ESPECIFICA
CAMPO
OPTIMA (%) (gr/cm3) CAMPO (%) (gr/cm3) CION
6.10 2.379 6.0 2.329 97.91 95