PEMBACAAN DIAL KONSOLIDASI


Beban 0.825 1.650 3.300 6.600
Tekanan 0.250 0.500 1.000 2.000
( 〖𝑘𝑔 /𝑐𝑚
Waktu Akar Waktu (menit)
〗 ^3)
o detik 0 0 8.4 24.2 55.8
6 detik 0.32 1.7 11.3 36 62.4
15 detik 0.5 2.4 12.6 40 63.7
30 detik 0.71 2.9 13.2 43 64.9
1 menit 1 3.1 13.8 45 66.1
2 menit 1.41 3.7 14.4 46.5 66.8
4 menit 2 4 15.1 47.5 67.4
8 menit 2.83 4.3 15.8 48.8 68.3
15 menit 3.87 4.6 16.4 50 69
30 menit 5.48 5.1 17.2 51.6 69.8
1 jam 7.75 5.5 18.6 53.1 70.6
2 jam 10.95 5.9 19.3 53.5 71.5
4 jam 15.49 6.7 20.9 54 72.3
8 jam 21.91 7.5 22.7 54.7 72.9
24 jam 37.95 8.4 24.2 55.8 73.1

0 10 20 30
0

1
hijau
0 2.38
2
0 10
3
biru
Beban (lbs)

0 4
2.737
0 10
5

0.75 70
2.9 2.9
8

9
0.75 0.75
10
10 2.9 data 1
9

10
data 1

hijau
0 2.98 0 10 20 30
8
11 19 9
biru 10
0 3.42711
11 2512
13
14
Beban (lbs)

15
1.51 016
14.51 14.5117
18
19
20
1.51 1.5121
25 14.5122
23
24
25
data 2
5 6 7

13.200 26.400 6.600 0.825


0
4.000 8.000 2.000 0.250 0 1.63
134
148.9 134 135
73.1 97.3 148.9 135.1 136
78 110 145.6 129.6 137
79.1 111.2 143.7 127.9 0 1.875 138
80 113 142.1 125.6 148.9 134 139
140

Beban (lbs)
81.2 116.5 141.2 123.3
141
83 120.6 139.8 121.9 142
85 125.8 139.1 118.2 0 0.95 143
87.2 130 138.4 116.4 141.4 141.4 144
89 130.7 137.9 114.1 145
91 130.9 137 111.1 0.95 0.95 146
147
92.8 131.1 136.2 108.9 148.9 141.4
148
94 131.9 136 106.5 149
95.8 140.6 135.5 105 150
96.2 145.4 135.3 104.7
97.3 148.9 135.1 104.3

30 40

0 0.97
24 58

0 1.12
24 58

0.58 0
41.3 41.3

0.58 0.58
58 41.3
`
30 40

0 1.78
58.4 75

0 2.047
58.4 75

1.12 0
67.5 67.5

1.12 1.12
75 67.5
0 10 20 30
134
135 0
136 135.1
137
138
139 0
140
Beban (lbs)

135.1
141
142
143
144 0
145 123
146
147
1.05
148
149
100
150
data 7

0 10 20 30
24
26
28
30
32
34
36
Beban (lbs)

38
40
42
44
46
48
50
52
54
56
data 3
54
56
data 3

0 10 20 30
55
56
57
58
59
60
61
62
Beban (lbs)

63
64
65
66
67
68
69
70
71
72
73
74
75
data 4
30 40 0 10
100
2.73
103
100
106
109
3.14 112
115

Beban (lbs)
100
118
121
1.05 124
123 127
130
1.05 133
123 136
139

30 40 0 10
0 4.13 73
76 98 75
77
79
0 4.75
76 98 81
Beban (lbs)

83
85
1.82 0 87
84.31 84.31 89
91
1.82 1.82
93
98 84.31
95
97
97

30 40
0 10
0 3.9 97
105 150 102

107

0 4.485 112
105 150

Beban (lbs)
117
122

2.302 0 127
127.3 127.3 132

137
2.302 2.302
150 127.3 142

147
10 20 30 40

data 8

10 20 30 40

data 5
data 5

10 20 30 40

data 6
KADAR AIR DAN BERAT ISI
A Berat ring (gr)
B Berat tanah basah + ring (gr)
C Berat tanah basah (B-A) (gr)
D Berat cawan (gr)
E Berat tanah kering + cawan + ring (gr)
F Berat tanah kering (E-D-A) (gr)
G Berat air (C-F) (gr)
H Kadar air [(G/F)*100%] (%)
I volume tanah basah/ring (cmᵌ)
J Berat isi tanah basah (C/I) (gr/cmᵌ)
K Berat isi tanah kering [(J/(100+H)*100%] (gr/cmᵌ)

*Ket:
1. Diameter tanah sebelum dan sesudah = 4.69
2. Tinggi tanah sebelum = 1.23
Tinggi tanah sesudah = 1.19
SEBELUM SESUDAH
20.3 47.4
72.7 100.6
52.4 53.2
- 23.3
- 116.6
45.9 45.9
6.5 7.3
14.2 15.9
21.24 20.55
2.55 2.85
2.2 2.4
PEMBACAAN DIAL KONSOLIDASI
Beban 0.825 1.650 3.300 6.600 13.200
Tekanan ( 〖𝒌𝒈 /𝒄𝒎 0.250 0.500 1.000 2.000 4.000
Waktu 〗 ^𝟑)Akar Waktu
0 detik 0 0 8.4 24.2 55.8 73.1
6 detik 0.32 1.7 11.3 36 62.4 78
15 detik 0.5 2.4 12.6 40 63.7 79.1
30 detik 0.71 2.9 13.2 43 64.9 80
1 menit 1 3.1 13.8 45 66.1 81.2
2 menit 1.41 3.7 14.4 46.5 66.8 83
4 menit 2 4 15.1 47.5 67.4 85
8 menit 2.83 4.3 15.8 48.8 68.3 87.2
15 menit 3.87 4.6 16.4 50 69 89
30 menit 5.48 5.1 17.2 51.6 69.8 91
1 jam 7.75 5.5 18.6 53.1 70.6 92.8
2 jam 10.95 5.9 19.3 53.5 71.5 94
4 jam 15.49 6.7 20.9 54 72.3 95.8
8 jam 21.91 7.5 22.7 54.7 72.9 96.2
24 jam 37.95 8.4 24.2 55.8 73.1 97.3
IDASI
26.400 6.600 0.825
8.000 2.000 0.250

97.3 148.9 135.1


110 145.6 129.6
111.2 143.7 127.9
113 142.1 125.6
116.5 141.2 123.3
120.6 139.8 121.9
125.8 139.1 118.2
130 138.4 116.4
130.7 137.9 114.1
130.9 137 111.1
131.1 136.2 108.9
131.9 136 106.5
140.6 135.5 105
145.4 135.3 104.7
148.9 135.1 104.3
0 10 20 30
0
1
2
Penurunan(mm)

3
4
5
6
7
8
9
10

Tekanan 0.25 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40
√𝑡90=0. 68𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (0.68) 〗 ^2
𝑡90 =0.563
0 10 20 30
8
9
10
Penurunan(mm) 11
12
13
14
15
16
17
18
19
20

Tekanan 0.50 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40

√𝑡90="1.51 " 𝑚𝑒𝑛𝑖𝑡


𝑡90 = 〖 (1.51) 〗 ^2
𝑡90 =2.280

𝒄𝒎)^𝟑

it)
0 10 20 30
24
26
28
30
32
Pembebanan(mm)
34
36
38
40
42
44
46
48
50
52
54
56

Tekanan 1 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40

√𝑡90=0.58 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (0.58) 〗 ^2
𝑡90 =0.336

𝒄𝒎)^𝟑

enit)
0 10 20
55
57
59

Penurunan(mm)
61
63
65
67
69
71
73
75

Tekanan 2 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
20 30 40

√𝑡90=1.12 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (1.12) 〗 ^2
𝑡90 =1.254

nan 2 (𝒌𝒈/𝒄𝒎)^𝟑

Waktu(menit)
0 10 20
73
75
77
79

Penurunan(mm)
81
83
85
87
89
91
93
95
97

Tekanan 4 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
20 30 40
√𝑡90=1.82 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (1.82) 〗 ^2
𝑡90 =3.312

nan 4 (𝒌𝒈/𝒄𝒎)^𝟑

Waktu(menit)
〗 ^2
0 10 20 30
97
102
107
Pembebanan(mm) 112
117
122
127
132
137
142
147

Tekanan 8 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40

√𝑡90=2.302 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (2.302) 〗 ^2
𝑡90 =5.299

𝒄𝒎)^𝟑

enit)
0 10 20 30
134
135
136
137
138
Penurunan(mm)

139
140
141
142
143
144
145
146
147
148
149
150

Tekanan 2 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40

√𝑡90=0.95 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (0.95) 〗 ^2
𝑡90 =0.903

𝒌𝒈/𝒄𝒎)^𝟑

(menit)
0 10 20 30
100
103
106
109
Penurunan(mm)
112
115
118
121
124
127
130
133
136
139

Tekanan 0.25 (𝒌𝒈/𝒄𝒎)^𝟑

Akar Waktu(menit)
30 40

√𝑡90=1.05 𝑚𝑒𝑛𝑖𝑡
𝑡90 = 〖 (1.05) 〗 ^2
𝑡90 =1.103

𝒈/𝒄𝒎)^𝟑

nit)
Penu
runan
Koreksi Penurunan yg Benar
Tekanan Pembacaan Dial (mm) Koto
〖 (𝑘𝑔/𝑐𝑚 Alat ΔH (mm)
r
〗 ^2) (mm)
1 2 3 4 5
0.00 0 0 0 0
0.25 0.084 8.4 0 0.008
0.50 0.242 24.2 0 0.024
1.00 0.558 55.8 0 0.056
2.00 0.731 73.1 0 0.073
4.00 0.973 97.3 0 0.097
2.00 1.489 148.9 0 0.149
0.25 1.351 135.1 0 0.135

Keterangan
Bt = 45.9 gr
D = 4.69 cm
𝐴=¼𝜋𝐷^2
0.250

0.200

0.150
Void Rato (e)

0.100

0.050

0.000
0.00 0.50 1.00 1.50
0.00 0.50 1.00 1.50

Berat Jenis (Gs) = 2.691


Luas Contoh (A) = 17.27
〖𝑐𝑚〗 ^2

Tinggi Tanah Kering,


Ht =
Ht = 0.988 cm
Tinggi Contoh Ho = 1.23 cm H1 = 1.19 cm
𝒆=(𝑯−𝑯𝒕)
Angko Pori /𝑯𝒕 0.245 0.204

Kadar Air (w) 14.20% 15.90%


(𝒘∗𝑮𝒔)/𝒆
Derajat Kejenuhan
155.986% 174.640%

Angka Pori Penurunan Merata Tinggi Contoh Merata


𝑡_90
Δ𝑒=( 𝛥𝐻)/ e = eo - Δe (cm) H-8
𝐻𝑡
6 7 8 9 10
0.000 0.000 0.004 1.226 38.4
0.009 0.236 0.016 1.214 138.624
0.024 0.221 0.040 1.190 86.4
0.056 0.189 0.064 1.166 74.727
0.074 0.171 0.085 1.145 1058.4
0.098 0.147 0.123 1.107 540
0.151 0.094 0.142 1.088 81
0.137 0.108

0.250

0.200

0.150

0.100

0.050

0.000
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00

Void Ratio vs Applied Ratio

Pressure, p (kg/cm²)
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00

Void Ratio vs Applied Ratio

Pressure, p (kg/cm²)
20
18
16
14
12

Void Rato (e)


Koefisien Pemapatan
10
𝐶𝑣=(0.212∗𝐻^2)
90 /𝑡_90 8
6
( 〖𝑐𝑚〗 ^
2/𝑑𝑡𝑘)
11 4
0.00835246875 8.352469 2
0.002313703254848 2.313703 0
0.003712208333333 3.712208 0.00 0.50
0.004292087197399 4.292087
0.000303037414966 0.303037
0.000593953333333
0.003959688888889

0.094 0.094 4 4
0 2 0.147 4

2 2 0.147 0.147
0.094 2 0 4

4.50 5.00
4.50 5.00
20
18
16
14
12
Void Rato (e)

10
8
6
4
2
0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Void Ratio vs Applied Ratio

Pressure, p (kg/cm²)
4.00 4.50 5.00
PEMERIKSAAN PERMABILITY
∆𝜎 Tinggi contoh 𝑀𝑣
(𝑘𝑔/ merata (Hm) ∆𝐻 ∆𝐻/𝐻𝑚 〖 (𝑐𝑚 〗 ^
〖𝑐𝑚〗 ^2) 2/𝑘𝑔)
(cm)
(4) : (1)
1 2 3 4 5

0.25 1.226
0.02610114
0.008 0.006525
0.25 1.214
0.07907743
0.024 0.019769
0.5 1.19
0.09411765
0.056 0.047059
1 1.166
0.06260720
0.073 0.062607
2 1.145 0.097 0.084716 0.04235808

0 1.226 0.008
0.25 1.214 0.024
0.5 1.19 0.056
1 1.166 0.073
2 1.145
𝐾=𝑀𝑣∗𝐶𝑣∗𝛾𝑤
𝐶𝑣 (𝑐𝑚/𝑑𝑒𝑡)
〖 (𝑐𝑚 〗 ^ (5)*(6)* 〖 10 〗 ^(−3)
2/𝑑𝑒𝑡)
6 7

0.008352469
2.18008978792822E-07
0.002313703
1.82961686985173E-07
0.003712208
3.49384282352941E-07
0.004292087
2.68715566895369E-07
0.000303037 1.28360650655022E-08
JUMLAH 1.03190658009181E-06
RATA-RATA 2.06381316018361E-07
`0.009494813
0.002344
0.015909
0.004263
0.001614
1 7
0.00 0.000
0.25 0.245
0.50 0.245
1.00 0.245
2.00 0.245
4.00 0.245
2.00 0.245
0.25 0.245

`0.009494813