PLAN DE SITUATION
P.N.
P.N.
A
B C
1 19750 1
N 2211 7664 7664 2211
N
5200 4675 4675 5200
675 2000 2000 2000 2000 675
500
P-103 P-086 P-074 P-056 P-039 P-070 350.000000 313.746000
PIEAU COORDENÉE X COORDENÉE Y
P-071 350.000000 317.671000
675 1000 1000 1000 1000 1000 1000 1000 1000 P-001 359.000000 305.246000 CHAUDIÈRE DE
1400
P-072 350.000000 322.996000 RECUPERATION
P-094 P-077 P-065 P-048 P-002 359.000000 309.946000
P-073 350.000000 325.796000 ET CHEMINÉE
4700
P-003 359.200000 311.846000
1400
P-074 350.000000 328.596000
P-102 P-085 P-073 P-055 P-038 P-004 359.200000 313.746000
P-075 349.000000 321.596000
P-005 359.200000 315.746000
P-076 349.000000 324.396000
1400
8125
P-006 359.200000 317.671000
P- 093 P- 076 P- 064 P-047 P-077 349.000000 327.196000
℄ CHEMINÉE P-007 359.200000 319.596000
2 8 ℄ STACK P-078 348.850000 299.246000 2
E=350,000
1400
N=324,396
P-008 358.050000 303.246000
P-079 348.850000 303.246000
P-101 P-084 P-072 P-054 P-037
P-009 358.050000 307.596000
P-080 348.850000 307.596000
P-010 358.050000 310.896000
P-081 348.850000 311.846000
P-092 P-075 P-063 P-046 P-011 358.050000 312.796000
3425
1400
P-083 348.850000 319.596000
4800
625
P-013 358.050000 316.708500
P-084 348.000000 322.996000
P-014 358.050000 318.633500
P-085 348.000000 325.796000
7 P-015 356.900000 301.246000
P-086 348.000000 328.596000
P-016 356.900000 305.246000
1375
1375
P-087 347.700000 301.246000
P-13 9 P-125 P-100 P-083 P-062 P-045 P-022 P-007 P-017 356.900000 309.946000
P-088 347.700000 305.246000
P-018 356.900000 311.846000
P-089 347.700000 309.946000
963
963
P-132 P-117 P-030 P-014
P-019 356.900000 313.746000
1925
P-090 347.700000 313.746000
P-020 356.900000 315.746000
963
963
P-138 P-124 P-109 P-091 P-071 P-053 P-036 P-021 P-006 P-091 347.700000 317.671000
3850
963
3 P-131 P-116 P-029 P-013 P-022 356.900000 319.596000 3
1925
P-093 347.000000 324.396000
P-023 355.750000 299.246000
NOTES GÉNÉRALES / GENERAL NOTES
1000 963
1000 963
P-137 P-123 P-099 P-082 P-061 P-044 P-020 P-005 P-094 347.000000 327.196000
6 P-024 355.750000 303.246000
P-095 346.550000 299.246000 1. LES COORDONNÉES LOCALES DU PROJET E=0,00m ET N=0,00m, CORRESPONDENT AUX COORDONNÉES
P-130 P-115 P-028 P-012 P-025 355.750000 307.596000
P-096 346.550000 303.246000 EN SYSTÈME DE RÉFÉRENCE LAMBERT X=-34.166,4341m ET Y=88.892,2053m.
2000
P-026 355.750000 310.896000 2. TOUTES LES DIMENSIONS SONT INDIQUÉES EN mm, SAUF INDICATION CONTRAIRE.
950 1000
950 1000
P-097 346.550000 307.596000
3100
P-136 P-122 P-108 P-090 P-070 P-052 P-035 P-019 P-004 P-027 355.750000 312.796000 3. TOUTES LES ÉLÉVATIONS SONT INDIQUÉES EN m, SAUF INDICATION CONTRAIRE.
P-098 346.550000 311.846000
4. L'ÉLÉVATION DU PROJET ±0,00m CORRESPOND À L'ÉLÉVATION +2,20m SUR LE NIVEAU DE LA MER.
31825
1900
P-029 355.750000 316.708500
5 P-100 346.550000 319.596000 ANTI-HORAIRE.
17300
950
950
P-135 P-121 P-098 P-081 P-060 P-043 P-18 P-003 P-030 355.750000 318.633500
P-101 346.000000 322.996000 1. THE PROJECT LOCAL COORDINATES E=0,00m AND N=0,00m, ARE IN CORRESPONDANCE WITH LAMBERT
P-031 354.600000 297.946000
2700
950
950
P-128 P-113 P-026 P-010 P-102 346.000000 325.796000 REFERENCE SYSTEM COORDINATES X=-34.166,429m AND Y=88.892,2053m.
1900
P-032 354.600000 301.246000 2. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE INDICATED.
P-103 346.000000 328.596000 3. ALL ELEVATIONS ARE IN m, UNLESS OTHERWISE INDICATED.
P-13 4 P -120 P-1 07 P -08 9 P- 069 P-05 1 P -034 P-002 P-033 354.600000 305.246000
P-104 345.400000 297.946000 4. THE PROJECT ELEVATION ±0,00m CORRESPONDS TO ELEVATION +2,20m ABOVE MEAN SEA LEVEL 4
4 4 P-017
P-034 354.600000 309.946000
P-105 345.400000 301.246000 5. THE PROJECT NORTH FORMS AN ANGLE OF 122º7'24" WITH THE GEOGRAPHIC NORTH
P-035 354.600000 313.746000 COUNTERCLOCKWISE.
2350
675 P-106 345.400000 305.246000
1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 675
P-036 354.600000 317.671000
P-107 345.400000 309.946000 NOTES PARTICULIERS / PARTICULAR NOTES
P-127 P-112 P-097 P-080 P-059 P-042 P-025 P-009 P-037 354.000000 322.996000
4700
2350
P-110 344.250000 299.246000
P-040 353.450000 299.246000 H.D.A.: HAUT DU ACIER / TOP OF STEEL
P-111 344.250000 303.246000 1.- 100% DE L'ESSAI D'INTÉGRITÉ DOIRT ÊTRE EFFECTUÉ POUR LES ÉQUIPEMENTS PRINCIPAUX DES PIEUX
P-133 P-119 P-106 P-088 P-068 P-050 P-033 P-016 P-001 P-041 353.450000 303.246000
P-112 344.250000 307.596000 TELS QUE LA HRSG-TG-TV ET ¼ DES PIEUX DU TOTAL DES PIEUX RESTANTS.
3 P-042 353.450000 307.596000
P-113 344.250000 310.896000 2.- LES TOLÉRANCES D'IMPLANTATION SUIVANTS SERONT PRÉVUS SELON LA NORME NF EN 12699:
1575
TOLÉRANCE D'EMPLACEMENT : 0,1M : OK
2000
P-043 353.450000 311.846000
P-114 344.250000 312.796000
INCLINATION : 0,04 M / M = 4 % EST UNE VALEUR ÉLEVÉE.
3000
675
1300
H.D.B.
B.D.B. 0A 07/05/2018 JJO PCC DSP POUR CONSTRUCTION
- - - - - -
- - - - - -
100
0A
- - - - - -
DESCRIPTION DE LA RÉVISION:
0A POUR CONSTRUCTION
REMPLACE: ÉCHELLE: NUMÉROTATION:
1060
2000