$ 4,738,232.62
berat ac-01
133.858 in d 1.5 m 59.055 in
30.832 ft h 4.32 m 14.1696 ft
t 0.3125 in
w shell 2876.451 lb
w head 405.61 lb
w bottom 405.61 lb
w total 3687.671 lb
berat ac-02
117.3226 in d 0.772 m 30.39364 in
49.856 ft h 2.5 m 8.2 ft
t 0.3125 in
w shell 856.7207 lb
w head 116.1971 lb
w bottom 116.1971 lb
w total 1089.115 lb
37.37 in
39.36 ft
Dodeken = $ 718.26 /ton sumber: https://www.zauba.com/import-dodecene/hs-code-290
Benzen = $ 853.00 /ton sumber : https://www.seair.co.in/indonesia-import-data/benzene
Dodekilbenzen = $ 3,680.00 /ton sumber : https://www.seair.co.in/indonesia-import-data/dodecyl
Tungsten oxide = $ 2,110.00 /ton sumber : https://www.alibaba.com/showroom/tungsten-oxide-pr
com/showroom/tungsten-oxide-price.html 2019
com/showroom/bulk-sodium-hydroxide-price.html 2019
wroom/nahso3-99%2525.html 2019
wroom/sodium-hypochlorite-price.html 2019
2019
wroom/hydrazine-hydrate-price.html 2019
wroom/anion-exchange-resin-price.html 2019
wroom/polystyrene-sulfonate-cation-exchange-resin.html 2019
wroom/silica-gel-price.html 2019
m/marketquotes/CL_.html 2019
wroom/activated-carbon-price.html 2019
m/ekonomi/20190103155456-85-358260/pemerintah-pastikan-tarif-listrik-tak-naik-hingga-maret-2019 2019
W9TCHHH8/tanah-dijual-karangtalun-cilacap-53234 2019
Jumlah Jumlah Jumlah
No Alat
Unit Operator/Unit/Shift Operator/Shift
Proses
1 Tangki Penyimpanan 3 0 0
2 Mixer 1 0.3 0.3
3 Reaktor 1 0.5 0.5
4 Menara Distilasi 2 0.3 0.6
5 Furnace 1 0.5 0.5
6 Heat Exchanger 3 0.1 0.3
7 Reboiler 1 0.1 0.1
8 Kondensor 2 0.1 0.2
9 Pompa 13 0 0
10 Accumulator 2 0 0
Utilitas
1 Screener 1 0.05 0.05
2 Tangki Penyimpanan 9 0 0
3 Mixer 3 0.3 0.9
4 Basin 7 0 0
5 SWRO 1 0.3 0.3
6 Carbon Filter 1 0.1 0.1
7 Cation Exchanger 1 0.5 0.5
8 Anion Exchanger 1 0.5 0.5
9 Cooling Tower 1 1 1
10 Heat Exchanger 1 0.1 0.1
11 Deaerator 1 0.3 0.3
12 Boiler 1 1 1
13 Stack 1 0 0
14 Pompa 29 0 0
15 Wastewater treatment plant 2
16 Control Room 6
Total 15.25
16
64
2.5
3 12
12.75
13 52
Persentase
No Jabatan Jumlah Gaji/orang/bulan Total
thdp UMR
1 Direktur Utama 1 5500% Rp 104,500,000.00 Rp 104,500,000.00
2 Direktur 2 4000% Rp 76,000,000.00 Rp 152,000,000.00
3 Kepala Divisi 6 1800% Rp 34,200,000.00 Rp 205,200,000.00
4 Kepala Bagian 14 1000% Rp 19,000,000.00 Rp 266,000,000.00
5 Engineer 12 500% Rp 9,500,000.00 Rp 114,000,000.00
6 Kepala Shift 8 400% Rp 7,600,000.00 Rp 60,800,000.00
7 Operator 64 350% Rp 6,650,000.00 Rp 425,600,000.00
8 Kepala Keselamatan Kerja 1 520% Rp 9,880,000.00 Rp 9,880,000.00
9 Staff Keselamatan Kerja 2 450% Rp 8,550,000.00 Rp 17,100,000.00
10 Kepala Kesehatan 1 360% Rp 6,840,000.00 Rp 6,840,000.00
11 Personel Kesehatan 5 280% Rp 5,320,000.00 Rp 26,600,000.00
12 Staff I 10 250% Rp 4,750,000.00 Rp 47,500,000.00
13 Staff II 12 220% Rp 4,180,000.00 Rp 50,160,000.00
14 Staff III 6 200% Rp 3,800,000.00 Rp 22,800,000.00
15 Teknisi 8 250% Rp 4,750,000.00 Rp 38,000,000.00
16 Analis 2 250% Rp 4,750,000.00 Rp 9,500,000.00
17 Kepala Keamanan 1 200% Rp 3,800,000.00 Rp 3,800,000.00
18 Petugas Keamanan 12 180% Rp 3,420,000.00 Rp 41,040,000.00
19 Tenaga Kebersihan 15 150% Rp 2,850,000.00 Rp 42,750,000.00
Total Rp 1,644,070,000.00
Rp 19,728,840,000.00
$ 15,874,675.12
$ 132,288.96
Rp 1,719,756,471.33 /bulan
UMR Rp 1,900,000.00
/tahun