Vous êtes sur la page 1sur 67

REPUBLIQUE TUNISIENNE

MINIISTERE DE iS AFPAIRE iS H O CIALEiS DE

LA iSOLIDARITE ET DEs 'revisioniS A L’:s'rRANGER

CAISSENATIONALEDESECVRITESOCIAM

PROJET D'AMENAGEMENT ET D'EXTENSION


DU BUREAU REGIONAL DE LA CNSS DU KEF

NOTE DE CALCUL
IiIUR RIDEAU

LOT. STRUCTURE

UNISIE
ENGINEERING 4ppt. II°l — Bloc 9 f0NI4 I — 6ité 0/ympu/ue — 1002 /’f/P/2—/’éf: 7l 770 801*—7l 805 60lfi’m: 7I 805 582
ONSEILS Email : obhzgplcinet.tn
Sommaire
I. Vue de la structure...................................................................................................2

II. Données - Noeuds.....................................................................................................3

III. Données – Barres..................................................................................................4

IV. Données - Sections................................................................................................5

V. Données - Matériaux................................................................................................5

VI. Chargements - Cas................................................................................................5

VII. Chargements - Valeurs.........................................................................................5

VIII. Combinaisons........................................................................................................7

IX. Réactions – Valeurs..............................................................................................7

X. Réactions EFF: Extrêmes globaux.......................................................................11

XI. Déplacements - Valeurs......................................................................................11

XII. Déplacements DEP: Extrêmes globaux............................................................17

XIII. Efforts - Enveloppe.............................................................................................18

XIV. Contraintes - Extrêmes globaux........................................................................20

XV. Données - Pièces..................................................................................................20

XVI. Vérification des barres acier..............................................................................22

XVII. Dimensionnement de fixation............................................................................58


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

I. Vue de la structure
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

II. Données - Noeuds

Noeud X [m] Y [m] Z [m] Appui


3 0,80 0,0 3,60 Appui_10 V
4 0,80 0,0 0,0 Appui_10 V
8 1,60 0,0 3,60 Appui_10 V
9 1,60 0,0 0,0 Appui_10 V
12 2,40 0,0 3,60 Appui_10 V
13 2,40 0,0 0,0 Appui_10 V
16 3,20 0,0 3,60 Appui_10 V
17 3,20 0,0 0,0 Appui_10 V
20 4,00 0,0 3,60 Appui_10 V
21 4,00 0,0 0,0 Appui_10 V
24 4,80 0,0 3,60 Appui_10 V
25 4,80 0,0 0,0 Appui_10 V
34 5,60 0,0 3,60 Appui_10 V
35 5,60 0,0 0,0 Appui_10 V
38 6,40 0,0 3,60 Appui_10 V
39 6,40 0,0 0,0 Appui_10 V
43 0,0 0,0 3,60 Appui_10 V
46 0,0 0,0 0,0 Appui_10 V
48 7,20 0,0 0,0 Appui_10 V
49 7,20 0,0 3,60 Appui_10 V
50 0,80 0,0 1,20
51 1,60 0,0 1,20
52 2,40 0,0 1,20
53 3,20 0,0 1,20
54 4,00 0,0 1,20
55 4,80 0,0 1,20
56 5,60 0,0 1,20
57 6,40 0,0 1,20
58 0,80 0,0 2,40
59 1,60 0,0 2,40
60 2,40 0,0 2,40
61 3,20 0,0 2,40
62 4,00 0,0 2,40
63 4,80 0,0 2,40
64 5,60 0,0 2,40
65 6,40 0,0 2,40
66 1,20 0,0 3,60
68 0,0 0,0 2,40
69 7,20 0,0 2,40
70 7,20 0,0 1,20
71 0,0 0,0 1,20
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

III. Données – Barres


Noeud Noeud Longueur Gamma Type de Élément de
Barre Section Matériau
1 2 [m] [Deg] barre construction
75 43 3 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
76 3 8 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
77 8 12 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
78 12 16 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
79 16 20 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
80 20 24 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
81 24 34 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
82 34 38 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
83 38 49 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
85 58 59 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
86 59 60 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
88 61 62 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
89 62 63 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
90 63 64 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
94 50 51 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
95 51 52 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
96 52 53 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
97 53 54 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
98 54 55 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
99 55 56 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
100 56 57 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
102 46 4 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
103 4 9 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
104 9 13 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
105 13 17 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
107 25 35 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
108 35 39 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
109 39 48 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
110 17 21 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
111 21 25 TPR 52003* ALUM 0,80 0,0 Barre TPR Barre
112 60 61 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
115 9 8 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
116 12 13 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
117 16 17 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
118 20 21 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
119 24 25 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
121 35 34 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
122 39 38 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
124 4 3 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
126 48 49 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
127 46 43 TPR 52003* ALUM 3,60 0,0 Montant TPR Barre
128 58 68 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
129 69 65 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
130 70 57 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
131 50 71 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
132 65 64 TPR 52002 ALUM 0,80 0,0 Barre TPR Barre
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

IV. Données - Sections

Nom de la section
TPR 52002
TPR 52003*
Nom de la section Liste des barres
TPR 52002 85 86 88A90 94A100 112 128A132
TPR 52003* 75A83 102A105 107A111 115A119 121 122 124 126 127
Nom de la section AX [cm2] AY [cm2] AZ [cm2]
TPR 52002 3,92 2,08 2,00
TPR 52003* 6,20 4,12 2,24
Nom de la section IX [cm4] IY [cm4] IZ [cm4]
TPR 52002 23,51 15,23 16,19
TPR 52003* 76,76 34,74 89,48

V. Données - Matériaux

Matériau E [MPa] G [MPa] NU LX [1/°C] RO [kN/m3] Re [MPa]


1 ALUM 75000,00 27800,00 0,35 0,00 27,47 120,00

VI. Chargements - Cas

Cas Préfixe Nom du cas Nature Type d'analyse


1 PERM1 PERM1 permanente Statique linéaire
2 VENT1 Simulation du vent Y+ 27,02 m/s vent Statique linéaire
3 EXPL1 EXPL1 d'exploitation Statique linéaire
4 EFF Statique linéaire
5 EFF+ Statique linéaire
6 EFF- Statique linéaire
7 DEP Statique linéaire
8 DEP+ Statique linéaire
9 DEP- Statique linéaire

VII. Chargements - Valeurs

Cas Type de charge Liste Valeurs de la charge


75A83 85 86 88A90 94A-
1 poids propre 100 102A105 107A112 1- PZ Moins Coef=1,00
15A119 121 122 124A132
2 charge uniforme 126 PY=0,04[kN/m] PZ=-0,01[kN/m] local
2 charge uniforme 124 PY=0,07[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 115 PY=0,07[kN/m] PZ=-0,00[kN/m] local
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Cas Type de charge Liste Valeurs de la charge


2 charge uniforme 112 PY=0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 116 PY=0,07[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 117 PY=0,07[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 118 PY=0,07[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 119 PY=0,07[kN/m] PZ=0,00[kN/m] local
(EF) linéaire sur les
2 125_BORD(1) PY=-0,08[kN/m] local
bords
(EF) linéaire sur les
2 125_BORD(2) PY=-0,09[kN/m] PZ=0,00[kN/m] local
bords
(EF) linéaire sur les
2 125_BORD(4) PY=-0,11[kN/m] PZ=0,00[kN/m] local
bords
(EF) surfacique uni-
2 125 PZ=0,99[kN/m2] local
forme
2 charge uniforme 121 PY=0,07[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 122 PY=0,07[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 127 PY=0,04[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 128 PY=-0,07[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 129 PY=-0,07[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 75 PY=0,03[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 76 PY=0,03[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 77 PY=0,04[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 78 PY=0,04[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 79 PY=0,04[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 80 PY=0,04[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 81 PY=0,04[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 82 PY=0,03[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 83 PY=0,03[kN/m] PZ=0,01[kN/m] local
2 charge uniforme 130 PY=-0,07[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 85 PY=0,08[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 86 PY=0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 131 PY=-0,08[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 88 PY=0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 89 PY=0,08[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 90 PY=0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 132 PY=-0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 94 PY=0,09[kN/m] PZ=0,00[kN/m] local
2 charge uniforme 95 PY=0,09[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 96 PY=0,09[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 97 PY=0,10[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 98 PY=0,10[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 99 PY=0,10[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 100 PY=0,09[kN/m] PZ=-0,00[kN/m] local
2 charge uniforme 102 PY=0,03[kN/m] PZ=-0,01[kN/m] local
2 charge uniforme 103 PY=0,04[kN/m] PZ=-0,02[kN/m] local
2 charge uniforme 104 PY=0,04[kN/m] PZ=-0,02[kN/m] local
2 charge uniforme 105 PY=0,04[kN/m] PZ=-0,02[kN/m] local
2 charge uniforme 110 PY=0,04[kN/m] PZ=-0,02[kN/m] local
2 charge uniforme 107 PY=0,04[kN/m] PZ=-0,02[kN/m] local
2 charge uniforme 108 PY=0,04[kN/m] PZ=-0,02[kN/m] local
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Cas Type de charge Liste Valeurs de la charge


2 charge uniforme 109 PY=0,03[kN/m] PZ=-0,01[kN/m] local
2 charge uniforme 111 PY=0,04[kN/m] PZ=-0,02[kN/m] local
3 charge uniforme PY=-1,00[kN/m]

VIII. Combinaisons
Combinaison/Comp. Définition
EFF/ 1 1*1.33 + 3*1.50
EFF/ 2 1*1.33
EFF/ 3 1*1.00 + 3*1.50
EFF/ 4 1*1.00
EFF/ 5 1*1.33 + 2*1.50
EFF/ 6 1*1.00 + 2*1.50
EFF/ 7 1*1.33 + 2*1.42 + 3*1.42
EFF/ 8 1*1.00 + 2*1.42 + 3*1.42
EFF/ 9 1*1.00 + 2*1.75 + 3*1.00
EFF/ 10 1*1.00 + 2*1.75
DEP/ 1 1*1.00 + 3*1.00
DEP/ 2 1*1.00
DEP/ 3 1*1.00 + 2*1.00
DEP/ 4 1*1.00 + 2*1.00 + 3*1.00

IX. Réactions – Valeurs

Noeud/Cas FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


3/ 1 0,00 0,0 2,25 0,0 -0,00 0,0
3/ 2 -0,00 -1,56 -0,01 -0,85 0,00 0,00
3/ 3 0,0 0,0 0,0 0,0 0,0 0,0
3/ EFF+ 0,00 0,0 3,00 0,0 0,00 0,00
3/ EFF- -0,00 -2,73 2,24 -1,49 -0,00 0,0
3/ DEP+ 0,00 0,0 2,25 0,0 0,00 0,00
3/ DEP- -0,00 -1,56 2,24 -0,85 -0,00 0,0
4/ 1 -0,00 0,0 2,26 0,0 -0,00 0,0
4/ 2 -0,00 -1,64 0,01 0,86 -0,00 0,00
4/ 3 0,0 0,0 0,0 0,0 0,0 0,0
4/ EFF+ -0,00 0,0 3,02 1,50 -0,00 0,00
4/ EFF- -0,00 -2,87 2,26 0,0 -0,00 0,0
4/ DEP+ -0,00 0,0 2,27 0,86 -0,00 0,00
4/ DEP- -0,00 -1,64 2,26 0,0 -0,00 0,0
8/ 1 -0,00 0,0 2,24 0,0 0,00 0,0
8/ 2 -0,00 -1,60 -0,01 -0,96 0,00 0,00
8/ 3 0,0 0,0 0,0 0,0 0,0 0,0
8/ EFF+ -0,00 0,0 2,99 0,0 0,00 0,00
8/ EFF- -0,00 -2,80 2,22 -1,69 0,00 0,0
8/ DEP+ -0,00 0,0 2,24 0,0 0,00 0,00
8/ DEP- -0,00 -1,60 2,23 -0,96 0,00 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


9/ 1 0,00 0,0 2,24 0,0 0,00 0,0
9/ 2 -0,00 -1,67 0,01 0,97 -0,00 0,00
9/ 3 0,0 0,0 0,0 0,0 0,0 0,0
9/ EFF+ 0,00 0,0 3,01 1,69 0,00 0,00
9/ EFF- -0,00 -2,92 2,24 0,0 -0,00 0,0
9/ DEP+ 0,00 0,0 2,26 0,97 0,00 0,00
9/ DEP- -0,00 -1,67 2,24 0,0 -0,00 0,0
12/ 1 -0,00 0,0 2,24 0,0 0,00 0,0
12/ 2 -0,00 -1,61 -0,01 -0,97 0,00 -0,00
12/ 3 0,0 0,0 0,0 0,0 0,0 0,0
12/ EFF+ -0,00 0,0 2,99 0,0 0,00 0,0
12/ EFF- -0,00 -2,82 2,22 -1,69 0,00 -0,00
12/ DEP+ -0,00 0,0 2,24 0,0 0,00 0,0
12/ DEP- -0,00 -1,61 2,23 -0,97 0,00 -0,00
13/ 1 0,00 0,0 2,24 0,0 0,00 0,0
13/ 2 -0,00 -1,67 0,01 0,97 -0,00 -0,00
13/ 3 0,0 0,0 0,0 0,0 0,0 0,0
13/ EFF+ 0,00 0,0 3,01 1,69 0,00 0,0
13/ EFF- -0,00 -2,93 2,24 0,0 -0,00 -0,00
13/ DEP+ 0,00 0,0 2,26 0,97 0,00 0,0
13/ DEP- -0,00 -1,67 2,24 0,0 -0,00 -0,00
16/ 1 -0,00 0,0 2,24 0,0 0,00 0,0
16/ 2 -0,00 -1,60 -0,01 -0,96 0,00 0,00
16/ 3 0,0 0,0 0,0 0,0 0,0 0,0
16/ EFF+ -0,00 0,0 2,99 0,0 0,00 0,00
16/ EFF- -0,00 -2,80 2,22 -1,68 0,00 0,0
16/ DEP+ -0,00 0,0 2,24 0,0 0,00 0,00
16/ DEP- -0,00 -1,60 2,23 -0,96 0,00 0,0
17/ 1 0,00 0,0 2,24 0,0 0,00 0,0
17/ 2 -0,00 -1,66 0,01 0,96 -0,00 0,00
17/ 3 0,0 0,0 0,0 0,0 0,0 0,0
17/ EFF+ 0,00 0,0 3,01 1,68 0,00 0,00
17/ EFF- -0,00 -2,91 2,24 0,0 -0,00 0,0
17/ DEP+ 0,00 0,0 2,26 0,96 0,00 0,00
17/ DEP- -0,00 -1,66 2,24 0,0 -0,00 0,0
20/ 1 0,00 0,0 2,24 0,0 -0,00 0,0
20/ 2 -0,00 -1,60 -0,01 -0,96 0,00 -0,00
20/ 3 0,0 0,0 0,0 0,0 0,0 0,0
20/ EFF+ 0,00 0,0 2,99 0,0 0,00 0,0
20/ EFF- -0,00 -2,80 2,22 -1,68 -0,00 -0,00
20/ DEP+ 0,00 0,0 2,24 0,0 0,00 0,0
20/ DEP- -0,00 -1,60 2,23 -0,96 -0,00 -0,00
21/ 1 -0,00 0,0 2,24 0,0 -0,00 0,0
21/ 2 -0,00 -1,66 0,01 0,96 -0,00 -0,00
21/ 3 0,0 0,0 0,0 0,0 0,0 0,0
21/ EFF+ -0,00 0,0 3,01 1,68 -0,00 0,0
21/ EFF- -0,00 -2,91 2,24 0,0 -0,00 -0,00
21/ DEP+ -0,00 0,0 2,26 0,96 -0,00 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


21/ DEP- -0,00 -1,66 2,24 0,0 -0,00 -0,00
24/ 1 0,00 0,0 2,24 0,0 -0,00 0,0
24/ 2 -0,00 -1,61 -0,01 -0,97 0,00 0,00
24/ 3 0,0 0,0 0,0 0,0 0,0 0,0
24/ EFF+ 0,00 0,0 2,99 0,0 0,00 0,00
24/ EFF- -0,00 -2,82 2,22 -1,70 -0,00 0,0
24/ DEP+ 0,00 0,0 2,24 0,0 0,00 0,00
24/ DEP- -0,00 -1,61 2,23 -0,97 -0,00 0,0
25/ 1 -0,00 0,0 2,24 0,0 -0,00 0,0
25/ 2 -0,00 -1,68 0,01 0,97 -0,00 -0,00
25/ 3 0,0 0,0 0,0 0,0 0,0 0,0
25/ EFF+ -0,00 0,0 3,01 1,70 -0,00 0,0
25/ EFF- -0,00 -2,94 2,24 0,0 -0,00 -0,00
25/ DEP+ -0,00 0,0 2,25 0,97 -0,00 0,0
25/ DEP- -0,00 -1,68 2,24 0,0 -0,00 -0,00
34/ 1 0,00 0,0 2,24 0,0 -0,00 0,0
34/ 2 -0,00 -1,60 -0,01 -0,97 0,00 0,00
34/ 3 0,0 0,0 0,0 0,0 0,0 0,0
34/ EFF+ 0,00 0,0 2,99 0,0 0,00 0,00
34/ EFF- -0,00 -2,81 2,22 -1,69 -0,00 0,0
34/ DEP+ 0,00 0,0 2,24 0,0 0,00 0,00
34/ DEP- -0,00 -1,60 2,23 -0,97 -0,00 0,0
35/ 1 -0,00 0,0 2,24 0,0 -0,00 0,0
35/ 2 -0,00 -1,67 0,01 0,97 -0,00 0,00
35/ 3 0,0 0,0 0,0 0,0 0,0 0,0
35/ EFF+ -0,00 0,0 3,01 1,70 -0,00 0,00
35/ EFF- -0,00 -2,93 2,24 0,0 -0,00 0,0
35/ DEP+ -0,00 0,0 2,26 0,97 -0,00 0,00
35/ DEP- -0,00 -1,67 2,24 0,0 -0,00 0,0
38/ 1 -0,00 0,0 2,25 0,0 0,00 0,0
38/ 2 -0,00 -1,57 -0,01 -0,86 0,00 0,00
38/ 3 0,0 0,0 0,0 0,0 0,0 0,0
38/ EFF+ -0,00 0,0 3,00 0,0 0,00 0,00
38/ EFF- -0,00 -2,75 2,23 -1,51 0,00 0,0
38/ DEP+ -0,00 0,0 2,25 0,0 0,00 0,00
38/ DEP- -0,00 -1,57 2,24 -0,86 0,00 0,0
39/ 1 0,00 0,0 2,26 0,0 0,00 0,0
39/ 2 -0,00 -1,65 0,01 0,86 -0,00 0,00
39/ 3 0,0 0,0 0,0 0,0 0,0 0,0
39/ EFF+ 0,00 0,0 3,02 1,51 0,00 0,00
39/ EFF- -0,00 -2,88 2,26 0,0 -0,00 0,0
39/ DEP+ 0,00 0,0 2,27 0,86 0,00 0,00
39/ DEP- -0,00 -1,65 2,26 0,0 -0,00 0,0
43/ 1 -0,02 0,0 1,12 0,0 -0,01 0,0
43/ 2 0,00 -0,57 -0,00 -0,43 0,00 0,0
43/ 3 0,0 0,0 0,0 0,0 0,0 0,0
43/ EFF+ -0,01 0,0 1,50 0,0 -0,01 0,0
43/ EFF- -0,02 -1,00 1,12 -0,75 -0,02 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


43/ DEP+ -0,02 0,0 1,12 0,0 -0,01 0,0
43/ DEP- -0,02 -0,57 1,12 -0,43 -0,01 0,0
46/ 1 0,02 0,0 1,13 0,0 -0,01 0,0
46/ 2 0,00 -0,60 0,00 0,43 -0,00 -0,00
46/ 3 0,0 0,0 0,0 0,0 0,0 0,0
46/ EFF+ 0,03 0,0 1,51 0,75 -0,01 0,0
46/ EFF- 0,02 -1,05 1,13 0,0 -0,02 -0,00
46/ DEP+ 0,02 0,0 1,13 0,43 -0,01 0,0
46/ DEP- 0,02 -0,60 1,13 0,0 -0,01 -0,00
48/ 1 -0,02 0,0 1,13 0,0 0,01 0,0
48/ 2 -0,01 -0,64 0,01 0,45 -0,00 0,00
48/ 3 0,0 0,0 0,0 0,0 0,0 0,0
48/ EFF+ -0,02 0,0 1,51 0,79 0,02 0,00
48/ EFF- -0,03 -1,11 1,13 0,0 0,01 0,0
48/ DEP+ -0,02 0,0 1,13 0,45 0,01 0,00
48/ DEP- -0,02 -0,64 1,13 0,0 0,01 0,0
49/ 1 0,02 0,0 1,12 0,0 0,01 0,0
49/ 2 -0,01 -0,61 -0,00 -0,45 0,00 0,00
49/ 3 0,0 0,0 0,0 0,0 0,0 0,0
49/ EFF+ 0,02 0,0 1,50 0,0 0,02 0,00
49/ EFF- 0,01 -1,07 1,12 -0,79 0,01 0,0
49/ DEP+ 0,02 0,0 1,12 0,0 0,02 0,00
49/ DEP- 0,01 -0,61 1,12 -0,45 0,01 0,0

Cas 1 PERM1
Somme totale 0,00 0,0 40,42 0,0 -0,00 0,0
Somme réactions 0,00 0,0 40,42 0,0 -145,50 0,0
Somme efforts 0,0 0,0 -40,42 0,0 145,50 0,0
Vérification 0,00 0,0 0,00 0,0 0,0 0,0
Précision 5,04151e-16 1,29630e-31

Simulation du
Cas 2 vent Y+ 27,02
m/s
Somme totale -0,04 -28,48 0,02 0,02 -0,00 0,00
Somme réactions -0,04 -28,48 0,02 50,19 -0,13 -102,92
Somme efforts 0,04 28,48 -0,02 -50,19 0,13 102,92
Vérification 0,00 -0,00 0,0 0,00 0,00 -0,00
Précision 9,47317e-16 8,16280e-32

Cas 3 EXPL1
Somme totale 0,0 0,0 0,0 0,0 0,0 0,0
Somme réactions 0,0 0,0 0,0 0,0 0,0 0,0
Somme efforts 0,0 0,0 0,0 0,0 0,0 0,0
Vérification 0,0 0,0 0,0 0,0 0,0 0,0
Précision 0,0 0,0

Cas EFF+ EFF+


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


Somme totale 0,02 0,0 54,07 14,69 0,02 0,00
Somme réactions -0,06 -49,85 40,45 87,84 -145,74 -180,11
Somme efforts 0,06 49,85 -40,45 -87,84 145,74 180,11
Vérification 0,00 -0,00 0,00 0,00 0,0 -0,00
Précision 2,16200e-15 2,72483e-31

Cas EFF- EFF-


Somme totale -0,08 -49,85 40,25 -14,67 -0,03 -0,00
Somme réactions -0,06 -49,85 40,45 87,84 -145,74 -180,11
Somme efforts 0,06 49,85 -40,45 -87,84 145,74 180,11
Vérification 0,00 -0,00 0,00 0,00 0,0 -0,00
Précision 2,16200e-15 2,72483e-31

Cas DEP+ DEP+


Somme totale 0,00 0,0 40,54 8,40 0,01 0,00
Somme réactions -0,04 -28,48 40,44 50,19 -145,64 -102,92
Somme efforts 0,04 28,48 -40,44 -50,19 145,64 102,92
Vérification 0,00 -0,00 0,00 0,00 0,00 -0,00
Précision 1,45147e-15 2,11258e-31

Cas DEP- DEP-


Somme totale -0,04 -28,48 40,32 -8,38 -0,01 -0,00
Somme réactions -0,04 -28,48 40,44 50,19 -145,64 -102,92
Somme efforts 0,04 28,48 -40,44 -50,19 145,64 102,92
Vérification 0,00 -0,00 0,00 0,00 0,00 -0,00
Précision 1,45147e-15 2,11258e-31

X. Réactions EFF: Extrêmes globaux

FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]

MAX 0,03 0,0 3,02 1,70 0,02 0,00


Noeud 46 3 4 35 49 4
Cas EFF/5 1 EFF/5 EFF/9 EFF/5 EFF/9

MIN -0,03 -2,94 -0,01 -1,70 -0,02 -0,00


Noeud 48 25 24 24 46 25
Cas EFF/5 EFF/9 2 EFF/9 EFF/5 EFF/9

XI. Déplacements - Valeurs


Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]
3/ 1 0,0 0,0 0,0 0,0 0,0 0,0
3/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
3/ 3 0,0 0,0 0,0 0,0 0,0 0,0
3/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
3/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
3/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
3/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


4/ 1 0,0 0,0 0,0 0,0 0,0 0,0
4/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
4/ 3 0,0 0,0 0,0 0,0 0,0 0,0
4/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
4/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
4/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
4/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
8/ 1 0,0 0,0 0,0 0,0 0,0 0,0
8/ 2 0,0 0,0 0,0 0,0 0,0 0,000
8/ 3 0,0 0,0 0,0 0,0 0,0 0,0
8/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
8/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
8/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
8/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
9/ 1 0,0 0,0 0,0 0,0 0,0 0,0
9/ 2 0,0 0,0 0,0 0,0 0,0 0,000
9/ 3 0,0 0,0 0,0 0,0 0,0 0,0
9/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
9/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
9/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
9/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
12/ 1 0,0 0,0 0,0 0,0 0,0 0,0
12/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
12/ 3 0,0 0,0 0,0 0,0 0,0 0,0
12/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
12/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
12/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
12/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
13/ 1 0,0 0,0 0,0 0,0 0,0 0,0
13/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
13/ 3 0,0 0,0 0,0 0,0 0,0 0,0
13/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
13/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
13/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
13/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
16/ 1 0,0 0,0 0,0 0,0 0,0 0,0
16/ 2 0,0 0,0 0,0 0,0 0,0 0,000
16/ 3 0,0 0,0 0,0 0,0 0,0 0,0
16/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
16/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
16/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
16/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
17/ 1 0,0 0,0 0,0 0,0 0,0 0,0
17/ 2 0,0 0,0 0,0 0,0 0,0 0,000
17/ 3 0,0 0,0 0,0 0,0 0,0 0,0
17/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
17/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
17/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


17/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
20/ 1 0,0 0,0 0,0 0,0 0,0 0,0
20/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
20/ 3 0,0 0,0 0,0 0,0 0,0 0,0
20/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
20/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
20/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
20/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
21/ 1 0,0 0,0 0,0 0,0 0,0 0,0
21/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
21/ 3 0,0 0,0 0,0 0,0 0,0 0,0
21/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
21/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
21/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
21/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
24/ 1 0,0 0,0 0,0 0,0 0,0 0,0
24/ 2 0,0 0,0 0,0 0,0 0,0 0,000
24/ 3 0,0 0,0 0,0 0,0 0,0 0,0
24/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
24/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
24/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
24/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
25/ 1 0,0 0,0 0,0 0,0 0,0 0,0
25/ 2 0,0 0,0 0,0 0,0 0,0 0,000
25/ 3 0,0 0,0 0,0 0,0 0,0 0,0
25/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
25/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
25/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
25/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
34/ 1 0,0 0,0 0,0 0,0 0,0 0,0
34/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
34/ 3 0,0 0,0 0,0 0,0 0,0 0,0
34/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
34/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
34/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
34/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
35/ 1 0,0 0,0 0,0 0,0 0,0 0,0
35/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
35/ 3 0,0 0,0 0,0 0,0 0,0 0,0
35/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
35/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
35/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
35/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
38/ 1 0,0 0,0 0,0 0,0 0,0 0,0
38/ 2 0,0 0,0 0,0 0,0 0,0 0,000
38/ 3 0,0 0,0 0,0 0,0 0,0 0,0
38/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
38/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


38/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
38/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
39/ 1 0,0 0,0 0,0 0,0 0,0 0,0
39/ 2 0,0 0,0 0,0 0,0 0,0 0,000
39/ 3 0,0 0,0 0,0 0,0 0,0 0,0
39/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
39/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
39/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
39/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
43/ 1 0,0 0,0 0,0 0,0 0,0 0,0
43/ 2 0,0 0,0 0,0 0,0 0,0 0,000
43/ 3 0,0 0,0 0,0 0,0 0,0 0,0
43/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
43/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
43/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
43/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
46/ 1 0,0 0,0 0,0 0,0 0,0 0,0
46/ 2 0,0 0,0 0,0 0,0 0,0 0,000
46/ 3 0,0 0,0 0,0 0,0 0,0 0,0
46/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,000
46/ EFF- 0,0 0,0 0,0 0,0 0,0 0,0
46/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,000
46/ DEP- 0,0 0,0 0,0 0,0 0,0 0,0
48/ 1 0,0 0,0 0,0 0,0 0,0 0,0
48/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
48/ 3 0,0 0,0 0,0 0,0 0,0 0,0
48/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
48/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
48/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
48/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
49/ 1 0,0 0,0 0,0 0,0 0,0 0,0
49/ 2 0,0 0,0 0,0 0,0 0,0 -0,000
49/ 3 0,0 0,0 0,0 0,0 0,0 0,0
49/ EFF+ 0,0 0,0 0,0 0,0 0,0 0,0
49/ EFF- 0,0 0,0 0,0 0,0 0,0 -0,000
49/ DEP+ 0,0 0,0 0,0 0,0 0,0 0,0
49/ DEP- 0,0 0,0 0,0 0,0 0,0 -0,000
50/ 1 -0,0 0,0 -0,0 0,0 -0,000 0,0
50/ 2 0,0 0,4 0,0 -0,003 0,000 0,001
50/ 3 0,0 0,0 0,0 0,0 0,0 0,0
50/ EFF+ 0,0 0,7 -0,0 0,0 -0,000 0,003
50/ EFF- -0,0 0,0 -0,0 -0,006 -0,000 0,0
50/ DEP+ 0,0 0,4 -0,0 0,0 -0,000 0,001
50/ DEP- -0,0 0,0 -0,0 -0,003 -0,000 0,0
51/ 1 -0,0 0,0 -0,0 0,0 0,000 0,0
51/ 2 0,0 0,5 0,0 -0,004 0,000 0,000
51/ 3 0,0 0,0 0,0 0,0 0,0 0,0
51/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,000
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


51/ EFF- -0,0 0,0 -0,0 -0,007 0,000 0,0
51/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,000
51/ DEP- -0,0 0,0 -0,0 -0,004 0,000 0,0
52/ 1 -0,0 0,0 -0,0 0,0 0,000 0,0
52/ 2 0,0 0,5 0,0 -0,004 0,000 -0,000
52/ 3 0,0 0,0 0,0 0,0 0,0 0,0
52/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,0
52/ EFF- -0,0 0,0 -0,0 -0,007 0,000 -0,000
52/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,0
52/ DEP- -0,0 0,0 -0,0 -0,004 0,000 -0,000
53/ 1 -0,0 0,0 -0,0 0,0 0,000 0,0
53/ 2 0,0 0,5 0,0 -0,004 0,000 -0,000
53/ 3 0,0 0,0 0,0 0,0 0,0 0,0
53/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,0
53/ EFF- -0,0 0,0 -0,0 -0,007 0,000 -0,000
53/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,0
53/ DEP- -0,0 0,0 -0,0 -0,004 0,000 -0,000
54/ 1 0,0 0,0 -0,0 0,0 -0,000 0,0
54/ 2 0,0 0,5 0,0 -0,004 0,000 0,000
54/ 3 0,0 0,0 0,0 0,0 0,0 0,0
54/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,000
54/ EFF- 0,0 0,0 -0,0 -0,007 -0,000 0,0
54/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,000
54/ DEP- 0,0 0,0 -0,0 -0,004 -0,000 0,0
55/ 1 0,0 0,0 -0,0 0,0 -0,000 0,0
55/ 2 0,0 0,5 0,0 -0,004 0,000 0,000
55/ 3 0,0 0,0 0,0 0,0 0,0 0,0
55/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,000
55/ EFF- 0,0 0,0 -0,0 -0,007 -0,000 0,0
55/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,000
55/ DEP- 0,0 0,0 -0,0 -0,004 -0,000 0,0
56/ 1 0,0 0,0 -0,0 0,0 -0,000 0,0
56/ 2 0,0 0,5 0,0 -0,004 0,000 -0,000
56/ 3 0,0 0,0 0,0 0,0 0,0 0,0
56/ EFF+ 0,0 0,8 -0,0 0,0 0,000 0,0
56/ EFF- 0,0 0,0 -0,0 -0,007 -0,000 -0,000
56/ DEP+ 0,0 0,5 -0,0 0,0 0,000 0,0
56/ DEP- 0,0 0,0 -0,0 -0,004 -0,000 -0,000
57/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
57/ 2 0,0 0,4 -0,0 -0,003 0,000 -0,001
57/ 3 0,0 0,0 0,0 0,0 0,0 0,0
57/ EFF+ 0,0 0,7 -0,0 0,0 0,000 0,0
57/ EFF- 0,0 0,0 -0,0 -0,006 0,000 -0,003
57/ DEP+ 0,0 0,4 -0,0 0,0 0,000 0,0
57/ DEP- 0,0 0,0 -0,0 -0,003 0,000 -0,001
58/ 1 0,0 0,0 -0,0 0,0 -0,000 0,0
58/ 2 0,0 0,4 0,0 0,003 -0,000 0,001
58/ 3 0,0 0,0 0,0 0,0 0,0 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


58/ EFF+ 0,0 0,7 -0,0 0,006 -0,000 0,003
58/ EFF- 0,0 0,0 -0,0 0,0 -0,000 0,0
58/ DEP+ 0,0 0,4 -0,0 0,003 -0,000 0,001
58/ DEP- 0,0 0,0 -0,0 0,0 -0,000 0,0
59/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
59/ 2 0,0 0,5 0,0 0,004 -0,000 0,000
59/ 3 0,0 0,0 0,0 0,0 0,0 0,0
59/ EFF+ 0,0 0,8 -0,0 0,007 0,000 0,000
59/ EFF- 0,0 0,0 -0,0 0,0 -0,000 0,0
59/ DEP+ 0,0 0,5 -0,0 0,004 0,000 0,000
59/ DEP- 0,0 0,0 -0,0 0,0 -0,000 0,0
60/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
60/ 2 0,0 0,5 0,0 0,004 -0,000 -0,000
60/ 3 0,0 0,0 0,0 0,0 0,0 0,0
60/ EFF+ 0,0 0,8 -0,0 0,007 0,000 0,0
60/ EFF- 0,0 0,0 -0,0 0,0 -0,000 -0,000
60/ DEP+ 0,0 0,5 -0,0 0,004 0,000 0,0
60/ DEP- 0,0 0,0 -0,0 0,0 -0,000 -0,000
61/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
61/ 2 0,0 0,5 0,0 0,004 -0,000 -0,000
61/ 3 0,0 0,0 0,0 0,0 0,0 0,0
61/ EFF+ 0,0 0,8 -0,0 0,007 0,000 0,0
61/ EFF- 0,0 0,0 -0,0 0,0 -0,000 -0,000
61/ DEP+ 0,0 0,5 -0,0 0,004 0,000 0,0
61/ DEP- 0,0 0,0 -0,0 0,0 -0,000 -0,000
62/ 1 -0,0 0,0 -0,0 0,0 -0,000 0,0
62/ 2 0,0 0,5 0,0 0,004 -0,000 0,000
62/ 3 0,0 0,0 0,0 0,0 0,0 0,0
62/ EFF+ 0,0 0,8 -0,0 0,007 -0,000 0,000
62/ EFF- -0,0 0,0 -0,0 0,0 -0,000 0,0
62/ DEP+ 0,0 0,5 -0,0 0,004 -0,000 0,000
62/ DEP- -0,0 0,0 -0,0 0,0 -0,000 0,0
63/ 1 -0,0 0,0 -0,0 0,0 -0,000 0,0
63/ 2 0,0 0,5 0,0 0,004 -0,000 0,000
63/ 3 0,0 0,0 0,0 0,0 0,0 0,0
63/ EFF+ 0,0 0,8 -0,0 0,007 -0,000 0,000
63/ EFF- -0,0 0,0 -0,0 0,0 -0,000 0,0
63/ DEP+ 0,0 0,5 -0,0 0,004 -0,000 0,000
63/ DEP- -0,0 0,0 -0,0 0,0 -0,000 0,0
64/ 1 -0,0 0,0 -0,0 0,0 -0,000 0,0
64/ 2 0,0 0,5 0,0 0,004 -0,000 -0,000
64/ 3 0,0 0,0 0,0 0,0 0,0 0,0
64/ EFF+ 0,0 0,8 -0,0 0,007 -0,000 0,0
64/ EFF- -0,0 0,0 -0,0 0,0 -0,000 -0,000
64/ DEP+ 0,0 0,5 -0,0 0,004 -0,000 0,0
64/ DEP- -0,0 0,0 -0,0 0,0 -0,000 -0,000
65/ 1 -0,0 0,0 -0,0 0,0 0,000 0,0
65/ 2 0,0 0,4 -0,0 0,004 -0,000 -0,001
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Noeud/Cas UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


65/ 3 0,0 0,0 0,0 0,0 0,0 0,0
65/ EFF+ 0,0 0,7 -0,0 0,006 0,000 0,0
65/ EFF- -0,0 0,0 -0,0 0,0 0,000 -0,002
65/ DEP+ 0,0 0,4 -0,0 0,004 0,000 0,0
65/ DEP- -0,0 0,0 -0,0 0,0 0,000 -0,001
66/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
66/ 2 0,0 0,0 0,0 0,0 -0,000 -0,000
66/ 3 0,0 0,0 0,0 0,0 0,0 0,0
66/ EFF+ 0,0 0,0 -0,0 0,0 0,000 0,0
66/ EFF- 0,0 0,0 -0,0 0,0 0,000 -0,000
66/ DEP+ 0,0 0,0 -0,0 0,0 0,000 0,0
66/ DEP- 0,0 0,0 -0,0 0,0 0,000 -0,000
68/ 1 0,0 0,0 -0,0 0,0 0,000 0,0
68/ 2 0,0 0,2 0,0 0,002 -0,000 0,003
68/ 3 0,0 0,0 0,0 0,0 0,0 0,0
68/ EFF+ 0,0 0,4 -0,0 0,003 0,000 0,005
68/ EFF- 0,0 0,0 -0,0 0,0 0,000 0,0
68/ DEP+ 0,0 0,2 -0,0 0,002 0,000 0,003
68/ DEP- 0,0 0,0 -0,0 0,0 0,000 0,0
69/ 1 -0,0 0,0 -0,0 0,0 -0,000 0,0
69/ 2 0,0 0,2 0,0 0,002 -0,000 -0,003
69/ 3 0,0 0,0 0,0 0,0 0,0 0,0
69/ EFF+ 0,0 0,4 -0,0 0,003 -0,000 0,0
69/ EFF- -0,0 0,0 -0,0 0,0 -0,000 -0,005
69/ DEP+ 0,0 0,2 -0,0 0,002 -0,000 0,0
69/ DEP- -0,0 0,0 -0,0 0,0 -0,000 -0,003
70/ 1 0,0 0,0 -0,0 0,0 -0,000 0,0
70/ 2 0,0 0,2 -0,0 -0,002 0,000 -0,003
70/ 3 0,0 0,0 0,0 0,0 0,0 0,0
70/ EFF+ 0,0 0,4 -0,0 0,0 -0,000 0,0
70/ EFF- 0,0 0,0 -0,0 -0,003 -0,000 -0,005
70/ DEP+ 0,0 0,2 -0,0 0,0 -0,000 0,0
70/ DEP- 0,0 0,0 -0,0 -0,002 -0,000 -0,003
71/ 1 -0,0 0,0 -0,0 0,0 0,000 0,0
71/ 2 0,0 0,2 0,0 -0,002 0,000 0,003
71/ 3 0,0 0,0 0,0 0,0 0,0 0,0
71/ EFF+ 0,0 0,4 -0,0 0,0 0,000 0,005
71/ EFF- -0,0 0,0 -0,0 -0,003 0,000 0,0
71/ DEP+ 0,0 0,2 -0,0 0,0 0,000 0,003
71/ DEP- -0,0 0,0 -0,0 -0,002 0,000 0,0

XII. Déplacements DEP: Extrêmes globaux


UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]

MAX 0,0 0,8 0,0 0,007 0,000 0,005


Noeud 70 55 66 63 71 71
Cas EFF/9 EFF/9 2 EFF/9 EFF/5 EFF/9
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

UX [cm] UY [cm] UZ [cm] RX [Rad] RY [Rad] RZ [Rad]


MIN -0,0 0,0 -0,0 -0,007 -0,000 -0,005
Noeud 71 3 57 55 69 70
Cas EFF/1 1 EFF/5 EFF/9 EFF/5 EFF/9

XIII. Efforts - Enveloppe

Barre FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


75 / MAX 0,0 0,29 0,17 0,0 0,00 0,08
75 / MIN 0,0 0,0 -0,17 0,0 -0,03 -0,07
76 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
76 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
77 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
77 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
78 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
78 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
79 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
79 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
80 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
80 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
81 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
81 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
82 / MAX 0,0 0,11 0,17 0,0 0,00 0,0
82 / MIN 0,0 -0,11 -0,17 0,0 -0,03 -0,02
83 / MAX 0,0 0,0 0,17 0,0 0,00 0,08
83 / MIN 0,0 -0,29 -0,17 0,0 -0,03 -0,06
85 / MAX 0,02 0,37 0,33 0,0 0,00 0,0
85 / MIN -0,01 -0,30 -0,33 -0,01 -0,06 -0,03
86 / MAX 0,02 0,36 0,33 0,0 0,00 0,0
86 / MIN -0,01 -0,32 -0,33 -0,00 -0,06 -0,06
88 / MAX 0,02 0,34 0,33 0,0 0,00 0,0
88 / MIN -0,01 -0,34 -0,33 -0,00 -0,06 -0,06
89 / MAX 0,02 0,33 0,33 0,0 0,00 0,0
89 / MIN -0,01 -0,34 -0,33 -0,00 -0,06 -0,06
90 / MAX 0,02 0,32 0,33 0,00 0,00 0,0
90 / MIN -0,01 -0,36 -0,33 0,0 -0,06 -0,06
94 / MAX 0,0 0,38 0,33 0,01 0,00 0,0
94 / MIN -0,03 -0,30 -0,33 0,0 -0,06 -0,04
95 / MAX 0,0 0,36 0,33 0,00 0,00 0,0
95 / MIN -0,03 -0,32 -0,33 0,0 -0,06 -0,06
96 / MAX 0,0 0,34 0,33 0,0 0,00 0,0
96 / MIN -0,03 -0,34 -0,33 -0,00 -0,06 -0,06
97 / MAX 0,0 0,35 0,33 0,00 0,00 0,0
97 / MIN -0,03 -0,35 -0,33 0,0 -0,06 -0,06
98 / MAX 0,0 0,34 0,33 0,00 0,00 0,0
98 / MIN -0,03 -0,35 -0,33 0,0 -0,06 -0,06
99 / MAX 0,0 0,33 0,33 0,0 0,00 0,0
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Barre FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


99 / MIN -0,03 -0,36 -0,33 -0,00 -0,06 -0,06
100 / MAX 0,0 0,30 0,33 0,0 0,00 0,0
100 / MIN -0,03 -0,38 -0,33 -0,01 -0,06 -0,04
102 / MAX 0,0 0,36 0,18 0,0 0,0 0,08
102 / MIN 0,0 0,0 -0,18 0,0 -0,03 -0,08
103 / MAX 0,0 0,16 0,18 0,0 0,0 0,0
103 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
104 / MAX 0,0 0,17 0,18 0,0 0,0 0,0
104 / MIN 0,0 -0,16 -0,18 0,0 -0,03 -0,03
105 / MAX 0,0 0,17 0,18 0,0 0,0 0,0
105 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
107 / MAX 0,0 0,16 0,18 0,0 0,0 0,0
107 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
108 / MAX 0,0 0,17 0,18 0,0 0,0 0,0
108 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
109 / MAX 0,0 0,0 0,18 0,0 0,0 0,08
109 / MIN 0,0 -0,35 -0,18 0,0 -0,03 -0,07
110 / MAX 0,0 0,17 0,18 0,0 0,0 0,0
110 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
111 / MAX 0,0 0,17 0,18 0,0 0,0 0,0
111 / MIN 0,0 -0,17 -0,18 0,0 -0,03 -0,03
112 / MAX 0,02 0,34 0,33 0,00 0,00 0,0
112 / MIN -0,01 -0,34 -0,33 0,0 -0,06 -0,06
115 / MAX 2,65 2,58 0,00 0,01 0,00 0,0
115 / MIN -2,64 -2,59 -0,00 -0,01 -0,00 -1,69
116 / MAX 2,65 2,59 0,00 0,00 0,00 0,0
116 / MIN -2,65 -2,59 -0,00 -0,00 -0,00 -1,69
117 / MAX 2,65 2,58 0,00 0,00 0,00 0,0
117 / MIN -2,65 -2,58 -0,00 -0,00 -0,00 -1,68
118 / MAX 2,65 2,58 0,00 0,00 0,00 0,0
118 / MIN -2,65 -2,58 -0,00 -0,00 -0,00 -1,68
119 / MAX 2,65 2,60 0,00 0,00 0,00 0,0
119 / MIN -2,65 -2,59 -0,00 -0,00 -0,00 -1,70
121 / MAX 2,65 2,59 0,00 0,01 0,00 0,0
121 / MIN -2,64 -2,60 -0,00 -0,01 -0,00 -1,70
122 / MAX 2,66 2,36 0,00 0,04 0,00 0,0
122 / MIN -2,66 -2,37 -0,00 -0,04 -0,00 -1,51
124 / MAX 2,66 2,34 0,00 0,05 0,00 0,0
124 / MIN -2,66 -2,35 -0,00 -0,05 -0,00 -1,50
126 / MAX 1,33 1,14 0,03 0,08 0,01 0,0
126 / MIN -1,33 -1,14 -0,01 -0,08 -0,01 -0,79
127 / MAX 1,33 1,07 0,00 0,08 0,01 0,0
127 / MIN -1,33 -1,08 -0,03 -0,08 -0,01 -0,75
128 / MAX 0,02 0,17 0,34 0,0 0,00 0,08
128 / MIN -0,01 -0,47 -0,32 -0,02 -0,06 -0,04
129 / MAX 0,02 0,47 0,32 0,02 0,00 0,08
129 / MIN -0,01 -0,18 -0,35 0,0 -0,06 -0,04
130 / MAX 0,0 0,47 0,32 0,0 0,00 0,08
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Barre FX [kN] FY [kN] FZ [kN] MX [kNm] MY [kNm] MZ [kNm]


130 / MIN -0,04 -0,18 -0,34 -0,02 -0,06 -0,04
131 / MAX 0,0 0,18 0,35 0,02 0,00 0,08
131 / MIN -0,03 -0,48 -0,32 0,0 -0,06 -0,04
132 / MAX 0,02 0,30 0,33 0,01 0,00 0,04
132 / MIN -0,01 -0,38 -0,33 0,0 -0,06 0,0

XIV. Contraintes - Extrêmes globaux

S max [MPa] S min [MPa] S max(My) [MPa]

MAX 101,02 4,28 9,53


Barre 121 124 129
Noeud 35 4 65
Cas EFF/9 EFF/1 EFF/5

MIN -4,27 -100,90 0,0


Barre 124 119 75
Noeud 3 24 43
Cas EFF/1 EFF/9 3

S max(Mz) [MPa] S min(My) [MPa] S min(Mz) [MPa] Fx/Ax [MPa]

MAX 97,66 0,0 0,0 4,30


Barre 121 75 75 122
Noeud 35 43 43 39
Cas EFF/9 3 1 EFF/5

MIN 0,0 -9,53 -97,66 -4,29


Barre 75 129 121 122
Noeud 43 65 35 38
Cas 1 EFF/5 EFF/9 EFF/5

XV. Données - Pièces

Pièce Nom Composants Famille


75 Barre TPR_75 75 (N/A)
76 Barre TPR_76 76 (N/A)
77 Barre TPR_77 77 (N/A)
78 Barre TPR_78 78 (N/A)
79 Barre TPR_79 79 (N/A)
80 Barre TPR_80 80 (N/A)
81 Barre TPR_81 81 (N/A)
82 Barre TPR_82 82 (N/A)
83 Barre TPR_83 83 (N/A)
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Pièce Nom Composants Famille


85 Barre TPR_85 85 (N/A)
86 Barre TPR_86 86 (N/A)
88 Barre TPR_88 88 (N/A)
89 Barre TPR_89 89 (N/A)
90 Barre TPR_90 90 (N/A)
94 Barre TPR_94 94 (N/A)
95 Barre TPR_95 95 (N/A)
96 Barre TPR_96 96 (N/A)
97 Barre TPR_97 97 (N/A)
98 Barre TPR_98 98 (N/A)
99 Barre TPR_99 99 (N/A)
100 Barre TPR_100 100 (N/A)
102 Barre TPR_102 102 (N/A)
103 Barre TPR_103 103 (N/A)
104 Barre TPR_104 104 (N/A)
105 Barre TPR_105 105 (N/A)
107 Barre TPR_107 107 (N/A)
108 Barre TPR_108 108 (N/A)
109 Barre TPR_109 109 (N/A)
110 Barre TPR_110 110 (N/A)
111 Barre TPR_111 111 (N/A)
112 Barre TPR_112 112 (N/A)
115 Montant TPR_115 115 (N/A)
116 Montant TPR_116 116 (N/A)
117 Montant TPR_117 117 (N/A)
118 Montant TPR_118 118 (N/A)
119 Montant TPR_119 119 (N/A)
121 Montant TPR_121 121 (N/A)
122 Montant TPR_122 122 (N/A)
124 Montant TPR_124 124 (N/A)
126 Montant TPR_126 126 (N/A)
127 Montant TPR_127 127 (N/A)
128 Barre TPR_128 128 (N/A)
129 Barre TPR_129 129 (N/A)
130 Barre TPR_130 130 (N/A)
131 Barre TPR_131 131 (N/A)
132 Barre TPR_132 132 (N/A)
Pièce Section Type de barre Ly [m] Lz [m]
75 TPR 52003* Barre TPR 0,80 0,80
76 TPR 52003* Barre TPR 0,80 0,80
77 TPR 52003* Barre TPR 0,80 0,80
78 TPR 52003* Barre TPR 0,80 0,80
79 TPR 52003* Barre TPR 0,80 0,80
80 TPR 52003* Barre TPR 0,80 0,80
81 TPR 52003* Barre TPR 0,80 0,80
82 TPR 52003* Barre TPR 0,80 0,80
83 TPR 52003* Barre TPR 0,80 0,80
85 TPR 52002 Barre TPR 0,80 0,80
86 TPR 52002 Barre TPR 0,80 0,80
88 TPR 52002 Barre TPR 0,80 0,80
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Pièce Section Type de barre Ly [m] Lz [m]


89 TPR 52002 Barre TPR 0,80 0,80
90 TPR 52002 Barre TPR 0,80 0,80
94 TPR 52002 Barre TPR 0,80 0,80
95 TPR 52002 Barre TPR 0,80 0,80
96 TPR 52002 Barre TPR 0,80 0,80
97 TPR 52002 Barre TPR 0,80 0,80
98 TPR 52002 Barre TPR 0,80 0,80
99 TPR 52002 Barre TPR 0,80 0,80
100 TPR 52002 Barre TPR 0,80 0,80
102 TPR 52003* Barre TPR 0,80 0,80
103 TPR 52003* Barre TPR 0,80 0,80
104 TPR 52003* Barre TPR 0,80 0,80
105 TPR 52003* Barre TPR 0,80 0,80
107 TPR 52003* Barre TPR 0,80 0,80
108 TPR 52003* Barre TPR 0,80 0,80
109 TPR 52003* Barre TPR 0,80 0,80
110 TPR 52003* Barre TPR 0,80 0,80
111 TPR 52003* Barre TPR 0,80 0,80
112 TPR 52002 Barre TPR 0,80 0,80
115 TPR 52003* Montant TPR 3,60 3,60
116 TPR 52003* Montant TPR 3,60 3,60
117 TPR 52003* Montant TPR 3,60 3,60
118 TPR 52003* Montant TPR 3,60 3,60
119 TPR 52003* Montant TPR 3,60 3,60
121 TPR 52003* Montant TPR 3,60 3,60
122 TPR 52003* Montant TPR 3,60 3,60
124 TPR 52003* Montant TPR 3,60 3,60
126 TPR 52003* Montant TPR 3,60 3,60
127 TPR 52003* Montant TPR 3,60 3,60
128 TPR 52002 Barre TPR 0,80 0,80
129 TPR 52002 Barre TPR 0,80 0,80
130 TPR 52002 Barre TPR 0,80 0,80
131 TPR 52002 Barre TPR 0,80 0,80
132 TPR 52002 Barre TPR 0,80 0,80

XVI. Vérification des barres acier


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 75 Barre TPR_75 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2


ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.02/12.41 = -1.63 MPa
SigFz = -0.08/17.37 = -4.60 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-1.63 + 1.00*-4.60 = | -6.22 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.19 = 0.31 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.54 = 0.90 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 76 Barre TPR_76 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -1.08 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-1.08 = | -3.28 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.23 = 0.39 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.73| = |-1.21| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 77 Barre TPR_77 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -0.96 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-0.96 = | -3.16 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.24 = 0.39 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.73| = |-1.21| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 78 Barre TPR_78 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -1.03 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-1.03 = | -3.22 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.24| = |-0.39| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.73 = 1.21 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 79 Barre TPR_79 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -0.95 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-0.95 = | -3.14 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.23 = 0.39 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.73| = |-1.21| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 80 Barre TPR_80 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -1.04 MPa

PARAMETRES DE DEVERSEMENT:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-1.04 = | -3.23 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.24 = 0.39 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.73| = |-1.21| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 81 Barre TPR_81 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -0.96 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-0.96 = | -3.15 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.24| = |-0.40| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.73 = 1.21 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 82 Barre TPR_82 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.19 MPa
SigFz = -0.02/17.37 = -1.06 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.19 + 1.00*-1.06 = | -3.25 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.23| = |-0.38| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.73 = 1.21 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 83 Barre TPR_83 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.02/12.41 = -1.62 MPa
SigFz = -0.08/17.37 = -4.48 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-1.62 + 1.00*-4.48 = | -6.10 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.17| = |-0.29| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.54| = |-0.89| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 85 Barre TPR_85 POINT: 2 COORDONNEE: x = 0.50 L = 0.40 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

CONTRAINTES: SigN = 0.00/3.92 = 0.00 MPa


SigFy = 0.02/6.09 = 4.02 MPa
SigFz = 0.07/6.23 = 10.57 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=439040.06 Lz=0.80 m Muz=466733.23
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.00 + 1.00*1.00*4.02 + 1.00*10.57 = 14.58 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.18 = 0.30 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.01 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 86 Barre TPR_86 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.01/3.92 = 0.01 MPa


SigFy = 0.05/6.09 = 8.93 MPa
SigFz = 0.05/6.23 = 7.66 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=33151.28 Lz=0.80 m Muz=35242.35
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.01 + 1.00*1.00*8.93 + 1.00*7.66 = 16.60 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.48 = 2.46 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.64| = |-2.73| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 88 Barre TPR_88 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.00/3.92 = 0.01 MPa


SigFy = 0.06/6.09 = 9.04 MPa
SigFz = 0.05/6.23 = 7.62 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=58445.74 Lz=0.80 m Muz=62132.30
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.01 + 1.00*1.00*9.04 + 1.00*7.62 = 16.66 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.40| = |-2.32| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.65 = 2.74 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 89 Barre TPR_89 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.00/3.92 = 0.01 MPa


SigFy = 0.06/6.09 = 9.04 MPa
SigFz = 0.05/6.23 = 7.70 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=57104.92 Lz=0.80 m Muz=60706.91
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.01 + 1.00*1.00*9.04 + 1.00*7.70 = 16.75 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.39| = |-2.31| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.65 = 2.74 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 90 Barre TPR_90 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.00/3.92 = 0.01 MPa


SigFy = 0.06/6.09 = 9.05 MPa
SigFz = 0.05/6.23 = 7.64 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=45110.53 Lz=0.80 m Muz=47955.95
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.01 + 1.00*1.00*9.05 + 1.00*7.64 = 16.70 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.47| = |-2.44| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.65 = 2.74 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 94 Barre TPR_94 POINT: 2 COORDONNEE: x = 0.50 L = 0.40 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.07 MPa


SigFy = -0.02/6.09 = -4.02 MPa
SigFz = -0.07/6.23 = -10.66 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.07 + 1.00*-4.02 + -10.66 = | -14.75 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.18 = 0.30 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.00| = |-0.00| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 95 Barre TPR_95 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.08 MPa


SigFy = -0.06/6.09 = -9.07 MPa
SigFz = -0.05/6.23 = -7.75 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.08 + 1.00*-9.07 + -7.75 = | -16.90 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.48 = 2.46 < 120.00 MPa (1.313)
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

1.54*Tauz = |1.66*-1.66| = |-2.75| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 96 Barre TPR_96 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.09 MPa


SigFy = -0.06/6.09 = -9.07 MPa
SigFz = -0.05/6.23 = -7.77 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.09 + 1.00*-9.07 + -7.77 = | -16.93 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.42 = 2.35 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.66| = |-2.75| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

FAMILLE:
PIECE: 97 Barre TPR_97 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.09 MPa


SigFy = -0.06/6.09 = -9.07 MPa
SigFz = -0.05/6.23 = -7.77 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.09 + 1.00*-9.07 + -7.77 = | -16.93 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.43 = 2.38 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.66| = |-2.75| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 98 Barre TPR_98 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.09 MPa


SigFy = -0.05/6.09 = -8.94 MPa
SigFz = -0.05/6.23 = -7.86 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.09 + 1.00*-8.94 + -7.86 = | -16.89 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.43| = |-2.38| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.65 = 2.73 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 99 Barre TPR_99 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.09 MPa


SigFy = -0.05/6.09 = -8.94 MPa
SigFz = -0.05/6.23 = -7.82 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.09 + 1.00*-8.94 + -7.82 = | -16.85 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.50| = |-2.50| < 120.00 MPa (1.313)
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

1.54*Tauz = 1.66*1.65 = 2.73 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 100 Barre TPR_100 POINT: 2 COORDONNEE: x = 0.50 L = 0.40 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.08 MPa


SigFy = -0.02/6.09 = -4.02 MPa
SigFz = -0.07/6.23 = -10.46 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.08 + 1.00*-4.02 + -10.46 = | -14.57 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.18| = |-0.29| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.01| = |-0.02| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

FAMILLE:
PIECE: 102 Barre TPR_102 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.02/12.41 = -1.81 MPa
SigFz = -0.08/17.37 = -4.59 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-1.81 + 1.00*-4.59 = | -6.40 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.08 = 0.13 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.61 = 1.02 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 103 Barre TPR_103 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

CONTRAINTES:
SigFy = -0.03/12.41 = -2.38 MPa
SigFz = -0.03/17.37 = -1.45 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.38 + 1.00*-1.45 = | -3.83 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.35| = |-0.57| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.81 = 1.34 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 104 Barre TPR_104 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.39 MPa
SigFz = -0.02/17.37 = -1.35 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.39 + 1.00*-1.35 = | -3.74 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.36 = 0.59 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.81| = |-1.35| < 120.00 MPa (1.313)
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL KEF.rtd
Autodesk Robot Structural Analysis Professional 2018 Projet : CNSS EL KEF

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 105 Barre TPR_105 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.40 MPa
SigFz = -0.02/17.37 = -1.41 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.40 + 1.00*-1.41 = | -3.81 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.36| = |-0.59| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.81 = 1.35 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

PIECE: 107 Barre TPR_107 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.39 MPa
SigFz = -0.02/17.37 = -1.35 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.39 + 1.00*-1.35 = | -3.73 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.36| = |-0.60| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.81 = 1.35 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 108 Barre TPR_108 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

CONTRAINTES:
SigFy = -0.03/12.41 = -2.38 MPa
SigFz = -0.03/17.37 = -1.45 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.38 + 1.00*-1.45 = | -3.83 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.35 = 0.58 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.81| = |-1.34| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 109 Barre TPR_109 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.02/12.41 = -1.80 MPa
SigFz = -0.08/17.37 = -4.47 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-1.80 + 1.00*-4.47 = | -6.27 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.07| = |-0.12| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.61| = |-1.02| < 120.00 MPa (1.313)
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 110 Barre TPR_110 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.40 MPa
SigFz = -0.02/17.37 = -1.33 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.40 + 1.00*-1.33 = | -3.73 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.35 = 0.58 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.81| = |-1.35| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 111 Barre TPR_111 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES:
SigFy = -0.03/12.41 = -2.39 MPa
SigFz = -0.02/17.37 = -1.43 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
kD*kFy*SigFy + kFz*SigFz = 1.00*1.00*-2.39 + 1.00*-1.43 = | -3.82 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*0.36 = 0.59 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.81| = |-1.35| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 112 Barre TPR_112 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.00/3.92 = 0.01 MPa


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

SigFy = 0.05/6.09 = 8.91 MPa


SigFz = 0.05/6.23 = 7.72 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=46989.79 Lz=0.80 m Muz=49953.75
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.01 + 1.00*1.00*8.91 + 1.00*7.72 = 16.65 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.41 = 2.33 < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.64| = |-2.72| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 115 Montant TPR_115 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.99/6.20 = 3.20 MPa


SigFy = 0.00/12.41 = 0.09 MPa
SigFz = 1.69/17.37 = 97.30 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=9.99 Lz=3.60 m Muz=25.74
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.09 + 1.05*97.30 = 106.01 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-6.28| = |-10.43| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.01 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 116 Montant TPR_116 POINT: 3 COORDONNEE: x = 1.00 L = 3.60 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.98/6.20 = 3.20 MPa


SigFy = 0.00/12.41 = 0.10 MPa
SigFz = 1.69/17.37 = 97.36 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=10.00 Lz=3.60 m Muz=25.76
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.10 + 1.05*97.36 = 106.08 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*6.28 = 10.42 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.02 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 117 Montant TPR_117 POINT: 3 COORDONNEE: x = 1.00 L = 3.60 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.98/6.20 = 3.20 MPa


SigFy = 0.00/12.41 = 0.12 MPa
SigFz = 1.68/17.37 = 96.87 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=10.00 Lz=3.60 m Muz=25.76
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.12 + 1.05*96.87 = 105.58 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*6.25 = 10.38 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.02 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 118 Montant TPR_118 POINT: 3 COORDONNEE: x = 1.00 L = 3.60 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.98/6.20 = 3.20 MPa


SigFy = 0.00/12.41 = 0.13 MPa
SigFz = 1.68/17.37 = 96.96 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=10.00 Lz=3.60 m Muz=25.76
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.13 + 1.05*96.96 = 105.70 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*6.26 = 10.39 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.02 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 119 Montant TPR_119 POINT: 3 COORDONNEE: x = 1.00 L = 3.60 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.98/6.20 = 3.20 MPa


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

SigFy = 0.00/12.41 = 0.14 MPa


SigFz = 1.70/17.37 = 97.65 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=10.00 Lz=3.60 m Muz=25.76
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.14 + 1.05*97.65 = 106.44 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*6.30 = 10.46 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.02 = 0.03 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 121 Montant TPR_121 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.99/6.20 = 3.20 MPa


SigFy = 0.00/12.41 = 0.15 MPa
SigFz = 1.70/17.37 = 97.66 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=9.99 Lz=3.60 m Muz=25.74
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.20 + 1.00*1.15*0.15 + 1.05*97.66 = 106.47 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-6.31| = |-10.47| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.02 = 0.03 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 122 Montant TPR_122 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 2.00/6.20 = 3.22 MPa


SigFy = 0.00/12.41 = 0.14 MPa
SigFz = 1.51/17.37 = 87.03 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=9.93 Lz=3.60 m Muz=25.57
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.22 + 1.00*1.15*0.14 + 1.05*87.03 = 95.30 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-5.74| = |-9.53| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.02 = 0.03 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé


TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 124 Montant TPR_124 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 2.00/6.20 = 3.22 MPa


SigFy = 0.00/12.41 = 0.11 MPa
SigFz = 1.50/17.37 = 86.34 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=9.93 Lz=3.60 m Muz=25.59
Lfy=3.60 m k1y=1.03 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.15 Lambda z=94.76 kFz=1.05

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.03*3.22 + 1.00*1.15*0.11 + 1.05*86.34 = 94.52 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-5.70| = |-9.47| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.01 = 0.02 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 126 Montant TPR_126 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3

CONTRAINTES: SigN = 1.00/6.20 = 1.61 MPa


SigFy = 0.01/12.41 = 0.84 MPa
SigFz = 0.79/17.37 = 45.38 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=19.87 Lz=3.60 m Muz=51.18
Lfy=3.60 m k1y=1.02 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.07 Lambda z=94.76 kFz=1.03

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.02*1.61 + 1.00*1.07*0.84 + 1.03*45.38 = 49.12 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-2.78| = |-4.61| < 120.00 MPa (1.313)
1.54*Tauz = 1.66*0.13 = 0.21 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 127 Montant TPR_127 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52003*


ht=5.6 cm
bf=10.3 cm Ay=4.12 cm2 Az=2.24 cm2 Ax=6.20 cm2
ea=0.2 cm Iy=34.74 cm4 Iz=89.48 cm4 Ix=76.76 cm4
es=0.2 cm Wely=12.41 cm3 Welz=17.37 cm3
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

CONTRAINTES: SigN = 1.00/6.20 = 1.61 MPa


SigFy = 0.01/12.41 = 0.56 MPa
SigFz = 0.75/17.37 = 43.22 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=3.60 m Muy=19.91 Lz=3.60 m Muz=51.28
Lfy=3.60 m k1y=1.02 Lfz=3.60 m k1z=1.01
Lambda y=152.09 kFy=1.07 Lambda z=94.76 kFz=1.03

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.02*1.61 + 1.00*1.07*0.56 + 1.03*43.22 = 46.61 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-2.62| = |-4.35| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.09| = |-0.16| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 1.8 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 128 Barre TPR_128 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.01/3.92 = 0.03 MPa


SigFy = 0.05/6.09 = 7.57 MPa
SigFz = 0.07/6.23 = 10.94 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=15151.71 Lz=0.80 m Muz=16107.43
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.03 + 1.00*1.00*7.57 + 1.00*10.94 = 18.55 < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.95| = |-3.24| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.58| = |-2.62| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 129 Barre TPR_129 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = 0.01/3.92 = 0.02 MPa


SigFy = 0.05/6.09 = 7.42 MPa
SigFz = 0.07/6.23 = 10.71 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:
Ly=0.80 m Muy=22539.06 Lz=0.80 m Muz=23960.75
Lfy=0.80 m k1y=1.00 Lfz=0.80 m k1z=1.00
Lambda y=40.58 kFy=1.00 Lambda z=39.36 kFz=1.00

FORMULES DE VERIFICATION:
k1*SigN + kD*kFy*SigFy + kFz*SigFz = 1.00*0.02 + 1.00*1.00*7.42 + 1.00*10.71 = 18.15 < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.95 = 3.24 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.57 = 2.61 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 130 Barre TPR_130 POINT: 1 COORDONNEE: x = 0.00 L = 0.00 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.04/3.92 = -0.09 MPa


SigFy = -0.05/6.09 = -7.61 MPa
SigFz = -0.07/6.23 = -10.70 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.09 + 1.00*-7.61 + -10.70 = | -18.40 | < 120.00 MPa (3.731)
1.54*Tauy = 1.66*1.95 = 3.24 < 120.00 MPa (1.313)
1.54*Tauz = 1.66*1.59 = 2.63 < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!


CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 131 Barre TPR_131 POINT: 3 COORDONNEE: x = 1.00 L = 0.80 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /5/ 1*1.33 + 2*1.50

MATERIAU:
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.03/3.92 = -0.08 MPa


SigFy = -0.05/6.09 = -7.43 MPa
SigFz = -0.07/6.23 = -11.02 MPa

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION:
SigN + kD*SigFy + SigFz = -0.08 + 1.00*-7.43 + -11.02 = | -18.54 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-1.99| = |-3.30| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-1.57| = |-2.61| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 7 DEP /3/ 1*1.00 + 2*1.00

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

CALCUL DES STRUCTURES ACIER

NORME: CM66
TYPE D'ANALYSE: Vérification des pièces

FAMILLE:
PIECE: 132 Barre TPR_132 POINT: 2 COORDONNEE: x = 0.50 L = 0.40 m

CHARGEMENTS:
Cas de charge décisif: 4 EFF /9/ 1*1.00 + 2*1.75 + 3*1.00

MATERIAU:
ALUM fy = 120.00 MPa

PARAMETRES DE LA SECTION: TPR 52002


ht=5.0 cm
bf=5.2 cm Ay=2.08 cm2 Az=2.00 cm2 Ax=3.92 cm2
ea=0.2 cm Iy=15.23 cm4 Iz=16.19 cm4 Ix=23.51 cm4
es=0.2 cm Wely=6.09 cm3 Welz=6.23 cm3

CONTRAINTES: SigN = -0.00/3.92 = -0.01 MPa


SigFy = -0.02/6.09 = -4.02 MPa
SigFz = -0.07/6.23 = -10.45 MPa
TUNISIE ENGINNERING&CONSEILS Fichier : MUR RIDEAU CNSS EL
Autodesk Robot Structural Analysis Professional KEF.rtd Projet : CNSS EL KEF

PARAMETRES DE DEVERSEMENT:

PARAMETRES DE FLAMBEMENT:

en y: en z:

FORMULES DE VERIFICATION :
SigN + kD*SigFy + SigFz = -0.01 + 1.00*-4.02 + -10.45 = | -14.47 | < 120.00 MPa (3.731)
1.54*Tauy = |1.66*-0.18| = |-0.29| < 120.00 MPa (1.313)
1.54*Tauz = |1.66*-0.00| = |-0.00| < 120.00 MPa (1.313)

DEPLACEMENTS LIMITES

Flèches (REPERE LOCAL):


uz = 0.0 cm < uz max = L/200.00 = 0.4 cm Vérifié
Cas de charge décisif: 1 PERM1

Déplacements (REPERE GLOBAL): Non analysé

Profil correct !!!

XVII. Dimensionnement de fixation


Le mode de fixation de nos profilés TPR a été calculés par le logiciel SPIT-I EXPERT, qui prit on
charge le dimensionnement de la platine ; type d'ancrage et la méthode d’installation suivant les
réactions EFF : Extrêmes globaux affichés par le logiciel Autodesk Robot Structural Analysis
Professional 2018.
Ref : 15/01/2019 15:59 / Version du logiciel Page :

NOTE DE CALCUL DU DIMENSIONNEMENT DE FIXATIONS


Nom de la société : Réalisé par :
Numéro de téléphone : Adresse électronique :
Projet :
Nom de la société : Désignation du projet : CNSS EL KEF 'Mur Rideau'
Nom du contact : Adresse :
Numéro de téléphone : Point de fixation :
Adresse électronique : Commentaires :
Support béton :
Résistance du béton: C20/25
Épaisseur du matériau de base: 400 mm Fissuration du béton: Béton non fissuré
Type de renforcement : Renforcement du béton espacé Renforcement de bord: Renforcement de bord rectiligne
Conditions :
Conditions d'installation :: Trou sec
Température court terme : 40 °C Température long terme : 24 °C
Hypothèses de calcul
- La platine doit être suffisament rigide pour ne pas se déformer sous les charges appliquées
- La connection entre le profilé et la platine n'est pas vérifiée
Pièce à fixer:
Epaisseur de la pièce à fixer : 8 mm Diamètre de passage : 20 mm
Le concepteur doit vérifier que la platine est suffisamment rigide afin de garantir la validité des sollicitations calculées
Chevilles recommandées : TRIGA Z-A4 Version Ecrou E12-18/15
Modèle de calcul :
Profilé : Tube rect. 120*60*2,5
Position du profilé : Ex: 0, Ey: 0
Sans montage avec écartement

Charges à l'Etat Limite Ultime : Charges statiques


Dimensions :
et quasi-statiques
Nz: 3 kN Mx: 1,7 kNm
Vx: 0 kN My: 0 kNm
Vy: -2,9 kN Mz: 0 kNm

Les modèles de calcul proposés n'engagent la responsabilité de SPIT que dans la stricte similitude des hypothèses de calcul retenues, et d'une mise en œuvre conforme aux instructions données dans les ATE. Le résultat de ces calculs ne
concerne que les chevilles SPIT. Il appartient au Maître d'ouvrage ou au Bureau d'Etudes de vérifier que le support est apte à supporter les charges apportées par les chevilles notamment dans le cas d'un groupe de chevilles. Toute modification
de ce logiciel effectuée sans l'accord écrit de SPIT, nous dégage de toute responsabilité.
Ref : 15/01/2019 15:59 / Version du logiciel Page :
Charges à l'Etat Limite Ultime Charges statiques et quasi-
statiques
Charges sur les chevilles Chevilles recommandées :
Charges sur les chevilles TRIGA Z-A4 Version Ecrou E12-18/15
Cheville Traction Cisaill. [x] Cisaill. [y] ETA n° : None
1 16,7 kN 0 kN -1,5 kN
2 13,5 kN 0 kN -1,5 kN

Dimensionnement : selon Annexe C du guide d'ATE 001 (Amendement d'Août 2010)


TRACTION CISAILLEMENT
Ruine par extraction/glissement : Ruine béton en bord de dalle
Mode de ruine non décisif : Mode de ruine non décisif
Ruine par cône de béton : Ruine par effet de levier :
0
0
k1 = 10,1; N Rk,c = 36,1 kN k1 = 0; NRk,c = 36,1 kN
Scr,N = 240 mm; Ccr,N = 120 mm Scr,N = 240 mm; Ccr,N = 120 mm
0 0
Ac,N / Ac,N = 1,42 Ac,N / Ac,N = 1,42
Enx = 5 mm; Eny = 0 mm ψs,N = 1,000; ψre,N = 1,000
ψec,N,x = 0,960; ψec,N,y = 1,000 NRk,c = 51,2 kN; k-pryout : 2
ψs,N = 1,000; ψre,N = 1,000 VRk,cp = 102,4 kN
NRk,c = 49,1 kN VRd,cp = 68,3 kN; γMc,V = 1,5
NRd,c = 32,8 kN; γMc,N = 1,5 VSd,cp = 2,9 kN; βV,cp = 0,04
g
NSd = 30,2 kN; βN,c = 0,92 Ruine acier :
Ruine par fendage : Sans bras de levier
Mode de ruine non décisif VRk,s = 47,4 kN
Ruine acier : VRd,s = 37,9 kN; γMs,V = 1,25
NRk,s = 58,5 kN VSd,s = 1,5 kN; βV,s = 0,04
NRd,s = 24,4 kN; γMs,N = 2,4
h
NSd = 16,7 kN; βN,s = 0,69
Equation d'intéraction:
α α 1,5 1,5
(βN + βV) = 0,92 + 0,04 = 0,89 ≤ 1
Déplacement :
Charge à long terme : Charge à court terme :
h h h h
NSd / 1.35 : 12,4 kN; VSd / 1.35 : 1,1 kN NSd / 1.35 : 12,4 kN; VSd / 1.35 : 1,1 kN
δN:0,07 mm; δV:0,34 mm δN:0,07 mm; δV:0,5 mm
δNV:0,35 mm δNV:0,51 mm
Ref : 15/01/2019 15:59 / Version du logiciel Page :
Dimensions de la platine
Ref : 15/01/2019 15:59 / Version du logiciel Page :
Chevilles recommandées : TRIGA Z-A4 Version Ecrou E12-18/15
Code produit : 050606 / ETA n° : None /
Données de pose:
Profondeur d'ancrage : 80 mm
Epaisseur minimum du support béton : 167 mm
Diamètre de perçage dans le béton : 18 mm
Profondeur de perçage dans le béton : 112 mm
Couple de serrage : 80,00 Nm
Qualité d'acier de la platine : S235
Epaisseur de la pièce à fixer : 8 mm
Tube rect.
Profilé :
120*60*2,5
Diamètre de passage : 20 mm
Méthode d'installation:

Nettoyage :
Performances issues d'essais pratiqués par le laboratoire SPIT
Ref : 16/01/2019 09:23 / Version du logiciel Page :

NOTE DE CALCUL DU DIMENSIONNEMENT DE FIXATIONS


Nom de la société : Réalisé par :
Numéro de téléphone : Adresse électronique :
Projet :
Nom de la société : Désignation du projet : CNSS EL KEF 'Mur Rideau'
Nom du contact : Adresse :
Numéro de téléphone : Point de fixation :
Adresse électronique : Commentaires :
Support béton :
Résistance du béton: C20/25
Épaisseur du matériau de base: 400 mm Fissuration du béton: Béton non fissuré
Type de renforcement : Renforcement du béton espacé Renforcement de bord: Renforcement de bord rectiligne
Conditions :
Conditions d'installation :: Trou sec
Température court terme : 40 °C Température long terme : 24 °C
Hypothèses de calcul
- La platine doit être suffisament rigide pour ne pas se déformer sous les charges appliquées
- La connection entre le profilé et la platine n'est pas vérifiée
Pièce à fixer:
Epaisseur de la pièce à fixer : 8 mm Diamètre de passage : 20 mm
Le concepteur doit vérifier que la platine est suffisamment rigide afin de garantir la validité des sollicitations calculées
Chevilles recommandées : TRIGA Z-A4 Version Ecrou E12-18/15
Modèle de calcul :
Profilé : Tube rect. 120*60*2,5
Position du profilé : Ex: 0, Ey: 0
Sans montage avec écartement

Charges à l'Etat Limite Ultime : Charges statiques


Dimensions :
et quasi-statiques
Nz: 3 kN Mx: 1,7 kNm
Vx: 0 kN My: 0 kNm
Vy: -2,9 kN Mz: 0 kNm

Les modèles de calcul proposés n'engagent la responsabilité de SPIT que dans la stricte similitude des hypothèses de calcul retenues, et d'une mise en œuvre conforme aux instructions données dans les ATE. Le résultat de ces calculs ne
concerne que les chevilles SPIT. Il appartient au Maître d'ouvrage ou au Bureau d'Etudes de vérifier que le support est apte à supporter les charges apportées par les chevilles notamment dans le cas d'un groupe de chevilles. Toute modification
de ce logiciel effectuée sans l'accord écrit de SPIT, nous dégage de toute responsabilité.
Ref : 16/01/2019 09:23 / Version du logiciel Page :
Charges à l'Etat Limite Ultime Charges statiques et quasi-
statiques
Charges sur les chevilles Chevilles recommandées :
Charges sur les chevilles TRIGA Z-A4 Version Ecrou E12-18/15
Cheville Traction Cisaill. [x] Cisaill. [y] ETA n° : None
1 16,7 kN 0 kN -1,5 kN
2 13,5 kN 0 kN -1,5 kN

Dimensionnement : selon Annexe C du guide d'ATE 001 (Amendement d'Août 2010)


TRACTION CISAILLEMENT
Ruine par extraction/glissement : Ruine béton en bord de dalle
Mode de ruine non décisif : Mode de ruine non décisif
Ruine par cône de béton : Ruine par effet de levier :
0
0
k1 = 10,1; N Rk,c = 36,1 kN k1 = 0; NRk,c = 36,1 kN
Scr,N = 240 mm; Ccr,N = 120 mm Scr,N = 240 mm; Ccr,N = 120 mm
0 0
Ac,N / Ac,N = 1,42 Ac,N / Ac,N = 1,42
Enx = 5 mm; Eny = 0 mm ψs,N = 1,000; ψre,N = 1,000
ψec,N,x = 0,960; ψec,N,y = 1,000 NRk,c = 51,2 kN; k-pryout : 2
ψs,N = 1,000; ψre,N = 1,000 VRk,cp = 102,4 kN
NRk,c = 49,1 kN VRd,cp = 68,3 kN; γMc,V = 1,5
NRd,c = 32,8 kN; γMc,N = 1,5 VSd,cp = 2,9 kN; βV,cp = 0,04
g
NSd = 30,2 kN; βN,c = 0,92 Ruine acier :
Ruine par fendage : Sans bras de levier
Mode de ruine non décisif VRk,s = 47,4 kN
Ruine acier : VRd,s = 37,9 kN; γMs,V = 1,25
NRk,s = 58,5 kN VSd,s = 1,5 kN; βV,s = 0,04
NRd,s = 24,4 kN; γMs,N = 2,4
h
NSd = 16,7 kN; βN,s = 0,69
Equation d'intéraction:
α α 1,5 1,5
(βN + βV) = 0,92 + 0,04 = 0,89 ≤ 1
Déplacement :
Charge à long terme : Charge à court terme :
h h h h
NSd / 1.35 : 12,4 kN; VSd / 1.35 : 1,1 kN NSd / 1.35 : 12,4 kN; VSd / 1.35 : 1,1 kN
δN:0,07 mm; δV:0,34 mm δN:0,07 mm; δV:0,5 mm
δNV:0,35 mm δNV:0,51 mm
Ref : 16/01/2019 09:23 / Version du logiciel Page :
Dimensions de la platine
Ref : 16/01/2019 09:23 / Version du logiciel Page :
Chevilles recommandées : TRIGA Z-A4 Version Ecrou E12-18/15
Code produit : 050606 / ETA n° : None /
Données de pose:
Profondeur d'ancrage : 80 mm
Epaisseur minimum du support béton : 167 mm
Diamètre de perçage dans le béton : 18 mm
Profondeur de perçage dans le béton : 112 mm
Couple de serrage : 80,00 Nm
Qualité d'acier de la platine : S235
Epaisseur de la pièce à fixer : 8 mm
Tube rect.
Profilé :
120*60*2,5
Diamètre de passage : 20 mm
Méthode d'installation:

Nettoyage :
Performances issues d'essais pratiqués par le laboratoire SPIT