139 ozn. oblik i mere Vrsta lg n lgn ozn. oblik i mere Vrsta lg n lgn
[cm] armature [m] [kom] [m] [cm] armature [m] [kom] [m]
40
150 100 50
139
70
20 R 14 L=458 (38) 89
70
20
40
125
89 1 B500B 12 4.65 128 595.20
50
25 R 8 L=358 (22)
50
140
21 B500B 18 5.25 8 42.00
70
140 20 15 290
25
1-1
20
R=1:50 200 50 50 340
125
2 290 B500B 12 5.55 128 710.40
24 5R 14
21 4R 18
22 1R 18
22 1R 18
22 1R 18
22 1R 18
22 1R 18
22 1R 18
24 R 14 L=300 (20)
8 R 14/15
16 2R 12
16 2R 12
25
50
50
7 R 14/15 7 R 14/15
20 19R 14/15
22 B500B 18 3.85 24 92.40
25
20
2 128R 12/15
22 R 18 L=385 (24)
21 R 18 L=525 (8)
90 13 40
340
290
15
285
78
60
60
340
340
27 R 12 L=241 (26)
25 11R 8/15
26 R 14 L=335 (6)
3 B500B 14 5.70 24 136.80
15
47
23 B500B 14 1.50 20 30.00
27 1R 12
27 1R 12
27 1R 12
27 1R 12
27 1R 12
165
26 3R 14
27 3R 12
22 1R 18
22 1R 18
22 1R 18
22 1R 18
22 1R 18
22 1R 18
21 4R 18
23 R 14 L=150 (20)
445 135
215
215
3 R 14/15 1 128R 12/15
4 R 16/15
23 5R 14
3 R 14/15 285
4 1200 B500B 16 12.00 12 144.00
24 B500B 14 3.00 20 60.00
285 50 400 50 350 50 400 50 285
135
15
78
1920 70
60
60
70
5 B500B 12 5.50 16 88.00
47
15 13 25 B500B 8 3.58 22 78.76
89
89
25 25 15
425
Zid kontrafora d=50 cm ... kom.2 Zid kontrafora d=50 cm ... kom.2 6 1200 B500B 12 12.00 36 432.00 40
60
60
13 230R 12 L=200 (230)
7 425 B500B 14 4.25 40 170.00 215
50 290
47
47
15
16 R 12 L=410 (4) 8 1200 B500B 14 12.00 26 312.00
28
28 26 B500B 14 3.35 6 20.10
90
9 425 B500B 12 4.25 20 85.00
125
125
2 R 12 L=555 (128) 15
40
290 10 B500B 12 3.75 82 307.50
50
13
13
50
50
13
15 7R 12/15 L=699-1151 (14)
13
290 27 B500B 12 2.41 26 62.66
1 R 12 L=465 (128) a=673-1125 335
1
215
40
250 50
40
16 2R 12
6 9R 12/15 L=1200 (36)
47 47 1200
a
14 8R 12/15 L=111-390 (32) 14 8R 12/15 L=111-390 (32)
a=98-377 a=98-377 4x:
13
78
78
13
lgn
11 a = 329, 323, 317, 311, 305, 299, 293, 287, 281, 275, B500B 12 *2.41 4 x 44 423.76
[mm] [m] [kg/m'] [kg]
269, 263, 257, 251, 246, 240, 234, 228, 222, 216, B500B
8 6R 14/15 L=1200 (26)
1200 210, 204, 198, 192, 186, 180, 174, 168, 162, 156,
7 6R 14/15 L=425 (40) 7 6R 14/15 L=425 (40) 8 78.76 0.41 31.90
285
425 425 150, 144, 138, 132, 126, 120, 114, 108, 102, 96, 91,
12 3491.62 0.91 3180.87
5 R 12 L=550 (16)
9 R 12 L=425 (20)
7 R 14 L=425 (40)
3 12R 14/15
7 12R 14/15
7 2R 14/15
5 8R 12/15
9 2R 12/15
9 8R 12/15
3 R 14 L=570 (24)
85, 79, 73
14 967.74 1.24 1201.93
78
425
425
425
16 144.00 1.62 233.42
445
40
12 B500B 14 5.40 12 64.80
37
18 134.40 2.05 275.52
11 44R 12/15
11 44R 12/15
50
50
47
28 47
40
335
28
6 9R 12/15
14 8R 12/15 14 8R 12/15
a=73-329
3D izgled
13
8 6R 14/15
a
7 6R 14/15 7 6R 14/15 14 B500B 12 *2.50 4x8 80.16
400
4x:
13
13
a
15 B500B 12 *9.25 2x7 129.50
2x:
60
60
16 B500B 12 4.10 4 16.40
50
290
125 22
60
56
60
13
60
17 B500B 12 1.98 8 15.84
19 4R 12 L=598 (4)
598
4 12R 16/15
8 12R 14/15
6 R 12 L=1200 (36)
4 R 16 L=1200 (12)
6 R 12 L=1200 (36)
8 R 14 L=1200 (26)
6 2R 12/15
6 8R 12/15
6 8R 12/15
8 2R 14/15
706 56
(8)
22
66 18
4R
60
L= 7 12
18 B500B 12 7.66 8 61.28
12
1920
1200
1200
1200
1200
350
L
4R 706 706 = 766
18 ( 8)
13
13
15 7R 12/15 L=699-1151 (14)
a=673-1125
70
1 128R 12/15 2 128R 12/15 139
20 B500B 14 4.58 38 174.04
40
70
139
60 60
17 4R 12 L=198 (8)
17 4R 12 L=198 (8)
6 9R 12/15 L=1200 (36)
50
1200
125
14 8R 12/15 L=111-390 (32) 14 8R 12/15 L=111-390 (32)
125
a=98-377 a=98-377
13
13
13
13
78 78
8 6R 14/15 L=1200 (26)
37
37
425 1200 425
12 6R 14/15 L=540 (12) 12 6R 14/15 L=540 (12)
400
1920
2
19 4R 12 19 4R 12
40
15 7R 12/15
15 7R 12/15
15 7R 12/15
11 44R 12/15
11 44R 12/15
18 4R 12
18 4R 12
10 R 12/15
KONSULTANTI : INVESTITOR:
50
264
264
40 ZAVOD ZA VODOPRIVREDU d.o.o. VLADA REPUBLIKE SRPSKE,
Milo
6 9R 12/15
6 9R 12/15
5 R 12 L=550 (16)
9 R 12 L=425 (20)
7 R 14 L=425 (40)
340
340
JEDINICA ZA KOORDINACIJU
335
INSTITUT ZA VODOPRIVREDU
2-2 POLJOPRIVREDNIH PROJEKATA
"JAROSLAV ERNI" A.D.
3 12R 14/15
7 12R 14/15
400
400
6 9R 12/15 (APCU)
5 8R 12/15
9 2R 12/15
9 8R 12/15
7 2R 14/15
445
425
425
14 8R 12/15 14 8R 12/15
a=73-329
PROJEK AT:
8 6R 14/15
8 6R 14/15
17 4R 12
17 4R 12
8 6R 14/15
285
76
FAZA PROJEKTA:
6 8R 12/15 8 12R 14/15 GLAVNI PROJEKAT 1
136
KNJIGA:
2 R 12/15
60
60
60
6 2R 12 8 2R 14 KNJIGA 5, TEHNI KO RJE ENJE DIONICE NASIPA
78
78
2
POTPIS:
300 St. 15+733,63
KOORDINATOR ZZV:
1
Dejan Hrkal
POTPIS: ARMATURNI PLAN
Temeljna stopa d=60 cm - Donja zona Temeljna stopa d=60 cm - Gornja zona DATUM: RAZMJERA: BROJ PRILOGA:
KOORDINATOR IJ
Zoran Kne
POTPIS:
05.2016. 1 : 50 2.2.