Vous êtes sur la page 1sur 43

Nombre

GROS ŒUVRE
BETON DE PROPRETE 24
SEMELLES ISOLES 24
AMORCES POTEAUX 24
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 24
POUTRES 1
LINTEAUX 1

PLANCHERS EN CORPS CREUX


HOURDIS
12+4 NERVURES
DALLE DE COMPRESSION
HOURDIS
16+4 NERVURES
DALLE DE COMPRESSION

DALLE PLEINE DES BALCONS

AGGLOS CREUX DE 15×20×40


MACONNERIE ELEVATION
MORTIER DE POSE

SUR MUR D'EPAISSEUR 1,5 cm


ENDUITS LISSES AU MORTIER DE SOUS PLANCHER 2 cm
CIMENT SOUS ESCALIER 2 cm
CALFEUTREMENT 1,5cm
FORME DE PENTE 2%
ESCALIER
ACROTERE
SECOND ŒUVRE
CARRELAGE
SOLS
CARRELAGE SOLS
ESCALIERS
FACADE
CARRELAGE MURS
TOILETTE ET CUISINE
SOLS
PLINTHES
ESCALIERS
PEINTURE
INTERIEUR
LES BADIGEONS ( CHAUX )
EXTERIEUR
INTERIEUR
PEINTURE SUR MURS
PEINTURE SUR MURS
EXTERIEUR
PEINTURE SOUS PLAFOND
PEINTURE SOUS ESCALIER
L ou H (m) Section (m2) Volume (m3)

150 4.22 6.94 Type Largeur


0.3 3.75 27.00 70
1 0.075 1.80 80
50 0.075 3.75 90
PORTE
150 0.045 6.75 120
0.12 260 31.20 160
150 0.12 18.00 118.5 300
120 0.025 3.00 135.5 60
3.2 0.075 5.76 100
FENETRE
150 0.06 9.00 120
150 0.03 4.50 500
TOTAL LONGUEUR CALFEUTREM
Surface (m2) Ratio Volume (m3) SURFACE CALFEUTREMENT
0.07 0.00
0 0.03 0.00 Niveau Surface (m2)
0.04 0.00 2 25
0.08 12
150 0.04 6 Lo (m) a (m)
POTEAU
0.04 6 3.2 0.15
2 Epaisseur (m) Volume (m3)
0 0.15 0 σsol (bars) A (m)
SEMELLE
Surface (m2) Ratio Volume (m3) 2 1.1
0.1 36.4
364
0.025 9.1 L redress b(m)
REDRESS
Epaisseur (m) Surface (m2) Volume (m3) 3 0.15
0.015 666 9.99 151.5
0.02 150 3.00 L longrine b(m)
LONGRINE
0.02 0 0.00 4 0.15
0.015 0 0.00
0.1 0 0.00 L poutre b(m)
POUTRE
2 marches 0,45 6 0.15
palier 0,25
paillasse 1
Perimetre (m) Hauteur (m) Surface (m2)
0 144 int
0 113 ex
0 3 0 10 cloc
0 2 0 76 acc in
0
0
Perimetre (m) Hauteur (m) Surface (m2)
0 3 0
0 3 0
0 3 0
0 3 0
0
0
Hauteur Nombre L calf (m)
220 0 0
220 0 0
220 0 0
220 0 0
220 0 0
300 0 0
60 0 0
120 0 0
120 0 0
160 0 0
NGUEUR CALFEUTREMENT (m) 0
ACE CALFEUTREMENT (m2) 0

Charge (T)
75 1,5*surf*char

α Br (cm2) b (m)
0.56 644 0.5

B (m) H (m)
3.5 0.3 2.3

H(m) Lt(m)
0.5 50

H(m) Lt(m)
0.3 150

H(m) Lt(m)
0.4 150
Nombre
GROS ŒUVRE
BETON DE PROPRETE 0
SEMELLES ISOLES 0
AMORCES POTEAUX 0
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 30
POUTRES 1
LINTEAUX 1

PLANCHERS EN CORPS CREUX


HOURDIS
12+4 NERVURES
DALLE DE COMPRESSION
HOURDIS
16+4 NERVURES
DALLE DE COMPRESSION

DALLE PLEINE DES BALCONS

AGGLOS CREUX DE 15×20×40


MACONNERIE ELEVATION
MORTIER DE POSE

SUR MUR D'EPAISSEUR 1,5 cm


ENDUITS LISSES AU MORTIER DE SOUS PLANCHER 2 cm
CIMENT SOUS ESCALIER 2 cm
CALFEUTREMENT 1,5cm
FORME DE PENTE 2%
ESCALIER
ACROTERE
SECOND ŒUVRE
CARRELAGE
SOLS
CARRELAGE SOLS
ESCALIERS
FACADE
CARRELAGE MURS
TOILETTE ET CUISINE
SOLS
PLINTHES
ESCALIERS
PEINTURE
INTERIEUR
LES BADIGEONS ( CHAUX )
EXTERIEUR
INTERIEUR
PEINTURE SUR MURS
PEINTURE SUR MURS
EXTERIEUR
PEINTURE SOUS PLAFOND
PEINTURE SOUS ESCALIER
L ou H (m) Section (m2) Volume (m3)

0 1.43 0.00 Type Largeur


0.25 1.2 0.00 70
1 0.03 0.00 80
0 0.045 0.00 90
PORTE
0 0.045 0.00 120
0.12 0 0.00 160
0 0.12 0.00 118.5 300
0 0.025 0.00 135.5 60
3.2 0.03 2.88 100
FENETRE
120 0.06 7.20 120
120 0.03 3.60 500
TOTAL LONGUEUR CALFEUTREM
Surface (m2) Ratio Volume (m3) SURFACE CALFEUTREMENT
0.07 0.00
0 0.03 0.00 Niveau Surface (m2)
0.04 0.00 2 10
0.08 13.6
170 0.04 6.8 Lo (m) a (m)
POTEAU
0.04 6.8 3.2 0.15
Surface (m2) Epaisseur (m) Volume (m3)
0 0.15 0 σsol (bars) A (m)
SEMELLE
Surface (m2) Ratio Volume (m3) 2.5 0.9
0.1 33.6
336
0.025 8.4 L redress b(m)
REDRESS
Epaisseur (m) Surface (m2) Volume (m3) 3 0.15
0.015 750 11.25 151.5
0.02 170 3.40 L longrine b(m)
LONGRINE
0.02 0 0.00 4 0.15
0.015 0 0.00
0.1 0 0.00 L poutre b(m)
POUTRE
2 marches 0,45 6 0.15
palier 0,25
paillasse 1
Perimetre (m) Hauteur (m) Surface (m2)
0 144 int
0 113 ex
0 3 0 10 cloc
0 2 0 76 acc in
0
0
Perimetre (m) Hauteur (m) Surface (m2)
0 3 0
0 3 0
0 3 0
0 3 0
34
Hauteur Nombre L calf (m)
220 0 0
220 0 0
220 0 0
220 0 0
220 0 0
300 0 0
60 0 0
120 0 0
120 0 0
160 0 0
NGUEUR CALFEUTREMENT (m) 0
ACE CALFEUTREMENT (m2) 0

Charge (T)
30 1,5*surf*char

α Br (cm2) b (m)
0.56 257 0.2

B (m) H (m)
1.3 0.25 1.3

H(m) Lt(m)
0.3 0

H(m) Lt(m)
0.3 0

H(m) Lt(m)
0.4 130
Nombre
GROS ŒUVRE
BETON DE PROPRETE 0
SEMELLES ISOLES 0
AMORCES POTEAUX 0
LONGRINES DE REDRESSEMENT
LONGRINES
DALLAGES
AGGLOS PLEINS DE 15×20×40
MACONNERIE SOUBASSEMENT
MORTIER DE POSE
POTEAUX 0
POUTRES 1
LINTEAUX 1

PLANCHERS EN CORPS CREUX


HOURDIS
12+4 NERVURES
DALLE DE COMPRESSION
HOURDIS
16+4 NERVURES
DALLE DE COMPRESSION

DALLE PLEINE DES BALCONS

AGGLOS CREUX DE 15×20×40


MACONNERIE ELEVATION
MORTIER DE POSE

SUR MUR D'EPAISSEUR 1,5 cm


ENDUITS LISSES AU MORTIER DE SOUS PLANCHER 2 cm
CIMENT SOUS ESCALIER 2 cm
CALFEUTREMENT 1,5cm
FORME DE PENTE 2%
ESCALIER
ACROTERE
SECOND ŒUVRE
CARRELAGE
SOLS
CARRELAGE SOLS
ESCALIERS
FACADE
CARRELAGE MURS
TOILETTE ET CUISINE
SOLS
PLINTHES
ESCALIERS
PEINTURE
INTERIEUR
LES BADIGEONS ( CHAUX )
EXTERIEUR
INTERIEUR
PEINTURE SUR MURS
PEINTURE SUR MURS
EXTERIEUR
PEINTURE SOUS PLAFOND
PEINTURE SOUS ESCALIER
L ou H (m) Section (m2) Volume (m3)

100 1.70 1.25 Type Largeur


0.25 1.44 0.00 70
1 0.0375 0.00 80
0 0.045 0.00 90
PORTE
0 0.045 0.00 120
0.12 0 0.00 160
0 0.12 0.00 118.5 300
0 0.025 0.00 135.5 60
3.2 0.0375 0.00 100
FENETRE
0 0.06 0.00 120
0 0.03 0.00 500
TOTAL LONGUEUR CALFEUTREM
Surface (m2) Ratio Volume (m3) SURFACE CALFEUTREMENT
0.07 0.00
0 0.03 0.00 Niveau Surface (m2)
0.04 0.00 2 12
0.08 0
0 0.04 0 Lo (m) a (m)
POTEAU
0.04 0 3.2 0.15
Surface (m2) Epaisseur (m) Volume (m3)
0 0.15 0 σsol (bars) A (m)
SEMELLE
Surface (m2) Ratio Volume (m3) 2.5 0.9
0.1 0
0
0.025 0 L redress b(m)
REDRESS
Epaisseur (m) Surface (m2) Volume (m3) 3 0.15
0.015 0 0.00 151.5
0.02 0 0.00 L longrine b(m)
LONGRINE
0.02 0 0.00 4 0.15
0.015 0 0.00
0.1 0 0.00 L poutre b(m)
POUTRE
0 marches 0,45 6 0.15
0.1 0 0 palier 0,25
paillasse 1
Perimetre (m) Hauteur (m) Surface (m2)
0 144 int
0 113 ex
0 3 0 10 cloc
0 2 0 76 acc in
0
0
Perimetre (m) Hauteur (m) Surface (m2)
0 3 0
0 3 0
0 3 0
0 3 0
0
0
Hauteur Nombre L calf (m)
220 0 0
220 0 0
220 0 0
220 0 0
220 0 0
300 0 0
60 0 0
120 0 0
120 0 0
160 0 0
NGUEUR CALFEUTREMENT (m) 0
ACE CALFEUTREMENT (m2) 0

Charge (T)
36 1,5*surf*char

α Br (cm2) b (m)
0.56 309 0.25

B (m) H (m)
1.5 0.25 1.4

H(m) Lt(m)
0.3 30

H(m) Lt(m)
0.3 72

H(m) Lt(m)
0.4 72
DEVIS QUANTITATIF ET ESTIMATIF
BATIMENT R+1 SIS YEUMBEUL
DESCRIPTION DES OUVRAGES UNITES QUANTITES

A. GROS ŒUVRE
1. TERRASSEMENT
Decapage terres vegetales m3 51.592
Fouilles
Fouilles en puit m3 54.016
Fouilles en rigole m3 72.000
Remblais contre fondations m3 94.097
Remblais sous dallages m3 40.332
SOUS TOTAL TERRASSEMENT

2. FONDATIONS
Beton de proprete dose a 150 kg/m3 sous :
Semelles isolees m3 3.020
Longrines de redressement m3 0.247
Murs de soubassement m3 1.982
Beton arme dose a 350 kg/m3
Semelles isolees m3 15.687
Amorces poteaux m3 1.089
Longrines de redressement m3 2.250
Longrines m3 5.237
Murs de soubassement en agglos pleins de 15×20×40 m2 62.81
Dallage en Beton arme dose a 250 kg/m3 m3 18.752
SOUS TOTAL FONDATIONS

3. ELEVATIONS
3.1 REZ-DE-CHAUSSEE
Beton arme dose a 350 kg/m3
Poteaux m3 2.475
Poutres m3 7.340
Linteaux m3 1.077
Escalier m3 3.214
Maconnerie en agglos creux de 15×20×40 m2 364.00
Planchers en corps creux
12+4 m2 56.00
16+4 m2 47.48
Planchers en dalles pleines des balcons m3 1.263
Enduits lisses au mortier de ciment
Sur murs ( ep = 1,5cm) m2 469.15
Sous planchers ( ep = 2cm) m2 134.26
Calfeutrement des baies ml 111.7
SOUS TOTAL ELEVATION RDC
3.2 ETAGE
Beton arme dose a 350 kg/m3
Poteaux m3 2.513
Poutres m3 7.340
Linteaux m3 1.961
Escaliers m3 3.214
Maconnerie en agglos creux de 15×20×40 m2 351.09
Planchers en corps creux
12+4 m2 56.00
16+4 m2 47.48
Planchers en dalles pleines des balcons m3 1.263
Enduits lisses au mortier de ciment
Sur murs ( ep = 1,5cm) m2 448.64
Sous planchers ( ep = 2cm) m2 130.46
Calfeutrement des baies ml 179.5
SOUS TOTAL ELEVATION ETAGE

3.3 TERRASSE ACCESSIBLE


Beton arme dose a 350 kg/m3
Poteaux m3 0.953
Poutres m3 0.554
Dalle pleine m3 1.008
Linteaux m3 0.036
Acroteres en agglos creux de 15×20×40 m2 55.15
Maconnerie en agglos creux de 15×20×40 m2 32.91
Enduits lisses au mortier de ciment
Sur murs ( ep = 1,5cm) m2 32.91
Sous planchers ( ep = 2cm) m2 21.00
Calfeutrement des baies ml 3.52
Forme de pente ( 2% ) m3 4.175
SOUS TOTAL ELEVATION TERRASSE

TOTAL GROS ŒUVRE

B. SECOND ŒUVRE
1. ETANCHEITE
Etanchéité des toilettes étages m2 14.86
Etanchéité balcons m2 8.42
Etanchéité terrasse m2 208.78
Releve d'etancheite ml 38.74
SOUS TOTAL ETANCHEITE

2. REVETEMENT SOL ET MURS


Carrelage sur sol m2 260.23
Carrelage en Faience sur murs de facade m2 308.35
Carrelage en faience sur murs de toilette et cuisine m2 72.00
Plinthes ml 581.8
SOUS TOTAL REVETEMENT
3. MENUISERIE
En bois
Porte en bois 70×220 U 5
Porte en bois 80×220 U 7
Metallique
Porte d'entree 170×220 U 1
Porte cage d'escalier 80×220 U 1
Porte garage 300×220 U 1
En aluminium + Vitrerie
Porte salon 120×220 U 1
Fenetre 60×60 U 1
Fenetre 120×120 U 12
Fenetre 200×120 U 1
Balcons U 2
SOUS TOTAL MENUISERIE

4. PEINTURE
Preparations et Badigeons U 1.00
Peinture sur murs m2 459.93
Peinture sous plafonds m2 233.25
Peinture sous escalier m2 35.30
SOUS TOTAL PEINTURE

5. PLOMBERIE SANITAIRE
Installation et tuyauterie ENS 1
Appareillage ENS 1
Robinet de puisage U 7
Evier U 2
Lavabos U 6
Chaise anglais U 5
Chasse haute U 5
Baignoire U 1
Siphon de sol U 7
SOUS TOTAL PLOMBERIE

6. ELECTRICITE
Installation et cablages ENS 1
Appareillage ENS 1
Tableau compteurs
Dijoncteurs repartisseurs U 12
Bouton poussoir sonnerie U 1
Interrupteur U 45
Prise de courant U 22
Lampe U 49
SOUS TOTAL ELECTRICITE

TOTAL SECOND ŒUVRE


COUT GLOBAL ESTIMATIF DE LA CONSTRUCTION

cOUT GLOBAL ESTIMATIF DE LA CONSTRUCTION + TVA


MATIF
EUL
P.U P.T

2,500 128,980
-
3,000 162,048
3,500 252,000
2,500 235,243
2,000 80,664
858,935

40,000 120,800
30,000 7,410
30,000 59,460
-
100,000 1,568,700
150,000 163,350
150,000 337,500
150,000 785,550
7,000 439,635
75,000 1,406,400
4,888,805

150,000 371,250
150,000 1,101,000
150,000 161,550
150,000 482,100
7,000 2,548,000
-
18,000 1,008,000
20,000 949,600
150,000 189,450
-
1,000 469,150
1,500 201,390
900 100,512
7,582,002
150,000 376,950
150,000 1,101,000
150,000 294,150
150,000 482,100
7,000 2,457,630
-
18,000 1,008,000
20,000 949,620
150,000 189,450
-
1,000 448,640
1,500 195,695
900 161,586
7,664,821

150,000 142,875
150,000 83,160
200,000 201,600
150,000 5,400
7,000 386,050
7,000 230,377
-
1,000 32,910
1,500 31,496
900 3,168
1,500 6,263
1,123,298

22,117,860

5000 74,300
7000 58,947
6500 1,357,070
5000 193,700
1,684,017

7,000 1,821,610
7,000 2,158,478
7,000 504,000
1,000 581,800
5,065,888
40,000 200,000
50,000 350,000
-
100,000 100,000
50,000 50,000
25,000 25,000
-
100,000 100,000
15,000 15,000
60,000 720,000
90,000 90,000
200,000 400,000
2,050,000

600,000 600,000
4,000 1,839,724
4,000 933,000
4,000 141,200
3,513,924

900,000 900,000
800,000 800,000
10,000 70,000
30,000 60,000
100,000 600,000
100,000 500,000
20,000 100,000
100,000 100,000
7,000 49,000
3,179,000

800,000 800,000
500,000 500,000
-
35,000 420,000
10,000 10,000
2,500 112,500
2,000 44,000
3,500 171,500
4,058,000

19,550,829
N 43,859,649

ION + TVA 50.000.000


QUANTITE
ELEMENTS DE CONTRUCTION
NIVEAUX (m3)
GROS ŒUVRE
BETON DE PROPRETE 6.94
SEMELLES ISOLEES 27.00
AMORCES POTEAUX 1.80
LONGRINES DE REDRESSEMENT 3.75
FONDATIONS LONGRINES 6.75
DALLAGES 31.20
MACONNERIE AGGLOS PLEINS DE 15×20×40 18.00
SOUBASSEMENT MORTIER DE POSE 3.00
SOUS TOTAL
POTEAUX 5.76
POUTRES 9.00
LINTEAUX 4.50
PLANCHERS EN CORPS CREUX
HOURDIS 0
12+4 NERVURES 0
DALLE DE COMPRESSION 0
HOURDIS 12
16+4 NERVURES 6
DALLE DE COMPRESSION 6
DALLE PLEINE DES BALCONS 0
ELEVATIONS MACONNERIE AGGLOS CREUX DE 15×20×40 36.4
ELEVATION MORTIER DE POSE 9.1
SUR MUR D'EPAISSEUR 1,5 cm 9.99
ENDUITS LISSES AU SOUS PLANCHER 2 cm 3.00
MORTIER DE CIMENT CALFEUTREMENT 1,5 cm 0.00
SOUS ESCALIER 2 cm 0.00
CARRELAGE SOLS 3 cm 0.00
MORTIER DE POSE POUR
CARRELAGE CARRELAGE MURS 2 cm 0.00
PLINTHES 1 cm 0.00
FORME DE PENTE 2% 0.00
ESCALIER 2
SOUS TOTAL
SECOND ŒUVRE
CARRELAGE (m2)
CARRELAGE SOLS 0
CARRELAGE MURS 0
PLINTHES 0
PEINTURE (m2)
LES BADIGEONS (CHAUX) 0
PEINTURE A EAU (SP) 0
PEINTURE A HUILE (MURS) 0
MENUISERIE
PORTE 70 4

EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)

150 1040.78149 800 5550.83463 400 2775.41732 50% 520.390747


350 9450 800 21600 400 10800 50% 4725
350 630 800 1440 400 720 50% 315
350 1312.5 800 3000 400 1500 50% 656.25
350 2362.5 800 5400 400 2700 50% 1181.25
250 7800 800 24960 400 12480 50% 3900
250 4500 580 10440 580 10440 50% 2250
400 1200 0 0 1000 3000 50% 600
Sac 50 kg 566 Cam 16m3 5 Cam 16m3 3 Fut 200 l 71
350 2016 800 4608 400 2304 50% 1008
350 3150 800 7200 400 3600 50% 1575
350 1575 800 3600 400 1800 50% 787.5
0 0 0 50% 0
250 0 580 0 580 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
350 4200 580 6960 580 6960 50% 2100
350 2100 800 4800 400 2400 50% 1050
350 2100 800 4800 400 2400 50% 1050
350 0 800 0 400 0 50% 0
250 9100 580 21112 580 21112 50% 4550
400 3640 0 0 1000 9100 50% 1820
300 2997 0 0 1000 9990 50% 1498.5
400 1200 0 0 1000 3000 50% 600
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
250 0 0 0 1000 0 50% 0
350 700 800 1600 400 800 50% 350
Sac 50 kg 656 Cam 16m3 3 Cam 16m3 4 Fut 200 l 82

16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110

60
90

90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )

50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 691.2 2% 13.824
130 1170 2% 23.4
90 405 2% 8.1

100 0 2% 0

100 3000 2% 60

125 0 2% 0

130 260 2% 5.2


Par 100 kg 55 Par 1 kg 111
QUANTITE
ELEMENTS DE CONTRUCTION
NIVEAUX (m3)
GROS ŒUVRE
BETON DE PROPRETE 6.94
SEMELLES ISOLEES 27.00
AMORCES POTEAUX 1.80
LONGRINES DE REDRESSEMENT 3.75
FONDATIONS LONGRINES 6.75
DALLAGES 31.20
MACONNERIE AGGLOS PLEINS DE 15×20×40 18.00
SOUBASSEMENT MORTIER DE POSE 3.00
SOUS TOTAL
POTEAUX 2.88
POUTRES 7.20
LINTEAUX 3.60
PLANCHERS EN CORPS CREUX
HOURDIS 0
12+4 NERVURES 0
DALLE DE COMPRESSION 0
HOURDIS 13.6
16+4 NERVURES 6.8
DALLE DE COMPRESSION 6.8
DALLE PLEINE DES BALCONS 0
ELEVATIONS MACONNERIE AGGLOS CREUX DE 15×20×40 33.6
ELEVATION MORTIER DE POSE 8.4
SUR MUR D'EPAISSEUR 1,5 cm 11.25
ENDUITS LISSES AU SOUS PLANCHER 2 cm 3.40
MORTIER DE CIMENT CALFEUTREMENT 1,5 cm 0.00
SOUS ESCALIER 2 cm 0.00
CARRELAGE SOLS 3 cm 0.00
MORTIER DE POSE POUR
CARRELAGE CARRELAGE MURS 2 cm 0.00
PLINTHES 1 cm 0.00
FORME DE PENTE 2% 0.00
ESCALIER 2
SOUS TOTAL
SECOND ŒUVRE
CARRELAGE (m2)
CARRELAGE SOLS 0
CARRELAGE MURS 0
PLINTHES 0
PEINTURE (m2)
LES BADIGEONS 0
PEINTURE A EAU 34
PEINTURE A HUILE 0
MENUISERIE
PORTE 70 4

EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)

150 1040.78149 800 5550.83463 400 2775.41732 50% 520.390747


350 9450 800 21600 400 10800 50% 4725
350 630 800 1440 400 720 50% 315
350 1312.5 800 3000 400 1500 50% 656.25
350 2362.5 800 5400 400 2700 50% 1181.25
250 7800 800 24960 400 12480 50% 3900
250 4500 580 10440 580 10440 50% 2250
400 1200 0 0 1000 3000 50% 600
Sac 50 kg 566 Cam 16m3 5 Cam 16m3 3 Fut 200 l 71
350 1008 800 2304 400 1152 50% 504
350 2520 800 5760 400 2880 50% 1260
350 1260 800 2880 400 1440 50% 630
0 0 0 50% 0
250 0 580 0 580 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
350 4760 580 7888 580 7888 50% 2380
350 2380 800 5440 400 2720 50% 1190
350 2380 800 5440 400 2720 50% 1190
350 0 800 0 400 0 50% 0
250 8400 580 19488 580 19488 50% 4200
400 3360 0 0 1000 8400 50% 1680
300 3375 0 0 1000 11250 50% 1687.5
400 1360 0 0 1000 3400 50% 680
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
250 0 0 0 1000 0 50% 0
350 700 800 1600 400 800 50% 350
Sac 50 kg 630 Cam 16m3 3 Cam 16m3 4 Fut 200 l 79

16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110

60
90

90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )

50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 345.6 2% 6.912
130 936 2% 18.72
90 324 2% 6.48

130 0 2% 0

130 3536 2% 70.72

125 0 2% 0

130 260 2% 5.2


Par 100 kg 54 Par 1 kg 108
QUANTITE
ELEMENTS DE CONTRUCTION
NIVEAUX (m3)
GROS ŒUVRE
BETON DE PROPRETE 6.94
SEMELLES ISOLEES 27.00
AMORCES POTEAUX 1.80
LONGRINES DE REDRESSEMENT 3.75
FONDATIONS LONGRINES 6.75
DALLAGES 31.20
MACONNERIE AGGLOS PLEINS DE 15×20×40 18.00
SOUBASSEMENT MORTIER DE POSE 3.00
SOUS TOTAL
POTEAUX 0.00
POUTRES 0.00
LINTEAUX 0.00
PLANCHERS EN CORPS CREUX
HOURDIS 0
12+4 NERVURES 0
DALLE DE COMPRESSION 0
HOURDIS 0
16+4 NERVURES 0
DALLE DE COMPRESSION 0
DALLE PLEINE DES BALCONS 0
ELEVATIONS MACONNERIE AGGLOS CREUX DE 15×20×40 0
ELEVATION MORTIER DE POSE 0
SUR MUR D'EPAISSEUR 1,5 cm 0.00
ENDUITS LISSES AU SOUS PLANCHER 2 cm 0.00
MORTIER DE CIMENT CALFEUTREMENT 1,5 cm 0.00
SOUS ESCALIER 2 cm 0.00
CARRELAGE SOLS 3 cm 0.00
MORTIER DE POSE POUR
CARRELAGE CARRELAGE MURS 2 cm 0.00
PLINTHES 1 cm 0.00
FORME DE PENTE 2% 0.00
ESCALIER 0
SOUS TOTAL
SECOND ŒUVRE
CARRELAGE (m2)
CARRELAGE SOLS 0
CARRELAGE MURS 0
PLINTHES 0
PEINTURE (m2)
LES BADIGEONS 0
PEINTURE A EAU 0
PEINTURE A HUILE 0
MENUISERIE
PORTE 70 4

EN BOIS
PORTE 80 8
EN BOIS
PORTE 90 1
PORTE 120 3
EN FER PORTE GARAGE 1
FENETRE 60 3
FENETRE 120 7
EN ALUMINIUM
FENETRE 160 0
FENETRE PATIO 0
PLOMBERIE SANITAIRE
CANALISATION PVC ALIMENTATION EAU POTABLE
CANALISATION PVC EVACUATION EAUX USEES
ACCESSOIRE DE RACCORDEMENT TUYAUTERIE
ROBINET 4
EVIER DE CUISINE 1
LAVABOS 3
APPAREILLAGE
CHAISE ANGLAISE 3
CHASSE HAUTE 3
REGARD 3
ELECTRICITE
CIMENT GRAVIER / GRAINS DE RIZ SABLE EAU
DOSAGE QTE ( Kg ) DOSAGE QTE ( L ) DOSAGE QTE ( L ) DOSAGE QTE ( L)

150 1040.78149 800 5550.83463 400 2775.41732 50% 520.390747


350 9450 800 21600 400 10800 50% 4725
350 630 800 1440 400 720 50% 315
350 1312.5 800 3000 400 1500 50% 656.25
350 2362.5 800 5400 400 2700 50% 1181.25
250 7800 800 24960 400 12480 50% 3900
250 4500 580 10440 580 10440 50% 2250
400 1200 0 0 1000 3000 50% 600
Sac 50 kg 566 Cam 16m3 5 Cam 16m3 3 Fut 200 l 71
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
0 0 0 50% 0
250 0 580 0 580 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
350 0 580 0 580 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
350 0 800 0 400 0 50% 0
250 0 580 0 580 0 50% 0
400 0 0 0 1000 0 50% 0
300 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
400 0 0 0 1000 0 50% 0
250 0 0 0 1000 0 50% 0
350 0 800 0 400 0 50% 0
Sac 50 kg 0 Cam 16m3 0 Cam 16m3 0 Fut 200 l 0

16 M3 G 200000
16 M3 S 65000
110 100KG FER 45000
110
110
110

60
90

90
ACIER FIL D'ATTACHE
DOSAGE QTE ( Kg ) DOSAGE QTE ( Kg )

50 1350 2% 27
120 216 2% 4.32
130 487.5 2% 9.75
130 877.5 2% 17.55
30 936 2% 18.72
0
0
Par 100 kg 39 Par 1 kg 77
120 0 2% 0
130 0 2% 0
90 0 2% 0

0 0 2% 0

130 3120 2% 62.4

125 0 2% 0

130 0 2% 0
Par 100 kg 31 Par 1 kg 62
DESIGNATIONS UNITES QUANTITES P.U

I. GROS ŒUVRE
1 Ciment Tonne 0 65,000 FCFA
2 Sable Cam 16 m3 0 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 0 135,000 FCFA
4 Grains de riz Cam 16 m3 0 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 0 450,000 FCFA
7 Fils de fer Kg 0 1,000 FCFA
Sous total Fondations
1 Ciment Tonne 16 65,000 FCFA
2 Sable Cam 16 m3 3 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 2 135,000 FCFA
4 Grains de riz Cam 16 m3 2 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 2 450,000 FCFA
7 Fils de fer Kg 40 1,000 FCFA
Sous total R-D-C
1 Ciment Tonne 30 65,000 FCFA
2 Sable Cam 16 m3 6 80,000 FCFA
3 Gravier 8/16 Cam 16 m3 3 135,000 FCFA
4 Grains de riz Cam 16 m3 3 135,000 FCFA
5 Eau Fut 200 l 0 1,000 FCFA
6 Fer Tonne 6 450,000 FCFA
7 Fils de fer Kg 120 1,000 FCFA
Sous total Etage

COUT TOTAL GROS ŒUVRE

II. SECOND OEUVRE


1. CARRELAGE
1.1 Grès cérame m2 85 6,000 FCFA
1.2 Faience m2 45 6,000 FCFA
1.3 Plinthe m 130 1,000 FCFA
Sous total
2. PEINTURE
2.1 Enduit de lissage (Senac) Seau 20 kg 466 500 FCFA
2.2 Peinture a eau (Gylatex) Seau 23 kg 466 1,000 FCFA
2.3 Peinture a huile Seau 25 kg 85 1,000 FCFA
Sous total
3. MENUISERIE
3.1 Porte 70 U 6 100,000 FCFA
3.2 Porte 80 U 4 100,000 FCFA
bois
3.3 metallique Porte 90 U 0 100,000 FCFA
3.4 Porte 120 U 0 100,000 FCFA
bois
metallique

3.5 Porte garage U 0 100,000 FCFA


3.6 Fenetre 60 U 4 40,000 FCFA
bois
3.7 metallique Fenetre 120 U 6 80,000 FCFA
3.8 Cage escalierU 1 100,000 FCFA
Sous total
4. PLOMBERIE SANITAIRE
4.1 Installation Forfaitaire
4.2 Tuyauterie Forfaitaire
4.3 Appareillage Forfaitaire
Sous total
5. ELECTRICITE
Sous total Forfaitaire
6. MAINS D'OEUVRE
6.1 Mouleurs briques Forfaitaire
6.2 Chef de chantier Forfaitaire
6.3 Maçons Forfaitaire
6.4 Carreleur(s) Forfaitaire
6.5 Peintre(s) Forfaitaire
6.6 Menuisier(s) Forfaitaire
6.7 Plombier(s) Forfaitaire
6.8 Electricien(s) Forfaitaire
Sous total
7. MATERIEL
Sous total Forfaitaire

COUT GLOBAL ESTIMATIF DE LA CONSTRUCTION


P.T

BP 55,825
- FCFA 10 SI 454,000
- FCFA 1 AMP 72,450
- FCFA 2 LR 119,550
- FCFA LONG 265,925
- FCFA DALL 590,000
- FCFA 1 MS 231,500
- FCFA 26 1,789,250
- FCFA RDC ETAGE
1,040,000 FCFA PO 241,250
240,000 FCFA POUT 369,720
270,000 FCFA LINT 207,280
270,000 FCFA PH16+4 1,646,800
- FCFA DP 124,035
900,000 FCFA ME 683,200
40,000 FCFA END 253,600
2,760,000 FCFA MORT,CARR 163,550
1,950,000 FCFA
480,000 FCFA
405,000 FCFA
405,000 FCFA
- FCFA
2,700,000 FCFA
120,000 FCFA
6,060,000 FCFA

8,820,000 FCFA

ESC 137,450
3,826,885
510,000 FCFA
270,000 FCFA
130,000 FCFA
910,000 FCFA

233,000 FCFA
466,000 FCFA
85,000 FCFA
784,000 FCFA

600,000 FCFA
400,000 FCFA
- FCFA
- FCFA
- FCFA
160,000 FCFA
480,000 FCFA
100,000 FCFA
1,740,000 FCFA

- FCFA 4,434,000 FCFA


100,000 FCFA
500,000 FCFA
600,000 FCFA

400,000 FCFA

- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA
- FCFA

- FCFA

7,194,000 FCFA
TERRASSE

Vous aimerez peut-être aussi