Académique Documents
Professionnel Documents
Culture Documents
DALLAGE= 0.15
Ep latérite = 1 20.00 15.00 0.00 0.00 94.78 0.00 0.00 28.43 2085
0.5
Ep grave =
Ep BP =
0 0.00 94.78 0.00 0.00 28.43 2085.23
0.395
823.67
Prof, fouilles =
1.50
20 832.36 25.08619650392
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
SOMME 0 0
4 - - 265.0 2,760.8 2,760.8 - - - - - -
0.222 0.395 0.617 0.888 1.208 1.578 2.466 3.847 6.336 9.896
SEMELLES
Béton de Débord
Longrine= 70 Nbr Dimension Fouilles Laterite Grave 0/40 Coffrage Prof, fouilles
Volume béton propreté fouille
L l H/E
F1 25 0.7 0.7 0.2 0.098 2.450 18.225 2.025 0.000 0.000 14.000 0.900 0.200
BP
0.1
Good earth
0
Gravel
0
SOMME 17.5 0.49
25 17.5 12.25 0.200 2.450 18.225 2.025 0.000 0.000 14.000
LT= S=
FUTS
Nbr Dimension Volume béton Coffrage
Futs sur: L l H/E
F1 25 0.2 0.2 0.9 0.036 0.900 0.360 9.000
0 0.000 0.000 0.000 0.000
0
0
0
0
0
0
0
0
SOMME 5 0.04
25 5 1 0.900 0.900 9.000
LT= S=
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
SOMME 0 0
50 - - 180.0 115.0 - - - - - -
0.222 0.395 0.617 0.888 1.208 1.578 2.466 3.847 6.336 9.896
POIDS - - 111 102 - - - - - - 213
LONGRINE
LONGRINE FOUILLES EN RIGOLES ACIER
Longueur Largeur H Longrine Nbre Volume Coffrage TN Longueur Largeur H Nbre Volume HA8
Lg1 70 0.2 0.2 1 2.800 28.000 67.73 70.000 0.6 0.5 1 21 0.27 231
Lg2 0.000 0.000 FFL
Lg3 0.000 0.000 68
Lg4 0.000 0.000
Lg5 0.000 0.000
Lg6 0.000 0.000
TOTAL béton 70.000 2.800 28.000 70.000 0.600 0.500 1.000 21.000 231.000
0.395
91.245
SOUBASSEMENT
MACONNERIE 20 PLEINS BETON DE PROPRETE
Longueur Largeur H Nbre Surf Enduit ext Longueur Largeur H Nbre Volume
Long 70.000 0.2 0.45 1 31.500 28.000 70.000 0.6 0.1 1 4.2
Déd futs 0.000
Déd raid 0.000
0.000
0.000
0.000
TOTAL béton 70.000 31.500 28.000 70.000 0.600 0.100 1.000 4.200
165.688
5,950
7,140.3
ACIER
HA10
305.45
305.455
0.617
188.465 280
BENIN-GDIZ GLO-DJIGBE
Sr.
ITEM DESCRIPTION UNIT QTY Rate AMOUNT (CFA)
No.
I CIVIL WORK
B EARTHWORK
Earth Work in Excavation in all kinds of soil (Excluding rock &
boulders) and backfilling in foundation trenches, column pits using
1.01 mechanical means, from existing ground level including dressing of CuM 215.16 4,000 860,636
sides and bottom to final level, to receive PCC and ramming
bottom. Storage of excavation materials in one place.
1.02 Excess earth to be removed from the site CuM 183.68 3,000 551,040
Providing and filling in Plinth, foundation and wherever required as
per direction of the Engineer, in layer not exceeding 200 mm.
2
Thick, compacted including watering, ramming, consolidating and
dressing etc. at all lead and lifts.
2.01 With available good earth CuM 46.45 2,000 92,908
2.02 Good earth to be Brought from outside CuM 0.00 8,500 0
2.03 Silty sand CuM 0.00 8,500 0
2.04 Laterite compacted at 95% CuM 136.68 9,500 1,298,486
2.05 Crushed gravel class 0/40 under foundation CuM 37.16 26,000 966,173
2.06 Crushed gravel class 0/25 under foundation CuM 0.00 26,000 0
2.07 Providing and laying plastic film polyane (200 microns minimum) SqM 189.57 1,500 284,349
Providing and placing bituminous dampproufing membrane to
2.08 SqM 0.00 15,500 0
concrete surface
C CONCRETE WORK
Laying plain cement concrete C15 (Min. cement content of 150
1 Kg/CuM) under foundations Footings/beams including formwork at CuM 18.38 70,000 1,286,769
all levels & height
E PLASTERING WORK
F PAINTING
1 Approved lnternal quality paint to rendered faces of walls SqM 0.00 2,800 0
2 Approved external quality paint to rendered faces of walls SqM 29.40 3,000 88,200
II ASSEMBLY WORK
I PRELIMINARY WORK
2.1 Anchor bolt sealing Au 1 -
Sr.
ITEM DESCRIPTION UNIT QTY Rate AMOUNT (CFA)
No.
I CIVIL WORK
B EARTHWORK
Earth Work in Excavation in all kinds of soil (Excluding rock &
boulders) and backfilling in foundation trenches, column pits using
1.01 mechanical means, from existing ground level including dressing of CuM 215.16 0
sides and bottom to final level, to receive PCC and ramming
bottom. Storage of excavation materials in one place.
1.02 Excess earth to be removed from the site CuM 183.68 0
Providing and filling in Plinth, foundation and wherever required as
per direction of the Engineer, in layer not exceeding 200 mm.
2
Thick, compacted including watering, ramming, consolidating and
dressing etc. at all lead and lifts.
2.01 With available good earth CuM 46.45 0
2.02 Good earth to be Brought from outside CuM 0.00 0
2.03 Silty sand CuM 0.00 0
2.04 Laterite compacted at 95% CuM 136.68 0
2.05 Crushed gravel class 0/40 under foundation CuM 37.16 0
2.06 Crushed gravel class 0/25 under foundation CuM 0.00 0
2.07 Providing and laying plastic film polyane (200 microns minimum) SqM 189.57 0
Providing and placing bituminous dampproufing membrane to
2.08 SqM 0.00 0
concrete surface
C CONCRETE WORK
Laying plain cement concrete C15 (Min. cement content of 150
1 Kg/CuM) under foundations Footings/beams including formwork at CuM 18.38 0
all levels & height
0.00
Providing & Laying, Mixing, Pouring of cement concrete for lintel as
per Design Mix. using coarse sand, coarse aggregate, including all
leads & lifts, vibrating, scaffolding wherever necessary, curing as
4 directed, including cost of shuttering, centering in ply for columns CuM 18,500 0
and beams and steel shuttering for slabs including struting and
proping etc. & removal of formwork etc. complete. . (Cement
Concrete of C25 Grade with min. Cement content of 350 Kg/CuM)
0.00
E PLASTERING WORK
29.40
F PAINTING
1 Approved lnternal quality paint to rendered faces of walls SqM 2,800 0
2 Approved external quality paint to rendered faces of walls SqM 0.00 3,000 0
29.40
II ASSEMBLY WORK
A PRELIMINARY WORK
3.1 Anchor bolt sealing Au 1 -
CIVIL WORK
Sr. No. ITEM DESCRIPTION QTY (Kg) QTY (TONNE)
CIVIL WORK