PROJECT

AZITO PHASE IV PROJECT


COMBINED CYCLE POWER PLANT EXPANSION PROJECT
(CÔTE D’IVOIRE)

TITTLE

TEST SUR SITE ET PROCEDURES DE MISE EN SERVICE.


SOUS-STATION 225 kV

DOCUMENT NUMBER

AZ-0014-PRO-AEE-0004

REVISION 00
DOCUMENT ISSUED FOR: REVIEW
DATE 11/03/2021

VLT-AEE POWER YEB-AEE POWER JIV-AEE POWER

Issued by: Revised by: Approved by:

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND CAN NOT BE DUPLICATED, MODIFIED OR DISCLOSED TO
THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT IS INTENDED FOR, WITHOUT
THE WRITTEN CONSENT OF COBRA.
AZITO PHASE IV PROJECT Doc. No.
COMBINED CYCLE POWER PLANT EXPANSION PROJECT
(CÔTE D’IVOIRE) AZ-0014-PRO-AEE-0004
11/03/2021
TEST SUR SITE ET PROCEDURES DE MISE EN SERVICE.
SOUS-STATION 225 kV
Rev: 00

Summary of Revisions

Revision Date Changes Description


00 11/03/2021 ISSUED FOR INFORMATION & REVIEW
AZITO PHASE IV PROJECT Doc. No.
COMBINED CYCLE POWER PLANT EXPANSION PROJECT
(CÔTE D’IVOIRE) AZ-0014-PRO-AEE-0004
11/03/2021
TEST SUR SITE ET PROCEDURES DE MISE EN SERVICE.
SOUS-STATION 225 kV
Rev: 00

Summary of Content

Revision Date index

Essais des disjoncteurs 225 kV

Essais disjoncteur 225 kV - ATR TRAVEE


Essais disjoncteur 225 kV - COUPLAGE TRAVEE

Essais des sectionneurs 225 kV

Essais sectionneur tripolaire 225 kV - ATR TRAVEE


Essais des sectionneurs unipolaires 225 kV - ATR TRAVEE
Essais des sectionneurs unipolaires 225 kV - COUPLAGE TRAVEE

Essais des transformateur de courant 225 kV

Essais transformateur de courant 225 kV - ATR TRAVEE


Essais transformateur de courant 225 kV - COUPLAGEE TRAVEE

Essais des transformateur de tension 225 kV

Essais transformateur de tension 225 kV - ATR TRAVEE

Essais des paratonerres 225 kV

Essais paratonerres 225 kV - ATR TRAVEE

Essais des cellules MV

MV Primary Switchgear Site test procedure

Intégration dans le système de contrôle existant

1KHF374450 SAT Test Report (RevA)