11.

4 cm 600 m
1 cm 52.63 m

B
Kontur Elevasi Beda tinggi (m) Jarak (i) (cm) Jarak Aktual (m) Kelandaian (gi) %
A 95
0.5 5.002 263.26 0.19
A1 95.5
A1 95.5
0.5 2.682 141.16 0.35
B 96
B 96
0 5.978 314.63 0.00
B1 96
B1 96
0.5 1.411 74.24 0.67
C 95.5
C 95.5
0.5 2.484 130.72 0.38
C1 95
C1 95
0.5 2.611 137.40 0.36
C2 94.5
C2 94.5
0 3.544 186.53 0.00
D 94.5
D 94.5
0.5 0.984 51.79 0.97
D1 95
D1 95
0.5 1.310 68.95 0.73
D2 95.5
D2 95.5
0 2.588 136.21 0.00
D3 95.5
D3 95.5
0.5 2.184 114.95 0.43
E 95
E 95
0.5 1.805 94.98 0.53
E1 94.5
E1 94.5
0.5 1.855 97.65 0.51
E2 94
E2 94
0 4.396 231.39 0.00
F 94
F 94
0 4.315 227.11 0.00
F1 94
F1 94
0.5 2.701 142.16 0.35
G 94.5
RATA - RATA KELANDAIAN 0.53

Keterangan :
Jarak Aktual : Jarak Pada Peta
Skala

Kelandaian : Beda Tinggi


x 100
Jarak Aktual

Lampiran Autocad
JA/5000
95
5.265 0.053
95.5
95.5
2.823 0.028
96
96
6.293 0.063
96
96
1.485 0.015
95.5
95.5
2.614 0.026
95
95
2.748 0.027
94.5
94.5
3.731 0.037
94.5
94.5
1.036 0.010
95
95
1.379 0.014
95.5
95.5
2.724 0.027
95.5
95.5
2.299 0.023
95
95
1.900 0.019
94.5
94.5
1.953 0.020
94
94
4.628 0.046
94
94
4.542 0.045
94
94
2.843 0.028
94.5
Kelas Daerah Jarak Antar Tikungan
Datar 263.26

Datar 404.42
7.684

Datar 719.05

Datar 793.29
7.389

Datar 924.01

Datar 1061.41

Datar 1247.93
8.638

Datar 1299.72

Datar 1368.67

Datar 1504.88

Datar 1619.83
7.066
1
Datar 1714.81

Datar 1812.46

Datar 2043.85
8.057

Datar 2270.96

Datar 2413.12
7.016
Datar
3
TABEL KOORDINAT TIKUNGAN
Titik A B C D E F G
X 0.612 5.38 12.217 20.844 27.587 34.762 37.541

Y 2.284 8.4 11.206 11.67 9.561 13.227 19.472

X 0 4.768 6.837 8.627 6.743 7.175 2.779

Y 0 6.116 2.806 0.464 -2.109 3.666 6.245

Arc tan x/y 0 37.94 67.69 86.92 -72.63 62.94 23.99

Azimut - 217.94 247.69 266.92 107.37 242.94 203.99

∆ - 29.75 19.24 20.45 44.43 38.95 -

Titik A B C 2 Titik B C D
X 0.612 5.38 12.217 X 5.38 12.22 20.84

Y 2.284 8.4 11.206 Y 8.40 11.21 11.67

X 0 4.768 6.837 X 4.77 6.84 8.63

Y 0 6.116 2.806 Y 6.12 2.81 0.46

Azimut - 217.94 247.69 Azimut 217.94 247.69 266.92

∆ - 29.75 - ∆ - 19.24 -

Titik C D E 4 Titik D E F
X 12.22 20.84 27.59 X 20.84 27.59 34.76

Y 11.21 11.67 9.56 Y 11.67 9.56 13.23

X 6.84 8.63 6.74 X 8.63 6.74 7.18

Y 2.81 0.46 -2.11 Y 0.46 -2.11 3.67

Arc tan x/y 67.69 86.92 -72.63 Arc tan x/y 86.92 -72.63 62.94

Azimut 247.69 266.92 107.37 Azimut 266.92 107.37 242.94

∆ - 20.45 - ∆ - 44.43 -

5 Titik E F G
X 27.59 34.76 37.54

Y 9.56 13.23 19.47

X 6.74 7.18 2.78

Y -2.11 3.67 6.25

Arc tan x/y -72.63 62.94 23.99

Azimut 107.37 242.94 203.99

∆ - 38.95 -
Perhitungan Alinyemen Horizontal
Data-data :
Lebar Pelaksanaan : 2x5m 5
Klasifikasi Jalan : KOLEKTOR PRIMER
Kelas Jalan : 1

kecepatan Rencana (VR) km/jam


Fungsi
Datar Bukit Pegunungan
Arteri 60-100 50-90 40-80
Kolektor 40-80 30-70 20-60
Lokal 40-80 30-70 20-60

Dipilih VR 60 km/jam 60
e maks luar kota 10% 0.1
e maks dalam kota 8% 0.08
en 2% 0.02

VR (km/jam) 120 100 80 60


R min (m) 665 395 230 125

X Y KOORDINAT
0.61 2.28 0.612;2.284 0.612;2.284;
5.38 8.4 5.38;8.4 5.38;8.4;
12.22 11.206 12.217;11.206 12.217;11.206;
34.76 13.23 34,762;13,227 34,762;13,227;
37.54 19.47 37,541;19,472 37,541;19,472;
50 40 30 20 *e max adalah 0,8
80 50 30 10

.612;2.284;

.217;11.206;
,762;13,227;
,541;19,472;
Tikungan B

DATA PERENCANAAN Kontrol


VR 60 θs 10.82
e maks 0.1 θc 8.11
f maks 0.153 Lc 22.51
∆ 29.75
en 0.02
B 5
m 125
R 159
e 0.091 Cek Ls dengan 4 Metode
Ls Tabel (SCS) 60 1. Berdasarkan waktu tempuh di lengkung perali
re 0.035 Ls : 50.00
Rmin 112.04 2. Berdasarkan landai relatif
1/2 ∆ 14.87314 Ls : 69.38
3. Berdasarkan rumus modifikasi short
Keamanan Ls : 37.49
52.63 4. Berdasarkan tingkat pencapaian perubahan ke
1.56 Ls : 38.10

Kesimpulan
Digunakan Ls terbesar :
L:
Parameter
p 2.22
k 39.21
SCS Ts 82.02
E 7.81
Xs 69.04
Ys 5.04

Landai relatif
waktu tempuh di lengkung peralihan 0.008 ≥ 0.008 … OK!
t= 3
andai relatif
Lt 161.26
umus modifikasi short
c= 0.4
ngkat pencapaian perubahan kelandaian

impulan
69.38
161.3
Tikungan C

DATA PERENCANAAN Kontrol


VR 60 θs 13.23
e maks 0.1 θc -7.22
f maks 0.153 Lc -16.38 SS
∆ 19.24
en 0.02
B 5
m 125
R 130
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 50.00 t= 3
Rmin 112.04 2. Berdasarkan landai relatif
1/2 ∆ 9.617632 Ls : 73.75
3. Berdasarkan rumus modifikasi short
Keamanan Ls : 51.30 c= 0.4
52.63 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.25 Ls : 38.10

Kesimpulan
Digunakan Ls terbesar : 73.75
L: 131.1
Parameter
p 3.52
k 43.41
Ts 66.03
E 5.43
Xs 73.16
Ys 6.97

Landai relatif
0.008 ≥ 0.008 …OK!

Lt 131.12
Tikungan D

DATA PERENCANAAN Kontrol


VR 60 θs 6.00
e maks 0.1 θc 8.45
f maks 0.153 Lc 35.25 SCS
∆ 20.45
en 0.02 Perhitungan dengan SS Panjang Perjalanan sela
B 5 θs 10.22
m 125 Ls 85.25 50
R 239
e 0.063 Cek Ls dengan 4 Metode
Ls Tabel (SS) 50 1. Berdasarkan waktu tempuh di lengkung peralih
re 0.035 Ls : 50.00
Rmin 112.04 2. Berdasarkan landai relatif
1/2 ∆ 10.22336 Ls : 51.88
3. Berdasarkan rumus modifikasi short
Keamanan Ls : 23.94
52.63 4. Berdasarkan tingkat pencapaian perubahan kela
1.63 Ls : 38.10

Kesimpulan
Digunakan Ls terbesar : 85.25
L : 170.5
` Parameter
p 1.27
k 42.56
Ts 85.89
E 5.15
Panjang Perjalanan selama 3 detik Xs 84.98
Ys 5.07
R ok
Landai relatif
0.008 ≥ 0.004868 …OK!
puh di lengkung peralihan
t= 3
tif Lt 170.4938

difikasi short
c= 0.4
ncapaian perubahan kelandaian
Tikungan E

DATA PERENCANAAN Kontrol `


VR 60 θs 6.99
e maks 0.08 θc 30.45
f maks 0.153 Lc 108.90 SCS
∆ 44.43
en 0.02 Perhitungan dengan SS Panjang Perjalanan selama 3 detik
B 5 θs 22.22
m 125 Ls 158.90 50 R ok
R 205
e 0.068 Cek Ls dengan 4 Metode
Ls Tabel (SS) 50 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 50.00 t= 3
Rmin 121.66 2. Berdasarkan landai relatif
1/2 ∆ 22.216198 Ls : 55.00
3. Berdasarkan rumus modifikasi short
Keamanan Ls : 30.14 c= 0.4
52.63 4. Berdasarkan tingkat pencapaian perubahan kelandaian
3.13 Ls : 28.57

Kesimpulan
Digunakan Ls terbesar : 158.90
L : 317.8
Parameter
p 5.31
k 79.00
Ts 164.89
E 22.17
Xs 156.51
Ys 20.53

Landai relatif
0.008 ≥ 0.002769 …OK!

Lt 317.7904
Tikungan F

DATA PERENCANAAN Kontrol


VR 60 θs 11.02
e maks 0.08 θc 16.90
f maks 0.153 Lc 38.32 SCS
∆ 38.95
en 0.02
B 5
m 125
R 130
e 0.079 Cek Ls dengan 4 Metode
Ls Tabel (SS) 50 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 50.00 t= 3
Rmin 121.66 2. Berdasarkan landai relatif
1/2 ∆ 19.473393 Ls : 61.88
3. Berdasarkan rumus modifikasi short
Keamanan Ls : 59.07 c= 0.4
52.63 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.59 Ls : 28.57

Kesimpulan
Digunakan Ls terbesar : 61.88
L : 162.1
Parameter
p 2.51
k 36.67
Ts 83.52
E 10.55
Xs 61.52
Ys 4.91

Landai relatif
0.008 ≥ 0.008 …OK!

Lt 162.07
10.6 cm 600 m
1 cm 56.60 m

TABEL KELANDAIAN ALINYEMEN HORIZONT


Kontur Elevasi Beda tinggi (m) Jarak (i) (cm) Jarak Aktual (m) Kelandaian (gi) %
A 945
5 1.9 107.55 4.65
A1 950
A1 950
5 5.7 322.64 1.55
B 955
B 955
0 3.4 192.45 0.00
B1 955
B1 955
5 3.7 209.43 2.39
C 960
C 960
5 1.7 96.23 5.20
C1 955
C1 955
5 2 113.21 4.42
C2 950
C2 950
5 4.3 243.40 2.05
D 945
D 945
5 1.7 96.23 5.20
D1 950
D1 950
0 4.1 232.08 0.00
D2 950
D2 950
5 1.9 107.55 4.65
E 945
E 945
5 2.2 124.53 4.02
E1 940
E1 940
5 4.8 271.70 1.84
F 935
F 935
5 1.7 96.23 5.20
F1 930
F1 930
5 2.7 152.83 3.27
F2 925
F2 925
5 2.5 141.51 3.53
G 920
RATA - RATA KELANDAIAN 3.20

PERHITUNGAN
CAD
KELANDAIAN
KONTUR Y (m) X (m) gi (%)
PV1
1 325.00 0.31
PV2
PV2
5 190.00 2.63
PV3
PV3
0 305.00 0.00
PV4
PV4
6 115.00 5.22
PV5
PV5
0 340.00 0.00
PV6
PV6
4 340.00 1.18
PV7
PV7
10 395.00 2.53
PV8
PV8
14 250.00 5.60
PV9
PV9
1 140.00 0.71
G

No. Nama Stationing Elevasi


1 A 0 949
2 PV1 107.55 949
3 PV2 430.19 950
4 PV3 622.64 955
5 PV4 928.30 955
6 PV5 1041.51 949
7 PV6 1381.13 949
8 PV7 1720.75 945
9 PV8 2116.98 935
10 PV9 2366.04 921
11 G 2507.55 920

Titik Kelandaian Jarak Aktual


A-PV1 0.00 107.55

PV1-PV2 0.31 430.19

PV2-PV3 2.63 515.09

PV3-PV4 0.00 498.11

PV4-PV5 5.22 209.43


PV5-PV6 0.00 452.83

PV6-PV7 1.18 435.85

PV7-PV8 2.53 503.77

PV8-PV9 5.60 520.75

PV9-G 0.71 141.51


NYEMEN HORIZONTAL
Kelas Daerah Jarak Antar Tikungan
Perbukitan 107.55 1
7.60
Datar 430.19 2

Datar 622.64 3
7.10
Datar 832.08 4

Perbukitan 928.30 5

Perbukitan 8.00 1041.51 6

Datar 1284.91 7

Perbukitan 1381.13 8

Datar 7.70 1613.21 9

Perbukitan 1720.75 10

Perbukitan 1845.28 11
7.00
Datar 2116.98 12

Perbukitan 2213.21 13

Perbukitan 6.90 2366.04 14

Perbukitan 2507.55 15

Perbukitan -
PANJANG KRITIS (m)
325.00

190.07

305.00

115.16

340.00

340.02

395.13

250.39

140.00
1
A 107.55 0.022
A1
2
A1 322.64 0.065
B
3
B 192.45 0.038
B1
4
B1 209.43 0.042
C
5
C 96.23 0.019
C1
6
C1 113.21 0.023
C2
7
C2 243.40 0.049
D
8
D 96.23 0.019
D1
9
D1 232.08 0.046
D2
10
D2 107.55 0.022
E
11
E 124.53 0.025
E1
12
E1 271.70 0.054
F
13
F 96.23 0.019
F1
14
F1 152.83 0.031
F2
15
F2 141.51 0.028
G
945
950
950
955
955
955
955
960
960
955
955
950
950
945
945
950
950
950
950
945
945
940
940
935
935
930
930
925
925
920
Pelebaran Tikungan Pelebaran Tikungan
Tikungan B Tikungan C
Data Perhitungan Data Perhitungan
Vr 60 Rw 160.2484 Vr 60 Rw 131.2477
Rc 159 Ri 157.5486 Rc 130 Ri 128.5036
n 2 B 2.6998 n 2 B 2.7440
c 1.25 Z 0.4996 c 1.25 Z 0.5525
b 2.5 Bt 8.3993 b 2.5 Bt 8.5406
P 6.5 U 0.1998 P 6.5 U 0.2440
A 1.5 Δb 1.3993 A 1.5 Δb 1.5406
Bn 7 Bn 7

Kebebasan Samping Kebebasan Samping


Tikungan B Tikungan C
Data Perhitungan Data Perhitungan
Vr 60 Eo 28.250 Vr 60 Eo 28.250
Rc 159 Jh 84.649 Rc 130 Jh 84.649
B 3.5 Jh<Lt Maka: B 3.5 Jh<Lt Maka:
fm 0.33 1-COS 15.423 fm 0.33 1-COS 18.910
L.p 60 0.036009 L.p 60 0.053971
R' 157.25 E jh 5.662 R' 128.25 E jh 6.922
g 0 g 0
Lt 161.26 ok Lt 131.12 ok

JA
DATA JPM PERHITUNGAN DATA JPM PERHITUNGAN
a 2.268 D1 50.3061 a 2.268 D1 50.3061
T1 3.68 D2 157.4592 T1 3.68 D2 157.4592
T2 9.44 D3 30 T2 9.44 D3 30
m 15 D4 104.9728 m 15 D4 104.9728
D 353 D 353
Eo 28.25 Eo 28.25
JPM>Lt JPM>Lt
1-cos 64.314 1-cos 78.857
0.567 0.807
E jpm 175.4913 E jpm 212.3133

tidak ok tidak ok

Karena Jarak pandang menyiap tidak memenuhi, maka diperlukan rambu tidak boleh menyiap

Jh untuk vertikal
Kebebasan Samping Kebebasan Samping
Tikungan B Tikungan C
Data Perhitungan Data Perhitungan
Vr 60 Eo 28.250 Vr 60 Eo 28.250
Rc 159 Jh 84.649 Rc 130 Jh 84.649
B 3.5 Jh<Lt Maka: B 3.5 Jh<Lt Maka:
fm 0.33 1-COS 15.423 fm 0.33 1-COS 18.910
L.p 60 0.036009 L.p 60 0.053971
R' 157.25 E jh 5.662 R' 128.25 E jh 6.922
g 0 g 0
L 0 L 0
Lt 161.26 ok Lt 131.12 ok
Pelebaran Tikungan Pelebaran Tikungan Pelebaran Tikungan
Tikungan D Tikungan E Tikungan F
Data Perhitungan Data Perhitungan Data
Vr 60 Rw 240.2493 Vr 60 Rw 206.2491 Vr 60
Rc 239 Ri 237.6161 Rc 205 Ri 203.5938 Rc 130
n 2 B 2.6332 n 2 B 2.6552 n 2
c 1.25 Z 0.4075 c 1.25 Z 0.4400 c 1.25
b 2.5 Bt 8.1740 b 2.5 Bt 8.2504 b 2.5
P 6.5 U 0.1332 P 6.5 U 0.1552 P 6.5
A 1.5 Δb 1.1740 A 1.5 Δb 1.2504 A 1.5
Bn 7 Bn 7 Bn 7

Kebebasan Samping Kebebasan Samping Kebebasan Samping


Tikungan D Tikungan E Tikungan F
Data Perhitungan Data Perhitungan Data
Vr 60 Eo 28.250 Vr 60 Eo 28.250 Vr 60
Rc 239 Jh 84.649 Rc 205 Jh 84.649 Rc 130
B 3.5 Jh<Lt Maka: B 3.5 Jh<Lt Maka: B 3.5
fm 0.33 1-COS 10.222 fm 0.33 1-COS 11.932 fm 0.33
L.p 60 0.015873 L.p 60 0.021607 L.p 60
R' 237.25 E jh 3.766 R' 203.25 E jh 4.392 R' 128.25
g 0 g 0 g 0
Lt 170.4938 ok Lt 317.7904 ok Lt 162.07

JARAK PANDANG MENYIAP


DATA JPM PERHITUNGAN DATA JPM PERHITUNGAN DATA JPM
a 2.268 D1 50.3061 a 2.268 D1 50.3061 a 2.268
T1 3.68 D2 157.4592 T1 3.68 D2 157.4592 T1 3.68
T2 9.44 D3 30 T2 9.44 D3 30 T2 9.44
m 15 D4 104.9728 m 15 D4 104.9728 m 15
D 353 D 353
Eo 28.25 Eo 28.25
JPM>Lt JPM>Lt
1-cos 42.628 1-cos 49.759
0.264 0.354
E jpm 124.4886 E jpm 85.38707

tidak ok tidak ok

Kebebasan Samping Kebebasan Samping Kebebasan Samping


Tikungan D Tikungan E Tikungan F
Data Perhitungan Data Perhitungan Data
Vr 60 Eo 28.250 Vr 60 Eo 28.250 Vr 60
Rc 239 Jh 84.649 Rc 205 Jh 84.649 Rc 130
B 3.5 Jh<Lt Maka: B 3.5 Jh<Lt Maka: B 3.5
fm 0.33 1-COS 10.222 fm 0.33 1-COS 11.932 fm 0.33
L.p 60 0.015873 L.p 60 0.021607 L.p 60
R' 237.25 E jh 3.766 R' 203.25 E jh 4.392 R' 128.25
g 0 g 0 g 0
L 0 L 0 L 0
Lt 170.4938 ok Lt 317.7904 ok Lt 162.07
Pelebaran Tikungan
Tikungan F
Perhitungan
Rw 131.2477
Ri 128.5036
B 2.7440
Z 0.5525
Bt 8.5406
U 0.2440
Δb 1.5406

Kebebasan Samping
Tikungan F
Perhitungan
Eo 28.250
Jh 84.649
Jh<Lt Maka:
1-COS 18.910
0.053971
E jh 6.922

ok
PERHITUNGAN
D1 50.3061
D2 157.4592
D3 30
D4 104.9728
D 353
Eo 28.25
JPM>Lt
1-cos 78.857
0.807
E jpm 197.1294

tidak ok

Kebebasan Samping
Tikungan F
Perhitungan
Eo 28.250
Jh 84.649
Jh<Lt Maka:
1-COS 18.910
0.053971
E jh 6.922

ok
Perhitungan STA TIKUNGAN B Tikungan C
skala 52.63 P-B S-C-S P-C S-C-S
Ls - B 60.00 m Ls - C 60.00
d Antar Tikungan Lc - B 22.51 m Lc - C -16.38
d A-B 7.7 404.42 Ts - B 82.02 m Ts - C 66.03
d B-C 7.4 388.87
d C-D 8.6 454.64
d D-E 4.9 256.95 Tikungan D Tikungan F
d E-F 4.0 209.93 P-D S-S P-F S-C-S
d F-G 13.3 698.31 Ls - D 50.00 m Ls - E 50.00
2413.12 Lc - G 35.25 m Lc - E 38.32
Ts - G 85.89 m Ts - E 83.52
sumbu
x y
A 0.612 2.284 Tikungan E
B 5.38 8.4 P-F S-S
C 12.217 11.206 Ls - F 50.00 m
D 20.844 11.67 Lc - F 108.90 m
E 27.587 9.561 Ts - F 164.89 m
F 34.762 13.227
G 37.541 19.472

0,612;2,284
5,38;8,4
12,217;11,206
20,844;11,67
27,587;9,561
34,762;13,227
37,541;19,472
Perhitungan Penyelesaian
0.0000 sta A 0+ 0.0000
m 322.3970 sta TS-B 0+ 322.3970
m 382.3970 sta CS-B 0+ 382.3970
SCS
m 404.9033 sta SC-B 0+ 404.9033
464.9033 sta ST-B 0+ 464.9033
705.7142 sta TS-C 0+ 705.7142
765.7142 sta CS-C 0+ 765.7142
SCS
749.3355 sta SC-C 0+ 749.3355
m 809.3355 sta ST-C 0+ 809.3355
m 1112.0545 sta TS-D 1+ 112.0545
m 1162.0545 SS sta S-S 1+ 162.0545
1212.0545 sta ST-D 1+ 212.0545
1218.2199 sta TS-E 1+ 218.2199
1268.2199 SS sta S-S 1+ 268.2199
1318.2199 sta ST-E 1+ 318.2199
1279.7386 sta TS-F 1+ 279.7386
1329.7386 sta CS-F 1+ 329.7386
SCS
1368.0612 sta SC-F 1+ 368.0612
1418.0612 sta ST-F 1+ 418.0612
2032.8457 Ok sta G 2+ 32.8457
KONTROL OVERLAPPING

TITIK A-B 82.02 OK 404.42


TITIK B-C 148.06 OK 388.87
TITIK C-D 151.92 OK 454.64
TITIK D-E 250.78 OK 256.95
TITIK E-F 248.41 OL 209.93
TITIK F-G 83.52 OK 698.31

KONTROL OVERLAPPING
VR*1000/3600*3 50

TSB - STC 240.81 OK


TSC - STD 302.72 OK
TSD - STE 6.17 OL
TSE - STF -38.48 OL
PV1
VR 60
Jh 84.65 G1 G2
Jh 84.65 X 107.55 322.64
g1 0.0000 Y1 949 949
g2 0.3099 Y2 949 950

Perhitungan Cekung
A -0.31 0.31
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 2.936
2 L berdasarkan keluesan bentuk 36.0 -
3 L berdasarkan syarat drainase 15.5 -
4 L berdasarkan penyinaran lampu Jh<Lv 5.3 tidak Ok
Jh>Lv -1173.8 Ok
5 L brdsrkn J pndng bbs d bwh bangunan Jd<Lv 0.6 tidak Ok
Jd>Lv -12220.1 Ok
Dipilih Lv yang Ok 36.0
Ev 0.0139
x 18
y 0.0139

Data Stationing Data Elevasi


Sta PV1 107.55 Elevasi PLV1 950
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 89.5500 Elevasi PLV1 950.0000
Sta A1 98.5500 Elevasi A1 950.0000
Sta PPV1 107.55 Elevasi PPV1 950.0139
Sta B1 116.5500 Elevasi B1 950.0279
Sta PTV1 125.5500 Elevasi PTV1 950.0558
PV3
VR 60
Jd 353 G1 G2
Jh 84.65 X 192 305.66
g1 2.5981 Y1 950 955
g2 0.0000 Y2 955 955

Perhitungan Cembung
A 2.60 2.5980774227
Lv Keterangan
1 L berdasarkan kenyamanan perjalanan 24.613
2 L berdasarkan syarat drainase 129.9 -
3 L berdasarkan JPH Jh<Lv 46.7 tidak Ok
Jh>Lv 15.723 Ok
4 L berdasarkan JPM Jd<Lv 337.2 tidak Ok
Jd>Lv 336.5 Ok
Dipilih Lv yang Ok 15.7
Ev 0.0511
x 7.8616
y 0.0511

Data Stationing Data Elevasi


Sta PV3 622.64 Elevasi PLV3 955
Perhitungan Stationing Perhitungan Elevasi
Sta PLV3 614.7784 Elevasi PLV3 954.7957
Sta A3 618.7092 Elevasi A3 954.8979
Sta PPV3 622.64 Elevasi PPV3 954.9489
Sta B3 626.5708 Elevasi B3 955.0000
Sta PTV3 630.5016 Elevasi PTV3 955.0000
PV5
VR 60
Jh 84.65 G1 G2
Jh 84.65 X 113.21 340
g1 -5.2999 Y1 955 949
g2 0.0000 Y2 949 949

Perhitungan Cekung
A -5.30 5.30
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 50.209
2 L berdasarkan keluesan bentuk 36.0 -
3 L berdasarkan syarat drainase 265.0 -
4 L berdasarkan penyinaran lampu Jh<Lv 91.2 Ok
Jh>Lv 90.8 tidak Ok
5 L brdsrkn J pndng bbs d bwh bangunan Jd<Lv 9.9 tidak Ok
Jd>Lv -555.2 Ok
Dipilih Lv yang Ok 36.0
Ev 0.2385
x 18
y 0.2385

Data Stationing Data Elevasi


Sta PV5 1041.51 Elevasi PLV5 950
Perhitungan Stationing Perhitungan Elevasi
Sta PLV5 1023.5100 Elevasi PLV5 950.9540
Sta A5 1032.5100 Elevasi A5 950.4770
Sta PPV5 1041.51 Elevasi PPV5 950.2385
Sta B5 1050.5100 Elevasi B5 950.0000
Sta PTV5 1059.5100 Elevasi PTV5 950.0000
PV7
VR 60
Jd 353 G1 G2
Jh 84.65 X 340 396.23
g1 -1.1778 Y1 949 945
g2 -2.5238 Y2 945 935

Perhitungan Cembung
A 1.35 1.3459997512
Lv Keterangan
1 L berdasarkan kenyamanan perjalanan 12.752
2 L berdasarkan syarat drainase 67.3 -
3 L berdasarkan JPH Jh<Lv 24.2 tidak Ok
Jh>Lv -127.136 Ok
4 L berdasarkan JPM Jd<Lv 174.7 tidak Ok
Jd>Lv -7.2 Ok
Dipilih Lv yang Ok 67.3
Ev 0.1132
x 33.6500
y 0.1132

Data Stationing Data Elevasi


Sta PV7 1720.75 Elevasi PLV7 945
Perhitungan Stationing Perhitungan Elevasi
Sta PLV7 1687.1000 Elevasi PLV7 945.3963
Sta A7 1703.9250 Elevasi A7 945.1982
Sta PPV7 1720.75 Elevasi PPV7 944.8868
Sta B7 1737.5750 Elevasi B7 944.5754
Sta PTV7 1754.4000 Elevasi PTV7 944.1507
PV9
VR 60
Jh 84.65 G1 G2
Jh 84.65 X 249.06 141.51
g1 -5.6211 Y1 935 921
g2 -0.7067 Y2 921 920

Perhitungan Cekung
A -4.91 4.91
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 46.558
2 L berdasarkan keluesan bentuk 36.0 -
3 L berdasarkan syarat drainase 245.7 -
4 L berdasarkan penyinaran lampu Jh<Lv 84.6 tidak Ok
Jh>Lv 84.6 Ok
5 L brdsrkn J pndng bbs d bwh bangunan Jd<Lv 9.2 tidak Ok
Jd>Lv -612.1 Ok
Dipilih Lv yang Ok 36.0
Ev 0.2212
x 18
y 0.2212

Data Stationing Data Elevasi


Sta PV9 2366.04 Elevasi PLV9 925
Perhitungan Stationing Perhitungan Elevasi
Sta PLV9 2348.0400 Elevasi PLV9 926.0118
Sta A9 2357.0400 Elevasi A9 925.5059
Sta PPV9 2366.04 Elevasi PPV9 924.7788
Sta B9 2375.0400 Elevasi B9 924.9364
Sta PTV9 2384.0400 Elevasi PTV9 924.8728
PV2
VR 60 KETERANGAN :
Jh 84.65 G1 G2
Jh 84.65 X 322.64 192
g1 0.3099 Y1 949 950
g2 2.5981 Y2 950 955

Perhitungan Cekung
A -2.29 2.29
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 21.677
2 L berdasarkan keluesan bentuk 36.0 -
3 L berdasarkan syarat drainase 114.4 -
4 L berdasarkan penyinaran lampu Jh<Lv 39.4 tidak Ok
Jh>Lv -12.6 Ok
5 L brdsrkn J pndng bbs d bwh bangunan Jd<Lv 4.3 tidak Ok
Jd>Lv -1508.9 Ok
Dipilih Lv yang Ok 36.0
Ev 0.1030
x 18
y 0.1030

Data Stationing Data Elevasi


Sta PV2 430.19 Elevasi PLV2 955
Perhitungan Stationing Perhitungan Elevasi
Sta PLV2 412.1900 Elevasi PLV2 954.9442
Sta A2 421.1900 Elevasi A2 954.9721
Sta PPV2 430.19 Elevasi PPV2 955.1030
Sta B2 439.1900 Elevasi B2 955.2338
Sta PTV2 448.1900 Elevasi PTV2 955.4677
PV4
VR 60
Jd 353 G1 G2
Jh 84.65 X 305.66 113.21
g1 0.0000 Y1 955 955
g2 -5.2999 Y2 955 949

Perhitungan Cembung
A 5.30 5.2999
Lv Keterangan
1 L berdasarkan kenyamanan perjalanan 50.209
2 L berdasarkan syarat drainase 265.0 -
3 L berdasarkan JPH Jh<Lv 95.2 Ok
Jh>Lv 94.014 tidak Ok
4 L berdasarkan JPM Jd<Lv 687.9 Ok
Jd>Lv 524.9 tidak Ok
Dipilih Lv yang Ok 95
Ev 0.6305
x 47.5893
y 0.6305

Data Stationing Data Elevasi


Sta PV4 928.30 Elevasi PLV4 955
Perhitungan Stationing Perhitungan Elevasi
Sta PLV4 880.7107 Elevasi PLV4 955.0000
Sta A4 904.5054 Elevasi A4 955.0000
Sta PPV4 928.3 Elevasi PPV4 954.3695
Sta B4 952.0946 Elevasi B4 953.7389
Sta PTV4 975.8893 Elevasi PTV4 952.4778
PV6
VR 60
Jd 353 G1 G2
Jh 84.65 X 340 340
g1 0.0000 Y1 949 949
g2 -1.1778 Y2 949 945

Perhitungan Cembung
A 1.18 1.1778
Lv Keterangan
1 L berdasarkan kenyamanan perjalanan 11.158
2 L berdasarkan syarat drainase 58.9 -
3 L berdasarkan JPH Jh<Lv 21.2 tidak Ok
Jh>Lv -169.473 Ok
4 L berdasarkan JPM Jd<Lv 152.9 tidak Ok
Jd>Lv -109.1 Ok
Dipilih Lv yang Ok 58.889
Ev 0.0867
x 29.4447
y 0.0867

Data Stationing Data Elevasi


Sta PV6 1381.13 Elevasi PLV6 950
Perhitungan Stationing Perhitungan Elevasi
Sta PLV6 1351.6853 Elevasi PLV6 950.0000
Sta A6 1366.4077 Elevasi A6 950.0000
Sta PPV6 1381.13 Elevasi PPV6 949.9133
Sta B6 1395.8523 Elevasi B6 949.8266
Sta PTV6 1410.5747 Elevasi PTV6 949.6532
PV8
VR 60
Jd 353 G1 G2
Jh 84.65 X 396.23 249.06
g1 -2.5238 Y1 945 935
g2 -5.6211 Y2 935 921

Perhitungan Cembung
A 3.10 3.0973
Lv Keterangan
1 L berdasarkan kenyamanan perjalanan 29.343
2 L berdasarkan syarat drainase 154.9 -
3 L berdasarkan JPH Jh<Lv 55.6 tidak Ok
Jh>Lv 40.479 Ok
4 L berdasarkan JPM Jd<Lv 402.0 Ok
Jd>Lv 396.1 tidak Ok
Dipilih Lv yang Ok 40.479
Ev 0.1567
x 20.2393
y 0.1567

Data Stationing Data Elevasi


Sta PV8 2116.98 Elevasi PLV8 935
Perhitungan Stationing Perhitungan Elevasi
Sta PLV8 2096.7407 Elevasi PLV8 935.5108
Sta A8 2106.8604 Elevasi A8 935.2554
Sta PPV8 2116.98 Elevasi PPV8 934.8433
Sta B8 2127.0996 Elevasi B8 934.4312
Sta PTV8 2137.2193 Elevasi PTV8 933.8623
KETERANGAN :
PV1 cekung
PV2 cekung
PV3 cembung
PV4 cembung
PV5 cekung
PV6 cembung
PV7 cembung
PV8 cembung
PV9 cekung
JARAK ASLI ELEVASI TANAH
STA+ STA
(m) ASLI (m)
0 0+ 0 945
50 0+ 50 947.27
100 0+ 100 949.55
PV1 107.55 0+ 107.55 950
150 0+ 150 950.62
200 0+ 200 951.38
250 0+ 250 952.15
300 0+ 300 952.92
350 0+ 350 953.69
400 0+ 400 954.46
PV2 430.19 0+ 430.19 955
450 0+ 450 955
500 0+ 500 955
550 0+ 550 955
600 0+ 600 955
PV3 622.64 0+ 622.64 955
650 0+ 650 955.60
700 0+ 700 956.79
750 0+ 750 957.98
800 1+ -200 959.17
835 1+ -165 960
850 1+ -150 959.21
900 1+ -100 956.58
PV4 928.30 1+ -71.70 955
950 1+ -50 954.13
1000 1+ 0 951.96
PV5 1041.51 1+ 41.51 950
1050 1+ 50 949.9
1100 1+ 100 948.88
1150 1+ 150 947.86
1200 1+ 200 946.84
1250 1+ 250 945.82
1290 1+ 290 945
1300 1+ 300 945.53
1350 1+ 350 948.16
PV6 1381.13 1+ 381.13 950
1400 1+ 400 950
1450 1+ 450 950
1500 1+ 500 950
1550 1+ 550 950
1600 1+ 600 950
1615 1+ 615 950
1650 2+ -350 948.41
1700 2+ -300 946.14
PV7 1720.75 2+ -279.25 945
1750 2+ -250 944
1800 2+ -200 942
1850 2+ -150 940
1850 2+ -150 940
1900 2+ -100 939.07
1950 2+ -50 938.15
2000 2+ 0 937.22
2050 2+ 50 936.3
2100 2+ 100 935.37
PV8 2116.98 2+ 116.98 935
2150 2+ 150 932.42
2200 2+ 200 930.79
2215 2+ 215 930
2250 2+ 250 928.87
2300 2+ 300 926.26
2350 2+ 350 925.65
PV9 2366.04 2+ 366.04 925
2400 2+ 400 923.93
2450 2+ 450 922.14
2500 2+ 500 920.36
2507.55 2+ 507.55 920
ELEVASI RENCANA Volume (m3)
JARAK C (m) S (m) LUAS (m)
AS JALAN (m) Galian
949 0 -4 0.80 39.20
949 50 -1.73 0.80 20.10
949 50 0.55 0.80 7.39 687.192
949 7.55 1 0.80 13.80 80.000
949.12 42.45 1.5 0.80 21.30 744.998
949.28 50 2.1 0.80 30.83 1303.200
949.43 50 2.72 0.80 41.28 1802.668
949.58 50 3.34 0.80 52.34 2340.580
949.74 50 3.95 0.80 63.83 2904.412
949.89 50 4.57 0.80 76.12 3498.748
950 30.19 5 0.80 85.00 2432.075
950.39 19.81 4.61 0.80 76.93 1603.933
951.71 50 3.29 0.80 51.43 3209.024
953.03 50 1.97 0.80 28.71 2003.600
954.34 50 0.66 0.80 8.93 941.080
955 22.64 0 0.00 0.00 101.070
955 27.36 0.60 0.80 8.09 110.644
955 50 1.79 0.80 25.83 848.032
955 50 2.98 0.80 45.84 1791.940
955 50 4.17 0.80 68.12 2849.136
955 35 5 0.80 85.00 2679.620
955 15 4.21 0.80 68.91 1154.320
955 50 1.58 0.80 22.54 2286.160
955 28.30 0 0.00 0.00 318.900
953.96 21.70 0.17 0.80 2.23 24.229
951.35 50 0.61 0.80 8.23 261.520
949 41.51 1 0.80 13.80 457.184
949 8.49 0.9 0.80 12.35 110.998
949 50 -0.12 0.80 1.55
949 50 -1.14 0.80 13.78
949 50 -2.16 0.80 24.35
949 50 -3.18 0.80 33.25
949 40 -4 0.80 39.20
949 10 -3.47 0.80 35.48
949 50 -0.84 0.80 10.36
949 31.13 1 0.80 13.80 375.981
948.82 18.87 1.18 0.80 16.45 285.446
948.24 50 1.76 0.80 25.36 1045.300
947.56 50 2.44 0.80 36.48 1546.024
947.06 50 2.94 0.80 45.13 2040.444
946.47 50 3.53 0.80 55.86 2524.840
946.29 15 3.71 0.80 59.24 863.250
945.88 35 2.53 0.80 38.01 1701.910
945.29 50 0.85 0.80 11.63 1240.968
945 20.75 0 0.00 0.00
944.37 29.25 -0.37 0.80 4.70
943.1 50 -1.1 0.80 13.33
941.84 50 -1.84 0.80 21.21
941.84 0 -1.84 0.80 21.21
940.57 50 -1.5 0.80 17.70
939.30 50 -1.15 0.80 13.89
938.04 50 -0.82 0.80 10.12
936.77 50 -0.47 0.80 5.93
935.51 50 -0.14 0.80 1.80
935 16.98 0 0.00 0.00 15.319
932.32 33.02 0.1 0.80 1.31 21.595
930.52 50 0.27 0.80 3.57 121.908
929.68 15 0.32 0.80 4.24 58.577
927.72 35 1.15 0.80 16.01 354.374
924.92 50 1.34 0.80 18.86 871.612
922.12 50 3.53 0.80 55.86 1867.880
921 16.04 4 0.80 64.80 967.683
920.79 33.96 3.14 0.80 48.71 1927.360
920.43 50 1.71 0.80 24.57 1831.924
920.07 50 0.29 0.80 3.84 710.164
920 7.55 0 0.00 0.00 14.486
TOTAL 56245.115
SELISIH 44209.198
Volume (m3)
KETERANGAN
Timbunan
0.000 TIMBUNAN
1482.392 TIMBUNAN
GALIAN
GALIAN 107.55
GALIAN DRAINASE 0.5
GALIAN LEBAR JALAN 7
GALIAN BAHU JALAN 2.5
GALIAN LEBAR TOTAL 13
GALIAN
GALIAN
GALIAN 322.64
GALIAN PV1 107.55
GALIAN PV2 430.19
GALIAN PV3 622.64
GALIAN PV4 928.30
GALIAN 192 PV5 1041.51
GALIAN PV6 1381.13
GALIAN PV7 1720.75
GALIAN PV8 2116.98
GALIAN PV9 2366.04
GALIAN
GALIAN
GALIAN
GALIAN 305.66
GALIAN
GALIAN
GALIAN 113.21
GALIAN
347.412 TIMBUNAN
383.220 TIMBUNAN
953.196 TIMBUNAN
1439.940 TIMBUNAN
1449.002 TIMBUNAN
373.386 TIMBUNAN
1145.820 TIMBUNAN
GALIAN 340
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
120.641 TIMBUNAN 340
68.745 TIMBUNAN
450.812 TIMBUNAN
863.588 TIMBUNAN
0.000 TIMBUNAN
972.788 TIMBUNAN
789.800 TIMBUNAN
600.352 TIMBUNAN
401.384 TIMBUNAN
193.440 TIMBUNAN
GALIAN 396.23
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN 249.06
GALIAN
GALIAN
GALIAN
GALIAN 141.51
12035.917
44209.198
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
TIMBUNAN
GALIAN
GALIAN
ELEVASI
ELEVASI
JARAK ASLI RENCANA
STA TANAH ASLI JARAK C (m)
(m) AS JALAN
(m)
(m)

0 0+ 0 945 949 0 -4
50 0+ 50 947.27 949 50 -1.73
100 0+ 100 949.55 949 50 0.55
PV1 107.55 0+ 107.55 950 949 7.55 1
150 0+ 150 950.62 949.12 42.45 1.5
200 0+ 200 951.38 949.28 50 2.1
250 0+ 250 952.15 949.43 50 2.72
300 0+ 300 952.92 949.58 50 3.34
350 0+ 350 953.69 949.74 50 3.95
400 0+ 400 954.46 949.89 50 4.57
PV2 430.19 0+ 430.19 955 950 30.19 5
450 0+ 450 955 950.39 19.81 4.61
500 0+ 500 955 951.71 50 3.29
550 0+ 550 955 953.03 50 1.97
600 0+ 600 955 954.34 50 0.66
PV3 622.64 0+ 622.64 955 955 22.64 0
650 0+ 650 955.60 955 27.36 0.60
700 0+ 700 956.79 955 50 1.79
750 0+ 750 957.98 955 50 2.98
800 1+ -200 959.17 955 50 4.17
835 1+ -165 960 955 35 5

ELEVASI
ELEVASI
JARAK ASLI RENCANA
STA TANAH ASLI JARAK C (m)
(m) AS JALAN
(m)
(m)

850 1+ -150.00 959.21 955.00 15.00 4.21


900 1+ -100.00 956.58 955.00 50.00 1.58
PV4 928.30 1+ -71.70 955.00 955.00 28.30 0.00
950 1+ -50.00 954.13 953.96 21.70 0.17
1000 1+ 0.00 951.96 951.35 50.00 0.61
PV5 1041.51 1+ 41.51 950.00 949.00 41.51 1.00
1050 1+ 50.00 949.90 949.00 8.49 0.90
1100 1+ 100.00 948.88 949.00 50.00 -0.12
1150 1+ 150.00 947.86 949.00 50.00 -1.14
1200 1+ 200.00 946.84 949.00 50.00 -2.16
1250 1+ 250.00 945.82 949.00 50.00 -3.18
1290 1+ 290.00 945.00 949.00 40.00 -4.00
1300 1+ 300.00 945.53 949.00 10.00 -3.47
1350 1+ 350.00 948.16 949.00 50.00 -0.84
PV6 1381.13 1+ 381.13 950.00 949.00 31.13 1.00
1400 1+ 400.00 950.00 948.82 18.87 1.18
1450 1+ 450.00 950.00 948.24 50.00 1.76
1500 1+ 500.00 950.00 947.56 50.00 2.44
1550 1+ 550.00 950.00 947.06 50.00 2.94
1600 1+ 600.00 950.00 946.47 50.00 3.53
1615 1+ 615.00 950.00 946.29 15.00 3.71

ELEVASI
ELEVASI
JARAK ASLI RENCANA
STA TANAH ASLI JARAK C (m)
(m) AS JALAN
(m)
(m)

1615 1+ 615 950 946.29 15 3.71


1650 2+ -350 948.41 945.88 35 2.53
1700 2+ -300 946.14 945.29 50 0.85
PV7 1720.75 2+ -279.25 945 945 20.75 0
1750 2+ -250 944 944.37 29.25 -0.37
1800 2+ -200 942 943.1 50 -1.1
1850 2+ -150 940 941.84 50 -1.84
1850 2+ -150 940 941.84 0 -1.84
1900 2+ -100 939.07 940.57 50 -1.5
1950 2+ -50 938.15 939.30 50 -1.15
2000 2+ 0 937.22 938.04 50 -0.82
2050 2+ 50 936.3 936.77 50 -0.47
2100 2+ 100 935.37 935.51 50 -0.14
PV8 2116.98 2+ 116.98 935 935 16.98 0
2150 2+ 150 932.42 932.32 33.02 0.1
2200 2+ 200 930.79 930.52 50 0.27
2215 2+ 215 930 929.68 15 0.32
2250 2+ 250 928.87 927.72 35 1.15
2300 2+ 300 926.26 924.92 50 1.34
2350 2+ 350 925.65 922.12 50 3.53
PV9 2366.04 2+ 366.04 925 921 16.04 4

ELEVASI
ELEVASI
JARAK ASLI RENCANA
STA TANAH ASLI JARAK C (m)
(m) AS JALAN
(m)
(m)

2400 2+ 400 923.93 920.79 33.96 3.14


2450 2+ 450 922.14 920.43 50 1.71
2500 2+ 500 920.36 920.07 50 0.29
2507.55 2+ 507.55 920 920 7.55 0
Volume (m3)

S (m) LUAS (m) KETERANGAN


Galian Timbunan

0.80 39.20 0.000 TIMBUNAN


0.80 20.10 1482.392 TIMBUNAN
0.80 7.39 687.192 GALIAN
0.80 13.80 80.000 GALIAN
0.80 21.30 744.998 GALIAN
0.80 30.83 1303.200 GALIAN
0.80 41.28 1802.668 GALIAN
0.80 52.34 2340.580 GALIAN
0.80 63.83 2904.412 GALIAN
0.80 76.12 3498.748 GALIAN
0.80 85.00 2432.075 GALIAN
0.80 76.93 1603.933 GALIAN
0.80 51.43 3209.024 GALIAN
0.80 28.71 2003.600 GALIAN
0.80 8.93 941.080 GALIAN
0.00 0.00 101.070 GALIAN
0.80 8.09 110.644 GALIAN
0.80 25.83 848.032 GALIAN
0.80 45.84 1791.940 GALIAN
0.80 68.12 2849.136 0.000 GALIAN
0.80 85.00 2679.620 0.000 GALIAN

Volume (m3)

S (m) LUAS (m) KETERANGAN


Galian Timbunan

0.80 68.91 1154.32 GALIAN


0.80 22.54 2286.16 GALIAN
0.00 0.00 318.90 GALIAN
0.80 2.23 24.23 GALIAN
0.80 8.23 261.52 GALIAN
0.80 13.80 457.18 GALIAN
0.80 12.35 111.00 GALIAN
0.80 1.55 347.41 TIMBUNAN
0.80 13.78 383.22 TIMBUNAN
0.80 24.35 953.20 TIMBUNAN
0.80 33.25 1439.94 TIMBUNAN
0.80 39.20 1449.00 TIMBUNAN
0.80 35.48 373.39 TIMBUNAN
0.80 10.36 1145.82 TIMBUNAN
0.80 13.80 375.98 GALIAN
0.80 16.45 285.45 GALIAN
0.80 25.36 1045.30 GALIAN
0.80 36.48 1546.02 GALIAN
0.80 45.13 2040.44 GALIAN
0.80 55.86 2524.84 GALIAN
0.80 59.24 863.25 GALIAN

Volume (m3)

S (m) LUAS (m) KETERANGAN


Galian Timbunan

0.80 59.24 863.250 GALIAN


0.80 38.01 1701.910 GALIAN
0.80 11.63 1240.968 GALIAN
0.00 0.00 120.641 TIMBUNAN
0.80 4.70 68.745 TIMBUNAN
0.80 13.33 450.812 TIMBUNAN
0.80 21.21 863.588 TIMBUNAN
0.80 21.21 0.000 TIMBUNAN
0.80 17.70 972.788 TIMBUNAN
0.80 13.89 789.800 TIMBUNAN
0.80 10.12 600.352 TIMBUNAN
0.80 5.93 401.384 TIMBUNAN
0.80 1.80 193.440 TIMBUNAN
0.00 0.00 15.319 GALIAN
0.80 1.31 21.595 GALIAN
0.80 3.57 121.908 GALIAN
0.80 4.24 58.577 GALIAN
0.80 16.01 354.374 GALIAN
0.80 18.86 871.612 GALIAN
0.80 55.86 1867.880 GALIAN
0.80 64.80 967.683 GALIAN
Volume (m3)

S (m) LUAS (m) KETERANGAN


Galian Timbunan

0.80 48.71 1927.360 GALIAN


0.80 24.57 1831.924 GALIAN
0.80 3.84 710.164 GALIAN
0.00 0.00 14.486 GALIAN
TOTAL 56245.12 12035.92
SELISIH 44209.198
ELEVASI
JARAK
STA+ PENOMORAN STA TANAH ASLI
PETA
(m)
0 0 0+ 0 945
50 50 0+ 50 947.27
50 100 0+ 100 949.55
PV1 7.55 107.55 0+ 107.55 950
42.45 150 0+ 150 950.62
50 200 0+ 200 951.38
50 250 0+ 250 952.15
50 300 0+ 300 952.92
50 350 0+ 350 953.69
50 400 0+ 400 954.46
PV2 30.19 430.19 0+ 430.19 955
19.81 450 0+ 450 955
50 500 0+ 500 955
50 550 0+ 550 955
50 600 0+ 600 955
PV3 22.64 622.64 0+ 622.64 955
27.36 650 0+ 650 955.60
50 700 0+ 700 956.79
50 750 0+ 750 957.98
50 800 1+ -200 959.17
35 835 1+ -165 960
15 850 1+ -150 959.21
50 900 1+ -100 956.58
PV4 28.30 928.30 1+ -71.70 955
21.70 950 1+ -50 954.13
50 1000 1+ 0 951.96
PV5 41.51 1041.51 1+ 41.51 950
8.49 1050 1+ 50 949.9
50 1100 1+ 100 948.88
50 1150 1+ 150 947.86
50 1200 1+ 200 946.84
50 1250 1+ 250 945.82
40 1290 1+ 290 945
10 1300 1+ 300 945.53
50 1350 1+ 350 948.16
PV6 31.13 1381.13 1+ 381.13 950
18.87 1400 1+ 400 950
50 1450 1+ 450 950
50 1500 1+ 500 950
50 1550 1+ 550 950
50 1600 1+ 600 950
15 1615 1+ 615 950
35 1650 2+ -350 948.41
50 1700 2+ -300 946.14
PV7 20.75 1720.75 2+ -279.25 945
29.25 1750 2+ -250 944
50 1800 2+ -200 942
50 1850 2+ -150 940
0 1850 2+ -150 940
50 1900 2+ -100 939.07
50 1950 2+ -50 938.15
50 2000 2+ 0 937.22
50 2050 2+ 50 936.3
50 2100 2+ 100 935.37
PV8 16.98 2116.98 2+ 116.98 935
33.02 2150 2+ 150 932.42
50 2200 2+ 200 930.79
15 2215 2+ 215 930
35 2250 2+ 250 928.87
50 2300 2+ 300 926.26
50 2350 2+ 350 925.65
PV9 16.04 2366.04 2+ 366.04 925
33.96 2400 2+ 400 923.93
50 2450 2+ 450 922.14
50 2500 2+ 500 920.36
7.55 2507.55 2+ 507.55 920
ELEVASI RENCANA Volume (m3)
JARAK C (m) S (m) LUAS (m)
AS JALAN (m) Galian
949 0 -4 0.80 39.20
949 50 -1.73 0.80 20.10
949 50 0.55 0.80 7.39 687.192
949 7.55 1 0.80 13.80 80.000
949.12 42.45 1.5 0.80 21.30 744.998
949.28 50 2.1 0.80 30.83 1303.200
949.43 50 2.72 0.80 41.28 1802.668
949.58 50 3.34 0.80 52.34 2340.580
949.74 50 3.95 0.80 63.83 2904.412
949.89 50 4.57 0.80 76.12 3498.748
950 30.19 5 0.80 85.00 2432.075
950.39 19.81 4.61 0.80 76.93 1603.933
951.71 50 3.29 0.80 51.43 3209.024
953.03 50 1.97 0.80 28.71 2003.600
954.34 50 0.66 0.80 8.93 941.080
955 22.64 0 0.00 0.00 101.070
955 27.36 0.60 0.80 8.09 110.644
955 50 1.79 0.80 25.83 848.032
955 50 2.98 0.80 45.84 1791.940
955 50 4.17 0.80 68.12 2849.136
955 35 5 0.80 85.00 2679.620
955 15 4.21 0.80 68.91 1154.320
955 50 1.58 0.80 22.54 2286.160
955 28.30 0 0.00 0.00 318.900
953.96 21.70 0.17 0.80 2.23 24.229
951.35 50 0.61 0.80 8.23 261.520
949 41.51 1 0.80 13.80 457.184
949 8.49 0.9 0.80 12.35 110.998
949 50 -0.12 0.80 1.55
949 50 -1.14 0.80 13.78
949 50 -2.16 0.80 24.35
949 50 -3.18 0.80 33.25
949 40 -4 0.80 39.20
949 10 -3.47 0.80 35.48
949 50 -0.84 0.80 10.36
949 31.13 1 0.80 13.80 375.981
948.82 18.87 1.18 0.80 16.45 285.446
948.24 50 1.76 0.80 25.36 1045.300
947.56 50 2.44 0.80 36.48 1546.024
947.06 50 2.94 0.80 45.13 2040.444
946.47 50 3.53 0.80 55.86 2524.840
946.29 15 3.71 0.80 59.24 863.250
945.88 35 2.53 0.80 38.01 1701.910
945.29 50 0.85 0.80 11.63 1240.968
945 20.75 0 0.00 0.00
944.37 29.25 -0.37 0.80 4.70
943.1 50 -1.1 0.80 13.33
941.84 50 -1.84 0.80 21.21
941.84 0 -1.84 0.80 21.21
940.57 50 -1.5 0.80 17.70
939.30 50 -1.15 0.80 13.89
938.04 50 -0.82 0.80 10.12
936.77 50 -0.47 0.80 5.93
935.51 50 -0.14 0.80 1.80
935 16.98 0 0.00 0.00 15.319
932.32 33.02 0.1 0.80 1.31 21.595
930.52 50 0.27 0.80 3.57 121.908
929.68 15 0.32 0.80 4.24 58.577
927.72 35 1.15 0.80 16.01 354.374
924.92 50 1.34 0.80 18.86 871.612
922.12 50 3.53 0.80 55.86 1867.880
921 16.04 4 0.80 64.80 967.683
920.79 33.96 3.14 0.80 48.71 1927.360
920.43 50 1.71 0.80 24.57 1831.924
920.07 50 0.29 0.80 3.84 710.164
920 7.55 0 0.00 0.00 14.486
TOTAL 56245.115
SELISIH 44209.198
Volume (m3)
KETERANGAN
Timbunan
0.000 TIMBUNAN
1482.392 TIMBUNAN
GALIAN
GALIAN 107.55 DRAINASE 0.5
GALIAN LEBAR JALAN 7
GALIAN BAHU JALAN 2.5
GALIAN LEBAR TOTAL 13
GALIAN
GALIAN
GALIAN
GALIAN 322.64
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN 192
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN 305.66
GALIAN
GALIAN
GALIAN 113.21
GALIAN
347.412 TIMBUNAN
383.220 TIMBUNAN
953.196 TIMBUNAN
1439.940 TIMBUNAN
1449.002 TIMBUNAN
373.386 TIMBUNAN
1145.820 TIMBUNAN
GALIAN 340
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
120.641 TIMBUNAN 340
68.745 TIMBUNAN
450.812 TIMBUNAN
863.588 TIMBUNAN
0.000 TIMBUNAN
972.788 TIMBUNAN
789.800 TIMBUNAN
600.352 TIMBUNAN
401.384 TIMBUNAN
193.440 TIMBUNAN
GALIAN 396.23
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN
GALIAN 249.06
GALIAN
GALIAN
GALIAN
GALIAN 141.51
12035.917
44209.198
panjang cad Panjang asli Beda Tinggi sta C
1 1.00 121.19 121.1900 10 0 -4.00
2 13 79.59 79.5900 5 50 -1.73
3 127.490 127.4900 5 100 0.55
4 132.46 132.4600 5 107.55 1.00
5 639.06 639.0600 5 150 1.50
6 571.64 571.6400 5 200 2.10
7 388.66 388.6600 5 250 2.72
8 121.09 121.0900 5 300 3.34
9 96.54 96.5400 5 350 3.95
10 88.02 88.0200 5 400 4.57
11 84.35 84.3500 5 430.19 5.00
12 87.33 87.3300 5 450 4.61
13 77 77.0000 5 500 3.29
14 71.98 71.9800 5 550 1.97
15 67.52 67.5200 5 600 0.66
16 65.72 65.7200 5 622.64 0.00
17 141.7 141.7000 10 650 0.60
18 71.1 71.1000 5 700 1.79
19 66.17 66.1700 5 750 2.98
20 65.47 65.4700 5 800 4.17
21 66.31 66.3100 5 835 5.00
22 77.07 77.0700 5 850 4.21
23 73.63 73.6300 5 900 1.58
24 160.57 160.5700 10 928.30 0.00
25 83.36 83.3600 5 950 0.17
26 73.97 73.9700 5 1000 0.61
27 129.570 129.5700 10 1041.51 1.00
28 66 66.0000 5 1050 0.90
29 66.27 66.2700 5 1100 -0.12
30 63.04 63.0400 5 1150 -1.14
31 56.9 56.9000 5 1200 -2.16
32 79.83 79.8300 10 1250 -3.18
33 74.83 74.8300 10 1290 -4.00
34 76.66 76.6600 10 1300 -3.47
35 36.66 36.6600 5 1350 -0.84
36 112.96 112.9600 10 1381.13 1.00
37 63.89 63.8900 5 1400 1.18
38 53.72 53.7200 5 1450 1.76
39 62.16 62.1600 5 1500 2.44
40 129.62 129.6200 5 1550 2.94
41 512.87 512.8700 0 1600 3.53
42 608.16 608.1600 5 1615 3.71
43 228.56 228.5600 5 1650 2.53
44 352.6 352.6000 5 1700 0.85
45 527.260 527.2600 0 1720.75 0.00
46 207.45 207.4500 5 1750 -0.37
47 169.67 169.6700 5 1800 -1.10
48 422.05 422.0500 10 1850 -1.84
49 422.05 422.0500 10 1850 -1.84
50 359.75 359.7500 5 1900 -1.50
51 447.08 447.0800 5 1950 -1.15
52 976.010 976.0100 5 2000 -0.82
53 246.82 246.8200 10 2050 -0.47
54 194.550 194.5500 10 2100 -0.14
55 197.31 197.3100 10 2116.98 0.00
56 269.010 269.0100 0 2150 0.10
57 417.05 417.0500 0 2200 0.27
58 268.61 268.6100 0 2215 0.32
59 218.79 218.7900 0 2250 1.15
60 240.9 240.9000 5 2300 1.34
61 170.9 170.9000 5 2350 3.53
62 389.150 389.1500 10 2366.04 4.00
63 150.32 150.3200 5 2400 3.14
64 174.97 174.9700 5 2450 1.71
65 77.3 77.3000 0 2500 0.29
66 354.52 354.5200 0 2507.55 0.00
Miring KETERANGAN en
1.0727 TIMBUNAN A kiri naik 0 0
0.8167 TIMBUNAN kiri naik 50 50
0.5098 GALIAN kiri naik 100 50
0.4907 GALIAN A1 kiri naik 107.55 7.55
0.1017 GALIAN kiri naik 150 42.45
0.1137 GALIAN kanan naik 200 50
0.1672 GALIAN kanan naik 250 50
0.5368 GALIAN kanan naik 300 50
0.6733 GALIAN kanan naik 350 50
0.8180 GALIAN kanan naik 400 50 kanan naik LS 4.7
0.8535 GALIAN B kanan naik 430.19 30.19 kanan naik LC 9.1
0.8244 GALIAN kanan naik 450 19.81 kanan naik LS 3.8
0.8442 GALIAN kanan naik 500 50
0.9030 GALIAN kanan naik 550 50
0.9627 GALIAN kanan naik 600 50
0.9890 NORMAL B1 kanan naik 622.64 22.64
0.9174 GALIAN kanan naik 650 27.36
0.9142 GALIAN kanan naik 700 50
1.0987 GALIAN kanan naik 750 50
1.1105 GALIAN kanan naik 800 50 kanan naik LC 9.8
1.0964 GALIAN C kanan naik 835 35 kanan naik LC 9.8
0.9433 GALIAN kanan naik 850 15 kanan naik LC 9.8
0.9874 GALIAN kanan naik 900 50 kanan naik LS 6.9
0.8096 NORMAL C1 kanan naik 928.30 28.30
0.7798 GALIAN kanan naik 950 21.70
0.8787 GALIAN kanan naik 1000 50
1.0033 GALIAN C2 kanan naik 1041.51 41.51
0.9848 GALIAN kanan naik 1050 8.49
0.9808 TIMBUNAN kanan naik 1100 50
1.0311 TIMBUNAN kanan naik 1150 50
1.1424 TIMBUNAN kanan naik 1200 50
1.6285 TIMBUNAN kanan naik 1250 50
1.8942 TIMBUNAN D kanan naik 1290 40 kiri naik LS 6
1.8489 TIMBUNAN kanan naik 1300 10 kanan naik LS 4.6
1.7730 TIMBUNAN kanan naik 1350 50
1.1508 GALIAN D1 kanan naik 1381.13 31.13
1.0174 GALIAN kanan naik 1400 18.87
1.2100 GALIAN kanan naik 1450 50
1.0457 GALIAN kanan naik 1500 50
0.5015 GALIAN kanan naik 1550 50
0.0000 GALIAN 1600 50
0.1069 GALIAN D2 kanan naik 1615 15
0.2844 GALIAN kanan naik 1650 35
0.2021 GALIAN kanan naik 1700 50 kiri naik LS 3
0.0000 NORMAL E 1720.75 20.75 kiri naik LS 5.6
0.3435 TIMBUNAN kanan naik 1750 29.25 kiri naik LS 4
0.3831 TIMBUNAN kanan naik 1800 50
0.3080 TIMBUNAN kanan naik 1850 50
0.3080 TIMBUNAN E1 kanan naik 1850 0
0.1807 TIMBUNAN kanan naik 1900 50
0.1454 TIMBUNAN kanan naik 1950 50
0.0666 TIMBUNAN kiri naik 2000 50
0.5267 TIMBUNAN kiri naik 2050 50
0.7474 TIMBUNAN kiri naik 2100 50 kiri naik LC 7.9
0.7369 NORMAL F kiri naik 2116.98 16.98 kiri naik LC 7.9
0.0000 GALIAN 2150 33.02 kiri naik LS 7
0.0000 GALIAN 2200 50 kiri naik LS 4.4
0.0000 GALIAN F1 2215 15
0.0000 GALIAN 2250 35
0.2698 GALIAN kiri naik 2300 50
0.3803 GALIAN kiri naik 2350 50
0.3341 GALIAN F2 kiri naik 2366.04 16.04
0.4324 GALIAN kiri naik 2400 33.96
0.3715 GALIAN kiri naik 2450 50
0.0000 GALIAN 2500 50
0.0000 NORMAL G 2507.55 7.55
en/100 kemiringan Jalan lebar total nilai e

0.047 0.7425 15.7986 0.1047 kanan 35.4581


0.091 1.4377 1.3993 0.1091 kanan 5.2705
0.038 0.6003 0.1038 kiri 44.6985

0.098 1.5760 16.0812 0.1098 kanan 34.4567


0.098 1.5760 1.5406 0.1098 kanan 2.4567
0.098 1.5760 0.1098 kiri 15.5391
0.069 1.1096 0.1069 kiri 65.5391

0.06 0.9209 15.3480 0.106 kiri 1.6773


0.046 0.7060 1.174 0.1046 kanan 12.2837

0.03 0.4650 15.5008 0.103 kiri 28.3414


0.056 0.8680 1.2504 0.1056 kiri 8.5914
0.04 0.6200 0.104 kanan 20.6586

0.079 1.2704 16.0812 0.1079 kiri 25.0964


0.079 1.2704 1.5406 0.1079 kiri 8.1164
0.07 1.1257 0.107 kanan 34.8542
0.044 0.7076 0.1044 kanan 50.8542
Keterangan :
masuk dalam tikungan
PV
kemiringan jalan yang digunakan (hanya ada pada tikungan)
en diperoleh dari sumbu jalan yang ada pada tikungan/cad layang-layang
Kemiringan jalan (en/100)*(lebar total+pelebaran)
kiri/kanan naik dilihat dari perbedaan elevasi di cad
kiri/kanan naik Untuk tikungan, gambar lebih tinggi apabila garis berada di sudut luar dan sebalikn
nilai e 0,1+((en/100)*0,1)
data untuk mencari Ls/Lc dan sumbu jalan pada tikungan layang-layang
ngan)
d layang-layang

da di sudut luar dan sebaliknya.

an layang-layang
10.6 cm 600 m
1 cm 56.60 m

0
7 8.2 13.2 20.9 28.7 35.4 38.6
50
50
22.9 15.3 9.6 11.8 12 10 3.8
7.55
42.45
50
50
396.23 464.15 747.17 1183.02 1624.53 2003.77 2184.91
50
50
1296.23 866.04 543.40 667.92 679.25 566.04 215.09
50
11 cm 600 cm 30.19
1 cm 54.55 cm 19.81
50
50
50
7 8.2 13.2 20.9 28.7 35.4 38.6 22.64
27.36
22.9 15.3 9.6 11.8 12 10 3.8 50
50
50
35
381.82 447.27 720.00 1140.00 1565.45 1930.91 2105.45
15
50
1249.09 834.55 523.64 643.64 654.55 545.45 207.27
28.30
21.70
50
41.51
8.49
50
50
50
50
40
10
50
31.13
18.87
50
50
50
50
15
35
50
20.75
29.25
50
50
0
50
50
50
50
50
16.98
33.02
50
15
35
50
50
16.04
33.96
50
50
7.55
5000

0 0
50 50 A
50 100 A1
10 110 A1
40 150 B
50 200 B
50 250 B1
50 300 B1
50 350 C
50 400 C
35 435 C1
-435 C1
0 C2
0 C2
0 D
0 D
0 D1
0 D1
0 D2
0 D2
0 E
0 E
0 E1
0 E1
0 F
0 F
0 F1
0 F1
0 F2
0 F2
0 G
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Vous aimerez peut-être aussi