GENERAL NOTES
LIST OF BOLTS
ITEM
DESCRIPTION ISO SPECIFICATIONS
Q. T. Y. REF. DWG. 1.- Distances shown in this drawing are in mm.
Ø BOLTS x LENGTH BOLTS NUTS WASHERS
1 M12 x 45 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 192/192/384 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
2.- Modules shall be transported in horizontal position lying on west face.
8 2 M16 x 45 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 74/74/148 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) 8
3 M16 x 50 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 12/12/24 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) BILL OF MATERIALS 3.- Coil tubes shall rest on baffle holes on horizontal position as shown in these drawing.
4 M16 x 55 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 64/64/128 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) ASSEMBLY MARK Q.T.Y. WIDTH (mm) HEIGHT (mm) LENGTH (mm) U.W. (kg) T.W. (kg)
MK-4601 1 881 220 6162 763.9 763.9
4.- Painting scheme for transport structure:
5 M24 x 65 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 60/60/120 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4602 1 220 855 6162 760.8 760.8
6 M24 x 70 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 36/36/72 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) MK-4603 2 428 220 6082 435.8 871.7 - Surface preparation: Sa 2 1/2
7 M24 x 80 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 24/24/48 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) MK-4604 1 480 220 6082 450.9 450.9 - 1st coat: PRIMER 40 µm
MK-4605 2 428 220 6082 435.8 871.7
8 M27 x 70 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 16/16/32 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4606 1 428 220 6082 447.9 447.9
9 M27 x 95 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 104/208/208 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030) MK-4607 1 840 415 4640 1064.4 1064.4
MK-4608 1 840 415 4640 1064.4 1064.4
10 M27 x 110 (8.8) EN ISO 4017 EN ISO 4032 EN ISO 7089 40/80/80 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4609 1 200 1230 3300 268.0 268.0
* ALL THEM HOT DIP GALVANIZED MK-4610 6 300 2458 1025 78.7 472.5 - Final color: RAL 1003
MK-4611 6 300 1374 1025 56.6 339.6
MK-4612 4 15 750 750 51.9 207.5 5.- Transport bolts shall be galvanized according to PACKING MARKING SHIPPING
02 MK-4613 2 1906 435 265 158.6 317.2
7 MK-4614 2 1906 435 265 158.6 317.2 7
MK-4615 1 960 840 415 46.2 46.2
MK-4616 1 960 840 415 46.2 46.2
MK-4617 3 300 200 1230 38.7 116.0
MK-4618 20 100 100 2826 57.8 1155.1
MK-4619 10 100 100 2910 59.5 594.9
MK-4620 24 110 100 869 18.5 445.2
MK-4621 24 110 100 829 17.7 425.9
MK-4610 MK-4610 MK-4622 11 32 72 857 3.0 33.1
MK-4610 MK-4610 MK-4617 MK-4623 22 30 30 94 0.5 10.3
MK-4610
MK-4617 MK-4617 MK-4610
MK-4617 MK-4610 MK-4610 TOTAL WEIGHT (kg) 11090.6
MK-4617 MK-4617
MK-4610
MK-4610 MK-4610
MK-4610
6 MK-4620 6
MK-4621
MK-4620 MK-4620
MK-4621 MK-4621
MK-4620
MK-4621 MK-4620
MK-4621
MK-4620
MK-4621
MK-4618
X
MK-4618 MK-4618
MK-4612 MK-4618
MK-4612
MK-4618
MK-4616
REFERENCE DOCUMENTS
MK-4618
MK-4621
MK-4618
WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
MK-4618
MK-4618
MK-4621 STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
MK-4618
MK-4621 MK-4620
MK-4621 AND LIFTING LUGS
MK-4620
MK-4620
MK-4621 MK-4620 LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 MK-4606
MK-4620
3
MK-4620 FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4621
WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
6 MK-4602
MK-4613 INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
11 L MK-4613
16 MANUAL
16
11 K MK-4613
MK-4613 6
L
K
K
L
MK-4614 MK-4611
MK-4609 MK-4614
MK-4611
MK-4611 6 MK-4611 MK-4609 MK-4611
K 11 North L MK-4611 16
2 North 11 2
16 6
MODULE IV TRANSPORT STRUCTURE - VIEW FROM EAST MODULE IV TRANSPORT STRUCTURE - VIEW FROM WEST
1:50 1:50 STATUS DESCRIPTION
DRAWN CHECKED APPROVED DATE
REV.
BY BY BY YYYY-MM-DD
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
K L
L K
A B MK-4612 / PL15*750
MK-4612 / PL15*750
15
MK-4616 / PL15*750
MK-4614 / PL15*265
MK-4608 / HEB240
HEB240
520
UPN260
6 6
330
330
312
6 6 6 6
HEB100 HEB100
1431
1431
1431
4 *M 24 * 70 4 *M 16 * 55
5 4
4 *M 16 * 55 MK-4617 / HEB100 4 *M 24 * 70 4 *M 24 * 65 4 *M 16 * 55
4 4 *M 16 * 55 6 5 4
MK-4610 / HEB100 4
HEB100
1000
4 *M 16 * 55
4
1500
HEB100 HEB100
4 *M 16 * 55
2000
4
5 MK-4617 / HEB100
5
4 *M 24 * 65 4 *M 24 * 70 4 *M 24 * 65
MK-4611 / HEB100 5
MK-4610 / HEB100 6 MK-4610 / HEB100 MK-4606 / HEB220 5 4 *M 24 * 65 5
HEB100
HEB100
11 11 11 4 *M 24 * 65
11
4 *M 16 * 55 4 *M 24 * 70 5
/ HEB100
4 *M 16 * 55 4 *M 24 * 65 4 *M 24 * 70 4 6
4 5 6
HEB100
MK-4604 / HEB220
2000
HEB100
HEB100
MK-4609
1500
MK-4611 / HEB100
MK-4602 / UPN260
1000
MK-4610 / HEB100 MK-4617 / HEB100 4 *M 24 * 65 4 *M 24 * 70 4 *M 16 * 55 4 *M 24 * 65
4 *M 24 * 65 5 6 4 4 *M 16 * 55 5
5 4 4 *M 16 * 55
4
HEB100
4 *M 16 * 55 4 *M 24 * 65
4 MK-4611 / HEB100 4 *M 24 * 70 5 MK-4611 / HEB100
MK-4610 / HEB100 6 4 *M 24 * 65
5
HEB100 HEB100
4 *M 24 * 65
5
1431
1431
1431
4 MK-4601 / HEB220 4
16 16 16 16
330
330
330
520
HEB240
MK-4607 / HEB240
MK-4615 / PL15*750
15
MK-4612 / PL15*750
A B MK-4612 / PL15*750 REFERENCE DOCUMENTS
L K K L
WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
MODULE IV TRANSPORT STRUCTURE - TOP VIEW MODULE IV TRANSPORT STRUCTURE - BOTTOM VIEW
1:40 STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
1:40
AND LIFTING LUGS
LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 3
FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
MANUAL
2 2
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
45 960 700 1230 700 960 45 45 960 700 1230 700 960 45 - Surface preparation: Sa 2 1/2
MK-4617 / HEB100 MK-4617 / HEB100 - 1st coat: PRIMER 40 µm
MK-4610 / HEB100 4 *M 24 * 70 4 *M 24 * 65 4 *M 24 * 65 MK-4610 / HEB100 MK-4610 / HEB100 4 *M 24 * 65 4 *M 24 * 70 MK-4610 / HEB100
6 5 5 5 4 *M 24 * 70 6
6
4 *M 24 * 70
6 4 *M 24 * 65
5
- Final color: RAL 1003
5.- Transport bolts shall be galvanized according to PACKING MARKING SHIPPING
7 INSTRUCTION 26071-675-V1Z-MBHH-0045 7
HEB100
HEB100
HEB100
HEB100
2358
2358
2358
2358
EL.14185 EL.14185 EL.14185 EL.14185
(MANIFOLDS) 4 *M 16 * 55 4 *M 16 * 55 (MANIFOLDS) (MANIFOLDS) 4 *M 16 * 55
4 4
4 *M 16 * 55 (MANIFOLDS)
4 4 UPN260
381
381
EL.13381 EL.13381 EL.13381 EL.13381
(INSIDE PLATE) (INSIDE PLATE) (INSIDE PLATE) (INSIDE PLATE)
1115
1115
26 *M 27 * 95 MK-4612 / PL15*750 2 *M 27 * 70 2 *M 27 * 70 26 *M 27 * 95
2 *M 27 * 70 9 8 8 9 2 *M 27 * 70
8 8
MK-4607 / HEB240
300
300
600
600
6 6
300
300
2 *M 27 * 70
8 2 *M 27 * 70
26 *M 27 * 95 2 *M 27 * 70 8
9 8 2 *M 27 * 70 26 *M 27 * 95
8 9 MK-4612 / PL15*750
2320 2320
2320 2320
5 5
5580
5580
14096
14096
14096
14096
9044
9044
EL.8731 EL.8731 EL.8731 EL.8731
9832
9832
(WHRU CL) (WHRU CL) (WHRU CL) (WHRU CL)
4 4
420
420
MK-4618 / HEB100
420
420
20 *M 27 * 110
480 480 10
480 480
REFERENCE DOCUMENTS
2277
2277
WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
MK-4602 / UPN260
STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
HEB100 HEB100
AND LIFTING LUGS
EL.4075 EL.4075 EL.4075 EL.4075
407
407
(BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 3
4 *M 16 * 55
4 FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4613 / PL15*265 4 *M 16 * 55
4 4 *M 16 * 55
4
4 *M 16 * 55 WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
4 MK-4614 / PL15*265
MK-4613 / PL15*265
MK-4614 / PL15*265 INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
4 *M 24 * 65 MK-4611 / HEB100 MK-4611 / HEB100 4 *M 24 * 65 MK-4611 / HEB100
MK-4611 / HEB100 5
1906
1906
1906
1906
5 MANUAL
MK-4609 / HEB100 MK-4609 / HEB100
4 *M 24 * 70 4 *M 24 * 65 4 *M 24 * 65
EL.2250 6 5 5 EL.2250 EL.2250 4 *M 24 * 65 4 *M 24 * 65 4 *M 24 * 70 EL.2250
5 6
(T.O.C.) (T.O.C.) (T.O.C.) 5 (T.O.C.)
MK-4614 / PL15*165 MK-4613 / PL15*165 MK-4614 / PL15*165
MK-4613 / PL15*165
67 4505 68 68 4505 68
2 K L L K 2
MODULE IV TRANSPORT STRUCTURE - VIEW FROM NORTH MODULE IV TRANSPORT STRUCTURE - VIEW FROM SOUTH
1:40 1:40
DRAWN CHECKED APPROVED DATE
STATUS DESCRIPTION BY BY BY YYYY-MM-DD REV.
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
2358
2358
2358
EL.14185 EL.14185 EL.14185 EL.14185
(MANIFOLDS) 867 614 1222 756 1222 614 867 (MANIFOLDS) (MANIFOLDS) 827 1836 756 1836 827 (MANIFOLDS)
UPN260
621
621
621
HEB100
HEB100
HEB100
HEB100
HEB100
HEB100
(INSIDE PLATE) C MK-4601 / HEB220
C (INSIDE PLATE) (INSIDE PLATE) (INSIDE PLATE)
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
2835
2835
2835
2835
15 460 15 460
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
460 15 460 15
L
L
2 *M 16 * 45 2 *M 16 * 45
2 2
2 *M 16 * 45 2 *M 16 * 45
2 2
MK-4603 / HEB220
D D
MK-4603 / HEB220
5 5
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
EL.8731 EL.8731
2920
2920
EL.8731 EL.8731
2920
2920
(WHRU CL) (WHRU CL) (WHRU CL) (WHRU CL)
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
MK-4619
2 *M 16 * 45 2 *M 16 * 45
2 2
2 *M 16 * 45
2 2 *M 16 * 45
2
E E
EL.7455 MK-4605 / HEB220 EL.7455 EL.7455 EL.7455
MK-4605 / HEB220
MK-4616 / PL15*750 M M
MK-4615 / PL15*750 MK-4615 / PL15*750
MK-4612 / PL15*750 MK-4616 / PL15*750
4 MK-4612 / PL15*750 4
MK-4612 / PL15*750
MK-4612 / PL15*750
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
/ HEB100
2835
2835
2835
2835
15 460
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
MK-4618
15 460
MK-4618
MK-4618
MK-4618
MK-4618
470 15 460 15
M
2 *M 16 * 50
867 614 1222 756 1222 614 867
2 *M 16 * 50
K K K
M REFERENCE DOCUMENTS
3 3 827 1836 756 1836 827
MK-4602 / UPN260 24 *M 16 * 45 2 *M 16 * 50
2 2 *M 16 * 50
3 3 WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
HEB220
F F STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
HEB100
HEB100
HEB100
HEB100
HEB100
HEB100
MK-4606 / HEB220
AND LIFTING LUGS
621
621
621
621
EL.4075 EL.4075 EL.4075 EL.4075
(BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 MK-4614 / PL15*265
MK-4613 / PL15*265
3
MK-4614 / PL15*265 2 *M 16 * 50 6 *M 24 * 95 FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
2 *M 16 * 50 3 7
3
7
6 *M 24 * 95 WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
MK-4613 / PL15*265
PL15*270
1274
1274
1906
PL15*165 MK-4609 / HEB100
PL15*165
PL15*270
MK-4609 / HEB100 K K K
EL.2250 EL.2250 EL.2250 EL.2250
(T.O.C.) (T.O.C.) (T.O.C.) (T.O.C.)
MK-4611 / HEB100 MK-4611 / HEB100 MK-4611 / HEB100 MK-4611 / HEB100 MK-4611 / HEB100 MK-4611 / HEB100
1431 1000 2000 1431
1431 1000 2000 1431
5862
5862
6 11 16
2 G H G G H G 16 11 6 2
Section B -B
Section A - A 1:40
1:40 DRAWN CHECKED APPROVED DATE
STATUS DESCRIPTION BY BY BY YYYY-MM-DD REV.
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
827
827
827
827
HEB100 HEB100
HEB100
864
864
Det. "a "
864
864
HEB100 MK-4621 / HEB100 5.- Transport bolts shall be galvanized according to PACKING MARKING SHIPPING
MK-4621 / HEB100 HEB100
7 INSTRUCTION 26071-675-V1Z-MBHH-0045 7
4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45
MK-4620 / HEB100 1 1 MK-4620 / HEB100 1 1
972
972
972
972
MK-4620 / HEB100
MK-4620 / HEB100 MK-4621 / HEB100
MK-4621 / HEB100
756
756
11 11
756
756
MK-4621 / HEB100 MK-4620 / HEB100 MK-4621 / HEB100
MK-4620 / HEB100
4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45 HEB100
HEB100 1 1 HEB100 1 1
972
972
972
972
MK-4620 / HEB100 MK-4620 / HEB100 MK-4621 / HEB100
MK-4621 / HEB100
6 6
HEB100
4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45 4 *M 12 * 45
1 1 1 1
MK-4620 / HEB100 HEB100
864
864
864
864
MK-4621 / HEB100
MK-4621 / HEB100 MK-4620 / HEB100
HEB100
4 *M 12 * 45 4 *M 12 * 45 HEB100 4 *M 12 * 45 4 *M 12 * 45 HEB100
1 1 HEB220 1 1
827
827
827
827
HEB220 HEB220 HEB220
16 16 16 16
COIL TUBES SUPPORTED
COIL TUBES SUPPORTED ON BAFFLE INSIDE HOLE
ON BAFFLE INSIDE HOLE
220 4640 220
220 4640 220
L K L K
5 Section C - C Section D - D 5
1:40 1:40
L K L K
220 4640 220 220 4640 220
827
827
827
827
864
864
864
864
HEB100 HEB100
MK-4621 / HEB100 MK-4622 / ROD20 MK-4621 / HEB100
972
972
972
756
11 11
756
756
HEB100
AND LIFTING LUGS
4 *M 12 * 45 4 *M 12 * 45 MK-4622 / ROD20
HEB100 4 *M 12 * 45 1 MK-4620 / HEB100 1 4 *M 12 * 45 HEB100
1 1
LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 3
972
972
972
972
MK-4621 / HEB100 MK-4620 / HEB100 MK-4622 / ROD20 FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
MK-4620 / HEB100 MK-4621 / HEB100
WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
HEB100 MK-4622 / ROD20
4 *M 12 * 45 4 *M 12 * 45
1 1
4 *M 12 * 45 4 *M 12 * 45 INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
1 1
HEB100
864
864
864
864
827
827
827
16 16 16 16
COIL TUBES SUPPORTED COIL TUBES SUPPORTED
ON BAFFLE INSIDE HOLE ON BAFFLE INSIDE HOLE
2 2
L K
L K
Section F - F
Section E - E 1:40 STATUS DESCRIPTION
DRAWN CHECKED APPROVED DATE
REV.
1:40 BY BY BY YYYY-MM-DD
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
4 *M 24 * 70
MK-4617 / HEB100 - Surface preparation: Sa 2 1/2
4 *M 24 * 65
- 1st coat: PRIMER 40 µm
MK-4610 / HEB100 6 5 MK-4610 / HEB100
K L
4 *M 24 * 70 4 *M 24 * 65
6 5
2358
7 INSTRUCTION 26071-675-V1Z-MBHH-0045 7
621
621
4 *M 12 * 45 4 *M 12 * 45 HEB100 4 *M 12 * 45 4 *M 12 * 45 MK-4620 / HEB100
MK-4604 / HEB220 1 1 (INSIDE PLATE) (INSIDE PLATE) 1 1 (INSIDE PLATE)
(INSIDE PLATE)
6 6
MK-4618 / HEB100
2835
2835
2835
MK-4618 / HEB100
MK-4618 / HEB100
MK-4621 / HEB100 MK-4620 / HEB100
MK-4620 / HEB100
BY MODULARIZATION 4 *M 12 * 45 4 *M 12 * 45 1 BY MODULARIZATION 4 *M 12 * 45
WORKSHOP 1 1 BY MODULARIZATION
WORKSHOP 4 *M 12 * 45
1 WORKSHOP
MK-4619 / HEB100
5 MK-4619 / HEB100 5
EL.8731 EL.8731 EL.8731 EL.8731
2920
2920
2920
(WHRU CL) (WHRU CL) (WHRU CL) (WHRU CL)
MK-4619 / HEB100
MK-4605 / HEB220
MK-4605 / HEB220 BY MODULARIZATION BY MODULARIZATION MK-4605 / HEB220 BY MODULARIZATION MK-4605 / HEB220
WORKSHOP WORKSHOP WORKSHOP
BY MODULARIZATION BY MODULARIZATION
WORKSHOP MK-4621 / HEB100 BY MODULARIZATION
WORKSHOP
WORKSHOP
4 4
2835
2835
2835
MK-4618 / HEB100
MK-4618 / HEB100 MK-4618 / HEB100
BY MODULARIZATION BY MODULARIZATION
WORKSHOP WORKSHOP BY MODULARIZATION
WORKSHOP
829 1078 785 1078 869
BY MODULARIZATION
WORKSHOP
MK-4621 / HEB100 MK-4620 / HEB100
BY MODULARIZATION
WORKSHOP
MK-4621 / HEB100
829 1078 785 1079 869 BY MODULARIZATION
WORKSHOP REFERENCE DOCUMENTS
MK-4620 / HEB100
HEB220
WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
4 *M 12 * 45 4 *M 12 * 45 HEB220 MK-4606 / HEB220 4 *M 12 * 45 4 *M 12 * 45 HEB100
MK-4606 / HEB220 1 1 1 1
STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
621
621
EL.4075 EL.4075 EL.4075 EL.4075
HEB100
(BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) (BOTTOM OF PLATE) AND LIFTING LUGS
MK-4622 / ROD20 4 *M 16 * 55 MK-4622 / ROD20 MK-4602 / UPN260
4 LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 MK-4602 / UPN260 4 *M 16 * 55
4 3
FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
HEB100
HEB100
1274
WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
MK-4609 / HEB100
4 *M 24 * 70 4 *M 24 * 65 4 *M 24 * 65 INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
6 5 5
MANUAL
4 *M 24 * 65
5
EL.2250 EL.2250 EL.2250 EL.2250
(T.O.C.) (T.O.C.) (T.O.C.) MK-4611 / HEB100 MK-4611 / HEB100 (T.O.C.)
K L 960 700 1230 700 960
Section G - G
1:40 K L
Section H - H
1:40
2 2
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
P O N M L K J I H G F E D C B A
GENERAL NOTES
1.- Distances shown in this drawing are in mm.
8 *M 27 * 95 20 *M 27 * 110
L K 9 10
- Final color: RAL 1003
MK-4607 // MK-4608 / HEB240
960 700 1230 700 960
4 *M 24 * 70
5.- Transport bolts shall be galvanized according to PACKING MARKING SHIPPING
MK-4610 / HEB100 6 MK-4610 / HEB100
7 INSTRUCTION 26071-675-V1Z-MBHH-0045 7
4 *M 24 * 65
5
4 *M 24 * 65 4 *M 24 * 70 4 *M 16 * 100 4 *M 16 * 55
5 MK-4617 / HEB100 6 4 4
HEB100
HEB100
P P
2358
2358
N N
EL.14185 EL.14185
(MANIFOLDS) (MANIFOLDS)
6 6
4 *M 16 * 55 4 4 *M 16 * 55
4 HEB240 8 *M 27 * 95
L K MK-4612 / PL15*750 9
MK-4612 / PL15*750
Section J - J Section L - L Section M - M
1:40 1:10 1:10
5 L 4 *M 16 * 55 4 *M 16 * 55
K 5
4 4 PL18*160 PL18*160
PL30*840
EL.4075 EL.4075
(BOTTOM OF PLATE) (BOTTOM OF PLATE)
HEB240
PL18*160 PL18*160
HEB100
HEB100
1274
1274
490
MK-4609 / HEB100
PL30*700
4 *M 24 * 65 4 *M 24 * 65 4 *M 24 * 70
5 5 6
250
4 *M 24 * 65 5
EL.2250 EL.2250 PL15*750
PIPE 20" SCH.100 MK-4616 / PL15*750 PIPE 20" SCH.100
(T.O.C.) 960 700 1230 700 960
(T.O.C.)
MK-4611 / HEB100
15
15
MK-4611 / HEB100
4 MK-4612 / PL15*750
4 *M 16 * 55
4
MK-4612 / PL15*750
4 *M 16 * 55
4
4
L K
Section K - K Section N - N Section P - P
1:40 1:10 1:10
REFERENCE DOCUMENTS
WHRS GENERAL ARRANGEMENT DRAWING 69987-FE-03-331400 (26071-675-V1Z-MBHH-00099)
STRESS CALCULATION OF THE TRUNNIONS 69987-FE-03-331654 (26071-675-V1Z-MBHH-00167)
AND LIFTING LUGS
LIFTING BEAMS DRAWING 69987-FE-03-331801 (26071-675-V1Z-MBHH-00194)
3 3
FLUE GAS BOILER II M4 CASING GAD 69987-FE-03-331H800 (26071-V1Z-013001Y01E15-00030)
WHRS PACKING PROCEDURE 69987-FE-03-331804 (26071-V1Z-013001H01-00895)
INSTALLATION OPERATION AND MAINTENANCE 69987-FE-03-331783 (26071-675-V1Z-MBHH-00191)
508 120 120 120 120 120 120 120 105
MANUAL
24 24 24 24 25 25 25 25
173
174
POSITION OF BAFFLES
FOR TRANSPORTATION
2 2
PROJECT NAME:
Contractor:Air Liquide Engineering & Construction
PART
TITLE
1 1
VENDOR:
Novargi Industries, SL
FORMAT: SCALE: NOVARGI DOC No.: REV.
P O N M L K J I H G F E D C B A
Derived From G-TPL-0-2-26, Rev 3 Issued Date 2019/11/28
69987 Pertamina Reformer EP PROJECT
Add note that these european material are equivalent to ASTM A325 M as
1 1 Note is to be added
specified in CRS for clarity
10
11
12
13