Vous êtes sur la page 1sur 17

LUAS PENAMPANG TULANGAN BAJA PER METER PANJANG PLAT

Diameter Luas Penampang (mm2)


Batang Jarak Spasi p.k.p (mm)
(mm) 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450
6 565.7 377.1 282.9 226.3 188.6 161.6 141.4 125.7 113.1 102.9 94.3 87.0 80.8 75.4 70.7 66.6 62.9
8 1005.7 670.5 502.9 402.3 335.2 287.3 251.4 223.5 201.1 182.9 167.6 154.7 143.7 134.1 125.7 118.3 111.7
9 1272.9 848.6 636.4 509.1 424.3 363.7 318.2 282.9 254.6 231.4 212.1 195.8 181.8 169.7 159.1 149.7 141.4
10 1571.4 1047.6 785.7 628.6 523.8 449.0 392.9 349.2 314.3 285.7 261.9 241.8 224.5 209.5 196.4 184.9 174.6
12 2262.9 1508.6 1131.4 905.1 754.3 646.5 565.7 502.9 452.6 411.4 377.1 348.1 323.3 301.7 282.9 266.2 251.4
13 2655.7 1770.5 1327.9 1062.3 885.2 758.8 663.9 590.2 531.1 482.9 442.6 408.6 379.4 354.1 332.0 312.4 295.1
14 3080.0 2053.3 1540.0 1232.0 1026.7 880.0 770.0 684.4 616.0 560.0 513.3 473.8 440.0 410.7 385.0 362.4 342.2
16 4022.9 2681.9 2011.4 1609.1 1341.0 1149.4 1005.7 894.0 804.6 731.4 670.5 618.9 574.7 536.4 502.9 473.3 447.0
18 5091.4 3394.3 2545.7 2036.6 1697.1 1454.7 1272.9 1131.4 1018.3 925.7 848.6 783.3 727.3 678.9 636.4 599.0 565.7
19 5672.9 3781.9 2836.4 2269.1 1891.0 1620.8 1418.2 1260.6 1134.6 1031.4 945.5 872.7 810.4 756.4 709.1 667.4 630.3
20 6285.7 4190.5 3142.9 2514.3 2095.2 1795.9 1571.4 1396.8 1257.1 1142.9 1047.6 967.0 898.0 838.1 785.7 739.5 698.4
22 5070.5 3802.9 3042.3 2535.2 2173.1 1901.4 1690.2 1521.1 1382.9 1267.6 1170.1 1086.5 1014.1 950.7 894.8 845.1
25 6547.6 4910.7 3928.6 3273.8 2806.1 2455.4 2182.5 1964.3 1785.7 1636.9 1511.0 1403.1 1309.5 1227.7 1155.5 1091.3
28 8213.3 6160.0 4928.0 4106.7 3520.0 3080.0 2737.8 2464.0 2240.0 2053.3 1895.4 1760.0 1642.7 1540.0 1449.4 1368.9
29 6607.9 5286.3 4405.2 3775.9 3303.9 2936.8 2643.1 2402.9 2202.6 2033.2 1888.0 1762.1 1652.0 1554.8 1468.4
32 8045.7 6436.6 5363.8 4597.6 4022.9 3575.9 3218.3 2925.7 2681.9 2475.6 2298.8 2145.5 2011.4 1893.1 1787.9
36 8146.3 6788.6 5818.8 5091.4 4525.7 4073.1 3702.9 3394.3 3133.2 2909.4 2715.4 2545.7 2396.0 2262.9
40 8381.0 7183.7 6285.7 5587.3 5028.6 4571.4 4190.5 3868.1 3591.8 3352.4 3142.9 2958.0 2793.7
50 8730.2 7857.1 7142.9 6547.6 6044.0 5612.2 5238.1 4910.7 4621.8 4365.1
LUAS PENAMPANG TULANGAN BAJA

Diameter Luas Penampang (mm2)


Batang Jumlah Batang
(mm) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
6 28.3 56.6 84.9 113.1 141.4 169.7 198.0 226.3 254.6 282.9 311.1 339.4 367.7 396.0 424.3 452.6 480.9
8 50.3 100.6 150.9 201.1 251.4 301.7 352.0 402.3 452.6 502.9 553.1 603.4 653.7 704.0 754.3 804.6 854.9
9 63.6 127.3 190.9 254.6 318.2 381.9 445.5 509.1 572.8 636.4 700.1 763.7 827.4 891.0 954.6 1018.3 1081.9
10 78.6 157.1 235.7 314.3 392.9 471.4 550.0 628.6 707.1 785.7 864.3 942.9 1021.4 1100.0 1178.6 1257.1 1335.7
12 113.1 226.3 339.4 452.6 565.7 678.9 792.0 905.1 1018.3 1131.4 1244.6 1357.7 1470.9 1584.0 1697.1 1810.3 1923.4
13 132.8 265.6 398.4 531.1 663.9 796.7 929.5 1062.3 1195.1 1327.9 1460.6 1593.4 1726.2 1859.0 1991.8 2124.6 2257.4
14 154.0 308.0 462.0 616.0 770.0 924.0 1078.0 1232.0 1386.0 1540.0 1694.0 1848.0 2002.0 2156.0 2310.0 2464.0 2618.0
16 201.1 402.3 603.4 804.6 1005.7 1206.9 1408.0 1609.1 1810.3 2011.4 2212.6 2413.7 2614.9 2816.0 3017.1 3218.3 3419.4
18 254.6 509.1 763.7 1018.3 1272.9 1527.4 1782.0 2036.6 2291.1 2545.7 2800.3 3054.9 3309.4 3564.0 3818.6 4073.1 4327.7
19 283.6 567.3 850.9 1134.6 1418.2 1701.9 1985.5 2269.1 2552.8 2836.4 3120.1 3403.7 3687.4 3971.0 4254.6 4538.3 4821.9
20 314.3 628.6 942.9 1257.1 1571.4 1885.7 2200.0 2514.3 2828.6 3142.9 3457.1 3771.4 4085.7 4400.0 4714.3 5028.6 5342.9
22 380.3 760.6 1140.9 1521.1 1901.4 2281.7 2662.0 3042.3 3422.6 3802.9 4183.1 4563.4 4943.7 5324.0 5704.3 6084.6 6464.9
25 491.1 982.1 1473.2 1964.3 2455.4 2946.4 3437.5 3928.6 4419.6 4910.7 5401.8 5892.9 6383.9 6875.0 7366.1 7857.1 8348.2
28 616.0 1232.0 1848.0 2464.0 3080.0 3696.0 4312.0 4928.0 5544.0 6160.0 6776.0 7392.0 8008.0 8624.0 9240.0 9856.0 10472.0
29 660.8 1321.6 1982.4 2643.1 3303.9 3964.7 4625.5 5286.3 5947.1 6607.9 7268.6 7929.4 8590.2 9251.0 9911.8 10572.6 11233.4
32 804.6 1609.1 2413.7 3218.3 4022.9 4827.4 5632.0 6436.6 7241.1 8045.7 8850.3 9654.9 10459.4 11264.0 12068.6 12873.1 13677.7
36 1018.3 2036.6 3054.9 4073.1 5091.4 6109.7 7128.0 8146.3 9164.6 10182.9 11201.1 12219.4 13237.7 14256.0 15274.3 16292.6 17310.9
40 1257.1 2514.3 3771.4 5028.6 6285.7 7542.9 8800.0 10057.1 11314.3 12571.4 13828.6 15085.7 16342.9 17600.0 18857.1 20114.3 21371.4
50 1964.3 3928.6 5892.9 7857.1 9821.4 11785.7 13750.0 15714.3 17678.6 19642.9 21607.1 23571.4 25535.7 27500.0 29464.3 31428.6 33392.9

TULANGAN YANG ADA DIPASARAN :


= TULANGAN POLOS
= TULANGAN DEFORM
= TULANGAN POLOS DAN DEFORM
TULANGAN BAJA PER METER PANJANG PLAT

Luas Penampang (mm2)


Jarak Spasi p.k.p (mm)
475 500 525 550
59.5 56.6 53.9 51.4
105.9 100.6 95.8 91.4
134.0 127.3 121.2 115.7
165.4 157.1 149.7 142.9
238.2 226.3 215.5 205.7
279.5 265.6 252.9 241.4
324.2 308.0 293.3 280.0
423.5 402.3 383.1 365.7
535.9 509.1 484.9 462.9
597.1 567.3 540.3 515.7
661.7 628.6 598.6 571.4
800.6 760.6 724.4 691.4
1033.8 982.1 935.4 892.9
1296.8 1232.0 1173.3 1120.0
1391.1 1321.6 1258.6 1201.4
1693.8 1609.1 1532.5 1462.9
2143.8 2036.6 1939.6 1851.4
2646.6 2514.3 2394.6 2285.7
4135.3 3928.6 3741.5 3571.4
PENAMPANG TULANGAN BAJA

Luas Penampang (mm2)


Jumlah Batang
18 19 20 21
509.1 537.4 565.7 594.0
905.1 955.4 1005.7 1056.0
1145.6 1209.2 1272.9 1336.5
1414.3 1492.9 1571.4 1650.0
2036.6 2149.7 2262.9 2376.0
2390.1 2522.9 2655.7 2788.5
2772.0 2926.0 3080.0 3234.0
3620.6 3821.7 4022.9 4224.0
4582.3 4836.9 5091.4 5346.0
5105.6 5389.2 5672.9 5956.5
5657.1 5971.4 6285.7 6600.0
6845.1 7225.4 7605.7 7986.0
8839.3 9330.4 9821.4 10312.5
11088.0 11704.0 12320.0 12936.0
11894.1 12554.9 13215.7 13876.5
14482.3 15286.9 16091.4 16896.0
18329.1 19347.4 20365.7 21384.0
22628.6 23885.7 25142.9 26400.0
35357.1 37321.4 39285.7 41250.0
PERHITUNGAN PONDASI PC1

PONDASI TIANG PANCANG

DATA
sisi pile = 20 cm
panjang = 600 cm
Luas Penampang A = 400 cm2

DAYA DUKUNG TIANG PANCANG

Qu 400 65 80 1050
+ = 25467 kg
3 5

p = 25.4667 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 145260 kg = 145.26 ton (JOINT 112)
Renc. Jumlah pancang = 145.26
PC 3 25.4666667
= 5.7039267 buah >> 4 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.30 m
panjang Pile Cap : = 1000.00 cm
lebar Pile Cap : = 960.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 145260 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.2405 m
● b0 = 2.000962 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 145260 kg
● Luas bidang geser pons ,Ap = 0.5382 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ß𝑐 ቁ = 1096056.5876479 N = 1096.057
6
● Tegangan geser pons yang diisyaratkan = 1096.06 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 442.455 kN
● Syarat
Ө. Vnp > Puk
442.46 > 1452.6 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
Pu = 145260.00 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 1,65 x 1,65 x 0,6 x 2400 = 138240.00 kg
Pu total = 283500.00 kg

= 708750 kgm
Mu 7087500000
Mn = = = 8859375000 N-mm
Φ 0.8
Mn 8859375000
Rn = = = 15.3169722
b*d2 578402500
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 677.4 )
22.11 390
= Err:502
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.023297397047397
ρmin = 0.00359 < ρ = Err:502 < ρmax = 0.02330
Digunakan ρ = Err:502 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = Err:502 * 10000 * 240.5
= Err:502 mm2 Err:502
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 19 369.94
813.868
Err:502
= Err:502 >>>>> 14.00 buah
283.385

### - 100 - 38
=
13.00
= 758.62 >>>> 100 mm

Luasan tulangan terpakai = 28338.50 mm2

Dipasang tulangan utama : D19-100 (2 lapis) pada arah x maupun y

PERHITUNGAN PONDASI PC2

PONDASI TIANG PANCANG

DATA
sisi pile = 30 cm
panjang = 1600 cm
Luas Penampang A = 900 cm2

DAYA DUKUNG TIANG PANCANG

Qu 900 65 120 1050


+ = 44700 kg
3 5

p = 44.7 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 124420 kg = 124.42 ton (JOINT 112)
Renc. Jumlah pancang = 124.42
PC 3 44.7
= 2.78344519 buah >> 3 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.60 m
panjang Pile Cap : = 165.00 cm
lebar Pile Cap : = 165.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 124420 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.5405 m
● b0 = 2.002162 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 124420 kg
● Luas bidang geser pons ,Ap = 1.2096 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ቁ = 2464756.1991072 N = 2464.756
ß𝑐 6
● Tegangan geser pons yang diisyaratkan = 2464.76 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 2236.099 kN
● Syarat
Ө. Vnp > Puk
2236.10 > 1244.2 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
Pu = 124420.00 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 1,65 x 1,65 x 0,6 x 2400 = 3920.40 kg
Pu total = 128340.40 kg

= 52940.415 kgm

Mu 529404150
Mn = = = 661755188 N-mm
Φ 0.8
Mn 661755188
Rn = = = 1.3728466
b*d2 482031413
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 60.7 )
22.11 390
= 0.00367
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.023297397047397
ρmin = 0.00359 < ρ = 0.00367 < ρmax = 0.02330
Digunakan ρ = 0.00367 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = 0.00367 * 1650 * 540.5
= 3272.06 mm2 11.546334
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 19 369.94
813.868
3272.06
= 11.55 >>>>> 12.00 buah
283.385

1650.00 - 100 - 38
=
11.00
= 137.45 >>>> 100 mm

Luasan tulangan terpakai = 4675.85 mm2

Dipasang tulangan utama : D19-100 (2 lapis) pada arah x maupun y

PERHITUNGAN PONDASI PC3

PONDASI TIANG PANCANG

DATA
sisi pile = 30 cm
panjang = 1600 cm
Luas Penampang A = 900 cm2

DAYA DUKUNG TIANG PANCANG

Qu 900 65 120 1050


+ = 44700 kg
3 5
p = 44.7 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 90980 kg = 90.98 ton (JOINT 112)
Renc. Jumlah pancang = 90.98
PC 3 44.7
= 2.03534676 buah >> 2 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.60 m
panjang Pile Cap : = 165.00 cm
lebar Pile Cap : = 90.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 90980 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.5405 m
● b0 = 2.002162 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 90980 kg
● Luas bidang geser pons ,Ap = 1.2096 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ß𝑐 ቁ = 2464756.1991072 N = 2464.756
6
● Tegangan geser pons yang diisyaratkan = 2464.76 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 2236.099 kN
● Syarat
Ө. Vnp > Puk
2236.10 > 909.8 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
Pu = 90980.00 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 1,65 x 0,9 x 0,6 x 2400 = 2138.40 kg
Pu total = 93118.40 kg

= 38411.34 kgm

Mu 384113400
Mn = = = 480141750 N-mm
Φ 0.8
Mn 480141750
Rn = = = 0.9960798
b*d2 482031413
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 44.1 )
22.11 390
= 0.00263
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.023297397047397
ρmin = 0.00359 < ρ = 0.00263 < ρmax = 0.02330
Digunakan ρ = 0.00263 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = 0.00359 * 1650 * 540.5
= 3201.42 mm2
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 19

3201.42
= 11.30 >>>>> 12.00 buah
283.385

1650.00 - 100 - 38
=
11.00
= 137.45 >>>> 100 mm
Luasan tulangan terpakai = 4675.85 mm2
Dipasang tulangan utama : D19-100 (2 lapis) pada arah x maupun y

PERHITUNGAN PONDASI PC4

PONDASI TIANG PANCANG

DATA
sisi pile = 30 cm
panjang = 1600 cm
Luas Penampang A = 900 cm2

DAYA DUKUNG TIANG PANCANG


Qu 900 65 120 1050
+ = 44700 kg
3 5
p = 44.7 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 46760 kg = 46.76 ton (JOINT 112)
Renc. Jumlah pancang = 46.76
PC 3 44.7
= 1.04608501 buah >> 1 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.60 m
panjang Pile Cap : = 90.00 cm
lebar Pile Cap : = 90.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 46760 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.5405 m
● b0 = 2.002162 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 46760 kg
● Luas bidang geser pons ,Ap = 1.2096 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ቁ = 2464756.1991072 N = 2464.756
ß𝑐 6
● Tegangan geser pons yang diisyaratkan = 2464.76 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 2236.099 kN
● Syarat
Ө. Vnp > Puk
2236.10 > 467.6 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
Pu = 46760.00 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 1,65 x 0,9 x 0,6 x 2400 = 1166.40 kg
Pu total = 47926.40 kg

= 10783.44 kgm

Mu 107834400
Mn = = = 134793000 N-mm
Φ 0.8
Mn 134793000
Rn = = = 0.5126647
b*d2 262926225
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 22.7 )
22.11 390
= 0.00133
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.023297397047397
ρmin = 0.00359 < ρ = 0.00133 < ρmax = 0.02330
Digunakan ρ = 0.00359 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = 0.00359 * 900 * 540.5
= 1746.23 mm2 6.1620438
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 19 369.94
813.868
1746.23
= 6.16 >>>>> 7.00 buah
283.385

900.00 - 100 - 38
=
6.00
= 127.00 >>>> 100 mm

Luasan tulangan terpakai = 2550.47 mm2

Dipasang tulangan utama : D19-100 (2 lapis) pada arah x maupun y

PERHITUNGAN PONDASI FP1

Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 7092.79 kg = 7.09 ton (JOINT 112)
Mu = 553.42 kgm =
PERHITUNGAN PELAT SETEMPAT :
Tebal Pile Cap : = 0.40 m
panjang Pile Cap : = 270.00 cm
lebar Pile Cap : = 150.00 cm
Selimut beton = 50 mm
b kolom = 300 mm
h kolom = 600 mm
Sudut geser tanah = 5
nilai kohesi (c) = 0.9 ton/m2
Berat volume tanah = 1.46 ton/m3

PEMBEBANAN PONDASI (q) :


● Berat sendiri pondasi
0.40 x 2400 = 960 kg/m
● Berat tanah diatas pondasi
0.40 x 2100 = 840 kg/m
Berat total = 1800 kg/m
PEMBEBANAN PONDASI (P) :
● Berat padestal
0.30 x 0.6 x 0.5 x 2400 = 216 kg
DAYA DUKUNG IJIN PONDASI TELAPAK SETEMPAT (TERZAGHI FORMULA)

q ult = c.Nc.(1+0,3B/L)+Df.γ.Nq+0,5.B.Ny.(1-0,2B/L)

Berdasarkan terzaghi bearing modified factor untuk harga sudut tanah = 5

Nc = 6.7
Nq = 1.4
Ny = 0.2
q ult = 0.9 x 6.7 ( 2.215 ) + 0.9 x 1.46 x 1.4 +

=
0.5
15.22455
x
ton/m2
1.5 x 0.2 ( 0.19 )
KONTROL TERHADAP TEGANGAN IJIN TANAH

P tot = 7308.79 kg

7092.79 553.42
σmax = + + 1800
4.05 0.167 6.075
= 4097.894 kg/m2 = 4.10 ton/m2 < 5.07 ton/m2

CEK TERHADAP GESER PONS


Hasil output SAP
Pu1 = 7092.79 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.342 m
● b0 = 1.801368 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 1.56 m
● Lebar bidan geser pons arah y : By = 2.76 m
● Gaya geser pons akibat beban terfaktor pada kolom = 7092.79 kg
● Luas bidang geser pons ,Ap = 2.9521 m2
● Lebar bidang geser pons , bp = 8.632 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 0.5649
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ቁ = 2123654.9383413 N = 2123.655
ß𝑐 6
● Tegangan geser pons yang diisyaratkan = 2123.65 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 4702.001 kN
● Syarat
Ө. Vnp > Puk
4702.00 > 70.9279 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
W pile cap = 1,2 x 2,6 x 0,4 x 2400 = 3888.00 kg
qu = 174.96 kgm

Mu = 728.38 kgm
Mu 7283800
Mn = = = 9104750 N-mm
Φ 0.8
Mn 9104750
Rn = = = 0.0288305
b*d2 315802800
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 1.3 )
22.11 390
= 0.00007
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.023297397047397
ρmin = 0.00359 < ρ = 0.00007 < ρmax = 0.02330
Digunakan ρ = 0.00359 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = 0.00359 * 1200 * 342
= 1473.23 mm2 7.3309652
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 16 369.94
813.868
1473.23
= 7.33 >>>>> 8.00 buah
200.96

1200.00 - 100 - 32
=
7.00
= 152.57 >>>> 150 mm

Luasan tulangan terpakai = 1607.68 mm2


Dipasang tulangan utama : D16-150 (2 lapis) pada arah x maupun y
PERHITUNGAN PONDASI P1

PONDASI TIANG PANCANG

DATA
diameter = 40 cm
panjang = 1200 cm
Luas Penampang A = 1256 cm2

DAYA DUKUNG TIANG PANCANG

Qu 1256 65 125.6 1050


+ = 53589 kg
3 5

p = 53.589 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 205990 kg = 205.99 ton (JOINT 112)
Renc. Jumlah pancang = 205.99
PC 3 53.5893333
= 3.84386196 buah >> 4 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.60 m
panjang Pile Cap : = 220.00 cm
lebar Pile Cap : = 220.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 205990 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.5405 m
● b0 = 2.002162 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 205990 kg
● Luas bidang geser pons ,Ap = 1.2096 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil dari persamaan berikut
2 ඥ𝑓′𝑐
▪ Vc = ቀ1 + ß𝑐 ቁ = 2464756.1991072 N = 2464.756
6
● Tegangan geser pons yang diisyaratkan = 2464.76 KN
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp = 2236.099 kN
● Syarat
Ө. Vnp > Puk
2236.0989179489 > 2059.9 Ok
PERHITUNGAN TULANGAN PILE CAP
Beban maksimum yang diterima :
Pu = 205990.00 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 2,2 x 2,2 x 0,6 x 2400 = 6969.60 kg
Pu total = 212959.60 kg

= 117127.78 kgm
Mu 1171277800
Mn = = = 1464097250 N-mm
Φ 0.8
Mn 1464097250
Rn = = = 2.2780112
b*d2 642708550
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 100.7 )
22.11 390
= 0.00628
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.0232973970474
ρmin = 0.00359 < ρ = 0.00628 < ρmax = 0.02330
Digunakan ρ = 0.00628 untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang dibutuhkan :
As = ρ.b.d = 0.00628 * 1000 * 540.5
= 3392.51 mm2 8.9290685
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 22 369.94
813.868
3392.51
= 8.93 >>>>> 9.00 buah
379.94

1000.00 - 100 - 44
=
8.00
= 107.00 >>>> 100 mm

Luasan tulangan terpakai = 3799.40 mm2

Dipasang tulangan utama : D22-100 (2 lapis) pada arah x maupun y

PERHITUNGAN PONDASI P2

PONDASI TIANG PANCANG

DATA
diameter = 40 cm
panjang = 1200 cm
Luas Penampang A = 1256 cm2

DAYA DUKUNG TIANG PANCANG

Qu 1256 65 125.6 1050


+ = 53589 kg
3 5
p = 53.589 ton
Dari hasil perhitungan SAP 2000 v14.0.0 diperoleh hasil hitungan yaitu :
Pu = 95495.36 kg = 95.50 ton (JOINT 112)
Renc. Jumlah pancang = 95.50
PC 3 53.5893333
= 1.78198447 buah >> 2 buah
PERHITUNGAN PILE CAP :
Tebal Pile Cap : = 0.60 m
panjang Pile Cap : = 220.00 cm
lebar Pile Cap : = 120.00 cm
Selimut beton = 50 mm
b kolom = 500 mm
h kolom = 500 mm

CEK TERHADAP GESER PONS


Hasil output SAP
Pu = 95495.36 kg
● Tebal efektif pile cap = d = h-sb-1/2TU = 0.5405 m
● b0 = 2.002162 m
● Jarak pusat tulangan terhadap sisi luar beton : d = 0.06 m
● Lebar bidang geser pons arah x : Bx = 0.56 m
● Lebar bidan geser pons arah y : By = 0.56 m
● Gaya geser pons akibat beban terfaktor pada kolom = 95495.36 kg
● Luas bidang geser pons ,Ap = 1.2096 m2
● Lebar bidang geser pons , bp = 2.238 m
Rasio sisi panjang terhadap sisi pendek kolom ßc = 1
● Tegangan geser pons diambil terkecil dari persamaan berikut
2 ඥ𝑓′ 𝑐
▪ Vc = ቀ1 + ß𝑐 ቁ = 2.4647561991072 Mpa
6
● Tegangan geser pons yang diisyaratkan = 2.46476 Mpa
● Faktor reduksi kekuatan geser ponds = 0.75
● Kuat geser pons = Ө. Ap.fp.10³ = 2236.098917949 kN
● Syarat
Ө. Vnp > Puk
2236.0989179489 > 954.9536 Ok

PERHITUNGAN TULANGAN PILE CAP

Beban maksimum yang diterima :


Pu = 95495.36 kg
W padestal = 0,5 x 0,5 x 1,9 x 2400 = 0.00 kg
W pile cap = 2,2 x 1,2 x 0,6 x 2400 = 3801.60 kg
Pu total = 99296.96 kg

= 54613.328 kgm

Mu 546133280
Mn = = = 682666600 N-mm
Φ 0.8
Mn 682666600
Rn = = = 1.0621713
b*d2 642708550
fy 390
m = = = 22.11
0.85f'c 17.64
ρ = 1 x (1-√1- 2.m.Rn)
m fy
= 1 x ( 1 - √ 1 - 47.0 )
22.11 390
= 0.00281
Cek rasio penulangan :
ρmin = 1.4 = 0.003590
fy
ρmax = 0.85f'c * β1 * 600
fy 600+fy
= 0.045 * 0.85 * 0.61
= 0.0232973970474
ρmin = 0.00359 < ρ = 0.00281 < ρmax = 0.02330
Digunakan ρ = 0.00359 untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang dibutuhkan :


As = ρ.b.d = 0.00359 * 2200 * 540.5
= 4268.56 mm2
Berdasarkan tabel luas penampang tulangan baja, dipakai tulangan ; D 19

4268.56
= 15.06 >>>>> 16.00 buah
283.385

2200.00 - 100 - 38
=
15.00
= 137.47 >>>> 100 mm

Luasan tulangan terpakai = 6234.47 mm2

Dipasang tulangan utama : D19-100 (2 lapis) pada arah x maupun y

Vous aimerez peut-être aussi